DDWD Yard Schedule rev 5

Activity ID

Activity Name

Schedule % Start
Complete

Refurbishment
Refurbishm
Construction
Constructio
13

Finish

0% 15-Dec-10 A

28-Nov-11

0% 15-Dec-10 A

28-Nov-11

0% 10-Jan-11 A

17-Oct-11

Riser and Well Topside Manual valves

100% 10-Jan-11 A

23-Jul-11 A

ACD01330

Riser and Well Topside, Piping and support

100% 21-Feb-11 A

15-Oct-11

ACDR2053

Riser&Well Topside, Blasting, Coating&Insulation

100% 21-Feb-11 A

17-Oct-11

0% 15-Dec-10 A

29-Oct-11

20
ACD01190

MO1, Refurbishment and Instrument

100% 15-Dec-10 A

29-Oct-11

ACD01200

MO2, Refurbishment and Instrument

100% 15-Dec-10 A

29-Oct-11

ACD01340

Separation and stabilization Manual valves

100% 18-Dec-10 A

16-Jul-11 A

ACD01350

Separation and stabilization piping and support

100% 18-Dec-10 A

10-Oct-11

ACDR2054

Seperation&Stabilisation-Blast&coat

100% 25-Dec-10 A

10-Oct-11

ACD01210

MO3, Refurbishment and Instrument

100% 03-Jan-11 A

29-Oct-11

ACD01220

MO4, Refurbishment and Instrument

100% 03-Jan-11 A

29-Oct-11

ACD01230

MO6, Refurbishment and Instrument

100% 03-Jan-11 A

29-Oct-11

ACDR2012

Removal Of Sand Treatment Package And Piping

100% 25-Jan-11 A

10-Feb-11 A

ACD01160

Actuated valves re-installation

100% 21-Feb-11 A

25-Oct-11

ACD00910

Instaln of lighting on flare,Process modules

100% 25-Jul-11 A

25-Oct-11

ACD01550

Topside Pump skid installation

100% 25-Jul-11 A

30-Sep-11

ACD01170

Control valves re-installation

0% 20-Sep-11*

19-Oct-11

ACD01180

PSVs re-installation

0% 20-Sep-11*

19-Oct-11

0% 18-Dec-10 A

23-Jul-11 A

21
ACD01360

Crude Handling&Metering Manual valves Overhaul

100% 18-Dec-10 A

16-Jul-11 A

ACD01050

Overhaul cargo valves,actuators&valve Blocks

100% 11-Jan-11 A

23-Jul-11 A

ACD00040

Remove Agitator Mixer In Mud Upper, Port/Stbd

100% 24-Jan-11 A

12-Mar-11 A

ACD00010

Overhauling of cargo pumps 1 and 2

100% 27-Feb-11 A

07-Apr-11 A

ACD00030

Hydraulic power pack pumps 1,2,3 overhaul

100% 27-Feb-11 A

17-Jun-11 A

21.01
Integrtd Tank Gauging&V/v Cntrl -Assistance

21.02
ACD00830

Renew Crude oil transfer pump motors

21.03

0% 19-Jun-11 A

10-Oct-11

100% 19-Jun-11 A

10-Oct-11

0% 17-Apr-11 A

30-Sep-11

100% 17-Apr-11 A

30-Sep-11

0% 18-Dec-10 A

21-Oct-11

ACD01370

Crude Handling and Metering Piping and support

100% 18-Dec-10 A

08-Oct-11

ACDR2055

Crude Handling&Metering-Blasting&Painting

100% 25-Dec-10 A

08-Oct-11

ACDR2115

Pressure Test Of Marpol Line

100% 22-Aug-11 A

26-Aug-11 A

ACDR4078

Replacement of Switches in Dirty/Crude Oil Tanks

0% 01-Oct-11*

21-Oct-11

0% 21-Jul-11 A

25-Oct-11

86.67% 21-Jul-11 A

25-Oct-11

23
ACD01040

Fab&Install piping for new stripping pumps

42
ACD01380

Chemcial Injection- Manual valves overhaul

0% 18-Dec-10 A

16-Jul-11 A

100% 18-Dec-10 A

16-Jul-11 A

0% 18-Dec-10 A

43
Flare Manual valves overhaul

100% 18-Dec-10 A

23-Jul-11 A

ACD01400

Flare piping & support renewal

100% 12-Jan-11 A

30-Oct-11

ACDR2056

Flare Blasting Coating And Insulation Pipeline

100% 17-Jan-11 A

30-Oct-11

ACD00840

Renew Flare liquid return pumps motors

100% 14-Aug-11 A

30-Sep-11

0% 18-Dec-10 A

21-Oct-11

ACD01410

Oily Water- Manual valves overhaul

100% 18-Dec-10 A

16-Jul-11 A

ACD01420

Oily water-piping and support renewal

100% 18-Dec-10 A

10-Oct-11

ACDR2057

Oily Water Piping-Blasting Coating & Insulation

100% 25-Dec-10 A

10-Oct-11

ACD00850

Renew Water recycle pumps motors

100% 08-Aug-11 A

25-Sep-11

ACD00980

Check, test and calibration of ODME system

0% 01-Oct-11*

21-Oct-11

0% 13-Jul-11 A

19-Oct-11

100% 13-Jul-11 A

19-Oct-11

45
ACDR2113

Flare Tower Locking Device

0% 18-Dec-10 A

50
SW system-Manual valves overhaul

100% 18-Dec-10 A

16-Jul-11 A

ACD01440

Sea water system piping and support renewal

100% 20-Dec-10 A

19-Oct-11

ACDR2058

Sea Water Piping-Blasting, Coating & Insulation

100% 25-Dec-10 A

19-Oct-11

0% 15-Dec-10 A

02-Jul-11 A

ACD00110

Assistance to Deck fresh water pipes renewal

100% 15-Dec-10 A

02-Jul-11 A

ACD00970

Renewal of SW line from MGE FW cooler no.3

100% 16-May-11 A

17-Jun-11 A

0% 15-Dec-10 A

55
Overhaul deck main steam valves

100% 15-Dec-10 A

10-Jan-11 A

ACD00950

Auxiliary boiler - Overhauling valves

100% 15-Dec-10 A

10-Mar-11 A

ACD01450

Steam system- Manual valves overhaul

100% 18-Dec-10 A

07-Apr-11 A

ACD01460

Steam System-piping and support renewal

100% 20-Dec-10 A

23-Jul-11 A

ACD00120

Boiler burner motor bearings Renewal-Assistance

100% 24-Jan-11 A

12-Mar-11 A

ACD01080

Deck main steam pipes to be renewed

100% 21-Feb-11 A

23-Apr-11 A

0% 06-Jan-11 A
Repair of COST & aft bilge tanks, No. 46 and 53.

100% 06-Jan-11 A

12-Mar-11 A

ACDR2059

Open Drain-Blasting, Painting And Insulation

100% 30-Jan-11 A

21-Oct-11

ACDR2116

Open Drain, Manual Valves Overhaul

100% 01-May-11 A

16-Jul-11 A

ACD00140

Assistance to Jowa Service engr OWS calibration

0% 01-Oct-11*

21-Oct-11

0% 18-Dec-10 A

21-Oct-11

ACD00200

Overhaul drain system aft

100% 18-Dec-10 A

20-Aug-11 A

ACD01480

Closed Drain-Manual valves overhaul

100% 18-Dec-10 A

16-Jul-11 A

ACDR2060

Closed Drain-Blasting, Coating And Insulation

100% 25-Dec-10 A

21-Oct-11

58

0% 20-Apr-11 A

24-Jun-11 A

ACD01100

Bow thruster motor 1 & 2 to be overhauled

100% 20-Apr-11 A

17-Jun-11 A

ACD01110

Azimuth thruster motor 1 & 2 to be overhauled

100% 20-Apr-11 A

17-Jun-11 A

ACD00740

Overhaul of Propulsion System-Assistance

100% 24-Apr-11 A

24-Jun-11 A

ACDR2003

Az.Thr.Steering System Hydraulic Pumps Renewal

100% 01-May-11 A

17-Jun-11 A

ACDR2004

Az.Thr Pitch System Hydraulic Pumps Renewal

100% 01-May-11 A

17-Jun-11 A

ACDR2005

Az. Thr. Steering Oil Pump Motor Bearing Renewal

100% 01-May-11 A

17-Jun-11 A

ACDR2006

Az.Thr Pitch L.Oil Pump Motors Bearing Renewal

100% 01-May-11 A

17-Jun-11 A

ACD03610

Thruster Polishing

100% 16-May-11 A

21-May-11 A

0% 26-Jun-11 A

59
New cooling table & hot cupboard in messroom

100% 26-Jun-11 A

16-Jul-11 A

ACDR3023

Upgrade of Deck Store to Laboratory

100% 15-Jul-11 A

09-Nov-11

ACD01500

Compr.Air /Instr. Air- Manual valves overhaul

Actual Work

Critical Remaining Work

Remaining Work

MILESTONES

Summary

Q1

Q2

Q3

09-Nov-11

ACDR31024

63

Q4

21-Oct-11

ACD00710

57

2012
Q3

23-Jul-11 A

ACD00130

56

Q2

19-Oct-11

ACD01430

53

Q1

30-Oct-11

ACD01390

44

2011
Q4

ACD01320

ACD00750

11-Jun-12 17:09

ATHENA FPSO

0% 18-Dec-10 A

16-Jul-11 A

100% 18-Dec-10 A

16-Jul-11 A

Page 1 of 15

TASK filter: All Activities


Primavera Systems, Inc.

DDWD Yard Schedule rev 5


Activity ID

Activity Name

ACD01510

Schedule % Start
Complete

Finish

100% 05-Jan-11 A

ACD00160

Overhauling of PV valves on Deck

100% 15-Dec-10 A

25-Feb-11 A

ACD01520

Inert Gas system-Manual valves overhaul

100% 18-Dec-10 A

16-Jul-11 A

ACD01530

Inert Gas system-piping and support renewal

100% 20-Dec-10 A

05-Nov-11

ACDR2014

Repair Of Purge Pipes On Slop Tanks P/S

100% 01-Feb-11 A

02-Jul-11 A

ACD00170

IG plant test / overhaul-Assistance

100% 21-Feb-11 A

17-Jun-11 A

ACD00190

Overhaul / Repair of IG Line

100% 21-Feb-11 A

16-Jul-11 A

ACDR2010

I.G.Blowers 1 And 2 To Be Overhauled

100% 10-Mar-11 A

31-Mar-11 A

ACDR2015

Ig Compr.Motors 1&2 O/H And Bearings Renewal

100% 15-Apr-11 A

15-May-11 A

ACD00180

New IG control system-Assistance

100% 11-Jun-11 A

30-Sep-11

ACD03640

Pressure Testing Of Ig Line

100% 19-Jun-11 A

16-Jul-11 A

ACDR2011

Renovation Of Messroom With Associated Equipment

100% 04-Jul-11 A

07-Sep-11 A

ACDR2122

Upgrading I.G. Control Panel

100% 20-Jul-11 A

03-Sep-11 A

0% 15-Dec-10 A

64

65
Hyd power pack motors bearings renewal

66
ACD00960

Sanitary discharge system cleaning

71

0% 24-Jan-11 A

14-May-11 A

100% 24-Jan-11 A

14-May-11 A

0% 08-May-11 A

17-Jun-11 A

100% 08-May-11 A

17-Jun-11 A

0% 18-Dec-10 A

15-Apr-11 A

100% 18-Dec-10 A

15-Apr-11 A

ACD00230

Overhaul Fire Pumps 1 & 2 & el.motors-Assistance

100% 03-Jan-11 A

05-Feb-11 A

ACD00940

Deluge Pumps& Motors No1&2 overhaul

100% 05-Jan-11 A

07-Apr-11 A

0% 25-Jan-11 A

05-Mar-11 A

100% 25-Jan-11 A

05-Mar-11 A

Renew CW line and valves to flare boom manifold

0% 07-Jan-11 A

73
Removal of riser winches-5Nos

100% 07-Jan-11 A

20-Jan-11 A

ACD00930

Inspection&certify all permanent lifting points

100% 02-Aug-11 A

25-Oct-11

ACD00260

Load test of existing deck crane

0% 21-Oct-11*

22-Oct-11

0% 25-Sep-11

24-Oct-11

0% 25-Sep-11*

24-Oct-11

0% 18-Dec-10 A

11-Nov-11

ACD00450

Anti flame resin on entrance doors&monkey Island

76
ACD00820

Re-arrangement of Hospital

100% 18-Dec-10 A

19-Oct-11

ACD00700

Hyd.Pump motor of Lifeboat davit renewal

100% 29-Mar-11 A

14-May-11 A

ACD00300

Wheel house window wipers - renewal

100% 01-May-11 A

10-Sep-11 A

ACD00270

Load test of Lifeboat Davit

0% 20-Oct-11*

21-Oct-11

ACD00290

Load test of MOB davit

0% 20-Oct-11*

21-Oct-11

ACD00280

Load test of Liferaft davits

0% 10-Nov-11*

11-Nov-11

0% 11-Jun-11 A

16-Jul-11 A

80.01
ACD00330

Upgrading the HV switch board -Assistance

100% 11-Jun-11 A

16-Jul-11 A

ACD00310

HV Sw.Board- servicing -Assistance

100% 25-Jun-11 A

16-Jul-11 A

82

0% 20-Mar-11 A

05-Sep-11 A

ACD00380

MGE no. 3 install new governor-Assistance

100% 20-Mar-11 A

20-Mar-11 A

ACDR2119

Upgrade Process Mcc Room

100% 19-Jun-11 A

16-Jul-11 A

ACDR4091

Replace circuit breakers

56.67% 25-Aug-11 A
0% 07-Jul-11 A

82.01

100% 07-Jul-11 A

21-Jul-11 A

ACDR3003

Upgrade Process MCC

100% 10-Jul-11 A

30-Sep-11

220V main distribution board-Clean&Tighten

84

0% 07-Jul-11 A

21-Jul-11 A

100% 07-Jul-11 A

21-Jul-11 A

0% 10-Apr-11 A

27-Aug-11 A

ACD00390

Harbour generator service-Assistance

100% 10-Apr-11 A

17-Jun-11 A

ACD00900

Em. Switchboard 440/220V-Calibrate-Assistance

100% 03-Jul-11 A

16-Jul-11 A

ACDR31020

Modification to Em. Switchboard 440/220V

100% 10-Jul-11 A

30-Jul-11 A

ACDR31019

Install new 440/220V Emerg.Transformer

100% 02-Aug-11 A

27-Aug-11 A

0% 05-Jan-11 A

85
Remove existing UPS

100% 05-Jan-11 A

11-Feb-11 A

ACD03270

Install new 220V UPS

100% 19-Jun-11 A

16-Jul-11 A

ACD03290

Fab&Instln foundn for new UPS

100% 19-Jun-11 A

24-Jun-11 A

0% 22-May-11 A
Vingtor Intercom & PA system service-Assistance

100% 22-May-11 A

02-Jul-11 A

ACDR2123

Pabx Telephone System

100% 10-Jul-11 A

20-Aug-11 A

ACD00420

Emergency Telephone System service-Assistance

100% 15-Jul-11 A

25-Oct-11

ACDR2124

Assistance to DPRS instaln

0% 01-Oct-11*

25-Oct-11

0% 24-Jan-11 A

15-Nov-11

100% 24-Jan-11 A

15-Nov-11

0% 25-Jan-11 A

28-Nov-11

ACD01150

Replacement of Process Instruments

88
ACD00440

Trace Heaters on deck to be renewed

100% 25-Jan-11 A

30-Oct-11

ACDR4075

Upgrade of Room L6007 to Common office

100% 31-Jul-11 A

05-Sep-11 A

ACDR4060

Instaln of socket outlets in L4005 - Mess Room

73.33% 20-Aug-11 A

05-Sep-11 A

ACDR4099

Upgrade of Room L2005

33.33% 01-Sep-11 A

10-Oct-11

ACDR4100

Upgrade of Room L2008

33.33% 01-Sep-11 A

10-Oct-11

ACDR4101

Upgrade of Room L2054

33.33% 01-Sep-11 A

10-Oct-11

ACD01140

Installation of Heat tracing lines

90
ACD01560

Topside Heater & Cooler refurbishment

91

0% 15-Oct-11*

28-Nov-11

0% 29-Jan-11 A

25-Sep-11

100% 29-Jan-11 A

25-Sep-11

0% 17-Apr-11 A

28-Nov-11

ACD01300

M01,02,03,04-Blasting and Coating

100% 17-Apr-11 A

30-Oct-11

ACD02340

Final Coat-Maindeck

100% 02-Aug-11 A

28-Nov-11

0% 01-Feb-11 A

31-Oct-11

94
ACDR2013

Removal Of Midship Mooring Winches

100% 01-Feb-11 A

20-Feb-11 A

ACD03590

Anchor Chain Lower,Hp Wash,Calibrate & Mark

100% 30-Mar-11 A

17-Jun-11 A

ACD03600

Chain Lockers-Mud Removal,Descale,Hp Wash&Paint

100% 30-Mar-11 A

08-May-11 A

ACDR4097

Fab&Install identification panels

97

0% 20-Sep-11*

31-Oct-11

0% 18-Dec-10 A

30-Sep-11

ACD00670

Engine room (combustion engine) fans overhaul

100% 18-Dec-10 A

17-Jun-11 A

ACD00680

Engine room (cooling air) fans overhaul

100% 24-Jan-11 A

07-Apr-11 A

ACDR2009

Vibration Measurement Sensor On P.Room Exh Fan

100% 01-Feb-11 A

15-Feb-11 A

ACDR2117

Relocate Starter panel for Smking room fan

100% 19-Jun-11 A

09-Jul-11 A

ACDR2118

Install new starter panel- Hospital Fan

100% 19-Jun-11 A

16-Jul-11 A

ACDR2001

Instrument Room Fan Coil Is To Be Relocated

100% 15-Jul-11 A

30-Sep-11

Actual Work

Critical Remaining Work

Remaining Work

MILESTONES

Summary

Q3

25-Oct-11

ACD00410

87

Q2

16-Jul-11 A

ACD03280

86

Q1

30-Sep-11

440v marine & utility switchboard-Clean&Tighten

ACD00890

Q4

05-Sep-11 A

ACD00880

82.02

2012
Q3

25-Oct-11

ACD03080

75

Q2

05-Nov-11

Renew Deluge monitors on main deck-Assistance

ACD00240

Q1

02-Jul-11 A

ACD00220

72

2011
Q4

Compr. Air system/Instrument Air-Piping&support

ACD00860

11-Jun-12 17:09

ATHENA FPSO

Page 2 of 15

TASK filter: All Activities


Primavera Systems, Inc.

