WEEK 2.
Critical Path.
6. Critical Path.
a. Introduction to Critical Path. (W02.01).
b. Critical Path in a Project Schedule. (W02.02).
c. Determining the Number of Critical Paths in a Project. (W02.03).
d. Imposing Lag Durations in Critical Path. (W02.04).
e. Determining Critical Path in a Start to Start Relationship. (W02.05).
f. Determining Critical Path in a Finish to Finish Relationship.
(W02.06).
Activity Floats.
7. Activity Floats.
a. Types of Floats in a Construction Project. (W02.07).
b. Activity Floats. (W02.08).
c. Determining Total Float and Free Float. (W02.09).
d. Introduction to the Interfering Float. (W02.10).
e. Independent Float. (W02.11).
Project Delivery.
11.What is a Project and Project Development Cycle.
a. Project Development Cycle Part 1. (W02.01).
b. Project Development Cycle Part 2. (W02.02).
12.Construction Contract Types.
a. Contract Types. (W02.03).
13.Project Delivery Methods.
a. Project Delivery Methods. (W02.04).
b. Contract Strategy Assessment. (W02.05).
c. CM at Risk and CM as Agency. (W02.06).
d. Alliance Contracting and Public Private Partnership. (W02.07).
14.Types of Project Bonds.
a. Types of Surety Bonds. (W02.08).
b. Purchasing a Surety Bond. (W02.09).
c. Terminating a Surety Bond. (W02.10).
d. Surety Loss Data. (W02.11).
Lean Project Delivery.
15.Lean Project Delivery.
a. Project Delivery and the Theory of Lean. (W02.12).
b. Lean Design and Delivery. (W02.13).
c. Lean Design: Flow. (W02.14).
WEEK 3.
WEEK 4.
WEEK 5.