Anda di halaman 1dari 42

DANIEL ABARCA MORA

ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

MEMORIA DE CLCULO

PROYECTO:

CONSTRUCCION DE UN ASCENSOR
PANORAMICO Y DUCTO DE ESTRUCTURA
METALICA DE LA FILIAL PUERTO
MALDONADO-UAC

CUSCO, JUNIO DEL 2016

INDICE
MEMORIA DE CALCULO

Pgina 1 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

1.

ALCANCES DE ESTUDIO.

2.

ANALISIS DE TRFICO.

2.1

GENERALIDADES.

2.2

ANALISIS DE TRFICO CONSTRUCCION DE UN ASCENSOR


PANORAMICO Y DUCTO DE ESTRUCTURA METALICA DE LA FILIAL
DE PUERTO MALDONADO-UAC.

2.2.1
2.2.2
2.2.3
2.2.4
2.2.5
2.2.6
2.3

CALCULO DE PARAMETROS.
POBLACION.
TIEMPO TOTAL DE VIAJE.
NUMERO DE PARADAS PROBABLES.
CAPACIDAD DE TRANSPORTE.
INTERVALO DE TRFICO.
ANALISIS DE TRFICO DEL CONSTRUCCION DE UN ASCENSOR
PANORAMICO Y DUCTO DE ESTRUCTURA METALICA DE LA
FILIAL DE PUERTO MALDONADO-UAC.

2.3.1
CALCULO DE LA POBLACION DEL EDIFICIO.
2.3.2
CALCULO DEL NMERO DE PARADAS PROBABLES.
2.3.3
CALCULO DEL TIEMPO TOTAL DE VIAJE.
2.3.3.1
TIEMPO DE IDA Y VUELTA.
2.3.3.2
TIEMPO TOTAL DE ACELERACIN Y
DESACELERACION.
2.3.3.3
TIEMPO TOTAL DE APERTURA Y CIERRE DE
PUERTAS.
2.3.3.4
TIEMPO TOTAL DE ENTRADA Y SALIDA DE
PASAJEROS.
2.3.4
CALCULO DE LA CAPACIDAD DE TRANSPORTE POR CADA
5 MINUTOS.
2.3.5
CALCULO DE LA CAPACIDAD DE TRFICO.
2.3.6
INTERVALO DE TRFICO.
2.3.7
INTERVALO DE TRAFICO MAXIMO.

1.

ALCANCES DE ESTUDIO
En este captulo se desarrolla el anlisis de trfico para la universidad
andina del cusco filial puerto Maldonado. el cual es un parmetro, que

MEMORIA DE CALCULO

Pgina 2 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

permitir seleccionar una serie de caractersticas como modelo, tambin


nos permite seleccionar el nmero de ascensores en el proyecto
determinado as como la capacidad de los mismos, puesto que esta se
encuentra directamente relacionada con la poblacin que utiliza el
equipo de transporte vertical y a su vez influye en sumo grado con el
objetivo de mantener las condiciones originales de funcionamiento del
elevador.
3.

ANALISIS DE TRFICO
2.1

GENERALIDADES
El anlisis de trfico es un sistema de clculo que permite a los
proyectos de construccin conocer los parmetros que intervienen
en la proyeccin del sistema vertical de la edificacin, disponer de
diferentes alternativas que garanticen la buena calidad de los
equipos y la ejecucin dentro de los parmetros recomendados
por las normas recomendadas en esta materia y de encontrar
soluciones actuales y cnsona con las particularidades propias del
edificio.
Cabe destacar que los clculos realizados en este captulo estn
basados en modelos matemticos en los cuales se toman todos
los parmetros que intervienen en la especificacin del ascensor
los cuales se encuentran en la Norma de la Asociacin Brasilea
de Normas Tcnicas NBR la cual tomamos como modelo base para
nuestro anlisis.
El siguiente anlisis de trfico contempla:
Datos de la edificacin suministrados por el cliente.
Definicin de las variables que intervienen en los clculos de
trfico.
Variables utilizadas en el anlisis.
Recomendaciones de normas internacionales.

2.2

ANALISIS DE TRFICO CONSTRUCCION DE UN ASCENSOR


PANORAMICO Y DUCTO DE ESTRUCTURA METALICA DE LA
FILIAL DE PUERTO MALDONADO-UAC.
En una edificacin el sistema de transporte vertical puede o no
satisfacer la demanda en un momento dado de modo que el flujo
de trfico analiza a fin de determinar el periodo crtico y en que
parte del da se encuentra la mayor demanda de usuarios de esta
manera estimar primeramente la calidad de servicio que el
sistema est en capacidad de prestar y en segundo trmino la
cantidad de servicio que esta puede cubrir.

MEMORIA DE CALCULO

Pgina 3 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

A continuacin se presenta el procedimiento del clculo de trfico en


cualquier tipo de edificacin.

2.2.1 CALCULO DE PARAMETROS


2.2.2 POBLACION
El factor bsico en un estudio de trfico vertical, es sin duda
la poblacin del edificio que usara el sistema de transporte. La
forma de medir este parmetro es a travs del nmero estimado
de personas que necesitan el uso del transporte vertical, el tipo de
edificacin a construirse, el rea neta en cada nivel del edificio, el
rea til del edificio, puestos de estacionamiento, entre otros. Esta
informacin debe ser suministrada por el propietario o el
arquitecto de la obra al momento de solicitar el anlisis de trfico.
La actividad a la que se destina el edificio es la base para iniciar el
proceso de clculo de la poblacin.

La NBR recomienda que en cualquier edificacin se puede


descontar el 50% de la poblacin que se encuentre un piso arriba
y un piso debajo de la planta de acceso principal (planta base)
siempre y cuando estn situados a una distancia no mayor a 5 m.
Adicionalmente se puede hacer un descuento del 30% de la
poblacin a los pisos superiores a los anteriores que estn
contenidos dentro de una distancia no mayor de los 12 m.
MEMORIA DE CALCULO

Pgina 4 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

La capacidad de transporte se expresa como el porcentaje de la


poblacin del edificio que requiere el servicio del elevador y que
pueden ser evacuadas
o transportadas por el sistema de
transporte vertical en un periodo tpico de 5 minutos y depende de
la categora del edificio as:

2.2.3 TIEMPO TOTAL DE VIAJE


Es definido como el tiempo necesario para efectuar un
circuito completo, entonces en trminos prcticos representa la
suma de de todos los tiempos empleados por la cabina desde que
sale de una planta en direccin ascendente y regresa de nuevo a
ella.
El tiempo total de viaje es otro parmetro en el anlisis, para lo
que se aplica la siguiente ecuacin:

T =T 1 +T 2+ 1.1( T 3 +T 4 )
Donde:
T:
T1:
T2:

T3:

T4:

MEMORIA DE CALCULO

Tiempo total de viaje del ascensor


Tiempo de ida y vuelta entre los pisos extremos
Tiempo total de aceleracin y desaceleracin
(resultado de multiplicar el nmero
de paradas
probables por los tiempos descritos en la tabla 1.3.3 y
dividido para 2)
Tiempo total de apertura y cierre de puertas
(resultado de multiplicar el nmero de paradas
probables por el tiempo de apertura y cerrado de
puertas en una parada, tabla 1.3.4)
Tiempo total de entrada y salida de pasajeros
(resultado de multiplicar el nmero de pasajeros por
el tiempo dado en la tabla 1.3.5)

Pgina 5 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

2.2.4 NUMERO DE PARADAS PROBABLES.


Es el nmero probable de veces que un ascensor se
detendr durante su viaje ascendente o descendente, segn sea
el caso del pico, en los pisos ubicados por encima de la planta
principal en un viaje completo.
El nmero de paradas probables se calcula con la tabla 1.3.6 y la
siguiente ecuacin:

N=P( P1 )

P2
P1

Donde:
N:
P:
C:

Nmero de paradas probables


Nmero de paradas del elevador
Capacidad de la cabina

2.2.5 CAPACIDAD DE TRANSPORTE.


Est relacionado con el nmero de personas que el sistema
de transporte vertical puede transportar durante el periodo crtico
de 5 min en la demanda de trfico.
Para proceder con los clculos se debe obtener la capacidad de
transporte del elevador en cinco minutos mediante.
MEMORIA DE CALCULO

Pgina 6 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

Ct =

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

L300
T
Donde:
Ct:
L:
T:
La ecuacin

Capacidad de transporte (pasajeros)


Capacidad de la cabina
Tiempo del viaje (s)
siguiente permite obtener la capacidad de trfico:

Donde:
CT:
Ct1:
Ct2:
Ct3:

Capacidad
Capacidad
Capacidad
Capacidad

CT =C t 1 +Ct 2+ +C tn

de
de
de
de

trafico
transporte del ascensor 1
transporte del ascensor 2
transporte del ascensor 3

2.2.6 INTERVALO DE TRFICO.

I=

T
ne

Es el espacio de tiempo existente entre las cabinas de un


grupo de ascensores que parten desde la planta principal y
realizan un viaje completo durante el pico de trfico.
Convencionalmente se considera el pico de trfico en subida para
edificios de oficina, en subida y bajada para hoteles y hospitales y
piso en bajada para edificios residenciales. Este lapso de tiempo
mide la calidad de servicio que el sistema de transporte vertical
est en capacidad de mantener.
El intervalo de trfico se obtiene mediante la siguiente ecuacin:

Donde:
I:
Intervalo de trafico
T:
Tiempo total del viaje en segundos
ne:
Numero de elevadores del grupo
En el siguiente cuadro se muestran los parmetros establecidos
que determinan el intervalo de trfico.

MEMORIA DE CALCULO

Pgina 7 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

El tiempo de espera de los pasajeros en los vestbulos de los


ascensores, no debe exceder los siguientes intervalos:

La ejecucin del anlisis del trfico para el edificio en el cual se


encuentra el ascensor y que es motivo de estudio en la presente
memoria de clculo se efectuara a continuacin.
Se debe mencionar que los valores obtenidos sern los que
determinen el funcionamiento del elevador, en el mejor de los
casos y dependiendo de la optimizacin de las funciones del
control.
2.3

ANALISIS DE TRFICO DEL CONSTRUCCION DE UN ASCENSOR


PANORAMICO Y DUCTO DE ESTRUCTURA METALICA DE LA FILIAL
DE PUERTO MALDONADO-UAC.
2.3.1 CALCULO DE LA POBLACION DEL EDIFICIO.
Primeramente para realizar este clculo ser realizada en
base a la Norma de la Asociacin Brasilea de Normas Tcnicas
NBR con las condiciones descritas anteriormente como el tipo de
servicio que ofrecer el edificio y tambin se utilizara para dicho
calculo los factores mostrados en la Tabla 1.3.1 los cuales indican

MEMORIA DE CALCULO

Pgina 8 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

el nmero de personas por unidad de rea el clculo de la


poblacin del bloque se realiz en una hoja de clculo.

MEMORIA DE CALCULO

Pgina 9 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

MEMORIA DE CALCULO

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

Pgina 10 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

Por tanto calculamos la poblacin del edificio que requiere el servicio


del elevador y que pueden ser evacuadas o transportadas por el
sistema de transporte vertical en un periodo tpico de 5 min el cual
depende de la categora del edificio, utilizamos la Tabla 1.3.2
resultando que para universidades se debe considerar un 20% de la
poblacin total entonces
% MIN. TRANSP. EN 5 min /cada ascensor = 119 personas
Se debe tener en cuenta que el nmero de paradas de la edificacin
es de 5

MEMORIA DE CALCULO

Pgina 11 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

2.3.2 CALCULO DEL NMERO DE PARADAS PROBABLES.


El nmero de paradas probables se calcula a partir de la
siguiente formula:

N=P(P1)

P2
P1

Donde:
N:
Nmero de paradas probables
P:
Nmero de paradas (5 paradas)
C:
Capacidad de la cabina (10 pasajeros)
Entonces para nuestro caso empleando la formula anterior
determinamos el nmero de paradas probables
N = 4.77
2.3.3 CALCULO DEL TIEMPO TOTAL DE VIAJE
El tiempo total de viaje tambin es otro parmetro muy
importante que ayudara en nuestro anlisis para lo que se aplica
la siguiente ecuacin.
T= T1+T2+1.1*(T3+T4)
Donde:
T1:
tiempo de ida y vuelta
T2:
tiempo total de aceleracin y desaceleracin
(resultado de multiplicar el nmero de paradas
probables por los tiempos descritos en la Tabla 1.3.3 y
dividido para 2)
T3:
tiempo total de apertura y cierre de puertas
(resultado de multiplicar el nmero de paradas
probables por el tiempo de apertura y cerrado de
puertas en una parada Tabla 1.3.4)
T4:
tiempo total de entrada y salida de pasajeros
(resultado de multiplicar el nmero de pasajeros por
el tiempo dado en la Tabla1.3.5)
2.3.3.1

TIEMPO DE IDA Y VUELTA.

Es el cociente entre la altura de viaje y la


velocidad promedio del ascensor multiplicada por 2
(ida y vuelta)

T 1=

de viaje
2
( altura
velocidad )
Para este bloque se tendr que:
Altura de viaje = 14 m

MEMORIA DE CALCULO

Pgina 12 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

Velocidad = 1 m/s
Entonces:
T1= 28 seg.
2.3.3.2

T 2=

2.75N
2

TIEMPO
TOTAL
DE
ACELERACIN
Y
DESACELERACION.
Para obtener este valor ser necesario utilizar
la Tabla 1.3.3 y determinar un factor segn
la
velocidad del ascensor entonces para una velocidad
de 1 m/s se obtiene un factor de 2.75 por tanto.

Donde:
N:
Nmero de paradas probables
Entonces
determinamos el tiempo total
aceleracin y desaceleracin
T2= 6.558 seg.

de

2.3.3.3

TIEMPO TOTAL DE APERTURA Y CIERRE DE


PUERTAS.
Para obtener este valor ser necesario utilizar
la Tabla 1.3.3 y determinar un factor segn el tipo de
apertura del ascensor entonces para un ascensor de
apertura central (AC) se obtiene un factor de 3.9 por
tanto:
T3 = 5.5*N
Donde:
N:
Nmero de paradas probables
Entonces determinamos el tiempo total de apertura y
cierre de puertas
T3 = 26.235 seg.

2.3.3.4

TIEMPO TOTAL DE ENTRADA Y SALIDA DE


PASAJEROS.