DDWD Yard Schedule rev 5


Activity ID

Activity Name

Schedule % Start
Complete

0% 15-Dec-10 A

99

Finish

Clean APT Port/Stbd to drinking water standard

100% 15-Dec-10 A

07-Apr-11 A

Hydroblasting & First coat-Main deck

100% 15-Dec-10 A

10-Jan-11 A

ACD00690

Replacement of railings-proces plant- Asistance

100% 15-Dec-10 A

07-Apr-11 A

ACD02170

Removal of planks from Maindeck

100% 15-Dec-10 A

24-Dec-10 A

ACD03530

Cleaning And Floor Perotection In Passageway

100% 15-Dec-10 A

24-Dec-10 A

ACD00630

Cleaning of sludge tanks-Assistance

100% 20-Dec-10 A

07-Jan-11 A

ACD00640

Cleaning of bilge water Fwd. Tank-Assistance

100% 28-Dec-10 A

06-Jan-11 A

ACD01540

Topside Vessels cleaning

100% 04-Jan-11 A

12-Feb-11 A

ACD01260

Flare Boom House repair

100% 05-Jan-11 A

12-Feb-11 A

ACD00060

Coating repair in Trunks, Fr.22-104-Assistance

100% 06-Jan-11 A

30-Jul-11 A

ACD00470

Coating repair in ballast tank 5 Port

100% 06-Jan-11 A

11-Feb-11 A

ACD00530

Coating repair in ballast tank 5 Stbd

100% 09-Jan-11 A

11-Feb-11 A

ACD00540

Coating repair in ballast tank 6 Stbd

100% 09-Jan-11 A

25-Feb-11 A

ACD00480

Coating repair in ballast tank 6 Port

100% 10-Jan-11 A

25-Feb-11 A

ACD01290

M01,02,03,04-Structural Repair

100% 12-Jan-11 A

15-Apr-11 A

ACD00990

Overhaul of SW clng pump&motor for process plant

100% 17-Jan-11 A

07-Apr-11 A

ACD01010

Remove old Stripping&Mud pumps

100% 17-Jan-11 A

11-Feb-11 A

ACD01240

Flare Boom Stack repair

100% 17-Jan-11 A

28-Feb-11 A

ACD01270

Flare KO Drum skid- Structural repair

100% 17-Jan-11 A

12-Feb-11 A

ACD01310

Topside Piping repairs

100% 24-Jan-11 A

15-Oct-11

ACD00600

Coating repair in Stability tank 2

100% 21-Feb-11 A

12-Mar-11 A

ACD01250

Flare Boom Stack /Housing Blasting and Coating

100% 21-Feb-11 A

07-Apr-11 A

ACD00590

Coating repair in Stability tank 1

100% 27-Feb-11 A

12-Mar-11 A

ACD00460

Install sounding pipes for WBT 5-6-7-8-9 P/S

100% 29-Mar-11 A

15-Apr-11 A

ACD01280

Flare KO Drum skid-Blasting and Coating

100% 29-Mar-11 A

15-Apr-11 A

ACD00080

Overboard valves inspect / overhaul

100% 30-Mar-11 A

17-Jun-11 A

ACD00090

Sea water valves/ non return valves overhaul

100% 30-Mar-11 A

17-Jun-11 A

ACD03540

Hull Blasting And Painting

100% 30-Mar-11 A

17-Jun-11 A

ACD03550

Seachests -3 Nos-To Open Clean And Paint

100% 30-Mar-11 A

24-Jun-11 A

ACD03580

Hull Anodes Renewal

100% 30-Mar-11 A

24-Jun-11 A

ACDR4106

Clean Bilge well areas in all COT

100% 01-Apr-11 A

20-Apr-11 A

ACDR4108

Chem.dosing level gauges-Overhauls 5 nos.

100% 01-Apr-11 A

20-Apr-11 A

ACDR4109

Overhauling of dosing pumps

100% 01-Apr-11 A

20-Apr-11 A

ACDR4110

Re-sleeve Hyd.Power pack bearing housing

100% 01-Apr-11 A

20-Apr-11 A

ACDR4111

Demolition of Piping from deck

100% 01-Apr-11 A

20-Apr-11 A

ACD00490

Coating repair in ballast tank 7 Port

100% 05-Apr-11 A

15-Apr-11 A

ACD03560

Seachests -3 Nos- Renew Anodes

100% 05-Apr-11 A

24-Jun-11 A

ACD00100

Assistance to Cathelco Antifouling-Anode Renewal

100% 10-Apr-11 A

17-Jun-11 A

ACD00500

Coating repair in ballast tank 8 Port

100% 10-Apr-11 A

17-Jun-11 A

ACD00510

Coating repair in ballast tank 9 Port

100% 10-Apr-11 A

17-Jun-11 A

ACD00520

Coating repair in ballast tank 10 Port

100% 10-Apr-11 A

26-May-11 A

ACD00550

Coating repair in ballast tank 7 Stbd

100% 10-Apr-11 A

17-Jun-11 A

ACD00560

Coating repair in ballast tank 8 Stbd

100% 10-Apr-11 A

17-Jun-11 A

ACD00570

Coating repair in ballast tank 9 Stbd

100% 10-Apr-11 A

17-Jun-11 A

ACD00620

Cleaning of sewage tank-Assistance

100% 10-Apr-11 A

17-Jun-11 A

ACD00580

Coating repair in ballast tank 10 Stbd

100% 15-Apr-11 A

26-May-11 A

ACD01030

Install new Stripping pumps

100% 17-Apr-11 A

16-Jul-11 A

ACDR2041

Em.Gen.Engine Radiator To Be Renewed

100% 29-May-11 A

15-Jun-11 A

ACD01020

Fab&Install fndns for new Stripping pumps

100% 01-Jun-11 A

15-Jun-11 A

ACD03570

Hull Markings

100% 11-Jun-11 A

24-Jun-11 A

ACDR31021

Upgrade of Cabins to conferance room L6052

100% 26-Jun-11 A

30-Jul-11 A

ACD00920

Supports& cable tray for existng modules(all)

100% 15-Jul-11 A

30-Sep-11

ACDR3001

Installation of Lighting & Small Power- Hospital

100% 15-Jul-11 A

27-Aug-11 A

ACDR31022

Upgrade of Deck Store to Laboratory C3018

ACDR5032

Forecastle store room refurbishment

29-Sep-11

New Section

0% 03-Jan-11 A

10-Nov-11

Construction
Constructio

0% 03-Jan-11 A

10-Nov-11

0% 16-May-11 A

30-Sep-11

100% 16-May-11 A

30-Sep-11

Ship stationary production piping - Installation

0% 17-Apr-11 A

18
Instaln of VSDs for subsea pumps

100% 17-Apr-11 A

02-Jul-11 A

ACDR2097

Instaln Of Subsea Cabinets

100% 15-Jun-11 A

16-Jul-11 A

ACDR4034

Ithaca WP - VFD Monitoring System

ACDR2180

Instln Of OPPS System

29
ACD02120

WI pump VSD transformer/VSD

0% 01-Oct-11*

30-Oct-11

0% 10-Oct-11

16-Oct-11

0% 10-Oct-11*

16-Oct-11

0% 08-May-11 A

17-Jun-11 A

100% 08-May-11 A

17-Jun-11 A

0% 05-Apr-11 A

52
Ballast piping in new section

100% 05-Apr-11 A

02-Jul-11 A

ACD01750

Fab & Install Ballast tank vent line

100% 24-Apr-11 A

20-Oct-11

0% 24-Apr-11 A

25-Sep-11

ACD01630

Fab&Install open drain in new section

100% 24-Apr-11 A

30-Jul-11 A

ACDR3011

Installation of Bilge Level Switches

100% 02-Aug-11 A

25-Sep-11

0% 24-Apr-11 A

15-Oct-11

100% 24-Apr-11 A

15-Oct-11

0% 15-Jun-11 A

05-Oct-11

100% 15-Jun-11 A

05-Oct-11

0% 25-Aug-11 A

20-Sep-11

80.95% 25-Aug-11 A

20-Sep-11

0% 19-Jun-11 A

30-Sep-11

57
ACD01640

Fab&Install closed drain in new section

63
ACDR2080

Instaln Of Pneumatic Control Panel &Tubing

65.02
ACDR4042

Instaln of PMS cabinets in S101 in New Section

70
ACD02010

Instaln of detectors/lights/CC TV/sm pwr fit'ngs

100% 19-Jun-11 A

25-Sep-11

ACDR2076

Installation Of F&G Detectors-New Section

100% 17-Jul-11 A

30-Sep-11

ACDR2098

F&G Detectors For El./ Utility

100% 17-Jul-11 A

30-Sep-11

ACDR4076

F&G Detectors in New Section

100% 20-Aug-11 A

30-Sep-11

0% 20-Aug-11 A

10-Oct-11

73.33% 20-Aug-11 A

10-Oct-11

0% 01-May-11 A

25-Sep-11

70.02
ACD02440

Instaln of detectors/lights (Inside STP)

71
ACDR2134

Install ICAF For Sea Chest In New Section

100% 01-May-11 A

17-Jun-11 A

ACD01740

Fire water piping from STP deluge skid

100% 16-May-11 A

20-Aug-11 A

Actual Work

Critical Remaining Work

Remaining Work

MILESTONES

Summary

Q4

Q1

Q2

Q3

20-Oct-11

ACD01720

56

2012
Q3

30-Oct-11

ACD02110

20

Q2

09-Nov-11

0% 20-Sep-11*

13

Q1

09-Nov-11

ACD00650

22.22% 01-Sep-11 A

2011
Q4

ACD00610

ACD01940

11-Jun-12 17:09

ATHENA FPSO

Page 3 of 15

TASK filter: All Activities


Primavera Systems, Inc.

DDWD Yard Schedule rev 5


Activity ID

Activity Name

Schedule % Start
Complete

Finish

Deluge piping inside STP system

100% 16-May-11 A

10-Sep-11 A

ACDR3016

Blinds for New Sea Chest in New Section

100% 20-May-11 A

17-Jun-11 A

ACD01730

Deluge skid installation

100% 11-Jun-11 A

25-Sep-11

ACD01770

Compr.air Connection to STP deluge skid

100% 16-Jul-11 A

20-Aug-11 A

76
Raised Escape Routes-New Section

79
ACD01960

Installation of ESD & Manual valves

80.02

0% 10-Jun-11 A

25-Jul-11 A

100% 10-Jun-11 A

25-Jul-11 A

0% 02-Aug-11 A

25-Sep-11

100% 02-Aug-11 A

25-Sep-11

0% 17-Apr-11 A

17-Jun-11 A

ACD02150

Instln of 6.6/0.45kV Power Transfo's (1600kVA)

100% 17-Apr-11 A

17-Jun-11 A

ACDR2088

80-Eh-0900 6,6Kv Process & Utility Switchboard

100% 11-Jun-11 A

17-Jun-11 A

0% 15-Jun-11 A

80.03
Instaln Of -Ergtg Backup Lo Pump Starter Panel

100% 15-Jun-11 A

17-Jun-11 A

ACDR2125

80-Ec-9285 Gtg Heater Control Panel

100% 15-Jun-11 A

17-Jun-11 A

ACDR2126

80-Pa-9182-Ec Gtg Backup Pump Starter Panel

100% 15-Jun-11 A

17-Jun-11 A

ACD02130

Instaln of GTG starter motor VSD (56kw)

100% 15-Jul-11 A

27-Jul-11 A

ACD02140

Instaln of GTG liquid fuel pump VSD

100% 15-Jul-11 A

29-Jul-11 A

0% 11-Jun-11 A
Instaln Of 440V Process & Utility Switchboard

100% 11-Jun-11 A

17-Jun-11 A

ACDR2092

Instln-Lighting&Small Pwr Distrbn Panel

100% 25-Aug-11 A

30-Sep-11

0% 28-Aug-11 A

25-Sep-11

93.33% 28-Aug-11 A

25-Sep-11

ACDR2093

Instln-Em.Light'G&Sm.Pwr Distrbn Panel

0% 03-Jul-11 A

85
Instaln-85-Er-0901/0902 110V Dc Ups

100% 03-Jul-11 A

16-Jul-11 A

ACD02160

Installation of GTG battery charger system

100% 15-Jul-11 A

25-Sep-11

0% 10-Jul-11 A

15-Oct-11

ACDR2072

Pa/Ga System-New Section

100% 10-Jul-11 A

30-Sep-11

ACDR2085

Office Data & Telephone Network-New Section

100% 17-Jul-11 A

15-Oct-11

0% 15-Jun-11 A

87
Installation Of Cabinets In Instrument Room Stp

100% 15-Jun-11 A

20-Jul-11 A

ACDR2078

Installation Of Cctv

100% 17-Jul-11 A

25-Oct-11

0% 19-Jun-11 A

30-Sep-11

ACDR2073

Installation Of Light Fixtures

100% 19-Jun-11 A

25-Sep-11

ACDR2074

Installation Of Junction Box

100% 17-Jul-11 A

25-Sep-11

ACDR2075

Installation Of Floodlights

100% 17-Jul-11 A

25-Sep-11

ACDR2077

Installation Of Emergency Light Fixtures

100% 17-Jul-11 A

25-Sep-11

ACDR2079

Installation Of Flashlight (Beacons)

