List Of Docu

S.No
Form 1
Form 2
Form 3
Form 4
Form 5
Form 6
Form 7
Form 8
Form 9

Description
Project schedule
Design Documents check list
Materials check list
Mounting Systems check list
Construction Materials and installation check list
Mounting Installation check list
Electrical Installation check list
Final Installation check list
Inspection check list

List Of Documents- Solar Projects


Mark if Available

Date

Revision

Date of Revision

Comments

Form 1:
Project Details
Client Name:
DEWA
PO Number:
Date:
Name of PV plant:
ABDULLAH SAEED MOSQUE- ALTAWAR
Power (KWp):
5.72 kWp
Location:
ALTAWAR
Installation type:
Roof top
Prepared by:
Osama Tahir
Approved By:
Rev. & Date:

S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Form 1: Project schedule


Item
Complete Project Duration
NOC From DEWA and Other Authorities
Documentation
Procurement
Civil Material
Mounting System
Solar panels/Inveter/Other Electrical Items
Site Works
Construction
Mounting installation
Electrical Installation
Final Check
DEWA Inspection
Hand Over Documentation

Estimated Duration

Date

Actual Duration

Date

Form 2: Design
Project Details
Client Name:
DEWA
PO Number:
Date:
Name of PV plant:
ABDULLAH SAEED MOSQUE- ALTAWAR
Power (KWp):
5.72 kWp
Location:
ALTAWAR
Installation type:
Roof top
Prepared by:
Osama Tahir
Approved By:
Rev. & Date:

S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Form 2: Design Documents check list


Item
Solar NOC
NOC From Other Authorities
Setting out plan
Load Schedule
PV Single Line Diagram
System Single Line Diagram
PvSyst Report
PV Panel Specification Data
PV InverterSpecification Data
Solar DA Application
PV-DB Circuit Diagram
PV-DB Layout
PV Panel Connection Diagram
Shading analysis
Installation Diagram
Mech. Load calculation (if necessary)
Safety and Warning Signs

Tick if Available
Available
NO
Available
Available
Available
Available
NO
Available
Available
Available
Available
Available
Available
Available
Available
_
Available

Date

Comments

Form 3: Mai
Project Details
Project Details
Client Name:
DEWA
PO Number:
Date:
Name of PV plant:
ABDULLAH SAEED MOSQUE- ALTAWAR
Power (KWp):
5.72 kWp
Location:
ALTAWAR
Installation type:
Roof top
Prepared by:
Osama Tahir
Approved By:
Rev. & Date:

S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Form 3: Main Material Check List


Item
Doc/PV Single Line Diagram
PV-Panel
PV-Inverter
PV- Interface Protection
PV-DB
RRGP-Meter Cabinet
C.B. (for existing panel)
DC Cable
AC Cable
Earth Cable
Cable tray
Cable accessories
Bus Bar [Earth]

Description
Available
NO
Available
_
_
NO
NO
Available
Available
Available
NO
NO
NO

Qty.

Complete

Incomplete

Form 4:
Project Details
Client Name:
DEWA
PO Number:
Date:
Name of PV plant:
ABDULLAH SAEED MOSQUE- ALTAWAR
Power (KWp):
5.72 kWp
Location:
ALTAWAR
Installation type:
Roof top

S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Prepared by:

15

Osama Tahir
Approved By:

16
17
18
19
20

Rev. & Date:

Form 4: Mounting Systems- Check List


Item
Doc/Installation Diagram
TR Purlin (5.1 Meter )
TR Purlin H2116 coupler
Flat Beam (H2307, L= 1.2 m)
Inclined Beam (H2306, L=1.2 m)
Support (H2309)
Support (H2308, L = 0.926 m)
Support (H2308, L = 0.530 m)
Support (H2308, L = 0.260 m)
Panel Edge Clamp
Panel Middle Clamp
Panel Clamp Caps
End Cup for H2216
Self-Drilling Screw

Description

Qty.

TR-H2216
H2307
H2306
H2309
H2308
H2308
H2308
8960440101
8960180201
8960660001
8962216040
7626703201

16
12
32
32
32
_
_
_
90
_
90
8
40

Transom to inclined beam clamp

8962406001

140

Hex Bolt M8 x 30
Hex nut M8
T Slot Nut M8 (to fix panels)
Hex Bolt M8 x 40
Serrated Lock Washer M8

7622803001
7628008101
8968008103
7629084001
7627300801

250
250
90
90
250

t
Tick if Available
Available
Available
Available
Available
Available
Available
_
_
_
NO
_
NO
NO
Available
NO
NO
NO
NO
NO
NO

