TOTAL LENGTH OF BRIDGE (BACK TO BACK OF BACKWALL) = 60000mm

END OF BRIDGE

BEG. OF BRIDGE

BACK OF BACKWALL

BACK OF BACKWALL

BACK OF BACKWALL

K1526 + 075.00
ELEV = 54.31 m

PIER

K1526 + 105.00

3750

7500

K1526 + 135.00
ELEV = 54.31m

30000

30000

29400
GIRDER LENGTH
7500

29400
GIRDER LENGTH
7500

7500

7500

3750

3750

7500

BACK OF BACKWALL

CL OF

3750

1700
DRAIN

FILL

BE
EL

BE

S=1:1

5
7

4
7
1110
SDWK

:1

3
7

EL

S = 1.5%

7320
CLEAR ROADWAY

S = 1.5%

S = 1.5%

S = 1.5%

7320
CLEAR ROADWAY

+ 100

FILL

:1

S=1:1

1110
SDWK

BE
RM

LE
VE
L

S=1:1

1f

RM
BE

DEFLECTION
JOINT

PARAFFIN 1e
JOINT 23

L
VE
LE

FILL

1110

CL OF BRIDGE

1110

RM

1
S=

:1

RM

1
S=

LE
V

S=1:1

approach slab

V
LE

FILL

1700
DRAIN

=
1
:1

SIDEWALK 1a

+ 100

BH-1
DRAIN
1700
DRAIN

RAILING

2
1700
DRAIN

STRUCTURAL CONCRETE

1c

GABIONS
1.0 X 3.0 X 1.0 m

M/B

TBB

GENERAL PLAN
1:150

TOTAL LENGTH OF BRIDGE (BACK TO BACK OF BACKWALL) = 60000mm


BEG. OF BRIDGE

CL OF

K1526 + 075.00
ELEV = 54.31 m
3
8

2500

2500

29400
GIRDER LENGTH

300

STRUCTURAL CONCRETE

:1

:1

H.O.W.L. ELEV = 51.439 M

STRUCTURAL CONCRETE

:1

S=1:1

S=1:1

30000

5
7

FILL

RAILING

BACK OF BACKWALL

TYPE IV PSCG

:1

ELEV. = 50.539 M
BOT. OF COPING

ELEV. = 49.930 M

EXISTING BOX CULVERT ELEV. = 50.585 M

1700

1700

DRAIN

DRAIN
BH-1
3 LAYER GABIONS
1.0 X 1.0 X 1 0 m

ELEV. = 45.340 M
BOT. OF FTG

2
-

3 LAYER GABIONS
1.0 X 1.0 X 1 0 m

H-PILES
HP 14 X 117
L= 21.00 m.
PCAP = 750 KN

BH-2

H-PILES
HP 14 X 117
L= 21.00 m.
PCAP = 750 KN

ELEV. = 47.540 M
BOT. OF FTG

HYDRAULIC DESIGN DATA :


2. Design Discharge
Q 50 =
cu.m./sec
QMSL =
cu.m./sec
3. Design Velocity =
m./sec.
4. HIghest Observed Water Level,
HOWL = 51.439 m.

GENERAL ELEVATION
SCALE

ELEV. = 52.439 M
BOT. OF GIRDER
ELEV. = 52.139 M
LEVEL BERM
ELEV. =51.040 M
BOT. OF ABUT. WALL

1:150

IVIN S. CUTAB

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
Palao, Iligan City, Lanao del Norte