Para obtener este valor ser necesario utilizar


la Tabla 1.3.3 y determinar un factor segn la longitud
de apertura del ascensor entonces para un ascensor
con una longitud de apertura de apertura de puerta
menor a 1.1 se obtiene un factor de 2.4 por tanto:
T4 = 2.4*C
Donde:
MEMORIA DE CALCULO

Pgina 13 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

C:
Capacidad de cabina (10 pasajeros)
Entonces determinamos el tiempo total de apertura y
cierre de puertas

T4 = 24 seg.
Ahora calculamos el TIEMPO TOTAL DE VIAJE del
ascensor resultando
T= 89.82 seg.
2.3.4 CALCULO DE LA CAPACIDAD DE TRANSPORTE POR
CADA 5 MINUTOS.
Para realizar este clculo se utilizara la siguiente formula

L300
Ct=
T

Donde:
Ct:
Capacidad de transporte (pasajeros)
L:
Capacidad de la cabina (10 pasajeros)
T:
Tiempo total del viaje (seg)
Entonces con estos valores calculamos la capacidad de pasajeros
Ct = 33.4 pasajeros, aprox. 34 pasajeros
Este valor indica que el ascensor puede
transportar
aproximadamente 34 pasajeros cada 5 min, que es 5.6% del total
de la poblacin, el cual es inferior al nmero exigido por la norma
(20%).
Para alcanzar el 20% de la poblacin en transporte es necesario
que se instalen 4 ascensores de 10 personas
2.3.5 CALCULO DE LA CAPACIDAD DE TRFICO.
Utilizaremos la siguiente formula
CT=Ct1+Ct2++Ctn
Donde:
CT:
Capacidad de trafico
Ct1: Capacidad de transporte de ascensor 1
Ct2: Capacidad de transporte del ascensor 2
Ct3: Capacidad de transporte del ascensor n
Por tanto como este bloque tiene un ascensor la capacidad de
trfico ser:
CT = 33.4*1
CT =33.4 =34 personas
MEMORIA DE CALCULO

Pgina 14 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

2.3.6 INTERVALO DE TRFICO.

I=

Se calcula con la siguiente formula

T
ne

Donde:
I:
T:
Ne:

Intervalo de trafico
Tiempo total del viaje
Numero de ascensores (1 ascensores)

Luego determinamos el intervalo de trfico


I = 89.8 seg.
Lo cual es muy superior a lo exigido por la norma (40seg), por lo que para
alcanzar el intervalo de trfico optimo se requiere como mnimo 3 ascensores.
2.3.7 INTERVALO DE TRAFICO MAXIMO.
Este valor se calcula a partir de la Tabla 1.3.7 segn el
nmero de ascensores
Resultando 40 seg.

MEMORIA DE CALCULO

Pgina 15 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

MEMORIA DE CLCULO ESTRUCTURAL DE LA


CAJA DE ASCENSOR
OBRA:

ADECUACION DE UN ASCENSOR PARA EL PABELLON DE


LA
FILIAL
DE
PUERTO
MALDONADO
DE
LA
UNIVERSIDAD ANDINA DEL CUSCO.

FECHA:

JUNIO DEL 2016.

1.0 INTRODUCCIN

La Universidad Andina del Cusco, es una universidad privada que imparte


educacin superior el cual es articulado, organizado, eficiente y generador de
conocimiento, tecnologa y profesionales del ms alto nivel para atender a las
distintas demandas sociales.
En tal sentido se hace necesaria la implementacin de instalaciones especiales
en el Edificio pabelln de la FILIAL DE PUERTO MALDONADO de la
Universidad Andina del Cusco y por ende la Elaboracin de un EXPEDIENTE
TCNICO en el cual se detallen las caractersticas constructivas para la
implementacin de dichas instalaciones.
Por tal motivo se ha Elaborado el presente Expediente Tcnico denominado
PROYECTO DE UN ASCESOR PANORAMICO Y DUCTO DE ESTRUCTURA
METALICA DE LA FILIAL DE PUERTO MALDONADO DE LA UNIVERSIDAD
ANDINA DEL CUSCO, que consiste en la elaboracin de las Especificaciones
Tcnicas Generales, Planos de distribucin, equipamiento y Presupuestos,
necesarias para el suministro e instalacin de los mismos.

2.0 CONCEPCIN ESTRUCTURAL DE LA CAJA DEL ASCENSOR


Para el suministro del ascensor se ha considerado, instalar un ascensor
elctrico sin cuarto de mquina en la parte superior del ducto, de tal manera
que se tenga un adecuado mantenimiento de la mquina.
MEMORIA DE CALCULO

Pgina 16 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

En ese entender toda la carga del peso de la cabina del ascensor y el


contrapeso son soportados por una loza que se ubica en la parte superior del
ducto, carga que es transmitida hacia la cimentacin mediante las paredes del
ducto del ascensor.
El pabelln de la filial de puerto Maldonado-UAC, no han sido concebidos en su
diseo para tener un ascensor por lo cual no se ha proyectado un ducto de
ascensor. En ese sentido y por la esbeltez de los ductos del ascensor se
propone realizar un ducto de ascensor en estructura metlica, y as facilitar el
proceso constructivo
Esta estructura metlica ser cubierta en su totalidad con paredes de vidrio, en
los lados laterales y PAC en la parte frontal o acceso del ascensor.
En ese sentido la estructura metlica deber ser capaz de soportar estas
cargas adicionales de vidrio y PAC, cuarto de mquinas, y dems cargas

3.0 DE LAS CARGAS APLICADAS


Cargas Muertas
Peso Propio: Conformadas por el peso de la estructura, y peso del vidrio
(cobertura de la caja del ascensor), Los elementos
estructurales de acero tienen un peso especfico de 7850
kgf/cm, y para el peso especfico del vidrio se ha
considerado un peso especfico de 2500 kgf/m.
Cargas Vivas
Nieve: La estructura de la caja del ascensor se encuentra
expuesta y ser necesario considerar esta carga.
Viento: la estructura de la caja del ascensor se encuentra
expuesta por lo que ser necesario considerar esta carga
de acuerdo al reglamento nacional de edificaciones.
Sismo: ser necesario considerar esta carga de acuerdo al
reglamento nacional de edificaciones.
Cabina del ascensor: Una de las partes mviles ms
importantes del ascensor viene a ser la cabina, la cual tiene
un peso aproximado de 1800Kgf, para un ascensor de 8
personas.
Contrapeso del ascensor: El pistn de ascensor es otra de las
partes mviles del ascensor, la cual tiene un peso
aproximado de 900Kgf, para un ascensor de 8 personas.
MEMORIA DE CALCULO

Pgina 17 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

Cargas de Montaje
Carga de instalacin: en la parte superior de la estructura
metlica ser necesario instalar un gancho de Izaje el cual
deber soportar por seguridad una carga de 1500Kg, solo
en el momento del montaje del ascensor.
4.0 ANLISIS ESTRUCTURAL.
El anlisis estructural de la caja del ascensor, consiste en determinar los
esfuerzos debido a las cargas que soportara durante su vida til. Para ello se
calculan las diversas condiciones de carga sobre los diferentes elementos
estructurales tales como Columnas, vigas y arrostramientos las cuales se
verificaran su resistencia a los diferentes esfuerzos que generan los diferentes
tipos cargas.
Las Normas aplicadas para el diseo son las siguientes:
Norma tcnica E-0.20 Cargas.
Norma tcnica E-0.30 Sismoresistente.
Norma tcnica E-0.50 Suelos
Norma tcnica E-0.60 Concreto Armado.
Todas las Normas Tcnicas anteriores estn
Reglamento Nacional de Edificaciones (RNE).

contempladas

dentro

del

Para una de las combinaciones del anlisis estructural, se ha considerado la


carga de montaje, ms la carga de viva del ascensor y se incluye la carga
muerta como si actuasen al mismo tiempo, esto para darle mayor fiabilidad a
la estructura.
Para el clculo de los diferentes elementos estructurales se han empleado los
siguientes programas:
CYPECAD Versin 2016p.
5.0

MODELAMIENTO DE LA ESTRUCTURA

El modelamiento de la estructura se hizo de la forma ms real posible,


obteniendo el siguiente modelo y los siguientes resultados para los dos casos
de prticos.
La Estructura proyectado, deber auto soportarse por s misma, no tendr
contacto directo con la edificacin existente, y por ende la masa de este, en
caso de un sismo no afectara a la edificacin existente.

MEMORIA DE CALCULO

Pgina 18 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

En ese sentido se ha modelado la estructura con 4 columnas espaciadas a 2


metros cada una, de tal manera que existe una homogeneidad geomtrica, ya
que la esbeltez de la estructura es importante.
Cada 3.24m de alto, se proyectan vigas que unen a las cuatro columnas y para
las cargas horizontales se han considerado en cada nivel cruces de San Andrs
que le dan una estabilidad importante a la estructura proyectada.
A continuacin se nuestra el modelo geomtrico para la estructura metlica
proyectada

VISTA ISOMETRICA

VISTA LATERAL

VISTA DE PLANTA

MEMORIA DE CALCULO

Pgina 19 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

Fig. N1, Modelamiento geomtrico de la estructura

Fig. N2, Modelamiento geomtrico de la estructura

MEMORIA DE CALCULO

Pgina 20 de 42

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

Fig. N3, Modelamiento geomtrico de la estructura

6.0

RESULTADOS DEL MODELAMIENTO ESTRUCTURAL EN EL


PROGRAMA CYPECAD
NDICE

1.- ESTRUCTURA

22
22
22
33

1.1.- Resultados
1.1.1.- Barras
1.1.2.- Sismo
2.- CIMENTACIN

36
36
36
36
38

2.1.- Elementos de cimentacin aislados


2.1.1.- Descripcin
2.1.2.- Medicin
2.1.3.- Comprobacin

MEMORIA DE CALCULO

Pgina 21 de 42

1.- ESTRUCTURA
1.1.- Resultados
1.1.1.- Barras
1.1.1.1.- Resistencia
Referencias:
N: Esfuerzo axil (t)
Vy: Esfuerzo cortante segn el eje local Y de la barra. (t)
Vz: Esfuerzo cortante segn el eje local Z de la barra. (t)
Mt: Momento torsor (tm)
My: Momento flector en el plano 'XZ' (giro de la seccin respecto al eje local 'Y' de la barra). (tm)
Mz: Momento flector en el plano 'XY' (giro de la seccin respecto al eje local 'Z' de la barra). (tm)
Los esfuerzos indicados son los correspondientes a la combinacin psima, es decir, aquella que demanda la
mxima resistencia de la seccin.
Origen de los esfuerzos psimos:

G: Slo gravitatorias
GV: Gravitatorias + viento
GS: Gravitatorias + sismo
GVS: Gravitatorias + viento + sismo

: Aprovechamiento de la resistencia. La barra cumple con las condiciones de resistencia de la norma si se


cumple que 100 %.

Barra

(%)

Posicin
(m)

Comprobacin de resistencia
Esfuerzos psimos
Vy
(t)
0.128

Vz
(t)
-0.646

Mt
(tm)
0.001

My
(tm)
0.365

Mz
(tm)
-0.076

Origen

Estado

N2/N47

26.11

1.000

N
(t)
-0.135

GS

Cumple

N47/N4
N6/N48

26.62
26.48

0.000
1.000

-0.214
-0.263

0.134
0.128

0.642
-0.630

-0.001
-0.001

0.364
0.369

0.078
-0.076

GS
GS

Cumple
Cumple

N48/N8
N1/N3

26.29
21.04

0.000
2.000

-0.190
-0.589

0.126
-0.104

0.678
0.060

0.001
-0.003

0.370
-0.055

0.075
0.104

GS
G

Cumple
Cumple

N1/N63
N63/N5

25.45
25.45

1.000
0.000

-0.860
-0.860

0.302
-0.315

0.010
0.010

-0.005
-0.005

0.003
0.003

-0.190
-0.190

G
G

Cumple
Cumple

N5/N7
N3/N76

40.51
25.44

2.000
1.000

-1.042
1.068

0.111
0.302

0.861
-0.012

0.000
-0.005

-0.850
0.001

-0.111
-0.190

G
G

Cumple
Cumple

N76/N7
N13/N17

25.44
20.54

0.000
2.000

1.068
0.383

-0.316
-0.138

-0.012
0.029

-0.005
-0.002

0.001
-0.023

-0.190
0.138

G
G

Cumple
Cumple

N17/N70
N70/N25

26.56
26.56

1.000
0.000

2.054
2.054

0.352
-0.265

0.004
0.004

-0.002
-0.002

0.000
0.000

-0.185
-0.185

G
G

Cumple
Cumple

N21/N25

19.96

2.000

0.112

-0.023

0.570

0.000

-0.559

0.023

GV

Cumple
Pgina 22

Barra

(%)

Posicin
(m)