100% 17-Jul-11 A

30-Sep-11

91
ACD03660

Coating of the Block units

94
ACD01970

Installation of Swivel leak tanks

97
ACDR2084

Installation Of HVAC Eqpt& Piping In New Section

97.02
ACD02070

Installation of ventilation skids&Duct

0% 29-Mar-11 A

27-Oct-11

100% 29-Mar-11 A

27-Oct-11

0% 11-Jun-11 A

06-Aug-11 A

100% 11-Jun-11 A

06-Aug-11 A

0% 22-May-11 A

15-Oct-11

100% 22-May-11 A

15-Oct-11

0% 22-May-11 A

20-Jul-11 A

100% 22-May-11 A

20-Jul-11 A

0% 03-Jan-11 A

99
Fabrication of MCM

100% 03-Jan-11 A

23-Apr-11 A

ACD03630

Fabrication of STP Cylinder

100% 04-Jan-11 A

25-Mar-11 A

ACD01570

Fab new Hull section & Green sea protecn

100% 05-Jan-11 A

23-Apr-11 A

ACDR2108

Fabricate And Install Greensea Protection

100% 01-Mar-11 A

20-May-11 A

ACD01800

Assembly of MCM,Cylinder+New Block

100% 13-Mar-11 A

14-May-11 A

ACD01590

Fabricate crane Pedestal

100% 29-Mar-11 A

05-May-11 A

ACD01690

Fab&Install extension Piperack

100% 29-Mar-11 A

28-May-11 A

ACD01790

Fab&Instaln of Swivel support beams

100% 29-Mar-11 A

16-Jul-11 A

ACD01870

Fabrication & Installation of Winch Foundation

100% 29-Mar-11 A

14-May-11 A

ACD01880

Fabcn&Instaln of Protect.Structure for Winch

100% 29-Mar-11 A

28-May-11 A

ACD03700

Cone Hatch Fabrication

100% 29-Mar-11 A

21-May-11 A

ACD03680

Docking Start

100% 30-Mar-11 A

ACDR2103

Manual Sounding Pipes For Wbts In New Section

100% 01-Apr-11 A

15-Apr-11 A

ACD01810

Fabrication of Ship stationary platforms

100% 05-Apr-11 A

21-May-11 A

ACD01860

STP piping supports including deluge

100% 05-Apr-11 A

02-Jul-11 A

ACD02210

Fabrication of Swivel Trolley & Access tower

100% 05-Apr-11 A

02-Jul-11 A

ACD01850

Supports for C.trays-New Sction

100% 10-Apr-11 A

24-Jun-11 A

ACD01820

Instaln of Ship/Geo stationary platforms

100% 17-Apr-11 A

30-Jul-11 A

ACD01840

Fab&Instaln of STP&New Section Eqpt supports

100% 17-Apr-11 A

09-Jul-11 A

ACD02080

Instaln MCT's/Pens/Coamings for cables

100% 24-Apr-11 A

02-Jul-11 A

ACD01780

Machining(Yard's assistance)

100% 01-May-11 A

14-May-11 A

ACD02100

Installation of STP valve rack

100% 01-May-11 A

09-Jul-11 A

ACDR2105

FW Pump fndn in New section

100% 01-May-11 A

17-Jun-11 A

ACDR2106

Foundations In Utility Room & Data floor

100% 01-May-11 A

16-Jul-11 A

ACDR2185

Stiffening for Pull in winch foundation

100% 01-May-11 A

28-May-11 A

ACDR23000

Supports for lights/speakers/detectors-N/S

100% 01-May-11 A

16-Jul-11 A

ACD01930

Utility piping inside STP system

100% 08-May-11 A

20-Sep-11

ACD02040

Installation of Locking mechanisms

100% 08-May-11 A

30-Jul-11 A

ACD02180

Install cable trays (all system) in new section

100% 08-May-11 A

03-Sep-11 A

ACD01990

Installation of Swivel Barrier HPU

100% 16-May-11 A

17-Jun-11 A

ACD02020

Installation of ESD HPU

100% 16-May-11 A

17-Jun-11 A

ACD03670

Block ready for Installation

100%

16-May-11 A

ACD02060

Instaln of hydraulic and pneumatic drain pumps

100% 04-Jun-11 A

24-Jun-11 A

ACD02050

Installation of Mating cone seal

100% 05-Jun-11 A

30-Jul-11 A

ACDR2067

Installation Of Normal Distribution Board

100% 11-Jun-11 A

09-Jul-11 A

ACDR2069

Installation Of Emergency Distribution Board

100% 11-Jun-11 A

02-Jul-11 A

ACD01980

Instaln of all control panels/ups in new section

100% 15-Jun-11 A

21-Jul-11 A

ACDR2062

Instaln Of Swivel Barrier Hpu Starter Cabinets

100% 15-Jun-11 A

09-Jul-11 A

ACDR2063

Installation Of Ventilation Starter Cabinets

100% 15-Jun-11 A

02-Jul-11 A

ACDR2064

Installation Of Stp Main Control Cabinet

100% 15-Jun-11 A

09-Jul-11 A

ACDR2065

Installation Of Stp Hpu Starter Cabinet

100% 15-Jun-11 A

09-Jul-11 A

ACDR2066

Installation Of Aux Control Cabinet

100% 15-Jun-11 A

02-Jul-11 A

ACDR2068

Installation Of Esd Hpu Starter Cabinets

100% 15-Jun-11 A

02-Jul-11 A

ACDR2070

Instaln-Stp Utility Drain Pump Starter Cabinets

100% 15-Jun-11 A

02-Jul-11 A

Critical Remaining Work

Remaining Work

MILESTONES

Summary

Q1

Q2

Q3

10-Nov-11

ACD01760

Actual Work

Q4

25-Oct-11

ACDR2100

88

2012
Q3

25-Sep-11

ACDR2094

86

Q2

30-Sep-11

ACDR2090

84

Q1

29-Jul-11 A

ACDR2089

82

2011
Q4

ACD01920

ACDR2131

11-Jun-12 17:09

ATHENA FPSO

Page 4 of 15

TASK filter: All Activities


Primavera Systems, Inc.

DDWD Yard Schedule rev 5


Activity ID

11-Jun-12 17:09

ATHENA FPSO

Activity Name

Schedule % Start
Complete

Finish

ACDR2071

Installation Of Stp Drain Pump Starter Cabinets

100% 15-Jun-11 A

09-Jul-11 A

ACDR2095

Instaln Of Lighting & Small Power- New Section

100% 19-Jun-11 A

25-Sep-11

ACD02300

Cable pulling&Term-Inside STP

100% 10-Jul-11 A

10-Nov-11

ACD02850

Cable pulling&Terminations-Outside STP

100% 10-Jul-11 A

25-Oct-11

ACDR3024

New manual sounding pipes for Void Spaces in NS

100% 10-Jul-11 A

29-Jul-11 A

ACDR23010

Instaln of Penetrations for tubings

100% 15-Jul-11 A

10-Sep-11 A

Integration
Construction
Constructio
13

0% 14-Dec-10 A

08-Dec-11

0% 14-Dec-10 A

08-Dec-11

0% 16-May-11 A

15-Oct-11

ACD01680

Production piping from new section to STP unit

100% 16-May-11 A

15-Oct-11

ACD01950

Geostationary production piping - Installation

100% 16-May-11 A

05-Oct-11

ACD02430

Fab&Instaln of Subsea HPU support

100% 16-May-11 A

16-Jul-11 A

ACD02410

Fab&Install Production piping

ACD02420

Install Subsea HPU

68.09% 10-Aug-11 A

15-Oct-11

70% 28-Aug-11 A

20-Sep-11

0% 16-Sep-11

08-Nov-11

18
ACDR5035

Assistance-ROV launch and recovery system

0% 16-Sep-11*

30-Sep-11

ACDR5034

Assistance-RAMMS System

0% 10-Oct-11*

08-Nov-11

0% 16-May-11 A

25-Oct-11

20
ACD02450

Install new internals in slug catcher

ACDR5010

Instaln of Piping,E&I for Slug catcher pump

100% 16-May-11 A

21

25-Oct-11

0% 20-Dec-10 A

15-Oct-11

Demolition of existing offloading line aft

100% 20-Dec-10 A

31-Dec-10 A

ACD02530

Removal of Riser reel, foundation, piping&HPU

100% 25-Dec-10 A

10-Feb-11 A

ACD02460

Midship offloading station modific's(Structure)

100% 09-Jan-11 A

15-Jan-11 A

ACD02470

Removal of midship offloading line

100% 17-Jan-11 A

28-Jan-11 A

ACD02500

COW line for the moonpool crude tank

100% 17-Apr-11 A

15-Oct-11

0% 10-Aug-11 A

15-Nov-11

71.11% 10-Aug-11 A

15-Oct-11

ACDR4079

Cargo system modifications

ACDR4041

Modificn to Hydr.System for Ballast&Cargo valves

21.02

0% 11-Sep-11*

15-Nov-11

0% 25-Jul-11 A

15-Nov-11

ACDR4022

Fabrication and Installation of Stern Gate

100% 25-Jul-11 A

29-Oct-11

ACDR4098

Modify the SDS reel

100% 05-Aug-11 A

20-Oct-11

ACDR4002

Fab&Install the offloading line to SDS reel

53.33% 10-Aug-11 A

08-Nov-11

ACDR4115

Stiffening for Hose reel

100% 15-Aug-11 A

30-Sep-11

ACDR4025

Fabr. and Inst. of Access Platform for SDS Reel

48.89% 20-Aug-11 A

30-Sep-11

ACDR4090

Reinstallation of Hose reel

85.71% 24-Aug-11 A

30-Aug-11 A

ACDR4027

Strengthening &Fndn for Spooling device

33.33% 01-Sep-11 A

10-Oct-11

ACDR4028

Strengthening &Fndn for hose reel platform

33.33% 01-Sep-11 A

30-Sep-11

ACDR4026

Strengthening &Fndn for Messenger line winch

0% 25-Sep-11*

15-Oct-11

ACDR2176

Grab Sampler/Grab Sampler Cabinet

0% 10-Oct-11*

24-Oct-11

ACD02490

COW Machine instlnthe moonpool crude tank

0% 16-Oct-11

18-Oct-11

ACDR4024

Installation of Spooling Device

0% 16-Oct-11*

29-Oct-11

ACD02510

Protective barrier: COW M/C-moonpool crude tank

0% 26-Oct-11

15-Nov-11

0% 01-May-11 A

29-Oct-11

100% 01-May-11 A

21-Oct-11

21.03
ACDR2178

Replacement Of Flow Meters

ACDR2177

Assist.Upgrading Of Offloading Metering System

0% 25-Sep-11*

24-Oct-11

ACDR4048

Installation of Messenger line Winch

0% 16-Oct-11*

29-Oct-11

0% 16-May-11 A

30-Oct-11

29
ACD01710

WI piping between new section & STP unit

100% 16-May-11 A

30-Oct-11

ACD02550

Install WI Module

100% 05-Jul-11 A

25-Jul-11 A

ACD02540

WI line from WI unit to new section interface

ACD03350

Instr. air tubing & support for Water inj.module

42

80% 10-Aug-11 A

30-Oct-11

22.5% 02-Sep-11 A

30-Oct-11

0% 01-May-11 A

18-Nov-11

ACDR2150

Fab& Instaln Chemical Laydown & Storage Platform

100% 01-May-11 A

15-Oct-11

ACD02590

Installation of methanol and chemical module

100% 13-Jul-11 A

20-Sep-11

ACD02580

Topside chem. tank filling lines from CI module

100% 28-Jul-11 A

10-Nov-11

ACD01660

Fab & Install Chemical injection tube to swivel

68.09% 10-Aug-11 A

30-Oct-11

ACD03360

Instr.air tubing & support for Chem. inj.module

22.5% 02-Sep-11 A

10-Nov-11

ACD02560

Chemical injection piping HU to Module

0% 15-Oct-11*

18-Nov-11

0% 03-Jan-11 A

25-Nov-11

43
ACD02600

Flare stack,foundation,cable& piping removal

100% 03-Jan-11 A

08-Jan-11 A

ACD02640

Extension & install flare boom rest

100% 10-Apr-11 A

15-Oct-11

ACD02610

Fab&Install new u.d.stiffen for flare stack

100% 17-Apr-11 A

08-Sep-11 A

ACD02620

Fab&Install new flare line

100% 24-Apr-11 A

30-Oct-11

ACD02630

Reinstall Flare stack

28.57% 05-Sep-11 A

01-Oct-11

ACDR4080

Fabrication & Installation of Propane Bottlerack

0% 01-Oct-11*

21-Oct-11

ACDR5036

Flare Ignition panel renewal

0% 05-Oct-11*

19-Oct-11

ACDR4046

Propane bottles instaln & hook up

0% 19-Nov-11

25-Nov-11*

0% 19-Jun-11 A

24-Oct-11

44
ACD02670

Foundns-Produced water pumps,cooler&polish unit

100% 19-Jun-11 A

05-Sep-11 A

ACD02650

Install piping for produced water pumps,Coolers

100% 22-Jul-11 A

10-Oct-11

ACDR3004

Instr.tubing for Floatation Skid

100% 02-Aug-11 A

21-Oct-11

ACD02660

Install produced water pumps,cooler&polish unit

0% 11-Sep-11

25-Sep-11

ACDR2179

Assistance to Install Of Oiw Analyser

0% 25-Sep-11*

24-Oct-11

0% 20-Mar-11 A

10-Nov-11

45
ACD02740

Fab&Install fuel gas skid foundation

100% 20-Mar-11 A

14-May-11 A

ACD02700

Modification to gas piping.

100% 10-Apr-11 A

20-Oct-11

ACD02730

Foundns for stripping gas cooler & Scrubber

100% 11-Jun-11 A

02-Jul-11 A

ACD02680

Fab&Install turbine generator fuel gas line

100% 19-Jun-11 A

21-Oct-11

ACD02690

Piping for stripping gas cooler & Scrubber

100% 23-Jul-11 A

20-Oct-11

ACD02710

Install fuel gas conditioning skid

100% 20-Aug-11 A

30-Sep-11

ACDR2L004

Lift fuel gas conditioning skid

100% 20-Aug-11 A

ACD02720

Install stripping gas cooler and scrubber

ACD03370

Inst.air tubing & support for Fuel gas module

80.95% 25-Aug-11 A

46
ACDR2L003

Lift chemical module

ACD01650

Fab & Install Methanolinjection tube to swivel

ACD03380

Instr.air tubing & supp.for Methanol Inj. module

ACD02570

Methanol injection piping HU to Module

Q1

Q2

2012
Q3

Q4

Q1

Q2

Q3

21-May-11 A

0% 01-Oct-11*

ACD02520

21.01

2011
Q4

25-Sep-11

0% 21-Sep-11*

10-Nov-11

0% 13-Jul-11 A

18-Nov-11

100% 13-Jul-11 A
71.11% 10-Aug-11 A

05-Oct-11

22.5% 02-Sep-11 A

10-Nov-11

0% 15-Oct-11*

18-Nov-11

0% 19-Jun-11 A

05-Nov-11

50

Actual Work

Critical Remaining Work

Remaining Work

MILESTONES

Summary

Page 5 of 15

TASK filter: All Activities


Primavera Systems, Inc.