1c
23

300 300

29400
GIRDER LENGTH

H-PILES
HP 14 X 117
L= 21.00 m.
PCAP = 750 KN

Lanao del Norte 2nd District Engineering Office

ELEV. = 47.540 M
BOT. OF FTG

K1526 + 135.00
ELEV = 54.31m

30000

300

ELEV. = 52.439 M
BOT. OF GIRDER
ELEV. = 52.139 M
LEVEL BERM
ELEV. = 51.040 M
BOT. OF ABUT. WALL

END OF BRIDGE

PIER

K1526 + 105.00

105

BACK OF BACKWALL

FILL

SCALE

M1

1
-

ALONG STA. FELOMINA - BONBONON - DIGKILAAN ROGONGON ROAD, ILIGAN CITY

GENERAL PLAN
and
ELEVATION

ENGINEERING AIDE

MA. LIZA E. POMICPIC

LEONORA C. CLET

ENGINEER II

CHIEF, PLANNING AND DESIGN SECTION

REY PETER B. GILLE, DM


DISTRICT ENGINEER

ARTHUR M. CUPAY

EFREN A. BERBA, CEO VI, CESE

CHIEF, PLANNING AND DESIGN DIVISION

OIC-ASST. REGIONAL DIRECTOR

EVELYN T. BARROSO, PhD


REGIONAL DIRECTOR

CL
CL

1110
SDWK

1110
SDWK

7320
CLEAR ROADWAY
3660
ONE-LANE

1110
SDWK

3660
ONE-LANE

3660
ONE-LANE
250

1c SIDEWALK

50

1% SLOPE

50

1% SLOPE

STRUCTURAL CONCRETE

1.5 SLOPE

ELEV = 54.310 m
FINISHED GRADE

LEVEL
SOFFIT

SLOPING
SOFFIT
TYPE IV GIRDER

TYPE IV-B GIRDER

1% SLOPE

1.5 SLOPE

LEVEL
SOFFIT

SLOPING
SOFFIT

50

50

ELEV = 54.310 m
FINISHED GRADE

1.5 % SLOPE

175
270

1.5 % SLOPE

RAILINGS

200
50

50
900

200

900

RAILINGS

3660
ONE-LANE

250

SIDEWALK 1c

270
175

1110
SDWK

7320
CLEAR ROADWAY

=
1
:1

ELEV. = 52.439 M
BOT. OF GIRDER

2250

2250

ELEV. = 52.439 M
BOT. OF GIRDER

2250

GABIONS
1.0 X 3.0 X 1.0 m

ELEV. = 52.139 M
LEVEL BERM

2250

2250

COPING

2250

5500

=
1
:1

1350

2750

2750

1350
ELEV. = 50.539 M
BOT. OF COPING

1200
DIA

1450
ELEV. = 47.540 M
BOT. OF FTG

1450

1450

1450

1450

1450

1450

9450

H-PILES
HP 14 X 117
L= 21.00 m.
PCAP = 750 KN

ELEV. = 45.34 M
BOT. OF FTG

3 SECTION @ ABUTMENT
6
SCALE

4
6

CL

1:50

SECTION @ PIER
SCALE

1:50

9540
1110
SDWK

7320

1110
SDWK

3660
ONE-LANE

3660
ONE-LANE
250

SIDEWALK 1c

RAILINGS

DRAIN

1.5 % SLOPE

175
270

1.5 % SLOPE

ELEV = 607.000 m
FINISHED GRADE

50

50
900

1% SLOPE

50

200

LEVEL
SOFFIT

SLOPING
SOFFIT
TYPE IV-B GIRDER

5
6

OFFICE OF THE DISTRICT ENGINEER


Palao, Iligan City, Lanao del Norte

SCALE

1:50

IVIN S. CUTAB

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


