LOKASI PEMBANGUNAN : JL.

LANUDAL, PENFUI TIMUR

Jarak ke beberapa lokasi:

Bandara eltari kupang : 6,2 km (10 menit)


Toko sinar bangunan : 8,4 km (18 menit)
Toko
Toko
Toko
Toko

Duta bangunan : 13 km (31 menit)


prima bangunan : 12 km (28 mneit)
istana bangunan : 4km (8 menit)
kristal bangunan : 2km (6 menit)
RUANG

NO.

R. TIDUR 1

2
3

R. TAMU
GARASI
R. KELUARGA
R. TIDUR 2
R. TIDUR 3
KM/WC 1
KM/WC 2
DAPUR
R. MAKAN
TERAS
SELASAR 1
SELASAR 2

4
5
6

7
8
9

10
11
12

13

kusen
P2
P1
J2
J4
J sudut
BV1
P. ROLLING DOOR

P - 0,075
=
=
=
=
=
=
=
=
=
=
=
=

3
3
3
3.5
3.5
3
2
2
3
5
3
3

P - 0,075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075

2.925
2.925
2.925
3.425
3.425
2.925
1.925
1.925
2.925
4.925
2.925
2.925

H
2.2
2.2
1.6
1.8
1.8
0.5
2.55

x
x
x
x
x
x
x
x
x
x
x
x

x
x
x
x
x
x
x

Luas kusen total

4
3.5
3.5
3
3
3
1.5
1.5
3
3
1.2
2

L
1.3
0.8
0.55
0.85
1.33
0.5
2.7

L - 0,075
0.075
3.925
0.075
3.425
0.075
3.425
0.075
2.925
0.075
2.925
0.075
2.925
0.075
1.425
0.075
1.425
0.075
2.925
0.075
2.925
0.075
1.125
0.075
1.925

=
=
=
=
=
=
=
=
=
=
=
=
=
=

BANYAK

JUMLAH
11.48063
10.01813
10.01813
10.01813
10.01813
8.555625
2.743125
2.743125
8.555625
14.40563
3.290625
5.630625
6
103.4775

LUAS
1
8
5
2
2
1
1

=
=
=
=
=
=
=

2.86
14.08
4.4
3.06
4.788
0.25
6.885

36.323

m
m
m
m
m
m
m
m
m
m
m
m
m
m

m
m
m
m
m
m
m
m

PE
NO.
I
PEKERJAAN PERSIAPAN

II

GAMBAR

PEKERJAAN TANAH DAN URUGAN

h
b

NO.
GAMBAR
III PENGERJAAN PASANGAN DAN PLESTERAN

IV

PEKERJAAN BETON

PEKERJAAN DINDING
b

PEKERJAAN PLESTERAN

PEKERJAAN KAYU & KACA

PERHITUNGAN VOUME
URAIAN PEKERJAAN DAN PERHITUNGAN
1. Pembersihan lahan
P (m)
11

L(m)
15

P (m)
11

L(m)
15

b (m)
0.93

h(m)
0.45

L (m)
1.5

b (m)
1

h(m)
0.75

L (m)
12

b (m)
0.5

h(m)
0.55

L (m)
12.7

2. Pemasangan bowplank + vitzet

3. Penyediaan air kerja


1. Galian tanah pondasi
a. Pondasi A

b. Pondasi B

c. Pondasi C

d. Pondasi D
b (m)
1

h(m)
0.75

L (m)
81.2

Total volume galian


2. Urugan Tanah kembali
Vgalian (m)
74.02025
3. Urugan Pasir dibawah Pondasi
Pondasi
A
B
C
D

b (m)
0.93
1
0.5
1

h(m)
0.05
0.05
0.05
0.05

L (m)
1.5
12
12.7
81.2

volume
0.06975
0.6
0.3175
4.06

A (m)
5.85
6
98.25

b (m)

h(m)

