Anda di halaman 1dari 7

Drawing and Design Report Reconciliation

A number of drawings and technical reports referenced in this SEI supersede (replace) material submitted in
support of the Environmental Statement. The table below provides a simple reconciliation of the material
contained in the ES and this SEI. It identifies each superseded drawing/report of the ES by reference number and
title, and shows the revision number of each drawing submitted with this SEI which supersedes it. Where there is
no ES document referred to (marked as N/A), the document is additional.

SEI Appendix

Drawing / Design Report


YP-P2-CD-080 - Surface Water Drainage General
Arrangement

A - Updated
Scheme
Drawings and
Reconciliation
Table

SEI Revision
Number

1,4,5

YP-P2-CD-110 - Phasing Plans Phase 1 Months 1 - 6

YP-P2-CD-111 - Phasing Plans Phases 2 and 3 Months


7 - 24

YP-P2-CD-112 - Phasing Plans Phase 4 Months 25 - 32

YP-P2-CD-113 - Phasing Plans Phases 5+6 Months 33 41 and Removal of Stockpile

YP-P2-CD-114 - Phasing Plans Phase 7 Finished


Operating Phase

YP-P2-CD-200 - Site General Arrangement MTS Scheme


Earthwork Strategy Groundwater Drainage Design

YP-P2-CX-030 - Site General Arrangement MTS Scheme


Construction Masterplan

11

YP-P2-CX-031 - Site General Arrangement MTS Scheme


Operation Masterplan

12

YP-P2-CX-032 - Site General Arrangement MTS Scheme


Earthworks Strategy Earthworks Bunds and Ponds

YP-P2-CX-033 - Site General Arrangement MTS Scheme


earthworks Strategy Construction Platforms

YP-P2-CX-036 Pyritic Mudstone Facilities and Temporary


NHNI Waste Storage Facility

N/A

YP-P2-CX-070 - Proposed Site Earthworks, MTS


Phasing Strategy, Phase 1 - Month 2

ES Revision
Number

Where more than one revision number is shown this indicates that, because of the different timing of the preparation of the
ES and its appendices and supporting reports, different revisions were referenced because they were the most up-to-date
drawing at the time.
2
Where ES revision number is N/A this indicates the drawing / report was not submitted with the ES or is a new drawing /
report to accompany the SEI

