CANTIDADES DE OBRA
MDULO: UV-178
DESCRIPCIN
TRABAJOS PRELIMINARES
Instalacin de faenas
Replanteo y control
MOVIMIENTO DE TIERRA
Excavacin 0,0<H1,5 m
Excavacin 1,5<H3,0 m
Excavacin 3,0<H4,5 m
Excavacin 4,5<H6,0 m
Agotamiento
Relleno y compactado con tierra comn
ENTIBADO
Discontinuo 0,0<H1,5 m
Discontinuo 0,0<H3,0 m
Continuo 0,0<H1,5 m
Continuo 0,0<H3,0 m
Continuo 0,0<H4,5 m
Continuo 0,0<H6,0 m
PROVISIN, TRANSPORTE Y COLOCACIN DE AGREGADOS Y OTROS PARA FUNDACIN DE
ASIENTO
Arena
Piedra boln
Ripio lavado
Pilotes de cuchi rstico 4" x 4" x 2,2 m
PROVISIN, TRANSPORTE Y COLOCACIN TUBERA
Tubera PVC SDR-41 150 mm J. Elstica (incluye prueba hidrulica)
Tubera PVC SDR-41 200 mm J. Elstica (incluye prueba hidrulica)
Tubera PVC SDR-41 250 mm J. Elstica (incluye prueba hidrulica)
Tubera PVC SDR-41 300 mm J. Elstica (incluye prueba hidrulica)
Tubera PVC SDR-41 400 mm J. Elstica (incluye prueba hidrulica)
CONSTRUCCIN CMARA DE INSPECCIN DE LADRILLO Dcm=1,20 m - Dt600 mm (INCLUYE
CAMADA DE PIEDRA Y RIPIO)
0,0<H1,5 m
1,5<H2,0 m
2,0<H2,5 m
2,5<H3,0 m
3,0<H3,5 m
3,5<H4,0 m
4,0<H4,5 m
CONSTRUCCIN CMARA DE INSPECCIN DE LADRILLO (INCLUYE CAMADA DE RIPIO)
Substituta de TIL 0,0<H1,0 m (Dcm=0,60 m)
0,60 x 0,60 m
CONEXIONES A COLECTORES Y A CMARAS DE INSPECCIN
A cmara con cada en PVC 150 mm
A cmara con cada en PVC 200 mm
A cmara con cada en PVC 250 mm
CONEXIONES DOMICILIARIAS SUPERFICIALES H2 m DE TUBERA PVC SDR-35 100 mm JUNTA
ELSTICA (INCLUYE CMARA DE INSPECCIN 0,60 x 0,60 m, CODO DE 100 mm Y DADO DE
HS)
A colector de 150 mm (incluye silleta 150 x 100 mm)
CONEXIONES DOMICILIARIAS PROFUNDAS TIPO CHIMENEA 2,00<H3,50 m DE TUBERA PVC
SDR-35 100 mm JUNTA ELSTICA (INCLUYE CMARA DE INSPECCIN 0,60 x 0,60 m, CODO DE
100 mm, LOSA DE HA H21 Y ENCAMISADO DE HS H15)
A colector de 150 mm (incluye silleta 150 x 100 mm)
A colector de 200 mm (incluye silleta 200 x 100 mm)
A colector de 250 mm (incluye silleta 250 x 100 mm)
A colector de 300 mm (incluye silleta 300 x 100 mm)
RETIRO Y REPOSICIN DE PAVIMENTOS
Retiro y reposicin de pavimento rgido (H28 e=20 cm, incluye camada de 15 cm de capa base y
acelerador de fraguado)
Retiro y reposicin de acera (incluye contrapiso de ladrillo)
OTROS
Provisin de material de prstamo
Transporte de excedente a lugares seleccionados L5 Km
Provisin, transporte y colocacin de tapa y marco de HF para cmara
