Anda di halaman 1dari 15

Contents

DT Statistic................................................................................................................. 2
Failure Event............................................................................................................ 3
KPI........................................................................................................................... 4
CSSR.................................................................................................................... 4
CCSR.................................................................................................................... 4
RSCP >=-95......................................................................................................... 5
EcNo >= -14........................................................................................................ 7
MOS >= 3............................................................................................................ 8
3G Penetration..................................................................................................... 9
SAVE workbook.................................................................................................. 10
DL Throughput................................................................................................... 11
Mapping/ Plot............................................................................................................ 13
Export....................................................................................................................... 14

DT STATISTIC & MAPPING LOGFILES


@ Nemo Analyzer
DT Statistic

Failure Event :
# Calldrop (CAD) Target ZERO DROPP CALL
# Call Failure (CAF)
KPI

KPI

Refer to
Project
2016

CSSR
CCSR
RSCP >= -95
EcNo >= -14
MOS >=3
DL Throughput >=512
kbps BBC80
DL Throughput >=1024
kbps BBC6
3G Penetration

Target
98%
100%
90%
90%
98%

DT methode
Voice
Data
v
v
v
v
v
v
v
v

80%

80%
95%

Mapping/ Plot

DT methode
KPI
RSCP
EcNo
MOS >=3
DL Throughput
3G Penetration

Mapping/
Plot
v
v
v
v
v

Voice
v
v
v
v

Data
v
v
v
v

Failure Event
1. Logfile>UMTS>Failure Event

2. Export to txt (faster than export to excel)

Not all event CAD & CAF fill to statistic. Some case, event
exclude
Nemo Event Exclude
& Include.pdf

Example : there are 8 CAD, network cause : Normal, Unspecified


exclude >>Zero Drop call
See pdf file attached

Logfiles contain CAD/ CAF/ HO Failure (after filtering / take out


exclude event or add remark : Include/ exclude ) need to be inform to
RNO Cluster for further analsysis

KPI
CSSR

See : Failure event procedure

See :attempt
Failure event procedure, manually check
Formula : CSSR= (#Call Attemp - #CAF)/#Call
How to get Call Attempt, CAF?

Dont use this value, if find event exclude (CAD/ CAF)


CCSR
Formula : CCSR= (#Call Attemp - #CAF- #CAD)/(#Call Attempt - #CAF)

RSCP >=-95

Select Legend

Add page to other plot :


Right click >>
Page>>Add Page
To Rename page >>Page
>> Properties>>Title :
<name>

EcNo >= -14

Add page and rename with Title EcNo


Follow procedure plot RSCP >= -95

DRAG to page
EcNo

Procedure RSCP >= -95 number 2 & 3


Make 2 legend EcNo >= -14 & EcNo <-14 and give legend name , sample
EcNo -14
Select legend EcNo -14
Result

MOS >= 3
Add page and rename with title MOS

DRAG to page
MOS

Procedure RSCP >= -95 number 2 & 3


Make 2 legend MOS , MOS >= 3 & EcNo < 314 and give legend name ,
sample MOS 3
Select legend MOS 3
Result

3G Penetration
Add page and rename title <Serving System>

DRAG to page
Serving System

Procedure RSCP >= -95 number 2 & 3


Result

SAVE workbook
Save workbook that contain page/ sheet RSCP|EcNo|MOS|Serving System, to make
1 click to process RSCP EcNo MOS Serving System.

To use this workbook, just right click logfile>>UMTS>> <name workbook>. Can
apply to all logfile voice

DL Throughput
Use workbook Threshold Voice to logfile data
Result

Go to page MOS , blank, coz logfiles data.


Change audio quality MOS (PSM Mobile) DL to Application throughput
download

Result

Change Legend with 2 range as target

or
For 2015 Project BBC6 DL thp target thp >= 512000 80%

For 2016 Project BBC6 DL thp target thp >= 1000000 80%
(please ask to your PM)
Rename Page MOS to Throughput
Save Workbook , use new workbook to process logfile data

Mapping/ Plot
DT methode
KPI
RSCP
EcNo
MOS >=3
DL Throughput
3G Penetration

Mapping/
Plot
v
v
v
v
v

Voice
v
v
v
v

Data
v
v
v
v

To plot each KPI data & voice, modify workbook Threhold Voice plot logfile voice
& workbook Threhold Data plot logfile data. Just change the (range) Legend in
each page of workbook & save workbook with new name, example : Voice Plotting &
Data Plotting.

Export

Export to tabfile

Name & directory


to save tabfile

Thanks

Anda mungkin juga menyukai