Anda di halaman 1dari 116

TWACS: Basics

Instructor Training
Manual
YXXXXXXX

www.twacs.com

945 Hornet Drive Hazelwood, MO 63042

Introduction

TWACS: Basics

Proprietary Notice
Information contained in this document is private to Distribution Control
Systems, Inc., St. Louis, Missouri (DCSI). This information may not be
published, reproduced, or otherwise disseminated without the express
written authorization of DCSI.
Any software or firmware described in this document is furnished under a
license and may be used or copied only in
accordance with the terms of such license.

Disclaimer
The information in this document is subject to change without notice and
should not be construed as a commitment by DCSI. DCSI assumes no
responsibility for any errors that may appear in this document.
No responsibility is assumed for the use or reliability of software on
equipment that is not supplied by DCSI.
TWACS, the TWACS logo, and the DCSI logo are registered trademarks
of Distribution Control Systems, Inc., St. Louis, Mo.
TWACS
Two Way Automatic Communication System,
a product of
Distribution Control Systems, Inc.
Confidential and Proprietary
Copyright 1998, 1999, 2000, 2001, 2002, 2003, 2004
All Rights Reserved

Production Code

Distribution Control Systems, Inc.

Introduction

Production Code

TWACS: Basics

ii

Distribution Control Systems, Inc.

Introduction

TWACS: Basics

Table of Contents

Using This Manual


A brief description of the purpose, book design, audience, revisions, and
who to contact with questions.

Chapter 1: What is the TWACS System?

Introduction to the TWACS System


TWACS System Applications
TWACS User Roles

Chapter 2: TWACS System Design

TWACS System Overview


TWACS Level 3 Components
Substation Electrical System Elements
TWACS Level 2 Components
TWACS Level 1 Components and Communication

Chapter 3: TNS System Design

Production Code

TNS System Overview


TNS Common User Elements

iii

Distribution Control Systems, Inc.

Introduction

TWACS: Basics

Using This Manual


This section contains information that helps participants understand and
use this manual.

Purpose
The TWACS: Basics training manual is an instructional manual to be used
during instructor-led training or for review following an instructor-led
training class. This learning experience presents participants with the key
concepts required to comprehend TWACS system applications. During
this experience participants will learn the TWACS system architecture and
nine core applications. Topics include: understanding basic applications,
relevant electrical systems, TWACS components, and TNS system
architecture.

Book Structure
This book was designed with the participant in mind. As a participant in a
TWACS training class the number one requirement is to retain and
immediately put the concepts learned in class to use. To facilitate ease of
learning, increased retention, and immediate use of concepts learned in
class, this book was designed in a series of Learning Nuggets, Modules
and Chapters.
A Learning Nugget is a specific concept or set of specific actions a
participant should learn and be able to execute, provided in a progressive
and stepped-out (Step 1, Step 2) design. Alone, a Learning Nugget can
assist a participant in understanding a single concept or executing a single
task.

Production Code

iv

Distribution Control Systems, Inc.

Introduction

TWACS: Basics
Although, Learning Nuggets are built to stand alone as small nuggets of
knowledge, to increase a participants abilities to comprehend, retain, and
execute TWACS system knowledge, Learning Nuggets are grouped
together in Learning Modules. A Learning Module is a collection of
Learning Nuggets encapsulated by an introduction, objectives, vocabulary,
review, and practice with an understanding of how the Learning Nuggets
in the Learning Module relate to one another.
Related Learning Modules are grouped together in Learning Chapters. A
Learning Chapter is a collection of Learning Modules encapsulated by an
introduction, objectives, vocabulary, review, and practice with an
understanding of how the Learning Modules in the Learning Chapters
relate to one another and the TWACS system as a whole. The Learning
Chapter also provides a more detailed table of contents as well as indexed
reference to the Learning Chapters contents.
As a whole, the book is designed to follow a typical path for participants
as they begin to implement and use the TWACS system, broken down into
more easily understood and retained Learning Nuggets. Back at work, the
Learning Nuggets will allow the participant to use the training manual for
ready reference, locating the exact nugget needed.

Audience
To design this book, seven different audience roles were identified:
TNS Operator
The Utility employee responsible for operating and maintaining the TNS
system.
Customer Service Representative Manager
The Utility employee responsible for interfacing with the customer
regarding customer related issues.
Meter Technician
The Utility employee responsible for installing and maintaining meters.
Substation and Transmission Engineer
The Utility employee responsible for designing Substation and
Transmission elements.
Production Code

Distribution Control Systems, Inc.

Introduction

TWACS: Basics
Billing
The Utility employee responsible for customer billing.

TWACS Project Manager


The Utility employee responsible for Project Managing the TWACS
implementation.
Customer Engineer
The Utility employee responsible for interfacing with the Utilities large
corporate customers on TWACS capabilities.

Based on these seven roles, the introduction of each Learning Chapter and each
Learning Module includes a Utility Personnel table with recommendations as to
which of the seven roles would find the following information a requirement or
elective for their role.
Personnel

Required

Elective

TNS Operators
TWACS Project Managers
Customer Service Representative/Managers
Billing Personnel
Substation and Transmission Engineers

Meter Technicians

Customer Engineers

Revisions
DSCI periodically will issue revisions to this document as enhancements
and changes are implemented, or as corrections are required.
With each revision, the document will include a Whats Changed section
describing the new or revised information.

Production Code

vi

Distribution Control Systems, Inc.

Introduction

TWACS: Basics

Support
Please address your questions to Customer Care as follows:
E-mail: care@twacs.com
Phone: 1-800-892-9008
Address: Distribution Control Systems
945 Hornet Drive
Hazelwood, MO 63042
USA

Production Code

vii

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System


Chapter Duration
60 minutes
Schedule Time
____________

TWACS Basics

What is the TWACS System?

Equipment Needed
Chapter Introduction

Laptop

Projector

Projection Screen The TWO-WAY AUTOMATIC COMMUNICATION SYSTEM (TWACS) enables electric
utility companies to perform enhanced functions and gather information

Whiteboard

______________ not previously available to the utility. Through the TWACS system,
Class Openers
Welcome/Thanks
Phone/Restroom
location
Leave class as
needed
Cells to vibrate
Intros 1Name
2Company
3Goals
______________
Intro
This class is an
overview of how the
TWACS system
enhances a utilitys
service and
productivity.
Relationship
Understanding the
TWACS system big
picture will help you
get the most out of
the system.

Personnel
Information in this
class benefits

Useful
Information in this
class is useful when
preparing to
implement or use the
TWACS system.

Production Code

electric utilities can revolutionize the way their business is done.


As an electric utility begins the process of evaluating or implementing the
TWACS system, it is important that those involved with the use and
implementation of the system have a general idea of what the TWACS
system will do for the utility. This chapter gives the participant a highlevel understanding of how the TWACS System can change the way
business is done in the electric utility.
Utility personnel who will benefit from the information in this chapter
include:
Personnel

Required

TNS Operators

TWACS Project Managers

Customer Service Representative Managers

Billing Personnel

Substation and Transmission Engineers

Meter Technicians

Customer Engineers

Elective

The information in this chapter will help participants develop a base-level


understanding of the TWACS system capabilities when preparing to use
the TWACS system. This base-level understanding of TWACS system
capabilities will help enhance the participants perspective as new
TWACS system tasks are introduced throughout this and other TWACS
system training courses.

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System


Vocabulary
Vocabulary to look
for(read vocab)

TWACS Basics

Vocabulary introduced in this chapter includes:


TWACS

AMR

DCSI

FREEZE SNAPSHOT

ON-REQUEST

DEMAND READ

HIGH-WATER MARK

LOAD CONTROL

SERVICE DISCONNECT/
CONNECT

COLLAR

PIRATE

NO PULSE

BLINK COUNT

TIME OF USE

TNS OPERATOR

TWACS PROJECT
MANAGER

The learning modules in this chapter include:


Schedule by Mod
Morning:__________
1st Break:__________

Introduction to the TWACS System


After 1st B:_________

TWACS System Applications


Lunch:____________

TWACS User Roles


After L:____________
nd
2 B:_____________
After 2nd B:_________

Chapter Objectives
By the end of this chapter, participants should be able to:
Objectives
Emphasize you will
be able to(list
objectives)

Production Code

Discuss the TWACS system on a high level and recognize its


place in the utility system hierarchy.
Explain DCSI and its relationship to the TWACS system.
Describe the TWACS system in terms of what new functions
can be accomplished after the TWACS system deployment.
List the roles of various utility company employees as those
roles relate to the TWACS system.

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System


Module Duration
15 minutes
Schedule Time
____________

TWACS Basics

Introduction to the TWACS System


Module Introduction

Intro
In this module, the participant will gain a high-level understanding of what
High-level overview of
the TWACS system is, what the TWACS system does, and how the
TWACS system

TWACS system fits in the overall scheme of utility company systems.

Personnel
Information in this
class benefits

Personnel

Required

Elective

TNS Operators
TWACS Project Managers
Customer Service Representative Managers
Billing Personnel
Substation and Transmission Engineers
Meter Technicians
Customer Engineers
Useful
Getting started with
TWACS

The information in this module is useful when the participant is preparing


to work with the TWACS system and its components.

Vocabulary
Vocabulary introduced in this module includes:
Vocabulary to look for
in this module(read
TWACS
AMR
DCSI
vocab)
Topics in Mod
We will cover the
following topics

Objectives
Emphasize you will
be able to(list
objectives)

Production Code

The learning nuggets in this module include:

The TWACS System at a High Level

Module Objectives

Develop a high-level understanding of the TWACS system


Develop an understanding of who DCSI is and their relationship
to the TWACS system

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

THE TWACS SYSTEM


AT A HIGH LEVEL
Two-Way
bi-directional
remote data
existing power line

TWACS
Business Tool
TWACS uses the
existing
infrastructure of
the electrical
system. Some
alternative
approaches use
out of band
information paths
like radio or
microwave.
Examples of these
types of
companies include
CellNet Data
Systems (now
Schlumberger)
and Nexus.

Two-Way Automatic Communication System (TWACS) is a system


designed for electric utility companies that provides a unique bidirectional system for collecting, communicating, and analyzing
information about and managing utility customer electricity usage. The
TWACS system uses existing power line assets for two-way remote data
acquisition and control solutions.
The TWACS system is a critical business tool for utilities that understand
that serving customers and keeping them loyal rests on:

The meter,

Near real-time data, and

The best-in-class performance and competitive advantages that the


TWACS system enables.
TWACS Enables New Functions

Using the TWACS system, electric utility companies can


revolutionize the way they do business.
The TWACS system enables the electric utility to
gather information and perform functions not
previously available to the utility. The
TWACS system uses the existing
infrastructure as the path for gathering
information. The TWACS system can be
valuable in many aspects of the utilitys
business including:

Uses of TWACS

Production Code

Automatic Meter Reading (AMR)


Interval data collection
Line voltage and power quality
monitoring
Outage mapping
Remote service disconnect/connect
Load shedding

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

Additional
History
TWACS was
developed at New
England Power.
Emerson Electric
bought the patent
rights. TWACS
was once called
Chance Load
Systems (from AB
Chance)
Esco was spun off
of Emerson
Electric in 1991 as
Emerson was
getting rid of
defense
contracting. DCSI
is part of the
communication
segment along
with Comtrak if
looking at the
annual or quarterly
reports.

Production Code

TWACS Basics

Who is DCSI?

Distribution Control Systems, Incorporated


or DCSI developed TWACS. DCSI is
headquartered in St. Louis, MO, and is a
division of ESCO Technologies, Inc. ESCO
Technologies is a publicly traded company
trading on the New York Stock Exchange
under the symbol ESE.
TWACS History

DCSI has a long and successful history with the TWACS system in
the electric utility industry.

The TWACS system was first developed in the late 1970s.


1987 first load control contract sold to Florida Power and
Light.
1991 Alberta Power and Light is first AMR customer.
1997 Automatic Meter Reading dominates business growth.
Today, over 6 million addressable units installed or under
contract.

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

Introduction to the TWACS System Review


Review
The main points of
this section

The TWACS system is unique in using the existing


infrastructure and meter signaling that enables two-way
communication with all meters on the utility system.
DCSI is a division of ESCO Technologies, a publicly held
company based in St. Louis, MO.
The TWACS system has been around a long timesince the
1970s.

Introduction to the TWACS System Practice


Practice
Lets take a minute to
practice what we have
covered in this
section:

1. True/False: The TWACS system uses high frequency signaling on


the electrical system to communicate with meters at customer
locations. This factor limits the reach of the TWACS system to
only certain customers.
2. DCSI first developed the TWACS system in what decade?

3. How many addressable meter and load control units are under
contract and managed with the TWACS system?

Production Code

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

Introduction to the TWACS System Practice


Answers

Practice Answers
Review answers and
ask for questions

1. True/False: The TWACS system uses high frequency signaling on


the electrical system to communicate with meters at customer
locations. This factor limits the reach of the TWACS system to
only certain customers.
False
2. DCSI first developed the TWACS system in what decade?
In the late 1970s
3. How many addressable meter and load control units are under
contract and managed with the TWACS system?
Over 6 million

Production Code

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

Module Duration
30 minutes
Schedule Time
____________

TWACS Basics

TWACS Applications
Module Introduction
The TWACS system enables applications in a utility not previously

Intro
available to the utility. Having a thorough understanding of the TWACS
TWACS gives utilities
system capabilities allows participants to optimize their results from their
new applications

TWACS system deployment.


Personnel
Information in this
class benefits

Personnel

Required

Elective

TNS Operators
TWACS Project Managers
Customer Service Representative Managers
Billing Personnel
Substation and Transmission Engineers
Meter Technicians
Customer Engineers
Useful
Starting to work with
the TWACS System

The information in this module is useful when the participant is preparing


to work with the TWACS system and its components. The participant can
develop a general understanding of how the TWACS system can change
business functions.

Vocabulary introduced in this module includes:


Vocabulary
Vocabulary to look for
AMR
FREEZE SNAPSHOT
ON-REQUEST
in this module(read
vocab)

Production Code

DEMAND READ

HIGH-WATER MARK

LOAD CONTROL

SERVICE CONNECT/
DISCONNECT

COLLAR

PIRATE

NO PULSE

BLINK COUNT

TIME OF USE

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

Topics in Mod
We will cover the
following topics

The learning nuggets in this module include:

Objectives
Emphasize you will
be able to(list
objectives)

Automatic Meter Reading


Load Control
Service Disconnect/Connect
Tamper Detection/Energy Theft Reduction
Service Reliability/Outage Count Monitoring
Billing Enhancements
Cross-Utility Cooperative Work

Module Objectives

Develop an understanding of the TWACS system applications


Determine what customer needs can be fulfilled by the TWACS
system
Determine what utility company needs the TWACS system can
fulfill
Develop a working understanding of the following functions:

Production Code

TWACS Basics

Automatic Meter Reading (AMR),


Load control,
Distribution automation,
Service disconnect/connect,
Tamper detection/energy theft reduction, and
Service reliability/outage count monitoring.

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

AMR
AMR is one of the
fundamental benefits
of TWACS. Using
AMR, utilities can
offer services to the
customer like never
before.

