CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

NATIONAL UNIVERSITY OF CIVIL ENGINEERING


DIVISION OF CONSTRUCTION TECHNOLOGY AND MANAGEMENT

PROJECT
CONSTRUCTION ENGINEERING I
CONSTRUCTION OF MONOLITHIC REINFORCED CONCRETE IN
MULTI-STOREY BUILDING
Content: Design construction method of monolithic reinforced concrete
in multi-storey building
Lecturer:
Student:
Class:
Id Number

VUONG DO TUAN CUONG


TRINH HUU NAM
55XE
455

DATA

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Number of storeys
Number of spans
[] Wood (kG/cm2)
Wood (kG/m3)
Season
b (m)

Roof

Dm
m (cm)

8
21
90
600
Winter
12
2.2
2.4
2.2
40
3.3
5.8
4.0
4.5
3.4
3.4
30/45
30/40
30/35
30/30
30/50
30/45
30/40
30/35
15
25/40
25/60
25/35
20/30
20/60
15

Reinf.
ratio

1.0

Foudatio
n

A
B
C

A (m)
t (cm)
B (m)

1
2

L (m)
H1 (m)
Ht (m)
Hm (m)

F.1; F.2
F.3; F.4
F.5; F.6
F.7; F.8
F.1; F.2
F.3; F.4
F.5; F.6
F.7; F.8

C1 (d/h1)
Body

Column
C2 (d/h2)
s (cm)

D1g
D1b

D1
Beam D (cm)

D2
D3

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

CALCULATION
I. DRAWINGS (enclosed):
II. PRELIMINARY DATA:
1. Preliminary concrete volume, steel mass and form work area:

Element
Length (m)

C1

Colum
n

C2

D1
Beam
D
m
Slab

F[1;2
]
F[3;4
]
F[5;6
]
F[7;8
]
F[1;2
]
F[3;4
]
F[5;6
]
F[7;8
]
D1b
D1g
D2
D3
Dmb
Dmg
S1
S2

CONCRETE VOLUME
Volume
Size
per
element
Width
Height
(m3)
(m)
(m)

Quantit
y

Volume
(m3)

4.50

0.30

0.45

0.61

88.00

53.46

3.40

0.30

0.40

0.41

88.00

35.90

3.40

0.30

0.35

0.36

88.00

31.42

3.40

0.30

0.30

0.31

88.00

26.93

4.50

0.30

0.50

0.68

132.00

89.10

3.40

0.30

0.45

0.46

132.00

60.59

3.40

0.30

0.40

0.41

132.00

53.86

3.40

0.30

0.35

0.36

132.00

47.12

5.80
4.00
3.30
3.30
5.80
4.00
5.80
4.00

0.25
0.25
0.25
0.20
0.25
0.25
3.30
3.30

0.60
0.40
0.35
0.30
0.60
0.60
0.15
0.15

0.87
0.40
0.29
0.20
0.87
0.60
2.87
1.98

308.00
308.00
735.00
588.00
44.00
44.00
336.00
336.00

267.96
123.20
212.23
116.42
38.28
26.40
964.66
665.28

19

Total
(m3)

2812.81

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

STEEL MASS
Element

C1
Column
C2

D1
Beam
D
m
Slab

F[1;2]
F[3;4]
F[5;6]
F[7;8]
F[1;2]
F[3;4]
F[5;6]
F[7;8]
D1b
D1g
D2
D3
Dmb
Dmg
S1
S2

Volumn
(m3)

Reinf.
ratio (%)

Steel
Unit Weight
(Kg/m3)

Steel Mass
(Kg)

Total
(Kg)

53.46
35.90
31.42
26.93
89.10
60.59
53.86
47.12
267.96
123.20
212.23
116.42
38.28
26.40
964.66
665.28

0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01

7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00
7850.00

4196.61
2818.46
2466.16
2113.85
6994.35
4756.16
4227.70
3699.23
21034.86
9671.20
16660.15
9139.28
3004.98
2072.40
75725.50
52224.48

220805.37

FORMWORK AREA
Size
Element
Colum
n
C1

C2

F[1;2
]
F[3;4
]
F[5;6
]
F[7;8
]
F[1;2
]
F[3;4
]
F[5;6

Area
(m2)

Number
of
Element
s

Area of
Formwor
k (m2)

Total
(m2)
37539.0
8

Length
(m)

Width
(m)

Height
(m)

4.50

0.30

0.45

6.75

88.00

594.00

3.40

0.30

0.40

4.76

88.00

418.88

3.40

0.30

0.35

4.42

88.00

388.96

3.40

0.30

0.30

4.08

88.00

359.04

4.50

0.30

0.50

7.20

132.00

950.40

3.40

0.30

0.45

5.10

132.00

673.20

3.40

0.30

0.40

4.76

132.00

628.32

19

CONSTRUCTION ENGINEERING PROJECT

Beam

Slab

]
F[7;8
]
D1b
D1
D1g
D2
D3
Dmb
D
m Dmg
S1
S2

TRINH HUU NAM 55XE

3.40

0.30

0.35

4.42

132.00

583.44

5.80
4.00
3.30
3.30
5.80
4.00
5.80
4.00

0.25
0.25
0.25
0.20
0.25
0.25
3.30
3.30

0.60
0.40
0.35
0.30
0.60
0.60
0.15
0.15

9.86
5.20
3.96
3.30
9.86
6.80
40.02
27.60

308.00
308.00
735.00
588.00
44.00
44.00
336.00
336.00

3036.88
1601.60
2910.60
1940.40
433.84
299.20
13446.72
9273.60

2. Equipment: Vertical transporter:


Since concrete motar volume is large (more than 100m3 per slab), and to be decrease works
on transporting => Select tower crane to transport concrete motar.
Total length of the building is 3.3 x 21 = 69.3 (m) => Use tower crane on rails.
Required height of the lifting hook:
Hyc=hct + hat + hck + ht = 28.3+1+1.5+1.5=32.3(m)
Legend:
hct: height of building
hat: safety distance
hck: height of construction elements
ht: height of hanging kits\
Select tower crane KB-403A with the following parameters:
Maximum load capacity: Q=8 (T)
Maximum operating radius: R=30 (m)
Hoisting height: H=57.5 (m)
III. Formwork design:
1. Slab formwork:
a. Calculating diagram:

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

MC 1-1

1- Concrete slab;

2- Boards;

3- Stud;

4 Stringer;

Select a typical slab to calculate the formwork: L1=5.8 (m), B=3.3 (m) (axis A-B;1-2).
Calculate on a strip with width 1(m). (perpendicular to the stringers direction).
Calculating diagram is a continuous beam with stringers acting as supports.