Conexin a cmara existente
Plano de obra construida
UNIDAD
PRECIO (Bs)
UNITARIO
PARCIAL
CANTIDAD
glb
0.00
23,514.00
0.00
m3
28,970.00
0.00
m3
8,919.00
0.00
m3
1,258.00
0.00
m3
96.00
0.00
m3
25,310.00
0.00
m3
29,967.00
0.00
m2
1,023.00
0.00
m2
4,000.00
0.00
m2
15,725.00
0.00
m2
43,668.00
0.00
7,243.00
0.00
m2
238.00
0.00
m3
7,545.00
0.00
m3
182.00
0.00
m3
741.00
0.00
pza
156
0.00
21,007.00
0.00
1,326.00
0.00
440.00
0.00
540.00
0.00
201.00
0.00
89
0.00
pza
pza
35
0.00
pza
19
0.00
pza
0.00
pza
0.00
pza
0.00
pza
0.00
pza
101
0.00
pza
95
0.00
pza
25
0.00
pza
0.00
pza
0.00
pza
1,300
0.00
pza
541
0.00
pza
124
0.00
pza
41
0.00
pza
51
0.00
m2
750.00
0.00
m2
800.00
0.00
m3
1,963.00
0.00
m3
9,276.00
0.00
pza
0.00
pto
0.00
glb
0.00
TOTAL (Bs)
0.00
CANTIDADES DE OBRA
MDULO: UV-183
TEM
1
DESCRIPCIN
TRABAJOS PRELIMINARES
1.1
Instalacin de faenas
1.2
Replanteo y control
MOVIMIENTO DE TIERRA
2.1
Excavacin 0,0<H1,5 m
2.2
Excavacin 1,5<H3,0 m
2.3
Excavacin 3,0<H4,5 m
2.4
Agotamiento
2.5
ENTIBADO
3.1
Discontinuo 0,0<H1,5 m
3.2
Discontinuo 0,0<H3,0 m
3.3
Continuo 0,0<H1,5 m
3.4
Continuo 0,0<H3,0 m
3.5
Continuo 0,0<H4,5 m
4.1
Arena
4.2
Piedra boln
4.3
Ripio lavado
4.4
5.1
5.2
5.3
5.4
5.5
6.1
0,0<H1,5 m
6.2
1,5<H2,0 m
6.3
2,0<H2,5 m
6.4
2,5<H3,0 m
6.5
3,0<H3,5 m
7.1
7.2
0,60 x 0,60 m
8
8.1
9
9.1
10
10.1
10.2
10.3
10.4
11
11.1
11.2
12
13
14
15
16
UNIDAD
PRECIO (Bs)
UNITARIO
PARCIAL
CANTIDAD
glb
0.00
13,238.00
0.00
m3
15,773.00
0.00
m3
5,166.00
0.00
m3
316.00
0.00
m3
9,179.00
0.00
m3
16,178.00
0.00
m2
4,770.00
0.00
m2
4,017.00
0.00
m2
12,948.00
0.00
m2
21,075.00
0.00
m2
5,112.00
0.00
m3
4,213.00
0.00
m3
64.00
0.00
m3
1,143.00
0.00
pza
89
0.00
12,304.00
0.00
370.00
0.00
264.00
0.00
280.00
0.00
20.00
0.00
pza
42
0.00
pza
23
0.00
pza
16
0.00
pza
0.00
pza
0.00
pza
57
0.00
pza
58
0.00
pza
18
0.00
pza
750
0.00
pza
342
0.00
pza
35
0.00
pza
25
0.00
pza
27
0.00
m2
525.00
0.00
m2
400.00
0.00
m3
1,063.00
0.00
m3
5,077.00
0.00
pza
0.00
pto
0.00
glb
0.00
TOTAL (Bs)
0.00
MDULO: UV-248
TEM
DESCRIPCIN
TRABAJOS PRELIMINARES
1.1
Instalacin de faenas
1.2
Replanteo y control
MOVIMIENTO DE TIERRA
2.1
2.2
2.3
2.4
2.5
Excavacin 0,0<H1,5 m
Excavacin 1,5<H3,0 m
Excavacin 3,0<H4,5 m
Excavacin 4,5<H6,0 m
Agotamiento
2.6
ENTIBADO
3.1
3.2
3.3
3.4
Discontinuo 0,0<H1,5 m
Discontinuo 0,0<H3,0 m
Continuo 0,0<H1,5 m
Continuo 0,0<H3,0 m
3.5
Continuo 0,0<H4,5 m
4.1