TWACS Basics

AUTOMATIC METER READING

Traditionally, utilities read meters manually by a person actually going


from one meter to the next documenting readings from the meter. Using
the AUTOMATIC METER READING (AMR) function of TWACS, electric utilities
can read meters for various reasons at various times of the month without
ever dispatching a person to a meter site. AMR does provide a level of
cost savings for the utility, and enables the utility to perform many other
Ask
How many of you are functions not previously available with manual reads.
fairly new to
TWACS?
How many have
used TWACS for a
while?

AMR can be a valuable tool in aiding both customers and electric utility
personnel in resolving customer problems and managing customer energy
use. Among these problems are customer situations like the following:
Customer Problems:

Customer Problems
Ask
What are your
utilities using TWACS
to accomplish?

Production Code

I want to know why my bill was so


high last month.
I want to know how much energy we
use when were at work versus when
were at home.
I want to know what impact my
visiting kids have on my energy use.
I want to know how much it would
impact my energy costs to keep my
business open another 3 hours in the
evening.
I want to use trend information on
energy use as part of an analysis to see
if it makes sense to adjust business
hours during certain times of the
year.
Can you help me figure out why my
bill is so much more than my
neighbors?
Continued on next page.

10

Type of meter read that


can help:
AMR, Hourly, Daily Shift,
On-Request
Hourly

Daily Shift, On-Request,


Hourly
Hourly

Hourly, Daily Shift

AMR, Hourly Daily Shift,


On-Request

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

Im moving out of my home today.


Can you disconnect my service now
so I wont get charged for additional
days?
How much capacity will we need in
this subdivision in the next six
months?
Were in a mid-summer crisis. We
need to reengineer the transmission
facilities. How can I isolate which
customers have a recent increase in
usage?

On-Request, Service
Disconnect

Daily Shift, Demand,


Hourly or Interval Data
Daily Shift, Demand

Table 1 - Customer Problems Solved by TNS

The following sections detail the various read types.


Reads
Daily and hourly
readings can help the
utility provide
customers with
unprecedented
service levels to
isolate high-energy
use.

Scheduled Daily Shift Reads

It is recommended the TWACS system be set up to perform reads at


a minimum once daily. DCSI manufactures meters to store a FREEZE
SNAPSHOT at midnight, and the TWACS system has a 24-hour
window in which to pull off the snapshot data for the daily read
before it is overwritten.
Using the TWACS system, the utility runs reports detailing the
amount of usage per day. The utility can establish trends with this
information.

Hourly Data History


Instant feedback for
customers on usage
and reasons for
changes in cost

Figure 1 - AMR Daily Usage Report

Production Code

11

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

Daily historical information shows the customers utilization. A


customer may have a complaint about a bill. In Figure 1, AMR
Daily Usage Report, the Customer Service Representative (CSR)
views customer usage on a daily basis for the month of December.
Reviewing daily information, it becomes clear to the customer that
having two college age kids home over the December weekends and
Christmas holiday caused a spike in utilization.

Figure 2 - Daily Usage Report

The daily read report in Figure 2, Daily Usage Report, combined


with an analysis of the temperatures for those days listed, helped
isolate the issue. The heater was running feverishly on cold days for
this customer. After a site visit, the utility determined for the
customer that the building contractor had neglected to insulate the
attic properly.

Production Code

12

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System


Hourly Reads
Establish trends
Utility usage
cost/benefit analysis

TWACS Basics

Scheduled Hourly Reads

Meters can be read more often than every day. Meters can store
information for hourly tracking of information. Reports that detail
the amount of usage per day can be run to establish trends.

Figure 3 - Daily Usage Report

The hourly report in Figure 3, Daily Usage Report, is from a home


in which the builder neglected to insulate the attic. The report
shows the attic was insulated between 8:00 and 10:00 in the morning
on December 5th. The report yields a good estimate of what the lack
of insulation was costing the homeowner.
Commercial customers benefit from this type of information as well.
Hourly reports provide information to commercial customers that
can be used in cost/benefit analysis for staying open later hours or
cutting the workday shorter. Trends can also be established for
specific times of the year to help determine optimal seasonal hours
of operation.

Production Code

13

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System


On-Request
Meter Reads
higher level of
customer service
and
responsiveness,
not available
before TWACS
system.
Example

TWACS Basics

On-Request Meter Reads

Customer Service Representatives (CSRs) often receive calls


relating to billing questions. In the days of manual meter reading,
the utility would dispatch meter readers or customers would selfread their meters for an accurate count or verification. TWACS
enables CSRs to take an immediate reading while the customer is on
the telephone. This ON-REQUEST READ capability provides CSRs with
new capabilities not available with the previous manual process.
For example:
A utilitys customer contacts the utility and
notifies them that moving day has arrived and
the utility must disconnect service. The CSR
can perform an immediate service disconnect
followed by an on-request meter read with the
customer on the line to provide the customer
with a statement of the final bill.

Demand Reads
Allows Customer
Service a way to
help customers
determine source
of high-energy use
problems
Allows for tracking
and estimating
peak use times

Production Code

Demand Reads

Peak demand is a tariff component for some utilities, particularly for


commercial customers. Using the TWACS system, utilities can
accurately track and bill for high periods of usage accordingly.
700
It is often difficult to
600
estimate energy
requirements for a customer 500
400
or group of customers.
300
Using DEMAND READS, the
200
utility can get an idea of
100
how much energy to budget
0
1
3
5
7
9 11 13 15 17 19 21 23 25 27 29
for a customer or group of
customers. This can be
Figure 4 - Demand Read
particularly beneficial in a short-term
High Water Marks
energy crisis created by high use or
power failure. With demand reads in
the TWACS system, the meters store a HIGH WATER MARK for usage.
This high-water mark represents the highest 15-minute demand of
usage for the customer. Using this information, Substation and
Transmission Engineers can estimate peaks more accurately based
on high usage for customers and groups of customers. Some
utilities use this high water mark reading as the basis of the billing
rate for the rest of the year.

14

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

Load Control
Control peak
power demand
Turn on or off
elements using
power

Problems
Load Control Can
Resolve

TWACS Basics

LOAD CONTROL
With two-way communications to the customer site, the TWACS system
enables powerful methods for utilities to perform functions that allow
management of peak power demand. One of those functions is LOAD
CONTROL. Using load control, utilities can remotely engage and disengage
elements of high use on the customer premise. Among these problems are
customer situations like the following:
Problems:
Peak times in July are causing us to have problems with brownouts.
When we lose power for a corporate customer and redistribute
facilities to accommodate, load capacities are exceeded.
Our customers ask us for help controlling their energy bills.
Pricing changes from deregulation have created windows of
opportunity for customers to shed peak time rate power costs.
Table 2 Problems TWACS Load Control Can Solve

Load control uses the same TWACS infrastructure


deployed for AMR. Using TWACS load control, the
utility can plan strategies that allow trimming of
utilization during peak usage times. Load control allows
the utility to remotely turn off components within a
residential (or commercial) customer premise that draw
substantial levels of power. This shedding of power
allows the utility to control peak demand that can avert
brownouts.
Typical components set up on load control include items
like water heaters and air conditioners.

Figure 5 - Water Heater


Equipped with Load Control
Transponder

Production Code

15

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System


Service
Disconnect/Connect
Employee safety:
frequent disconnects
for failure to pay can
be done remotely
keeping utility
employees from
entering a potentially
dangerous situation at
the customer site.
Problems
Resolved by
Service
Disconnect/
Connect

TWACS Basics

SERVICE
DISCONNECT/CONNECT
Using the SERVICE DISCONNECT/CONNECT features of the
TWACS system, CSRs can perform a near immediate
physical deactivation and reactivation of service
without dispatching a meter technician to the premise.
This feature can help resolve problems like:
Problems:
Im moving today, and I want my billing to stop now.
I cant pay my bill this monthor next monthor next month.
Can you disengage the service at our vacation home for the next
two months?
We just moved in. Can you turn our power on?
Table 3 Service disconnect/connect Problems Can Solve

Increase
Responsiveness
moving day with
connect or
disconnect and
immediate exact
usage bill

Production Code

Meters can be equipped with a COLLAR that can receive and respond to
commands from the TWACS system to disconnect or reconnect the power
in a matter of seconds. Connections may be made in response to a new
customer who has just moved into a new home and is requesting power.
Disconnects may be done on bad credit accounts who are continually late
on payment. Disconnects may also be done at the time of account
closeout when a customer is moving out of a home or
business. Automatic disconnect followed by an onrequest read can give the customer a bill of
their exact usage. Due to the reduced time
cost of connecting and disconnecting service
through TWACS, utilities gain a level of
responsiveness not previously available.

16

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

Tamper and Theft

TWACS Basics

TAMPER DETECTION/ENERGY
THEFT REDUCTION
The TWACS system enables the utility to detect meter
tampering, thus reducing the occurrence and impact of
energy theft. Energy theft can take several forms
including:

Forms of Energy
Theft

Problems:
We think the customer may have turned the meter
upside down for part of the month, but we cant
prove it.
The customers bill is substantially less over the
past few months. It may be that they have bypassed
the meter.
Table 4 Tamper Detection Problems TWACS Can Solve

Meter Tamper
3 main detection
points

No Pulse
The TWACS
system can help
you remotely
determine if it is
normal for this
customer to have a
No Pulse or
possible tampering
Reverse Rotation
If tamper found
can bill for pulses
in reverse

Production Code

The TWACS system can detect meter tampering. Customers who PIRATE
electricity generally do so by either: disconnecting the meter for a period
of time, or by turning the meter to run in reverse. Both of these actions are
illegal but can be difficult to prove without the TWACS system. TWACS
transponders report three items that can indicate tampering:
No pulses in 24 hours
Reverse rotation
Blink count
No Pulses in 24 Hours

This indicator identifies if the meter has not recorded energy use in a
24-hour period. In the case of this indicator, the TWACS system
allows the utility to track nuisance NO PULSE indications from barns,
light poles, vacation homes, etc., by documenting special fields that
allow you to identify customers for whom a no pulse would be
normal.
Reverse Rotation

This indicator identifies if the meter has run in reverse. A customer


may reverse the feeds on the meter causing the meter to run in the
opposite direction, thus reducing the customers usage and bill. The
TWACS transponders on the meter can detect this condition, report
the theft attempt, and bill for the pulses in the reverse direction.

17

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System


Blink Count
TWACS records
outages in the
meter to help
determine if
customer is
attempting to
reduce bill by
disconnecting
power
Monitor Service
Real-time
monitoring for
isolation of major
failures

Problems
Resolved by
Monitoring Service
Real-time

TWACS Basics

Blink Count

When the meter loses power, the transponder in the meter tracks the
outage through the BLINK COUNT. If a customer is intermittently
bypassing the power throughout the billing cycle to avoid detection,
the TWACS system records the blink count and provides an
indication of what is happening.

SERVICE
RELIABILITY/OUTAGE
COUNT MONITORING
The TWACS system enables the utility to detect outage counts and collect
availability information in real-time, thus helping to isolate trouble and
avert more major failures. Here are a few examples of customer problems
that might occur:
Problems:
The customer says they are getting frequent power flickers. Can
we isolate if its a customer problem or utility problem?
Weve had a customer call every couple of days about light
flickers, but we havent been able to isolate the trouble. We need
more information about the scope of the problem.
The customer said their power was out. We dispatched a
technician only to find out that it was the customers problem.
Can we tell if all our customers are back in service after the
outage?
Our lost energy average runs too high.
We lost another transformer to overload. We need to monitor these
more closely.
Our distribution path data is way off. We continue to make
mistakes in our judgment.
Table 5 - Outage Problems TWACS Can Solve

Blink Count
As a warning for
future failures

Production Code

Blink Count Indications of Future Problems

Outage monitoring can be done through the use of the


TWACS blink count tracking. Intermittent problems in
service can be very difficult to troubleshoot and can be a
sign of more major problems to come.

18

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

Example Blink
Count Warning

Real-time Line
Test
Can save a truck
roll

Restored Service
Rapid location of
restored and nonrestored power for
better allocation of
truck rolls

Production Code

TWACS Basics

As an example, equipment intermittently failing or tree limbs


brushing against power lines may cause a temporary power failure
that the customer sees as a blink in their electricity. The customer
may not report a minor outage such as this. The TWACS system
will see these blinks and track them as part of its blink count. Since
the meter reports the blink count, the focus on the problem is
narrowed to the locations that share the problem. This forewarning
might be used to summon tree service personnel focusing on
specific neighborhoods and customer locations for trouble, hence
narrowing the focus of where major trouble is likely to show. Using
this blink count feature of the TWACS system effectively has the
potential to save the utility major expenses associated with line
repair, not to mention the potential of saving the life of an
unfortunate person who could be caught in the wrong place at the
wrong time if a power line falls due to the weight of a tree limb.
False Dispatch: Customer Problem

Outages reported by a customer often result in dispatching service


personnel to the location of the outage. If the problem is the
customers, the manpower of a truck roll is wasted. With the
TWACS system, while the customer is on the line, the CSR can do a
quick test on the line to see if the meter responds. If the meter
responds, then the problem is beyond the meter and hence is the
customers problem. There is no need to dispatch a technician to the
site to ensure it is not the utilitys problem.
Are All the Customers Back Up?

After a major system outage,


TWACS can be used to validate
which customers are back
online and which ones still have
residual problems. This can
save valuable time for the
technician that is still in the
area when they find out that
three homes in the neighborhood are
still without power.

19

Figure 6 - Outage Map

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

Tracking Lost
Power

Where Did the Power Go?

Avoid
Transformer
Overload

How is the Transformer Load?

Improved
Accuracy of Path
Maps

Production Code

When utility companies purchase power from upstream sources, the


difference between the amount of power they purchase minus the
amount of power they sell represents the amount of power lost.
While a certain amount of power loss is a normal part of distributing
power, excessive amounts can cause unnecessary revenue loss.
Excessive loss amounts can come from a variety of sources
including equipment failure and customer theft. Using the TWACS
system, a very accurate estimate of loss can be calculated at various
levels, allowing the utility to focus efforts on when the power is lost
and where the lost power is going. One utility was able to cut lost
power from seven to three percent after deploying and using the
TWACS system.

Often times, utilities find out about overloaded transformers when


the transformers blow and have to be replaced. Using the TWACS
system, customer demand can be monitored so that when utilization
exceeds certain thresholds, distribution problems can be handled in a
more graceful manner.
Getting Path Maps Straight

Utility path maps and actual distribution facility configurations do


not always match.
RAD1
MTU OMU
Radial Circuit
LTN1
Keeping these two
LTN2
elements in
12.47kV
D
synchronization is
D
D
Spot
particularly challenging
D
Area Network
Network
Normally Closed
120/208V
277/480V
when cabling is
D
underground and out of
D
D
12.47kV
visibility. Using the
LTN3
D
LTN4, ...
TWACS system, the
RAD2, ...
Radial Circuit
MTU OMU
utility can validate and
correct path maps to
Figure 7 - Path Map Illustration
avoid costly mistakes.
For example, a
neighborhood that is documented on the wrong phase can have
problems if they are redirected to another distribution path and
consumption estimates are exceeded. Using the TWACS system,
the utility can improve the accuracy of maps to avoid these types of
mistakes.

