Anda di halaman 1dari 3

Commissioning and initial start up

http://www.spe.org/training/courses/FCS.php

Commissioning

The two phases of commissioning: planning and execution

Managing safety during the commissioning phase?

Commissioning team organization

Commissioning management systems/databases

Handover and acceptance of systemsthe process

Pre-commissioning and commissioning

Oil/gas/sater process systems

Common problems during commissioning/start-up

Subsea commissioning

Spare parts and consumables

Measuring progress and schedule

Differences between commissioning and normal operations

Initial Startup

Scope and objectives of initial startup

Regulatory requirements

Flow assurance

Well unloading

Treatment and disposal of flow back aqueous fluids

Solids management and monitoring

POB management

Flow line and umbilical displacement

Control system evaluation (valves sizing, loop tuning)

Well beanup and choking plan

Well testing

Data collection plan

Chemical use at startup

Methanol contaminated crude

Operating Walkdowns of Power Plants (POM 102 - 2014)


Gas Turbines (PTC 22 - 2014)
Operating Walkdowns of Power Plants (POM 102 - 2014)
Pressure Relief Devices (PTC 25 - 2014)
Pressure Gauges and Gauge Attachments (B40.100 - 2013)
Prevention of Water Damage to Steam Turbines Used for Electric Power Generation:
Nuclear-Fueled Plants (TDP-2 - 2012)
High-Purity Water Treatment Systems (PTC 31 - 2011)
Steam Turbines in Combined Cycles (PTC 6.2 - 2011)
Gas Transmission and Distribution Piping Systems (B31.8 - 2010)
Performance Monitoring Guidelines for Power Plants (PTC PM - 2010)
Energy Assessment for Process Heating Systems (EA-1 - 2009)
Energy Assessment for Pumping Systems (EA-2 - 2009)
Energy Assessment for Steam Systems (EA-3 - 2009)
Guide to Life Cycle Management of Pressure Equipment Integrity (PTB-2 - 2009)
Gas Turbine Heat Recovery Steam Generators (PTC 4.4 - 2008)
Steam and Water Sampling, Conditioning, and Analysis in the Power Cycle (PTC
19.11 - 2008)
Performance Test Code on Gas Turbines (PTC 22 - 2005)
Steam Traps (PTC 39 - 2005)
Steam Turbines (PTC 6 - 2004)
OM - 2004 Code for Operation and Maintenance of Nuclear Power Plants with
Addenda (OM - 2004)
Gas Transmission and Distribution Piping Systems (B31.8 - 2003)
Recommended Practices for the Prevention of Water Damage to Steam Tables Used
For Electric Power Gen (TDP-1 - 1998)
Performance Test Code on Deaerators (PTC 12.3 - 1997)

Performance Test Code on Overall Plant Performance (PTC 46 - 1996)


PTC 12.3 - 1997 Deaerators (PTC 12.3 - 1997)
Procedures for Routine Performance Test of Steam Turbines (PTC 6S - 1988)
Centrifugal Pumps (PTC 8.2 - 1990)
Ejectors (PTC 24 - 1976)
Overspeed Trip Systems Of Steam Turbine-Generator Units (PTC 20.2 - 1965)
Fired Steam Generators (PTC 4 - 2008)
General aspects and philosophy of Commissioning and Start-up

Anda mungkin juga menyukai