Anda di halaman 1dari 1

WEEKLY ACTIVITY REPORT

Week 44
30-Oct-2016

Meeting With Mr. Sabir For Understanding of SEC Communication network.

Studied The PTS WITH TITTLE OF COMMUNICATIONS SYSTEMS


REQUIREMENTS FOR CONSTRUCTION OF 380kV D/C OHTL BETWEEN
NAJRAN UNIVERSITY (NJR) BSP TO FARA.

Studied THE PTS with TITTLE OF COMMUNICATIONS SYSTEMS REQUIREMENTS


FOR Abu Arish 2 132/13.8 KV SUBSTATION.

Meeting With Mr. Mushari Regarding Punchlist, LAN/WAN, Missing cards ...

31-Oct-2016

Studied The PTS WITH TITTLE OF COMMUNICATIONS SYSTEMS


REQUIREMENTS FOR CONSTRUCTION OF 380kV D/C OHTL BETWEEN
NAJRAN UNIVERSITY (NJR) BSP TO FARA.

Studied Power Horizon Proposal For SERAT OBAIDA S/S.


Attended RFTS Commisioning And testing Activity At ABHA east 380 Kv
Substation.

1-Nov-2016

Prepared Report for PTS WITH TITTLE OF COMMUNICATIONS SYSTEMS


REQUIREMENTS FOR CONSTRUCTION OF 380kV D/C OHTL BETWEEN
NAJRAN UNIVERSITY (NJR) BSP TO FARA.

Prepare report FOR LAN/WAN Installation Status at S/Ss.


Studied Power Horizon Proposal For SERAT OBAIDA S/S.

2-Nov-2016

UPDATED Data Base With More SUBSTATIONS and CD's.

Submitted Report for COMMUNICATIONS SYSTEMS REQUIREMENTS FOR


CONSTRUCTION OF 380kV D/C OHTL BETWEEN NAJRAN UNIVERSITY
(NJR) BSP TO FARA.

3-Nov-2016

Working on the Status Of NEW SubStation Installation Status Data Base ...