20

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

Billing
Focused on the
needs of the utility
and customer

TWACS Basics

BILLING ENHANCEMENTS
The TWACS system information can be used for a number of benefits
relating to billing and other customer service related issues. Since it is
easy and inexpensive to collect usage information down to the day, hour
or 15-minute increment, the utility can enhance the way it interacts with
customers relating to billing.
Here are some examples of customer situations in which the TWACS
system might be useful:

Billing Problems
The TWACS
System resolves

Problems:
Our customer wants a consolidated bill for 5 sites. We cant
provide one bill with the same interval, and were having to hold up
billing while we queue the reads that come in.
I get my Social Security check on the 5th. Can you bill me on the
6th so Im sure to have enough money to cover the bill?
Can you monitor the power at our vacation home so our pipes
dont freeze?
We have implemented budget billing, but to save money, we only
read annually. Now we have no idea how much lost power we
have.
We need to reflect in our customers billing our actual cost. That
cost goes up if we need to go to outside resources during peak times,
and our customer bills need to reflect this increased cost.
Table 6 - Billing Problems TWACS Can Solve
Consolidated Billing

One Bill
For all of the
customers
locations

Production Code

The TWACS system makes consolidated billing very easy. Since


reads are generally done at least every day, a customers billing
cycle does not need to be related to the geographical location of the
customer. A customer with five different locations spread across the
metropolitan area can have a consolidated bill for all the sites with
minimal effort on the part of the utility.

21

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

Increased
Consistent
Revenue Stream

TWACS Basics

Specific Day of Month Billing

For many people, living from paycheck to paycheck is


a reality, particularly for those living on fixed
incomes. Some customers want to
prioritize certain bills so they are paid as
soon as they receive their paycheck. The
TWACS system allows you to set up the
billing cycles to meet the needs of the end
customer. This ultimately means a more
consistent revenue stream and less cost for the
utility when they do not have to worry about funds
availability with the customer.

Vacation Home
Monitoring to avoid
disaster can be an
additional revenue
stream

Vacation Home Monitoring

Budget Bill
Without losing the
ability to track lost
energy

Budget Billing Causes Lost Energy Tracking Problem

Time of Use
Balance the cost of
energy at peak
times by billing
customer with
appropriate rates
during peak times

Production Code

People who own vacation homes that they visit infrequently or


seasonally may need help monitoring the availability of electricity.
If electricity is disrupted, there is the potential for bad things to
happen like frozen water pipes or lost food in the freezer. Using the
TWACS system, utilities can set up paid services in which they
monitor the availability and use of electricity proactively at a
customers vacation home to avoid such problems.

When budget billing is implemented, there is temptation to save cost


by reducing meter reads to a minimum annual reading. Reducing
meter reads to once annually makes it difficult to track lost energy.
With the TWACS system, you can implement budget billing and
still maintain the daily or hourly reads needed for tracking lost
energy without incurring additional cost.
Time of Use Billing

It is the law of supply and demand when


a utility has to pay a premium for energy
from sources like energy brokers during
peak times. The result is higher energy
costs during the peaks. At certain times
of the day, energy demand and energy
costs peak. Many utilities want customer
billing to reflect this additional cost.
Prior to the TWACS system, TIME OF USE
(TOU) billing required special meters and a lot of hassle. With
TWACS, hourly billing can be enabled quickly and simply without
additional cost simply by configuring the TWACS system and the
meters for hourly billing cycles.
22

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System


Read All Meters
Electricity
Gas and
Water

Problems
Resolved
By TWACS and
cross-utility work

TWACS Basics

CROSS-UTILITY
COOPERATIVE WORK
The TWACS system enables the utility to interact with other meters on the
customers premise. The electrical system provides an ideal path for flow
of two-way information (unlike gas and water paths). The utility can use
the communications path enabled by the TWACS system to read not only
electric meters, but water and gas meters as well. This function may solve
problems from several different perspectives:
Problems:
The water co-op has asked us if we can help them automate their
meter reading process.
The board is pressing us for revenue growth, so we are
approaching the gas company to use automation of their meter
reading as a source of revenue.
Table 7 - Cross-Utility Problems TWACS Can Solve

Read 3 Meters
from 1 Meter

Properly equipped electric meters, such as


the meter pictured in Figure 8,
Schlumberger Centron RF, have inputs for
water and gas meters. The TWACS
system can read all three meters
automatically.

Figure 8 - Schlumberger
Centron RF

Production Code

23

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

The TWACS System Applications Review


Review
The main points of
this section

The TWACS system provides extensive AMR capabilities for


monthly, daily, hourly or shorter interval reads of KWH,
consumption, demand, and other important meter information.
The TWACS system provides shedding capabilities through
extensive load control support.
The TWACS system improves customer responsiveness by
enabling automatic service disconnect and connect.
The TWACS system reduces theft potential by tracking no
pulses, reverse rotations, and blink counts.
The TWACS system enables service reliability enhancements
such as tracking of blink count indications, elimination of false
dispatch for service outage, service monitoring, and power loss
monitoring.
The TWACS system enables new billing enhancements such as
consolidated billing, specific day or month billing, vacation
home monitoring, budget billing without lost energy, and time
of use billing.
The TWACS system enables a profit center for cross-utility
cooperation in that it can read electric meters and other meters
such as gas and water.

The TWACS System Applications Practice


Practice
Lets take a minute to
practice what we have
covered in this
section:

1. What three items can the TWACS system track to help prevent
energy theft?
2. What capability of AMR enables utility companies to adjust a
customers billing date?
3. What AMR function of the TWACS system enables a utility to
help a customer estimate the impact of changing hours of
operation?
4. What type of read helps utilities that may have a tariff component
for peak demand?
5. What type of read helps utility customer service representatives
deal with problems while customers are on the telephone?
6. What function of the TWACS system helps make life safer for
utility employees by eliminating the need for employees to go to
customer sites when bills are not paid?

Production Code

24

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

The TWACS System Applications Practice


Answers

Practice Answers
Review answers and
ask for questions

1. What three items can the TWACS system track to help prevent
energy theft?
No pulses in 24 hours, reverse rotations, and blink count.
2. What capability of AMR enables utility companies to adjust a
customers billing date?
AMR
3. What AMR function of the TWACS system enables a utility to
help a customer estimate the impact of changing hours of
operation?
Hourly Reads
4. What type of read helps utilities that may have a tariff component
for peak demand?
Demand Reads
5. What type of read helps utility customer service representatives
deal with problems while customers are on the telephone?
On-Request Reads
6. What function of the TWACS system helps make life safer for
utility employees by eliminating the need for employees to go to
customer sites when bills are not paid?
Service Disconnect/Connect

Production Code

25

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System


Module Duration
15 minutes

TWACS Basics

TWACS User Roles

Schedule Time
____________

Module Introduction
Intro
Roles of TWACS
System Users

Personnel
Information in this
class benefits

Specific roles exist for users when interacting with the TWACS system.
This module explains the common roles defined for participants using the
TWACS system. The TWACS system revolutionizes the way a utility can
conduct business. To take full advantage of the TWACS system, the
utility must understand who will need to use information from the
TWACS system, who will use which capabilities within the TWACS
system, and in what capacity.
Personnel

Required

Elective

TNS Operators
TWACS Project Managers
Customer Service Representative Managers
Billing Personnel
Substation and Transmission Engineers
Meter Technicians
Customer Engineers
Useful
The information in this module is useful when the participant is preparing
Preparing to work with to work with the TWACS system and its components. The participant can
the TWACS system

develop a general idea of what roles will be performed by participants at


the utility.

Vocabulary introduced in this module includes:


Vocabulary
Vocabulary to look for
in this module(read
TNS OPERATOR
TWACS PROJECT
MANAGER
vocab)

Production Code

26

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

The learning nuggets in this module include:

Topics in Mod
We will cover the
following topics

TNS Operator
TWACS Project Manager
Customer Service Representative/Manager
Billing Personnel
Substation and Transmission Engineer
Meter Technician
Customer Engineer

Module Objectives
Objectives
Emphasize you will
be able to(list
objectives)

Develop an understanding of who in the utility should use the


TWACS system
Develop an understanding of who would use the TWACS
system for which functions and applications
Develop an understanding of the functional roles of the
following participants:

Production Code

TNS Operator,
TWACS Project Manager,
Customer Service Representative/Manager,
Billing Personnel,
Substation and Transmission Engineer,
Meter Technician, and
Customer Engineer.

27

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

TNS OPERATOR
The TNS OPERATOR is a new role at the utility with the installation of the
TWACS system. TWACS Net Server (TNS) is the computer system that
controls aspects and interacts with components of the TWACS system.
Although it is a new role, it is common that an existing utility employee
will add the role of TNS Operator to their existing list of responsibilities.
The TNS Operator is the person who has the most comprehensive
knowledge of the TNS system and should be the focal point of
responsibility for the TNS system. The TNS Operator is responsible for a
number of critical system functions including but not limited to:
TNS Operator
A new role at the
utility performing the
following functions

Entering information into TNS about substation equipment


Entering meters into the database
Configuring meter addresses
Setting up Automatic Meter Reading (AMR)
Using the system for enhanced functionality
Ensuring that TNS information is backed up
TWACS PROJECT MANAGER

TWACS Project
Manager
Manages the
TWACS system
implementation/
co-ordination of
maintainace and
upgrades, or, may
be, a temporary
position assigned
for the duration of
the TWACS
installation.

Production Code

The TWACS PROJECT MANAGER (PM) is a new role at the utility that comes
with the decision to deploy the TWACS system. The TWACS PM is
responsible for successful deployment of the entire TWACS system. The
TWACS PM must have a good understanding of the overall capabilities of
the TWACS system and the goals of the utility in their deployment of the
TWACS system. The TWACS PM must develop an understanding of
many aspects of the TWACS system including, but not limited to:

What the TWACS system enables the utility to do


What the utility would like for the TWACS system to do
Meter capabilities
Read functions and their uses
Regulatory issues the utility may be facing
Billing capabilities the utility possesses or would like to possess
What customers want the utility to do for them
What the utility would like to do for its customers

28

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

Although the TWACS PM is a new role introduced by the deployment of


the TWACS system, the role of TWACS PM may be added to the
functional responsibilities of an existing employee or it may be contracted
out to a third party. In either case, the TWACS PM will work closely with
DCSI personnel to develop an understanding of how the TWACS system
should be deployed to meet the goals of the utility.
CUSTOMER SERVICE
REPRESENTATIVE/MANAGER
The Customer Service Representative (CSR) and the CSR Manager are
existing utility employees who interact with customers on issues relating
to the customers electric service. The CSR interfaces with the TNS
system within the TWACS system for various functions including:

Customer Service
Existing roles at the
utility able to perform
the following functions
with the TWACS
system

Immediate service disconnects/connects


On-request meter reads for customer billing complaints
Meter read history review
Read functions and their uses
Review of outage counts
Review of daily or hourly usage reports of customer energy use
Interaction with Load Control elements to tailor use to customer need
Interaction with the TWACS system to test voltage if a customer has
problems with power that cause dimming lights or other problems
BILLING PERSONNEL

Billing personnel are existing utility employees responsible for billing


customers for energy use. Billing personnel use the TWACS system
through TNS relating to the following functions:
Billing Personnel

Existing roles at the


utility able to perform

the following functions

with the TWACS


system

Production Code

Collection of export files detailing customer use and input into existing
Customer Information Systems
Validation of billing data
Establishment of appropriate rate classes (in conjunction with the TNS
Operator)
Service disconnect for bad credit (in conjunction with CSRs)
Fraud and theft protection

29

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

SUBSTATION AND
TRANSMISSION ENGINEER
The Substation and Transmission (S&T) Engineer is an existing utility
employee that deals with the infrastructure that delivers power to the
customer. An S&T Engineer might have the following responsibilities
relating to the TWACS system:
Substation and
Transmission
Engineer
Existing roles at the
utility able to perform
the following functions
with the TWACS
system

Design of substation components for the TWACS system


Support of TWACS substation system components
Validation that the TNS system configuration mirrors the equipment
and configuration of the substation (with the TNS Operator)
Use of outage reports for indications of major problems
Support of Load Control applications for load shedding advantages
Review of consumption reports for short-term load estimates
Validation that Alternate Paths account for distribution changes (with
TNS Operator)
Use of testing tools for voltage validation
METER TECHNICIAN

The Meter Technician is an existing utility employee that deals with


installation and support of meters. The Meter Technician would interact
with TWACS system components at the customer site for various
functions including, but not limited to:

Meter Technician
Existing roles at the
utility able to perform
the following functions
with the TWACS

system

Production Code

Determining meter configurations by working with the TNS PM and


the TNS Operator
Installing, configuring and supporting meters to support the utilitys
goals for the TWACS system
Determining device location identifiers to help the TNS Operator sift
through faulty tamper indicators
Determining load control unit configuration by working with TNS PM,
TNS Operator, and S&T Engineer
Installing, configuring, and supporting load control units to support the
utilitys goals for the TWACS system
Working with TNS Operator and Billing personnel to resolve energy
theft issues
Reviewing TNS quality of signal indicators that indicate meter
problems
Reviewing TNS outage reports that indicate service problems
Use of testing tools for voltage validation

30

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

CUSTOMER ENGINEER
The Customer Engineer is a person who interfaces with predominantly
large customers on issues relating to their service requirements. The
Customer Engineer may or may not be a new role for the utility. The
Customer Engineer must be fluent with capabilities provided by the
TWACS system to perform the following functions:
Customer Engineer
Existing roles at the
utility able to perform
the following functions
with the TWACS
system

Production Code

Discussing with customers capabilities the utility can provide through


the use of the TWACS system
Producing/reviewing utilization reports for customers from TNS
Performing custom reads for customers in TNS
Use of testing tools for voltage validation

31

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

Review
The main points of
this section

TWACS Basics

TWACS User Roles Review


There are several functional positions in a utility relating to the
TWACS system including:
TNS Operator
TWACS Project
Manager
Customer Service
Representative/Manager

Billing Personnel

S&T Engineer

Meter Technician

Customer Engineer

Responsible for operating the


TNS system in TWACS
Responsible for deploying the
TWACS system at a utility
Responsible for interfacing with
the customer on service issues
and gathering customer related
information from the TWACS
system
Responsible for getting read
information from the TWACS
system for billing purposes
Responsible for TWACS design,
configuration, support, and
operation at a substation level
Responsible for TWACS meter
configuration, support, and
operation
Responsible for support of
utilitys large customers and
gathering information from the
TWACS system relevant to those
large customers

TWACS User Roles Practice


Practice
Lets take a minute to
practice what we have
covered in this
section:

1. What role would be responsible for getting TWACS billing data


into the billing system for a utility?
2. What role might be responsible for configuring meters?
3. What role is responsible for design and support of the TWACS
substation equipment?
4. What role is responsible for backup and configuration of TNS?

Production Code

32

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

TWACS User Roles Practice Answers


Practice Answers
Review answers and
ask for questions

1. What role would be responsible for getting TWACS billing data


into the billing system for a utility?
Billing Personnel
2. What role might be responsible for configuring meters?
Meter Technician
3. What role is responsible for design and support of the TWACS
substation equipment?
S&T Engineer
4. What role is responsible for backup and billing read monitoring for
TNS?
TNS Operator

Production Code

33

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System


Chapter Review
The main points of
this chapter

Chapter Review

Production Code

TWACS Basics

The TWACS system has a long history of helping customers


automate meter activity.
The TWACS system enables utilities to change and improve
the way they do business.
The TWACS system enables a host of new functions a utility
can perform including AMR, load control, automated service
disconnect/connect, tamper detection, service monitoring,
enhanced billing, and cross-utility meter reading.
The TWACS system use involves interaction from a number of
utility employees including the TNS Operator, TWACS Project
Manager, Customer Service Representative, Billing Personnel,
Substation & Transmission Engineers, Meter Technicians, and
Customer Engineers.

