NO URAIAN PEKERJAAN
1
PERSIAPAN
PENGUMPULAN DATA
PRESENTASI
TOTAL
1
2
3
4
5
6
7
8
PERSIAPAN
PENGUMPULAN DATA
MODELING SISTEM TENAGA LISTRIK
ANALISA LOAD FLOW
ANALISA STABILITAS TRANSIEN
ANALISA HUBUNG SINGKAT DAN RELE KOORDINASI
PEMBUATAN LAPORAN STUDI
PRESENTASI
Progress Pekerjaan
RUH INTERKONEKSI JARINGAN PEMBANGKIT DENGAN JARINGAN PENYUPLAI PLN TERHADAP KEANDA
%
M
WEIGHT
1
2
3
4
5
100.00
1.00
1.00
1.00
100%
90.00
10.00
10.00
5.00
5.00
100%
80.00
15.00
15.00
3.00
3.00
3.00
100%
70.00
15.00
15.00
3.00
3.00
100%
60.00
20.00
20.00
2.50
2.50
100%
50.00
Renc. (%)
20.00
20.00
40.00
100%
14.00
14.00
1.75
30.00
100%
5.00
5.00
20.00
10.00
100
0.00
Total Renc.
Renc.(%)
Total Real
Real.(%)
1.00
1.00
0.00
0.00
1
100
8.00
14.00
0.00
0.00
8.50
22.50
0.00
0.00
10.25
32.75
0.00
0.00
6.00
3
14.00
4
22.50
5
32.75
2
1.00
1
10
15
15
20
20
14
5
5.00
6.00
0.00
0.00
3.00
3.00
3.00
3.00
3.00
2.50
2.50
2.50
2.50
2.50
2.50
4.00
4.00
4.00
4.00
4.00
1.75
1.75
1.75
1.75
1.75
1.75
1.75
5.00
10.25
43.00
0.00
0.00
14.25
57.25
0.00
0.00
11.25
68.50
0.00
0.00
8.25
76.75
0.00
0.00
8.25
85.00
0.00
0.00
8.25
93.25
0.00
0.00
1.75
95.00
0.00
0.00
5.00
100.00
0.00
0.00
6
43.00
7
57.25
8
68.50
9
76.75
10
85.00
11
93.25
12
95.00
13
100.00