Comprobacin de resistencia
Esfuerzos psimos
Origen

Estado

N13/N64

24.93

1.000

N
(t)
-1.034

Vy
(t)
0.352

Vz
(t)
0.006

Mt
(tm)
-0.002

My
(tm)
0.000

Mz
(tm)
-0.185

Cumple

N64/N21
N14/N18

24.93
22.24

0.000
2.000

-1.034
0.345

-0.265
-0.151

0.006
0.029

-0.002
-0.003

0.000
-0.023

-0.185
0.151

G
G

Cumple
Cumple

N18/N71
N71/N26

25.58
25.58

1.000
0.000

1.453
1.453

0.367
-0.251

0.001
0.001

0.000
0.000

0.001
0.001

-0.185
-0.185

G
G

Cumple
Cumple

N22/N26
N14/N65

18.27
24.09

2.000
1.000

0.102
-0.552

-0.036
0.367

0.465
0.005

0.000
0.000

-0.454
0.000

0.037
-0.185

GV
G

Cumple
Cumple

N65/N22
N15/N19

24.09
21.16

0.000
2.000

-0.552
0.320

-0.251
-0.149

0.005
0.023

0.000
-0.003

0.000
-0.017

-0.185
0.149

G
G

Cumple
Cumple

N19/N72
N72/N27

24.79
24.79

1.000
0.000

1.024
1.024

0.364
-0.254

0.003
0.003

0.000
0.000

0.001
0.001

-0.185
-0.185

G
G

Cumple
Cumple

N23/N27
N15/N66

14.68
23.42

2.000
1.000

0.089
-0.226

-0.033
0.364

0.363
0.005

0.000
0.000

-0.352
0.000

0.033
-0.185

GV
G

Cumple
Cumple

N66/N23
N16/N20

23.42
18.86

0.000
2.000

-0.226
0.278

-0.254
-0.135

0.005
0.019

0.000
-0.003

0.000
-0.013

-0.185
0.135

G
G

Cumple
Cumple

N20/N73
N73/N28

24.19
24.19

1.000
0.000

0.687
0.687

0.349
-0.269

0.003
0.003

0.001
0.001

0.001
0.001

-0.184
-0.184

G
G

Cumple
Cumple

N24/N28
N16/N67

11.91
22.98

2.000
1.000

0.077
0.011

0.045
0.349

0.229
0.003

0.000
0.001

-0.218
0.001

-0.045
-0.184

G
G

Cumple
Cumple

N67/N24
N29/N50

22.98
40.68

0.000
0.000

0.011
0.141

-0.269
-0.102

0.003
-1.517

0.001
0.001

0.001
-0.721

-0.184
-0.089

G
G

Cumple
Cumple

N50/N30
N30/N75

41.41
21.01

1.000
1.000

0.126
0.233

-0.104
0.327

1.532
-0.006

-0.001
0.000

-0.736
0.011

0.090
-0.182

G
G

Cumple
Cumple

N75/N31
N32/N51

21.01
34.67

0.000
0.000

0.233
0.067

-0.291
0.076

-0.006
-1.401

0.000
-0.001

0.011
-0.607

-0.182
0.078

G
G

Cumple
Cumple

N51/N31
N29/N69

43.51
20.74

1.000
1.000

0.081
0.103

0.078
0.327

1.648
-0.013

0.001
0.000

-0.853
0.008

-0.079
-0.181

G
G

Cumple
Cumple

N69/N32
N4/N8

20.74
8.20

0.000
2.000

0.103
0.027

-0.291
-0.045

-0.013
0.021

0.000
0.000

0.008
-0.007

-0.181
0.046

G
GS

Cumple
Cumple

N2/N6
N25/N33

7.99
4.58

0.000
0.000

0.058
0.008

-0.044
0.000

-0.021
-0.364

0.000
0.000

-0.009
-0.093

-0.044
0.008

GS
G

Cumple
Cumple

N34/N33
N21/N34

2.69
4.58

2.000
0.000

0.001
-0.008

0.009
0.000

0.006
-0.364

0.000
0.000

0.000
-0.092

-0.009
0.008

GV
G

Cumple
Cumple

N26/N35
N36/N35

4.20
3.02

0.000
2.000

0.006
0.001

-0.001
0.010

-0.364
0.006

0.000
0.000

-0.093
0.000

0.005
-0.010

G
GV

Cumple
Cumple

N22/N36
N27/N37

4.19
4.29

0.000
0.000

-0.006
0.006

0.001
0.000

-0.364
-0.364

0.000
0.000

-0.091
-0.093

0.006
0.006

G
G

Cumple
Cumple

N38/N37
N23/N38

2.90
4.27

2.000
0.000

0.001
-0.006

0.010
0.000

0.006
-0.364

0.000
0.000

0.000
-0.091

-0.010
0.006

GV
G

Cumple
Cumple

N28/N39
N40/N39

4.70
2.48

0.000
2.000

0.008
0.000

0.000
0.008

-0.364
0.006

0.000
-0.001

-0.093
0.000

0.008
-0.008

G
G

Cumple
Cumple

N24/N40
N41/N42

4.67
13.46

0.000
2.000

-0.008
0.413

0.000
-0.095

-0.364
0.013

0.000
-0.003

-0.091
-0.007

0.009
0.095

G
G

Cumple
Cumple

N42/N74
N74/N44

22.89
22.89

1.000
0.000

0.284
0.284

0.329
-0.289

0.007
0.007

0.002
0.002

-0.001
-0.001

-0.180
-0.180

G
G

Cumple
Cumple
Pgina 23

Barra

(%)

Posicin
(m)

Comprobacin de resistencia
Esfuerzos psimos
Origen

Estado

N43/N44

10.23

2.000

N
(t)
0.373

Vy
(t)
0.060

Vz
(t)
0.109

Mt
(tm)
0.000

My
(tm)
-0.101

Mz
(tm)
-0.060

Cumple

N41/N68
N68/N43

22.44
22.44

1.000
0.000

0.024
0.024

0.329
-0.289

0.008
0.008

0.002
0.002

-0.001
-0.001

-0.180
-0.180

G
G

Cumple
Cumple

N43/N45
N45/N46

7.59
2.52

0.000
2.000

-0.009
0.000

0.000
0.009

-0.422
0.006

0.000
-0.001

-0.213
0.000

0.009
-0.009

G
G

Cumple
Cumple

N44/N46
N47/N62

7.64
67.00

0.000
1.000

0.009
0.004

0.000
-0.248

-0.422
-1.272

0.000
0.000

-0.215
1.279

0.009
0.131

G
GS

Cumple
Cumple

N62/N48
N48/N49

66.96
0.19

0.000
0.000

0.003
0.000

0.212
0.000

1.278
-0.015

0.000
0.000

1.279
-0.006

0.130
0.000

GS
G

Cumple
Cumple

N50/N51
N52/N53

47.98
9.69

1.000
2.000

-0.002
0.096

0.015
0.001

0.000
0.036

0.000
-0.001

1.506
-0.032

0.012
-0.001

G
GV

Cumple
Cumple

N54/N55
N56/N57

7.56
6.19

2.000
2.000

0.085
0.075

0.001
0.000

0.029
0.024

-0.001
-0.001

-0.025
-0.020

-0.001
-0.001

GV
GV

Cumple
Cumple

N58/N59
N60/N61

5.08
3.99

2.000
2.000

0.073
0.018

-0.003
-0.003

0.018
0.014

-0.001
-0.001

-0.014
-0.010

0.003
0.003

G
G

Cumple
Cumple

N5/N13
N13/N22

71.17
51.97

0.000
0.000

-3.625
-2.715

0.000
0.000

-0.011
-0.007

0.000
0.000

-0.015
-0.002

0.000
0.000

GV
GV

Cumple
Cumple

N22/N15
N15/N24

43.50
30.91

0.000
0.000

-2.240
-1.588

0.000
0.000

-0.008
-0.007

0.000
0.000

-0.006
-0.005

0.000
0.000

GV
GV

Cumple
Cumple

N24/N41
N41/N32

21.32
3.65

0.000
2.283

-1.058
0.301

0.001
0.007

-0.007
0.008

0.002
-0.002

-0.005
-0.003

0.003
-0.014

GV
GS

Cumple
Cumple

N32/N2
N1/N21

4.63
68.84

0.000
0.000

-0.271
-3.498

0.009
0.000

-0.007
-0.011

0.001
0.000

-0.004
-0.014

0.013
0.001

GS
GV

Cumple
Cumple

N21/N14
N14/N23

53.86
42.17

0.000
0.000

-2.806
-2.178

0.000
0.000

-0.007
-0.008

0.000
0.000

-0.004
-0.005

0.000
0.000

GV
GV

Cumple
Cumple

N23/N16
N16/N43

32.52
18.75

0.000
0.000

-1.634
-0.988

0.001
0.001

-0.008
-0.006

0.002
-0.001

-0.006
-0.004

0.003
0.001

GV
GV

Cumple
Cumple

N43/N29
N29/N6

5.33
4.72

0.000
0.000

-0.167
-0.295

0.008
-0.008

-0.011
-0.007

0.005
0.000

-0.008
-0.004

0.018
-0.013

G
GS

Cumple
Cumple

N7/N17
N17/N26

80.15
62.22

0.000
0.000

-4.064
-3.222

0.000
0.002

-0.012
-0.007

0.002
-0.001

-0.015
-0.003

0.004
0.004

GV
GV

Cumple
Cumple

N26/N19
N19/N28

47.74
35.08

0.000
0.000

-2.428
-1.789

0.001
0.002

-0.008
-0.008

0.002
-0.001

-0.007
-0.005

0.004
0.002

GV
GV

Cumple
Cumple

N28/N42
N42/N31

21.98
4.25

0.000
2.283

-1.092
0.094

0.001
0.008

-0.007
0.006

0.002
-0.002

-0.005
-0.001

0.003
-0.022

GV
G

Cumple
Cumple

N31/N4
N3/N25

3.61
83.22

3.010
0.000

-0.211
-4.246

-0.006
0.001

0.007
-0.011

0.000
-0.001

-0.003
-0.016

0.010
0.001

GS
GV

Cumple
Cumple

N25/N18
N18/N27

59.83
49.15

0.000
0.000

-3.084
-2.518

0.001
0.002

-0.008
-0.008

0.002
-0.001

-0.004
-0.005

0.004
0.003

GV
GV

Cumple
Cumple

N27/N20
N20/N44

34.86
21.85

0.000
3.808

-1.755
-1.061

0.001
0.001

-0.008
0.008

0.002
-0.001

-0.006
-0.007

0.003
-0.004

GV
GV

Cumple
Cumple

N44/N30
N30/N8

4.80
3.68

0.000
3.010

-0.081
-0.218

0.006
0.006

-0.011
0.007

0.004
0.000

-0.008
-0.003

0.017
-0.010

G
GS

Cumple
Cumple

N52/N25
N53/N21

38.49
51.77

0.000
0.000

-4.430
-6.025

0.006
-0.004

-0.035
-0.045

0.000
-0.001

-0.036
-0.048

0.003
-0.001

GV
GV

Cumple
Cumple
Pgina 24

Barra

(%)

Posicin
(m)

Comprobacin de resistencia
Esfuerzos psimos
Origen

Estado

N54/N26

31.12

2.232

N
(t)
-3.481

Vy
(t)
0.008

Vz
(t)
-0.015

Mt
(tm)
0.000

My
(tm)
0.021

Mz
(tm)
-0.015

GV

Cumple

N55/N22
N56/N27

41.57
24.77

2.232
2.232

-4.759
-2.741

-0.007
0.008

-0.023
-0.010

-0.001
0.000

0.029
0.016

0.013
-0.014

GV
GV

Cumple
Cumple

N57/N23
N58/N28

33.14
14.54

2.232
0.000

-3.775
-1.986

-0.006
0.006

-0.016
-0.020

-0.001
0.001

0.022
-0.018

0.012
0.002

GV
GV

Cumple
Cumple

N59/N24
N60/N44

24.00
8.57

0.000
0.000

-2.770
-1.171

-0.004
0.003

-0.025
-0.015

-0.001
0.001

-0.023
-0.012

0.000
0.000

GV
GV

Cumple
Cumple

N61/N43
N3/N13

12.04
100.00

0.000
0.000

-1.645
-5.335

0.000
-0.004

-0.017
-0.010

-0.002
0.002

-0.015
-0.010

0.002
-0.004

GV
GV

Cumple
Cumple

N1/N17
N17/N14

77.05
81.03

0.000
3.808

-3.980
-4.096

0.001
-0.008

-0.009
0.007

-0.001
0.001

-0.009
-0.002

-0.001
0.019

GV
GV

Cumple
Cumple

N13/N18
N18/N15

59.82
64.82

0.000
0.000

-3.060
-3.255

0.004
-0.008

-0.008
-0.008

-0.001
0.001

-0.005
-0.006

0.006
-0.013

GV
GV

Cumple
Cumple

N14/N19
N19/N16

47.47
47.13

0.000
0.000

-2.401
-2.337

0.004
-0.007

-0.008
-0.008

-0.001
0.001

-0.006
-0.006

0.006
-0.012

GV
GV

Cumple
Cumple

N15/N20
N20/N41

34.02
31.31

0.000
0.000

-1.703
-1.460

0.004
-0.010

-0.008
-0.008

0.000
0.000

-0.005
-0.005

0.005
-0.017

GV
G

Cumple
Cumple

N16/N42
N42/N29

19.09
9.03

0.000
0.000

-1.006
-0.313

0.002
-0.033

-0.007
-0.011

0.000
-0.001

-0.005
-0.007

0.003
-0.037

GV
G

Cumple
Cumple

N41/N30
N30/N2

8.17
3.58

0.000
0.000

0.381
-0.302

-0.033
-0.001

-0.010
-0.009

-0.001
-0.001

-0.004
-0.004

-0.037
-0.002

G
GS

Cumple
Cumple

N29/N4
N10/N1

3.79
39.51

0.000
0.000

-0.319
2.483

-0.002
0.000

-0.009
0.000

0.000
0.000

-0.004
0.000

-0.004
0.000

GS
GV

Cumple
Cumple

N10/N7
N11/N7

45.15
39.40

0.000
0.000

2.838
2.476

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

GV
GV

Cumple
Cumple

N11/N1
N9/N3

24.54
33.51

0.000
0.000

1.542
2.106

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

GV
GV

Cumple
Cumple

N12/N3
N12/N5

41.28
33.02

0.000
0.000

2.595
2.075

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

0.000
0.000

GV
GV

Cumple
Cumple

N9/N5
N9/N1

41.11
44.54

0.000
0.000

2.583
21.807

0.000
0.750

0.000
0.621

0.000
0.001

0.000
0.605

0.000
0.700

GV
GV

Cumple
Cumple

N1/N13
N13/N14

26.80
20.93

3.240
0.000

-18.636
-12.885

0.227
-0.218

0.273
-0.228

0.000
0.000

-0.232
-0.248

-0.125
-0.133

GV
GV

Cumple
Cumple

N14/N15
N15/N16

14.30
10.29

0.000
0.000

-8.127
-4.621

-0.214
-0.212

-0.201
-0.199

0.000
0.000

-0.144
-0.126

-0.119
-0.119

GV
GV

Cumple
Cumple

N16/N41
N41/N29

5.08
3.45

0.000
1.100

-2.329
-2.828

-0.224
0.001

-0.210
-0.312

0.000
0.000

-0.113
0.286

-0.128
-0.002

GV
G

Cumple
Cumple

N29/N2
N10/N5

5.63
43.67

2.250
0.000

-1.074
-18.937

-0.003
0.779

-0.409
0.283

-0.001
-0.001

0.497
0.602

0.004
0.709

G
GV

Cumple
Cumple

N5/N52
N52/N21

29.31
25.81

0.000
0.000

10.618
8.188

0.184
-0.108

1.986
-3.463

0.001
0.001

2.134
-2.102

0.067
-0.022

GV
GV

Cumple
Cumple

N21/N54
N54/N22

26.57
18.76

0.000
0.000

6.839
4.971

0.206
-0.090

1.661
-2.673

0.000
0.001

1.945
-1.578

0.114
-0.022

GV
GV

Cumple
Cumple

N22/N56
N56/N23

20.71
14.47

0.000
0.990

-7.608
-6.076

0.197
-0.214

-1.089
1.630

0.000
-0.001

-1.187
-0.626

0.094
0.126

GV
GV

Cumple
Cumple
Pgina 25


(%)