34

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

Chapter Practice
Chapter Practice
Lets take a minute to
practice what we have
covered in this
chapter:

1. What are two new roles the utility may have when deploying the
TWACS system?

2. True/False TWACS system is a new system that revolutionizes the


way a utility does business.

3. What types of reads can the TWACS system provide a utility to


assist in customer service issues?

4. What function enabled by the TWACS system enables a utility to


shed load when utilization reaches critical levels?

5. What function enabled by the TWACS system keeps employees


safe from disgruntled customers that dont pay their bills.

6. What three things can the TWACS system detect that help a utility
identify energy theft?

7. Which of the following billing functions is not enhanced by the


TWACS system?
a. Consolidated billing
b. Specific day of month billing
c. Time of use billing
d. Budget billing
e. E-commerce with large customers
8. Which of the following new potential revenue opportunities is not
enabled by the TWACS system?
a. Cross-utility meter reads (gas/water company)
b. Cross-utility billing (gas/water company)
c. Vacation home monitoring
d. Meter cleaning

Production Code

35

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

TWACS Basics

Chapter Practice Answers


Chapter Practice
Answers
Review answers and
ask for questions

1. What are two new roles the utility may have when deploying the
TWACS system?
TNS Operator and TWACS Project Manager
2. True/False TWACS is a new system that revolutionizes the way a
utility does business.
False. TWACS has been around since the late 1970s.
3. What types of reads can the TWACS system provide a utility to
assist in customer service issues?
AMR, Hourly, On-Request, and Daily Shift
4. What function enabled by the TWACS system enables a utility to
shed load when utilization reaches critical levels?
Load Control
5. What function enabled by the TWACS system keeps employees
safe from disgruntled customers that dont pay their bills.
Service Disconnect/Connect
6. What three things can the TWACS system detect that help a utility
identify energy theft?
No pulses in 24 hours, reverse rotation, blink count
7. Which of the following billing functions is not enhanced by the
TWACS system?
a. Consolidated billing
b. Specific day of month billing
c. Time of use billing
d. Budget billing
e. E-commerce with large customers
8. Which of the following new potential revenue opportunities is not
enabled by the TWACS system?
a. Cross-utility meter reads (gas/water company)
b. Cross-utility billing (gas/water company)
c. Vacation home monitoring
d. Meter cleaning

Production Code

36

Distribution Control Systems, Inc.

Chapter 1: What is the TWACS System

Version Record
Item
Product Reference
Current Version
Date Issued
Owner
Change History
Date
Version
8/6/03
0.1
8/7/03
0.2
8/8/03
0.3
8/8/03
1.0
8/29/03
1.1
9/3/03
1.2
9/17/03
2.0
10/23/03
2.1
10/27/03
2.2

Record
B Cha 1 Introduction to TWACS
3.2
11/11/03
Steve Seyer

Summary of Changes
First informal reviewed version created 7/22-7/24
Kellees update
Update per Kellees changes
Passed to DCSI for review
Johns, Steves and Ricks updates applied
Kellees review for AMRA Sample
Jasons updates applied
Review questions added, instructor notes added
Kellee applied formatting, additional instructor notes, protocol issues, vocab clean up, style
clean up to ready for Sandys review
Sandys review
Kellee updated with Sandys Changes
Sandys updates applied

10/29/03
10/30/03
11/11/03

2.3
3.0
3.2

Approval
Date

Version Name

Production Code

TWACS Basics

Signature

37

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Chapter Duration
90 minutes
Schedule Time
____________

TWACS Basics

TWACS System Design

Equipment Needed
Chapter Introduction

Laptop

Projector

Projection Screen The Two-Way Automatic Communication System (TWACS) enables

Whiteboard
electric utility companies to perform enhanced functions and gather

______________

information not previously available to the utility. Through the TWACS


system, electric utilities can revolutionize the way the utilities do business.

Intro
This chapter is an
overview of the
TWACS system
component levels.

As an electric utility begins the process of evaluating or implementing the


TWACS system, it is important for those involved with the use and
implementation of the system to develop a general idea of how the
TWACS system is structured. The general areas of understanding covered
in this chapter include:

Relationship
How the TWACS
system component
levels fit into the
electrical system.

Personnel
Information in this
class benefits

Knowledge of components involved in the TWACS system


Understanding how the TWACS system integrates with existing
electrical system elements
Knowing what changes utilities must make to equipment,
configuration, and procedure to deploy the TWACS system

This chapter gives the participant a general overview of the TWACS


component levels, what is included in the component level, and how these
components fit in the overall scheme of the electrical system.
Utility personnel who will benefit from the information in this chapter
include:
Personnel

Required

Elective

TNS Operators
TWACS Project Managers
Customer Service Representatives/ Managers
Billing Personnel
Substation and Transmission Engineers
Meter Technicians
Customer Engineers

Production Code

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

Useful
Information in this
class is useful when
preparing to
implement or use the
TWACS system.

Information in this chapter is useful to develop a base-level understanding


of TWACS structure and to prepare the participant to deploy and/or use
the TWACS system. A base-level understanding of TWACS structure
helps enhance the participants perspective as new TWACS system
information is introduced throughout this and other TWACS system
training courses.

Vocabulary
Vocabulary to look
for(read vocab)

Vocabulary introduced in this chapter includes:


TNS

CRU

OMU

MTU

IPU

FIXED SYSTEM

RCE

METERS

TRANSPONDER

METER NUMBER

SERIAL NUMBER

COMMERCIAL METER

RESIDENTIAL
METER

THREE PHASE METER

SINGLE PHASE METER

SOLID STATE

SINGLE PORT

MULTIPORT

DAILY READ

HOURLY READ

INTERVAL READ

FREEZE READ

CONSUMPTION

KWH

LCT

SERVICE
DISCONNECT/CONNECT
MODULE

INTER-BASE COLLAR

BUS

FEEDER

PRIMARY

SECONDARY

SCE

TNS MASTER STATION

COMMAND

RESPONSE

ZERO CROSSING POINT

ORACLE DATABASE
SERVER

TNS APPLICATION
SERVER

COMMUNICATION
SERVER

DIALUP
COMMUNICATIONS

DEDICATED
COMMUNICATIONS

Schedule by Mod
The learning modules in this chapter include:
Morning:__________
1st Break:__________

TWACS System Overview


After 1st B:_________

TWACS Level 3 Components


Lunch:____________

Substation Electrical System Elements


After L:____________
nd
2 B:_____________

TWACS Level 2 Components


After 2nd B:_________

TWACS Level 1 Components and Communication

Production Code

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

Chapter Objectives
By the end of this chapter, participants should be able to:
Objectives
Emphasize you will
be able to(list
objectives)

Production Code

Explain how the TWACS system interfaces with existing


electrical system components.
Name the changes required to implement the TWACS system.
Describe TWACS Level 1, 2, and 3 system components.
List TWACS communications options.

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Module Duration
10 minutes
Schedule Time
____________

TWACS Basics

TWACS System Overview


Module Introduction

Intro
Setting the stage for
following Mods by
giving an overview of
the TWACS system
Level 1-3 structure

This module discusses the levels of components defined in the TWACS


system. Three levels define the TWACS system at the:

Personnel
Information in this
class benefits

customer location,
substation equipment, and
base system at a utility company central office.

Personnel

Required

Elective

TNS Operators
TWACS Project Managers
Customer Service Representatives/ Managers
Billing Personnel
Substation and Transmission Engineers
Meter Technicians
Customer Engineers
Useful
Getting started with
the TWACS system

The information in this module is useful when the participant is preparing


to work with the TWACS system and its components. This module
provides a high-level understanding of:

what the TWACS system is,


what the TWACS system does,
and how the TWACS system fits in the overall scheme of utility
company systems.

Vocabulary
Vocabulary introduced in this module includes:
Vocabulary to look for
in this module(read
TNS
CRU
OMU
vocab)
MTU

IPU

FIXED SYSTEM

Topics in Mod
We will cover the
following topics

The learning nuggets in this module include:

Production Code

TWACS Levels Overview

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Objectives
Emphasize you will
be able to(list
objectives)

TWACS Basics

Module Objectives

Develop an understanding of the three Levels of TWACS


elements.

3 Level Overview
TWACS LEVELS OVERVIEW
try not to go into detail
giving only a big
There are three levels of TWACS components.
picture of the 3 levels,
more detail follows in Level 1 Central Control
the next Mods
Equipment (CCE) includes

computer and related


Level 1 Overview
components installed at the
Server(s) and Comm utility central office. These
equipment
components include the
TWACS NET SERVER (TNS), and
communications equipment
connecting the TNS system
with Level 2 components.
Level 2 Overview
Substation: CRU,
OMU, MTU, IPU

Production Code

Figure 1 TWACS Level 1 Components

Level 2 Substation Communications Equipment (SCE) includes

equipment found at the


substation. Level 2
components interface
the TWACS system
with the electrical
system to enable
outbound and inbound
communications
across the existing
Figure 2 TWACS Level 2 Components
electrical system infrastructure.
The main components include the
CONTROL AND RECEIVING UNIT (CRU), the OUTBOUND MODULATION UNIT (OMU) the
MODULATION TRANSFORMER UNIT (MTU) and the INBOUND PICKUP UNIT (IPU).

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Level 3 Overview
Customers Site:
Meters

TWACS Basics

Level 3 Remote
Communications
Equipment (RCE)

includes equipment
found at the customers
premise. Level 3
components include
meters and other
equipment designed to
Figure 3 TWACS Level 3 Components
provide information about the
services provided by the electric utility and allow the utility control of
those services.
Fixed System
The alternative to
a fixed system is a
mobile system.
In a mobile
system, the meter
reader carries a
device that is used
to track meter
reads. Mobile
systems do not
replace the need
for a human to visit
each
Cost meter
Savings
The fact that
TWACS uses the
existing
infrastructure
provides a major
cost savings when
compared with
alternative
approaches like
those that use cell
services. Hourly
readings with the
TWACS system do
not incur any more
cost than reading
once a month. For
competing
products like
Cellnet, the more
the utility reads,
the more cost
incurred since cell
services are billed
based on data
transmitted.

Production Code

The TWACS system is a FIXED SYSTEM because it uses existing


infrastructure components to distribute electricity to automate
communications with meters. In the case of the TWACS system, the
communications infrastructure is in part composed of the electrical system
infrastructure the utility already has in place.

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

TWACS System Overview Review


Review
The main points of
this section

The TWACS system components are divided into three major


categories, the meter (RCE), the substation (SCE) and TNS.
The TWACS system is a fixed system that uses the existing
electrical system infrastructure as opposed to a handheld device.

TWACS System Overview Practice

Practice
Lets take a minute to
practice what we have
covered in this
section:

1. The TWACS system can cost the same to operate if the utility
reads every meter once a month or each hour. Why?
a. The TWACS system uses the utilitys existing electrical
system for communication, hence there are no
communication costs for communications from each meter.
b. The TWACS system uses free out-of-bandwidth cell
service for transmission of information from the meters.
2. What are the acronyms for the three levels of the TWACS system?

3. What are the four major components of the SCE?

4. What is the major component of the CCE?

Production Code

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

TWACS System Overview Practice Answers


Practice Answers
Review answers and
ask for questions

1. The TWACS system can cost the same to operate if the utility
reads once a month or every meter each hour. Why?
a. The TWACS system uses the utilitys existing electrical
system for communication, hence there are no
communication costs for communications from each
meter.
b. The TWACS system uses free out-of-bandwidth cell
service for transmission of information from the meters.
2. What are the acronyms for the three levels of the TWACS system?
RCE, SCE, CCE
3. What are the four major components of the SCE?
CRU, OMU, MTU, IPU
4. What is the major component of the CCE?
TNS

Production Code

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Module Duration
25 minutes
Schedule Time
____________

TWACS Basics

TWACS Level 3 Components

Intro
Module Introduction
Components at the
customers site, or
There are three levels of TWACS components. Level 3 of TWACS is the
Level 3 of the TWACS
remote communications equipment (RCE) found at the customers
system

premise.

Personnel
Information in this
class benefits

Personnel

Required

Elective

TNS Operators
TWACS Project Managers
Customer Service Representatives/ Managers
Billing Personnel
Substation and Transmission Engineers
Meter Technicians
Customer Engineers
Useful
Getting started with
the TWACS system

The information in this module is useful when the participant is preparing


to work with the TWACS system and its components. Participants who
work with the TWACS system directly or indirectly will develop a more
comprehensive understanding of what and how the TWACS system
gathers information from the customer site. This section looks at the
devices collecting information and responding to commands sent from the
TWACS system.

Vocabulary introduced in this module includes:


Vocabulary
Vocabulary to look for
in this module(read
RCE
METERS
TRANSPONDER
vocab)

Production Code

METER NUMBER

SERIAL NUMBER

COMMERCIAL METER

RESIDENTIAL METER

THREE PHASE METER

SINGLE PHASE METER

SOLID STATE

SINGLE PORT

MULTIPORT

DAILY READ

HOURLY READ

INTERVAL READ

FREEZE READ

CONSUMPTION

KWH

LCT

SERVICE
DISCONNECT/CONNECT
MODULE

INTER-BASE COLLAR

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Topics in Mod
We will cover the
following topics
Objectives
Emphasize you will
be able to(list
objectives)

TWACS Basics

The learning nuggets in this module include:

Remote Communications Equipment

Module Objectives

Develop an understanding of TWACS Level 3 Components


Starting with Meters
We start with the

Differentiate between a transponder and a meter


meter because all

Define options for remote communications equipment


participants know

Build an understanding of meter serial numbers and their


about meters and it
relevance to the TWACS system
keeps them in their

Differentiate between commercial and residential meters


comfort zone.
Understanding the

Gain an understanding of load control transponders


difference between

Develop an understanding of disconnect/connect modules


meters and
transponders and how
the aspects of each
REMOTE COMMUNICATION EQUIPMENT
determine what and
(RCE)
how TWACS can
communicate is
The TWACS system
paramount for the
participants.
includes components on

the customers premise


that allow the utility to
gather information and
perform activities
relating to the
customers electrical
service. The generic
Figure 4 Remote Communications Equipment
term for customer premise
devices is REMOTE COMMUNICATIONS EQUIPMENT (RCE). The most common
RCEs are meters and Load Control Transponders.
Meter
Manufacture
While DCSI
manufactures the
transponder,
several companies
manufacture
meters such as
GE/GEC, ABB/
Westinghouse and
Schlumberger.

Production Code

Meter versus Transponder

Electric companies have used METERS for


generations to track electricity usage.
Utilities can equip a meter with a
TRANSPONDER that reads the meter and
relays information back to a central
collection resource. DCSI manufactures
transponders that attach to or integrate
with a variety of meters. The meter in
Figure 5, Meter with Transponder, is a
traditional electro-mechanical meter with a
transponder integrated within the lower
half of the meter.
10

Figure 5 Meter with


Transponder

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

Think of the transponder as the brains of the meter. When using the
TWACS system, the term meter refers to the combination of meter
and transponder.
Meter/Serial
Numbers
Some utilities replace
the billing system
meter number with the
TWACS serial number.
The Utility can order
the transponder with
and without the meter
manufacturers
faceplate. If the meter
manufacturers
faceplate is retained,
then the TWACS serial
number is placed on a
sticker on the lower
part of the unit.

