Elgin CBD Streetscape

Improvement Project
Streetscape Elements

October 17, 2006

Design Team
Client

Engineers

Urban Design and Landscape Architecture

Elgin CBD Streetscape Improvement Project


October 17, 2006

Agenda
Welcome
Phases
Streetscape Elements
Case Studies
Goals / Objectives
Streetscape Types
Concepts
Next Steps
Adjourn

Elgin CBD Streetscape Improvement Project


October 17, 2006

Project Area

Phases
Elgin CBD Streetscape Improvement Project
October 17, 2006

Phase 1:

Underground 2006
Surface 2007

Phase 2:

Underground 2007
Surface 2008

Phase 3:

Underground 2008
Surface 2009

Phase 4:

Underground 2009
Surface 2010

Phase 5:

Underground 2010
Surface 2011

Project Area

S. Grove Ave.

Spring St.

Phase 1

Underground 2006
Surface 2007

Elgin CBD Streetscape Improvement Project


October 17, 2006

Fulton St.

Project Area

Spring St.

Phase 2

Underground 2007
Surface 2008

Elgin CBD Streetscape Improvement Project


October 17, 2006

DuPage St.

Chicago St.

Project Area

Symphony Way

Douglas Ave.

Phase 3

Underground 2008
Surface 2009

Elgin CBD Streetscape Improvement Project


October 17, 2006

Division St.

Project Area

N. Grove Ave.

Center St.

Phase 4

Underground 2009
Surface 2010

Elgin CBD Streetscape Improvement Project


October 17, 2006

Highland Ave.

Project Area

Spring St.

Dexter Ave.

Phase 5

Underground 2010
Surface 2011

Elgin CBD Streetscape Improvement Project


October 17, 2006

Spring St.

Design Charette
A Design Charette was held on Thursday, August 17th at 7:00 p.m.
- there was a presentation of Streetscape Design
Guidelines by DLK Civic Design
- the group split up into 4 tables of about 8 each
- discussions took place regarding:
500 scale aerial photo
for contextual analysis
8 scale plan
for specific streetscape elements

Elgin CBD Streetscape Improvement Project


October 17, 2006

10

11

Analysis - Opportunities
Intersection

Interest Point

Circulation

Constraint

Elgin CBD Streetscape Improvement Project


October 17, 2006

Analysis - Opportunities
Consistency
-Tree Canopy / Module
-Tree Planting Methods
-Pavement
-Site Furniture
-Decorative Lighting
-Wayfinding Signage

Connections
-Across Bridges
-To Neighborhoods
-Civic Center
-Parking / Parking Garages
-New Riverfront Developments
-Old Railroad Right-Of-Way

Elgin CBD Streetscape Improvement Project


October 17, 2006

12

Analysis - Constraints

13

Constraints
-Unappealing Bridge Crossing
-Dangerous Intersections
-Inconsistency of Blocks
-No Connectivity of Circulation through
Civic Center
-Inadequate Way-finding Signage
-Inadequate Free Parking Signage

Elgin CBD Streetscape Improvement Project


October 17, 2006

Streetscape Elements
Decorative Street Lighting
Paving Options
P.C.C. Concrete
Concrete Pavers
Slab Pavers
Clay Pavers
Paving Installation Techniques
Granular Base
Concrete Base
Sand Setting Bed
Bituminous Setting Bed
Paving Patterns
Breaches in the Module
Corner Bump-Outs
Crosswalks
Landscape Planting Techniques
Hanging Baskets
Site Furniture

Elgin CBD Streetscape Improvement Project


October 17, 2006

14

Streetscape Elements
Decorative Street Lighting

Decorative Street Light

Single Pedestrian Light

Elgin CBD Streetscape Improvement Project


October 17, 2006

Double Pedestrian Light

15

Streetscape Elements
Paving Options
P.C.C. Concrete

Elgin CBD Streetscape Improvement Project


October 17, 2006

16

Streetscape Elements
Paving Options
P.C.C. Concrete

Elgin CBD Streetscape Improvement Project


October 17, 2006

17

Streetscape Elements
Paving Options
Concrete Pavers

Elgin CBD Streetscape Improvement Project


October 17, 2006

18

Streetscape Elements
Paving Options
Concrete Pavers

Elgin CBD Streetscape Improvement Project


October 17, 2006

19

Streetscape Elements
Paving Options
Concrete Pavers

Elgin CBD Streetscape Improvement Project


October 17, 2006

20

Streetscape Elements
Paving Options
Slab Pavers

Elgin CBD Streetscape Improvement Project


October 17, 2006

21

Streetscape Elements
Paving Options
Slab Pavers

Elgin CBD Streetscape Improvement Project


October 17, 2006

22

Streetscape Elements
Paving Options
Clay Pavers

Elgin CBD Streetscape Improvement Project


October 17, 2006

23

Streetscape Elements
Paving Options
Clay Pavers

Elgin CBD Streetscape Improvement Project


October 17, 2006

24

Streetscape Elements
Paving Installation Techniques
Granular Base

Elgin CBD Streetscape Improvement Project


October 17, 2006

25

Streetscape Elements
Paving Installation Techniques
Granular Base

Elgin CBD Streetscape Improvement Project


October 17, 2006

26

Streetscape Elements
Paving Installation Techniques
Concrete Base with Sand Setting Bed