Date

Comments

Form 5 : Construction M
Project Details
Client Name:
DEWA
PO Number:
Date:
Name of PV plant:
ABDULLAH SAEED MOSQUE- ALT
Power (KWp):
5.72 kWp
Location:
ALTAWAR
Installation type:
Roof top
Prepared by:
Osama Tahir
Approved By:
Rev. & Date:

S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

Form 5 : Construction Materials and installation check list


Item
Doc/Installation Diagram
Doc/Warning and Safety Sign
Concrete Blocks
Cement Bags for Plaster of Blocks
Sand Bags for Plaster of Bocks
Pasting Material type 1
Pasting Material type 2
Waterproof paint
Hex Bolt M8 x 30
Hex Nut M8
Preparing Inverter Installation Place
Tools/Box
Tools/Scaffolding
Tools/Measurement Tape
Tools/Line Dore
Tools/Spanner (10, 13)
Tools/Drilling machine
Tools/Drilling bits
Shift Material :Crane or Labors
Manpower- Fixing blocks
Manpower- Plaster work

Description

Qty.

(25 X 25 X 15)

64
3
6
3
3
1
250
250

7622803001
7628008101
if required

1
1
2
1
2
1
3
6
4
2

on check list
Tick if Available
Available
Available
NO
NO
NO
NO
NO
NO
NO
NO
NO
Available
Available
Available
Available
Available
Available
Available
6
4
2

Date

Comments

Form 6: Mounting
Project Details
Client Name:
DEWA
PO Number:

S.No
1
2
3
4
Date:
5
6
Name of PV plant:
7
ABDULLAH SAEED MOSQUE- ALTAWA 8
Power (KWp):
9
5.72 kWp
10
Location:
11
ALTAWAR
12
Installation type:
13
Roof top
14
Prepared by:
15
Osama Tahir
16
Approved By:
17
Rev. & Date:

Form 6: Mounting Installation check list


Item
Doc/Installation Diagram
Mounting Materials
Cable Tray

Tools/Box
Tools/Scaffolding
Tools/Measurement Tape
Tools/Line Dore
Tools/Spanner (10, 13)
Tools/Drilling Machine
Tools/Drilling Bits
Manpower Required

Description

Qty.

1
1
2
1
2
1
3
4

Tick if Available
Available
Available
NO

Available
Available
Available
Available
Available
Available
Available
Available

Date

Comments

Form 7 :Elect
Project Details
Client Name:
DEWA
PO Number:
Date:
Name of PV plant:
ABDULLAH SAEED MOSQUE- ALTAWAR
Power (KWp):
5.72 kWp
Location:
ALTAWAR
Installation type:
Roof top
Prepared by:
Osama Tahir
Approved By:
Rev. & Date:

S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Form 7 :Electrical Installation check list


Item
Doc/Sitting Out Plan
Doc/PV Single Line Diagram
Doc/PV Panel Connection Diagram
PV-panel
PV-inverter
PV-DB
RRGP-Meter Cabinet
C.B. (for existing panel)
DC Cable
AC Cable
Earthing Cable
Cable accessories

Tools/Box
Tools/Drilling machine
Manpower required

Description

SN260P-10
TRIO5.8

Qty.

Tick if Available
Available
Available
Available
NO
NO
NO
NO
NO
Available
Available
Available
NO

Date

Comments

F
Project Details
Client Name:
DEWA
PO Number:
Date:
Name of PV plant:
ABDULLAH SAEED MOSQUE- ALTA
Power (KWp):
5.72 kWp
Location:
ALTAWAR
Installation type:
Roof top
Prepared by:
Osama Tahir
Approved By:
Rev. & Date:

S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Form 8: Final Installation check list


Item
Documents
Warning and Safety Signs
Foundation Installation
Roof- Water Proofing
Assembling of Mounting System
Fixing of Mounting System
Fixing of PV Panel
Installation of Inverter
PV-DB Installation
RRGP-Meter Cabinet installation
C.B. (for existing panel) Installation
Installation of Cable Tray
PV Panel String Connection
PV Panel Array Connection
PV Panel Earthing Connection
DC Cable Laying and Connection
AC Cable Laying and Connection
Earthing Cable Laying and Connection

Description

Qty.

on check list
Tick if Available

Date

Comments

Revision/Date

Project Details
Client Name:
DEWA
PO Number:

S.No

Date:
Name of PV plant:
ABDULLAH SAEED MOSQUE- ALTAWAR
Power (KWp):
5.72 kWp
Location:
ALTAWAR
Installation type:
Roof top
Prepared by:
Osama Tahir
Approved By:
Rev. & Date:

Form 9: Inspection check list


Item

Description

eck list
Qty.

Tick if Available

Date

Comments