Meters, Meter Numbers, and Serial Numbers

A meter manufacturer assigns a METER NUMBER to each meter it


produces. Utilities key in the meter number into their billing
system. The meter number is different from the SERIAL NUMBER of the
TWACS transponder. DCSI assigns a unique serial number to each
TWACS transponder it manufactures. A utility may track both the
meter number and serial number in the customer billing system and
in TNS. The utility may choose
to replace the meter number with
the TWACS serial number. In a
TWACS deployment, the utility
must populate the TWACS serial
number field, and the meter
number is optional. The TWACS
system uses the serial numbers to
communicate with the meter.
The following is an example of the serial
number and meter number assignments
for the S4 meter pictured in Figure 6,
Meter Number versus Serial Number.
Component name

Meter/Serial #

Siemens S4 Meter
CMT-S4 Transponder

Meter# 84 642 886


Serial# 5859549

Figure 6 Meter Number


versus Serial Number

Manufacturer
assigning #
Siemens
DCSI

Table 1 Meter Number versus Serial Number

Production Code

11

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Commercial vs.
Residential Meters
The difference
between commercial
meters and
residential meters is
grayed a bit as we
later discuss TNS
issues relating to
meter
communications.
Some commercial
customers use
single-phase meters,
but the details get
more complex than
this. Dont get into a
big technical
discussion about
this. Again, broadbrush the strokes at
this stage.

TWACS Basics

Commercial versus Residential Meters

Meters come in a variety of types and models, but the most general
categories are COMMERCIAL METER and RESIDENTIAL METER. Since
businesses generally consume much more energy than residences,
commercial meters accommodate higher amounts of energy. We
consider commercial meters THREE PHASE METERS allowing all three
phases of energy to flow into a business. The phases are called
Phase A, B and C.
Since residences typically consume less power than businesses,
residences receive a lesser-powered connection to the electrical
system. Hence, residential meters are considered SINGLE PHASE
METERS allowing only a single phase of energy to flow into the
residence. Any available phase may service a residence. It is
common to distribute residences across phases for load balancing.
Utilities may use meters classified as residential for small business.
Mechanical versus Solid State or Digital

Mechanical or
Digital
Mechanical meters
= bolted on
transponder
Digital meters
= transponder is
internal circuit
board

Like our music and our watches, our electric meters evolved from
mechanical (or analog) to digital. With mechanical meters, a
technician will bolt the TWACS transponder to the mechanical
meter, and the transponder reads a black mark on the bottom of the
spinning disk. With digital meters, the TWACS transponder is a
circuit board the meter manufacturer includes with the digital meter.
It is common to refer to digital meters as SOLID STATE.

Ports
Single = electricity
only
Multiport =
electricity, gas,
and water

Single Port versus Multiport

Another way to categorize meters is with the


number of ports the meter has for inputs. A
SINGLE PORT meter can only track electricity
use. A MULTIPORT meter has inputs for gas
and water meter inputs. Note the meter
displayed in Figure 7, Multiport Meter, has
an extra set of inputs on the front panel for
the water and gas meter plug-ins.
Figure 7 Multiport Meter

Production Code

12

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

Reading Meters
Remember, the more
times you read, the
more information the
utility has to manage.
Hourly and Interval
reads may be
appropriate for select
customers and not the
entire population.

TWACS Basics

Read Frequencies

Another way to categorize meters is by the frequency of the reads


the utility performs on them. Meter read frequency categories
include DAILY, HOURLY, or INTERVAL. With daily reads, the utility will
program the TWACS system to collect the meter information every
day. The meter marks a daily FREEZE READ at midnight and the utility
has until midnight the next day to read the meter before the next
days read replaces the previous read. With hourly reads, the utility
reads the meters three times per day and collects the information
stored in the meters registers for the previous eight hours. Some
meters are capable of more frequent reads. Commercial customers
may want to see detail of electricity usage broken down into 15 or
30-minute intervals. For this level of detail, the customer needs a
meter capable of interval usage tracking.
If the utility wants
readings every:
Day
Hour
30 minutes
15 minutes

then you read:

or every x hours:

1 time per day


3 times per day
6 times per day
12 times per day

24 hours
8 hours
4 hours
2 hours

Table 2 Read Types by Time


Read Types
The participants will
have gray areas later
when it comes to
meter read types.
Develop a clear
understanding of
terms. KWH reading =
meter tech sees on the
front of the dials.
Consumption reading
= how much energy
used during a period of
time measured in
KWH. Establish a
general terminology
that KWH = front dials
on the meter.

Read Types: Consumption versus Kilowatt Hours

The TWACS system categorizes read types into two groups,


CONSUMPTION and KILOWATT HOUR (KWH). A consumption reading tells
The TWACS system how much energy the customers used in a
given interval. Meters track intervals in hour, 30-minute, and 15minute increments. A kilowatt-hour reading tells the TWACS
system what the meter dial settings are at particular moments in
time. The type of read requested determines the information
received.

Remember most
meters report pulses of
dial rotations. This
gets converted to
consumption or KWH
readings in the
TWACS system.

Production Code

13

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


KWH and
Consumption
Readings
Focus on ensuring
the participants
understand what
the difference is
between KWH and
consumption.
Once you have
explained ask
participant to
recap as a way to
make sure there
are no remaining
questions or
confusion.

TWACS Basics

If a utility is collecting interval data, then utility personnel will issue


reads for consumption data. If a utility is collecting a monthly read
for billing, then utility personnel will issue a read for KWH from the
meter telling the utility what is on the meter dial. Figure 8 and
Table 3, Sample KWH Readings from 8:00 a.m. to 11:00 a.m., show
the KWH readings from a meter at 10:00 a.m. and 11:00 a.m. at
24730 and 24736 kilowatt hours respectively. The consumption
reading for the hour between 10:00 a.m. and 11:00 a.m. is the
difference between the two readings or six-kilowatt hours. The
following picture and table detail the KWH and hourly consumption
readings for a three-hour period.

8:00am

24739 KWH

11:00am
24744 KWH

0 1

3 8
7
9

6 5
0 1

6 5
0 1

6 5
0 1

6 5
0 1

6 5
0 1

6 5
0 1

3 8
7

6 5

6 5
0 1

6 5
0 1

6 5
0 1

6 5

6 5
0 1

6 5

6 5
0 1

4
2

6 5
0 1

6 5
0 1

4
2

6 5
0 1

3 8
7

3 8
7

0 1

3 8

3 8
7

3 8
7

0 1

3 8

3 8
7

3 8

3 8
7

3 8

0 1

3 8

3 8
7

9
3 8

24736 KWH

10:00am

24730 KWH

9:00am

0 1

6 5
0 1

4
2

3 8
7

6 5

3
7

6 5

Figure 8 Sample KWH Readings from 8:00 a.m. to 11:00


Time
KWH
Hourly Consumption KWH
8:00am
24730
N/A
9:00am
24736
6
10:00am
24739
3
11:00am
24744
5
Table 3 Sample KWH Readings from 8:00 a.m. to 11:00 a.m.

Production Code

14

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

Meter Aspects
This is a very
basic chart
generalizing
capabilities.
More detail is
provided as we
start to enter
meter
information and
in the TWACS
AMR class. If a
participant
needs more
detail on meter
aspects ask to
talk with them at
break.
Note
The Centron
EMT-3C-MP lists
multiple for
ports. This
meter uses RF
signaling to talk
to other meters,
so this meter is
not limited to 3
ports like the
IMT-3H-3Port
which has 3
physical ports.
The Centron
EMT-3C-MP is
designed to
support multiple
meters in the
area including
meters on other
residences.

TWACS Basics

Common Meter Reference Page

The following, Table 4 Meter Aspects, lists aspects of commonly


used meters.
Meter Name

Use

Phase

Category

Ports

Freq.

IMT-3
IMT-3H
IMT-3H-3Port
Altimus EMT-3A
Centron EMT-3C-SP
Centron EMT-3C-MP
CMT-S4
CMT-Vectron

Residential
Residential
Residential
Residential
Residential
Residential
Commercial
Commercial

Single
Single
Single
Single
Single
Single
Three
Three

Mechanical
Mechanical
Mechanical
Digital
Digital
Digital
Digital
Digital

1
1
3
1
1
Multi
1
1

Daily
Hourly
Hourly
Hourly
Hourly
Hourly
15,30,60
Hourly

Table 4 Meter Aspects

IMT-3/3H

CMT-S4

CMT Vectron

IMT-3H-3Port

Figure 8 Commercial Meters

Altimus EMT-3A
Figure 9
Residential Meters

Production Code

15

Centron EMT-3C-SP/MP
Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

Transponders
to Meters
This is a very
basic chart. If a
participant
needs more
detail on meter
aspects ask to
talk with them at
break.

TWACS Basics

Common Meter Vendor Reference Page

The following, Table 5 Transponder with Meter Make and Model,


lists the DCSI transponder name and the meter make and model with
which the transponder will operate.
DCSI Transponder Name

Meter Make

Meter Model

IMT-3
IMT3H
IMT3H-3Port
IMT3H-SCD
Altimus EMT-3A
Centron EMT-3C-SP
Centron EMT-3C-MP
CMT-S4
CMT-Vectron

ABB/Westinghouse GE
Siemens/L&G
Schlumberger

D4, D5, AB1


I70
MS, MX
J4, J5
Altimus
Centron
Centron
S4
Vectron

Siemens
SchlumbergerSema
SchlumbergerSema
Landis+Gyr
SchlumbergerSema

Table 5 Transponder with Meter Make and Model


Load Control Transponders
Load Control
Example
Florida Power and
Light uses TWACS
for Load Control.
FP&L is able to
shed 1.3
Gigawatts of
power when
needed during
peak times.
WOW!

A LOAD CONTROL
is
remote communications
equipment that helps
avoid brownouts by
LCT
diverting load. LCTs
allow the utility to turn off
Figure 10 Load Control
components like central
Transponder
air conditioning units,
electric water heaters, pool heaters, heat pumps, pool
pumps, baseboard heaters, and other equipment
remotely. Typically the utilities shed load during peak
times of the day for selected components and at
intervals designed to minimally impact the customer.
LCTs provide the utility independent control of each
component attached.
TRANSPONDER (LCT)

Figure 11 LCT Used


with Water Heater

In some cases, the meter has LCT


capabilities built into the meter.
For example, the Altimus EMT3A has an optional load
control feature.

Production Code

16

Altimus (EMT-3A)
Figure 12 Altimus Meter
with LCT

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

Disconnect/
Connect
Inter-base collar
allows remote on
and off switch for
electric powered
components at
customers site.

Uses of
Disconnect/
Connect

IMT Family of
Meters
Please impress on
the participants
that the IMT-3H
SCD is a different
transponder than
the IMT-3 or IMT3H. The IMT-3H
SCD has the
interface
connection for the
connect/
disconnect collar
which is
manufactured by
BLP Components,
Ltd. DCSI is
making a new
DCS switch that is
covered in the
TWACS Advanced
Applications class.

Production Code

TWACS Basics

Remote Service
Disconnect/Connect Modules

The TWACS system components


can interface with remote SERVICE
DISCONNECT/CONNECT (SDC) MODULES,

which are useful for a number of


applications. The transponder
connects to an INTER-BASE COLLAR
that performs the connect/
disconnect function. There are
three primary applications for the
disconnect/connect feature:

Figure 13 Meter and


Inter-Base Collar

Revenue collection tool for problem accounts


Customer Service enhancement for seasonal and rental
customers
Improved efficiency for safe and convenient
connects/disconnects from the central office

Currently, the IMT-3H SCD transponder supports an interface to the


service disconnect/connect (SDC) inter-base collar. Future
enhancements will enable capabilities for disconnect/connect on
additional meters.

17

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

TWACS Level 3 Components Review


Review
The main points of
this section

Production Code

TWACS Remote Communications Equipment (RCE) represents


the meters and transponders at the customer site.
Serial numbers are TWACS transponder specific and assigned
by DCSI. The meter manufacturer may assign meter numbers.
Multiport meters may be used to read gas and water meters.
The more information the utility wants from a meter, the more
frequently the utility must read the meter.
KWH refers to the dial readings on the front of the meter.
Consumption is how much energy was used during a period of
time.
Load control transponders help with load shedding.
Remote service disconnect and connect requires a special switch
at the customer premise.

18

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

TWACS Level 3 Components Practice


Practice
Lets take a minute to
practice what we have
covered in this
section:

1. Three phase meters are often categorized as what type of meter?


a. Commercial
b. Residential
2. The number assigned to a meter by Schlumberger is called what?
a. Meter number
b. Serial number
3. The number assigned to a meter by DCSI is called what?
a. Meter number
b. Serial number
4. The reading of the dials on the front of the meter is called what?

5. If a utility wishes to perform hourly readings, how many times a


day must the system retrieve readings from the meter?

6. True/False The TWACS system only works with mechanical


meters?

7. The amount of energy used for a given interval is called what?

8. What meter provides interval readings of 15, 30, or 60 minutes?

9. Name a device used to provide remote service disconnect/connect.

Production Code

19

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

TWACS Level 3 Components Practice Answers


Practice Answers
Review answers and
ask for questions

1. Three phase meters are often categorized as what type of meter?


a. Commercial
b. Residential
2. The number assigned to a meter by Schlumberger is called what?
a. Meter number
b. Serial number
3. The number assigned to a meter by DCSI is called what?
a. Meter number
b. Serial number
4. The reading of the dials on the front of the meter is called what?
KWH

5. If a utility wishes to perform hourly readings, how many times a


day must the system retrieve readings from the meter?
3
6. True/False The TWACS system only works with mechanical
meters?
False, transponders exist for mechanical and solid state meters
7. The amount of energy used for a given interval is called what?
Consumption
8. What meter provides interval readings of 15, 30, or 60 minutes?
CMT-S4
9. Name a device used to provide remote service disconnect/connect.
Inter-base collar

Production Code

20

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Module Duration
15 minutes
Schedule Time
____________
Intro
This module is a
prelude to the
TWACS substation
components. This is
designed to give the
students a lay of
substation. Keep it
high level and very
general.

Personnel
Information in this
class benefits

TWACS Basics

Substation Electrical System Elements


Module Introduction
This module discusses the base-level electrical infrastructure components
into which the TWACS system will integrate. Topics covered include
basic terminology, function, and placement of the electrical system
infrastructure elements, and changes made to accommodate the TWACS
system. Before addressing TWACS Level 2 components at the substation,
the basic substation infrastructure components to which the TWACS
system interfaces will be covered.
Personnel

Required

Elective

TNS Operators
TWACS Project Managers
Customer Service Representatives/ Managers
Billing Personnel
Substation and Transmission Engineers
Meter Technicians
Customer Engineers

Useful
Getting started with
the TWACS system

The information in this module is useful when the individual is preparing


to work with the TWACS system and its components. Participants who
work with TWACS directly or indirectly will develop a more
comprehensive understanding of the components at the substation into
which the TWACS system integrates.