Barra

Comprobacin de resistencia
Esfuerzos psimos

Posicin
(m)

Origen

Estado

N23/N58

15.24

0.000

N
(t)
1.442

Vy
(t)
0.198

Vz
(t)
1.054

Mt
(tm)
0.000

My
(tm)
1.185

Mz
(tm)
0.097

GV

Cumple

N58/N24
N24/N60

11.15
10.98

0.990
0.000

-3.751
-0.265

-0.219
0.209

1.188
0.728

-0.001
0.000

-0.411
0.783

0.136
0.103

GV
GV

Cumple
Cumple

N60/N43
N43/N32

8.73
5.44

0.000
0.000

-2.492
-2.730

-0.027
-0.137

-0.742
-0.017

-0.001
0.000

-0.625
0.194

0.034
-0.127

G
G

Cumple
Cumple

N32/N6
N11/N3

6.02
52.64

0.000
0.000

-0.901
-30.378

0.164
-0.791

-0.451
0.562

0.000
0.001

-0.349
0.621

0.059
-0.719

GV
GV

Cumple
Cumple

N3/N17
N17/N18

34.48
26.38

3.240
0.000

-25.131
-17.336

0.231
-0.219

-0.302
0.240

0.001
0.000

0.281
0.299

-0.128
-0.136

GV
GV

Cumple
Cumple

N18/N19
N19/N20

17.56
12.18

0.000
0.000

-10.962
-6.247

-0.214
-0.213

0.204
0.202

0.000
0.000

0.160
0.135

-0.120
-0.120

GV
GV

Cumple
Cumple

N20/N42
N42/N30

5.56
4.36

0.000
1.100

-3.154
-2.966

-0.225
-0.012

0.214
0.320

0.000
0.000

0.115
-0.367

-0.128
0.010

GV
G

Cumple
Cumple

N30/N4
N12/N7

5.76
49.12

2.250
0.000

-0.947
-28.606

-0.009
0.727

0.391
0.255

-0.001
-0.001

-0.499
0.605

0.010
0.659

G
GV

Cumple
Cumple

N7/N53
N53/N25

39.90
32.09

0.000
0.000

-19.483
-16.552

0.197
-0.089

2.054
-3.443

0.000
0.001

2.158
-2.090

0.093
-0.025

GV
GV

Cumple
Cumple

N25/N55
N55/N26

33.51
23.99

0.000
0.000

-14.586
-12.228

0.189
-0.095

1.733
-2.652

0.000
0.001

1.978
-1.566

0.078
-0.021

GV
GV

Cumple
Cumple

N26/N57
N57/N27

26.68
18.59

0.000
0.000

-10.395
-8.483

0.192
-0.092

1.431
-2.085

0.000
0.001

1.599
-1.277

0.086
-0.020

GV
GV

Cumple
Cumple

N27/N59
N59/N28

20.04
13.78

0.000
0.990

-6.833
-5.291

0.190
-0.224

1.124
-1.610

0.000
0.001

1.216
0.557

0.086
0.141

GV
GV

Cumple
Cumple

N28/N61
N61/N44

14.22
9.63

0.000
0.000

-3.936
-4.329

0.204
-0.038

0.794
-0.767

0.000
-0.001

0.811
-0.611

0.098
0.025

GV
G

Cumple
Cumple

N44/N31
N31/N8

6.34
6.84

0.000
2.250

-2.150
-1.218

-0.041
0.015

0.501
0.438

0.000
0.001

0.374
-0.583

-0.039
-0.012

GS
G

Cumple
Cumple

1.1.1.2.- Comprobaciones E.L.U. (Resumido)


Barras

COMPROBACIONES (ANSI/AISC 360-05 (LRFD))


c

Pt

N2/N47

x: 0 m
= 0.1

200.0
Cumple

N47/N4

x: 1 m
= 0.1

N6/N48

Pc

Mx

My

= 0.8

x: 1 m
= 22.2

x: 1 m
= 8.5

200.0
Cumple

x: 1 m
= 0.8

x: 0 m
= 22.2

= 0.1

200.0
Cumple

= 0.9

N48/N8

= 0.1

200.0
Cumple

N1/N3

= 3.5

N1/N63
N63/N5

Vx

Estado
Vy

PMxMyVxVyT

= 0.6

x: 0 m
= 8.3

x: 1 m
= 26.1

CUMPLE
= 26.1

x: 0 m
= 8.8

x: 1 m
= 0.6

x: 1 m
= 8.3

x: 0 m
= 26.6

CUMPLE
= 26.6

x: 1 m
= 22.4

x: 1 m
= 8.5

= 0.6

x: 0 m
= 7.8

x: 1 m
= 26.5

CUMPLE
= 26.5

= 1.0

x: 0 m
= 22.4

x: 0 m
= 8.5

x: 1 m
= 0.6

x: 1 m
= 8.9

x: 0 m
= 26.3

CUMPLE
= 26.3

200.0
Cumple

= 4.0

x: 2 m
= 8.1

x: 0 m
= 12.9

= 1.2

x: 2 m
= 0.8

x: 2 m
= 21.0

CUMPLE
= 21.0

= 3.3

200.0
Cumple

= 4.8

x: 0 m
= 10.5

x: 1 m
= 23.5

= 3.6

x: 0 m
= 1.1

x: 1 m
= 25.4

CUMPLE
= 25.4

= 3.3

200.0
Cumple

= 4.8

x: 1 m
= 10.8

x: 0 m
= 23.5

= 3.7

x: 1 m
= 1.1

x: 0 m
= 25.4

CUMPLE
= 25.4

Pgina 26

Barras

COMPROBACIONES (ANSI/AISC 360-05 (LRFD))


c

Pt

Pc

Mx

My

Vx

Estado
Vy

PMxMyVxVyT

N5/N7

= 0.4

200.0
Cumple

N3/N76

= 4.3

200.0
Cumple

= 4.0

x: 0 m
= 11.0

x: 1 m
= 23.6

= 3.6

x: 0 m
= 1.1

x: 1 m
= 25.4

CUMPLE
= 25.4

N76/N7

= 4.3

200.0
Cumple

= 4.0

x: 1 m
= 10.4

x: 0 m
= 23.6

= 3.7

x: 1 m
= 1.1

x: 0 m
= 25.4

CUMPLE
= 25.4

N13/N17

= 6.3

200.0
Cumple

= 4.3

x: 2 m
= 3.3

x: 0 m
= 17.1

= 1.6

x: 2 m
= 0.4

x: 2 m
= 20.5

CUMPLE
= 20.5

N17/N70

= 8.1

200.0
Cumple

= 3.1

x: 0 m
= 0.7

x: 1 m
= 23.0

= 4.2

x: 0 m
= 0.1

x: 1 m
= 26.6

CUMPLE
= 26.6

N70/N25

= 8.1

200.0
Cumple

= 3.1

x: 1 m
= 1.2

x: 0 m
= 23.0

= 3.1

x: 1 m
= 0.2

x: 0 m
= 26.6

CUMPLE
= 26.6

N21/N25

= 1.0

200.0
Cumple

= 0.6

x: 2 m
= 17.3

x: 0 m
= 5.5

= 0.2

x: 2 m
= 4.2

x: 2 m
= 20.0

CUMPLE
= 20.0

N13/N64

= 6.2

200.0
Cumple

= 4.4

x: 0 m
= 0.7

x: 1 m
= 23.0

= 4.2

x: 0 m
= 0.1

x: 1 m
= 24.9

CUMPLE
= 24.9

N64/N21

= 6.2

200.0
Cumple

= 4.4

x: 1 m
= 1.3

x: 0 m
= 23.0

= 3.1

x: 1 m
= 0.2

x: 0 m
= 24.9

CUMPLE
= 24.9

N14/N18

= 4.5

200.0
Cumple

= 2.2

x: 2 m
= 3.3

x: 0 m
= 18.8

= 1.8

x: 2 m
= 0.4

x: 2 m
= 22.2

CUMPLE
= 22.2

N18/N71

= 5.7

200.0
Cumple

= 1.6

x: 0 m
= 2.3

x: 1 m
= 23.0

= 4.3

x: 0 m
= 0.3

x: 1 m
= 25.6

CUMPLE
= 25.6

N71/N26

= 5.7

200.0
Cumple

= 1.6

x: 1 m
= 2.7

x: 0 m
= 23.0

= 3.0

x: 1 m
= 0.3

x: 0 m
= 25.6

CUMPLE
= 25.6

N22/N26

= 0.8

200.0
Cumple

= 0.3

x: 2 m
= 14.1

x: 0 m
= 6.2

= 0.3

x: 2 m
= 3.4

x: 2 m
= 18.3

CUMPLE
= 18.3

N14/N65

= 4.4

200.0
Cumple

= 2.3

x: 0 m
= 2.3

x: 1 m
= 23.0

= 4.3

x: 0 m
= 0.3

x: 1 m
= 24.1

CUMPLE
= 24.1

N65/N22

= 4.4

200.0
Cumple

= 2.3

x: 1 m
= 2.9

x: 0 m
= 23.0

= 3.0

x: 1 m
= 0.3

x: 0 m
= 24.1

CUMPLE
= 24.1

N15/N19

= 3.3

200.0
Cumple

= 0.8

x: 2 m
= 2.4

x: 0 m
= 18.5

= 1.8

x: 2 m
= 0.3

x: 2 m
= 21.2

CUMPLE
= 21.2

N19/N72

= 4.1

200.0
Cumple

= 0.6

x: 0 m
= 1.4

x: 1 m
= 23.0

= 4.3

x: 0 m
= 0.2

x: 1 m
= 24.8

CUMPLE
= 24.8

N72/N27

= 4.1

200.0
Cumple

= 0.6

x: 1 m
= 1.8

x: 0 m
= 23.0

= 3.0

x: 1 m
= 0.2

x: 0 m
= 24.8

CUMPLE
= 24.8

N23/N27

= 0.6

200.0
Cumple

x: 1.2 m
= 0.1

x: 2 m
= 10.9

x: 0 m
= 6.0

= 0.3

x: 2 m
= 2.7

x: 2 m
= 14.7

CUMPLE
= 14.7

N15/N66

= 3.2

200.0
Cumple

= 0.9

x: 0 m
= 1.4

x: 1 m
= 23.0

= 4.3

x: 0 m
= 0.2

x: 1 m
= 23.4

CUMPLE
= 23.4

N66/N23

= 3.2

200.0
Cumple

= 0.9

x: 1 m
= 1.9

x: 0 m
= 23.0

= 3.0

x: 1 m
= 0.2

x: 0 m
= 23.4

CUMPLE
= 23.4

N16/N20

= 2.5

200.0
Cumple

x: 0 m
= 0.3

x: 2 m
= 1.8

x: 0 m
= 16.8

= 1.6

x: 2 m
= 0.2

x: 2 m
= 18.9

CUMPLE
= 18.9

N20/N73

= 3.0

200.0
Cumple

= 0.1

x: 0 m
= 1.2

x: 1 m
= 22.9

= 4.1

x: 0 m
= 0.2

x: 1 m
= 24.2

CUMPLE
= 24.2

N73/N28

= 3.0

200.0
Cumple

= 0.1

x: 1 m
= 1.7

x: 0 m
= 22.9

= 3.2

x: 1 m
= 0.2

x: 0 m
= 24.2

CUMPLE
= 24.2

N24/N28

= 0.5

200.0
Cumple

= 0.1

x: 2 m
= 7.6

x: 0 m
= 5.2

= 0.2

x: 2 m
= 1.9

x: 2 m
= 11.9

CUMPLE
= 11.9

N16/N67

= 2.4

200.0
Cumple

= 0.2

x: 0 m
= 1.2

x: 1 m
= 22.9

= 4.1

x: 0 m
= 0.2

x: 1 m
= 23.0

CUMPLE
= 23.0

N67/N24

= 2.4

200.0
Cumple

= 0.2

x: 1 m
= 1.8

x: 0 m
= 22.9

= 3.2

x: 1 m
= 0.2

x: 0 m
= 23.0

CUMPLE
= 23.0

N29/N50

= 0.4

200.0
Cumple

< 0.1

x: 1 m
= 24.4

x: 0 m
= 10.0

x: 0.25 m
= 0.7

x: 0 m
= 11.1

x: 0 m
= 40.7

CUMPLE
= 40.7

N50/N30

= 0.4

200.0
Cumple

< 0.1

x: 0 m
= 24.4

x: 1 m
= 10.1

x: 0.75 m
= 0.7

x: 1 m
= 11.3

x: 1 m
= 41.4

CUMPLE
= 41.4

= 4.1

x: 2 m
= 31.3

x: 2 m
= 12.5

= 0.5

x: 2 m
= 7.5

x: 2 m
= 40.5

CUMPLE
= 40.5

Pgina 27

Barras

COMPROBACIONES (ANSI/AISC 360-05 (LRFD))