DDWD Yard Schedule rev 5


Activity ID

Activity Name

ACD02770

Schedule % Start
Complete

Finish

100% 19-Jun-11 A

05-Nov-11

0% 26-Jun-11 A

03-Nov-11

ACDR3010

Extension/ Modification of Ballast System

100% 26-Jun-11 A

02-Jul-11 A

ACD02190

Tank measurement new section

100% 15-Jul-11 A

10-Oct-11

ACDR4085

Extension of Air Pipes and ventilators & modific

0% 25-Sep-11*

24-Oct-11

ACDR31030

Replacement of Ballast tank-G-Valves

0% 10-Oct-11*

03-Nov-11

0% 01-May-11 A

25-Sep-11

52

53
ACD01670

Fab & Install Utility system to STP cylinder

100% 01-May-11 A

25-Sep-11

ACDR2155

Blinding Of Piping Fresh Water Cargo System

100% 01-May-11 A

17-Jun-11 A

ACDR4036

Fr.Water to new eqpt from hydrophore on MD

71.11% 10-Aug-11 A

25-Sep-11

0% 10-Apr-11 A

20-Oct-11

100% 10-Apr-11 A

20-Oct-11

0% 19-Jun-11 A

15-Oct-11

56
Modifications to drain system

59
ACDR3012

Conversion Rooms 6053, 6054 to conference Room

100% 19-Jun-11 A

15-Oct-11

ACDR3014

Conversion Rooms 7003,7005 to Heli lounge

100% 19-Jun-11 A

15-Oct-11

0% 22-May-11 A

03-Nov-11

62
ACDR2112

Closing Of Tank Top For New Fo Service Tank

100% 22-May-11 A

07-Sep-11 A

ACD02800

Fab&Instaln of Foundations for MDO Booster pumps

100% 11-Jun-11 A

23-Jul-11 A

ACD02810

Fab&Instaln of Foundations for MDO Seperator

100% 11-Jun-11 A

16-Jul-11 A

ACD02820

Instaln for MDO Booster pumps

100% 10-Jul-11 A

30-Jul-11 A

ACD02830

Instaln of MDO Seperator

100% 10-Jul-11 A

30-Jul-11 A

ACD02790

Piping Modifications to MDO distribution system

ACDR4071

Foundns for Heater & Filter for MDO Distribution

100% 01-Aug-11 A

10-Aug-11 A

ACDR4072

Instaln of Heater & Filter for MDO Distribution

100% 11-Aug-11 A

25-Aug-11 A

ACDR5008

Tubing & Level transmitters for Diesel/MDO Tanks

80.56% 15-Jul-11 A

64

0% 05-Oct-11*

03-Nov-11

0% 29-Mar-11 A

30-Sep-11

Test ,Extent&Relocate PV valves

100% 29-Mar-11 A

10-Sep-11 A

ACDR31017

Navigation light / Cold Vent Mast

100% 20-Jul-11 A

30-Sep-11

0% 10-Jul-11 A

18-Nov-11

100% 10-Jul-11 A

05-Nov-11

ACD02090

Installation of Hydraulic tubing-New Section

ACDR5002

Hydraulic control cabinet modification

0% 20-Sep-11*

10-Oct-11

ACDR5037

Modification of HPU for Cargo control system

0% 20-Oct-11*

18-Nov-11

0% 05-Sep-11 A

10-Oct-11

15% 05-Sep-11 A

10-Oct-11

0% 15-Aug-11 A

07-Dec-11

60% 15-Aug-11 A

25-Oct-11

28.57% 05-Sep-11 A

15-Oct-11

65.01
ACDR4039

Hydr.piping for hand pump to sea chest valves

65.02
ACDR4059

Lub Oil System For Gas Turbine

ACDR4038

Instaln of hydr. hand pump for sea chest valves

ACDR4003

Install hydraulic supply lines to the SDS reel

0% 14-Sep-11

12-Nov-11

ACDR4123

Hydr.Piping (Offloading) Test,Flush,Reinstatmnt

0% 13-Nov-11

07-Dec-11

0% 11-Jul-11 A

25-Oct-11

70
ACD03390

F & G Detectors Topside

100% 11-Jul-11 A

25-Oct-11

ACDR3008

Instaln Of Fix.Gas Detn.In Trunks,WBTs etc @ STP

100% 02-Aug-11 A

25-Oct-11

ACDR4082

Upgrade of Autronica Fire Control

ACDR5012

Fire and Gas modification

90% 15-Aug-11 A

70.02
ACD03480

Installation of Pushbuttons / ESD Pushbuttons

71

24-Oct-11

0% 15-Jul-11 A

21-Oct-11

100% 15-Jul-11 A

21-Oct-11

0% 10-Apr-11 A

25-Nov-11

Modifications to fire water distribution system

100% 10-Apr-11 A

30-Oct-11

ACDR2137

Firewater Pump& Foundn In Fwd E/R

100% 01-May-11 A

20-Aug-11 A

ACDR2138

Install Sea Chest In ER For New Fire Pumps

100% 01-May-11 A

17-Jun-11 A

ACDR3015

Blinds for New Sea Chest in E/R

100% 20-May-11 A

17-Jun-11 A

ACDR2139

Install Piping Forfire Water Pumps In E/R

100% 22-May-11 A

20-Sep-11

ACDR2135

Pipe Routing Across New Section

100% 11-Jun-11 A

25-Oct-11

ACDR2183

Install ICAF for new seachests in E/R

100% 11-Jun-11 A

17-Jun-11 A

ACDR2104

Fw System & Hydraulic Lift Pump In New Section

100% 15-Jul-11 A

15-Oct-11

ACDR31036

Fire Water Deluge system

100% 15-Jul-11 A

10-Nov-11

ACDR2110

Installation Of Diesel Driven Fw Pump Container

100% 16-Jul-11 A

01-Oct-11

ACDR4070

Jockey Pump in E/R & Foundation

100% 01-Aug-11 A

20-Aug-11 A

ACDR4102

Instaln of Sprikler&PFP for Acetln&O2 cabinets

ACDR31016

Installation of Foam Nozzles

ACDR5001
ACDR4084
ACDR3020

22.22% 01-Sep-11 A

30-Oct-11

30% 02-Sep-11 A

25-Nov-11

Assist to Modific'n of Fire water control HPU

0% 20-Oct-11*

18-Nov-11

Deluge Nozzles for Fire System

0% 27-Oct-11

25-Nov-11

0% 15-Oct-11

13-Nov-11

0% 15-Oct-11*

13-Nov-11

0% 15-Dec-10 A

28-Oct-11

CO2 for Cold Flare

73
ACD02950

Removal of existing crane&pedestal

100% 15-Dec-10 A

05-Jan-11 A

ACDR2109

Removal Of Crane Pedestal & Boom Cradle

100% 20-Dec-10 A

05-Jan-11 A

ACD03050

Removal of Planks from Laydown(MD)

100% 22-Dec-10 A

28-Dec-10 A

ACDR2136

Heavy Lifts

86.67% 25-Dec-10 A

24-Aug-11 A

ACD03060

Bumper bars and railing for Laydown(MD)

100% 01-Jan-11 A

30-Jan-11 A

ACD02990

Removal and reinstall boomrest of exist crane

100% 04-Jan-11 A

27-Oct-11

ACD03240

Removal of existing cable for relocated crane

100% 25-Jan-11 A

27-Jan-11 A

ACD02970

U.D.Siffening for existing crane pedestal

100% 20-Mar-11 A

17-Jun-11 A

ACD02930

Ladders &Platforms for new crane

100% 01-May-11 A

20-Jul-11 A

ACD03040

Fab&Install Boomrest for new midships crane

100% 01-May-11 A

17-Jun-11 A

ACD02980

Reinstall turret and boom-existing crane

100% 11-Jun-11 A

10-Sep-11 A

ACD03620

Reinstall existing crane pedestal

100% 19-Jun-11 A

10-Sep-11 A

ACD02910

Installation of Turret-new crane

100% 28-Jul-11 A

30-Jul-11 A

ACD02920

Installation of Boom-new crane

100% 28-Jul-11 A

30-Jul-11 A

ACD03070

Install back planks on Laydown area(MD)

100% 08-Aug-11 A

03-Sep-11 A

ACDR4015

Fabrication and Installation of Crane Hook Cribs

0% 05-Oct-11*

25-Oct-11

ACD02940

Load test of new crane

0% 26-Oct-11*

28-Oct-11

0% 24-Apr-11 A

25-Nov-11

76
ACD03110

Fabcn and Instaln of Temporary refuge (TR) aft

100% 24-Apr-11 A

17-Jun-11 A

ACDR2114

Seachest In New Section

100% 01-May-11 A

17-Jun-11 A

ACDR2184

New Liferaft Platform

100% 01-May-11 A

23-Jul-11 A

ACDR2154

Raised Escape&Access Routes-Vessel

100% 11-Jun-11 A

15-Nov-11

ACD02370

Instaln of Davit for MOB

100% 15-Jul-11 A

25-Sep-11

ACD03100

Improve access on the 2nd escape routes

100% 15-Jul-11 A

25-Oct-11

ACDR3019

Instaln of Safety Plot Plan related equipment

100% 02-Aug-11 A

23-Nov-11

Actual Work

Critical Remaining Work

Remaining Work

MILESTONES

Summary

Q2

2012
Q3

Q4

Q1

Q2

Q3

25-Aug-11 A

0% 25-Sep-11*

ACD02890

72

Q1

25-Oct-11

ACD02870

65

2011
Q4

SW Distribution system Piping

ACD02780

11-Jun-12 17:09

ATHENA FPSO

Page 6 of 15

TASK filter: All Activities


Primavera Systems, Inc.

DDWD Yard Schedule rev 5


Activity ID

Activity Name

Schedule % Start
Complete

Finish

Passive Fire Protecn on Shielded escape & Eqpt

100% 02-Aug-11 A

20-Oct-11

ACDR4020
ACDR4049

Topside Access Modifications

16.67% 01-Sep-11 A

25-Nov-11

Provide cage for ladders onboard

33.33% 01-Sep-11 A

ACD02380

Refitting of MOB

0% 03-Oct-11

20-Oct-11
09-Oct-11

ACDR3022

Air Bottles in Safe Haven

0% 10-Oct-11*

08-Nov-11

ACDR5009

HVAC for safe haven

0% 20-Oct-11*

18-Nov-11

ACDR3018

Re-instaln of Bolts for Barb Wire incl New Sectn

0% 10-Nov-11*

24-Nov-11

0% 30-Jul-11 A

09-Nov-11

100% 30-Jul-11 A

09-Nov-11

0% 15-Jul-11 A

10-Nov-11

79
Instaln Of Pushbuttons / Esd Pushbuttons-Topside

80.03
ACD03120

Install gas turbine generator module

100% 15-Jul-11 A

ACDR2L002

Lift gas turbine generator module

100% 15-Jul-11 A

ACD03140

Install gas turbine exhaust support

100% 30-Jul-11 A

10-Oct-11

ACD03130

Install gas turbine exhaust duct

100% 25-Aug-11 A

17-Oct-11

ACD03400

Instr. air tubing & support for Gas turb. module

22.5% 02-Sep-11 A

10-Nov-11

82.01

0% 06-Jan-11 A

03-Sep-11 A

Cut & Splice Rcop 1Kv Lv Cables In Trunks

100% 06-Jan-11 A

03-Sep-11 A

ACDR2045

Cut & Splice Rcxp 1Kv Lv Cables In Trunks

100% 06-Jan-11 A

03-Sep-11 A

0% 16-Sep-11

13-Oct-11

ACD03260

Fab&Instaln of New 440V Em. Sub DB Foundn

0% 16-Sep-11

06-Oct-11

ACD03250

Instaln of New 440V Emergency Sub DB

0% 07-Oct-11

13-Oct-11

0% 01-May-11 A

30-Oct-11

86
ACDR2049

Pa/Ga System-Vesel

100% 01-May-11 A

15-Jul-11 A

ACDR2175

Instln Of Vsat Equipment

100% 01-May-11 A

24-Jun-11 A

ACDR2016

Office Data & Telephone Network-Vessel

100% 22-May-11 A

25-Jul-11 A

ACDR2050

Audio And Video Entertainment System

100% 29-May-11 A

15-Jul-11 A

ACDR3017

EIT Vertical cable trunk in Accommodation

100% 08-Jun-11 A

09-Jul-11 A

ACDR2182

Navigation aid system

100% 15-Jul-11 A

21-Oct-11

ACDR2020

Environmental Monitoring System

100% 22-Jul-11 A

25-Oct-11

ACDR2051

Offloading Monitoring Telemetry System

56.67% 25-Aug-11 A

10-Oct-11

ACDR2018

General Radio And Gmdss System

0% 01-Oct-11*

30-Oct-11

ACDR2019

Operational Radio System

0% 01-Oct-11*

30-Oct-11

0% 12-Jan-11 A

24-Oct-11

87
ACD03410

Demolishing CER 3017

100% 12-Jan-11 A

08-Feb-11 A

ACD03420

Demolishing CCR 8000

100% 25-Jan-11 A

07-Apr-11 A

ACDR3009

Installation Of Control System in CER 3017

100% 15-Jul-11 A

13-Aug-11 A

ACDR4031

Demolish 95% panel ECR

100% 20-Jul-11 A

05-Aug-11 A

ACDR4032

Demolish fixed gas detection panel

100% 20-Jul-11 A

05-Aug-11 A

ACDR4033

Installation of Equipment EIT Room - D-Deck

ACDR4030
ACDR4083

33.33% 01-Sep-11 A

10-Oct-11

CCR/Bridge Up_Grade

20% 05-Sep-11 A

20-Oct-11

Installation of new JBs

0% 25-Sep-11*

24-Oct-11

0% 15-Oct-11

28-Nov-11

88
ACDR2102

Instln Heat Trace Distr Panel

0% 15-Oct-11*

20-Oct-11

ACD03430

Heat tracing for Process,Flare&KO Drum

0% 30-Oct-11*

28-Nov-11

0% 10-Aug-11 A

30-Sep-11

100% 10-Aug-11 A

30-Sep-11

0% 01-Aug-11 A

08-Nov-11

90
ACDR4021

Fabrication & Installation of ROV Platform

91

71.93% 01-Aug-11 A

ACDR4081

Install manual sounding pipes for Void Spaces

ACDR5039

Helideck Marking

0% 15-Sep-11*

21-Sep-11

ACDR5038

Strengthening of Pumproom bulkhead

0% 25-Sep-11*

24-Oct-11

ACDR4086

Access platform for Fire monitor

0% 10-Oct-11*

08-Nov-11

0% 30-Jan-11 A

26-Nov-11

94
Removal of port side capstan and mooring bits

100% 30-Jan-11 A

26-Nov-11

ACD01910

Instaln of swivel in trolley

100% 11-Jul-11 A

20-Jul-11 A

ACD02030

Installation of Pull-in winch and guide roller

100% 15-Jul-11 A

27-Aug-11 A

ACD02220

Installation of Swivel Trolley & Access tower

100% 08-Aug-11 A

20-Aug-11 A

ACD01890

Instaln of Pull in winch roller&structures

0% 15-Oct-11*

28-Oct-11

0% 01-May-11 A

13-Nov-11

ACDR2008

Ecr Ac Fan Coil Units

100% 01-May-11 A

21-May-11 A

ACDR2146

Instaln Of Hvac To Supply Air To The New Section

100% 19-Jun-11 A

30-Sep-11

ACDR2153

LQ Hvac Upgrade

100% 15-Jul-11 A

30-Sep-11

ACDR31018

Ventilat'n duc extens'n for pump & azimuth rooms

100% 15-Jul-11 A

20-Oct-11

ACDR4029

General HVAC upgrade

16.67% 01-Sep-11 A

10-Nov-11

ACDR2152

Inastallation Of Hvac, Shielded Escape

99

0% 15-Oct-11*

13-Nov-11

0% 14-Dec-10 A

08-Dec-11

ACD02320

Removal of Container deck

100% 14-Dec-10 A

25-Dec-10 A

ACD02290

Decom.&removalof HPU&work shop container

100% 31-Dec-10 A

09-Jan-11 A

ACD03320

Mark,Disconnect, cut cables in trunks

100% 06-Jan-11 A

01-May-11 A

ACDR2046

Cut & Splice 60V Instrument Cables In Trunks

100% 06-Jan-11 A

03-Sep-11 A

ACDR2047

Cut & Splice 250V Instrument Cables In Trunks

100% 06-Jan-11 A

03-Sep-11 A

ACDR2048

Cut & Splice Special Cables In Trunks

100% 06-Jan-11 A

03-Sep-11 A

ACD02230

Fabcn and Instaln of moonpool closing structures

100% 17-Jan-11 A

17-Jun-11 A

ACD02360

Decom. and removal of MOB boat

100% 17-Jan-11 A

05-Feb-11 A

ACD03200

Install bulwark SB, PS and aft

100% 06-Feb-11 A

27-Oct-11

ACD02390

Remove Piping iwo of cutting of vessel

100% 27-Feb-11 A

01-May-11 A

ACD03170

Install bulwark in bow

100% 13-Mar-11 A

16-Jul-11 A

ACD02240

Fabcn&Instaln of water injection module supports

100% 20-Mar-11 A

14-May-11 A

ACD02260

Fabcn and Instaln of gas turbine module supports

100% 20-Mar-11 A

14-May-11 A

ACD03500

Bottom Plugs-(50 Nos)

100% 30-Mar-11 A

08-Apr-11 A

ACD03520

Install Hatch on Container deck

100% 10-Apr-11 A

16-Jul-11 A

ACDR4107

Local Hull strengthening

100% 20-Apr-11 A

10-Jul-11 A

ACD01620

Installation of Crane Pedestal

100% 01-May-11 A

28-May-11 A

ACD03150

Cutting & moving the Vessel

100% 02-May-11 A

07-May-11 A

ACD03160

Installation of new section

100% 16-May-11 A

17-Jun-11 A

ACDR2132

Bulkhead Insulation In New Section

100% 22-May-11 A

20-Oct-11

ACD01600

Assembly of flange to crane pedestal

100% 11-Jun-11 A

09-Jul-11 A

ACD01830

Dummy buoy top Instaln

100% 11-Jun-11 A

22-Jul-11 A

ACD02400

Piping Re-connection after joining of the vessel

100% 11-Jun-11 A

15-Oct-11

ACD03690

Bumper bar extension

100% 11-Jun-11 A

30-Jul-11 A

ACDR2107

Fire Protection Port Side Shielded Escape

100% 11-Jun-11 A

20-Nov-11

Actual Work

Critical Remaining Work

Remaining Work

MILESTONES

Summary

Q2

2012
Q3

Q4

Q1

Q2

Q3

20-Aug-11 A

ACD03010

97

Q1

03-Sep-11 A

ACDR2044

84

2011
Q4

ACDR3021

ACDR2111

11-Jun-12 17:09

ATHENA FPSO

Page 7 of 15

TASK filter: All Activities


Primavera Systems, Inc.