Lanao del Norte 2nd District Engineering Office

TYPICAL CROSS-SECTION

ALONG STA. FELOMINA - BONBONON - DIGKILAAN ROGONGON ROAD, ILIGAN CITY

SECTION @ ABUTMENT
SECTION @ PIER
TYPICAL CROSS-SECTION

ENGINEERING AIDE

MA. LIZA E. POMICPIC


ENGINEER II

LEONORA C. CLET
CHIEF, PLANNING AND DESIGN SECTION

REY PETER B. GILLE, DM


DISTRICT ENGINEER

ARTHUR M. CUPAY

EFREN A. BERBA, CEO VI, CESE

CHIEF, PLANNING AND DESIGN DIVISION

OIC-ASST. REGIONAL DIRECTOR

EVELYN T. BARROSO, PhD


REGIONAL DIRECTOR

TOTAL LENGTH OF BRIDGE (BACK TO BACK OF BACKWALL) = 60000mm

BEG. OF BRIDGE
BACK OF BACKWALL

CL OF

K1526 + 075.00
ELEV = 54.31 m

END OF BRIDGE
K1526 + 135.00
ELEV = 54.31m

PIER

BACK OF BACKWALL

K1526 + 105.00
30000
300

29400
GIRDER LENGTH

29402
GIRDER LENGTH

300 300
1c
23

300
TYPE IV PSCG

RAILING

:1
1
=
:1

GROUTED RIPRAP

1
:1

ELEV. = 48.539 M

BOT. OF GIRDER ELEV. = 50.239 M

:1

ELEV. = 50.5339 M
BOT. OF COPING

S=1:1

=
EXISTING BOX CULVERT ELEV. = 48.385 M

1700
DRAIN

BH-2

BH-1
1700
DRAIN
ELEV. = 47.540 M
BOT. OF FTG

S=1:1

H.O.W.L. ELEV = 49.239 M

FILL

2500

30000

ELEV. = 45.749 M
BOT. OF FTG

H-PILES
HP 14 X 117
L= 21.00 m.
PCAP = 750 KN

GABIONS
1.0 X 3.0 X 1 0 m

2
-

SCALE

H-PILES
HP 14 X 117
L= 21.00 m.
PCAP = 750 KN

GABIONS
1.0 X 3.0 X 1 0 m

H-PILES
HP 14 X 117
L= 21.00 m.
PCAP = 750 KN

FILL

2500

1:200

TOTAL LENGTH OF BRIDGE (BACK TO BACK OF BACKWALL) = 60000mm


END OF BRIDGE

BEG. OF BRIDGE
BACK OF BACKWALL

CL OF

K1526 + 075.00
ELEV = 52.11 m

BACK OF BACKWALL
PIER

K1526 + 105.00
30000

K1526 + 135.00
ELEV = 52.11m

30000

1700
DRAIN

FILL

S=1:1

RM
BE
L

S = 1.5%
S = 1.5%

7320
CLEAR ROADWAY

S = 1.5%
S = 1.5%

7320
CLEAR ROADWAY

+ 100

FILL

L
VE
LE

:1

S=1:1

RM
BE

S=1:1

1e

RM

BE

FILL

VE

LE

1110
SDWK

1110

CL OF BRIDGE

1110

RM

VE

BE

LE

:1

VE

1
S=

:1

1110
SDWK

S=1:1

1
S=
LE

FILL

1700
DRAIN

=
1
:1
+ 100

BH-1
1700
DRAIN

STRUCTURAL CONCRETE

1700
DRAIN

GABIONS
1.0 X 3.0 X 1.0 m

HYDRAULIC DESIGN DATA :

1
-

ENGINEERING AIDE

OFFICE OF THE DISTRICT ENGINEER


Palao, Iligan City, Lanao del Norte

2. Design Discharge
Q 50 =
cu.m./sec
QMSL =
cu.m./sec
3. Design Velocity =
m./sec.
4. HIghest Observed Water Level, HOWL = 51.239 m.