L (m)
1.5
10
9

4. Urugan Pasir Peninggi Lantai


Pondasi
A
B
C&D

0.2
0.15
0.2

PERHITUNGAN VOLUME
URAIAN PEKERJAAN DAN PERHITUNGAN
1. Pekerjaan Anstamping Batu Karang/ Kali
Pondasi
A
B
C

b (m)
0.93
0.8
0.5

h(m)
0.2
0.2
0.2

L (m)
1.5
12
12.7

0.2

81.2

Volume total pekerjaan anstamping batu kali


2. Pasangan Pondasi Batu Kali
Pondasi
A
B
C
D

a (m)

e (m)
0.53
0.53
0.83
0.83
0.3
1
0.3
0.5
0.3
1
Volume total (Vt)

volume kelebihan pada tiap perpotongan


lebar bawah
atas
0.8
0.8
0.3
0.3

tinggi
1.28
0.48

total volumekelebihan pada tiap potongan (Vk)


maka, volume kelebihan total pada 20 titik

c atau h (m)
0.2
0.4
0.8
0.6
0.8

L (m)
1.5
1.5
12
12.5
81.2

l
0.333333333
0.333333333

volume
0.2731
0.0144
0.2587
0.129333333
2.586666667

1. SLOOF
L (m)

l (m)
0.2

109.1

h (m)
0.15

2.KOLOM
t (m)
K. utama
K. praktis

l (m)
0.15
0.1

h (m)
0.1
0.1

4
4

n (buah)
20
6

3. RINGBALK
L (m)

l (m)
0.2

109.1

h (m)
0.15

1. Volume pasangan tembok biasa (1 pc : 5 psr)


L

Tembok.TOTAL

(m)

LKusen.TOTAL(m)

Trasrm.TOTAL(m)

tebal (b)

1421.00

36.32

8.1

0.15

2. volume pasangan tembok trasram (1 pc : 5 psr)

L Trasrm.TOTAL(m) tebal (b)


8.1
0.15

Luas kusen
lebar
P1
P2

tinggi
0.8
1.3

jumlah
2.15
2.15

luas
8
1

13.76
2.795

1. volume plesteran pasangan tembok biasa (1 pc : 5 psr)

2. volume plesteran pasangan tembok trasram (1 pc : 5 psr)

1. Pasangan Kayu Kosen Klas I (5/10)


b (m)
h (m)
Type
P2
0.05
P1
0.05
J2
0.05
J4
0.05
J sudut
0.05
Bv 1
0.05
P. ROLLING DOOR
0.05

L (m)
0.1
0.1
0.1
0.1
0.1
0.1
0.1

n (unit)
1
8
5
2
2
1
1

VOLUME

SATUAN

=
=

PxLxT
660

=
=

2 x ((L + 2) + (P + 2)
60

LS

=
=

bxhxL
0.62775

=
=

bxhxL
9

=
=

bxhxL
3.4925

=
=

bxhxL
60.9

74.02025

Vtotal =

5.04725

{A-(L x b)h}

VOLUME

Va
Vb
Vc

=
=
=
=

SATUAN

bxhxL
0.279
1.92
1.27

m
m
m

Vd

16.24

19.709

m
m

VA

VB
VC
VD

=
=
=
=

0.159 =
0.498
7.8
5
52.78
66.237

=
=

Vt - Vk
63.6503333333

0.657

m
m
m
m
m
m

m
m
m
m
m

=
=

Lxlxm
3.273

txlxhxn
24.25
10.2

T.TOTAL -

L K.TOTAL - L

Trasrm.TOTAL

1376.58

=
=

Axb

A
V

=
=
=

8.1
Axt
1.215

=
=

VT.biasa

=
=

VT.trasrm

=
=

[( b x h ) x L ] x n

206.49

x2
412.9731

x2
2.43

REKAPITULASI VOLUME
NO.
I

URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN

1
2
3
II

PEKERJAAN TANAH DAN URUGAN

1
2
3
4
III

Cor
Cor
Cor
Cor
Cor
Cor

Beton
Beton
Beton
Beton
Beton
Beton

Sloof (1pc : 2psr : 3krl)