DDWD Yard Schedule rev 5


Activity ID

Activity Name

Schedule % Start
Complete

Finish

Fire Protec'n-Shielded Escape&Oil Spill Protec'n

100% 11-Jun-11 A

20-Nov-11

ACD03310

Supports for cable trays/instruments-MD

100% 19-Jun-11 A

30-Sep-11

ACDR3002

Merging Tk 3 and Cargo Tk 7-opening behind fr#59

100% 19-Jun-11 A

30-Jul-11 A

ACDR2147

New Green Sea Protection On A-Deck

100% 20-Jun-11 A

24-Oct-11

ACD02250

Und.dk.Siffening for chemical/Methanol module

100% 26-Jun-11 A

10-Sep-11 A

ACD02330

Local support for Container deck

100% 26-Jun-11 A

23-Jul-11 A

ACDR31026

Misc Piping Systemsfrom P&ID

100% 30-Jun-11 A

30-Oct-11

ACDR4016

Linoleum flooring for cabins

100% 01-Jul-11 A

25-Aug-11 A

ACD03330

Splice cables in trunks(All)

100% 03-Jul-11 A

30-Sep-11

ACDR4017

Convert rooms 2005,2008,2054 to 4 men cabinets

100% 05-Jul-11 A

10-Oct-11

ACDR4018

Convert room 4008 to Duty mess room

100% 05-Jul-11 A

10-Oct-11

ACDR4019

Linoleum flooring for crew recreation room

100% 05-Jul-11 A

20-Jul-11 A

ACDR2L001

Lifting of WI module

100% 08-Jul-11 A

ACD01610

Machining of crane flange

100% 10-Jul-11 A

23-Jul-11 A

ACD03440

Power Cable Pulling

100% 10-Jul-11 A

20-Nov-11

ACD03460

Control cable pulling

100% 10-Jul-11 A

20-Nov-11

ACDR4074

Wooden Protection on Stern for off-loading hose

100% 10-Jul-11 A

20-Jul-11 A

ACD02310

Re-Instaln of Work shop container

100% 15-Jul-11 A

21-Jul-11 A

ACD01900

Instaln of Swivel pedestal structure

100% 17-Jul-11 A

30-Jul-11 A

ACD03300

Installation of Lighting and small power-MD

ACD03710

Cone Hatch Installation

100% 17-Jul-11 A

30-Jul-11 A

ACDR23020

Cable tray instaln-MD

100% 17-Jul-11 A

07-Oct-11

ACDR4073

Cabin Noise Reduction Upgrade

100% 20-Jul-11 A

20-Aug-11 A

ACD03450

Power Cable Terminations

96% 25-Jul-11 A

27-Nov-11

ACD03470

Control cable terminations

96% 25-Jul-11 A

27-Nov-11

ACDR4001

Fab&Install hose reel foundation

100% 25-Jul-11 A

10-Aug-11 A

ACD02350

Install back Container deck after hull extension

100% 26-Jul-11 A

20-Aug-11 A

ACD03490

E&I integration of new Crane

ACD03340

93.33% 17-Jul-11 A

10-Oct-11

New lighting control panel(wall mounted)

0% 26-Sep-11*

09-Oct-11

ACDR31014

Winterization Topside

0% 15-Oct-11*

28-Nov-11

ACDR31015

Winterization Marine

0% 15-Oct-11*

28-Nov-11

ACDR5011

Oil export metering

0% 15-Oct-11*

13-Nov-11

ACD03510

Inclining Test

0% 08-Dec-11

08-Dec-11

0% 05-Feb-11 A

24-Nov-11

0% 05-Feb-11 A

24-Nov-11

Construction
Constructio
20
Level Glasses For Topside Vessels

21.02

0% 15-Mar-11 A

30-Oct-11

100% 15-Mar-11 A

30-Oct-11

0% 26-Jun-11 A

10-Oct-11

ACDR3041

Hose Reel overhaul

100% 26-Jun-11 A

10-Oct-11

ACDR31004

Crude Oil Off Loading System modifications

100% 08-Aug-11 A

10-Oct-11

29
ACDR31013

Modification to WI VFD

42
ACDR3050

Re-routing of chemical injection lines

44
ACDR3051

Produced water piping rerouting

ACDR3052

Fuel gas piping to flotation unit

0% 05-Jul-11 A

10-Sep-11 A

100% 05-Jul-11 A

10-Sep-11 A

0% 20-Sep-11

30-Oct-11

0% 20-Sep-11*

30-Oct-11

0% 25-Jul-11 A

10-Oct-11

100% 25-Jul-11 A

10-Oct-11

0% 25-Aug-11 A

10-Oct-11

56.67% 25-Aug-11 A

10-Oct-11

45
52

0% 10-Jul-11 A

20-Oct-11

ACDR31001

Bilge system modification-New section

100% 10-Jul-11 A

30-Sep-11

ACDR31009

Ballast System modifications

100% 25-Jul-11 A

20-Oct-11

0% 25-Jul-11 A

25-Sep-11

100% 25-Jul-11 A

25-Sep-11

0% 15-Jul-11 A

10-Oct-11

100% 15-Jul-11 A

10-Oct-11

53
ACDR31010

Fresh Water Cargo System modifications

55
ACDR31011

Insulation&pipe renew on steam line aft of LQ

0% 11-Jun-11 A

57
Instaln of drain pipe from MCM to em cy trunk

100% 11-Jun-11 A

14-Jul-11 A

ACDR31002

Closed Drain System modification

100% 10-Jul-11 A

15-Oct-11

ACDR31005

Modifications to Piping for New steering Pumps

63.01
ACDR31003

Instr.air supply to water inj.shut off valve

64
ACDR3067

Changes to Nitrogen system

65.01
ACDR3043

Overhauling of Hydraulic valves in Azimuth room

90

0% 02-Aug-11 A

03-Sep-11 A

100% 02-Aug-11 A

03-Sep-11 A

0% 01-Oct-11

21-Oct-11

0% 01-Oct-11*

21-Oct-11

0% 10-Jul-11 A

16-Jul-11 A

100% 10-Jul-11 A

16-Jul-11 A

0% 26-Jun-11 A

25-Sep-11

100% 26-Jun-11 A

25-Sep-11

0% 01-May-11 A

20-Oct-11

ACDR2SI31

Open&Clean Produced Water Hydro Cyclones (3 Nos)

100% 01-May-11 A

15-Oct-11

ACDR31008

Refurbishment of various top side structures

100% 10-Jul-11 A

11-Oct-11

ACDR3047

Re-location PSV & BDV piping to Slug catcher

30% 02-Sep-11 A

97.01
ACDR3053

Extraction fan & ducting for battery storage

03-Sep-11 A

100% 02-Aug-11 A

03-Sep-11 A

Removal & Bypass Of Hydraulic Line For Capstan

100% 05-Feb-11 A

07-Feb-11 A

ACDR2SI12

Demolition Of deck items

100% 05-Feb-11 A

25-Feb-11 A

ACDR2SI11

Bollard (P) removal & Bollard (S) Relocation

100% 10-Feb-11 A

24-Nov-11

ACDR2SI2

Removal Of Cable Penetration To Er From Md

100% 10-Feb-11 A

20-Feb-11 A

ACDR2SI16

Cleaning of Stability tanks

100% 13-Feb-11 A

20-Feb-11 A

ACDR2SI13

Thickness Measurement Of Crude Oil Heater

100% 15-Feb-11 A

17-Feb-11 A

ACDR2SI3

Working Platform On Top Of K.O.Drum

100% 15-Feb-11 A

25-Mar-11 A

ACDR2SI39

Demolition of Top Side Piping

100% 15-Feb-11 A

20-May-11 A

ACDR2SI9

New Insert At Aft Stbd Of Accommodation

100% 15-Feb-11 A

28-Feb-11 A

ACDR2SI15

Cleaning Of Topside Pipes

100% 18-Feb-11 A

17-Jun-11 A

ACDR2SI1

Replacement Of Flexible Hose on Flare Boom

100% 20-Feb-11 A

17-Jun-11 A

ACDR2SI17

Removal Of Protection Screens

100% 20-Feb-11 A

21-Feb-11 A

ACDR2SI5

Overhaul Of Additional 28 Valves In Aux.Boiler

100% 20-Feb-11 A

25-Mar-11 A

ACDR2SI4

Thickness Measurement Of Near Flare Tower Area

100% 24-Feb-11 A

26-Feb-11 A

ACDR2SI8

Portside Offloading Line

100% 25-Feb-11 A

10-Mar-11 A

ACDR2SI18

Removal Of Equipment Inside Mud Tank

100% 01-Mar-11 A

10-Mar-11 A

ACDR2SI20

Relocate Capstan Valve Unit From Port To Stbd

100% 05-Mar-11 A

12-Mar-11 A

Critical Remaining Work

Remaining Work

MILESTONES

Summary

Q4

Q1

Q2

Q3

24-Nov-11

ACDR2SI10

Actual Work

2012
Q3

20-Oct-11

0% 02-Aug-11 A
0% 05-Feb-11 A

99

Q2

15-Oct-11

ACDR3034

58

Q1

15-Oct-11

97.78% 29-Jul-11 A

Site Instructions
Instruc

2011
Q4

ACDR2148

ACDR2SI7

11-Jun-12 17:09

ATHENA FPSO

Page 8 of 15

TASK filter: All Activities


Primavera Systems, Inc.

DDWD Yard Schedule rev 5


Activity ID

11-Jun-12 17:09

ATHENA FPSO

Activity Name

Schedule % Start
Complete

Finish

ACDR2SI21

Coating of FIRE damper foundation In E/R

100% 15-Mar-11 A

25-Mar-11 A

ACDR2SI25

Addl Work to coating repair in trunks

100% 15-Mar-11 A

10-May-11 A

ACDR2SI33

Removal of Ballast Pumps and Hydraulic Motors

100% 15-Mar-11 A

17-Jun-11 A

ACDR2SI22

Replace 2 Sections Of Ventilation Ducts E/R

100% 20-Mar-11 A

05-Apr-11 A

ACDR2SI14

Blasting And Painting Of Moonpool Area.

100% 01-Apr-11 A

24-Jun-11 A

ACDR2SI23

Overhauling Of Ig Compressor Motors 1&2

100% 01-Apr-11 A

15-May-11 A

ACDR2SI27

Crude Oil Pump Hydraulic Motor - 02 Nos

100% 05-Apr-11 A

15-Jul-11 A

ACDR2SI30

Remove Piping From Mud System

100% 05-Apr-11 A

05-May-11 A

ACDR2SI37

Removal Of Eng.Block For Harb.Genr'tor-Assistanc

100% 08-Apr-11 A

17-Jun-11 A

ACDR2SI26

Overhaul Five Strainers

100% 10-Apr-11 A

17-Jun-11 A

ACDR2SI36

Cleaning &touch up in E/R Fans Compartment

100% 15-Apr-11 A

17-Jun-11 A

ACDR2SI35

Hydro Jetting Deluge Line

100% 17-Apr-11 A

22-Apr-11 A

ACDR2SI28

Internal Coating of Sea Water Lines

100% 01-May-11 A

20-Sep-11

ACDR2SI29

Doubler Plate Iwo Of Old Flare Tower Foundation

100% 01-May-11 A

17-Jun-11 A

ACDR2SI32

Removal Of Conduit & Piping Support Structure

100% 01-May-11 A

15-May-11 A

ACDR2SI38

Thk.measure & Renew welds in ER/Azimuth Room

100% 01-May-11 A

17-Jun-11 A

ACDR2SI41

MPI of Weld Between IG Line and Cargo Railing

100% 22-May-11 A

17-Jun-11 A

ACDR3025

Straightening of deformed side frames in BW3S.

100% 29-May-11 A

24-Jun-11 A

ACDR3027

Paint Touch Up Pumps

100% 29-May-11 A

08-Jun-11 A

ACDR3036

Cleaning and Leakage Test of Sounding Pipes.

100% 29-May-11 A

05-Jun-11 A

ACDR3037

adjustment of existing vessel center plates

100% 30-May-11 A

17-Jun-11 A

ACDR3042

Additional Stiffeners in weld zone

100% 01-Jun-11 A

17-Jun-11 A

ACDR3044

Fab & installation of bottom and drain plugs

100% 02-Jun-11 A

16-Jun-11 A

ACDR3028

Thick. Meas'ment of overb'd pipe penetrations

100% 04-Jun-11 A

17-Jun-11 A

ACDR3029

Blasting of Anchor Chain.

100% 04-Jun-11 A

24-Jun-11 A

ACDR3039

Fabricate New Strainers

100% 04-Jun-11 A

24-Jun-11 A

ACDR3026

Cleaning & paint touch up in BW Tank No.2 P/S

100% 05-Jun-11 A

24-Jun-11 A

ACDR3033

Vertical manhole between Mech. w/s & stbd trunk

100% 05-Jun-11 A

24-Jun-11 A

ACDR3038

Fe and Hardness Test of Duplex Welds&Material.

100% 07-Jun-11 A

30-Jul-11 A

ACDR3031

Blasting & priming of Antifouling Anode Housing

100% 08-Jun-11 A

17-Jun-11 A

ACDR3055

Rectification of dented bottom plates

100% 08-Jun-11 A

17-Jun-11 A

ACDR3056

Installation of doblers plates for anodes

100% 08-Jun-11 A

24-Jun-11 A

ACDR3035

Cleanig / Paint Touch -Up Fore Peak

100% 10-Jun-11 A

24-Jun-11 A

ACDR31006

Cleaning & Renewal of Pipe in ER and Az.room

100% 10-Jun-11 A

25-Jun-11 A

ACDR3040

Add'l support for 1600KVA Trafo in new section

100% 11-Jun-11 A

09-Jul-11 A

ACDR31007

Supply 20ft container

100% 20-Jun-11 A

21-Jun-11 A

ACDR2SI34

Supply Temporary 220VAC Distribution Panel

100% 26-Jun-11 A

02-Jul-11 A

ACDR3074

Doubler plates& passive anodes for new seachest

100% 26-Jun-11 A

02-Jul-11 A

ACDR31012

Removal of Container supports on deck

100% 26-Jun-11 A

30-Jul-11 A

ACDR4005

Re chromming of Actuator Shafts

100% 01-Jul-11 A

10-Jul-11 A

ACDR4058

Delivery of 1,5mm SS wire

100% 01-Jul-11 A

10-Jul-11 A

ACDR3032

Removal of plates on port side gangway

100% 03-Jul-11 A

09-Jul-11 A

ACDR3046

Connec'n plates for trolley tower &STP Cylinder

100% 03-Jul-11 A

16-Jul-11 A

ACDR3057

Paint touch up in existing MW Swbd & Trafo rooms

100% 10-Jul-11 A

30-Jul-11 A

ACDR3030

Structure modification of existing module

100% 15-Jul-11 A

20-Sep-11

ACDR3064

Grating inside Emcy escape trunk

100% 15-Jul-11 A

28-Jul-11 A

ACDR4006

Overhaul of MOB Equipment,Blast&Coat

100% 15-Jul-11 A

10-Sep-11 A

ACDR4007

Renew bolts&gaskets of piping of Slug Catcher

100% 15-Jul-11 A

20-Oct-11

ACDR4062

Carry over work from lamprell

100% 15-Jul-11 A

10-Sep-11 A

ACDR4010

Renew Vertical Plates in way of Escape Way

100% 18-Jul-11 A

21-Nov-11

ACDR4014

Renew corroded FW Pipe in Messroom

100% 18-Jul-11 A

25-Jul-11 A

ACDR3054

Instaln of valves & Blind flanges for isolation

100% 20-Jul-11 A

30-Oct-11

ACDR4043

New Door signs in LQ

100% 20-Jul-11 A

30-Aug-11 A

ACDR4061

Cleaning&Paint touch up of Hydraulic Tank

100% 20-Jul-11 A

15-Sep-11

ACDR4045

Renewal of insulation for SW,Foam&Condnste lines

80% 25-Jul-11 A

18-Nov-11

ACDR4050

Relocate Door in Mess Room

100% 25-Jul-11 A

30-Jul-11 A

ACDR4065

Machine flanges on pressure vessels

100% 25-Jul-11 A

30-Aug-11 A

ACDR4093

Pad eyes&wooden protec'n bumper for Contnr deck

100% 28-Jul-11 A

05-Aug-11 A

ACDR4056

Ducting modifications for Accommodation

100% 01-Aug-11 A

10-Oct-11

ACDR4066

Mixer Taps in Galley

100% 01-Aug-11 A

20-Aug-11 A

ACDR4064

LQ furniture upgradation

100% 05-Aug-11 A

05-Sep-11 A

ACDR4068

Cleaning of Galley duct

100% 05-Aug-11 A

15-Aug-11 A

ACDR4063

Re-route drain in MV switchboard room

100% 10-Aug-11 A

15-Oct-11

ACDR4067

Fabric'n of fall out preventors in Accommodation

ACDR4087

61.54% 10-Aug-11 A

30-Aug-11 A

Instaln of flexible duct In AHU room

100% 10-Aug-11 A

30-Aug-11 A

ACDR4092

Alteration on trolley tower

100% 10-Aug-11 A

30-Aug-11 A

ACDR4113

Blast & Coating of Hose reel

100% 10-Aug-11 A

25-Aug-11 A

ACDR4114

Removal of corroded conduits-MD port pipe rack

100% 10-Aug-11 A

25-Aug-11 A

ACDR4011

Lub Oil System For Gas Turbine

ACDR4044

Prepare bolting arrangement for AHU

ACDR4051

90% 15-Aug-11 A

25-Oct-11

100% 15-Aug-11 A

30-Sep-11

Modificns to Fuel Oil System for Gas Turbine

90% 15-Aug-11 A

30-Oct-11

ACDR4052

Modifcns to FO System (FW Pump,MDO Pump&Heater)