Elgin CBD Streetscape Improvement Project


October 17, 2006

27

Streetscape Elements
Paving Installation Techniques
Concrete Base
- Sand Setting Bed

Elgin CBD Streetscape Improvement Project


October 17, 2006

28

Streetscape Elements
Paving Installation Techniques
Concrete Base with Bituminous Setting Bed

Elgin CBD Streetscape Improvement Project


October 17, 2006

29

Streetscape Elements
Paving Installation Techniques
Concrete Base
- Bituminous Setting Bed

Elgin CBD Streetscape Improvement Project


October 17, 2006

30

Streetscape Elements
Paving Patterns

Elgin CBD Streetscape Improvement Project


October 17, 2006

31

Streetscape Elements
Paving Pattern Details

Elgin CBD Streetscape Improvement Project


October 17, 2006

32

Streetscape Elements
ADA Tactile Surface

Accessible Ramps

Elgin CBD Streetscape Improvement Project


October 17, 2006

Truncated Dome Pavers

33

Streetscape Elements
Breaches in the Module

Vehicular Space

Elgin CBD Streetscape Improvement Project


October 17, 2006

Pedestrian Space

34

Streetscape Elements
Bump-outs

Frame / Protect Parking Lane

Elgin CBD Streetscape Improvement Project


October 17, 2006

35

Streetscape Elements
Decorative Crosswalks

Stamped Asphalt Crosswalk

Unit Paver Crosswalk

Elgin CBD Streetscape Improvement Project


October 17, 2006

Unit Paver Crosswalk

36

Streetscape Elements
Landscape Planting Techniques

Tree Grates

Elgin CBD Streetscape Improvement Project


October 17, 2006

Raised Planters

37

Streetscape Elements
Landscape Planting Techniques

Curbed Planters

Elgin CBD Streetscape Improvement Project


October 17, 2006

At-Grade Planters

38

Streetscape Elements
Landscape Planting Techniques

Paver Grate Installation

Elgin CBD Streetscape Improvement Project


October 17, 2006

Paver Grate

39

Streetscape Elements
Landscape Planting Techniques

Precast Concrete Tree Covers

Elgin CBD Streetscape Improvement Project


October 17, 2006

Decorative Paver Medallions

40

Streetscape Elements
Hanging Baskets

Existing Hanging Baskets across Bridges

Elgin CBD Streetscape Improvement Project


October 17, 2006

Hanging Baskets

41

Streetscape Elements
Site Furniture Options

Bench

Bollard

Elgin CBD Streetscape Improvement Project


October 17, 2006

Trash Receptacle

Newspaper Kiosk

42

Streetscape Elements
Information Kiosks

Existing Information Kiosk

Elgin CBD Streetscape Improvement Project


October 17, 2006

Information Kiosk

43

Streetscape Elements
Community Identifiers
- Gateway Elements

Elgin CBD Streetscape Improvement Project


October 17, 2006

44

Streetscape Elements
Community Identifiers
- Banners

Elgin CBD Streetscape Improvement Project


October 17, 2006

45

Streetscape Elements
Community Identifiers
- Medallions

Elgin CBD Streetscape Improvement Project


October 17, 2006

46

Streetscape Elements
Community Identifiers
- Medallions

Elgin CBD Streetscape Improvement Project


October 17, 2006

47

Case Studies
Park Ridge
-Clay Paver Band
-Concrete Sidewalk
-Decorative Lighting
-Consistency throughout Downtown

Elgin CBD Streetscape Improvement Project


October 17, 2006

48

Case Studies
Geneva
-Clay Paver Intersections
-Clay Paver Carriage Walks
-Site Furniture
-Wayfinding Signage
-Decorative Lighting
-Plantings within Bump-Outs

Elgin CBD Streetscape Improvement Project


October 17, 2006

49

Case Studies
Evanston
-Clay and Concrete Pavers
-Art Medallion Pavers
-Decorative Lighting
-Sidewalk Planters
-Site Furniture
-Consistency throughout Downtown

Elgin CBD Streetscape Improvement Project


October 17, 2006

50

Case Studies
Evanston

Elgin CBD Streetscape Improvement Project


October 17, 2006

51

Case Studies
Evanston

Elgin CBD Streetscape Improvement Project


October 17, 2006

52

Case Studies
Evanston

Elgin CBD Streetscape Improvement Project


October 17, 2006

53

Case Studies
Evanston

Elgin CBD Streetscape Improvement Project


October 17, 2006

54

Case Studies
Highland Park
- Clay Pavers
- Decorative Lighting
- Crosswalks
- Sidewalk Planters
- Site Furniture
- Consistency throughout Downtown

Elgin CBD Streetscape Improvement Project


October 17, 2006

55

Case Studies
Highland Park

Elgin CBD Streetscape Improvement Project


October 17, 2006

56

Case Studies
Highland Park

Elgin CBD Streetscape Improvement Project


October 17, 2006

57

Case Studies
Highland Park

Elgin CBD Streetscape Improvement Project


October 17, 2006

58

Case Studies
Highland Park

Elgin CBD Streetscape Improvement Project


October 17, 2006

59

Case Studies
Highland Park

Elgin CBD Streetscape Improvement Project


October 17, 2006

60

Elgin CBD Streetscape


Improvement Project
Streetscape Elements

October 17, 2006