Vocabulary
Vocabulary introduced in this module includes:
Vocabulary to look for
in this module(read
BUS
FEEDER
MTU
vocab)
PRIMARY

SECONDARY

Topics in Mod
We will cover the
following topics

The learning nuggets in this module include:

Production Code

21

The Electrical System Bus and Feeder

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Objectives
Emphasize you will
be able to(list
objectives)

TWACS Basics

Module Objectives

Develop an understanding of a Bus


Build an understanding of a Feeder
Develop an understanding of an MTU and why it is relevant to
TWACS deployment

THE ELECTRICAL SYSTEM BUS AND


FEEDER
Power Sources

The Substation
Substation
transformers,
buses and feeders
are existing
components in the
substation. The
MTU was added to
the substation to
accommodate the
TWACS system.

Utilities have designed the existing electrical system to distribute power to


customers located all over rural and metropolitan areas. Utilities distribute
power through a network of substations.
Ultimately, utilities draw power from a power
source such as a nuclear power plant,
hydropower from a dam, wind-power from a
windmill farm, or a conventional power plant
drawing power from burning coal or natural
gas.
Power plants ultimately
feed geographically
dispersed substations
designed to service large
areas of customer
populations. At the
substation, utilities
distribute power to area
customers from large
substation transformers
through the use of buses
Figure 14 Substation Transformers
and feeders. This nugget
focuses on the substation
where the TWACS system integrates with the electrical system.

Bus
Distributes power
from sub transformer
to the feeder

The Bus

Feeder
Distributes power
from bus to the
customers

The Feeder

Production Code

A BUS is the major transmission facility that distributes power from a


substation transformer. It is common to have only one or two buses
coming from a substation. Buses are contained within the substation
area.

The bus or buses connect multiple FEEDERS. Feeders are the portions
of the distribution network distributing power to utility customers.
22

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Bus/Feeder Layout

TWACS Basics

A substation may have many feeders distributing power to customer


areas like neighborhoods. The following diagram, Figure 16 Bus
and Feeder Configuration, illustrates a simple Bus/Feeder layout.

Figure 15 Bus and Feeder Configuration


MTU
Steps down high
voltage from feeder
before reaching the
customer.
Primary = high
voltage
Secondary = stepped
down voltage

The MTU

Buses distribute power to the feeders at


fairly high levels of voltage. Common
voltage for a bus or feeder is between
4000 and 35,000 volts. For TWACS to
interface with the power system,
technicians install a MODULATION
TRANSFORMER UNIT (MTU) to step down
the voltage.
Figure 16 MTU Placement

The purpose of a transformer


is to change the voltage from
one level to another. Think of
the MTU as having two sides.
One side plugs into the bus
(or the PRIMARY side at 4000
to 35,000 volts) and the other
side plugs into the TWACS
equipment (or the SECONDARY
side at 480 volts). The
TWACS: AMR class covers
more detailed information
regarding substation bus,
feeder, and MTU components.
Production Code

23

Figure 17 - MTU

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

Substation Electrical System Elements Review


Review
The main points of
this section

At the substation, the distribution system feeding customers is


composed of buses, and feeders.
Substation transformers, buses, and feeders already exist in the
utility substation prior to TWACS.
The MTU is added to the substation to interface the TWACS
system with the substation.

Substation Electrical System Elements Practice


Practice
Lets take a minute to
practice what we have
covered in this
section:

1. True/False To deploy the TWACS system, the utility must replace


the substation transformers, buses and feeders with TWACS
compatible components.

2. What component is added to the substation to interface the


TWACS system with substation equipment?

3. True/False The purpose of the MTU is to bring the voltage down to


a level the TWACS equipment can accept.

4. Which side of a transformer has the lowest voltage level to which


the TWACS system connects?
a. Primary
b. Secondary

Production Code

24

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

Substation Electrical System Elements


Practice Answers
Practice Answers
Review answers and
ask for questions

1. True/False To deploy the TWACS system, the utility must replace


the substation transformers, buses and feeders with TWACS
compatible components.
False, TWACS uses existing equipment
2. What component is added to the substation to interface the
TWACS system with substation equipment?
MTU
3. True/False The purpose of the MTU is to bring the voltage down to
a level the TWACS equipment can accept.
True
4. Which side of a transformer has the lowest voltage level to which
the TWACS system connects?
a. Primary
b. Secondary

Production Code

25

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Module Duration
20 minutes
Schedule Time
____________
Intro
Overview of the Level
2 components. These
components are
covered in detail in
the book TWACS
AMR. This section
should provide broad
strokes of the
components.
Personnel
Information in this
class benefits

TWACS Basics

TWACS Level 2 Components


Module Introduction
This module covers TWACS Level 2 Components. TWACS Level 2
components are the components that interface with the electrical system
for communication with remote communications equipment (RCE) at the
customers premise.
Personnel

Required

Elective

TNS Operators
TWACS Project Managers
Customer Service Representatives/ Managers
Billing Personnel
Substation and Transmission Engineers
Meter Technicians
Customer Engineers

Useful
Getting started with
the TWACS system

All participants who will be working with the TWACS system directly or
indirectly will develop a more comprehensive understanding of the
TWACS Level 2 components found at the substation.
The information in this chapter is useful when the individual is preparing
to work with the TWACS system and its components. This module
provides an understanding of:

TWACS Level 2 components


The TWACS system interfacing to electrical system components
TWACS Two-Way communications over the electrical system

Vocabulary
Vocabulary introduced in this module includes:
Vocabulary to look for
in this module(read
SCE
CRU
TNS MASTER STATION
vocab)

Production Code

COMMAND

OMU

MTU

RESPONSE

IPU

ZERO CROSSING POINT

26

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

Topics in Mod
We will cover the
following topics

The learning nuggets in this module include:

Objectives
Emphasize you will
be able to(list
objectives)

Substation Communication Equipment

Module Objectives

Production Code

TWACS Basics

Develop an understanding of TWACS Level 2 Substation


Communication Equipment (SCE) Components
Detail the flow of information across TWACS Level 2
Components
Create a general understanding of functional aspects of the
following:

Control and Receiving Unit (CRU)

Outbound Modulation Unit (OMU)

Inbound Pickup Unit (IPU)

Modulation Transformer Unit (MTU)

27

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

SUBSTATION COMMUNICATION
CRU
EQUIPMENT
The CRU translates
commands from TNS
The second level of TWACS is the SUBSTATION COMMUNICATION EQUIPMENT
to the substation
commonly referred to as the substation. There may be one or more
substations in a utility. The main SCE component is the CONTROL AND
TNS Master Station RECEIVING UNIT or CRU. A communications link (represented by the
Allows end users to
modem) connects the CRU to the TNS MASTER STATION located at a utility
issue commands out
central office (likely in the computer center). The TNS master station is a
to meters via a
keyboard and mouse TWACS Level 1 computer component providing a user interface to the
TWACS system. Commands from the TNS master station are sent over
the communications link to the CRU at the substation. The CRU then
communicates with other SCE components to execute commands sent by
the TNS master station. The following, Figure 19 Substation Layout with
the TWACS System, depicts the SCE components and how the
components fit the substation.
(SCE)

Ask
Ask participants: If the
TNS Master Station
was pictured in this
diagram, what would
it be connected to?

Figure 18 Substation Layout


with the TWACS System

Production Code

28

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Ask
Ask participants: to
answer the following
question without
looking at the
diagram: Once an end
user enters a
command into the
TNS Master Station
what path does the
command follow
before reaching the
meter?

TWACS Basics

TWACS Flow of Information

Figure 20, Flow of Information in Substation, represents the flow of


information through the SCE components.
The TNS Operator or
other user issues a
command to the TNS
master station. The
TNS master station
forwards the command
over a communications
link to the CRU. Once
the CRU receives a
COMMAND from the TNS
master station, the CRU
sends the required instructions
over the power lines via the

Figure 19 Flow of Information in


Substation

through the MODULATION


the meter (or other RCE).

OUTBOUND MODULATION UNIT (OMU)


TRANSFORMER UNIT (MTU), to

Zero Crossing Point


Transmitting
information at the zero
crossing of the power
signal makes the
TWACS system
unique. By taking this
approach, TWACS has
an extremely high
success rate for
communicating with
meters. Basically, if
the customer is getting
power, TWACS can
read the customers
meter. Many
competing products
have restrictions on
what customers they
can reach. Some use
high frequency
signaling that has
limited distance, and
other use out-of-band
signaling like cellular
networks that increase
in cost as use
increases.

Production Code

The meter sends a RESPONSE to the command over the powerlines and
the response is picked up by the INBOUND PICKUP UNIT (IPU) which
forwards the response back to the CRU. The CRU sends the
response back to the TNS master station over the communications
link.
Hardware configurations vary slightly from installation to
installation. More detailed information about each of the
components and variations in hardware configurations are covered
in the TWACS: Automatic Meter Reading course.
TWACS Communications

As previously mentioned,
communications in the
TWACS system utilizes the
existing power lines.
Utilities distribute power to
customers using a 60-hertz
signal.

Figure 20 Normal Energy Sine Wave

29

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

The CRU sends outbound commands to the OMU. The OMU then
sends the command to the meter
by varying the current slightly at
the ZERO CROSSING POINT of the 60hertz sine wave. This unique
approach gives TWACS an
advantage of reaching meters
long distances from the
substation, while still using the
existing infrastructure provided
by the electrical system. The
longest recorded distance from
Figure 21 Outbound Signaling
substation to meter for an
existing TWACS installation is
85 linear miles. If the utility can deliver electricity to the customer,
then the TWACS system can automate meter reads and load control
to the customer.
Similarly, inbound communications from the meter to the IPU are
accomplished by sending a signal
near the zero volt crossover
point. When the CRU sends
commands out to the meter, the
IPUs are instructed to watch for a
return response on a particular
path of the electrical system.

Figure 22 Inbound Current Signaling

Production Code

30

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

TWACS Level 2 Components Review


Review
The main points of
this section

The CRU controls communications at the substation.


The OMU is responsible for outbound transmission of
information.
The IPU is responsible for inbound communications of
information.
The TWACS system unique design of varying current of the
existing energy sine wave allows the TWACS system to reach
nearly every customer.

TWACS Level 2 Components Practice


Practice
Lets take a minute to
practice what we have
covered in this
section:

1. List the 4 major TWACS components at the substation.

2. What is the appropriate flow of information to the meter?


a. TNS to CRU to MTU to OMU to Meter
b. TNS to CRU to OMU to MTU to Meter
c. TNS to CRU to IPU to Meter
3. What is the appropriate flow of information from the meter?
a. Meter to MTU to OMU to Cru to TNS
b. Meter to IPU to CRU to TNS
c. Meter to CRU to IPU to TNS

Production Code

31

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

TWACS Level 2 Components Practice Answers


Practice Answers
Review answers and
ask for questions

1. List the 4 major TWACS components at the substation.


CRU, OMU, IPU, MTU
2. What is the appropriate flow of information to the meter?
a. TNS to CRU to MTU to OMU to Meter
b. TNS to CRU to OMU to MTU to Meter
c. TNS to CRU to IPU to Meter
3. What is the appropriate flow of information from the meter?
a. Meter to MTU to OMU to Cru to TNS
b. Meter to IPU to CRU to TNS
c. Meter to CRU to IPU to TNS

Production Code

32

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Module Duration
25 minutes
Schedule Time
____________

Intro
TWACS Level 1
overview where end
users interface with
the system via TNS

Personnel
Information in this
class benefits

TWACS Basics

TWACS Level 1 Components and


Communications
Module Introduction
This module covers TWACS Level 1 Components. TWACS Level 1
components form the interaction point for TWACS users.
Communications link options for connecting the substations to the Level 1
Components are also covered in this module.
Personnel

Required

Elective

TNS Operators
TWACS Project Managers
Customer Service Representatives/ Managers
Billing Personnel
Substation and Transmission Engineers
Meter Technicians
Customer Engineers

Useful
Getting started with
the TWACS system

Participants working with the TWACS system directly or indirectly will


develop a more comprehensive understanding of the TWACS Level 1
components found at a utility site and related communications options
available to the utility.
The information in this module is useful when the participant is preparing
to work with the TWACS system and its components. This module
provides an understanding of:

TWACS Level 1 components,


TNS and database and communications servers, and
TNS communications options.

Vocabulary introduced in this module includes:


Vocabulary
Vocabulary to look for
in this module(read
ORACLE DATABASE
TNS APPLICATION
COMMUNICATION
vocab)
SERVER
SERVER
SERVER
TNS MASTER
STATION

Production Code

DIALUP
COMMUNICATIONS

33

DEDICATED
COMMUNICATIONS

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

Topics in Mod
We will cover the
following topics

The learning nuggets in this module include:

Objectives
Emphasize you will
be able to(list
objectives)

Production Code

TWACS Net Server (TNS)


TNS Communications Options

Module Objectives

TNS
Where the end user
interfaces with the
TWACS system

TWACS Basics

Develop an understanding of TWACS Level 1 Components


Discuss TNS and its general capabilities and structure
Create an understanding of TNS communications options
Detail the functional aspects of the following:

TNS,

TNS master station,

communication server,

communications link, and

modems.

TWACS NET SERVER


The TWACS Net Server
(TNS) is the heart of the
TWACS system. TNS
interfaces the TNS Operator
and other users to the TWACS
system. While configuration
options vary depending on the
complexity established by the
number of users and substations
Figure 23 TNS Server
managed, the basic TNS configuration
involves a server and some form of
communications links connecting TNS to the substation.

34

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


TNS Basic Configuration

Often times, TNS is configured with a


bank of modems allowing the TNS
server to dial out and connect with
substations. (Additional
communications options are discussed
later in module TNS Communications
Options.) A minimal base-level TNS
server configuration involves a
Windows 2000 server running three
applications:

Oracle database server


TNS application server
Communication server

Modem Bank

TNS
Configuration
Most customers
will have the three
components on a
single system.

TWACS Basics

Figure 24 TNS Server


Applications

The ORACLE DATABASE SERVER is responsible for managing the meter


and meter-related databases.
The TNS APPLICATION SERVER is responsible for running the TNS
programs and providing an interface for communications.
The COMMUNICATION SERVER is responsible for interacting with
communications facilities like dialups or dedicated-line facilities to
connect to the substation equipment.

Production Code

35

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

In larger deployments of
TWACS, the basic TNS
configuration may not provide the
optimum level of performance. It
is possible to improve system
performance, if necessary, by
segregating the functions of the
TNS system so that the Oracle
database server, TNS application
server, and communication server
run on separate processing
machines.

Modem Bank

TNS Advanced Configuration

Advanced TNS
Configuration
Larger customers
will divide the
components into
multiple servers.
This may be done
if performance is
an issue on a
single system
configuration or if
distance creates a
need to disperse
communications
servers.

Figure 25 Segregated
TNS Components

In advanced configurations like the one


pictured in Figure 25, Segregated TNS Components, the computers
take on more distinct roles. In the advanced configuration detailed
in the figure, the TNS application server is the TNS MASTER STATION.
Although the TNS user stations can perform functions in the
TWACS system, all of the commands and responses would flow
through the TNS application server to the substation, as it is the TNS
master station in this configuration.
TNS COMMUNICATIONS OPTIONS
Best Com Option
The utility needs to
determine the best
way to configure
their system based
on their needs.
This section gives
them a few things
to think about
before making a
decision.