Calculating diagram of a slab strip with width 1m


b. Loads:
Self-weight of slab formwork (q1), (n1=1.1)
g1tc w 1 slab. fw. 600 1 0.03=18(kg / m)

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

g1tt g1tc n1 =18 1.1=19.8(kg / m)


Self-weight of concrete slab (q2), (n2=1.2)
g 2tc conc 1 slab 2500 1 0.15 375(kg / m)

g 2tt q2tc n 2 =375 1.2=450(kg / m)


Self-weight of steel (q3), (n3=1.2)
g3tc steel 1 slab 7850 1 0.15 0.01 11.78( kg / m)

g3tt q3tc n 3 =11.78 1.2=14.14( kg / m)


Live load by pouring concrete (q4), (n4=1.3)
p4tc 400 1 400( kg / m)

p4tt p4tc n 3 =400 1.3=520(kg / m)


Live load of workers and construction equipment (q5), (n5=1.3)
p5tc 250 1 250(kg / m)

p5tt p5tc n 5 =250 1.3=325(kg / m)


Total load for checking Strength condition of slab formwork:

q tt G tt Ptt 19.8 450 14.14 520 325 1328.94( kg / m)


Total load for checking Deformity condition of bottom board:

q tc G tc 18 375 11.78 404.78( kg / m)


c. Distance between stringers:
Geometric properties of slab formwork:

b b
100 33

225(cm 4 )
12
12
3

I sl .board

b b
100 32

150(cm3 )
6
6
2

Wsl .board

Distance of stringers based on the Strength condition:

19

CONSTRUCTION ENGINEERING PROJECT

M
Wsl .board

TRINH HUU NAM 55XE

[ ]w

Legend: M: Maximum bending moment:

q tt .l12 1328.94.l12

132.89l12
10
10

Wsl .board 1.5 104 (m3 )


[ ]w 90 104 (kg / m 2 )
132.89 l12 90 10 4.1,5.10 4 l1 1.0 m

Distance of stringers based on the Deformity condition:


f f
f

Legend:

: calculating deflection of slab formwork

q tc l2 4
404.78l2 4
f

1.28 103 l2 4
9
8
128.EI 128 1.1 10 225 10

1
L
400

(TCVN 4435:1995, corresponding with component


having exposed surface)

1.28 103 l24 l2 / 400 l2 1.25( m)

lstringer min(l1 ; l2 ) lstringer 1( m)


Select
Length of stringer:

Lstringer B bmain beam 2 s.board 2 0.15 3.3 0.25 2 0.03 2 0.15 2.69(m)
Number of stringers per a typical slab

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

str in g er

str in g er

Stringers to support slab formwork


d. Slab shores:
Calculating diagram: continuous beam with slab shores acting as supports
Select the cross-section of stringer: 0,08 x 0,12 m

bstringer l
The distance between loads applied on each stringer:

19

stringer

1(m)

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

str in g er

sl a b sho r e

Stringers and slab shores in a typical slab

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Geometric properties of stringer:


b h3 0.08 0.123
I stringer

1,15.10 5 ( m 4 )
12
12

Wstringer

b h 2 0.08 0.12 2

1,92.104 (m3 )
6
6

Loads:
Load from slab formwork:
q1tt q tt bstringer 1328.94 1 1328.94( kg / m)

q1tc q tc bstringer 404.78 1 404.78( kg / m)

Self-weight of stringer:
q2tt n g Fxg 1.1 600 0.08 0.12 6.34( kg / m)

q2tc g Fxg 600 0.08 0.12 5.76( kg / m)


Total load for checking Strength condition of slab shores:

q ttstringer q1tt q tt2 1328.94 6.34 1335.28( kg / m)


Total load for checking Deformity condition of slab shores:

q tcstringer q1tc q tc2 404.78 5.76 410.54( kg / m)


Distance between slab shores:
Strength condition:
M

[ ]w
W

10 Ws.board
10 90 10 4 1.92 10 4

1.14( m)
tt
qstringer
1335.28

l1

Deformity condition
f f

19

CONSTRUCTION ENGINEERING PROJECT

l2

TRINH HUU NAM 55XE

128EI s.board 3 128 1.1109 1.15 105

2.34(m)
tc
400qstringer
400 410.54

lshore 1(m)
Select

Design slab shore:


2
600(kg / m3 ) 90(kg / c m )

Select slab shore: bcxhc=0.1x0.1(m),

E 1.1 109 (kg / c m 2 )

Geometric properties:
3
b h
0.1 0.13
I c c
8.33 106 ( m4 )
12
12

Ac bc hc 0.1 0.1 0.01(m 2 )


Ic
8.33 106

0.029(m)
Ac
0.01

rc

H c (h floor hslab h wedge slab.board h stringer )


(4.5 0.15 0.1 0.03 0.12) 1
4.1( m)

Slenderness:

Hc
4.1
3100
3100

141.38 75 2
0.16
rc
0.029

141.382

Check strength condition:

q ttstringer lshore

1335.28 1
834550(kg / m 2 ) 90 104 ( kg / m 2 )
0.16 0.01

2. Beam formwork:

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Beam formwork includes 2 side boards and 1 bottom board.


Bottom board is calculated as continuous beam with T-head shores acting as supports.
Side board is calculated as continuous beam with studs acting as supports.
1 Side board
2 Bottom board
3 Stud
4 Kicker
5 Brace
6 Spreader
7 Ledge
8 T shore
9 Wedge
10 Sill
11 Bracing system

6
7

3
4

11

10

a. Formwork of beam D1b and DM:


Dimension of beam D1b and DM: bxh=25x60(cm)

b 4(cm)
Thickness of bottom board:

s 3(cm)
Thickness of side board:
Calculating bottom board:
Loads:
o Self-weight of bottom board (q1), (n1=1.1)
q1tc g Fd
Legend:

g 600(kg / m3 )

g
- Unit weight of wood,

Fd
- Cross-section area of bottom board
g1tc 600 (0.04 0.25)=6(kg / m)

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

g1tt g1tc n1 =6 1.1=6.6(kg / m)


o Self-weight of concrete beam (q2), (n2=1.2)
g 2tc conc b h 2500 0.25 0.6 375(kg / m)

g 2tt q2tc n 2 =375 1.2=450(kg / m)


o Self-weight of steel (q3), (n3=1.2)
g 3tc steel b h 7850 0.25 0.6 0.01 11.8( kg / m)

g3tt q3tc n 3 =11.8 1.2=14.2( kg / m)


o Live load by pouring concrete (q4), (n4=1.3)
p4tc 400 0.25 100(kg / m)

p4tt p4tc n 3 =100 1.3=130(kg / m)


o Live load of workers and construction equipment (q5), (n5=1.3)
p5tc 250 0.25 62.5(kg / m)

p5tt p5tc n 5 =62.5 1.3=81.3( kg / m)


Total load for checking Strength condition of bottom board:

q tt G tt Ptt 6.6 450 14.2 130 81.3 682.1( kg / m)


Total load for checking Deformity condition of bottom board:

q tc G tc 6 375 11.8 392.8(kg / m)

Distance between T-shores to support bottom board:


o Geometric properties of bottom board:

b b
25 43

133.3(cm 4 )
12
12
3

I b.board

b b
25 42

66.7(cm3 )
6
6
2

Wb.board

o T-shore distance::
Strength condition:

19

CONSTRUCTION ENGINEERING PROJECT

l1

TRINH HUU NAM 55XE

10 Wb.board
q

tt

10 90 66.7
93.8(cm)
6.821

Deformity condition:
128 EI b.board 3 128 110000 133.3
l2 3

106.1(cm)
400q tc
400 3.928
l 70(cm)
Select T-shore distance:
Calculating side board:
Design height of side board:

h s.board hbeam hslab h fw.slab 60 15 3 42(cm)

Loads:
o Horizontal load of concrete motar:
g1tc conc hbeam hs.board 2500 0.6 0.42 630(kg / m)

g1tt g1tc n 630 1.3 819( kg / m)


o Horizontal load by pouring concrete. Use bucket with volume ranging
from 0.2m3-0.8m3. According to TCVN 4453-1995:
p2tc hs.board 400 0.42 400 168( kg / m)

p2tt p2tc n 168 1.3 218.4(kg / m)