c

Pt

Pc

Mx

My

Vx

Estado
Vy

PMxMyVxVyT

N30/N75

= 0.4

200.0
Cumple

N75/N31

= 0.4

200.0
Cumple

< 0.1

x: 1 m
= 1.0

x: 0 m
= 20.5

= 1.4

x: 1 m
= 0.3

x: 0 m
= 21.0

CUMPLE
= 21.0

N32/N51

= 0.6

200.0
Cumple

x: 0.75 m
= 0.2

x: 1 m
= 24.4

x: 0 m
= 8.8

x: 0.5 m
= 0.6

x: 0 m
= 10.3

x: 0 m
= 34.7

CUMPLE
= 34.7

N51/N31

= 0.6

200.0
Cumple

x: 0.25 m
= 0.2

x: 1 m
= 26.4

x: 1 m
= 8.9

x: 0.5 m
= 0.6

x: 1 m
= 12.1

x: 1 m
= 43.5

CUMPLE
= 43.5

N29/N69

= 0.3

200.0
Cumple

< 0.1

x: 0 m
= 1.1

x: 1 m
= 20.4

= 1.6

x: 0 m
= 0.4

x: 1 m
= 20.7

CUMPLE
= 20.7

N69/N32

= 0.3

200.0
Cumple

< 0.1

x: 1 m
= 1.1

x: 0 m
= 20.4

= 1.4

x: 1 m
= 0.3

x: 0 m
= 20.7

CUMPLE
= 20.7

N4/N8

= 0.3

200.0
Cumple

= 0.2

x: 2 m
= 1.1

x: 2 m
= 5.1

x: 1.2 m
= 0.2

x: 2 m
= 0.3

x: 2 m
= 8.2

CUMPLE
= 8.2

N2/N6

= 0.3

200.0
Cumple

x: 0 m
= 0.2

x: 0 m
= 1.1

x: 2 m
= 4.9

x: 0.8 m
= 0.2

x: 0 m
= 0.3

x: 0 m
= 8.0

CUMPLE
= 8.0

N25/N33

< 0.1

200.0
Cumple

< 0.1

x: 0 m
= 2.9

x: 0.5 m
= 1.0

< 0.1

x: 0 m
= 2.7

x: 0 m
= 4.6

CUMPLE
= 4.6

N34/N33

< 0.1

200.0
Cumple

< 0.1

x: 1 m
= 0.9

x: 2 m
= 2.6

= 0.2

x: 0 m
= 0.1

x: 2 m
= 2.7

CUMPLE
= 2.7

N21/N34

< 0.1

200.0
Cumple

< 0.1

x: 0 m
= 2.8

x: 0 m
= 1.1

< 0.1

x: 0 m
= 2.7

x: 0 m
= 4.6

CUMPLE
= 4.6

N26/N35

< 0.1

200.0
Cumple

< 0.1

x: 0 m
= 2.9

x: 0.5 m
= 1.2

= 0.1

x: 0 m
= 2.7

x: 0 m
= 4.2

CUMPLE
= 4.2

N36/N35

< 0.1

200.0
Cumple

< 0.1

x: 1 m
= 0.9

x: 2 m
= 3.0

= 0.2

x: 0 m
= 0.1

x: 2 m
= 3.0

CUMPLE
= 3.0

N22/N36

< 0.1

200.0
Cumple

< 0.1

x: 0 m
= 2.8

x: 0 m
= 1.2

= 0.1

x: 0 m
= 2.7

x: 0 m
= 4.2

CUMPLE
= 4.2

N27/N37

< 0.1

200.0
Cumple

< 0.1

x: 0 m
= 2.9

x: 0.5 m
= 1.1

x: 0 m
= 0.1

x: 0 m
= 2.7

x: 0 m
= 4.3

CUMPLE
= 4.3

N38/N37

< 0.1

200.0
Cumple

< 0.1

x: 1 m
= 0.9

x: 2 m
= 2.9

= 0.2

x: 0 m
= 0.1

x: 2 m
= 2.9

CUMPLE
= 2.9

N23/N38

< 0.1

200.0
Cumple

< 0.1

x: 0 m
= 2.8

x: 0 m
= 1.2

x: 0 m
= 0.1

x: 0 m
= 2.7

x: 0 m
= 4.3

CUMPLE
= 4.3

N28/N39

< 0.1

200.0
Cumple

< 0.1

x: 0 m
= 2.9

x: 0.5 m
= 1.0

= 0.1

x: 0 m
= 2.7

x: 0 m
= 4.7

CUMPLE
= 4.7

N40/N39

< 0.1

200.0
Cumple

< 0.1

x: 1 m
= 0.9

x: 2 m
= 2.5

= 0.2

x: 0 m
= 0.1

x: 2 m
= 2.5

CUMPLE
= 2.5

N24/N40

< 0.1

200.0
Cumple

< 0.1

x: 0 m
= 2.8

x: 0 m
= 1.0

= 0.1

x: 0 m
= 2.7

x: 0 m
= 4.7

CUMPLE
= 4.7

N41/N42

= 1.5

N.P.(1)

N.P.(1)

x: 2 m
= 0.9

x: 2 m
= 11.9

= 1.1

x: 2 m
= 0.2

x: 2 m
= 13.5

CUMPLE
= 13.5

N42/N74

= 1.4

200.0
Cumple

= 0.1

x: 0 m
= 0.8

x: 1 m
= 22.3

= 3.9

x: 0 m
= 0.1

x: 1 m
= 22.9

CUMPLE
= 22.9

N74/N44

= 1.4

200.0
Cumple

= 0.1

x: 1 m
= 1.5

x: 0 m
= 22.3

= 3.4

x: 1 m
= 0.2

x: 0 m
= 22.9

CUMPLE
= 22.9

N43/N44

= 0.7

N.P.(1)

N.P.(1)

x: 2 m
= 3.8

x: 2 m
= 6.8

= 0.3

x: 2 m
= 1.0

x: 2 m
= 10.2

CUMPLE
= 10.2

N41/N68

= 1.1

200.0
Cumple

= 0.1

x: 0 m
= 0.8

x: 1 m
= 22.3

= 3.9

x: 0 m
= 0.1

x: 1 m
= 22.4

CUMPLE
= 22.4

N68/N43

= 1.1

200.0
Cumple

= 0.1

x: 1 m
= 1.6

x: 0 m
= 22.3

= 3.4

x: 1 m
= 0.2

x: 0 m
= 22.4

CUMPLE
= 22.4

N43/N45

< 0.1

200.0
Cumple

< 0.1

x: 0 m
= 6.6

x: 0 m
= 1.5

x: 0.25 m
= 0.1

x: 0 m
= 3.1

x: 0 m
= 7.6

CUMPLE
= 7.6

N45/N46

x: 0.6 m
< 0.1

200.0
Cumple

x: 0.6 m
< 0.1

x: 1 m
= 0.9

x: 2 m
= 2.5

= 0.2

x: 0 m
= 0.1

x: 2 m
= 2.2

CUMPLE
= 2.5

N44/N46

< 0.1

200.0
Cumple

< 0.1

x: 0 m
= 6.7

x: 0 m
= 1.5

x: 0.25 m
= 0.1

x: 0 m
= 3.1

x: 0 m
= 7.6

CUMPLE
= 7.6

< 0.1

x: 0 m
= 1.1

x: 1 m
= 20.5

= 1.6

x: 0 m
= 0.3

x: 1 m
= 21.0

CUMPLE
= 21.0

Pgina 28

Barras

COMPROBACIONES (ANSI/AISC 360-05 (LRFD))


c

Pt

Pc

Mx

My

Vx

Estado
Vy

PMxMyVxVyT

N47/N62

= 0.4

200.0
Cumple

N62/N48

x: 1 m
= 0.4

200.0
Cumple

x: 1 m
= 0.5

x: 0 m
= 65.2

x: 0 m
= 14.7

x: 0.5 m
= 1.1

x: 1 m
= 15.6

x: 0 m
= 67.0

CUMPLE
= 67.0

N48/N49

N.P.(2)

N.P.(1)

N.P.(1)

x: 0 m
= 0.2

x: 0 m
= 0.1

< 0.1

x: 0 m
= 0.1

N.P.(3)

CUMPLE
= 0.2

N50/N51

< 0.1

200.0
Cumple

< 0.1

x: 1 m
= 46.7

x: 0 m
= 3.0

= 0.1

x: 0 m
= 22.2

x: 1 m
= 48.0

CUMPLE
= 48.0

N52/N53

= 2.2

200.0
Cumple

= 1.7

x: 2 m
= 9.2

x: 0 m
= 0.6

< 0.1

x: 2 m
= 0.7

x: 2 m
= 9.7

CUMPLE
= 9.7

N54/N55

= 1.7

200.0
Cumple

= 0.9

x: 2 m
= 7.1

x: 0 m
= 0.6

< 0.1

x: 2 m
= 0.5

x: 2 m
= 7.6

CUMPLE
= 7.6

N56/N57

= 1.4

200.0
Cumple

x: 2 m
= 0.3

x: 2 m
= 5.9

x: 0 m
= 0.6

< 0.1

x: 2 m
= 0.4

x: 2 m
= 6.2

CUMPLE
= 6.2

N58/N59

= 1.1

200.0
Cumple

= 0.2

x: 2 m
= 4.6

x: 0 m
= 0.8

< 0.1

x: 2 m
= 0.4

x: 2 m
= 5.1

CUMPLE
= 5.1

N60/N61

= 0.9

200.0
Cumple

= 0.5

x: 2 m
= 3.2

x: 0 m
= 0.9

= 0.1

x: 2 m
= 0.3

x: 2 m
= 4.0

CUMPLE
= 4.0

N5/N13

x: 3.808 m
= 13.4

200.0
Cumple

x: 0 m
= 68.8

x: 0 m
= 2.9

x: 0 m
= 2.1

< 0.1

x: 0 m
= 0.2

x: 0 m
= 71.2

CUMPLE
= 71.2

N13/N22

x: 3.808 m
= 10.7

200.0
Cumple

x: 0 m
= 51.6

x: 3.808 m
= 1.2

x: 0 m
= 3.4

= 0.1

x: 3.808 m
= 0.1

x: 0 m
= 52.0

CUMPLE
= 52.0

N22/N15

x: 3.808 m
= 7.5

200.0
Cumple

x: 0 m
= 42.5

x: 0 m
= 1.1

x: 0 m
= 2.2

= 0.1

x: 0 m
= 0.1

x: 0 m
= 43.5

CUMPLE
= 43.5

N15/N24

x: 3.808 m
= 5.5

200.0
Cumple

x: 0 m
= 30.2

x: 3.808 m
= 1.1

x: 3.808 m
= 2.7

= 0.1

x: 3.808 m
= 0.1

x: 0 m
= 30.9

CUMPLE
= 30.9

N24/N41

x: 3.808 m
= 3.1

200.0
Cumple

x: 0 m
= 20.1

x: 0 m
= 1.3

x: 0 m
= 1.6

< 0.1

x: 0 m
= 0.1

x: 0 m
= 21.3

CUMPLE
= 21.3

N41/N32

x: 2.283 m
= 1.2

200.0
Cumple

x: 0 m
= 2.4

x: 2.283 m
= 1.0

x: 2.283 m
= 3.2

= 0.1

x: 2.283 m
= 0.1

x: 2.283 m
= 3.6

CUMPLE
= 3.6

N32/N2

x: 3.01 m
= 0.8

200.0
Cumple

x: 0 m
= 3.3

x: 0 m
= 1.1

x: 0 m
= 2.9

= 0.1

x: 0 m
= 0.1

x: 0 m
= 4.6

CUMPLE
= 4.6

N1/N21

x: 3.808 m
= 14.3

200.0
Cumple

x: 0 m
= 66.4

x: 0 m
= 2.8

x: 0 m
= 2.3

= 0.1

x: 3.808 m
= 0.2

x: 0 m
= 68.8

CUMPLE
= 68.8

N21/N14

x: 3.808 m
= 9.8

200.0
Cumple

x: 0 m
= 53.3

x: 0 m
= 1.4

x: 0 m
= 2.0

< 0.1

x: 0 m
= 0.1

x: 0 m
= 53.9

CUMPLE
= 53.9

N14/N23

x: 3.808 m
= 8.2

200.0
Cumple

x: 0 m
= 41.3

x: 3.808 m
= 1.2

x: 3.808 m
= 3.0

= 0.1

x: 3.808 m
= 0.1

x: 0 m
= 42.2

CUMPLE
= 42.2

N23/N16

x: 3.808 m
= 5.3

200.0
Cumple

x: 0 m
= 31.0

x: 0 m
= 1.1

x: 0 m
= 2.0

= 0.1

x: 0 m
= 0.1

x: 0 m
= 32.5

CUMPLE
= 32.5

N16/N43

x: 3.808 m
= 3.1

200.0
Cumple

x: 0 m
= 18.8

x: 3.808 m
= 1.3

x: 3.808 m
= 2.1

= 0.1

x: 0 m
= 0.1

x: 3.808 m
= 11.1

CUMPLE
= 18.8

N43/N29

x: 1.141 m
= 1.3

200.0
Cumple

x: 1.141 m
= 2.9

x: 0 m
= 1.4

x: 0 m
= 3.3

= 0.1

x: 0 m
= 0.2

x: 0 m
= 5.3

CUMPLE
= 5.3

N29/N6

x: 3.01 m
= 0.7

200.0
Cumple

x: 0 m
= 3.5

x: 0 m
= 1.1

x: 0 m
= 2.9

= 0.1

x: 0 m
= 0.1

x: 0 m
= 4.7

CUMPLE
= 4.7

N7/N17

x: 3.808 m
= 12.5

200.0
Cumple

x: 0 m
= 77.2

x: 0 m
= 2.9

x: 0 m
= 2.1

< 0.1

x: 0 m
= 0.2

x: 0 m
= 80.2

CUMPLE
= 80.2

N17/N26

x: 3.808 m
= 9.3

200.0
Cumple

x: 0 m
= 61.2

x: 0 m
= 1.3

x: 0 m
= 3.4

= 0.1

x: 3.808 m
= 0.1

x: 0 m
= 62.2

CUMPLE
= 62.2

N26/N19

x: 3.808 m
= 7.5

200.0
Cumple

x: 0 m
= 46.1

x: 0 m
= 1.2

x: 0 m
= 2.2

= 0.1

x: 0 m
= 0.1

x: 0 m
= 47.7

CUMPLE
= 47.7

N19/N28

x: 3.808 m
= 5.3

200.0
Cumple

x: 0 m
= 34.0

x: 3.808 m
= 1.1

x: 3.808 m
= 2.8

= 0.1

x: 3.808 m
= 0.1

x: 0 m
= 35.1

CUMPLE
= 35.1

N28/N42

x: 3.808 m
= 3.1

200.0
Cumple

x: 0 m
= 20.7

x: 0 m
= 1.3

x: 0 m
= 1.6

< 0.1

x: 0 m
= 0.1

x: 0 m
= 22.0

CUMPLE
= 22.0

N42/N31

x: 0.761 m
= 1.4

200.0
Cumple

x: 0.761 m
= 2.6

x: 2.283 m
= 1.0

x: 2.283 m
= 3.8

= 0.1

x: 2.283 m
= 0.1

x: 2.283 m
= 4.2

CUMPLE
= 4.2

= 0.5

x: 1 m
= 65.2

x: 1 m
= 14.7

x: 0.25 m
= 1.2

x: 0 m
= 15.5

x: 1 m
= 67.0

CUMPLE
= 67.0

Pgina 29

Barras

COMPROBACIONES (ANSI/AISC 360-05 (LRFD))


