Introduction
Platform B was launched July 16, 1969, in the
Bay Marchand Block 2 field. The 12-pile structure
was located in 55 ft of water, 7 miles offshore and
65 miles south of New Orleans. It was designed for
36 wells, which were to be drilled by two independently operated, full-sized drilling rigs.
The first well on the platform was started Sept.
15, 1969. By Dec. 1, 1970, the two rigs, Storrndrill
20 and Sformdrill 21, had drilled and completed 22
wells. Of those wells, 21 were dual completions and
one was a single completion. Daily production was
17,500 bbl of oil and 40 MMcf of gas. Two additional wells were in the process of being drilled. (Hg,
Now with Shell Development
MARCH, 1972
Co. in Houston.
T
4
,.,
. .
1
.I
I
. ..
:.
-.
-.
,-.
*,
----
?26
-e..-,
. ..
.-
-.
-.
._
.+ --*
. ..
.
-.,-.
c
*-
?-
.-
. ----
= .-----+.
---e.
--
Fig.2Platform
MAN~CH, 1972
B on fire.
227
5=
EEE1------ ~
PUBLIC RELATIONS
P.R. MGR. k STF.
--..-.~
K:LILt
SERVICES
b-,tL
r-l
ON. DRILL, SUPT.
2 ORILL ENGRS.
. ... .
. ..-.
SR. PURCH.
Marehand
Emergeney
In addition, two jack-up workover rigs, the OtTshore Co.s Hustler, and the Walker-Huthnance
Smackover, were obtained for the kill operations.
Bullards relief-well drilling group was compact
-.-m VOU.I..Q
- -.&+.arEOf RVw
m fl+ling
nis sum
(F@. 4).ANxv.. . . .... ~ng~nee~
aIId IWOengineering assistants, a reservoir engineer,
a directionaldrilling coordinator, and 10 drilling foremen. With the exception of the foremen, all the members of the relief-well drilling team were assigned to
the same office at the Offshore Div. headquarters.
Thus, all necessary decision-making apparatus for the
relief-well drilling was at hand.
22s
LEEVILLE OFFICE
!=l
TRANS. REPRE.
lfLo. ElJUIP. SPEC.
1 ~
TRANS. SPEC.
ma-t-==
Fig. 3-Bay
SUPV
sR. ANALYST
COMM. & TRANS.
Group organization
chart.
MANAGER
OEPUTV
~-------------l
,%
uaLc
EMTONs
P.R. MGR. & SiF.
REGIONAL STF.
t
r
RELIEF WELLS
. .
~i?iLL
-.. ame
LNWES.
2 ENGRS. ASSTS.
1 OIV. DRILL. COORO.
10 DRILL FOREMEN
Fig. 4-Relief.well
organization
chart.
TABLE
R;;;f
RADIUS OBJECTIVE
Blowout
Well
Distance
Between
Wells (ft)
KILL IMi
3
5
6
7
8
9
10
11
12
13
7
B-21
B-10
B-SD
B*3D
B-5D
B-16D
B4D
B-17
B-28
B-15
B-9
13
21
82
57
15
@*
(surf~~e kill)
28
15
18
150
SIICIL FOREMAN
Fig. -Kill
organization
chart.
n.akulnlaal~
x.4,.,-r-,--rk.td
LVAUU
&w*
U.,,-.--
th~
lmrictim ..
ffim m...
kill
..a~nauo
flIA4c
.....
..
Fig. 5-Aerial
MARCH, 1972
SELF ELEVATING
MOBILE PLATFORM
. \-.!
.
MGL
*
-...1
MUDLINE
d-
WATER
nleBl
-.. . ACING
.. .. . .
Fig. 7Kill
procedure
OIL
---
schematic
diagram.
,k.u-
~-..w.-w
pressures up to 10,000 psi. The use of two kill platforms allowed considerable operational flexibility
since separate kill operations could be bandied simultaneously. Being mobile, the platforms could be
positioned within stepping distance of the drilling
rigs. Especially advantageous was the all-weather
capability of the pumping piatform. Uiiiiiie imrgem,~l~~,tedml
offered
around-they-...mnc
r, the ~iatf~~.s
clock operations, regardless of rough seas. It is believed that this use of converted, jack-up rigs for
pumping was an industry first.
IMC assembled 35,000 bbl of 17 lb/gal premixed
mud in barges near Shells emergency staging base on
Bayou Lafourche, below Leeville, La. Mother
boats were secured to the pumping platforms and a
shuttle fleet of 10 mud vessels supplied the mother
boat with enough liquid mud to maintain a constant
pumping rate of 1,500 bbl/hour.
Ten relief wells were drilled to kill 11 producing
wells. One of the relief wells was used to kill two
wells that were close together and, as discussed
earlier, one relief well was unsuccessful. The completed relief wells were fitted with conventional trees
and marine marker beacons and foghorns (Fig. 9).
During the relief-well drilling and kill operations
a simultaneous effort was under way to set up firecontrol procedures. Headed by N. L. Dodge, this
organization consisted of three civil engineers, a staff
production engineer, and two construction inspectors.
Paul Red Adair was hired as a consultant. It is appropriate here to tell about the contribution of Adair
and his men. From the first day of the fire, Shell
thought it was possible to kill the burning wells using
the relief-well approach; as stated earlier, the intensity of the fire left no option. Adair confirmed this
assessment. Until the fire subsided, there was nothing
he could do; explosives and capping were out of the
question.