Total load for checking Strength condition of side board:
q tt G tt P tt 819 218.4 1037.4(kg / m)
Total load for checking Deformity condition of side board:
q tc G tc 630( kg / m)

Distance between T-shores to support side board:


o Geometric properties of side board:

I s.board

b b
42 33

94.5(cm4 )
12
12

Ws.board

b b
42 32

63(cm3 )
6
6

T-shore distance:
Strength condition:

19

CONSTRUCTION ENGINEERING PROJECT

l1

TRINH HUU NAM 55XE

10 Ws.board
q

tt

10 90 63
73.9(cm)
10.374

Deformity condition:
128 EI s.board 3 128 110000 94.5
l2 3

80.8(cm)
400q tc
400 6.3
l 70(cm)
Select T-shore distance:

T-shore to support formwork of beam D1b


T-shore for beam D1b and DM:
Vertical load from slab:
1328.94 1 0.2
S1
132.89( kg )
2
S2

404.78 1 0.2
40.48( kg )
2

Vertical loads from bottom board applied on T-shore:


p1 6.821 70 477.47( kg )

p2 3.928 70 274.96( kg )

Loads from side boards and transmit through braces:

N1

10.374 70
726.18(kg )
2 cos(60)

19

CONSTRUCTION ENGINEERING PROJECT

N2

TRINH HUU NAM 55XE

6.3 70
441(kg )
2 cos(60)

Total loads applied on T-shore:

Vtt S1 2 N1 sin(60) P1 132.89 2 726.18 sin(60) 477.47 1868.14(kg )

Vtc S 2 2 N 2 sin(60) P2 40.48 2 441 sin(60) 274.96 1079.27( kg )


2
600(kg / m3 ) 90(kg / c m )
Select T-shore: bcxhc=12x12(cm),
,

E 110000(kg / c m2 )

Geometric properties:
3
b h
12 123
I c c
1728(cm 4 )
12
12

Ac bc hc 12 12 144(cm 2 )
rc

Ic
1728.3

3.46(cm)
Ac
144

H c ( h floor hbeam h wedge b.board ) (450 60 10 4) 1 376(cm)


Slenderness:

H c 376
3100
3100

108.67 75 2
0.26
rc 3.46

108.67 2

Check strength condition:

Vtt
1868.14

49.90(kg / c m 2 ) 90(kg / c m2 )
A 0.26 144

Total displacement of bottom board:


Deformity of T-shore:
V l 1079.27 376
c tc c
0.025(cm)
Ac E 144 110000

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Maximum displacement of bottom board:


q tc l 4
3.928 704
Fmax

0.05(cm)
128 EI b.board 128 110000 133.3

Absolute displacement of main beam formwork:


dc c Fmax 0.025 0.05 0.075(cm)

Ldc
0.58(cm)
1000

b. Formwork for beam D1g:


Dimension of beam D1b: bxh=25x40 (cm)

b 4(cm)
Thickness of bottom board:

s 3(cm)
Thickness of side board:
Calculating bottom board:
Loads:
o Self-weight of bottom board (q1), (n1=1.1)
q1tc g Fd
Legend:

g 600(kg / m3 )

g
- Unit weight of wood,

Fd
- Cross-section area of bottom board
g1tc 600 (0.04 0.25)=6(kg / m)

g1tt g1tc n1 =6 1.1=6.6(kg / m)


o Self-weight of concrete beam (q2), (n2=1.2)
g 2tc conc b h 2500 0.25 0.4 250(kg / m)

g 2tt q2tc n 2 =250 1.2=300(kg / m)


o Self-weight of steel (q3), (n3=1.2)
g 3tc steel b h 7850 0.25 0.4 0.01 7.9( kg / m)

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

g 3tt q3tc n 3 =7.9 1.2=9.5(kg / m)


o Live load by pouring concrete (q4), (n4=1.3)
p4tc 400 0.25 100(kg / m)

p4tt p4tc n 3 =100 1.3=130(kg / m)


o Live load of workers and construction equipment (q5), (n5=1.3)
p5tc 250 0.25 62.5(kg / m)

p5tt p5tc n 5 =62.5 1.3=81.3( kg / m)


Total load for checking Strength condition of bottom board:

q tt G tt P tt 6.6 300 9.5 130 81.3 527.4( kg / m)


Total load for checking Deformity condition of bottom board:

q tc G tc 6 250 7.9 263.9( kg / m)

Distance between T-shores to support bottom board:


o Geometric properties of bottom board:

I b.board

b b
25 43

133.3(cm 4 )
12
12

Wb.board

b b
25 42

66.7(cm3 )
6
6

o T-shore distance:
Strength condition:
10 Wb.board
10 90 66.7
l1

106.7(cm)
tt
q
5.274
Deformity condition:
128 EI b.board 3 128 110000 133.3
l2 3

121.2(cm)
400q tc
400 2.639
l 80(cm)
Select T-shore distance:
Calculating side board:
Design height of side board:

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

h s.board hbeam hslab h fw.slab 40 15 3 22(cm)

Loads:
o Horizontal load of concrete motar:
g1tc conc hbeam hs.board 2500 0.4 0.22 220( kg / m)

g1tt g1tc n 220 1.3 286(kg / m)


o Horizontal load by pouring concrete. Use bucket with volume ranging
from 0.2m3-0.8m3. According to TCVN 4453-1995:
p2tc hs.board 400 0.22 400 88( kg / m)

p2tt p2tc n 88 1.3 114.4( kg / m)


Total load for checking Strength condition of side board:
q tt G tt Ptt 286 114.4 400.4(kg / m)
Total load for checking Deformity condition of side board:
q tc G tc 220(kg / m)

Distance between T-shores to support side board::


o Geometric properties of side board:

I s.board

b b
22 33

49.5(cm 4 )
12
12

Ws.board

b b
22 32

33(cm3 )
6
6

T-shore distance:
Strength condition:
10 Ws.board
10 90 33
l1

86.1(cm)
tt
q
4.004
Deformity condition:
128 EI s.board 3 128 110000 49.5
l2 3

92.5(cm)
400q tc
400 2.20
l 80(cm)

Select T-shore distance:


T-shore for beam D1g:
Vertical load from slab:

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

S1

1328.94 1 0.2
132.89( kg )
2

S2

404.78 1 0.2
40.48( kg )
2

Vertical loads from bottom board applied on T-shore:


p1 5.274 80 421.92( kg )

p2 2.639 80 211.1(kg )

Loads from side boards and transmit through braces:

N1

4.004 80
320.32( kg )
2 cos(60)

N2

2.20 80
176( kg )
2 cos(60)

Total loads applied on T-shore:

Vtt S1 2 N1 sin(60) P1 132.89 2 320.32 sin(60) 421.92 1109.62(kg )

Vtc S 2 2 N 2 sin(60) P2 40.48 2 176 sin(60) 211.1 556.42( kg )


2
600(kg / m3 ) 90(kg / c m )
Select T-shore: bcxhc=10x10(cm),
,
,

E 110000(kg / c m2 )

Geometric properties:
3
bc hc
10 103
I

833.33(cm 4 )
12
12

Ac bc hc 10 10 100(cm 2 )
rc

Ic
833.33

2.89(cm)
Ac
100

H c ( h floor hbeam h wedge b.board ) (450 40 10 4) 1 396(cm)

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Slenderness:

H c 396
3100
3100

137.02 75 2
0.17
rc
2.89

137.02 2

Check strength condition:

Vtt
1109.62

65.27( kg / c m 2 ) 90(kg / c m2 )
A 0.17 100

Total displacement of bottom board:


Deformity of T-shore:
V l
556.42 396
c tc c
0.019(cm)
Ac E 100 110000

Maximum displacement of bottom board:


q tc l 4
2.639 804
Fmax

0.058(cm)
128 EI b.board 128 110000 133.3

Absolute displacement of main beam formwork:


dc c Fmax 0.019 0.058 0.077(cm)
c. Formwork for beam D2:
Dimension of beam D2: bxh=25x35 (cm)

b 4(cm)
Thickness of bottom board:

s 3(cm)
Thickness of side board:
Calculating bottom board:
Loads:
o Self-weight of bottom board (q1), (n1=1.1)
q1tc g Fd
Legend:

19

Ldc
0.58(cm)
1000

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

g 600(kg / m3 )

g
- Unit weight of wood,

Fd
- Cross-section area of bottom board
g1tc 600 (0.04 0.25)=6(kg / m)

g1tt g1tc n1 =12.1 1.1=6.6(kg / m)


o Self-weight of concrete beam (q2), (n2=1.2)
g 2tc conc b h 2500 0.25 0.35 218.8(kg / m)

g 2tt q2tc n 2 =218.8 1.2=262.6( kg / m)


o Self-weight of steel (q3), (n3=1.2)
g3tc steel b h 7850 0.25 0.35 0.01 6.9( kg / m)

g 3tt q3tc n 3 =6.9 1.2=8.3(kg / m)


o Live load by pouring concrete (q4), (n4=1.3)
p4tc 400 0.25 100(kg / m)

p4tt p4tc n 3 =100 1.3=130(kg / m)


o Live load of workers and construction equipment (q5), (n5=1.3)
p5tc 250 0.25 62.5(kg / m)

p5tt p5tc n 5 =62.5 1.3=81.3( kg / m)


Total load for checking Strength condition of bottom board:

q tt G tt P tt 6.6 262.6 8.3 130 81.3 488.8(kg / m)


Total load for checking Deformity condition of bottom board:

q tc G tc 6 218.8 6.9 231.7( kg / m)

Distance between T-shores to support bottom board:


o Geometric properties of bottom board:

b b
25 43

133.3(cm 4 )
12
12
3

I b.board

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

b b
25 42

66.7(cm3 )
6
6
2

Wb.board

o T-shore distance:
Strength condition:
10 Wb.board
10 90 66.7
l1

110.8(cm)
tt
q
4.888
Deformity condition:
128 EI b.board 3 128 110000 133.3
l2 3

126.5(cm)
400q tc
400 2.317
l 90(cm)
Select T-shore distance:
Calculating side board:
Design height of side board:

h s.board hbeam hslab h fw.slab 35 15 3 17(cm)

Loads:
o Horizontal load of concrete motar:
g1tc conc hbeam hs .board 2500 0.35 0.17 148.8( kg / m)

g1tt g1tc n 148.8 1.3 193.4( kg / m)


o Horizontal load of pouring concrete. Use bucket with volume ranging
from 0.2m3-0.8m3. According to TCVN 4453-1995:
p2tc hs.board 400 0.17 400 68(kg / m)

p2tt p2tc n 68 1.3 88.4(kg / m)


Total load for checking Strength condition of side board:
q tt G tt Ptt 193.4 88.4 281.8( kg / m)
Total load for checking Deformity condition of side board:
q tc G tc 148.8( kg / m)

Distance between T-shores to support side board::


o Geometric properties of side board:

b b
17 33

38.3(cm 4 )
12
12
3

I s.board

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

b b
17 32

25.5(cm3 )
6
6
2

Ws.board
o

T-shore distance:
Strength condition:
10 Ws.board
10 90 25.5
l1

90.2(cm)
tt
q
2.818
Deformity condition:
128 EI s.board 3 128 110000 38.3
l2 3

96.8(cm)
400q tc
400 1.488
l 90(cm)

Select T-shore distance:

T-shore for beam D2:


Vertical load from slab:
1328.94 0.9 0.33
S1
197.35( kg )
2
S2

404.78 0.9 0.33


60.11(kg )
2

Vertical loads from bottom board applied on T-shore:


p1 4.888 90 439.92( kg )

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

p2 2.317 90 208.53( kg )

Loads from side boards and transmit through braces:

N1

2.818 90
253.62( kg )
2 cos(60)

N2

1.488 90
133.92(kg )
2 cos(60)

Total loads applied on T-shore:

Vtt S1 2 N1 sin(60) P1 197.35 2 253.62 sin(60) 439.92 1076.55( kg )

Vtc S 2 2 N 2 sin(60) P2 60.11 2 133.92 sin(60) 208.53 500.11( kg )


2
600(kg / m3 ) 90(kg / c m )
Select T-shore: bcxhc=10x10(cm),
,
,

E 110000(kg / c m2 )

Geometric properties:
3
b h
10 103
I c c
833.33(cm 4 )
12
12

Ac bc hc 10 10 100(cm 2 )
rc

Ic
833.33

2.89(cm)
Ac
100

H c ( h floor hbeam h wedge b.board ) (450 35 10 4) 1 401(cm)


Slenderness:

H c 401
3100
3100

138.75 75 2
0.16
rc
2.89

138.752

Check strength condition:

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Vtt
1076.55

67.28(kg / c m 2 ) 90( kg / c m 2 )
A 0.16 100

Total displacement of bottom board:


Deformity of T-shore:
V l
500.11 401
c tc c
0.016(cm)
Ac E 100 110000

Maximum displacement of bottom board:


q tc l 4
2.317 90 4
Fmax

0.081(cm)
128 EI b.board 128 110000 133.3

Absolute displacement of main beam formwork:


dc c Fmax 0.016 0.081 0.097(cm)
d. Formwork for beam D3:
Dimension of beam D2: bxh=20x30 (cm)

b 4(cm)
Thickness of bottom board:

s 3(cm)
Thickness of side board:
Calculating bottom board:
Loads:
o Self-weight of bottom board (q1), (n1=1.1)
q1tc g Fd
Legend:

g 600(kg / m3 )

g
- Unit weight of wood,

Fd
- Cross-section area of bottom board
g1tc 600 (0.04 0.2)=4.8(kg / m)

19

Ldc
0.58(cm)
1000

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

g1tt g1tc n1 =4.8 1.1=5.3(kg / m)


o Self-weight of concrete beam (q2), (n2=1.2)
g 2tc conc b h 2500 0.2 0.3 150(kg / m)

g 2tt q2tc n 2 =150 1.2=180(kg / m)


o Self-weight of steel (q3), (n3=1.2)
g 3tc steel b h 7850 0.2 0.3 0.01 4.7( kg / m)

g3tt q3tc n 3 =4.7 1.2=5.6(kg / m)


o Live load by pouring concrete (q4), (n4=1.3)
p4tc 400 0.2 80(kg / m)

p4tt p4tc n 3 =80 1.3=104(kg / m)


o Live load of workers and construction equipment (q5), (n5=1.3)
p5tc 250 0.2 50( kg / m)

p5tt p5tc n 5 =50 1.3=65(kg / m)


Total load for checking Strength condition of bottom board:

q tt G tt P tt 5.3 180 5.6 104 65 359.9(kg / m)


Total load for checking Deformity condition of bottom board:

q tc G tc 4.8 150 4.7 159.5( kg / m)