Pt

Pc

Mx

My

Vx

Estado
Vy

PMxMyVxVyT

N31/N4

x: 3.01 m
= 0.6

200.0
Cumple

x: 0 m
= 3.0

x: 0 m
= 1.1

x: 3.01 m
= 1.8

x: 1.317 m
= 0.1

x: 0 m
= 0.1

x: 3.01 m
= 3.6

CUMPLE
= 3.6

N3/N25

x: 3.808 m
= 12.1

200.0
Cumple

x: 0 m
= 80.6

x: 0 m
= 3.0

x: 0 m
= 2.3

= 0.1

x: 0 m
= 0.2

x: 0 m
= 83.2

CUMPLE
= 83.2

N25/N18

x: 3.808 m
= 9.5

200.0
Cumple

x: 0 m
= 58.6

x: 0 m
= 1.6

x: 0 m
= 2.0

< 0.1

x: 0 m
= 0.1

x: 0 m
= 59.8

CUMPLE
= 59.8

N18/N27

x: 3.808 m
= 7.4

200.0
Cumple

x: 0 m
= 47.8

x: 3.808 m
= 1.1

x: 3.808 m
= 3.0

= 0.1

x: 3.808 m
= 0.1

x: 0 m
= 49.1

CUMPLE
= 49.1

N27/N20

x: 3.808 m
= 5.3

200.0
Cumple

x: 0 m
= 33.3

x: 0 m
= 1.2

x: 0 m
= 2.0

= 0.1

x: 0 m
= 0.1

x: 0 m
= 34.9

CUMPLE
= 34.9

N20/N44

x: 3.808 m
= 3.1

200.0
Cumple

x: 0 m
= 20.6

x: 3.808 m
= 1.3

x: 3.808 m
= 2.1

= 0.1

x: 0 m
= 0.1

x: 3.808 m
= 21.9

CUMPLE
= 21.9

N44/N30

x: 1.141 m
= 1.2

200.0
Cumple

x: 0 m
= 2.6

x: 0 m
= 1.4

x: 0 m
= 3.1

x: 1.141 m
= 0.1

x: 0 m
= 0.2

x: 0 m
= 4.8

CUMPLE
= 4.8

N30/N8

x: 3.01 m
= 0.6

200.0
Cumple

x: 0 m
= 2.8

x: 0 m
= 1.1

x: 3.01 m
= 1.8

x: 1.317 m
= 0.1

x: 0 m
= 0.1

x: 3.01 m
= 3.7

CUMPLE
= 3.7

N52/N25

x: 2.232 m
= 23.7

200.0
Cumple

x: 0 m
= 32.4

x: 2.232 m
= 7.4

x: 2.232 m
= 2.7

= 0.1

x: 2.232 m
= 0.6

x: 0 m
= 38.5

CUMPLE
= 38.5

N53/N21

x: 2.232 m
= 17.4

200.0
Cumple

x: 0 m
= 44.1

x: 0 m
= 8.5

x: 2.232 m
= 2.3

= 0.1

x: 0 m
= 0.6

x: 0 m
= 51.8

CUMPLE
= 51.8

N54/N26

x: 2.232 m
= 18.7

200.0
Cumple

x: 0 m
= 25.5

x: 2.232 m
= 6.0

x: 2.232 m
= 3.1

= 0.1

x: 2.232 m
= 0.5

x: 2.232 m
= 31.1

CUMPLE
= 31.1

N55/N22

x: 2.232 m
= 13.7

200.0
Cumple

x: 0 m
= 34.9

x: 0 m
= 6.7

x: 2.232 m
= 2.8

= 0.1

x: 0 m
= 0.5

x: 2.232 m
= 41.6

CUMPLE
= 41.6

N56/N27

x: 2.232 m
= 14.8

200.0
Cumple

x: 0 m
= 20.1

x: 2.232 m
= 4.8

x: 2.232 m
= 3.0

= 0.1

x: 2.232 m
= 0.4

x: 2.232 m
= 24.8

CUMPLE
= 24.8

N57/N23

x: 2.232 m
= 10.8

200.0
Cumple

x: 0 m
= 27.7

x: 0 m
= 5.4

x: 2.232 m
= 2.6

= 0.1

x: 0 m
= 0.4

x: 2.232 m
= 33.1

CUMPLE
= 33.1

N58/N28

x: 2.232 m
= 10.8

200.0
Cumple

x: 0 m
= 14.5

x: 2.232 m
= 3.5

x: 2.232 m
= 2.6

= 0.1

x: 2.232 m
= 0.3

x: 2.232 m
= 11.1

CUMPLE
= 14.5

N59/N24

x: 2.232 m
= 7.7

200.0
Cumple

x: 0 m
= 20.3

x: 0 m
= 4.2

x: 2.232 m
= 2.3

= 0.1

x: 0 m
= 0.4

x: 0 m
= 24.0

CUMPLE
= 24.0

N60/N44

x: 2.232 m
= 6.4

200.0
Cumple

x: 0 m
= 8.6

x: 2.232 m
= 2.2

x: 2.232 m
= 2.4

= 0.1

x: 2.232 m
= 0.2

x: 2.232 m
= 7.4

CUMPLE
= 8.6

N61/N43

x: 2.232 m
= 4.6

200.0
Cumple

x: 0 m
= 12.0

x: 0 m
= 2.7

x: 2.232 m
= 2.1

= 0.1

x: 0 m
= 0.2

x: 0 m
= 9.5

CUMPLE
= 12.0

N3/N13

x: 3.808 m
= 14.4

200.0
Cumple

x: 0 m
= 100.0

x: 0 m
= 1.9

x: 3.808 m
= 3.9

= 0.1

x: 0 m
= 0.1

x: 0 m
= 100.5

CUMPLE
= 100.05

N1/N17

x: 3.808 m
= 19.3

200.0
Cumple

x: 0 m
= 75.6

x: 3.808 m
= 1.8

x: 3.808 m
= 3.8

= 0.1

x: 3.808 m
= 0.1

x: 0 m
= 77.1

CUMPLE
= 77.1

N17/N14

x: 3.808 m
= 10.9

200.0
Cumple

x: 0 m
= 78.2

x: 3.808 m
= 1.1

x: 3.808 m
= 4.8

= 0.2

x: 0 m
= 0.1

x: 3.808 m
= 81.0

CUMPLE
= 81.0

N13/N18

x: 3.808 m
= 14.7

200.0
Cumple

x: 0 m
= 58.1

x: 3.808 m
= 1.2

x: 3.808 m
= 4.7

= 0.2

x: 0 m
= 0.1

x: 0 m
= 59.8

CUMPLE
= 59.8

N18/N15

x: 3.808 m
= 8.4

200.0
Cumple

x: 0 m
= 61.8

x: 0 m
= 1.1

x: 3.808 m
= 4.8

= 0.2

x: 0 m
= 0.1

x: 0 m
= 64.8

CUMPLE
= 64.8

N14/N19

x: 3.808 m
= 11.4

200.0
Cumple

x: 0 m
= 45.6

x: 3.808 m
= 1.1

x: 3.808 m
= 4.8

= 0.2

x: 0 m
= 0.1

x: 0 m
= 47.5

CUMPLE
= 47.5

N19/N16

x: 3.808 m
= 5.8

200.0
Cumple

x: 0 m
= 44.4

x: 0 m
= 1.0

x: 3.808 m
= 4.5

= 0.2

x: 0 m
= 0.1

x: 0 m
= 47.1

CUMPLE
= 47.1

N15/N20

x: 3.808 m
= 7.9

200.0
Cumple

x: 0 m
= 32.3

x: 0 m
= 1.0

x: 3.808 m
= 4.4

= 0.2

x: 0 m
= 0.1

x: 0 m
= 34.0

CUMPLE
= 34.0

N20/N41

x: 3.808 m
= 3.2

200.0
Cumple

x: 0 m
= 27.7

x: 0 m
= 1.0

x: 3.808 m
= 3.6

= 0.1

x: 0 m
= 0.1

x: 0 m
= 31.3

CUMPLE
= 31.3

N16/N42

x: 3.808 m
= 4.4

200.0
Cumple

x: 0 m
= 19.1

x: 0 m
= 1.0

x: 3.808 m
= 3.6

= 0.1

x: 0 m
= 0.1

x: 3.808 m
= 11.3

CUMPLE
= 19.1

N42/N29

x: 2.283 m
= 1.2

200.0
Cumple

x: 0 m
= 2.9

x: 0 m
= 1.2

x: 2.283 m
= 6.9

= 0.5

x: 0 m
= 0.2

x: 0 m
= 9.0

CUMPLE
= 9.0

Pgina 30

Barras

COMPROBACIONES (ANSI/AISC 360-05 (LRFD))


c

Pt

x: 2.283 m
N41/N30
= 1.7

Pc

Mx

My

Vx

200.0
Cumple

x: 0 m
= 2.2

x: 0 m
= 0.8

x: 2.283 m
= 6.9

Estado
Vy

PMxMyVxVyT

= 0.5

x: 0 m
= 0.1

x: 0 m
= 8.2

CUMPLE
= 8.2

N30/N2

x: 3.01 m
= 0.8

200.0
Cumple

x: 0 m
= 3.6

x: 0 m
= 0.9

x: 0 m
= 1.7

= 0.1

x: 0 m
= 0.1

x: 0 m
= 3.0

CUMPLE
= 3.6

N29/N4

x: 3.01 m
= 0.8

200.0
Cumple

x: 0 m
= 3.8

x: 0 m
= 0.9

x: 0 m
= 1.6

= 0.1

x: 0 m
= 0.1

x: 0 m
= 3.4

CUMPLE
= 3.8

N10/N1

= 39.5

N.P.(1)

N.P.(1)

N.P.(4)

N.P.(4)

N.P.(5)

N.P.(5)

N.P.(3)

CUMPLE
= 39.5

N10/N7

= 45.2

N.P.(1)

N.P.(1)

N.P.(4)

N.P.(4)

N.P.(5)

N.P.(5)

N.P.(3)

CUMPLE
= 45.2

N11/N7

= 39.4

N.P.(1)

N.P.(1)

N.P.(4)

N.P.(4)

N.P.(5)

N.P.(5)

N.P.(3)

CUMPLE
= 39.4

N11/N1

= 24.5

N.P.(1)

N.P.(1)

N.P.(4)

N.P.(4)

N.P.(5)

N.P.(5)

N.P.(3)

CUMPLE
= 24.5

N9/N3

= 33.5

N.P.(1)

N.P.(1)

N.P.(4)

N.P.(4)

N.P.(5)

N.P.(5)

N.P.(3)

CUMPLE
= 33.5

N12/N3

= 41.3

N.P.(1)

N.P.(1)

N.P.(4)

N.P.(4)

N.P.(5)

N.P.(5)

N.P.(3)

CUMPLE
= 41.3

N12/N5

= 33.0

N.P.(1)

N.P.(1)

N.P.(4)

N.P.(4)

N.P.(5)

N.P.(5)

N.P.(3)

CUMPLE
= 33.0

N9/N5

= 41.1

N.P.(1)

N.P.(1)

N.P.(4)

N.P.(4)

N.P.(5)

N.P.(5)

N.P.(3)

CUMPLE
= 41.1

N9/N1

x: 1.2 m
= 17.8

200.0
Cumple

x: 0 m
= 18.6

x: 0 m
= 17.1

x: 0 m
= 15.7

= 1.2

= 7.0

x: 0 m
= 44.5

CUMPLE
= 44.5

N1/N13

x: 3.24 m
= 13.8

200.0
Cumple

x: 0 m
= 20.7

x: 3.24 m
= 2.6

x: 3.24 m
= 4.4

x: 3.24 m
= 0.5

x: 3.24 m
= 1.3

x: 3.24 m
= 26.8

CUMPLE
= 26.8

N13/N14

x: 3.24 m
= 8.6

200.0
Cumple

x: 0 m
= 14.1

x: 0 m
= 2.6

x: 0 m
= 4.4

x: 0 m
= 0.4

x: 0 m
= 1.0

x: 0 m
= 20.9

CUMPLE
= 20.9

N14/N15

x: 3.24 m
= 4.6

200.0
Cumple

x: 0 m
= 8.9

x: 0 m
= 1.4

x: 0 m
= 2.9

x: 3.24 m
= 0.4

x: 0 m
= 0.9

x: 0 m
= 14.3

CUMPLE
= 14.3

N15/N16

x: 3.24 m
= 1.7

200.0
Cumple

x: 0 m
= 5.1

x: 0 m
= 1.2

x: 3.24 m
= 2.9

x: 3.24 m
= 0.4

x: 0 m
= 0.9

x: 0 m
= 10.3

CUMPLE
= 10.3

N16/N41

x: 3.24 m
= 0.2

200.0
Cumple

x: 0 m
= 2.8

x: 0 m
= 1.1

x: 0 m
= 3.0

x: 0 m
= 0.4

x: 0 m
= 1.0

x: 0 m
= 5.1

CUMPLE
= 5.1

N41/N29

N.P.(2)

200.0
Cumple

x: 0 m
= 2.2

x: 1.1 m
= 2.4

x: 0 m
= 1.9

x: 0 m
= 0.2

= 1.2

x: 1.1 m
= 3.4

CUMPLE
= 3.4

N29/N2

N.P.(2)

