NO.
R. TIDUR 1
2
3
R. TAMU
GARASI
R. KELUARGA
R. TIDUR 2
R. TIDUR 3
KM/WC 1
KM/WC 2
DAPUR
R. MAKAN
TERAS
SELASAR 1
SELASAR 2
4
5
6
7
8
9
10
11
12
13
kusen
P2
P1
J2
J4
J sudut
BV1
P. ROLLING DOOR
P - 0,075
=
=
=
=
=
=
=
=
=
=
=
=
3
3
3
3.5
3.5
3
2
2
3
5
3
3
P - 0,075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
2.925
2.925
2.925
3.425
3.425
2.925
1.925
1.925
2.925
4.925
2.925
2.925
H
2.2
2.2
1.6
1.8
1.8
0.5
2.55
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
4
3.5
3.5
3
3
3
1.5
1.5
3
3
1.2
2
L
1.3
0.8
0.55
0.85
1.33
0.5
2.7
L - 0,075
0.075
3.925
0.075
3.425
0.075
3.425
0.075
2.925
0.075
2.925
0.075
2.925
0.075
1.425
0.075
1.425
0.075
2.925
0.075
2.925
0.075
1.125
0.075
1.925
=
=
=
=
=
=
=
=
=
=
=
=
=
=
BANYAK
JUMLAH
11.48063
10.01813
10.01813
10.01813
10.01813
8.555625
2.743125
2.743125
8.555625
14.40563
3.290625
5.630625
6
103.4775
LUAS
1
8
5
2
2
1
1
=
=
=
=
=
=
=
2.86
14.08
4.4
3.06
4.788
0.25
6.885
36.323
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
PE
NO.
I
PEKERJAAN PERSIAPAN
II
GAMBAR
h
b
NO.
GAMBAR
III PENGERJAAN PASANGAN DAN PLESTERAN
IV
PEKERJAAN BETON
PEKERJAAN DINDING
b
PEKERJAAN PLESTERAN
PERHITUNGAN VOUME
URAIAN PEKERJAAN DAN PERHITUNGAN
1. Pembersihan lahan
P (m)
11
L(m)
15
P (m)
11
L(m)
15
b (m)
0.93
h(m)
0.45
L (m)
1.5
b (m)
1
h(m)
0.75
L (m)
12
b (m)
0.5
h(m)
0.55
L (m)
12.7
b. Pondasi B
c. Pondasi C
d. Pondasi D
b (m)
1
h(m)
0.75
L (m)
81.2
b (m)
0.93
1
0.5
1
h(m)
0.05
0.05
0.05
0.05
L (m)
1.5
12
12.7
81.2
volume
0.06975
0.6
0.3175
4.06
A (m)
5.85
6
98.25
b (m)
h(m)
L (m)
1.5
10
9
0.2
0.15
0.2
PERHITUNGAN VOLUME
URAIAN PEKERJAAN DAN PERHITUNGAN
1. Pekerjaan Anstamping Batu Karang/ Kali
Pondasi
A
B
C
b (m)
0.93
0.8
0.5
h(m)
0.2
0.2
0.2
L (m)
1.5
12
12.7
0.2
81.2
a (m)
e (m)
0.53
0.53
0.83
0.83
0.3
1
0.3
0.5
0.3
1
Volume total (Vt)
tinggi
1.28
0.48
c atau h (m)
0.2
0.4
0.8
0.6
0.8
L (m)
1.5
1.5
12
12.5
81.2
l
0.333333333
0.333333333
volume
0.2731
0.0144
0.2587
0.129333333
2.586666667
1. SLOOF
L (m)
l (m)
0.2
109.1
h (m)
0.15
2.KOLOM
t (m)
K. utama
K. praktis
l (m)
0.15
0.1
h (m)
0.1
0.1
4
4
n (buah)
20
6
3. RINGBALK
L (m)
l (m)
0.2
109.1
h (m)
0.15
Tembok.TOTAL
(m)
LKusen.TOTAL(m)
Trasrm.TOTAL(m)
tebal (b)
1421.00
36.32
8.1
0.15
Luas kusen