Distance between T-shores to support bottom board:


o Geometric properties of bottom board:

b b
20 43

106.7(cm 4 )
12
12
3

I b.board

b b
20 42

53.3(cm3 )
6
6
2

Wb.board

o T-shore distance::
Strength condition:

19

CONSTRUCTION ENGINEERING PROJECT

l1

TRINH HUU NAM 55XE

10 Wb.board
q

tt

10 90 53.3
115.4(cm)
3.599

Deformity condition:
128 EI b.board 3 128 110000 106.7
l2 3

133.0(cm)
400q tc
400 1.595
l 90(cm)
Select Distance between T-shores s to support bottom board:
Calculating side board:
Design height of side board:

h s.board hbeam hslab h fw.slab 30 15 3 12(cm)

Loads:
o Horizontal load of concrete motar:
g1tc conc hbeam hs .board 2500 0.3 0.12 90( kg / m)

g1tt g1tc n 90 1.3 117( kg / m)


o Horizontal load of pouring concrete. Use bucket with volume ranging
from 0.2m3-0.8m3. According to TCVN 4453-1995:
p2tc hs.board 400 0.12 400 48(kg / m)

p2tt p2tc n 48 1.3 62.4(kg / m)


Total load for checking Strength condition of side board:
q tt G tt P tt 117 62.4 179.4( kg / m)
Total load for checking Deformity condition of side board:
q tc G tc 90(kg / m)

Distance between T-shores to support side board::


o Geometric properties of side board:

I s.board

b b
12 33

27(cm 4 )
12
12

Ws.board

b b
12 32

18(cm3 )
6
6

T-shore distance:
Strength condition:

19

CONSTRUCTION ENGINEERING PROJECT

l1

TRINH HUU NAM 55XE

10 Ws.board
q

tt

10 90 18
95.0(cm)
1.794

Deformity condition:
128 EI s.board 3 128 110000 27
l2 3

101.8(cm)
400q tc
400 0.9
l 90(cm)
Select T-shore distance:
T-shore for beam D3:
Vertical load from slab:
1328.94 0.9 0.33
S1
197.35(kg )
2
S2

404.78 0.9 0.33


60.11(kg )
2

Vertical loads from bottom board applied on T-shore:


p1 3.599 90 323.91( kg )

p2 1.595 90 143.55( kg )

Loads from side boards and transmit through braces:

N1

1.794 90
161.46(kg )
2 cos(60)

N2

0.9 90
81(kg )
2 cos(60)

Total loads applied on T-shore:

Vtt S1 2 N1 sin(60) P1 197.35 2 161.46 sin(60) 323.91 800.92(kg )


Vtc S 2 2 N 2 sin(60) P2 60.11 2 81 sin(60) 143.55 343.96( kg )

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

2
600(kg / m3 ) 90(kg / c m )
Select T-shore: bcxhc=10x10(cm),
,
,

E 110000(kg / c m 2 )

Geometric properties:
3
bc hc
10 103
I

833.33(cm 4 )
12
12

Ac bc hc 10 10 100(cm 2 )
rc

Ic
833.33

2.89(cm)
Ac
100

H c ( h floor hbeam h wedge b.board ) (450 30 10 4) 1 406(cm)


Slenderness:

H c 406
3100
3100

140.48 75 2
0.16
rc
2.89

140.482

Check strength condition:

Vtt
800.92

50.06( kg / c m 2 ) 90( kg / c m 2 )
A 0.16 100

Total displacement of bottom board:


Deformity of T-shore:
V l
343.96 406
c tc c
0.01(cm)
Ac E 100 110000

Maximum displacement of bottom board:


q tc l 4
1.595 904
Fmax

0.07(cm)
128 EI b.board 128 110000 106.7

Absolute displacement of main beam formwork:


dc c Fmax 0.07 0.01 0.08(cm)
3. Column formwork:

19

Ldc
0.58(cm)
1000

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

C -c

10

1
c

2
1

5
4

1 Side boards;
2 Studs, yokes;
3 Clams;
4 Positioning frames ;
5 Washout opening;
6 Props;
7 Turn buckles;
8 Steel hooks;
9 Wooden bars;
10 Bolts;
Select the biggest column to design column formwork and use these parameters for the
others.
Calculating the formwork for column C2 of the first floor: dxh = 22x50 (cm)
Calculating diagram: continuous beam with clamp acting as supports:

Loads applied on column formwork:


According to TCVN 4453-1995:

Horizontal pressure of the newly formed concrete (using needle vibrators):

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

q1tc conc H
Legend:

conc

conc 2500(kg / m3 )
- self-weight of newly formed concrete,

H=75 (cm)

q1tc conc H 2500 0.75 1875 (kg / m 2 )


q1tt q1tt n 1875 1.3 2437.5 (kg / m 2 )

Horizontal pressure of pouring concrete:


Normally, pouring and vibrating do not occur simultaneously.
According to TCVN 4453-1995, bucket with volume from 0.2 0.8 (m3):

q 2tc =400(kg/m 2 )
, reliability coefficient n = 1.3
q2tt 1.3 400 520 (kg / m 2 )
Total load for checking Strength condition of column formwork (applied on larger side
h=50(cm)):

q tt q1tt q211 h 2437.5 520 0.5 1478.75 ( kg / m)


Total load for checking Deformity condition of column form work (applied on larger
side h=50(cm)):
q tc q1tc h 1875 0.5 937.5(kg / m)
Geometric properties of column side board:

b b
50 33
I

112.5(cm 4 ) 1.125 10 6 ( m4 )
12
12
3

b b
50 32
W

75(cm3 ) 7.5 10 5 ( m3 )
6
6
2

Distance between clamp:


Strength condition:
l1

10 W
q tt

10 90 104 7.5 10 5
0.68(m)
1478.75

19

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Deformity condition:
l2

128EI 3 128 1.1109 1.125 106

0.75( m)
400q tc
400 937.5

lclamp 0.68(m) 68(cm)


Select
IV. LIST OF CONCRETE VOLUME, REINFORCEMENT MASS, FORMWORK
AREA, AND LABOUR FOR RESPECTIVE WORKS:

Concrete Volume (m)


Floo
r
[1]

Componen
t
[2]
C1
C2
C3
D1b

D1g
D2
D3
S1
S2

C1
C2
C3
D1b
D1g
D2
D3

Dimension(m)
l
b
h
[3]
[4]
[5]
4.30 0.30 0.45
0
0
0
4.30 0.30 0.50
0
0
0
4.50 0.30 0.50
0
0
0
6.02 0.25 0.60
5
0
0
4.00 0.25 0.40
0
0
0
3.00 0.25 0.35
0
0
0
3.07 0.20 0.30
5
0
0
3.07 2.72 0.15
5
5
0
3.07 1.77 0.15
5
5
0
2.80 0.30 0.45
0
0
0
2.80 0.30 0.50
0
0
0
3.00 0.30 0.50
0
0
0
6.02 0.25 0.60
5
0
0
4.00 0.25 0.40
0
0
0
3.00 0.25 0.35
0
0
0
3.07 0.20 0.30
5
0
0

V0(m
)
[6]

Quantity

V(m)

[7]

[8]

0.58

46.00

26.70

0.65

46.00

29.67

0.68

23.00

15.53

0.90

46.00

41.57

0.40

46.00

18.40

0.26

105.00

27.56

0.18

84.00

15.50

1.26

84.00

105.5
8

0.82

84.00

68.77

0.38

46.00

17.39

0.42

46.00

19.32

0.45

23.00

10.35

0.90

46.00

41.57

0.40

46.00

18.40

0.26

105.00

27.56

0.18

84.00

15.50

19

Total
(m)
[9]
[10]