60% 15-Aug-11 A

30-Oct-11

ACDR4096

Supply fittings

100% 15-Aug-11 A

30-Aug-11 A

ACDR5003

Doubler Plates under Solar Package Support

100% 15-Aug-11 A

30-Aug-11 A

ACDR4012

Quick Closing System, Fuel Oil Valves-Addl works

73.33% 20-Aug-11 A

30-Oct-11

ACDR4088

Closed Drain modification for fuel gas package

73.33% 20-Aug-11 A

30-Oct-11

ACDR4089

New ballast pipe to cargo ring in Az.thr room

73.33% 20-Aug-11 A

30-Oct-11

ACDR5015

Modification to winch control protection cage

100% 20-Aug-11 A

05-Sep-11 A

ACDR5020

Procurment of glue for plate oil cooler

100% 20-Aug-11 A

30-Aug-11 A

ACDR5031

Modification of geostationary spool

100% 20-Aug-11 A

27-Aug-11 A

ACDR4008

Inert gas system additional works

56.67% 25-Aug-11 A

05-Nov-11

ACDR4009

Sea Water System for Topside-Addl works

56.67% 25-Aug-11 A

30-Oct-11

ACDR4094

Access to Cold mast on Top of Bulwark

56.67% 25-Aug-11 A

30-Sep-11

ACDR4095

Modific'n of Ventilation duct over Jockey pump

80.95% 25-Aug-11 A

15-Sep-11

ACDR5016

Hospital Fan replacement

100% 25-Aug-11 A

10-Oct-11

ACDR4057

Demolish vents & Install G-Valves-Various tanks

71.43% 27-Aug-11 A

10-Nov-11

ACDR5007

Remove blind flange and penetration to COT-1

ACDR4112

Floodlight supports modification-2nos at Fwd

ACDR4053
ACDR4054

100% 28-Aug-11 A

30-Sep-11

Instaln of Foundation+Turbine cooler

22.22% 01-Sep-11 A

10-Oct-11

Instaln of Foundation+Oil tank seperator

22.22% 01-Sep-11 A

10-Oct-11

Critical Remaining Work

Remaining Work

MILESTONES

Summary

Q1

Q2

2012
Q3

Q4

Q1

Q2

Q3

05-Sep-11 A

40% 30-Aug-11 A

Actual Work

2011
Q4

Page 9 of 15

TASK filter: All Activities


Primavera Systems, Inc.

DDWD Yard Schedule rev 5


Activity ID

Activity Name

Schedule % Start
Complete

ACDR4055

Instaln of Foundation+ MDO Purge tank

ACDR5006

Re-Positioning of Container and Container Deck

ACDR5014

Replace lines from fresh water tanks

ACDR5018

Modificn to light fixtures&supports in New Sectn

ACDR5025

Additional cable tray for ICAF Anode

ACDR5004

Finish

22.22% 01-Sep-11 A

10-Oct-11

40% 01-Sep-11 A

30-Sep-11
20-Sep-11

40% 01-Sep-11 A

15-Oct-11

33.33% 01-Sep-11 A

15-Oct-11

Machining of Hydrocyclone flanges

60% 05-Sep-11 A

05-Oct-11

ACDR5005

Modify Ventil'n outlet -fwd Thruster room

24% 05-Sep-11 A

20-Sep-11

ACDR5022

Clash rectificn-Open drain line under WI Module

24% 05-Sep-11 A

30-Oct-11

ACDR5023

Replace two Flanges the Fuel Gas Package

24% 05-Sep-11 A

30-Oct-11

ACDR5043

Support for Electrical cabinets 79 & 88

0% 20-Sep-11*

10-Oct-11

ACDR4013

Nitrogen System-PSV calibration

0% 25-Sep-11*

08-Oct-11

ACDR5027

Modification of JB location for TUTU

0% 25-Sep-11*

09-Oct-11

ACDR5030

Fabricate & install reflector / deflector plates

0% 27-Sep-11*

26-Oct-11

ACDR4069

Additional Lighting in 4 man cabins

0% 01-Oct-11*

25-Oct-11

ACDR5029

Testing of force to open freeing ports

0% 01-Oct-11*

03-Oct-11

ACDR5033

Modification of CT outside STP Cylinder

0% 01-Oct-11*

21-Oct-11

ACDR5040

Instaln of quills and chem inj tubing topside

0% 01-Oct-11*

30-Oct-11

ACDR5041

Modification to laydown area bumpers

0% 01-Oct-11*

21-Oct-11

ACDR5044

Modification to Drain pipes in New Section

0% 01-Oct-11*

15-Oct-11

ACDR3049

New probe and sample point connections

0% 10-Oct-11*

30-Oct-11

ACDR5017

Wash and Touch up on Fuel Gas Package

0% 10-Oct-11*

23-Oct-11

ACDR5021

Addl duct on solar package Enclosure

0% 10-Oct-11*

23-Oct-11

ACDR5026

Glanding&termination of lighting on FG.cond.skid

0% 10-Oct-11*

30-Oct-11

ACDR5028

Installation of fan for A60 fire lift pump room

0% 10-Oct-11*

30-Oct-11

ACDR5042

Bridge Deck drain line modification

0% 10-Oct-11*

29-Oct-11

ACDR5019

Weather tight door for safe haven

0% 01-Nov-11*

15-Nov-11

ACDR5024

Renew Flooring in LQ.

0% 01-Nov-11*

20-Nov-11

0% 01-Dec-10 A

21-Dec-11

0% 01-Dec-10 A

21-Dec-11

0% 01-Dec-10 A

21-Dec-11

No WorkPack
WorkPa
Project Management
Man
No System
AML0010

Contract Award

100% 01-Dec-10 A

AML0020

Vessel Arrival

100% 12-Dec-10 A

AML0040

Drydocking

100% 30-Mar-11 A

29-Jun-11 A

AML0030

New Section-Ready for Installation

100%

16-May-11 A

AML0033

Inside STP-Piping&Elec.Completion

0%

11-Nov-11

AML0037

Outside STP-Piping&Elec.Completion

0%

11-Nov-11

AML0050

Mechanical Completion

0%

08-Dec-11

AML0060

Pre-Commissioning & Commissioning(By BWO)

0%

21-Dec-11

0% 04-Dec-10 A

15-Dec-11

0% 26-Feb-11 A

15-Jun-11 A

Engineering
13
AEB00780

P&ID, G.A-Production Piping

100%

26-Feb-11 A

AED00130

Production piping from new block to slug catcher

100% 13-Mar-11 A

15-Jun-11 A

AED00102

Details- Production pipingof new section to STP

100% 16-Apr-11 A

23-Apr-11 A

0% 16-Apr-11 A

23-Apr-11 A

100% 16-Apr-11 A

23-Apr-11 A

0% 13-Feb-11 A

15-Jul-11 A

18
Foundation for subsea VFDs in new section

20
AEB00740

P&ID-Oil piping

100%

13-Feb-11 A

AED00259

Separation and stabilization piping and support

100% 01-Jul-11 A

15-Jul-11 A

0% 05-Feb-11 A

21
P&ID-Offloading System

100%

05-Feb-11 A

AEB00630

P&ID-COW System

100%

13-Feb-11 A

AED00143

Offloading line to SDS reel

100% 13-Feb-11 A

23-Jul-11 A

AED00260

Crude Handling and Metering Piping and support

100% 21-Feb-11 A

24-Jun-11 A

AED00141

Midship offloading manifold platform modific'n

100% 01-Apr-11 A

09-Apr-11 A

AEB00350

Footprint- new COW m/c for moonpool COT

100%

14-Apr-11 A

AED00148

COW line for the moonpool crude tank

100% 16-Apr-11 A

23-Apr-11 A

AED00142

Tie in of Fresh Wtr bunkering line to pipe rack

100% 24-Apr-11 A

28-May-11 A

AED00230

Protective barrier for new COW M/C-& pipe

0% 20-Sep-11*

30-Sep-11

0% 06-Feb-11 A

15-Jul-11 A

AEB00810

P&Id-Stripping system

100%

06-Feb-11 A

AED00229

Piping details for new stripping pumps

100% 01-Jul-11 A

15-Jul-11 A

0% 02-Feb-11 A

29
G.A-WI Piping-New section

100%

02-Feb-11 A

AEB00850

P&ID-Water Injection System

100%

05-Feb-11 A

AED00149

Water Injec'n piping from WI unit to new section

100% 13-Mar-11 A

24-Jun-11 A

AED00208

Water inj. Piping from STP unit to new section

100% 14-Mar-11 A

05-May-11 A

AED0085

Foundation for transformer in new section

100% 01-Apr-11 A

09-Apr-11 A

0% 05-Feb-11 A

15-Jun-11 A

AEB00590

P&ID&G.A-Chemical injection tube to swivel

100%

05-Feb-11 A

AED0061

Dwgs-Chemical Injection piping HU to module

100% 16-Mar-11 A

15-Jun-11 A

AEB00710

P&ID-Methanol injection piping

100%

04-Apr-11 A

AEB00570

P&ID-Chem.tank filling lines

100%

05-Apr-11 A

AEB00580

P&ID-Chemical Injection Piping

100%

05-Apr-11 A

AED00219

Chem.Inj.tube from STP to new section interface

100% 10-Apr-11 A

15-Jun-11 A

43

0% 16-Apr-11 A

10-Jul-11 A

AED00238A

Lifting arrangement of flare boom&rest (5m fwd)

100% 16-Apr-11 A

23-Apr-11 A

AED00237

New flare line&supports to the relocated flare

100% 15-Jun-11 A

10-Jul-11 A

0% 16-Feb-11 A

15-Jul-11 A

44
AED00154

Piping-Produced wtr pumps,cooler&polishing unit

100% 16-Feb-11 A

15-Jul-11 A

AEB00770

P&ID-Produced water system

100%

11-Mar-11 A

AEB03060

Footprints-Produc.water pumps,cooler&polish unit

100%

24-Apr-11 A

0% 05-Feb-11 A

45
P&ID-Inert Gas piping.

100%

05-Feb-11 A

AEB00830

P&ID-Turbine generator fuel gas line

100%

15-Feb-11 A

AEB00180

Dwg-Fuel gas skid foundation

100%

17-Feb-11 A

AED00160

Fuel gas module line to turbine generator

100% 21-Feb-11 A

15-Jul-11 A

AEB00260

Footprints of strip. gas cooler & Scrubber

100%

13-Apr-11 A

AED00166

Modification to gas piping

100% 24-Apr-11 A

15-Jul-11 A

AED00165

Piping for stripping gas cooler & scrubber

100% 25-Apr-11 A

15-Jul-11 A

Critical Remaining Work

Remaining Work

MILESTONES

Summary

2012
Q3

Q4

Q1

Q2

Q3

15-Jul-11 A

AEB00660

Actual Work

Q2

24-Jun-11 A

AEB00860

42

Q1

30-Sep-11

AEB00730

23

2011
Q4

33.33% 01-Sep-11 A

AED0086

11-Jun-12 17:09

ATHENA FPSO

Page 10 of 15

TASK filter: All Activities


Primavera Systems, Inc.

DDWD Yard Schedule rev 5


Activity ID

Activity Name

Schedule % Start
Complete

46

Finish

0% 13-Feb-11 A

15-Jun-11 A

Piping Dwg-Methanol injection tube to swivel

100% 13-Feb-11 A

15-Jun-11 A

AED00231

Methanol Injection piping HU to module

100% 14-Mar-11 A

15-Jun-11 A

AEB00720

G.A-Methanol injection tube to swivel

100%

04-Apr-11 A

0% 05-Feb-11 A

50
P&ID Sea water system

100%

05-Feb-11 A

AED00169

Piping details for sea water cooling system

100% 10-May-11 A

15-Jul-11 A

0% 16-Jan-11 A

11-Jun-11 A

AED00103

Piping Dwg-Ballast piping in new section

100% 16-Jan-11 A

12-Apr-11 A

AED00108

Piping Dwg-for Ballast tank vent line

100% 16-Jan-11 A

14-May-11 A

AEB00550

P&ID&G.A-Ballast piping-new section

100%

13-Feb-11 A

AEB00560

P&ID-Ballast tank vent line

100%

15-Feb-11 A

AEB00070

Documents-Tank Measurement-new section

100%

11-Jun-11 A

0% 13-Feb-11 A

53
P&ID-SW System

100%

13-Feb-11 A

AEB00840

P&ID&G.A-Utility systems to STP Cylinder

100%

13-Feb-11 A

AED00214

Piping from ship utility system to STP cylinder

100% 13-Feb-11 A

21-May-11 A

0% 13-Feb-11 A

13-Feb-11 A

P&Id-Steam system

100%
0% 13-Feb-11 A

56

100%

13-Feb-11 A

AED0099

Open drain piping details in new section

100% 20-Mar-11 A

15-Jun-11 A

AED00170

New drain piping system

100% 20-Apr-11 A

15-Jun-11 A

0% 05-Feb-11 A

15-May-11 A

AEB00600

P&ID&G.A-Closed drain -New Section

100%

05-Feb-11 A

AED00100

Closed drain piping details in new section

100% 20-Mar-11 A

15-May-11 A

0% 13-Feb-11 A

24-Jun-11 A

AEB00700

P&ID-MDO distribution system

100%

13-Feb-11 A

AED00171

New piping for MDO distribution system

100% 22-May-11 A

24-Jun-11 A

AEB00220

Footprint for Foundations for MDO Booster pumps

100%

26-May-11 A

AEB00250

Footprint for Foundations for MDO Seperator

100%

26-May-11 A

0% 25-Feb-11 A

63
P&Id-Compr.Air/Instr.Air

100%

25-Feb-11 A

AED00173

Piping for compr. air distrib'n modific'n

100% 01-May-11 A

21-May-11 A

AED00261

Compr. Air /Instrument Air-Piping&support dwgs.

