Objectives:

To provide better Power Evacuation facility for the plant with minimum line
losses and with Minimum breakdowns accompanying all the safety
procedures and Greenko standards.
1. Minimizing the loss of generations time because of electrical equipments
failure.
2. Minimizing idle time of equipment due to breakdown.
3. Minimizing the repair time and repair cost
4. Minimizing the loss due to generations stoppages
5. Efficient use of maintenance electrical equipments
6. Prolonging the life of capital assets by minimizing the rate of wear and tear
7. To keep all productive assets in good working conditions
8. TO maximize efficiency and economy in generation through optimum use of
falsity
9. To minimize accident through regular inspection (or) working and repair of
safety devices
10.To minimize the total maintenance cost which includes the cost of repair ,cost
of preventions maintenance and inventory carrying costs, due to spare parts
inventory
11.Impact of poor maintenance are generation capacity, equipments cost,
service quality, employee safety, etc.
Maintenance performance: (Greenko rules)
1. Generation of maintenance :
2. Down time index
:
3. Maintenance
:

output/maintenance cost
down time Hrs/ Generation Hrs* 100
maintenance cost/ capital cost *100

Responsibilities of maintenance:
1. Ensures that equipments is properly use , selected operation & maintenance
based on Greenko rules.
2. Establishes and monitoring programs for critical time sections equipments
analysis.
3. Corrective maintenance includes repair of broken down equipments and
usually reactive.
4. Condition based monitory involves monitoring of equipment condition and
plant operation on real time basis and addresses a paternal problems.
Daily & Monthly maintenance of electrical equipments

1. Preventive and Breakdown maintenance of HT/LT systems.


2. Operation and Maintenance of all the electrical equipments both from
local and SCADA to ensure smooth functioning of the plant.

3. Overall Generation and Consumption monitoring and optimizing the


same.
4. Analysis of the plant performance by evaluating PR & PLF factors.
5. Implementing and follow up of Permit to work (PTW) and LOTO safety
procedures.
6. Preparing and keeping of spare parts as on when required.
7. Root cause analysis of the breakdown and taking corrective action to
avoid the equipment down time.
8. Planning the annual, monthly and daily maintenance activities and
executing the same.
9. To maintenance for Transmission line and Bay line systems.
10.
Cross checking the relays functions and Dc supply voltages
11.
Trouble shooting the alux relays and transformer protections
circuits
12.
Smoothly maintenance for power & TDT transformers.
Requesting the materials:
1. Digital megger (5KV)
2. Leakage testers ( clamp type mA)
3. MultiMates (1000v AC/DC)
4. ERT Kit (500 ohms)
5. Tools box
6. Laser gun for Temp checking
7. Safety belts & ropes
8. PPEs
9. Air blower / Vacuum cleaner
10.
Hand gloves (33 kv)