71.90

349.2
8
277.3
9

324.4
4
47.06

277.3
9

CONSTRUCTION ENGINEERING PROJECT

S1
S2
C1
C2
C3
D1b
3,4

D1g
D2
D3
S1
S2

3.07
5
3.07
5
2.80
0
2.80
0
3.00
0
6.02
5
4.00
0
3.00
0
3.07
5
3.07
5
3.07
5

2.72
5
1.77
5
0.30
0
0.30
0
0.30
0
0.25
0
0.25
0
0.25
0
0.20
0
2.72
5
1.77
5

0.15
0
0.15
0
0.40
0
0.45
0
0.45
0
0.60
0
0.40
0
0.35
0
0.30
0
0.15
0
0.15
0

TRINH HUU NAM 55XE

1.26

84.00

105.5
8

0.82

84.00

68.77

0.34

92.00

30.91

0.38

92.00

34.78

0.41

46.00

18.63

0.90

92.00

83.15

0.40

92.00

36.80

0.26

210.00

55.13

0.18

168.00

31.00

1.26

168.00

0.82

168.00

84.32

639.0
9
554.7
7

211.1
6
137.5
4

Concrete Volume (m)


Floo
r
5,6

Componen
t
C1
C2
C3
D1b
D1g
D2
D3
S1

Dimension(m)
l
b
h
2.80 0.30 0.35
0
0
0
2.80 0.30 0.40
0
0
0
3.00 0.30 0.40
0
0
0
6.02 0.25 0.60
5
0
0
4.00 0.25 0.40
0
0
0
3.00 0.25 0.35
0
0
0
3.07 0.20 0.30
5
0
0
3.07 2.72 0.15

V0(m
)

Quantity

V(m)

0.29

92.00

27.05

0.34

92.00

30.91

0.36

46.00

16.56

0.90

92.00

83.15

0.40

92.00

36.80

0.26

210.00

55.13

0.18

168.00

31.00

1.26

168.00

211.1

19

Total
(m)
629.2
9
74.52

554.7
7

CONSTRUCTION ENGINEERING PROJECT

S2
C1
C2
C3
D1b
7

D1g
D2
D3
S1
S2
C1
C2
C3
DMb

DMg
D2
D3
S1
S2

5
3.07
5
2.80
0
2.80
0
3.00
0
6.02
5
4.00
0
3.00
0
3.07
5
3.07
5
3.07
5
2.80
0
2.80
0
2.80
0
6.02
5
4.00
0
3.00
0
3.07
5
3.07
5
3.07
5

5
1.77
5
0.30
0
0.30
0
0.30
0
0.25
0
0.25
0
0.25
0
0.20
0
2.72
5
1.77
5
0.30
0
0.30
0
0.30
0
0.25
0
0.25
0
0.25
0
0.20
0
2.72
5
1.77
5

0
0.15
0
0.30
0
0.35
0
0.35
0
0.60
0
0.40
0
0.35
0
0.30
0
0.15
0
0.15
0
0.30
0
0.35
0
0.35
0
0.60
0
0.60
0
0.35
0
0.30
0
0.15
0
0.15
0

TRINH HUU NAM 55XE


6
137.5
4

0.82

168.00

0.25

46.00

11.59

0.29

46.00

13.52

0.32

23.00

7.25

0.90

46.00

41.57

0.40

46.00

18.40

0.26

105.00

27.56

0.18

84.00

15.50

1.26

84.00

105.5
8

0.82

84.00

68.77

0.25

46.00

11.59

0.29

46.00

13.52

0.29

23.00

6.76

0.90

46.00

41.57

0.60

46.00

27.60

0.26

105.00

27.56

0.18

84.00

15.50

1.26

84.00

105.5
8

0.82

84.00

68.77

19

32.36

309.7
5
277.3
9

31.88

318.4
6
286.5
9

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Labour For Concrete Work


Floo
r
[1]

3,4

5,6

Componen
t
[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2

V(m)
[3]
26.70
29.67
15.53
41.57
18.40
27.56
15.50
105.58
68.77
17.39
19.32
10.35
41.57
18.40
27.56
15.50
105.58
68.77
30.91
34.78
18.63
83.15
36.80
55.13
31.00
211.16
137.54
27.05
30.91
16.56
83.15
36.80
55.13
31.00
211.16
137.54

Quota
(h/m)
[4]
11.80
11.80
11.80
7.00
7.00
7.00
8.00
5.00
5.00
11.80
11.80
11.80
7.00
7.00
7.00
8.00
5.00
5.00
11.80
11.80
11.80
7.00
7.00
7.00
8.00
5.00
5.00
11.80
11.80
11.80
7.00
7.00
7.00
8.00
5.00
5.00

Man-hour
(h)
[5]
315.10
350.11
183.20
291.01
128.80
192.94
123.98
527.90
343.86
205.18
227.98
122.13
291.01
128.80
192.94
123.98
527.90
343.86
364.76
410.36
219.83
582.02
257.60
385.88
247.97
1055.80
687.72
319.17
364.76
195.41
582.02
257.60
385.88
247.97
1055.80
687.72

19

Man-day
(day)
[6]
39.39
43.76
22.90
36.38
16.10
24.12
15.50
65.99
42.98
25.65
28.50
15.27
36.38
16.10
24.12
15.50
65.99
42.98
45.60
51.29
27.48
72.75
32.20
48.23
31.00
131.98
85.97
39.90
45.60
24.43
72.75
32.20
48.23
31.00
131.98
85.97

Total
(day)
[7]
[8]
106.0
5

201.0
6

307.1
1

69.41

201.0
6

270.4
7

124.3
7

402.1
2

526.4
9

109.9
2

402.1
2

512.0
4

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Labour For Concrete Work


Floo
r
[1]

Component

V(m)

[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
DMb
DMg
D2
D3
S1
S2

[3]
11.59
13.52
7.25
41.57
18.40
27.56
15.50
105.58
68.77
11.59
13.52
6.76
41.57
27.60
27.56
15.50
105.58
68.77

Quota
(h/m)
[4]
14.00
11.80
11.80
7.00
7.00
7.00
8.00
5.00
5.00
14.00
11.80
11.80
7.00
7.00
7.00
8.00
5.00
5.00

19

Man-hour
(h)
[5]
162.29
159.58
85.49
291.01
128.80
192.94
123.98
527.90
343.86
162.29
159.58
79.79
291.01
193.20
192.94
123.98
527.90
343.86

Man-day
(day)
[6]
20.29
19.95
10.69
36.38
16.10
24.12
15.50
65.99
42.98
20.29
19.95
9.97
36.38
24.15
24.12
15.50
65.99
42.98

Total
(day)
[7]

[8]

50.92

201.0
6

251.9
8

50.21

209.1
1

259.3
2

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Reinforcement Mass (kg)


Flo
or

Compon
ent

Concret
e
Volume
(m)

[1]

[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3

[3]
0.58
0.65
0.68
0.90
0.40
0.26
0.18
1.26
0.82
0.38
0.42
0.45
0.90
0.40
0.26
0.18
1.26
0.82
0.34
0.38
0.41
0.90
0.40
0.26
0.18

Reinf
.
Ratio
( %
)
[4]
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

S1

1.26

S2

0.82

3,4

Unit
weight
(kg/m
)