lebar
P1
P2
tinggi
0.8
1.3
jumlah
2.15
2.15
luas
8
1
13.76
2.795
L (m)
0.1
0.1
0.1
0.1
0.1
0.1
0.1
n (unit)
1
8
5
2
2
1
1
VOLUME
SATUAN
=
=
PxLxT
660
=
=
2 x ((L + 2) + (P + 2)
60
LS
=
=
bxhxL
0.62775
=
=
bxhxL
9
=
=
bxhxL
3.4925
=
=
bxhxL
60.9
74.02025
Vtotal =
5.04725
{A-(L x b)h}
VOLUME
Va
Vb
Vc
=
=
=
=
SATUAN
bxhxL
0.279
1.92
1.27
m
m
m
Vd
16.24
19.709
m
m
VA
VB
VC
VD
=
=
=
=
0.159 =
0.498
7.8
5
52.78
66.237
=
=
Vt - Vk
63.6503333333
0.657
m
m
m
m
m
m
m
m
m
m
m
=
=
Lxlxm
3.273
txlxhxn
24.25
10.2
T.TOTAL -
L K.TOTAL - L
Trasrm.TOTAL
1376.58
=
=
Axb
A
V
=
=
=
8.1
Axt
1.215
=
=
VT.biasa
=
=
VT.trasrm
=
=
[( b x h ) x L ] x n
206.49
x2
412.9731
x2
2.43
REKAPITULASI VOLUME
NO.
I
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
1
2
3
II
1
2
3
4
III
Cor
Cor
Cor
Cor
Cor
Cor
Beton
Beton
Beton
Beton
Beton
Beton
1
2
3
4
5
6
7
VI
Pekerjaan Anstamping
Pasangan Pondasi Batu Karang (1 pc : 5 psr)
Pasangan Tembok Trasraam (1 pc : 3 psr)
Pasangan Tembok Biasa (1 pc : 5 psr)
Plesteran Tembok Trasraam (1 pc : 3 psr)
Plesteran Tembok Biasa (1 pc : 5 psr)
Plesteran Pondasi Tepi Luar (1 pc : 5 psr)
Acian Tembok
PEKERJAAN BETON
1
2
3
4
5
6
V
1
2
3
4
5
6
7
8
IV
Pembersihan Lahan
Pemasangan Bowplank
Penyediaan Air Kerja
1
2
3
NO.
VII
URAIAN PEKERJAAN
PEKERJAAN LANTAI
1
2
3
4
VIII
Keramik 30/30
Mozaik 30/30
Plint 10/20
Porselen 20/20
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Titik Lampu
Lampu TL 40 Watt
Lampu TL 20 Watt
Lampu Pijar 25 Watt
Saklar Tunggal
SaklarGanda
Stop Kontak
Sekring Cast
Arde Pembumian
Wastafel
Bak Air Porselin
Closed Jongkok
Septic Tank dan Peresapan
Instalasi Air Bersih
Instalasi Air Kotor
Floor Drain
Kran Air
Cat Tembok
Cat Plafond
Cat Kayu
Cat Seng
Teak Oil
1
2
3
4
5
6
7
XI
Tegel
Tegel
Tegel
Tegel
PEKERJAAN FINISHING
1
2
4
5
6
X
Pasangan
Pasangan
Pasangan
Pasangan
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
IX
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
Pasangan
1
2
ULASI VOLUME
KERJAAN
VOLUME
SATUAN
m2
m1
LS
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m3
m1
m2
m1
m2
KERJAAN
m1
VOLUME
SATUAN
m2
m2
m1
m2
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
LS
LS
Buah
Buah
m2
m2
m2
m2
m2
Buah
Buah
Buah
Buah
Buah
Buah
LS
m1
LS