Anda di halaman 1dari 4

ASSESMENT LAPANGAN DAN SURVEI SERTA STUDI PENGARUH INTERKONEKSI JARING

NO URAIAN PEKERJAAN
1

PERSIAPAN

PENGUMPULAN DATA

MODELING SISTEM TENAGA LISTRIK

ANALISA LOAD FLOW

ANALISA STABILITAS TRANSIEN

ANALISA HUBUNG SINGKAT DAN RELE KOORDINASI

PEMBUATAN LAPORAN STUDI

PRESENTASI

TOTAL

1
2
3
4
5
6
7
8

PERSIAPAN
PENGUMPULAN DATA
MODELING SISTEM TENAGA LISTRIK
ANALISA LOAD FLOW
ANALISA STABILITAS TRANSIEN
ANALISA HUBUNG SINGKAT DAN RELE KOORDINASI
PEMBUATAN LAPORAN STUDI
PRESENTASI

Progress Pekerjaan

RUH INTERKONEKSI JARINGAN PEMBANGKIT DENGAN JARINGAN PENYUPLAI PLN TERHADAP KEANDA
%
M
WEIGHT
1
2
3
4
5
100.00
1.00
1.00
1.00
100%
90.00
10.00
10.00
5.00
5.00
100%
80.00
15.00
15.00
3.00
3.00
3.00
100%
70.00
15.00
15.00
3.00
3.00
100%
60.00
20.00
20.00
2.50
2.50
100%
50.00
Renc. (%)
20.00
20.00
40.00
100%
14.00
14.00
1.75
30.00
100%
5.00
5.00
20.00
10.00

100

0.00

Total Renc.
Renc.(%)
Total Real
Real.(%)

1.00
1.00
0.00
0.00
1

100

8.00
14.00
0.00
0.00

8.50
22.50
0.00
0.00

10.25
32.75
0.00
0.00

6.00

3
14.00

4
22.50

5
32.75

2
1.00

1
10
15
15
20
20
14
5

5.00
6.00
0.00
0.00

TERHADAP KEANDALAN SISTEM TENAGA LISTRIK PT PERTAMINA RU IV CILACAP


MINGGU KE6
7
8
9
10
11
12
13

3.00

3.00

3.00

3.00

3.00

2.50

2.50

2.50

2.50

2.50

2.50

4.00

4.00

4.00

4.00

4.00

1.75

1.75

1.75

1.75

1.75

1.75

1.75
5.00

10.25
43.00
0.00
0.00

14.25
57.25
0.00
0.00

11.25
68.50
0.00
0.00

8.25
76.75
0.00
0.00

8.25
85.00
0.00
0.00

8.25
93.25
0.00
0.00

1.75
95.00
0.00
0.00

5.00
100.00
0.00
0.00

6
43.00

7
57.25

8
68.50

9
76.75

10
85.00

11
93.25

12
95.00

13
100.00

Anda mungkin juga menyukai