There are various ways to configure the TNS communications facilities


linking TNS to the substations. There are many factors that might impact
how a utility configures their communication options. These factors
include, but are not limited to:

Long distance costs between the substation and TNS


Support for interactive use by CSRs
Speed of processing reads
Cost of communications facilities
Use of existing infrastructure
General TNS Communications Topics

In the most basic configuration, the TNS server can have


communication ports and modems built in and the TNS server can
directly connect to a communications line connecting the TNS
master station to the substation. In the substation, the equipment
terminating the communications link is the Control and Receiving
Unit or CRU. The CRU has communications ports able to connect
to a modem or other data communications equipment.
Production Code

36

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

Dialup versus Dedicated


Dedicated is Best
Dedicated is
always better (no
busy signals, line
always available,
faster connection,
consistent cost) if
the utility can
afford it.

Utilities
can
configure
the TNS
Server to operate
using a DIALUP

Figure 26 Basic TNS Communications

COMMUNICATIONS

line. In this case,


the TNS server must dial each time it has a need to communicate
with a substation. This process can slow the overall communication
time since it takes about 30 seconds to actually connect with the
substation equipment. This slow connection feature may not be the
best method if the utility wishes to use the TWACS system for
Customer Service Representative (CSR) queries while tending to a
customer calling for support. A potential exists for no available
dialup facility when the CSR needs to connect to a substation. Busy
signals, telephone system problems, and poor line quality can cause
issues with dialup access.
Alternatively, configuring the TNS Server to operate using
DEDICATED COMMUNICATIONS facilities is possible. With a dedicated
link to each substation, there is no communications delay in setting
up the connection (as with dialup communications). Hence, CSRs
and other users can expect much quicker responses from the
TWACS system.
Communications Facility
Dialup
Dedicated

Connect
Speed
Slow
Fast

Cost
?
?

Table 27 Communication Facility


versus Connection Speed
Dialup
Not always the most
cost effective if longdistance charges or
have existing
dedicated system.

Production Code

While cost is certainly a factor, a utility, when considering dedicated


versus dialup communications facilities, should acknowledge it is
impossible to make a blanket assumption about which facility has a
higher cost. For example, it may appear that dialup facilities are less
costly than dedicated facilities. If the utility incurs long-distance
charges when calling between the TNS Server and the substation the
long-distance adds to the cost of dialup. If the utility already has a
dedicated communications link in place designed for other
communications with the substation, then it may actually cost the
utility less to use the existing dedicated facilities.
37

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Geographically
Dispersed
Communications
Servers Example

TWACS Basics

Distributing Communication Servers

In certain geographically challenged TWACS deployments, it can be


costly to network all of the substations back to a central site where
the TNS server is located. Fortunately, utilities can design the
TWACS system with geographically dispersed communications
servers.

In this diagram, notice the TNS Server is located in Mason City,


Iowa, and the communication servers are in Lincoln and Omaha,
Nebraska. Since Lincoln and Omaha are long-distance phone calls
from Mason City, this configuration provides a cost savings by
eliminating charges from dialing directly from Mason City to
Lincoln and Omaha. Also, telephone companies bill some dedicated
communications services based on distance, and this configuration
allows a consolidation of substations in one area to share the
communications link (through the communication server) back to
Mason City. Notice also the design of the Lincoln system uses an
existing radio network. As long as the network designer provides
proper interfaces at the end equipment, the TWACS system is very
flexible when it comes to communications options.

Production Code

38

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Communication
on Existing
Networks
Using existing
network
connections for the
TWACS system
network integration
may take some
help from
communications
consultants if the
utility does not
have the expertise
in-house. DCSI
field support
personnel do not
provide this type of
consulting, but
may be able to
provide the
customer with
consulting
company
references.

TWACS Basics

Using Existing Networks

Many utilities have an existing network connecting the substations


to a utility central office. This network is normally some form of
Wide Area Network (WAN) using telephone company services like
Frame Relay, Private Line networking, or Internet Virtual Private
Network (VPN). Using terminal servers to convert the serial inputs
to a LAN based communication interface like Ethernet, it is
relatively easy to use an existing network to connect the TNS server
to the substations. Figure 29, TNS Using Existing WAN, details
one of the ways you could configure WAN use for the TWACS
system. The class TWACS: Automated Meter Reading covers
communications options in more detail.

Figure 28 TNS Using Existing WAN

Production Code

39

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

TWACS Level 1 Components and


Communications Review
Review
The main points of
this section

Practice
Lets take a minute to
practice what we have
covered in this
section:

TNS is the heart of the TWACS system.


TNS can be configured as a standalone system or major
components can be spread across multiple computers.
Communications between TNS and the substation may be dialup
or dedicated.
The utility may use existing networks to connect substations.

TWACS Level 1 Components and


Communications Practice
1. What is the major component of the TWACS Level 1?

2. What are the three major components of TNS?

3. What is the most likely reason a utility might split the


communication server into a separate computer?
a. Job security for the IT department
b. Reduce costs of carrier (LD) services
c. Performance issues with the server
4. Why might a utility split the Oracle database server into its own
computer?
a. Job security for the IT department
b. Reduce costs of carrier (LD) services
c. Performance issues with the server
5. True/False The Oracle database server, TNS application server,
and communication server may not run on the same computer.

6. True/False The TWACS system performs better when dedicated


communications links connect substations to TNS.

7. True/False If an existing network connects the utilitys substations,


that network may not be used for the TWACS system.

Production Code

40

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

TWACS Level 1 Components and


Communications Practice Answers
Practice Answers
Review answers and
ask for questions

1. What is the major component of the TWACS Level 1?


TNS
2. What are the three major components of TNS?
Oracle database server, TNS application server,
Communication server
3. What is the most likely reason a utility might split the
communication server into a separate computer?
a. Job security for the IT department
b. Reduce costs of carrier (LD) services
c. Performance issues with the server
4. Why might a utility split the Oracle database server into its own
computer?
a. Job security for the IT department
b. Reduce costs of carrier (LD) services
c. Performance issues with the server
5. True/False The Oracle database server, TNS application server,
and communication server may not run on the same computer.
False
6. True/False The TWACS system performs better when dedicated
communications links connect substations to TNS.
True
7. True/False If an existing network connects the utilitys substations,
that network may not be used for the TWACS system.
False

Production Code

41

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

Chapter Review
Review
The main points of
this chapter

The TWACS system is comprised of three levels of components,


the RCE (Meter), the SCE (Substation) and the CCE (TNS).
TWACS Level 3 components represent the meter and
transponder.
TWACS Level 2 components represent the substation elements
that interface with the existing electrical distribution system.
TWACS Level 1 components represent TNS, the system that
controls the TWACS components.

Chapter Practice
Practice
Lets take a minute to
practice what we have
covered in this
chapter:
Practice Answers
Review answers and
ask for questions

1. What component added to the substation enables the TWACS


system to interface with the electrical system for outbound
communications?

2. True/False The TWACS system requires the utility to replace


substation transformers, buses, and feeders for implementation.

3. What component is the heart of the substation?

4. What component is the main control point of the TWACS system?

5. True/False Existing meters must be discarded for TWACS


deployment.

6. True/False Dialup is the most effective way to connect substations


to TNS.

7. True/False The TWACS system is less costly to operate than


competing products since the transport medium for the meter
communications uses the existing electrical system network.

Production Code

42

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design

TWACS Basics

Chapter Practice Answers


Practice Answers
Review answers and
ask for questions

1. What component added to the substation enables the TWACS


system to interface with the electrical system for outbound
communications?
MTU
2. True/False The TWACS system requires the utility to replace
substation transformers, buses, and feeders for implementation.
False
3. What component is the heart of the substation?
CRU
4. What component is the main control point of the TWACS system?
TNS
5. True/False Existing meters must be replaced for TWACS
deployment.
False
6. True/False Dialup is the most effective way to connect substations
to TNS.
False

8. True/False The TWACS system is less costly to operate than


competing products since the transport medium for the meter
communications uses the existing electrical system network.
True

Production Code

43

Distribution Control Systems, Inc.

Chapter 2: TWACS System Design


Version Record
Item
Product Reference
Current Version
Date Issued
Owner
Change History
Date
Version
8/4/03
0.1
8/7/03
0.2
8/8/03
0.3
8/14/03
0.4
8/14/03
0.5
8/12/03
1.0
9/3/03
1.3
10/24/03
2
10/27/03
2.2

Record
B CHA 2 TWACS System Design
3.2
11/11/03
Steve Seyer

Summary of Changes
First informal reviewed version created 7/8 8/4
Kellees review
Updates per 0.2 review
Kellees review
Updates per 0.4 review
Passed to DCSI for review
Made updates per John, Rick and Steves changes
Updated with instructor notes and reviews
Kellee applied formatting, additional instructor notes, protocol issues, vocab clean up, style
clean up to ready for Sandys review
Sandys Review
Kellee updated with Sandys changes
Sandys updates applied

10/30/03
10/30/03
11/11/03

2.3
3.0
3.2

Approval
Date

Version Name

Production Code

TWACS Basics

Signature

44

Distribution Control Systems, Inc.

Chapter 3: TNS System Design


Chapter Duration
90 minutes
Schedule Time
____________

TWACS Basics

TNS System Design

Equipment Needed

Laptop

Projector
Chapter Introduction

Projection Screen

Whiteboard
TWACS Net Server is the central control element of the TWACS system.

______________

TNS provides utility companies with a user interface to manage two-way


communications with their meters.

Class Openers
Welcome/Thanks
Phone/Restroom
location
Leave class as
needed
Cells to vibrate
Intros 1Name
2Company 3Goals
______________

As an electric utility begins the process of evaluating or implementing the


TWACS system, it is important those involved with the direct and indirect
use and implementation of the system develop a general idea of TNS
design and how TNS operates.
Utility personnel who will benefit from the information in this chapter
include:

Intro
This chapter is an
overview of how the
TNS system works
and relates to the
TWACS system as a
whole.

Personnel

Relationship
Understanding the
design of TNS will
allow the utility to set
up TNS in the way
that is most efficient
for them.

Billing Personnel

Personnel
Information in this
class benefits
Useful
Information in this
class is useful when
preparing to
implement or use the
TWACS system.

Production Code

Required

Elective

TNS Operators
TWACS Project Managers
Customer Service Representatives/ Managers

Substation and Transmission Engineers


Meter Technicians
Customer Engineers

Information in this chapter is useful when the participant is preparing to


deploy and/or use TNS. This information will help the participant develop
a base-level understanding of TNS system components and functions of
those components. The base-level understanding of TNS system design
will help enhance the participants perspective as new TWACS tasks are
introduced throughout this and other TWACS training courses.

Distribution Control Systems, Inc.

Chapter 3: TNS System Design


Vocabulary
Vocabulary to look
for(read vocab)

TWACS Basics

Vocabulary introduced in this chapter includes:


ORACLE

SERVER PROCESS

ORACLE DATABASE
MANAGER

DATABASE

TABLE

LOG FILE

WATCHDOG

ALERT

CIS

APPLICATION TOOL
BAR

SCROLL BAR

BUBBLE HELP

DROP-DOWN BOX

DROP-DOWN OPTION
LIST

CHECK BOX

RADIO BUTTON

TEXT FIELD

FORM

RECORDS

FIELD

BUTTON

The learning modules in this chapter include:


Schedule by Mod
Morning:__________
1st Break:__________

TNS System Overview


After 1st B:_________

TNS Common User Elements


Lunch:____________
After L:____________
2nd B:_____________
After 2nd B:_________
Chapter Objectives
By the end of this chapter, participants should be able to:

Objectives
Emphasize you will
be able to(list
objectives)

Production Code

List major TNS system components.


Differentiate between TNS databases, tables, and logs.
Discuss options for interfacing TNS with existing customer
databases.
Identify TNS common user elements.

Distribution Control Systems, Inc.

Chapter 3: TNS System Design


Module Duration
45 minutes
Schedule Time
____________

TWACS Basics

TNS System Overview

Intro
Module Introduction
High level overview of
basic system
This module discusses the general characteristics and design of the
components of TNS
TWACS Net Server (TNS) typically located at the utility central office.
(databases, tables,
TNS provides the user interface for utility company employees to interact
logs).

with TWACS.
Personnel
Information in this
class benefits

Personnel

Required

Elective

TNS Operators
TWACS Project Managers
Customer Service Representatives/ Managers
Billing Personnel
Substation and Transmission Engineers
Meter Technicians
Customer Engineers
Useful
Information in this chapter is useful when participants work with TNS
For end users as they directly or indirectly to develop an understanding of the elements that
are starting to use
make up TNS. This module covers:
TNS

TNS system components,


TNS databases,
TNS tables, and
TNS logs.

Vocabulary
Vocabulary introduced in this module includes:
Vocabulary to look for
in this module(read
ORACLE
SERVER PROCESS
ORACLE DATABASE
vocab)
MANAGER

Production Code

DATABASE

TABLE

LOG FILE

WATCHDOG

ALERT

CIS

Distribution Control Systems, Inc.

Chapter 3: TNS System Design


Topics in Mod
We will cover the
following topics

TWACS Basics

The learning nuggets in this module include:

TNS System Components


Managing TNS
Integrating AMR Data with Utility Billing Systems

Module Objectives
Objectives
Emphasize you will
be able to(list
objectives)

Develop a general understanding of TNS elements and system


design

TNS SYSTEM COMPONENTS


TWACS Net Server or TNS provides utility employees an interface to
communicate with the TWACS system. It is through TNS that the
following functions are set:
TNS Functions
functions set in TNS

Batched automatic meter reads


Interactive meter reads
Management of load control elements
Interval data collection
Line voltage and power quality monitoring
Outage mapping
Remote service disconnect/connect

It is important to understand that TNS is comprised of many components.


These components work together to complete the functions required of
TNS. This module will cover a number of general aspects of TNS system
design including the following concepts:
TNS Components
TNS is a
conglomeration of
various server
programs all running
simultaneously in a
multi-tasking
environment.

Production Code

Oracle Database Manager and servers


Databases
Tables
Log files

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

Server Processes
Server Processes are
the main mode of
communication
between the
components of TNS.

TNS Performance
If problems occur in
one or more of the
servers, the entire
TNS system
performance can
degrade. The TNS
Operator should
contact DCSI
Customer Care if an
application continues
to crash. The
Watchdog will not
automatically restart
servers.

Production Code

TWACS Basics

Oracle Database Manager and Servers

DCSI has developed TNS around a


database manager called
ORACLE. Many system
tasks known as SERVER
PROCESSES run
through the ORACLE
DATABASE MANAGER.
These server
processes control
aspects of the
TNS system.
Figure 1, TNS
Server Processes,
lists the critical
servers found in
TNS. Server
processes must be active
to perform certain
functions. Each server
process may have its own
databases and logs of information, and
server processes may share databases
of information depending on
requirements of the server process.

Figure 1 TNS Server Processes

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

TWACS Basics

What Is a Database?
Databases
Collection of related
items stored in a
folder.

TNS Databases
A few examples

TNS uses several databases to track


information. A DATABASE is nothing more
than a collection of related items kept in
an electronic folder. TNS uses several
databases. For example, there is a
permanent meter database responsible for
tracking all meters found on one of a
utilitys substations. There is also a temporary meter database that
tracks meters TNS has yet to find. There is a database to track
substation information. Another database tracks jobs to be
scheduled. The TNS users employ TNS applications to read and
manipulate TNS databases. Some examples of databases include:

Database Name

TNS Program
Name Used

Permanent meter
database

Purpose
Tracks meters TNS has found on a
substation.