1:150

IVIN S. CUTAB

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


Lanao del Norte 2nd District Engineering Office

SCALE

ALONG STA. FELOMINA - BONBONON - DIGKILAAN ROGONGON ROAD, ILIGAN CITY

BOREHOLE LOCATION PLAN


SOIL PROFILE

MA. LIZA E. POMICPIC

LEONORA C. CLET

ENGINEER II

CHIEF, PLANNING AND DESIGN SECTION

REY PETER B. GILLE, DM


DISTRICT ENGINEER

ARTHUR M. CUPAY

EFREN A. BERBA, CEO VI, CESE

CHIEF, PLANNING AND DESIGN DIVISION

OIC-ASST. REGIONAL DIRECTOR

EVELYN T. BARROSO, PhD


REGIONAL DIRECTOR

OF PIER

CL

L1 = 30000 mm

BACK OF
BACKWALL

C
L

OF BRIDGE SPAN

L2/2 = 15000 mm

S3

S2
S1

200

200

200
50

50

2250
1295

9340

50

2250

50

Lc
G4

Lc

S10

S12

S9

S13

S8

S14

G1

S9

S13

G7

Lc

S10

S12

G6

Lc

S7

G2

G5

Lc

S8

S14
S7

G8

S6

100

G3

Lc

EDGE OF SLAB

S6

G9

S5

S5

1 FRAMING PLAN
SCALE

1:75

2
CL

L1 = 30000 mm

BACK OF
BACKWALL

OF PIER
OF BRIDGE

L2/2 = 15000

CL OF SPAN

S2

C
L OF SPAN

S4

250

SEE ABUTMENT DETAIL

S3

S1

250

2 LONGITUDINAL SECTION
SCALE

1:75

IVIN S. CUTAB

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


ALONG STA. FELOMINA - BONBONON - DIGKILAAN ROGONGON ROAD, ILIGAN CITY

TYPICAL 2-SPAN PSCG


SUPERSTRUCTURE DETAILS
(14)

PDS

ENGINEERING AIDE

MA. LIZA E. POMICPIC


ENGINEER II

LEONORA C. CLET
ENGINEER II

REY PETER B. GILLE, DM


DISTRICT ENGINEER

ARTHUR M. CUPAY
CHIEF, PLANNING AND DESIGN DIVISION

EFREN A. BERBA, CEO VI, CESE


OIC, ASST. REGIONAL DIRECTOR

EVELYN T. BARROSO, PhD


REGIONAL DIRECTOR

9
27

( TOP BARS ONLY )

50

SHOWING TRANSVERSE REINF

CL ROADWAY

200

50

SHOWING LONGITUDINAL REINF.

50

2250

50

1295

508

100

AASHTO PSCG
TYPE IV-B

CL

G9

G7

G5
G6

G8

G3
G4

G2
G1

G2

G2
G1

G4

G6

G8

G7

G5

G3

G3

G5

G7

G8

G6

G4

G1

G6

G7

G5

G3

G8
G7

G4

G1

G5

G3

G2
G2

3@130

G3
G1

G5
G4

G7
G6

G8
G8

G6

G4

G7

G5

G1
G3

G2
G2

3@130

G6

G4

G1

G9

G7

G5

G3

G8

3@130

40 CLR.

183

175

50 CLR.

3@130

G2

G8

G6

G4

G1

OF ROADWAY

S16
S17

S11
S15

S2

S16

6 @ 150

84

57

S4
S1

S3

S3

11 SPACES @ 150

46

46

11 SPACES @ 150

46

46

SCALE

S7
S8

S13

G1

S5
S6

S5

G1

S6

S8

S10

S9

S7

G1

S5

S7

S9

S10

S8

S6

G1

11 SPACES @ 150

46

46

S15

S17

6 @ 150

57

84

S10

S8

S6

S10

S8

S9

S7

S5

OF ROADWAY

S9

S6
S7

G1

S5

S5

G1

390

S7
S6

S9
S8

S10
S10

S8

S6

S9

S7

G1
S5

G1

390

S14

S12

S7

S5

S8

S6

S13

390

175
40 CLR.

175

50 CLR.

390

S18

1:15

CL

S12

S2

S4

S16

TRANSVERSE SECTION

S14

S11

S1

S16
S17

S11
S15

84

S2

S18

6 @ 150

57

46

S1

S1
S4

11 SPACES @ 150

S3

S3

46

11 SPACES @ 150

46

46

S4

S11
S2

11 SPACES @ 150

46

S16
S15

46

57

6 @ 150

S17

84

TRANSVERSE SECTION
SCALE

1:15

IVIN S. CUTAB

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


ALONG STA. FELOMINA - BONBONON - DIGKILAAN ROGONGON ROAD, ILIGAN CITY

TYPICAL 2-SPAN PSCG


SUPERSTRUCTURE DETAILS
(2/4)

ENGINEERING AIDE

MA. LIZA E. POMICPIC

LEONORA C. CLET

ENGINEER II

CHIEF, PLANNING AND DESIGN SECTION

REY PETER B. GILLE, DM


DISTRICT ENGINEER

ARTHUR M. CUPAY
CHIEF, PLANNING AND DESIGN DIVISION

EFREN A. BERBA, CEO VI, CESE


OIC, ASST. REGIONAL DIRECTOR

EVELYN T. BARROSO, PhD


REGIONAL DIRECTOR

REINF. OVER PIER

TYPICAL CROSS SECTION

JOEL C. SAAVEDRA,CE

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


ALONG STA. FELOMINA - BONBONON - DIGKILAAN ROGONGON ROAD, ILIGAN CITY

TYPICAL 2-SPAN PSCG


SUPERSTRUCTURE DETAILS
(3/4)