Arena
4.2
Piedra boln
4.3
Ripio lavado
4.4
5.1
5.2
5.3
5.4
6.1
6.2
1,5<H2,0 m
6.3
2,0<H2,5 m
6.4
2,5<H3,0 m
6.5
3,0<H3,5 m
6.6
3,5<H4,0 m
7
7.1
7.2
8
0,60 x 0,60 m
CONEXIONES A COLECTORES Y A CMARAS DE INSPECCIN
8.1
8.2
8.3
9.1
9.2
9.3
10
10.1
10.2
10.3
11
11.1
11.2
12
13
14
15
16
UNIDAD
PRECIO (Bs)
CANTIDAD
UNITARIO
PARCIAL
0.00
glb
0.00
14,596.00
0.00
m3
m3
m3
m3
m3
17,805.00
5,374.00
664.00
1.00
5,745.00
0.00
0.00
0.00
0.00
0.00
m3
18,001.00
0.00
m2
m2
m2
m2
7,592.00
3,269.00
14,309.00
18,473.00
0.00
0.00
0.00
0.00
m2
5,018.00
0.00
m3
4,407.00
0.00
m3
321.00
0.00
m3
241.00
0.00
pza
810
0.00
12,157.00
0.00
1,074.00
0.00
270.00
0.00
1,095.00
0.00
pza
56
0.00
pza
17
0.00
pza
10
0.00
pza
0.00
pza
0.00
pza
0.00
pza
58
0.00
pza
10
0.00
pza
12
0.00
pza
0.00
pza
0.00
pza
902
0.00
pza
15
0.00
pza
16
0.00
pza
pza
100
55
0.00
0.00
pza
12
0.00
0.00
m2
150.00
0.00
m2
250.00
0.00
m3
m3
pza
pto
1,183.00
5,839.00
2
1
0.00
0.00
0.00
0.00
glb
0.00
Total (Bs)
0.00
MDULO: UV-252
TEM
1
DESCRIPCIN
TRABAJOS PRELIMINARES
1.1
Instalacin de faenas
1.2
Replanteo y control
MOVIMIENTO DE TIERRA
2.1
Excavacin 0,0<H1,5 m
2.2
Excavacin 1,5<H3,0 m
2.3
Excavacin 3,0<H4,5 m
2.4
Agotamiento
2.5
ENTIBADO
3.1
Discontinuo 0,0<H1,5 m
3.2
Discontinuo 0,0<H3,0 m
3.3
Continuo 0,0<H1,5 m
3.4
Continuo 0,0<H3,0 m
3.5
Continuo 0,0<H4,5 m
4.1
Arena
4.2
Piedra boln
4.3
Ripio lavado
4.4
5.1
5.2
5.3
5.4
6.1
0,0<H1,5 m
6.2
1,5<H2,0 m
6.3
2,0<H2,5 m
6.4
2,5<H3,0 m
6.5
7
3,0<H3,5 m
CONSTRUCCIN CMARA DE INSPECCIN DE LADRILLO (INCLUYE CAMADA DE RIPIO)
7.1
7.2
0,60 x 0,60 m
8
8.1
9
9.1
9.2
10
10.1
10.2
10.3
11
11.1
Retiro y reposicin de pavimento rgido (H28 e=20 cm, incluye camada de 15 cm de capa base y
acelerador de fraguado)
11.2
12
13
14
15
16
UNIDAD
PRECIO (Bs)
UNITARIO
PARCIAL
CANTIDAD
0.00
glb
0.00
11,655.00
0.00
m3
13,032.00
0.00
m3
2,760.00
0.00
m3
327.00
0.00
m3
3,040.00
0.00
m3
11,712.00
0.00
m2
5,116.00
0.00
m2
121.00
0.00
m2
15,045.00
0.00
m2
13,568.00
0.00
m2
2,693.00
0.00
m3
3,646.00
0.00
m3
51.00
0.00
m3
123.00
0.00
pza
567
0.00
10,506.00
0.00
783.00
0.00
141.00
0.00
225.00
0.00
pza
60
0.00
pza
10
0.00
pza
0.00
pza
0.00
pza
0.00
0.00
pza
43
0.00
pza
10
0.00
pza
11
0.00
0.00
pza
495
0.00
pza
18
0.00
pza
52
0.00
pza
22
0.00
pza
0.00
m2
100.00
0.00
m2
250.00
0.00
m3
806.00
0.00
m3
4,407.00
0.00
pza
0.00
pto
0.00
glb
0.00
Total (Bs)
0.00