Quanti
ty

[5]
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850

[6]
46
46
23
46
46
105
84
84
84
46
46
23
46
46
105
84
84
84
92
92
46
92
92
210
168

7850

168

7850

168

19

Reinf.
Mass
(kg)
[7]
2096.19
2329.10
1218.71
3263.44
1444.40
2163.66
1216.59
8288.04
5398.63
1364.96
1516.62
812.48
3263.44
1444.40
2163.66
1216.59
8288.04
5398.63
2426.59
2729.92
1462.46
6526.88
2888.80
4327.31
2433.19
16576.0
8
10797.2
6

Total
(kg)
[8]

[9]

5643.9
9

21774.
76

27418.
75

3694.0
5

21774.
76

25468.
81

6618.9
6

43549.
52

50168.
49

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Reinforcement Mass (kg)


Flo
or

5,6

Compon
ent

Concret
e
Volume
(m)

C1
C2
C3
D1b
D1g
D2
D3

0.29
0.34
0.36
0.90
0.40
0.26
0.18

Reinf
.
Ratio
( %
)
1
1
1
1
1
1
1

S1

1.26

7850

168

S2

0.82

7850

168

C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2

0.25
0.29
0.32
0.90
0.40
0.26
0.18
1.26
0.82
0.25
0.29
0.29
0.90
0.60
0.26
0.18
1.26
0.82

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850
7850

46
46
23
46
46
105
84
84
84
46
46
23
46
46
105
84
84
84

Unit
weight
(kg/m
)

Quanti
ty

7850
7850
7850
7850
7850
7850
7850

92
92
46
92
92
210
168

19

Reinf.
Mass
(kg)
2123.27
2426.59
1299.96
6526.88
2888.80
4327.31
2433.19
16576.0
8
10797.2
6
909.97
1061.63
568.73
3263.44
1444.40
2163.66
1216.59
8288.04
5398.63
909.97
1061.63
530.82
3263.44
2166.60
2163.66
1216.59
8288.04
5398.63

Total
(kg)

5849.8
2

43549.
52

49399.
34

2540.3
4

21774.
76

24315.
10

2502.4
2

22496.
96

24999.
38

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Labour For Reinforcement Work


Flo
or

Compone
nt

[1]

[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3

Reinf.
Mass
(kg)
[3]
2096.19
2329.10
1218.71
3263.44
1444.40
2163.66
1216.59
8288.04
5398.63
1364.96
1516.62
812.48
3263.44
1444.40
2163.66
1216.59
8288.04
5398.63
2426.59
2729.92
1462.46
6526.88
2888.80
4327.31
2433.19

S1

16576.08

6.98

S2

10797.26

6.98

3,4

Quota
(h/m)

Man-hour
(h)

Man-day
(day)

[4]
5.36
5.36
5.36
4.39
4.39
4.39
5.55
6.98
6.98
5.36
5.36
5.36
4.39
4.39
4.39
5.55
6.98
6.98
5.36
5.36
5.36
4.39
4.39
4.39
5.55

[5]
11235.55
12483.95
6532.30
14326.51
6340.92
9498.45
6752.09
57850.52
37682.45
7316.17
8129.08
4354.87
14326.51
6340.92
9498.45
6752.09
57850.52
37682.45
13006.53
14632.35
7838.76
28653.01
12681.83
18996.90
13504.18
115701.0
4
75364.89

[6]
1404.44
1560.49
816.54
1790.81
792.61
1187.31
844.01
7231.31
4710.31
914.52
1016.14
544.36
1790.81
792.61
1187.31
844.01
7231.31
4710.31
1625.82
1829.04
979.84
3581.63
1585.23
2374.61
1688.02

19

14462.63
9420.61

Total
(day)
[7]

[8]

3781.4
8

16556.
37

20337.
84

2475.0
2

16556.
37

19031.
38

4434.7
1

33112.
73

37547.
44

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Labour For Reinforcement Work


Flo
or

Compone
nt

[1]

[2]
C1
C2
C3
D1b
D1g
D2
D3

Reinf.
Mass
(kg)
[3]
2123.27
2426.59
1299.96
6526.88
2888.80
4327.31
2433.19

S1

16576.08

6.98

S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
DMb
DMg
D2
D3
S1
S2

10797.26
909.97
1061.63
568.73
3263.44
1444.40
2163.66
1216.59
8288.04
5398.63
909.97
1061.63
530.82
3263.44
2166.60
2163.66
1216.59
8288.04
5398.63

6.98
5.36
5.36
5.36
4.39
4.39
4.39
5.55
6.98
6.98
5.36
5.36
5.36
4.39
4.39
4.39
5.55
6.98
6.98

5,6

Quota
(h/m)

Man-hour
(h)

Man-day
(day)

[4]
5.36
5.36
5.36
4.39
4.39
4.39
5.55

[5]
11380.72
13006.53
6967.79
28653.01
12681.83
18996.90
13504.18
115701.0
4
75364.89
4877.45
5690.36
3048.41
14326.51
6340.92
9498.45
6752.09
57850.52
37682.45
4877.45
5690.36
2845.18
14326.51
9511.37
9498.45
6752.09
57850.52
37682.45

[6]
1422.59
1625.82
870.97
3581.63
1585.23
2374.61
1688.02

19

Total
(day)
[7]

[8]

3919.3
8

33112.
73

37032.
11

14462.63
9420.61
609.68
711.29
381.05
1790.81
792.61
1187.31
844.01
7231.31
4710.31
609.68
711.29
355.65
1790.81
1188.92
1187.31
844.01
7231.31
4710.31

1702.0
3

16556.
37

18258.
39

1676.6
2

16952.
67

18629.
30

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Formwork Area (m)


Floo
r

Compone
nt

[1]

[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2

3,4

Dimension (m)
Lengt
h
[3]
4.300
4.300
4.500
6.025
4.000
3.000
3.075
0.120
0.120
2.800
2.800
3.000
6.025
4.000
3.000
3.075
0.120
0.120
2.800
2.800
3.000
6.025
4.000
3.000
3.075
0.120
0.120

Perimet
er
[4]
1.5
1.6
1.6
1.7
1.3
1.2
1.0
11.6
9.7
1.5
1.6
1.6
1.7
1.3
1.2
1.0
11.6
9.7
1.4
1.5
1.5
1.7
1.3
1.2
1.0
11.6
9.7

Area
(m)

Quantit
y

A0
(m)

[5]
6.45
6.88
7.20
10.24
5.20
3.60
3.08
1.39
1.16
4.20
4.48
4.80
10.24
5.20
3.60
3.08
1.39
1.16
3.92
4.20
4.50
10.24
5.20
3.60
3.08
1.39
1.16

[6]
46.00
46.00
23.00
46.00
46.00
105.00
84.00
84.00
84.00
46.00
46.00
23.00
46.00
46.00
105.00
84.00
84.00
84.00
92.00
92.00
46.00
92.00
92.00
210.00
168.00
168.00
168.00

[7]
296.70
316.48
165.60
471.16
239.20
378.00
258.30
116.93
97.78
193.20
206.08
110.40
471.16
239.20
378.00
258.30
116.93
97.78
360.64
386.40
207.00
942.31
478.40
756.00
516.60
233.86
195.55

19

Total
(m)
[8]

[9]

778.78

1561.3
6

2340.
14

509.68

1561.3
6

2071.
04

954.04

3122.7
2

4076.
76

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Formwork Area (m)


Floo
r

Compone
nt

[1]