100% 29-May-11 A

15-Jun-11 A

0% 15-Jul-11 A

31-Aug-11 A

AED00176

Hydraulic supply lines to SDS reel

100% 15-Jul-11 A

31-Aug-11 A

AEB00200

P&ID-Hydr.Piping-SDS reel

100%

21-Jul-11 A

0% 01-Apr-11 A

70
F&G Layout-Maindeck

100%

01-Apr-11 A

AEB00340

F&G Layout-Topsides

100%

01-Apr-11 A

0% 17-Jan-11 A
Fire water piping from/to STP deluge skid

100% 17-Jan-11 A

15-Jun-11 A

AEB00640

P&ID-Fire Water distrbn system

100%

05-Feb-11 A

AED00174

Fire water distribution system for new modules

100% 11-Apr-11 A

15-Jul-11 A

AED00207

Foundation for Deluge skid

100% 01-May-11 A

15-May-11 A

AED00206

Piping details for Compr. air to deluge skid

100% 05-May-11 A

15-Jul-11 A

0% 05-Feb-11 A

11-Mar-11 A

AEB01060

P&ID-Cooling Water System

100%

05-Feb-11 A

AEB00650

P&ID-Flare System

100%

11-Mar-11 A

0% 21-Jan-11 A

73

20-May-11 A

AEB00110

Dwg for boomrest-new crane

100%

21-Jan-11 A

AED0091

Foundation/Pedestal for new offshore crane

100% 05-Feb-11 A

25-Feb-11 A

AEB00280

Dwgs-new Crane outfittings

100%

13-Feb-11 A

AEB00300

Dwgs-UD Stiff-Existng crane

100%

17-Feb-11 A

AEDR2034

Laydown area bumper bar

100% 01-May-11 A

20-May-11 A

0% 17-Feb-11 A

28-May-11 A

76
AEB00880

Str.Dwg- Temporary refuge (TR) aft

100%

17-Feb-11 A

AED00243

Structural details of Temporary refuge (TR) aft

100% 01-Apr-11 A

09-Apr-11 A

AED00180

Emerg. Escape route details at Power&WI modules

100% 20-Apr-11 A

28-May-11 A

AED00242

Improve access on the 2nd escape routes

100% 22-May-11 A

28-May-11 A

80
AED0081

Foundation for MV transformer in new section

0% 01-Apr-11 A

09-Apr-11 A

100% 01-Apr-11 A

09-Apr-11 A

0% 07-Apr-11 A

82

07-May-11 A

AEB00670

Heat tracing-PID

100%

07-Apr-11 A

AED00257

Foundn for 50kVA transformer in extension block

100% 01-May-11 A

07-May-11 A

0% 06-Sep-11 A

84
AEB00210

Footprint for new 440V Em. Sub DB Foundn

AED00248

Foundn for New 440V Em. Sub DB in Emerg.Gen room

100%
71.43% 06-Sep-11 A
0% 01-Apr-11 A

85

15-Sep-11
06-Sep-11 A
15-Sep-11
01-Jun-11 A

AEB00140

Footprint for new UPS foundation

100%

01-Apr-11 A

AED0074

Foundation for UPS/Panels in new section

100% 05-Apr-11 A

01-Jun-11 A

AED0075

Foundation for Battery charger in new section

100% 16-Apr-11 A

07-May-11 A

0% 10-Apr-11 A

88

28-Jul-11 A

AED0073

Lighting & small power instalns in new section

100% 10-Apr-11 A

15-Jun-11 A

AEB00060

Documents for Heat tracing

100%

11-Apr-11 A

AED00258

Installation details of Heat tracing lines

100% 22-May-11 A

28-May-11 A

AED00255

Lighting on process module,flare &KO drum

100% 15-Jun-11 A

28-Jul-11 A

0% 15-Mar-11 A

15-Jul-11 A

89
AED0072

Cable tray routing&supports-new section&E/R

100% 15-Mar-11 A

15-Jun-11 A

AEB00010

Cable tray arrangement-Maindeck

100%

07-Apr-11 A

AEB00020

Cable tray arrangement-Modules

100%

07-Apr-11 A

AED00228

Cable ladder routing for exist modules (all)

100% 10-May-11 A

15-Jun-11 A

AED0055

cable tray routing&supports for all system-MDK.

100% 13-May-11 A

15-Jul-11 A

0% 22-Jan-11 A

90

21-May-11 A

AEB00980

Str.Dwgs-Extension Piperack

100%

22-Jan-11 A

AED0052

MTO for Pipe rack extension + pipe support

100% 05-Feb-11 A

11-Feb-11 A

AED0053

Pipe rack extension with pipe support

100% 05-Feb-11 A

25-Feb-11 A

AEB00320

Equipment Layout-Topsides

100%

05-Apr-11 A

AED00213

Extension of all piping over the new section

100% 24-Apr-11 A

21-May-11 A

Actual Work

Critical Remaining Work

Remaining Work

MILESTONES

Summary

Q3

15-Jul-11 A

AED0066

72

Q2

01-Apr-11 A

AEB00330

71

Q1

15-Jun-11 A

AEB00620

65

Q4

15-Jun-11 A

G.A-Open drain -New Section

62

2012
Q3

13-Feb-11 A

AEB00750

57

Q2

21-May-11 A

AEB00820

55

Q1

15-Jul-11 A

AEB00540

52

2011
Q4

AED00101

AEB00800

11-Jun-12 17:09

ATHENA FPSO

Page 11 of 15

TASK filter: All Activities


Primavera Systems, Inc.

DDWD Yard Schedule rev 5


Activity ID

Activity Name

Schedule % Start
Complete

91

Finish

0% 16-Jan-11 A

10-Apr-11 A

New sounding pipes in WBTs 5-6-7-8-9 (P&S)

100% 16-Jan-11 A

05-Apr-11 A

AEB00120

Dwg for bulwark SB, PS and aft

100%

26-Jan-11 A

AEDR2013

Sounding in FO Tank

100% 23-Feb-11 A

06-Mar-11 A

AEB00150

Dwg-Bulwark in bow

100%

26-Feb-11 A

AEDR2024

Manual sounding piping for ballast tk in new sec

100% 20-Mar-11 A

10-Apr-11 A

97
Foundation for AHU in new section

XX

0% 25-Apr-11 A

07-May-11 A

100% 25-Apr-11 A

07-May-11 A

0% 16-Jan-11 A

12-Aug-11 A

AED00125

Lifting studies for riser reel off & onborard

100% 16-Jan-11 A

05-Apr-11 A

AED00127

Lifting studies for container deck off & onboard

100% 16-Jan-11 A

16-Jan-11 A

AED00113

Piping rejoining dwgs after new section fitting

100% 21-Feb-11 A

21-May-11 A

AED0050

Lifting studies for New chemical inj. module

100% 22-May-11 A

28-May-11 A

AED0044

Lifting studiesfor New Water inj. module

100% 01-Jun-11 A

15-Jun-11 A

AED0046

Lifting studies for New Power gen. module

100% 01-Jun-11 A

15-Jun-11 A

AED00121

Lifting studies for swivel & piping

100% 15-Jun-11 A

28-Jul-11 A

AED00123

Lifting studies for new offshore crane

100% 01-Jul-11 A

15-Jul-11 A

AED0048

Lifting studies for Fuel gas condng module

100% 15-Jul-11 A

12-Aug-11 A

0% 04-Dec-10 A

No System
New Hull-Fab drgs & Outfitting details

100% 04-Dec-10 A

25-Feb-11 A

AED002

MTO for New Hull,STP/MCM,Bulwark&Trolley tower

100% 04-Dec-10 A

15-Jan-11 A

AED005

Structural FAB drgs for MCM + STP cylinder

100% 15-Dec-10 A

10-Jan-11 A

AEB01000

Str.Dwgs-Turret &MCM

100%

16-Dec-10 A

AEB00100

Drawing-Winch Foundation

100%

21-Dec-10 A

AEB00130

Dwg for dummy buoy&Con hatch

100%

27-Dec-10 A

AEB01010

Str.Dwg-Swivel support beams

100%

27-Dec-10 A

AED003

Method statement for new block(Buld strtgy)

100% 02-Jan-11 A

23-Apr-11 A

AED00270

Bilge Keel for new section

100% 07-Jan-11 A

25-Jan-11 A

AEB00960

Str.Dwgs for new Hull section

100%

12-Jan-11 A

AEB00940

Str.Dwg-Moonpool closing structures

100%

13-Jan-11 A

AEB00970

Str.Dwgs- Swivel Trolley & Access tower

100%

13-Jan-11 A

AED0016

Deluge piping to/inside STP cylinder system

100% 15-Jan-11 A

10-May-11 A

AED004

Method statement new Hull to existng vessel.

100% 16-Jan-11 A

23-Apr-11 A

AED0021

Utility piping inside&partially outside STP

100% 17-Jan-11 A

05-May-11 A

AED00268C

Shifting of New block into location

100% 17-Jan-11 A

30-Apr-11 A

AEB00950

Str.Dwgs for new Crane pedestal

100%

22-Jan-11 A

AED00205

Construction details of Swivel support beams

100% 22-Jan-11 A

26-Jan-11 A

AED00220

Struct.details for Swivel trolley & outfittings

100% 23-Jan-11 A

25-Feb-11 A

AED008

Dummy buoy top & Cone hatch details

100% 24-Jan-11 A

11-Feb-11 A

AEB00460

P&ID &G.A-Deluge system-new section

100%

05-Feb-11 A

AEB00610

P&Id-Closed Drain system

100%

05-Feb-11 A

AEB00760

P&Id-Open Drain system

100%

05-Feb-11 A

AED0013

Protection structure for Pull in Winch Foundn

100% 05-Feb-11 A

25-Feb-11 A

AED0014

Foundn for Pull in winch guide roller & structre

100% 05-Feb-11 A

05-Apr-11 A

AED00183

Bulwark details for lenghtening section

100% 05-Feb-11 A

25-Feb-11 A

AED00204

Shipstationary access & platform,handrails

100% 05-Feb-11 A

25-Feb-11 A

AEB00490

P&ID &G.A-Geostationary production piping

100%

06-Feb-11 A

AEB00500

P&ID &G.A-Ship stationary production piping

100%

06-Feb-11 A

AEB00990

Str.Dwgs-Protection structure

100%

06-Feb-11 A

AEB00290

Dwgs-Ship stationary platforms

100%

08-Feb-11 A

AEB00310

Door & Hatch details

100%

10-Feb-11 A

AEDR2001

Bottom Shell plate increased

100% 10-Feb-11 A

20-Feb-11 A

AEB01110

PED Reqmt-for STP

100%

11-Feb-11 A

AEDR2003

Relocation of manhole from Fr#99.01 to Fr#99.02

100% 12-Feb-11 A

25-Feb-11 A

AEDR2004

Modification of girders near flush hatches

100% 14-Feb-11 A

24-Feb-11 A

AEDR2005

Modificn on new hull 3d model for addl sea chest

100% 14-Feb-11 A

24-Feb-11 A

AEDR2006

Modificn of girders near flush hatches

100% 16-Feb-11 A

28-Feb-11 A

AEDR2007

Modificn on main deck, HPU deck and CL section

100% 16-Feb-11 A

28-Feb-11 A

AEB00930

Str.Dwg-Gas turbine module supports

100%

17-Feb-11 A

AEB01020

Str.Dwg-Water injection module supports

100%

17-Feb-11 A

AEDR2008

Modification of cone hatch

100% 18-Feb-11 A

02-Mar-11 A

AEDR2009

Modification of long. BHD @ 5200 OFF CL SB

100% 19-Feb-11 A

03-Mar-11 A

AEDR2010

Revised access plan for new section

100% 20-Feb-11 A

05-Mar-11 A

AED00268B

Movement of vessel fwd block for insertion

100% 21-Feb-11 A

23-Apr-11 A

AEDR2011

New bunkering station

100% 21-Feb-11 A

06-Mar-11 A

AEDR2014

Bulwark pipes modification

100% 24-Feb-11 A

07-Mar-11 A

AEB00380

Instrument/Lighting layouts-New section

100%

25-Feb-11 A

AEDR2015

Swivel Stack up frame

100% 25-Feb-11 A

08-Mar-11 A

AEDR2016

Bulwark pipes modification

100% 01-Mar-11 A

15-Mar-11 A

AEDR2017

Access opening on HPU deck forward of Fr#99.09

100% 05-Mar-11 A

15-Mar-11 A

AEDR2018

Radial Steering and Rotation Mechanisms

100% 06-Mar-11 A

20-Mar-11 A

AEB00920

P&ID Crude Oil Handling

100%

11-Mar-11 A

AED0011

STP piping supports including deluge system

100% 12-Mar-11 A

05-Apr-11 A

AEDR2019

SWIVEL TROLLEY TOWER OUTFITTING 4 EL.13.550

100% 15-Mar-11 A

03-May-11 A

AEDR2025

DOOR OPENING ON FR#99.21 STBD

100% 15-Mar-11 A

28-Mar-11 A

AEDR2020

Swivel Trolley tower modification

100% 16-Mar-11 A

16-Apr-11 A

AEDR2026

Fndn in MV Trafo/LV SB room (HPU dk fnds 4 shts)

100% 17-Mar-11 A

31-Mar-11 A

AEDR2021

SWIVEL TROLLEY TOWER CRADLE STRUCTURES A & B

100% 18-Mar-11 A

04-Apr-11 A

AEDR2027

Chemical Injection storage platform

100% 18-Mar-11 A

03-Apr-11 A

AEDR2022

New piping jobs (topsides)

100% 20-Mar-11 A

15-Jul-11 A

AEDR2028

Fire lift pump Foundation

100% 20-Mar-11 A

05-Apr-11 A

AEB00030

Cable tray arrangement-New Section

100%

23-Mar-11 A

AEDR2029

Eqpt foundation in S.B/ESP VFD room (1500 ABL)

100% 25-Mar-11 A

10-Apr-11 A

AEB01090

Module Details-Water Injection

100%

31-Mar-11 A

AEB01150

Details of MCTs&Location drawing

100%

31-Mar-11 A

AED00190

Foundation for ventillation skids in new section

100% 01-Apr-11 A

15-May-11 A

AED00194

Foundation for pull in winch

100% 01-Apr-11 A

09-Apr-11 A

AED0092

Platforms & ladders for new crane pedestal

100% 01-Apr-11 A

09-Apr-11 A

AEB01100

Module Details-Fuel Gas Condit'ng

100%

04-Apr-11 A

AEB01080

Module Details-Ch.Injection

100%

05-Apr-11 A

Critical Remaining Work

Remaining Work

MILESTONES

Summary

Q1

Q2

2012
Q3

Q4

Q1

Q2

Q3

15-Dec-11

AED001

Actual Work

2011
Q4

AED0094

AED00186

11-Jun-12 17:09

ATHENA FPSO

Page 12 of 15

TASK filter: All Activities


Primavera Systems, Inc.

DDWD Yard Schedule rev 5


Activity ID

11-Jun-12 17:09

ATHENA FPSO

Activity Name

Schedule % Start
Complete

Finish

AED00268A

Load out of vessel from Safina to GA

100% 05-Apr-11 A

23-Apr-11 A

AED00268D

Load out of vessel from GA to Safina

100% 05-Apr-11 A

15-Jun-11 A

AEB00040

Control cable list

100%

06-Apr-11 A

AEB00870

Power Cable list

100%

06-Apr-11 A

AEB00890

Str.Dwg.- Support for MOB

100%

06-Apr-11 A

AEB00900

Str.Dwg-Chemical/Methanol module fndn

100%

06-Apr-11 A

AEB01050

Local Support for Container deck

100%

06-Apr-11 A

AEB01070

Module Details-Power Generation

100%

06-Apr-11 A

AEB01120

Pipe Support standards

100%

07-Apr-11 A

AEB00230

Dwgs- Pull in winch roller&structures

100%

08-Apr-11 A

AED0054

Details MCT's/Pens/Coamings for cables&tubings

100% 10-Apr-11 A

10-May-11 A

AED0089

MTO for instrument tubing/trays

100% 10-Apr-11 A

23-Apr-11 A

AED009

Foundation for Equipments inside STP compt.

100% 10-Apr-11 A

10-May-11 A

AEDR2012

New piping jobs-Integration

100% 10-Apr-11 A

27-Jul-11 A

AEDR2030

Swivel sea fastening brackets

100% 10-Apr-11 A

03-May-11 A

AEDR2031

STP Compartment Cylinder Structure.(Penetration)

100% 10-Apr-11 A

20-Apr-11 A

AEDR2032

STP Compartment Cylinder Structure (ladder)

100% 10-Apr-11 A

20-Apr-11 A

AEB00690

P&ID-Hydr.Piping-new section

100%

11-Apr-11 A

AEB00520

P&ID &G.A-Utility piping inside STP system

100%

12-Apr-11 A

AEB00680

Relocation details for flare tower

100%

12-Apr-11 A

AEB01160

P&ID Separation&Stabilisation

100%

14-Apr-11 A

AED00184

Installation of tubing to hydraulic equipments

100% 15-Apr-11 A

24-Jun-11 A

AEDR2035

Cable box on MDK (new hull)

100% 15-Apr-11 A

10-May-11 A

AEDR2036

Escape route on MDK

100% 15-Apr-11 A

28-May-11 A

AEDR2039

Chem. Injection storage platform (DRG REVISED)

100% 15-Apr-11 A

05-May-11 A

AED00118

Lifting studies for New section

100% 16-Apr-11 A

23-Apr-11 A

AED00191

Lifting arrangement of ventillation skids

100% 16-Apr-11 A

23-Apr-11 A

AED00192

Lifting arrangement of drain pumps in STP compt.

