PDS-Project Financing
Architects assist in the determination of requirements of
lending agencies, income-expense relationship and
relative demand for different building typs in actual
financing negotiations.
PDS-Architectural Programming
Investigating, identifying and documenting the needs of
the client for use in the design of the project.
PDS-Promotional Services
DS-Construction Phase
Which Phase in DS-Prepares forms for contract letting,
docs for constn, forms for invitation and instruction to
bidders, and forms for bidders proposal.
DS-Construction Phase
Which Phase in DS- Assists the owner in obtaining
proposals from contractors in preparing abstract of bids
and in awarding and preparing construction contracts.
Group-6
first structure- mbf
5%
Upon the signing of the agreement a minimum payment
equivalent to ___ of the compensation for basic
services.
15%
Upon the completion of the schematic design service, a
sum equal to ___ of the basic fee, computed upon a
reasonable estimated construction cost of the project.
35%
Upon the completion of the Design development
services, a sum equal to ___ of the basic fee, computed
upon a reasonable estimated construction cost of the
project.
85%
Upon the completion of the contract document services,
a sum sufficient to increase the total payments on the
fee to ____of the basic fee, computed upon a
reasonable estimated construction cost of the structure.
P500
A per diem of not less than ___ plus travelling and living
expenses shall be chargeable to the owne on any
occassion where the architect or his duly authorized
representative shall be required to perform services at a
locality beyond the radius of 100km from his established
office.
2 copies
During the progress of work the owner shall furnish the
architect ___ copies of recors of expenses being
incurred on the construction. Upon completion of the
project, the owner shall furnish the architect ___ copies
of the summary of all cost of labor, services, materials,
equipments, fixtures and all items used at and for the
completion of the construction.
5%
Should the client hire separately the services of the
consultant, the fee of said consultant shall be on the
account of the client and paid directly by the client. In
such a case, the fee of the architect for coordinating the
work and relating the work of the consultant to the
design concept of the architect will be ____ of the cost
of the work.
P-Physical Planning
I- Interior Design
L-Landscape Design
A-Acoustic, Communication and Electronic
Engineering
C-Comprehensive Planning
Design services needed within and outside the building
which require specializations fall under "Specialized
Allied Services" namely:
30%
The rates stipulated regarding Physical Planning is
based on the assumption that the land to be developed
is moderately flat. if the land is rugged with steep terrain
the fee shall be increased by ___%?
4%
For the preparation of detailed engineering drawings
and specifications on roads, drainage, sewerage, power
and comunication system regarding Physical Planning,
an additional fee of ____% of the cost of the
development is to be charged.
Administrative Matters
Legal responsibilyty of construction supervision group to
the owner?
Technical Matters
Legal responsibilyty of construction supervision group to
the architect and the design engineers?
1 to 3%
Construction management contracts are professional
service contracts normally negotiated between the
owner and the construction manager. a basic fixed fee of
____ % of the estimated construction cost is the total
compensation.
1. Salary Basis
2. management fee based on percentage of gross
rental. The rate of fee is from 4% to 6% of gross rental
Method of compensation of the architect in Post
Construction Services?
4% to 6% of gross rentals
What is the rate of fee of the architect if he
iscompensated for post construction services based on
management fee based on percentage of gross rental?
2% to 5%
When the owner hires an architect or a firm to
coordinate the whole range of Comprehensive
Architectural Services this constitutes Project
Management which is compensated on a percentage
basis of ___ % of estimated project cost.
7%
The fee of the architect for the Design Build Services by
Administration is ____% of the Project Construction
10%
The fee of the architect for the Design Build Service on a
Guaranteed Maximum Cost is either ____% of the
Project Construction Cost or is already built-in in the
Guaranteed Max Cost. Said fee is aside from the fee of
the Architect for Regular Design Services.
1. Direct Selection
2. Comparative Selection
3. Design Competition
Three basic method of selecting an architect by the
client?
Direct Selection
Method of selecting an Architect which is most often
used by an individual person undertaking a relatively
small project.
Comparative Selection
Design Competition
Method of selecting an Architect which are more
frequently used for civic or monumental projects and
prestigous private buildings.
Proposal Bond
(5%) Cashier's check or surety bond with the proposal
submitted by the bidder to guarantee that the bidder will
enter into the contract.
Performance Bond
(15%) Approved form of security furnished by the
contractor as a guarantee to execute work in
accordance with terms of the contract.
Payment Bond
(15%) Approved form of security furnished by the
contractor as a guarantee to pay all obligations arising
from the contract.
Guarantee Bond
(30%) Approved form of security furnished by the
contractor to guaranty the quality of materials and
workmanship performed.
Invitation to Bid
Notice or invitation issued to bidders giving information
of the magnitude and extent of the project, nature, etc.
Bid Bulletin
Additional information on contract documents.
Instruction to Bidders
List of instructions on preparation & conditions for award
of contract
General Conditions
Special Provisions
Instructions that supplement or modify drawings, specs,
& general conditions of the contract.
Specifications
Written or printed description of work describing qualities
of materials and mode of construction.
Supplementary Specs
Additional info issued as an addition or amendment to
provision of specs.
Specs
Which should govern if there is a discrepancy between
the drawings and specifications?
12 sq. m
Office and contractor's Building should be wooden floors
raised above ground, room of approx. ___ m should be
provided for the architect.
10 days
Contractor shall submit written notice to the architect at
least ___ days prior to beginning, susending or
resuming the work to the end that the architect may
15 days
____ days upon receipt of request for payment, the
architect shall either issue a certificate of payment or
withhold the request and inform the contractor in writing
the reasons for withholding it.
65%
No payments shall be made in excess of ____% of the
contract price unless a notarized statement is submitted
by the contractor to the effect that all bills for labor, other
than current wages, and bills for materials have been
paid.
30% , 1 yr
Guarantee bond is equivalent to ___% of the contract
price covering a period of ___ year after the final
acceptance of the work.
2 months
The owner will release the performance and payment
bonds after the expiration of ____months from the final
acceptance of work. Only after shall the contractor
furnish a guarantee bond in the amount of 30% of the
total contract cost and shall be for a period of 1 yr
commencing from the date of acceptance of work
guaranteeing the quality of work and materials.