SEI Appendix

Drawing / Design Report

ES Revision
Number

SEI Revision
Number

YP-P2-CX-071 - Proposed Site Earthworks, MTS


Phasing Strategy, Phase 1 - Month 3

YP-P2-CX-072 - Proposed Site Earthworks, MTS


Phasing Strategy, Phase 1 - Month 4

YP-P2-CX-073 - Proposed Site Earthworks, MTS


Phasing Strategy, Phase 1 - Month 5-6

YP-P2-CX-074 - Proposed Site Earthworks, MTS


Phasing Strategy, Phase 1 - Month 7-17

YP-P2-CX-075 - Proposed Site Earthworks, MTS


Phasing Strategy, Phase 3 - Month 18-24

YP-P2-CX-076 - Proposed Site Earthworks, MTS


Phasing Strategy, Phase 4 - Month 25-32

YP-P2-CX-077 - Proposed Site Earthworks, MTS


Phasing Strategy, Phase 5 - Month 33-40

10

YP-P2-CX-078 - Proposed Site Earthworks, MTS


Phasing Strategy, Phase 6 - Month 41 onwards

10

YP-P2-CX-079 - Proposed Site Earthworks MTS Phasing


Strategy Phase 7 - Removal of all non hazardous non
inert material off site

10

YP-P2-CX-080 - Doves Nest Farm Hours of Working

YP-P2-CX-410 TOC Construction Masterplan

4,5,6

YP-P2-CX-412 - Proposed Site Earthworks Tocketts


Lythe Phasing

3,4,5

YP-P2-CX-413 - Proposed Site Earthworks Tocketts


Lythe Phasing

3,5

YP-P2-CX-420 - Lockwood Beck Farm Construction


Masterplan

6,5,7

YP-P2-CX-421 - Lockwood Beck Farm Operational


Masterplan

5,6

YP-P2-CX-422 - Proposed Site Earthworks Lockwood


Beck Phasing

4,5

YP-P2-CX-423 - Proposed Site Earthworks Lockwood


Beck Phasing

YP-P2-CX-418 - Tocketts Lythe, Proposed Earthworks

SEI Appendix

Drawing / Design Report

ES Revision
Number

SEI Revision
Number

YP-P2-CX-431 - Lockwood Beck Farm Drainage Construction

YP-P2-CX-432 - Lockwood Beck Farm Drainage Operation

1,3

YP-P2-CX-440 - Lady Cross Plantation Construction


Masterplan

0,4,5,6

YP-P2-CX-441 - Lady Cross Plantation Operational


Masterplan

4,5,6

YP-P2-CX-442 - Proposed Site Earthworks Lady Cross


Plantation Phasing

A,4,5

YP-P2-CX-443 - Proposed Site Earthworks Lady Cross


Plantation Spoil Phasing

4,5

YP-P2-CX-445 - Lady Cross Plantation Drainage Construction

4,5

YP-P2-CX-446 - Lady Cross Plantation Drainage Operation

4,5

YP-P2-CX-447 - Lady Cross Plantation Proposed


Earthworks

2,3

1000-ENV-DFS-DWG-001 Conceptual 3D Arrangement

N/A

1000-ENV-DFS-DWG-003 Conceptual 3D Arrangement


showing indicative grouting

N/A

YP-P2-EL-201 - External Lighting Strategy Plan


Construction Phase 1

YP-P2-EL-202 - External Lighting Strategy Plan


Construction Phase 2

YP-P2-EL-203 - External Lighting Strategy Plan


Construction Phase 3

YP-P2-EL-204 - External Lighting Strategy Plan


Construction Phase 4

YP-P2-EL-205 - External Lighting Strategy Plan


Construction Phase 5

YP-P2-EL-206 - External Lighting Strategy Plan


Construction Phase 6

YP-P2-CX-433 - Lockwood Beck, Proposed Earthworks

SEI Appendix

Drawing / Design Report


YP-P2-EL-208 - External Lighting Strategy Plan:
Construction Lighting, Lighting Equipment Height Study

SEI Revision
Number

N/A

2309.MH01 / Existing Landscape Features

2309.MH02 / Removal of Existing Landscape Features

2309.MH03 / Restoration Proposals Site Plan 1:1250

2309.MH04 / Restoration Proposals Sections 1:2500

2309.MH05 / Restoration Proposals Sections 1:500

2309.MH06 / Restoration Proposals Sections 1:500

2322.LCP01 / Existing Landscape Features

2322.LCP02 / Removal of Existing Vegetation

2322.LCP03 / Restoration Proposals Site Plan 1:1250

N/A

2322.LCP04 / Restoration Proposals Sections 1:2500

N/A

2322.LB01 / Existing Landscape Features

2322.LB02 / Removal of Existing Vegetation

2322.LB03 / Restoration Proposals Site Plan 1:2500

N/A

2322.LB04 / Restoration Proposals Sections 1:2500

N/A

2322.LB05 / Restoration Proposals Sections 1:500

N/A

2322.LB06 / Restoration Proposals Sections 1:500

N/A

2322.TL01 / Existing Landscape Features

2322.TL02 / Removal of Existing Vegetation

2322.TL03 / Restoration Proposals Site Plan 1:1250

N/A

2322.TL04 / Restoration Proposals Sections 1:2500

N/A

2309-AS_sk01 Options for Additional Spoil Storage

N/A

YP-P2-CE-SCH-010 - Earthworks Strategy Volumes (with


MTS)

YP-P2-CE-SCH-011 - York Potash - Earthworks Strategy


Volumes - Lady Cross Plantation

N/A

YP-P2-SK-030 - LCP Alternative Access Junction

B - Earthworks
Spreadsheets
and Reports

ES Revision
Number

YP-P2-CE-011 Material Densities and Bulking

SEI Appendix

C - Surface
Water Design
Basis Reports
(Mine and MTS)
D - Integrated
Water and
Wastewater
Management
Strategy Reports

