TOTAL PRICE SUMMARY SHEET (PAIN

Code No. :
Project : Oman PTA Project
Date. : 09/11/2015.
Work Category
Bill of Quantity

A2 (PTA)

Base B/Q
Unit

31,826
M2

Labor Manhours
1. DIRECT WORK COST
1.1 Materials
1.2 Labor (Direct Labor)
1.3 Construction Equipment

1. SUB-TOTAL
2. INDIRECT WORK COST

2.1 Indirect labor


2.2 Site Temporary Facility(including Camp, Temporary Warehouse and etc.)
2.3 Insurance
2.4 Taxation
2.5 EHS Control
(Environmental, Health & Safety)
2.6 General Field Expenses

2. SUB-TOTAL
3. OVERHEAD AND PROFIT
TOTAL

0
0

E SUMMARY SHEET (PAINTING)


Bidder:
[UNIT : USD]
A3 (U&O)

A4-1 (Offsite)

42,640
M2

A4-2 (Offsite)

882
M2

REMARKS

TOTA

2,099
M2

77,447
M2

0
0
0
0

0
0
0
0
0
0
0

0
0

BILL O
(A2 :
Project :

OMAN PTA PROJECT

Discipline : PIPING

No.
4

Item Code

Description

Size

PAINTING
CODE : PCS-3

CARBON STEEL + INSULATION

CODE : PCS-1

CARBON STEEL + NON-INSULATION

CODE : PCS-6

STAINLESS STEEL + NON-INSULATION

CODE : PCS-6

GALVANIZED CARBON STEEL + NON-INSULATION

Page 3 of 14

POSCO Engineering Co., Ltd.

ILL OF MATERIALS
(A2 : PTA AREA)

Unit

Material

Q'ty

Unit Price

M2

14,740

M2

9,313

M2

7,363

M2

410

Labor
Total

Unit Price

Expense
Total

Unit Price

Total

Total
Unit Price

Total

31,826

Page 4 of 14

POSCO Engineering Co., Ltd.

Rev.A

Remark

Page 5 of 14

POSCO Engineering Co., Ltd.

BILL OF
( A3 : U
Project :

OMAN PTA PROJECT

Discipline : PIPING

No.
4

Item Code

Description

Size

PAINTING
CODE : PCS-3

CARBON STEEL + INSULATION

CODE : PCS-1

CARBON STEEL + NON-INSULATION

CODE : PCS-6

STAINLESS STEEL + NON-INSULATION

CODE : PCS-6

GALVANIZED CARBON STEEL + NON-INSULATION

Page 6 of 14

POSCO Engineering Co., Ltd.

LL OF MATERIALS
A3 : U&O AREA)

Unit

Q'ty

M2

13,629

M2

17,951

M2

7,039

M2

4,021

Material
Unit Price

Labor
Total

Unit Price

Expense
Total

Unit Price

Total

Total
Unit Price

Total

42,640

Page 7 of 14

POSCO Engineering Co., Ltd.

Rev.A

Remark

Page 8 of 14

POSCO Engineering Co., Ltd.

( A4-1
Project :

OMAN PTA PROJECT

Discipline : PIPING

No.
3

Item Code

Description

Size

PAINTING
CODE : PCS-1

CARBON STEEL + NON-INSULATION

Page 9 of 14

POSCO Engineering Co., Ltd.

BILL OF MATERIALS
( A4-1 : OFFSITE AREA - Natural Gas)

Unit

M2

Material

Q'ty

Unit Price

Labor
Total

Unit Price

Expense
Total

Unit Price

Total

Total
Unit Price

Total

882

882

Page 10 of 14

POSCO Engineering Co., Ltd.

Rev.A

Remark

Page 11 of 14

POSCO Engineering Co., Ltd.

BILL OF
( A4-2 : OFFSITE
Project :

OMAN PTA PROJECT

Discipline : PIPING

No.
3

Item Code

Description

Size

PAINTING
CODE : A1

CARBON STEEL + NON-INSULATION

CODE : A2

STAINLESS STEEL + NON-INSULATION

Page 12 of 14

POSCO Engineering Co., Ltd.

LL OF MATERIALS
FSITE AREA - PX, AA, MEG)

Unit

Q'ty

M2

1,017

M2

1,082

Material
Unit Price

Labor
Total

Unit Price

Expense
Total

Unit Price

Total

Total
Unit Price

Total

2,099

Page 13 of 14

POSCO Engineering Co., Ltd.

Rev.A

Remark

Page 14 of 14

POSCO Engineering Co., Ltd.