DOCUMENT NO.

POLLACHI-COIMBAROTRE SECTION OF NH209


KNR-ST-VD-DC-06
Design of Substructure and Foundation - Fixed DESIGNED
CHECKED
TITLE:
Pier P41
KKK
MPB
Design Details of Pier Group, GP1 (FIXED PIER) are presented in this REPORT.
P41is the Critical Pieramong this group of Piers.
Founding
S.No
Pier
FRL
GL
Height
Level
1
P2
334.579
324.2055
320.2055
14.373
2
P5
335.453
324.941
320.941
14.512
3
P8
335.839
324.827
320.827
15.012
4
P11
336.214
324.862
320.862
15.352
5
P14
336.589
325.048
321.048
15.541
6
P17
336.964
325.481
321.481
15.483
7
P20
337.5425
325.7665
321.7665
15.776
8
P23
339.111
326.775
322.775
16.336
9
P26
340.8845
329.512
325.512
15.373
10
P29
341.999
331.524
327.524
14.475
11
P32
342.3595
331.2775
327.2775
15.082
12
P35
342.074
329.968
325.968
16.106
13
P38
342.1235
330.058
326.058
16.066
343.398
330.373
326.373
17.025
14
P41
15
P44
345.273
333.466
329.466
15.807
16
P47
347.085
336.574
332.574
14.511
17
P50
348.2755
337.377
333.377
14.899
18
P53
348.719
337.505
333.505
15.214
19
P56
348.4105
338.105
334.105
14.306
20
P58
347.788
337.135
333.135
14.653
17.025
Maximim height
P41
PROJECT:

DATE

30-Oct-16
SHEET