ENGINEERING ASSISTANT

ROEL A. LLAUDER
ENGINEER II

LEONORA C. CLET
ENGINEER II

REY PETER B. GILLE, DM


DISTRICT ENGINEER

ARTHUR M. CUPAY
CHIEF, PLANNING AND DESIGN DIVISION

EFREN A. BERBA, CEO VI, CESE


OIC, ASST. REGIONAL DIRECTOR

EVELYN T. BARROSO, PhD


REGIONAL DIRECTOR

CL
60000

7320
(CLEAR ROADWAY)

2b

30000

30000

D1
c

2c

D3

D5
D7
D8

D2
1.0% SLOPE

1.0% SLOPE
4 - 40mm HOLE FOR

1.5% SLOPE

1.5% SLOPE
CONSTRUCTION JOINT

2a PLAN
SCALE 1:350m

D9

NOTES:

D4

1. CONCRETE AT d AREAS SHALL BE


PLACED AT LEAST 21 DAYS AHEAD OF
CONCRETE AT b AREAS.

D6

2. CONCRETE AT b AREAS SHALL BE


PLACED AT LEAST ONE DAY AHEAD OF
CONCRETE AT c AREAS. POUR d LAST.

5 @ 300

375
1295

375

5 @ 300

375

2250

3. REINFORCEMENT SHALL BE CONTINUOUS


AT CONSTRUCTION JOINTS.

2250

375

2250

HALF SHOWING INTERMEDIATE DIAPHRAGM

1295

HALF SHOWING DIAPHRAGM AT PIER


60000

1a

30000

ELEVATION (TYPE IV OR IV-B)


SCALE

30000

1:25m

3L/4

L/4

L/4

L/2

L/4

PC9 E.A. FACE (TYP.)

2b ELEVATION

DECK
D5

SCALE

1:350m

200

D9

D7
100 X 100 CHAMFER

D1
CONST. JOINT (ROUGHEN)

D3
1243

CONST. JOINT

DECK

624

D8
D4

10

67
300

250
20mm THK. PREMOULDED
JOINT FILLER

800

10

AASHTO PRE-STRESSED
GIRDER

250

67

250

D6

100 (MIN)

150

175

40

67

D2

19

PIER COPING

1b

1c

SECTION
SCALE

1:20m

SCALE

2c DETAIL

SECTION

SCALE

1:20m

DIAPHRAGM DETAILS
SCALE

VARIES AS SHOWN

1:50m

CONCRETE POURING SEQUENCE


SCALE

VARIES AS SHOWN

IVIN S. CUTAB

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


ALONG STA. FELOMINA - BONBONON - DIGKILAAN ROGONGON ROAD, ILIGAN CITY

TYPICAL 3-SPAN PSCG


SUPERSTRUCTURE DETAILS
(4 4)

