Cantilever
Stem height;
hstem = 14.667 ft
Stem thickness;
tstem = 8 in
= 90 deg
Stem density;
Toe length;
ltoe = 2.667 ft
Heel length;
lheel = 2.667 ft
Base thickness;
tbase = 18 in
Base density;
hret = 6 ft
= 0 deg
Depth of cover;
dcover = 1.667 ft
Depth of excavation;
dexc = 0.667 ft
Moist density;
mr = 135 pcf
Saturated density;
sr = 145 pcf
r = 30 deg
r = 0 deg
Soil density;
b = 115 pcf
Cohesion;
cb = 0 psf
b = 30 deg
b = 15 deg
bb = 30 deg
Seismic details
Horizontal seismic acceleration factor;
Kh = 0.2
Kv = 0
Loading details
Live surcharge load;
Project
Job Ref.
Section
Sheet no./rev.
Date
11/10/2016
8"
7'
2' 8"
Chk'd by
Date
App'd by
2' 8"
P1
14' 8"
200 psf
8"
1' 6"
1' 8"
9' 2"
10' 10"
6'
67 psf
479 psf
2070 psf
137 psf
6'
General arrangement
xbase = lbase / 2 = 3 ft
Date
Project
Job Ref.
Section
Sheet no./rev.
Date
11/10/2016
Chk'd by
Date
App'd by
Date
Sliding check
Vertical forces on wall
Wall stem;
Wall base;
Base soil;
Total;
Line loads;
Total;
Base friction;
Resistance to sliding;
Factor of safety;
Overturning check
Vertical forces on wall
Wall stem;
Wall base;
Base soil;
Total;
Line loads;
Project
Job Ref.
Section
Sheet no./rev.
Date
11/10/2016
Chk'd by
Date
App'd by
Base soil;
Total;
Date
Line loads;
Total;
Wall base;
Base soil;
Total;
Wall base;
Surcharge load;
Base soil;
Total;
Line loads;
Base soil;
Total;
Moments on wall
Wall stem;
Wall base;
Surcharge load;
Line loads;
Base soil;
Total;
Project
Job Ref.
Section
Sheet no./rev.
Date
11/10/2016
Chk'd by
Date
App'd by
Date
Eccentricity of reaction;
e = x - lbase / 2 = -0.435 ft
lload = lbase = 6 ft
Factor of safety;
Sliding check
Vertical forces on wall
Wall stem;
Wall base;
Base soil;
Total;
Line loads;
Seismic;
Total;
Base friction;
Resistance to sliding;
Factor of safety;
Overturning check
Vertical forces on wall
Wall stem;
Wall base;
Base soil;
Total;
Line loads;
Base soil;
Project
Job Ref.
Section
Sheet no./rev.
Date
11/10/2016
Chk'd by
Date
App'd by
Seismic;
Total;
Date
Line loads;
Seismic;
Total;
Wall base;
Base soil;
Total;
Wall base;
Surcharge load;
Base soil;
Total;
Line loads;
Base soil;
Seismic;
Total;
Moments on wall
Wall stem;
Wall base;
Surcharge load;
Line loads;
Base soil;
Seismic;
Project
Job Ref.
Section
Sheet no./rev.
Date
11/10/2016
Total;
Chk'd by
Date
App'd by
Date
Eccentricity of reaction;
e = x - lbase / 2 = -0.876 ft
lload = lbase = 6 ft
Factor of safety;
Concrete details
Compressive strength of concrete;
Concrete type;
Reinforcement details
Yield strength of reinforcement;
fy = 60000 psi
Es = 29000000 psi
Cover to reinforcement
Top face of base;
cbt = 2 in
cbb = 3 in
Masonry details
8" CMU in running bond, fully bedded with PCL class M mortar, fully grouted
Compressive strength of unit;
Length of unit;
lb = 15.625 in
Height of unit;
hb = 7.625 in
Thickness of joint;
tj = 0.375 in
twf = 1.25 in
twe = 1.25 in
twi = 1.25 in
Depth of cavity;
tc = tb - 2 twf = 5.125 in
Length of cavity;
7.625"
3.813"
15.625"
1.25"
5.125"
5.937"
1.25"
5.937"
1.25"
1.25"
1.25"
Project
Job Ref.
Section
Sheet no./rev.
Date
11/10/2016
Chk'd by
Date
App'd by
Date
1.4 Dead
Stem
Toe
0.32
1.45
0.27
0.32
0.32
1.45
Heel
2.3
1.32
1.52
0.55 0.27
0.32
0.9
-0.5
0.8
1
Stem
0.14
0.07
0.14
3.8
Toe
0.27
0.2
1.24
1.34 0.23
0.27
0.73 0.2
0.27
1.24
0.27
0.23
5.5
4.3
0.07
0.05
0.55
-6
-3.5
Heel
12.1
8.8
t = 8 in
A = tb = 91.5 in2/ft
Project
Job Ref.
Section
Sheet no./rev.