200.0
Cumple

x: 0 m
= 1.1

x: 2.25 m
= 4.1

x: 0 m
= 1.2

x: 0 m
= 0.3

= 1.6

x: 2.25 m
= 5.6

CUMPLE
= 5.6

N10/N5

x: 1.2 m
= 12.0

200.0
Cumple

x: 0 m
= 16.6

x: 0 m
= 18.4

x: 0 m
= 15.9

= 1.2

= 3.5

x: 0 m
= 43.7

CUMPLE
= 43.7

N5/N52

x: 2.25 m
= 10.0

200.0
Cumple

x: 0 m
= 15.6

x: 2.25 m
= 18.1

x: 1.125 m
= 3.1

x: 0 m
= 0.3

x: 0 m
= 7.9

x: 0 m
= 29.3

CUMPLE
= 29.3

N52/N21

x: 0.99 m
= 9.5

200.0
Cumple

x: 0 m
= 12.8

x: 0 m
= 17.5

x: 0.99 m
= 4.1

x: 0.99 m
= 0.5

x: 0.99 m
= 13.6

x: 0 m
= 25.8

CUMPLE
= 25.8

N21/N54

x: 2.25 m
= 6.3

200.0
Cumple

x: 0 m
= 11.0

x: 0 m
= 16.4

x: 0 m
= 4.8

x: 0 m
= 0.4

x: 0 m
= 6.7

x: 0 m
= 26.6

CUMPLE
= 26.6

N54/N22

x: 0.99 m
= 5.9

200.0
Cumple

x: 0 m
= 8.9

x: 0 m
= 13.1

x: 0.99 m
= 3.0

x: 0.99 m
= 0.3

x: 0.99 m
= 10.6

x: 0 m
= 18.8

CUMPLE
= 18.8

N22/N56

x: 2.25 m
= 3.4

200.0
Cumple

x: 0 m
= 7.3

x: 0 m
= 13.3

x: 0 m
= 3.3

x: 0 m
= 0.4

x: 0 m
= 5.5

x: 0 m
= 20.7

CUMPLE
= 20.7

N56/N23

x: 0.99 m
= 3.1

200.0
Cumple

x: 0 m
= 5.9

x: 0 m
= 10.7

x: 0.99 m
= 3.0

x: 0.99 m
= 0.3

x: 0.99 m
= 8.4

x: 0.99 m
= 14.5

CUMPLE
= 14.5

N23/N58

x: 2.25 m
= 1.3

200.0
Cumple

x: 0 m
= 4.3

x: 0 m
= 10.1

x: 0 m
= 3.4

x: 0 m
= 0.4

x: 0 m
= 4.4

x: 0 m
= 15.2

CUMPLE
= 15.2

N58/N24

x: 0.99 m
= 1.3

200.0
Cumple

x: 0 m
= 3.4

x: 0 m
= 8.3

x: 0.99 m
= 3.2

x: 0.99 m
= 0.3

x: 0.99 m
= 6.2

x: 0.99 m
= 11.1

CUMPLE
= 11.1

N24/N60

x: 2.25 m
= 0.3

200.0
Cumple

x: 0 m
= 2.6

x: 0 m
= 6.8

x: 0 m
= 3.5

x: 0 m
= 0.4

x: 0 m
= 3.1

x: 0 m
= 11.0

CUMPLE
= 11.0

Pgina 31

Barras

COMPROBACIONES (ANSI/AISC 360-05 (LRFD))


c

Pt

Pc

Mx

My

Vx

Estado
Vy

PMxMyVxVyT

N60/N43

x: 0.99 m
= 0.2

200.0
Cumple

x: 0 m
= 2.0

x: 0 m
= 5.6

x: 0.99 m
= 2.4

x: 0.99 m
= 0.3

x: 0.99 m
= 3.7

x: 0 m
= 8.7

CUMPLE
= 8.7

N43/N32

N.P.(2)

200.0
Cumple

x: 0 m
= 2.0

x: 0 m
= 2.8

x: 0 m
= 2.8

x: 0 m
= 0.3

x: 0 m
= 1.4

x: 0 m
= 5.4

CUMPLE
= 5.4

N32/N6

N.P.(2)

200.0
Cumple

x: 0 m
= 1.0

x: 2.25 m
= 3.6

x: 0 m
= 1.3

x: 0 m
= 0.3

x: 0 m
= 1.7

x: 0 m
= 6.0

CUMPLE
= 6.0

N11/N3

x: 1.2 m
= 13.2

200.0
Cumple

x: 0 m
= 25.0

x: 0 m
= 17.3

x: 0 m
= 16.1

= 1.2

= 7.2

x: 0 m
= 52.6

CUMPLE
= 52.6

N3/N17

x: 3.24 m
= 10.3

200.0
Cumple

x: 0 m
= 27.8

x: 3.24 m
= 2.3

x: 3.24 m
= 4.4

x: 3.24 m
= 0.5

x: 3.24 m
= 1.2

x: 3.24 m
= 34.5

CUMPLE
= 34.5

N17/N18

x: 3.24 m
= 6.4

200.0
Cumple

x: 0 m
= 19.0

x: 0 m
= 2.5

x: 0 m
= 4.3

x: 0 m
= 0.4

x: 0 m
= 1.0

x: 0 m
= 26.4

CUMPLE
= 26.4

N18/N19

x: 3.24 m
= 3.5

200.0
Cumple

x: 0 m
= 12.1

x: 0 m
= 1.3

x: 3.24 m
= 2.9

x: 3.24 m
= 0.4

x: 0 m
= 0.9

x: 0 m
= 17.6

CUMPLE
= 17.6

N19/N20

x: 3.24 m
= 1.4

200.0
Cumple

x: 0 m
= 7.5

x: 0 m
= 1.1

x: 3.24 m
= 3.0

x: 3.24 m
= 0.4

x: 0 m
= 0.9

x: 0 m
= 12.2

CUMPLE
= 12.2

N20/N42

x: 3.24 m
= 0.2

200.0
Cumple

x: 0 m
= 4.4

x: 0 m
= 1.1

x: 0 m
= 3.0

x: 0 m
= 0.4

x: 0 m
= 1.0

x: 0 m
= 5.6

CUMPLE
= 5.6

N42/N30

N.P.(2)

200.0
Cumple

x: 0 m
= 2.3

x: 1.1 m
= 3.1

x: 0 m
= 1.9

x: 0 m
= 0.2

= 1.2

x: 1.1 m
= 4.4

CUMPLE
= 4.4

N30/N4

N.P.(2)

200.0
Cumple

x: 0 m
= 1.0

x: 2.25 m
= 4.1

x: 0 m
= 1.3

x: 0 m
= 0.3

= 1.5

x: 2.25 m
= 5.8

CUMPLE
= 5.8

N12/N7

x: 1.2 m
= 10.1

200.0
Cumple

x: 0 m
= 21.1

x: 0 m
= 18.5

x: 0 m
= 15.3

= 1.2

= 3.5

x: 0 m
= 49.1

CUMPLE
= 49.1

N7/N53

x: 2.25 m
= 8.4

200.0
Cumple

x: 0 m
= 19.9

x: 2.25 m
= 18.2

x: 1.125 m
= 3.2

x: 0 m
= 0.3

x: 0 m
= 7.8

x: 0 m
= 39.9

CUMPLE
= 39.9

N53/N25

x: 0.99 m
= 8.4

200.0
Cumple

x: 0 m
= 15.9

x: 0 m
= 17.6

x: 0.99 m
= 4.0

x: 0.99 m
= 0.5

x: 0.99 m
= 13.5

x: 0 m
= 32.1

CUMPLE
= 32.1

N25/N55

x: 2.25 m
= 5.3

200.0
Cumple

x: 0 m
= 14.3

x: 0 m
= 16.4

x: 0 m
= 5.0

x: 0 m
= 0.4

x: 0 m
= 6.6

x: 0 m
= 33.5

CUMPLE
= 33.5

N55/N26

x: 0.99 m
= 5.3

200.0
Cumple

x: 0 m
= 11.3

x: 0 m
= 13.2

x: 0.99 m
= 3.1

x: 0.99 m
= 0.3

x: 0.99 m
= 10.5

x: 0 m
= 24.0

CUMPLE
= 24.0

N26/N57

x: 2.25 m
= 3.0

200.0
Cumple

x: 0 m
= 9.9

x: 0 m
= 13.3

x: 0 m
= 3.3

x: 0 m
= 0.4

x: 0 m
= 5.4

x: 0 m
= 26.7

CUMPLE
= 26.7

N57/N27

x: 0.99 m
= 3.0

200.0
Cumple

x: 0 m
= 7.5

x: 0 m
= 10.8

x: 0.99 m
= 3.0

x: 0.99 m
= 0.4

x: 0.99 m
= 8.4

x: 0 m
= 18.6

CUMPLE
= 18.6

N27/N59

x: 2.25 m
= 1.3

200.0
Cumple

x: 0 m
= 7.0

x: 0 m
= 10.1

x: 0 m
= 3.4

x: 0 m
= 0.4

x: 0 m
= 4.3

x: 0 m
= 20.0

CUMPLE
= 20.0

N59/N28

x: 0.99 m
= 1.3

200.0
Cumple

x: 0 m
= 4.8

x: 0 m
= 8.3

x: 0.99 m
= 3.2

x: 0.99 m
= 0.4

x: 0.99 m
= 6.1

x: 0.99 m
= 13.8

CUMPLE
= 13.8

N28/N61

x: 2.25 m
= 0.3

200.0
Cumple

x: 0 m
= 4.5

x: 0 m
= 6.7

x: 0 m
= 3.5

x: 0 m
= 0.4

x: 0 m
= 3.0

x: 0 m
= 14.2

CUMPLE
= 14.2

N61/N44

x: 0.99 m
= 0.2

200.0
Cumple

x: 0 m
= 3.1

x: 0 m
= 5.6

x: 0.99 m
= 2.4

x: 0.99 m
= 0.3

x: 0.99 m
= 3.7

x: 0 m
= 9.6

CUMPLE
= 9.6

N44/N31

N.P.(2)

200.0
Cumple

x: 0 m
= 2.4

x: 1.1 m
= 3.7

x: 0 m
= 2.7

x: 0 m
= 0.3

= 2.4

x: 0 m
= 6.3

CUMPLE
= 6.3

N31/N8

N.P.(2)

200.0
Cumple

x: 0 m
= 1.2

x: 2.25 m
= 4.8

x: 0 m
= 1.4

x: 0 m
= 0.3

x: 0 m
= 1.8

x: 2.25 m
= 6.8

CUMPLE
= 6.8

Notacin:
Pt: Resistencia a traccin
c: Slenderness limitation for compression
Pc: Resistencia a compresin
Mx: Resistencia a flexin eje X
My: Resistencia a flexin eje Y
Vx: Resistencia a corte X
Vy: Resistencia a corte Y
PMxMyVxVyT: Combined forces and torsion
x: Distancia al origen de la barra
: Coeficiente de aprovechamiento (%)
N.P.: No procede

Pgina 32

Barras

COMPROBACIONES (ANSI/AISC 360-05 (LRFD))


Pt

Pc

Mx

My

Vx

Estado
Vy

PMxMyVxVyT

Comprobaciones que no proceden (N.P.):


(1)
La comprobacin no procede, ya que no hay axil de compresin.
(2)
La comprobacin no procede, ya que no hay axil de traccin.
(3)
There is no torsion or other multiple force combination, therefore the check does not proceed.
(4)
La comprobacin no procede, ya que no hay momento flector.
(5)
La comprobacin no procede, ya que no hay esfuerzo cortante.

1.1.2.- Sismo
Norma utilizada: Norma Tcnica E.030
Norma Tcnica E.030 Diseo Sismorresistente

Mtodo de clculo: Anlisis modal espectral (Norma Tcnica E.030, Artculo 18.2)

1.1.2.1.- Espectro de clculo


1.1.2.1.1.- Espectro elstico de aceleraciones
Coef.Amplificacin:

Sae Z U C S

Donde:

T
C 2,5 p
T
Siendo:

C 2,5
es el factor de amplificacin ssmica.

El valor mximo de las ordenadas espectrales es 1.170 g.

Norma Tcnica E.030 (Artculo 18.2.b)

Parmetros necesarios para la definicin del espectro

Z: Factor de zona (Norma Tcnica E.030, Tabla 1)

Z:

0.3
0

U:

1.3
0

Zona ssmica (Norma Tcnica E.030, Fig 1 y Anexo 1): Zona 2

U: Factor de importancia (Norma Tcnica E.030, Tabla 3)


Importancia de la obra (Norma Tcnica E.030, Artculo 10 y Tabla 3): B: Edificaciones importantes

Pgina 33

S: Factor de amplificacin del suelo (Norma Tcnica E.030, Tabla 2)

S:

1.2
0

Tipo de perfil de suelo (Norma Tcnica E.030, 6.2): S2


Factor de amplificacin ssmica

T
C 2,5 p
T

C 2,5
T

Tp: Periodo de la plataforma del espectro (Norma Tcnica E.030, Tabla 2

0.6
0 s

Tipo de perfil de suelo (Norma Tcnica E.030, 6.2): S2

1.1.2.1.2.- Espectro de diseo de aceleraciones


El espectro de diseo ssmico se obtiene reduciendo el espectro elstico por el coeficiente (R)
correspondiente a cada direccin de anlisis.

Sa

Sae Z U C S

R
R

RX: Coeficiente de reduccin (X) (Norma Tcnica E.030, Tabla 6)

RX :

8.0
0

RY: Coeficiente de reduccin (Y) (Norma Tcnica E.030, Tabla 6)

RY :

8.0
0

Norma Tcnica E.030 (Artculo 18.2.b)

Espectro de diseo segn X

Espectro de diseo segn Y

1.1.2.2.- Coeficientes de participacin

Pgina 34

Modo

Lx

Ly

Mx

My

0%

77.18 %

76.01 %

0%

Modo 1

0.599 0.0001

Modo 2

0.519 1

0.0002

Modo 3

0.249 0.0075

0%

0.01 %

Modo 4

0.165 0.0003

0%

9.06 %

Modo 5

0.140 1

0.0008

1.53 %

0%

Modo 6

0.131 0.0004

0%

4.29 %

Modo 7

0.112 0.0082

0%

0.28 %

Modo 8

0.110 1

0.0004

14.31 %

0%

91.85 %

90.82 %

Total

Hiptesis X(1)
R=8
A = 1.432 m/s
D = 13.0115 mm

Hiptesis Y(1)
R=8
A = 1.432 m/s
D = 13.0115 mm

R=8
A = 1.435 m/s
D = 9.80553 mm
R=8
A = 1.435 m/s
D = 2.25919 mm

R=8
A = 1.435 m/s
D = 9.80553 mm
R=8
A = 1.435 m/s
D = 2.25919 mm

R=8
A = 1.435 m/s
D = 0.98771 mm
R=8
A = 1.435 m/s
D = 0.71141 mm

R=8
A = 1.435 m/s
D = 0.98771 mm
R=8
A = 1.435 m/s
D = 0.71141 mm

R=8
A = 1.435 m/s
D = 0.62266 mm
R=8
A = 1.435 m/s
D = 0.45755 mm

R=8
A = 1.435 m/s
D = 0.62266 mm
R=8
A = 1.435 m/s
D = 0.45755 mm

R=8
A = 1.435 m/s
D = 0.43939 mm

R=8
A = 1.435 m/s
D = 0.43939 mm

T: Periodo de vibracin en segundos.