E - Response to
NYMNPA
Scheme
Description
Queries

Drawing / Design Report

ES Revision
Number

SEI Revision
Number

YP-P2-CE-SCH-012 - York Potash - Earthworks Strategy


Volumes - Lockwood Beck

YP-P2-CE-SCH-013 - York Potash - Earthworks Strategy


Volumes - Tocketts Lythe

YP-P2-CE-SCH-014_Earthworks Strategy Volumes DNFOpt 2

N/A

TN-P2-CE-010 - MTS Spoil Disposal Design Basis


Preferred Sites

REP-P2-CD-001 - SWD Design Basis Report

REP-P2-CD-002 SWD Design Basis Report intermediate


sites

REP-P2-WSD-003 Integrated Water and Wastewater


Management Strategy Report

REP-P2-FD-003 Foul Drainage Disposal to Wilton


Feasibility 150211

N/A

0. 1000-ENG-EXE-MEM-002 Response to NYMNPA


Scheme Description Queries.pdf

N/A

0000-CTL-SCH-PLN-004 Summary Construction


Schedule

1000-ENV-DFS-DWG-005 Proposed Subsurface


Structures

N/A

1000-APP-EXE-DWG-010 Development at End of Month


43

N/A

1000-APP-EXE-DWG-011 Development at End of Month


48

N/A

1000-APP-EXE-DWG-012 Minimum Pit Bottom


Development for 6 CMs

N/A

1000-APP-EXE-DWG-008 -360 Sizes & Sequencing

N/A

1000-APP-EXE-DWG-009 -360 Indicative Vent

N/A

EDD-1358-GE-PFD-0001-001 Permanent Shaft System


Ventilation Process Flow Diagram

N/A

EDD-1335-GE-DAL-0004-001 Serv & Prod Shaft Temp


Conveying from Prod Shaft Kibble Winder to MTS Tunnel
Conveyor

N/A

SEI Appendix

O - Updated
Photomontages
and Landscape
Figures

Drawing / Design Report

ES Revision
Number

SEI Revision
Number

EDD-1335-GE-DAL-0006-001 Serv Shaft Proposed


Temporary Skip Tipping & Conveyor from Service Shaft
to MTS Tunnel Conveyor

N/A

EDD-1335-GE-DAL-0009-001 Prod Shaft Illustrative


Sketch of Proposed Kibble Tipping & Conveying at 360ml from Shaft to MTS Tunnel Conveyor

N/A

EDD-1335-GE-DAL-0005-001 Serv & Prod Shafts


Proposed Skip Tipping & Conveying at -360ml to MTS
Conveyor

N/A

TN-P2-CE-013 Polyhalite Handling

N/A

EDD-1322-ST-DAL-0001-001 Prod Shaft Shaft


Headgear

N/A

EDD-1325-GE-DAL-0001-001 Prod Shaft Shaft Cross


Section Configuration

N/A

EDD-1332-ST-DAL-0001-001 Serv Shaft Shaft


Headgear

N/A

EDD-1335-GE-DAL-0002-001 Serv Shaft Shaft Cross


Section Configuration

N/A

EDD-1338-GE-DAL-0001-001 Serv Shaft -45m Level


Station and Drift

N/A

EDD-1338-GE-DAL-0001-002 Serv Shaft -45m Level


Station and Drift

N/A

EDD-1312-GE-DAL-0002-001 Mine Head Surface


Terrace Shaft Sinking Phase Layout

N/A

25900-TWP-SS0-1339-00003 Serv Shaft Shaft Bottom


Structural

N/A

25900-TWP-MH0-1329-00001 Prod Shaft -1520m Skip


Loading Mineral Handling

N/A

25900-TWP-MH0-1322-00006 Prod Shaft Emergency


Cage Winder Configuration Equipping

N/A

2307.MH ZTV LCA 03 Landscape character - mounds


exc woodland

2307.MH ZTV LCA 04 Landscape character - mounds inc


woodland

2307.MH ZTV VR 03 Visual receptors - mounds exc


woodland

SEI Appendix

Drawing / Design Report

ES Revision
Number

SEI Revision
Number

2307.MH ZTV VR 04 Visual receptors - mounds inc


woodland

2307.MH PM06 Photomontage 06 - B1416 NW of site (5


sheets)

2307.MH PM09 Photomontage 09 - Stainsacre Lane &


C2C (5 sheets)

2307.MH PM10 Photomontage 10 - Normanby Hill top &


C2C (5 sheets)

2307.MH PM11 Photomontage 11 - A171 (5 sheets)

2323.LCP ZTV LCA03 Landscape character - mounds


exc woodland

2323.LCP ZTV LCA04 Landscape character - mounds inc


woodland

2323.LCP ZTV VR03 Visual receptors - mounds exc


woodland

2323.LCP ZTV VR04 Visual receptors - mounds inc


woodland

Anda mungkin juga menyukai