Date
11/10/2016
Chk'd by
S = 2 I / tb = 116.3 in3/ft
r = (I / A) = 2.2 in
Date
App'd by
Date
M = 145242 lb_in/ft
Axial load;
Effective height;
h = 2 hstem = 29.333 ft
Slenderness ratio;
h / r = 159.917
= 0.9
Pn = Pn = 20095 lb/ft
P / Pn = 0.083
PASS - Nominal axial strength exceeds axial load
Reinforcement provided;
Depth of reinforcement;
d = 3.813 in
Maximum usable compressive strain of masonry - cl.3.3.2
mu = 0.0025
Tensile strain in reinforcement at balance point;
s = fy / Es = 0.002069
s = 1.5
1 = 0.8
Compressive force at balance point;
c (in)
C (lb/ft)
T (lb/ft)
fs (psi)
M (lb_in/ft)
P (lb/ft)
0.01
0.038
586
27612
60000
2001
-24323
0.1
0.381
5856
27612
60000
19290
-19580
0.2
0.763
11712
27612
60000
36972
-14310
0.3
1.144
17568
27612
60000
53047
-9039
0.4
1.525
23424
27612
60000
67514
-3769
0.5
1.906
29280
27612
60000
80374
1502
0.547
2.086
32042
27612
60000
85882
3988
0.6
2.288
35136
22243
48333
91626
11604
0.7
2.669
40992
14299
31071
98220
20095
Project
Job Ref.
Section
Sheet no./rev.
10
Date
11/10/2016
Chk'd by
Date
App'd by
Date
25000
98220 lb_in/ft, 20095 lb/ft
20000
15000
10000
5000
105000
90000
75000
60000
45000
30000
15000
-5000
V = 3496 lb/ft
v = 0.8
Vn = v Vn = 7701 lb/ft
V / Vn = 0.454
PASS - Design shear strength exceeds applied shear force
t = 8 in
A = tb = 91.5 in2/ft
S = 2 I / tb = 116.3 in3/ft
r = (I / A) = 2.2 in
M = 96168 lb_in/ft
Axial load;
Effective height;
h = 2 hstem = 29.333 ft
Project
Job Ref.
Section
Sheet no./rev.
11
Date
11/10/2016
Chk'd by
Date
App'd by
Date
Slenderness ratio;
h / r = 159.917
= 0.9
Pn = Pn = 20095 lb/ft
P / Pn = 0.083
PASS - Nominal axial strength exceeds axial load
Reinforcement provided;
Depth of reinforcement;
d = 3.813 in
Maximum usable compressive strain of masonry - cl.3.3.2
mu = 0.0025
Tensile strain in reinforcement at balance point;
s = fy / Es = 0.002069
s = 1.5
1 = 0.8
Compressive force at balance point;
c (in)
C (lb/ft)
T (lb/ft)
fs (psi)
M (lb_in/ft)
P (lb/ft)
0.01
0.038
586
27612
60000
2001
-24323
0.1
0.381
5856
27612
60000
19290
-19580
0.2
0.763
11712
27612
60000
36972
-14310
0.3
1.144
17568
27612
60000
53047
-9039
0.4
1.525
23424
27612
60000
67514
-3769
0.5
1.906
29280
27612
60000
80374
1502
0.547
2.086
32042
27612
60000
85882
3988
0.6
2.288
35136
22243
48333
91626
11604
0.7
2.669
40992
14299
31071
98220
20095
Project
Job Ref.
Section
Sheet no./rev.
12
Date
11/10/2016
Chk'd by
Date
App'd by
Date
25000
98220 lb_in/ft, 20095 lb/ft
20000
15000
10000
5000
105000
90000
75000
60000
45000
30000
15000
-5000
V = 2656 lb/ft
Vn = min((4 - 1.75 min(M / (V tb), 1)) A (f'm 1 psi) + 0.25 P, 4
A (f'm 1 psi)) = 9626 lb/ft
v = 0.8
Vn = v Vn = 7701 lb/ft
V / Vn = 0.345
PASS - Design shear strength exceeds applied shear force
h = 18 in
M = 8832 lb_ft/ft
d = h - cbb - bb / 2 = 14.688 in
Project
Job Ref.
Section
Sheet no./rev.
13
Date
11/10/2016
Chk'd by
Date
App'd by
Date
c = a / 1 = 0.796 in
Strain in reinforcement;
t = 0.003 (d - c) / c = 0.052342
Section is in the tension controlled zone
Mn = f Mn = 29715 lb_ft/ft
M / Mn = 0.297
PASS - Design flexural strength exceeds factored bending moment
PASS - Area of reinforcement provided is greater than minimum area of reinforcement required
Rectangular section in shear - Chapter 11
Design shear force;
V = 5529 lb/ft
=1
s = 0.75
Vc = s Vc = 16721 lb/ft
V / Vc = 0.331
PASS - No shear reinforcement is required
h = 18 in
M = 6012 lb_ft/ft
d = h - cbt - bt / 2 = 15.687 in
c = a / 1 = 0.796 in
Strain in reinforcement;
t = 0.003 (d - c) / c = 0.05611
Mn = f Mn = 31786 lb_ft/ft
M / Mn = 0.189
PASS - Design flexural strength exceeds factored bending moment
Project
Job Ref.
Section
Sheet no./rev.
14
Date
11/10/2016
Chk'd by
Date
App'd by
Date
PASS - Area of reinforcement provided is greater than minimum area of reinforcement required
Rectangular section in shear - Chapter 11
Design shear force;
V = 4279 lb/ft
=1
s = 0.75
Vc = s Vc = 17859 lb/ft
V / Vc = 0.240
PASS - No shear reinforcement is required
3.812"
Reinforcement details
2"