Lx, Ly: Coeficientes de participacin normalizados en cada direccin del anlisis.
Mx, My: Porcentaje de masa desplazada por cada modo en cada direccin del anlisis.
R: Relacin entre la aceleracin de clculo usando la ductilidad asignada a la estructura y la aceleracin de clculo
obtenida sin ductilidad.
A: Aceleracin de clculo, incluyendo la ductilidad.
D: Coeficiente del modo. Equivale al desplazamiento mximo del grado de libertad dinmico.

Representacin de los periodos modales

Pgina 35

Espectro de diseo segn X

Espectro de diseo segn Y

Se representa el rango de periodos abarcado por los modos estudiados, con indicacin de los modos en los que se
desplaza ms del 30% de la masa:

Hiptesis Sismo X1
Hiptesis
T
A
modal
(s)
(g)
Modo 2

0.519

0.146

Hiptesis Sismo Y1
Hiptesis
T
A
modal
(s)
(g)
Modo 1

0.599

0.146

2.- CIMENTACIN
2.1.- Elementos de cimentacin aislados
2.1.1.- Descripcin
Referencias

(N9 - N10 - N11 - N12)

Geometra
Zapata rectangular excntrica
rea neta: 23.63 m
Ancho inicial X: 98.3 cm
Ancho inicial Y: 278.8 cm
Ancho final X: 396.7 cm
Ancho final Y: 270.0 cm
Ancho zapata X: 495.0 cm
Ancho zapata Y: 548.7 cm
Canto: 125.0 cm

Armado

Sup X: 3/4"c/12.5
Sup Y: 3/4"c/12.5
Inf X: 3/4"c/12.5
Inf Y: 3/4"c/12.5
Perimetral: 7 1/2"

Pgina 36

2.1.2.- Medicin
Referencia: (N9 - N10 - N11 N12)
Nombre de armado

Grado 60
1/2"

Parrilla inferior - Armado X

Longitud
(m)
Peso (kg)

Parrilla inferior - Armado Y

Longitud
(m)
Peso (kg)

Parrilla superior - Armado X

Longitud
(m)
Peso (kg)

Parrilla superior - Armado Y

Longitud
(m)
Peso (kg)

Armado perimetral

Longitud
(m)
Peso (kg)

Armado perimetral

Longitud
(m)
Peso (kg)

Armado perimetral

Longitud
(m)
Peso (kg)

Armado perimetral

Longitud
(m)
Peso (kg)

Armado perimetral

Longitud
(m)
Peso (kg)

Armado perimetral

Longitud
(m)
Peso (kg)

Armado perimetral

Longitud
(m)
Peso (kg)

Armado perimetral

Longitud
(m)
Peso (kg)

Armado perimetral

Longitud
(m)
Peso (kg)

3/4"
51x(2.657.01)
51x(5.9315.68)
46x(2.437.51)
46x(5.4416.80)
51x(1.465.81)
51x(3.2713.00)
46x(1.266.33)
46x(2.8214.16)

7x3.1
9
7x3.1
7
7x1.6
5
7x1.6
4
7x1.2
3
7x1.2
2
7x2.5
7
7x2.5
6
7x1.7
3
7x1.7
2
7x2.3
4
7x2.3
3
7x1.7
3
7x1.7
2
7x1.2
1
7x1.2
0
7x6.1
1
7x6.0
8

Total

289.17
646.95

276.46
618.51

227.97
510.03

222.18
497.07

22.33
22.21

11.55
11.49

8.61
8.56

17.99
17.89

12.11
12.04

16.38
16.29

12.11
12.04

8.47
8.42

42.77
42.54

Pgina 37

Referencia: (N9 - N10 - N11 N12)


Nombre de armado

Grado 60
1/2"

Armado perimetral

Longitud
(m)
Peso (kg)

Armado perimetral

Longitud
(m)
Peso (kg)

Armado perimetral

Longitud
(m)
Peso (kg)

Armado perimetral

Longitud
(m)
Peso (kg)

Armado perimetral

Longitud
(m)
Peso (kg)

Totales

Longitud
(m)
Peso (kg)

Total con mermas


(10.00%)

Longitud
(m)
Peso (kg)

Total

3/4"

7x5.5
7
7x5.5
4
7x1.0
3
7x1.0
2
7x1.5
2
7x1.5
1
7x2.8
5
7x2.8
3
7x1.5
2
7x1.5
1
239.7
5
238.4
3
263.7
3
262.2
7

38.99
38.78

7.21
7.17

10.64
10.58

19.95
19.84

10.64
10.58

1015.78
2272.56 2510.9
9
1117.36
2499.82 2762.0
9

Resumen de medicin (se incluyen mermas de acero)


Grado 60 (kg)
Elemento
Referencia: (N9 - N10 - N11 - N12)
Totales

1/2"
262.27
262.27

3/4"
2499.82
2499.82

Hormign (m)
Total
2762.09
2762.09

f'c=210
29.54
29.54

Limpieza
2.36
2.36

2.1.3.- Comprobacin
Referencia: (N9 - N10 - N11 - N12)
Dimensiones: 495 x 549 x 125 (rea neta: 23.63 m)
Armados: Xi:3/4"c/12.5 Yi:3/4"c/12.5 Xs:3/4"c/12.5 Ys:3/4"c/12.5 Perimetral:7 1/2"
Comprobacin

Valores

Estado

- Tensin media en situaciones persistentes:

Mximo: 1 kp/cm
Calculado: 0.452 kp/cm

Cumpl
e

- Tensin media en situaciones accidentales ssmicas:

Mximo: 1.5 kp/cm


Calculado: 0.406 kp/cm

Cumpl
e

- Tensin mxima en situaciones persistentes sin viento:

Mximo: 1.25 kp/cm


Calculado: 0.772 kp/cm

Cumpl
e

Tensiones sobre el terreno:


Criterio de CYPE Ingenieros

Pgina 38

Referencia: (N9 - N10 - N11 - N12)


Dimensiones: 495 x 549 x 125 (rea neta: 23.63 m)
Armados: Xi:3/4"c/12.5 Yi:3/4"c/12.5 Xs:3/4"c/12.5 Ys:3/4"c/12.5 Perimetral:7 1/2"
Comprobacin
Valores

Estado

- Tensin mxima en situaciones persistentes con viento:

Mximo: 1.25 kp/cm


Calculado: 1.208 kp/cm

Cumpl
e

- Tensin mxima en situaciones accidentales ssmicas:

Mximo: 1.875 kp/cm


Calculado: 0.994 kp/cm

Cumpl
e

Vuelco de la zapata:
Si el % de reserva de seguridad es mayor que cero, quiere decir que los coeficientes de seguridad al
vuelco son mayores que los valores estrictos exigidos para todas las combinaciones de equilibrio.

- En direccin X:

Reserva seguridad: 148.0 Cumpl


%
e

- En direccin Y:

Reserva seguridad: 72.2


%

Cumpl
e

Flexin en la zapata:
- En direccin X:
- En direccin Y:

Momento: 38.05 tm
Momento: 77.23 tm

Cumpl
e
Cumpl
e

Cortante en la zapata:
- En direccin X:
- En direccin Y:

Cortante: 27.18 t
Cortante: 38.33 t

Cumpl
e
Cumpl
e

Compresin oblicua en la zapata:


Criterio de CYPE Ingenieros

- Situaciones persistentes:
- Situaciones accidentales ssmicas:
Canto mnimo:
Captulo 15.7 (norma NTE E.060: 2009)

Espacio para anclar arranques en cimentacin:


- N9:
- N10:
- N11:
- N12:

Mximo: 630 t/m

Calculado: 26.15 t/m

Cumpl
e
Cumpl
e

Mnimo: 36 cm
Calculado: 125 cm

Cumpl
e

Calculado: 33.35 t/m

Mnimo: 72 cm
Calculado: 117 cm
Calculado: 117 cm
Calculado: 117 cm
Calculado: 117 cm

Cumpl
e
Cumpl
e
Cumpl
e
Cumpl
e

Cuanta geomtrica mnima:


Captulo 7.12 (norma NTE E.060: 2009)

- Armado inferior direccin X:


- Armado superior direccin X:
- Armado inferior direccin Y:
- Armado superior direccin Y:

Mnimo: 0.0018
Calculado: 0.0019
Calculado: 0.0019
Calculado: 0.0019
Calculado: 0.0019

Cumpl
e
Cumpl
e
Cumpl
e
Cumpl
e
Pgina 39

Referencia: (N9 - N10 - N11 - N12)


Dimensiones: 495 x 549 x 125 (rea neta: 23.63 m)
Armados: Xi:3/4"c/12.5 Yi:3/4"c/12.5 Xs:3/4"c/12.5 Ys:3/4"c/12.5 Perimetral:7 1/2"
Comprobacin
Valores

Estado

Dimetro mnimo de las barras:


Criterio de CYPE Ingenieros

- Parrilla inferior:
- Parrilla superior:

Mnimo: 10 mm
Calculado: 19.05 mm
Calculado: 19.05 mm

Cumpl
e
Cumpl
e

Separacin mxima entre barras:


Criterio de CYPE Ingenieros

- Armado inferior direccin X:


- Armado inferior direccin Y:
- Armado superior direccin X:
- Armado superior direccin Y:

Mximo: 30 cm
Calculado: 12.5 cm
Calculado: 12.5 cm
Calculado: 12.5 cm
Calculado: 12.5 cm

Cumpl
e
Cumpl
e
Cumpl
e
Cumpl
e

Separacin mnima entre barras:


Recomendacin del libro "Clculo de estructuras de cimentacin", J. Calavera. Ed. INTEMAC, 1991

Mnimo: 10 cm

Calculado: 12.5 cm

Cumpl
e
Cumpl
e
Cumpl
e
Cumpl
e

- Armado inf. direccin X hacia der:

Mnimo: 30 cm
Calculado: 262 cm

Cumpl
e

- Armado inf. direccin X hacia izq:

Mnimo: 30 cm
Calculado: 115 cm

Cumpl
e

- Armado inf. direccin Y hacia arriba:

Mnimo: 30 cm
Calculado: 250 cm

Cumpl
e

- Armado inf. direccin Y hacia abajo:

Mnimo: 39 cm
Calculado: 115 cm

Cumpl
e

- Armado sup. direccin X hacia der:

Mnimo: 30 cm
Calculado: 197 cm

Cumpl
e

- Armado sup. direccin X hacia izq:

Mnimo: 30 cm
Calculado: 50 cm

Cumpl
e

- Armado sup. direccin Y hacia arriba:

Mnimo: 30 cm
Calculado: 184 cm

Cumpl
e

- Armado sup. direccin Y hacia abajo:

Mnimo: 39 cm
Calculado: 49 cm

Cumpl
e

- Armado inferior direccin X:


- Armado inferior direccin Y:
- Armado superior direccin X:
- Armado superior direccin Y:

Calculado: 12.5 cm
Calculado: 12.5 cm
Calculado: 12.5 cm

Longitud de anclaje:
Criterio del libro "Clculo de estructuras de cimentacin", J. Calavera. Ed. INTEMAC, 1991

Longitud mnima de las patillas:


- Armado inf. direccin X hacia der:

Mnimo: 30 cm
Calculado: 115 cm

Cumpl
e
Pgina 40

Referencia: (N9 - N10 - N11 - N12)


Dimensiones: 495 x 549 x 125 (rea neta: 23.63 m)
Armados: Xi:3/4"c/12.5 Yi:3/4"c/12.5 Xs:3/4"c/12.5 Ys:3/4"c/12.5 Perimetral:7 1/2"
Comprobacin
Valores
- Armado inf. direccin X hacia izq:

Calculado: 115 cm

- Armado inf. direccin Y hacia arriba:


- Armado inf. direccin Y hacia abajo:
- Armado sup. direccin X hacia der:
- Armado sup. direccin X hacia izq:

Calculado: 115 cm
Calculado: 115 cm
Calculado: 50 cm
Calculado: 50 cm

- Armado sup. direccin Y hacia arriba:


- Armado sup. direccin Y hacia abajo:

Calculado: 49 cm
Calculado: 49 cm

Estado
Cumpl
e
Cumpl
e
Cumpl
e
Cumpl
e
Cumpl
e
Cumpl
e
Cumpl
e

Se cumplen todas las comprobaciones

Pgina 41

DANIEL ABARCA MORA


ING. MECNICO
CIP. 167452

8.-

CONSTRUCCION DE UN DOCUMEN
ASCENSOR
TO
PANORAMICO Y DUCTO ESPECIALID
DE ESTRUCTURA
AD
METALICA DE LA FILIAL
DE PUERTO
VOLUMEN
MALDONADO-UAC

EXPEDIENTE
TCNICO
ESTRUCTURAS
II

REVISI
N

CONCLUSIONES Y RECOMENDACIONES

De acuerdo al Anlisis de trfico de la edificacin, se requieren 4


ascensores para atender la demanda de este pabelln, en ese sentido
se deja precedente de que el ascensor proyectado, deber ser de uso
restringido para personas con discapacidad y personal administrativo si
as lo requiriese la universidad Andina.
Los apoyos empotrados en los extremos de la columna, dan mayor
rigidez a la estructura por lo que ser importante conseguir esta rigidez
durante su construccin.
La carga de montaje es una carga puntual y muy eventual y solo actuara
en el momento de montaje del ascensor o cuando se requiera hacer un
mantenimiento correctivo del ascensor lo cual ocurre en este tipo de
ascensor entre un periodo de 10 a 15 aos.
A pesar de considerar la carga de montaje, ms la carga de viva del
ascensor y la carga muerta como si actuasen al mismo tiempo, se puede
ver que la estructura proyectada nos da una buena confiabilidad.

MEMORIA DE CALCULO ESTRUCTURA METALICA

Pgina 42 de 42

Anda mungkin juga menyukai