ENGINEERING ASSISTANT

MA. LIZA E. POMICPIC


ENGINEER II

LEONORA C. CLET
CHIEF, PLANNING AND DESIGN SECTION

REY PETER B. GILLE, DM


DISTRICT ENGINEER

ARTHUR M. CUPAY
CHIEF, PLANNING AND DESIGN DIVISION

EFREN A. BERBA, CEO VI, CESE


OIC-ASST. REGIONAL DIRECTOR

EVELYN T. BARROSO, PhD


REGIONAL DIRECTOR

BAR BENDING DIAGRAM

b
c

1
1

b
d

b
a

67

a
b

a
B

a
1

67

b
c

b
d

20
1

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


ALONG STA. FELOMINA - BONBONON - DIGKILAAN ROGONGON ROAD, ILIGAN CITY

REINFORCEMENT SCHEDULE
AND ESTIMATED QUANTITIES
FOR SUPERSTRUCTURE
SLAB DETAIL

IVIN S. CUTAB
ENGINEERING AIDE

MA. LIZA E. POMICPIC

LEONORA C. CLET

ENGINEER II

CHIEF, PLANNING AND DESIGN SECTION

REY PETER B. GILLE, DM


DISTRICT ENGINEER

ARTHUR M. CUPAY
CHIEF, PLANNING AND DESIGN DIVISION

EFREN A. BERBA, CEO VI, CESE


OIC, ASST. REGIONAL DIRECTOR

EVELYN T. BARROSO, PhD


REGIONAL DIRECTOR

CL GIRDER

BACK OF
BACKWALL

END OF GIRDER
30000

300

14700

14700
REST @ 250 TO CENTERLINE

150

300

SEE
DETAILS

PG8

PG1

PG4

304

PG6

1271
LIFTING
DEVICE
(EA GIRDER
ENDS)
300

PG2

PG3

100

670.60

PG5

PG7
HALF SHOWING REINFORCEMENT

PG10 PG11

PARABOLA

HALF SHOWING CENTER OF GRAVITY OF TENDONS

PG9
EA FACE

GIRDER ELEVATION
1 PRESTRESSED
SCALE
1:40
508

508

PG6
PG8
PG7

PG4

661

138

138

AT ENDS
3 SECTION
SCALE
1:20

138
661

661

661

AT MIDSPAN
2 SECTION
SCALE
1:20

AT END VIEW
4 TOOTH
SCALE
1:20

PG12

@ ABUTMENT SIDE ONLY

PG8

150

PG1

1576

220

174

30

AT ABUT. ENDS
BEND PG9 BY 150mm

40

173

40

40

40

75

285.20

220

DOWELS EA FACE

6 EQUAL SPACES @ 220 = 1320

82

6 EQUAL SPACES @ 220 = 1320

PG6

PG4

BOTTOM OF GIRDER

27

400

BOTTOM OF GIRDER

END OF AASHTO GIRDER

AT END BLOCK
5 DOWELS
SCALE
1:30

DETAIL
6 TOOTH
SCALE
1:10

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
Lanao del Norte 2nd District Engineering Office
Palao, Iligan City, Lanao del Norte

ALONG STA. FELOMINA - BONBONON - DIGKILAAN ROGONGON ROAD, ILIGAN CITY

TYPICAL PRESTRESSED
CONCRETE GIRDER
(AASHTO TYPE IV-B)
L = 30 m

PG2

PG3

PG7

END OF AASHTO
PRESTRESSED GIRDER

NOTE:
PRESENTED HEREIN ARE SAMPLE TENDON DESIGN
LAYOUT ONLY. FOR APPLICABLE DESIGN GUIDES
SEE SHEET OF CAMBER DETAILS.

174

1576

82

DOWELS EA FACE
250 250

400

BLOCK REINF. DETAIL


7 END
SCALE
1:40

IVIN S. CUTAB
ENGINEERING AIDE

MA. LIZA E. POMICPIC


ENGINEER II

LEONORA C. CLET
CHIEF, PLANNING AND DESIGN SECTION

REY PETER B. GILLE, DM


DISTRICT ENGINEER

DOWELS EA FACE

174

174
138

661

PG9

PG3
PG2

PG2

ROUGHEN SURFACE

82

PG9

1576

1576
670.60

470.60

229
203

50

229

203

@ INTERIOR GIRDER

PG3

203

100

PG10

1070.60

10T12.70
870.60

584

PG4

1576

75

@ EXTERIOR GIRDER

203

229

229

584

1576

584

1576

4 - 10T12.70

152

408

408
152

152

PG6
PG11

PG1

408

PG1

ROUGHEN SURFACE

6 EQUAL SPACES @ 220 = 1320

ROUGHEN SURFACE

PG5
203

203

203

PG5

6 EQUAL SPACES @ 220 = 1320

508

508

82

508

ARTHUR M. CUPAY
CHIEF, PLANNING AND DESIGN DIVISION

EFREN A. BERBA, CEO VI, CESE


OIC, ASST. REGIONAL DIRECTOR

EVELYN T. BARROSO, PhD


REGIONAL DIRECTOR

Anda mungkin juga menyukai