Kolom Praktis (1pc : 2psr : 3krl)
Kolom Teras (1pc : 2psr : 3krl)
Ringbalk (1pc : 2psr : 3krl)
Meja Dapur (1pc : 2psr : 3krl)
Neut (1pc : 2psr : 3krl)

PEKERJAAN KAYU DAN KACA

1
2
3
4
5
6
7
VI

Pekerjaan Anstamping
Pasangan Pondasi Batu Karang (1 pc : 5 psr)
Pasangan Tembok Trasraam (1 pc : 3 psr)
Pasangan Tembok Biasa (1 pc : 5 psr)
Plesteran Tembok Trasraam (1 pc : 3 psr)
Plesteran Tembok Biasa (1 pc : 5 psr)
Plesteran Pondasi Tepi Luar (1 pc : 5 psr)
Acian Tembok

PEKERJAAN BETON

1
2
3
4
5
6
V

Galian Tanah Pondasi


Urugan Tanah Kembali
Urugan Pasir di Bawah Pondasi
Urugan Pasir Peninggi Lantai

PEKERJAAN PASANGAN DAN PLESTERAN

1
2
3
4
5
6
7
8
IV

Pembersihan Lahan
Pemasangan Bowplank
Penyediaan Air Kerja

Pasangan Kayu Kusen Klas I


Pasangan Daun Pintu Panil Kayu
Pas. Daun Pintu Double Teacwood 3 mm
Pas. Daun Pintu Double Teacwood 3 mm lapis seng
Pas. Daun Jendela Kaca dan Ventilasi 3 mm
Pas. Kayu Kap dan Gording
Pasangan Lisplank Papan

PASANGAN ATAP DAN PLAFOND

1
2
3

Pas. Atap Seng BJLS 0.30 mm


Pas. Atap Bubungan Seng Licin 0.30 mm
Pas. Plafond Tripleks 3 mm & Rangka

NO.
VII

URAIAN PEKERJAAN
PEKERJAAN LANTAI

1
2
3
4
VIII

Keramik 30/30
Mozaik 30/30
Plint 10/20
Porselen 20/20

Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan

Titik Lampu
Lampu TL 40 Watt
Lampu TL 20 Watt
Lampu Pijar 25 Watt
Saklar Tunggal
SaklarGanda
Stop Kontak
Sekring Cast
Arde Pembumian
Wastafel
Bak Air Porselin
Closed Jongkok
Septic Tank dan Peresapan
Instalasi Air Bersih
Instalasi Air Kotor
Floor Drain
Kran Air

Cat Tembok
Cat Plafond
Cat Kayu
Cat Seng
Teak Oil

PEKERJAAN PENGGANTUNG DAN PENGUNCI

1
2
3
4
5
6
7
XI

Tegel
Tegel
Tegel
Tegel

PEKERJAAN FINISHING

1
2
4
5
6
X

Pasangan
Pasangan
Pasangan
Pasangan

PEKERJAAN INSTALASI LISTRIK DAN AIR

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
IX

Pas. List Penutup Plafond (Berprofil)

Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan

Kunci Double Slaag


Kunci KM/ WC
Grendel
Engsel
Kait Angin
Anker Doc
Mur, Baut dan Beughel U

PEKERJAAN LAIN - LAIN

1
2

Pasangan Saluran Keliling Bangunan (Buis Beton U 30 cm)


Pembersihan Kembali

ULASI VOLUME

KERJAAN

VOLUME

SATUAN

m2
m1
LS

m3
m3
m3
m3

m3
m3
m2
m2
m2
m2
m2
m2

m3
m3
m3
m3
m3
m3

m3
m2
m2
m2
m2
m3
m1

m2
m1
m2

KERJAAN

m1

VOLUME

SATUAN

m2
m2
m1
m2
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
LS
LS
Buah
Buah

m2
m2
m2
m2
m2

Buah
Buah
Buah
Buah
Buah
Buah
LS

m1
LS

Anda mungkin juga menyukai