With the killing of B-21 on Dec. 30, 1970, the
fire was reduced an estimated 40 percent. From that
point on, Shell could have elected to use Adairs
services to kill the rest of the burning wells with
explosives. However, the prospect of oil flowing into
the Gulf from several wells at once was unacceptable,
whereas the relief-well approach appeared confirmed.
A
-I-:..*-
fiumrs
. . ----
-.-..
-.-1
Wise WUIMI
. ...3
wa~
.X,hila
-at,.:,d
IGL=llGU
-.,,Ab
+h
.a.e
-Ii-f
,W,.w.=..
-=...1
~lJ@a~~~
MARCH, 1972
w~iis
~~~
fhe
assi=~.~ent
UIG
GI.LOA
LtJ
~,
us-
---
--------------
--
wall
w..
--
~fi-
.-.
-,. .
-.
Fig. 9-Relief
and
marine
markers.
231
3?!?%IT
Fig. 10-Sand
cutting head.
Fig. 1 lPlatform
Pollution-Control
m. UIm- m.
P-J
m.m91R
m
m. m
swI
m.c41mttNc
u. vat m
I
I
mum.
Mam
M. -M
-,,
b*1
-w
am
am
II
Fig.
232
I
WM.
mwmul
II
-.
--
am
[
mullaI
This modest success, gained with Coast Guard permission and due regard for safety, led to an innovation that proved to be a real asset. An abrasive
cutting technique involving a Shell-designed boom
and delivery system and a Dowelldesigned cutting
head (Fig. 10) was used successfully to cut bent and
looped tubing, which improved visibility and diverted
the hydrocarbon flow away from the water and away
from other nearby wells. Water, nitrogen, and sand
were pumped at a high pressure through the boom
and cutting head, which was forked around the
tubing: The first model was modified to include a
hydraulic ram for fore and aft adjustment and a
swivel-mounted cutting head that allowed a fine degree of lateral adjustment through an arc.
Although the planning for salvaging and restoring
the Bay Marchand facility began much earlier, this
phase of the operation went into action when the final
well, B-4, was extinguished. The tension built up
near mid-April. Ten wells had been killed; but the
eleventh, B-4, despite many attempts, proved recalcitrant. We decided to sidetrack the relief well in an
attempt to get closer to the blowing zone. In the
meantime, the emergency group grew increasingly
concerned about the wells that had already been
killed and wanted to get those wells secured. When
the forecast predicted good weather for several days,
promising ideai oii-recovery coriditkm, the W! fire
was extinguished with a high-pressure stream of
water. With oil skimmers positioned downwind, the
fire-control team set a prefabricated deck onto the
remains of Platform B. Using this work deck, Adair
and his men, assisted by Shells field team, capped
B-4 on April 16, 1971. It was the 136th day of the
emergency.
The fire-control team started on the salvage and
restoration phase while Adairs CEW installed trees
on each of the other wells. Ail welis were then sectired
by pumping heavy mud into each tubing string. By
the ~irne ~1 the wells had been secured, about 95
percent of the junk and debris had been removed
from the platform area. (I%g. 11 shows Platform B
after all the wells had been secured.)
A new platform was fabricated and on Nov. 18,
1971, was set over the remains of the old structure.
It appears that all but two of the wells originally completed on B can be restored to production.
The 14 additional wells that would have been
drilled from Platform B had there not been a fire
are being drilled from a new platform that was set
in Sept., 1971.
*UM
12Pollution-control
*m
2UU
I
r
II
1-
organization.
~s
11
1 mn
Emergency Group
Conclusion
The Bay Marchand emergency was a technical challenge as well as a human tragedy. The challenge could
not have been met without the cooperation and the
immediate response of the offshore industry. The fact
that the challenge was met does not mitigate the
heartbreak of its happening in the first place. Nor
does it mean that any offshore fire that might occur
in the future will necessarily lend itself to the same
approach.
This overview, we feel, demonstrates that good
planning and etlicient organization, in hand with
modem technology, can go a long way toward overcoming a disaster.
Postscript
Of the 22 wells completed prior to the fire, 20 have
been restored to their original surface mechanical
condition. One has been abandoned, and another is
ready for abandonment. Restoration work consisted
of replacing the top few hundred feet of 7-in. and
10% -in. casing, extending the 30-in. conductors, replacing the top & 1,000 ft of tubing, and installing
new wellhead equipment. At least two of these wells
fir% , n~w
.-:11
-------- ~UW,l=
~-.x~ h-le
i. w=..
Icqu,le
,U,W -n
.wYa..
----- ip
. - rt~~press
r -=---Will
on one of them. Subsequent work will consist of
cleaning out mud from the tubing strings of all the
wells and flowing them for production.
Acknowledgment
I wish to express my appreciation to the management
of Shell Oil Co. for permission to publish this paper.
References
. . . ...,
1. M1lkr,
KOOCrt
Enzineerin~
Original
manuscript
received
in Society of Petroleum Engineers
received Jan. 26, 1972.
..-. .
Office Nix+. II, ~~~ 1, Revis~d mmmscri@
Paper (SPE 3492) was prasented
at SPE 46th Annual Fall Meeting. held in New Orleans, Oct. 3-6, 1971. @) Copyright 1972
American Institute of Mining, Metallurgical,
and Petroleum Engineers, Inc.
MARCH,
1972
Ikhg
~.
and ~kni~fik,
(%~iCh,
1972) 234-240.
2. Berry, W. L.: Pollution Control Aspects of the Bay
Marchand Fire; 1. Pet. Tech. (March, 1972) 241-249.
SPT
233