[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
DMb
DMg
D2
D3
S1
S2

5,6

Dimension (m)
Lengt
h
[3]
2.800
2.800
3.000
6.025
4.000
3.000
3.075
0.120
0.120
2.800
2.800
3.000
6.025
4.000
3.000
3.075
0.120
0.120
2.800
2.800
3.000
6.025
4.000
3.000
3.075
0.120
0.120

Perimet
er
[4]
1.3
1.4
1.4
1.7
1.3
1.2
1.0
11.6
9.7
1.2
1.3
1.3
1.7
1.3
1.2
1.0
11.6
9.7
1.2
1.3
1.3
1.7
1.7
1.2
1.0
11.6
9.7

Area
(m)

Quantit
y

A0
(m)

[5]
3.64
3.92
4.20
10.24
5.20
3.60
3.08
1.39
1.16
3.36
3.64
3.90
10.24
5.20
3.60
3.08
1.39
1.16
3.36
3.64
3.90
10.24
6.80
3.60
3.08
1.39
1.16

[6]
92.00
92.00
46.00
92.00
92.00
210.00
168.00
168.00
168.00
46.00
46.00
23.00
46.00
46.00
105.00
84.00
84.00
84.00
46.00
46.00
23.00
46.00
46.00
105.00
84.00
84.00
84.00

[7]
334.88
360.64
193.20
942.31
478.40
756.00
516.60
233.86
195.55
154.56
167.44
89.70
471.16
239.20
378.00
258.30
116.93
97.78
154.56
167.44
89.70
471.16
312.80
378.00
258.30
116.93
97.78

19

Total
(m)
[8]

[9]

888.72

3122.7
2

4011.
44

411.70

1561.3
6

1973.
06

411.70

1634.9
6

2046.
66

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Labour For Formwork Installation


Floo
r

Componen
t

[1]

[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2

3,4

F.work
area
(m)
[3]
296.70
316.48
165.60
471.16
239.20
378.00
258.30
116.93
97.78
193.20
206.08
110.40
471.16
239.20
378.00
258.30
116.93
97.78
360.64
386.40
207.00
942.31
478.40
756.00
516.60
233.86
195.55

Quota
(h/m)

Man-hour
(h)

Man-day
(day)

[4]
1.20
1.20
1.20
1.50
1.60
1.60
1.60
1.00
1.14
1.00
1.00
1.00
1.50
1.60
1.60
1.60
1.00
1.14
1.00
1.00
1.00
1.50
1.60
1.60
1.60
1.00
1.14

[5]
356.04
379.78
198.72
706.73
382.72
604.80
413.28
116.93
111.46
193.20
206.08
110.40
706.73
382.72
604.80
413.28
116.93
111.46
360.64
386.40
207.00
1413.47
765.44
1209.60
826.56
233.86
222.93

[6]
44.51
47.47
24.84
88.34
47.84
75.60
51.66
14.62
13.93
24.15
25.76
13.80
88.34
47.84
75.60
51.66
14.62
13.93
45.08
48.30
25.88
176.68
95.68
151.20
103.32
29.23
27.87

19

Total
(day)
[7]

[8]

116.8
2

291.9
9

408.8
1

63.71

291.9
9

355.7
0

119.2
6

583.9
8

703.2
4

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Labour For Formwork Installation


Floo
r

Componen
t

[1]

[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
DMb
DMg
D2
D3
S1
S2

5,6

F.work
area
(m)
[3]
334.88
360.64
193.20
942.31
478.40
756.00
516.60
233.86
195.55
154.56
167.44
89.70
471.16
239.20
378.00
258.30
116.93
97.78
154.56
167.44
89.70
471.16
312.80
378.00
258.30
116.93
97.78

Quota
(h/m)

Man-hour
(h)

Man-day
(day)

[4]
1.00
1.00
1.00
1.50
1.60
1.60
1.60
1.00
1.14
1.30
1.00
1.00
1.50
1.60
1.60
1.60
1.00
1.14
1.30
1.00
1.00
1.50
1.60
1.60
1.60
1.00
1.14

[5]
334.88
360.64
193.20
1413.47
765.44
1209.60
826.56
233.86
222.93
200.93
167.44
89.70
706.73
382.72
604.80
413.28
116.93
111.46
200.93
167.44
89.70
706.73
500.48
604.80
413.28
116.93
111.46

[6]
41.86
45.08
24.15
176.68
95.68
151.20
103.32
29.23
27.87
25.12
20.93
11.21
88.34
47.84
75.60
51.66
14.62
13.93
25.12
20.93
11.21
88.34
62.56
75.60
51.66
14.62
13.93

19

Total
(day)
[7]

[8]

111.0
9

583.9
8

695.0
7

57.26

291.9
9

349.2
5

57.26

306.7
1

363.9
7

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Labour For Formwork Dismantlement


Floo
r
[1]

3,4

Component
[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2

F.work area
(m)
[3]
296.70
316.48
165.60
471.16
239.20
378.00
258.30
116.93
97.78
193.20
206.08
110.40
471.16
239.20
378.00
258.30
116.93
97.78
360.64
386.40
207.00
942.31
478.40
756.00
516.60
233.86
195.55

Quota
(h/m)
[4]
0.38
0.38
0.38
0.32
0.32
0.32
0.32
0.27
0.27
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.27
0.27
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.27
0.27

19

Man-hour
(h)
[5]
112.75
120.26
62.93
150.77
76.54
120.96
82.66
31.57
26.40
61.82
65.95
35.33
150.77
76.54
120.96
82.66
31.57
26.40
115.40
123.65
66.24
301.54
153.09
241.92
165.31
63.14
52.80

Man-day
(day)
[6]
14.09
15.03
7.87
18.85
9.57
15.12
10.33
3.95
3.30
7.73
8.24
4.42
18.85
9.57
15.12
10.33
3.95
3.30
14.43
15.46
8.28
37.69
19.14
30.24
20.66
7.89
6.60

Total
(day)
[7]

[8]

36.99

98.10
61.11

20.39

81.50
61.11

38.16

122.2
2

160.3
9

CONSTRUCTION ENGINEERING PROJECT

TRINH HUU NAM 55XE

Labour For Formwork Dismantlement


Floo
r
[1]

5,6

Component
[2]
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
D1b
D1g
D2
D3
S1
S2
C1
C2
C3
DMb
DMg
D2
D3
S1
S2

F.work area
(m)
[3]
334.88
360.64
193.20
942.31
478.40
756.00
516.60
233.86
195.55
154.56
167.44
89.70
471.16
239.20
378.00
258.30
116.93
97.78
154.56
167.44
89.70
471.16
312.80
378.00
258.30
116.93
97.78

Quota
(h/m)
[4]
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.27
0.27
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.27
0.27
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.27
0.27

19

Man-hour
(h)
[5]
107.16
115.40
61.82
301.54
153.09
241.92
165.31
63.14
52.80
49.46
53.58
28.70
150.77
76.54
120.96
82.66
31.57
26.40
49.46
53.58
28.70
150.77
100.10
120.96
82.66
31.57
26.40

Man-day
(day)
[6]
13.40
14.43
7.73
37.69
19.14
30.24
20.66
7.89
6.60
6.18
6.70
3.59
18.85
9.57
15.12
10.33
3.95
3.30
6.18
6.70
3.59
18.85
12.51
15.12
10.33
3.95
3.30

Total
(day)
[7]

[8]

35.55

122.2
2

157.7
7

16.47

77.58
61.11

16.47

80.52
64.06