100% 16-Apr-11 A

23-Apr-11 A

AED00199

Support for normal DB

100% 16-Apr-11 A

30-Apr-11 A

AED00200

Support for AUX cotntrol cabinet

100% 16-Apr-11 A

07-May-11 A

AED00201

Support for STP HPU starter cabinets

100% 16-Apr-11 A

07-May-11 A

AED00202

Support for STP main control cabinet

100% 16-Apr-11 A

07-May-11 A

AED0026

Ship stationary piping system

100% 16-Apr-11 A

23-Apr-11 A

AED0027

Geostationary piping system

100% 16-Apr-11 A

23-Apr-11 A

AED00197

Support for ESD HPU starter cabinets

100% 22-Apr-11 A

30-Apr-11 A

AEB00240

Footprints&Eqpt layout- STP Equipments

100%

24-Apr-11 A

AEB01140

PED Reqmt-for New Hull & Topside

100%

24-Apr-11 A

AED00195

Foundation for emergency distribution board

100% 24-Apr-11 A

30-Apr-11 A

AEDR2037

Access platform for main crane (fwd crane)

100% 24-Apr-11 A

10-May-11 A

AED00196

Lifting Arrangement of of HPU in STP room

100% 01-May-11 A

07-May-11 A

AEB00160

Footprint for SW Cooling Pump

100%

21-May-11 A

AED00193

Lifting Arrangement of pull in winch

100% 22-May-11 A

28-May-11 A

AEDR2038

Fire protection gangway PS

100% 22-May-11 A

28-May-11 A

AEB00080

Drawing-Hull marking

100%

29-May-11 A

AEB00370

Instrument/Light details-New section

100%

29-May-11 A

AED00189

Integr'n of pneum.Contr.Panel to main supply

100% 29-May-11 A

18-Jun-11 A

AEB00530

Lighting layouts-Topsides/M.Deck

100%

11-Jun-11 A

AED0059

As built drgs for structure

100% 17-Jun-11 A

30-Nov-11

AED00279

Engg.for addl in Rev.3

100% 26-Jun-11 A

31-Aug-11 A

AED00198

Support for flood lights-New section

100% 01-Jul-11 A

15-Jul-11 A

AEDR2048

Additional Engineering in Rev.4

AEB00910

Str.Dwg-Foundation for hose reel

100%

26-Jul-11 A

AED0057

As built drgs for piping

100% 10-Aug-11 A

07-Dec-11

AEB00090

Footprints-Pushbuttons

100%

31-Aug-11 A

AEB00170

Telecom Details

0%

11-Sep-11*

AEB01030

Termination Diagrams-Control cables

0%

11-Sep-11*

AEB01040

Termination Diagrams-Power cables

0%

11-Sep-11*

AEB01130

Inclining Expt.Procedure

0%

11-Sep-11*

AED00269

Inclining Experiment report

0% 09-Dec-11

15-Dec-11

0% 25-Dec-10 A

11-Oct-11

96.67% 15-Jul-11 A

Procurement
Procureme

0% 25-Dec-10 A

11-Oct-11

Plates &Profiles

100% 25-Dec-10 A

11-Oct-11

APD00020

Pipes & Fittings

100% 01-Feb-11 A

30-Sep-11

APB00500

Deluge skid

100%

05-Apr-11 A

APB00640

ESD HPU

100%

05-Apr-11 A

APB00650

Swivel Barrier HPU

100%

05-Apr-11 A

APB00660

Starter / Control Cabinets

100%

05-Apr-11 A

APB00670

STP Valve Rack

100%

05-Apr-11 A

APD00030

Electrical Materials

100% 10-Apr-11 A

15-Jul-11 A

APD00050

HVAC Materials

100% 10-Apr-11 A

30-Sep-11

APB00370

Tank Washing machines moon pool

100%

12-Apr-11 A

APB00130

UPS System

100%

09-May-11 A

APB00570

Main Drain Pump

100%

02-Jun-11 A

APB00580

Secondary Drain Pump

100%

02-Jun-11 A

APB00700

Closed drain tank

100%

02-Jun-11 A

APB00610

Ventilation Skids

100%

16-Jun-11 A

APB00170

Stripping Gas Plate Cooler

100%

27-Jun-11 A

APB00250

Sea water lift pumps for water injection

100%

06-Jul-11 A

APB00600

CCTV

100%

06-Jul-11 A

APB00720

Water Injection Module

100%

07-Jul-11 A

APB00390

Swivel Stack

100%

13-Jul-11 A

APB00400

Torque arm set

100%

13-Jul-11 A

APB00410

Swivel Support System

100%

13-Jul-11 A

APB00140

Air Condition new section

100%

16-Jul-11 A

APB00520

Pull In Winch

100%

16-Jul-11 A

APB00550

Mating Cone Seal

100%

16-Jul-11 A

APB00560

Dummy Buoy Top

100%

16-Jul-11 A

APB00160

Produced Water Plate Cooler

100%

18-Jul-11 A

APB00740

Power Module

100%

19-Jul-11 A

APB00760

Misc Panels/UPS in New Section

100%

21-Jul-11 A

Actual Work

Critical Remaining Work

Remaining Work

MILESTONES

Summary

Q1

Q2

2012
Q3

Q4

Q1

Q2

Q3

10-Oct-11

APD00010

No System

2011
Q4

Page 13 of 15

TASK filter: All Activities


Primavera Systems, Inc.

DDWD Yard Schedule rev 5


Activity ID

Activity Name

Schedule % Start
Complete

Finish

Pedestal crane

100%

23-Jul-11 A

APB00420

GTG Battery System

100%

26-Jul-11 A

APB00430

8 ESD Valve

100%

26-Jul-11 A

APB00440

8 Isolation Valve

100%

26-Jul-11 A

APB00450

4 ESD Valve

100%

26-Jul-11 A

APB00460

3 ESD Valve

100%

26-Jul-11 A

APB00480

Geostationary piping

100%

26-Jul-11 A

APB00490

Piping between Swivel and topside interface

100%

26-Jul-11 A

APB00540

Locking Devices

100%

26-Jul-11 A

APB00320

Offloading MonitOring Telemetry System

100%

04-Aug-11 A

APB00270

Produced water pumps

100%

11-Aug-11 A

APB00360

Produced Water Cooler,Pumps&Polishing Unit

100%

11-Aug-11 A

APB00770

Firewater pump in Fwd E/R

100%

16-Aug-11 A

APB00730

Methanol&Chemical module

100%

19-Aug-11 A

APB00750

Fuel conditioning skid

100%

19-Aug-11 A

APB00340

Gas Scrubber

100%

31-Aug-11 A

APB00260

Process Pumps (Topside Pump skid???)

100%

06-Sep-11 A

APB00010

Electrical bulk materials

0%

11-Sep-11*

APB00020

Power Cables

0%

11-Sep-11*

APB00030

Field instrumentation

0%

11-Sep-11*

APB00040

Actuated valves for bilge and ballast systems

0%

11-Sep-11*

APB00050

Actuated valves for topside

0%

11-Sep-11*

APB00060

Control Valves

0%

11-Sep-11*

APB00070

Manually operated valves

0%

11-Sep-11*

APB00080

Paint

0%

11-Sep-11*

APB00090

Fire and gas detectors

0%

11-Sep-11*

APB00100

Switchgear

0%

11-Sep-11*

APB00110

Lighting fixtures

0%

11-Sep-11*

APB00120

Flood lights

0%

11-Sep-11*

APB00150

COW heat exchanger

0%

11-Sep-11*

APB00180

Control system - Cabinets CCR etc

0%

11-Sep-11*

APB00190

Crude oil flowmeter

0%

11-Sep-11*

APB00200

Instrument air compressor and dryers

0%

11-Sep-11*

APB00220

Hose end valve coupling

0%

11-Sep-11*

APB00230

Azimuth thruster SW pump

0%

11-Sep-11*

APB00280

PASystem

0%

11-Sep-11*

APB00290

Navigational Aids

0%

11-Sep-11*

APB00330

Safety equipment

0%

11-Sep-11*

APB00350

Pressure Vessels

0%

11-Sep-11*

APB00380

Hawser winch system

0%

11-Sep-11*

APB00470

Small bore valves

0%

11-Sep-11*

APB00510

Fire water deluge nozzels

0%

11-Sep-11*

APB00590

Illumination

0%

11-Sep-11*

APB00620

F &G Detection

0%

11-Sep-11*

APB00630

PA System

0%

11-Sep-11*

APB00680

Scale Inhibitor in.iection distribution panel

0%

11-Sep-11*

APB00690

Methanol Distribution valve

0%

11-Sep-11*

APB00710

Pneumatic control panel

0%

11-Sep-11*

APB00780

New Fire pump container

0%

11-Sep-11*

APB00530

Guide Roller / Load Cell

0%

26-Sep-11*

0% 11-Sep-11

08-Dec-11

0% 01-Nov-11

01-Nov-11

0%

01-Nov-11

0% 14-Nov-11

14-Nov-11

0%

14-Nov-11

0% 14-Nov-11

14-Nov-11

0%

14-Nov-11

0% 23-Oct-11

23-Oct-11

0%

23-Oct-11

0% 23-Nov-11

23-Nov-11

0%

23-Nov-11

0% 23-Nov-11

23-Nov-11

0%

23-Nov-11

0% 13-Nov-11

13-Nov-11

0%

13-Nov-11

0% 09-Nov-11

09-Nov-11

0%

09-Nov-11

0% 14-Nov-11

14-Nov-11

0%

14-Nov-11

0% 03-Dec-11

03-Dec-11

0%

03-Dec-11

0% 03-Dec-11

03-Dec-11

0%

03-Dec-11

0% 01-Nov-11

01-Nov-11

0%

01-Nov-11

0% 25-Nov-11

25-Nov-11

0%

25-Nov-11

0% 03-Dec-11

03-Dec-11

0%

03-Dec-11

0% 20-Nov-11

20-Nov-11

0%

20-Nov-11

0% 08-Nov-11

08-Nov-11

0%

08-Nov-11

0% 10-Oct-11

10-Oct-11

0%

10-Oct-11

0% 25-Oct-11

25-Oct-11

0%

25-Oct-11

0% 05-Nov-11

05-Nov-11

0%

05-Nov-11

0% 04-Nov-11

04-Nov-11

Construction
Constructio
13
Mechanical Compln-System 13

18
ACM0002

Mechanical Compln-System 18

20
ACM0003

Mechanical Compln-System 20

21
ACM0004

Mechanical Compln-System 21

21.01
ACM0044

Mechanical Compln-System 21.01

21.02
ACM0054

Mechanical Compln-System 21.02

21.03
ACM0064

Mechanical Compln-System 21.03

23
AMC0051

Mechanical Compln-System 23

29
ACM0007

Mechanical Compln-System 29

42
ACM0009

Mechanical Compln-System 42

43
ACM0010

Mechanical Compln-System 43

44
ACM0011

Mechanical Compln-System 44

45
ACM0012

Mechanical Compln-System 45

46
ACM0013

Mechanical Compln-System 46

50
ACM0014

Mechanical Compln-System 50

52
ACM0016

Mechanical Compln-System 52

53
ACM0017

Mechanical Compln-System 53

55
ACM0018

Mechanical Compln-System 55

56
ACM0019

Mechanical Compln-System 56

57

Actual Work

Critical Remaining Work

Remaining Work

MILESTONES

Summary

2011
Q4

APB00210

AMC0001

11-Jun-12 17:09

ATHENA FPSO

Page 14 of 15

Q1

Q2

2012
Q3

Q4

Q1

Q2

Q3

TASK filter: All Activities


Primavera Systems, Inc.

DDWD Yard Schedule rev 5


Activity ID

Activity Name

ACM0020

Schedule % Start
Complete

Mechanical Compln-System 57

58
ACM0021

Mechanical Compln-System 58

59
ACM0022

Mechanical Compln-System 59

62
ACM0023

Mechanical Compln-System 62

63
ACM0024

Mechanical Compln-System 63

63.01
ACM0074

Mechanical Compln-System 63.01

64
ACM0025

Mechanical Compln-System 64

65
ACM0026

Mechanical Compln-System 65

65.01
ACM0046

Mechanical Compln-System 65.01

65.02
ACM0056

Mechanical Compln-System 65.02

66
ACM0027

Mechanical Compln-System 66

70
ACM0028

Mechanical Compln-System 70

70.02
AMC0041

Mechanical Compln-System 70.02

71
ACM0029

Mechanical Compln-System 71

72
ACM0030

Mechanical Compln-System 72

73
ACM0031

Mechanical Compln-System 73

75
AMC0081

Mechanical Compln-System 75

76
ACM0033

Mechanical Compln-System 76

79
ACM0034

Mechanical Compln-System 79

80.01
ACM0035

Mechanical Compln-System 80.01

80.02
ACM0055

Mechanical Compln-System 80.02

80.03
ACM0045

Mechanical Compln-System 80.03

82
ACM0036

Mechanical Compln-System 82

82.01
ACM0066

Mechanical Compln-System 82.01

82.02
ACM0076

Mechanical Compln-System 82.02

84
ACM0038

Mechanical Compln-System 84

85
ACM0039

Mechanical Compln-System 85

86
ACM0040

Mechanical Compln-System 86

87
ACM0041

Mechanical Compln-System 87

88
AMC0091

Mechanical Compln-System 88

90
AMC0071

Mechanical Compln-System 90

91
AMC0061

Mechanical Compln-System 91

94
ACM0047

Mechanical Compln-System 94

97
ACM0048

Mechanical Compln-System 97

97.01
AMC0031

Mechanical Compln-System 97.01

97.02
AMC0011

Mechanical Compln-System 97.02

99
ACM0049

11-Jun-12 17:09

ATHENA FPSO

Mechanical Compln-System 99

Commissioning
Commissio
No System

Finish

0%

04-Nov-11

0% 11-Sep-11

11-Sep-11

0%

11-Sep-11

0% 24-Nov-11

24-Nov-11

0%

24-Nov-11

0% 09-Nov-11

09-Nov-11

0%

09-Nov-11

0% 20-Oct-11

20-Oct-11

0%

20-Oct-11

0% 05-Nov-11

05-Nov-11

0%

05-Nov-11

0% 20-Nov-11

20-Nov-11

0%

20-Nov-11

0% 20-Nov-11

20-Nov-11

0%

20-Nov-11

0% 25-Oct-11

25-Oct-11

0%

25-Oct-11

0% 08-Dec-11

08-Dec-11

0%

08-Dec-11

0% 11-Sep-11

11-Sep-11

0%

11-Sep-11

0% 09-Nov-11

09-Nov-11

0%

09-Nov-11

0% 05-Nov-11

05-Nov-11

0%

05-Nov-11

0% 03-Dec-11

03-Dec-11

0%

03-Dec-11

0% 28-Nov-11

28-Nov-11

0%

28-Nov-11*

0% 11-Nov-11

11-Nov-11

0%

11-Nov-11

0% 28-Oct-11

28-Oct-11

0%

28-Oct-11

0% 03-Dec-11

03-Dec-11

0%

03-Dec-11

0% 24-Nov-11

24-Nov-11

0%

24-Nov-11

0% 11-Sep-11

11-Sep-11

0%

11-Sep-11

0% 11-Sep-11

11-Sep-11

0%

11-Sep-11

0% 25-Nov-11

25-Nov-11

0%

25-Nov-11

0% 15-Oct-11

15-Oct-11

0%

15-Oct-11

0% 15-Oct-11

15-Oct-11

0%

15-Oct-11

0% 11-Sep-11

11-Sep-11

0%

11-Sep-11

0% 28-Oct-11

28-Oct-11

0%

28-Oct-11

0% 10-Oct-11

10-Oct-11

0%

10-Oct-11

0% 14-Nov-11

14-Nov-11

0%

14-Nov-11

0% 30-Nov-11

30-Nov-11

0%

30-Nov-11

0% 06-Dec-11

06-Dec-11

0%

06-Dec-11

0% 04-Nov-11

04-Nov-11

0%

04-Nov-11

0% 06-Dec-11

06-Dec-11

0%

06-Dec-11

0% 04-Dec-11

04-Dec-11

0%

04-Dec-11

0% 28-Nov-11

28-Nov-11

0%

28-Nov-11

0% 11-Sep-11

11-Sep-11

0%

11-Sep-11

0% 11-Sep-11

11-Sep-11

0%

11-Sep-11

0% 06-Dec-11

06-Dec-11

0%

06-Dec-11

0% 04-Jan-11 A

20-Dec-11

0% 04-Jan-11 A

20-Dec-11

ACD03720

General Services

93.63% 04-Jan-11 A

19-Dec-11

ACM00010

Mechanical Completion Activities

91.67% 18-Jul-11 A

07-Dec-11

ACM00030

Piping Testing

73.33% 18-Jul-11 A

30-Nov-11

ACM00020

Pre-Commissioning & Commissioning

ACM00040
ACM00050

60% 15-Aug-11 A

20-Dec-11

Retrojetting & Flushing

0% 25-Sep-11*

23-Nov-11

Piping Reinstatement

0% 09-Oct-11

07-Dec-11

Actual Work

Critical Remaining Work

Remaining Work

MILESTONES

Summary

2011
Q4

Page 15 of 15

Q1

Q2

2012
Q3

Q4

Q1

Q2

Q3

TASK filter: All Activities


Primavera Systems, Inc.