Meter Misc.
Temporary meter
database

Tracks meters that have not made it to


the permanent meter database.
Temp Meter Misc.

SCE database

Tracks substation equipment


configuration.
SCE Maintenance

Table 1 - Example Databases in TNS

Production Code

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

Tables
List of items

TNS Tables
A few examples

TWACS Basics

What Is a Table?

Tables are simplified versions of databases. A


TABLE is a simple list of items, and a table is
usually limited in size. TNS uses tables for lists
of information it must track. For example, there
is a table to track the types of meters a utility
uses. There is a table to track the types of
substations relating to the meters used. Another table tracks blocks
of serial numbers for meters used by the utility. A TNS user uses a
TNS program to read and modify tables. Some examples of tables
follow:

Table Name

TNS Program
Name Used

Product Table

Purpose
Tracks types of meters used by a utility
and aspects about the meter.

Product
Sub Product Table
SubProduct
Product Type Model
Cross Reference Table
Product Type
Model Cross
Reference
Response Status Cross
Reference Table

Tracks types of meters and how a


particular substation should
communicate with the meter.
Tracks serial numbers of meters utility
will use and type and model of the
meters.

Lists reference codes from various


functions within TNS.
Response Status
Cross Reference

Meter Conversion Table

Tracks meter pulse conversions to


KWH readings.
Meter Conversions

Table 2 - Example Tables in TNS

Production Code

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

Log Files
There are many logs
in TNS used to track
information. Users
will want to work with
only a specific few
on a day-to-day
basis.

TNS Log Files


A few examples

TWACS Basics

Log Files in TNS

TNS tracks some historical information about TNS activity in TNS


databases. This information is available using the TNS programs.
AMR read data is an example of this type of information. TNS also
uses a number of LOG FILES that track historical information about
various aspects of TNS operation. TNS users often view log files
using a standard text editor like Microsoft WordPad. DCSI
programmers and field support personnel use some of the log files to
determine program problems. Utility employees will find some of
the log files relevant when performing basic tasks within TNS.
Some of the relevant log files include:

Log Name

File Name

Purpose

Search-in History log

SHyyyymmdd.dat

Shows results of meters searched into


the database.

PreTIQ log

PreTIQ.dat

Shows meters that failed the


prequalification phase of the meter
search process.

Com Server Log

CSyyyymmdd.dat

Shows all connection and disconnection


history for a communication server to
substations.

Transaction (TR) Log

TRyyyymmdd.dat

Shows a history of all transactions to a


substation and back.

Table 3 - Example Log in TNS

Production Code

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

Tools for Managing


Watchdog
Alerts

Watchdog
Note: Utility can
only view
Watchdog on the
server, not the
clients (assuming
clients run native
applications).

TWACS Basics

MANAGING TNS
TNS provides the utility with valuable tools for managing the
TWACS system, among these tools are TNS Watchdog and TNS
Alerts. The utility can use these tools to proactively respond to
problems that arise.
TNS Watchdog

The WATCHDOG application (found by following the path


Start > TNS Watchdog GUI or by clicking the desktop
button labeled TNS Watchdog GUI) monitors the
availability of each critical server process in TNS. At
times, problems may arise with TNS components. Utility personnel
can use the Watchdog application to view the general health of the
TNS system. If a server process is not working properly, the TNS
Operator can view the Watchdog to see if the application is no
longer communicating with the Watchdog. From the Watchdog, the
TNS Operator can stop and start server processes in an attempt to
correct problems. Should a server process continually fail, the
utility should contact DCSI Customer Care.

Figure 2 TNS Watchdog GUI

Production Code

Distribution Control Systems, Inc.

Chapter 3: TNS System Design


Alerts
The utility might
consider sending
these alerts to the
TNS Operator cell
phone. All cell
phones have an
email address
associated with
them.

TWACS Basics
Alerts from TNS

The Watchdog
application also
allows the TNS
Operator to designate who
receives ALERTS if the
Watchdog discovers a problem
with one or more of the server
processes. Nearly every cell
phone and pager today has an
associated Internet email
address. The utility may wish
to send TNS alerts to employee
cell phones or pagers to
expedite problem resolution.
Figure 3 TNS Watchdog Alert Options
Note: The TNS Operator can
access the Options screen, as
shown in Figure 3, TNS Watchdog Alert Options, in the TNS
Watchdog Utility, by clicking Project > Options.

Billing Files
Remind
participants: Every
utility has a
different way to
interface with their
billing system. For
utilities that have
inflexible billing
systems, billing
files can be
custom tailored to
meet
requirements.

Production Code

INTEGRATING AMR DATA WITH


UTILITY BILLING SYSTEMS
The TWACS system allows the utility to automate the meter reading
process. Utilities must harness the information from the AMR process and
insert the data into the existing billing process for AMR to be effective.
TNS Read Data

TNS outputs files from each


AMR process with information
relevant to customer billing. The
Figure 4 Billing File Process
TNS default billing file created from the
AMR process may not be suitable for
integration into a utilitys CUSTOMER INFORMATION SYSTEM (CIS) or
billing system. DCSI, on request, will program TNS to create a
custom, billing file tailored to integrate with the utilitys billing
system. TNS creates the custom file in addition to the default billing
file.

10

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

TWACS Basics

TNS System Overview Review

Review
The main points of
this section

TNS is comprised of a number of servers working together to


complete required functions.
TNS data files are categorized as databases, tables, and logs.
The TNS Watchdog provides a graphical view of the server
status.
TNS has an alerting function that can notify an email recipient
of major TNS problems.

TNS System Overview Practice


Practice
Lets take a minute to
practice what we have
covered in this
section:

1. What program provides a graphical view of the TNS server


processes?

2. True/False TNS is comprised of a number of server processes


working together to perform various functions.

3. What type of file does TNS use for messages from processes?

4. Name three significant databases within TNS.

5. Which table is used to track serial numbers of meters the utility


will use?

6. Which log file shows when a meter fails to pre-qualify for the
meter search process?

7. True/False There is a standard format for billing files. If the utility


billing system wont accept the standard TNS billing file, the only
option for the utility is to have someone modify the utility billing
system.

Production Code

11

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

TWACS Basics

TNS System Overview Practice Answers


Practice Answers
Review answers and
ask for questions

1. What program provides a graphical view of the TNS server


processes?
TNS Watchdog
2. True/False TNS is comprised of a number of server processes
working together to perform various functions.
True
3. What type of file does TNS use for messages from processes?
Log files
4. Name three significant databases within TNS.
Permanent Meter Database, Temporary Meter Database, SCE
Database
5. Which table is used to track serial numbers of meters the utility
will use?
Product Type Model Cross-Reference Table
6. Which log file shows when a meter fails to pre-qualify for the
meter search process?
PreTIQ log
7. True/False There is a standard format for billing files. If the utility
billing system wont accept the standard TNS billing file, the only
option for the utility is to have someone modify the utility billing
system.
False, a custom, billing file can be created in TNS

Production Code

12

Distribution Control Systems, Inc.

Chapter 3: TNS System Design


Module Duration
45 minutes
Schedule Time
____________

TWACS Basics

TNS Common User Elements


Module Introduction

Intro
This Mod introduces
participants to
common TNS user
functions.
Personnel
Information in this
class benefits

This module discusses the common user elements users will find
throughout the TNS programs. DCSI engineers designed TNS programs
with a similar look and feel so that one module operates similarly to
another.
Personnel

Required

Elective

TNS Operators
TWACS Project Managers
Customer Service Representatives/ Managers
Billing Personnel
Substation and Transmission Engineers
Meter Technicians
Customer Engineers
Useful
Information in this module is useful when participants work with TNS
For end users of TNS

directly or indirectly to develop an understanding of the common user


elements that make up TNS. This module covers:

An overview of application groupings in TNS,


Common terminology used in TNS,
How to navigate through applications in TNS, and
How to query information in TNS forms.

Vocabulary introduced in this module includes:


Vocabulary
Vocabulary to look for
in this module(read
APPLICATION TOOL
SCROLL BAR
BUBBLE HELP
BAR
vocab)

Production Code

DROP-DOWN BOX

DROP-DOWN OPTION
LIST

CHECK BOX

RADIO BUTTON

TEXT FIELD

FORM

RECORDS

FIELD

BUTTON

13

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

Topics in Mod
We will cover the
following topics

TWACS Basics

The learning nuggets in this module include:

TNS Program Structure


TNS Navigational Aids

Module Objectives
Objectives
Emphasize you will
be able to(list
objectives)

Develop a general understanding of TNS common user elements


Learn how to navigate TNS application use
Develop an understanding of TNS forms query techniques

TNS PROGRAM STRUCTURE


TNS Components
This nugget is an
overview of functions
in TNS.

Production Code

It is important to understand that TNS is comprised of many components.


These components work together to complete the functions required of
TNS. This nugget covers an overview of the program elements to help the
participant develop a general understanding of where to look for certain
functions and how to use the forms provided in TNS.

14

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

Program Groups
The major program
groups are listed in
the table. Most of
these (but not all)
have tool bars
associated with
them.
The benefit of
opening a tool bar is
that the user is
prompted with
Certain and
meters
username
password
support only
TNSonce,
Max
and
then
any
Demand Finder like
application can be
Type without
31 and up. For
opened
example,
additional Type 21
Model 52 does not
authentication.

support demand.

TWACS Basics

Application Program Groups

TNS has many programs and forms that perform various functions.
TNS groups these programs into logical categories found on the
Windows Start menu. The following table lists the various program
groups found in TNS that appear on the Windows Start > Programs
list:
Program Group
TNS Max Demand
Finder
TNS Services Config
Utility

TNS Watchdog Utility


TNS AMR Hourly
Applications
TNS APM Search
TNS City-SUB
Maintenance
TNS Generic
Applications
TNS Load Control
Applications
TNS Metering
Maintenance
TNS SCE
Administrative Tools
TNS SCE
Maintenance
TNS System
Administration
TNS System
Maintenance
TNS TCT Volt
Applications
TNS Test
Communication Tool
TNS Trouble Server
Applications

What Can I Do with it?


Find the highest 15-minute interval for one or all
meters deployed.
Save the TNS configuration to a TNS
Configuration fileused to set up new server,
change the password of account no database
server running TNS services, and by DCSI.
Monitor, stop, and start servers within TNS.
Review and graph hourly and interval data for
one, some, or all meters.
Search for meters on alternate paths (feeders,
buses may have moved).
Group substations by city. You can set up groups
of substations if a search fails on the substation
where a user thought a meter was located.
Set up two-way addressingDCSI personnel
normally completes during installation.
Set up load control.
Search and read meters and set up conversion
tables.
View SCE logs.
Set up substations, bring substations online, issue
substation commands, and view SCE logs.
Identify meter serial numbers, models, types,
capabilities, and conversion factors.
Schedule jobs and display maintenance results.
Test voltage levels on one or more meters.
Analyze inbound and outbound data and
information.
Identify meter tampering and diagnostics from
RCE equipment.
Table 4 - TNS Program Groups

Production Code

15

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

TWACS Basics

TNS NAVIGATIONAL AIDS


Windows Basics
Some of this is
basic Windows
usage, but do not
skip over it since
those that most
need it may be
embarrassed to
say.

TNS has a common set of navigational aids used across the TNS
programs. By mastering the navigational aids, users can optimize the use
of and results from the TNS program.
Viewing Sub-Applications

When opening a program group, notice the symbol at the right of


each group name indicates programs defined under the group name.

The arrow symbol

to the right of an

application indicates sub-applications. When


placing the cursor on the application, the subapplications will show.

Application Tool Bars

Figure 5 Sub-Application View

Some of the TNS application groups have an APPLICATION TOOL BAR


defined. The advantage of using the application tool bar is the user
must only enter the username and password once for the group of
applications defined by the
tool bar. As long as the user
selects applications from the
open tool bar, the user
receives no password prompts
once the user enters the initial
tool bar username and
Figure 6 Tool Bar Login Screen
password. The following represents the
AMR Hourly tool bar selected from
Figure 5, Sub-Application View.
Once the user selects
the AMR Hourly tool
bar, TNS prompts the
user for an initial
username/password and
Figure 7 AMR Hourly Application Tool Bar
database alias. The
initial username is
dcsi, and the password is dcsi. The initial database name for
training is meter or tsmeter depending on the configuration.

Production Code

16

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

TWACS Basics

The utility may change the default username and password if


desired.
The AMR Hourly Data Applications tool bar then appears on the
desktop. As long as the user selects applications from the tool bar,
the applications will no longer prompt the user for username and
password.
Scroll Bars

Many of the forms also have vertical and horizontal SCROLL BARS.
Clicking on the bar and holding the mouse button down will allow
the user to pull the bar down or across to view other information.
Horizontal scroll bars are particularly useful because there are
usually more columns than can be displayed on the screen.
Vertical Scroll Bars
Many Forms/Windows have vertical Scroll Bars
allowing the user to view various Rows of Data.

Horizontal Scroll Bar


Many of the Forms/Windows have
Horizontal Scroll Bars allowing the user
to view various Columns of Data.

Figure 6 Scroll Bars Example

Bubble Help

The user can identify the application represented by the icon by


simply holding the cursor over the application for a few seconds.
Notice that the application label View AMR Hourly Data Records
now shows as
the BUBBLE HELP
in the first icon
of Figure 9,
Bubble Help
Example.

Figure 7 Bubble Help Example

Production Code

17

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

TWACS Basics

Drop-Down Menus

Most TNS
applications
make use of
a Windows
construct
known as

Typical Windows drop-down menus

DROP-DOWN
MENUS.

Drop-down
menus
provide TNS
with a more
organized
and ordered
look and
feel.

Figure 8 Drop-Down Menu Example

Drop-Down Option Lists

Many TNS applications make use of a Windows construct known as


DROP-DOWN OPTION LISTS. Drop-down option lists provide the TNS
user with an ordered method of selecting a limited set of values for a
particular field.

Figure 9 Drop-Down Option List Example

Production Code

18

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

TWACS Basics

Other Control Element Terminology

There are other types of control elements used in TNS.


CHECK BOXES allow the user to
select one or more options.

Figure 10 Checkbox
Example
RADIO BUTTONS allow

the user to select only


one of several options.
Figure 11 Radio Button Example

TEXT FIELDS allow

the user to enter data into a


field. To enter data, click in the field. A
blinking cursor in the field displays to signal
the field is ready for data entry.
Figure 12 Text Window
Example

Production Code

19

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

TWACS Basics

Forms in TNS

Many
applications
within TNS
make use of
FORMS that
allow for
manipulating
information in
the database.
Information in
the database
is stored as a
group of
RECORDS.
Figure 13 Forms Example
Each line in Figure 15, Forms Example,
represents a record. Records are comprised
of FIELDS. Each record has several fields, for example, the meter
record highlighted above has a Serial Number field, a Premises
field, and a Substation, Bus and Feeder field visible. Forms
make use of a standard set of BUTTONS for adding, deleteing, querying
and moving through the information TNS tracks in the database.
Not all forms will have every button, but there is a common set of
buttons used across most forms.
Print screen

Save record

Page up

Cancel add and exit

Previous transaction

Cancel add without saving

Page down

Do search

Next transaction

Cancel this search

Query list based on criteria

Cancel searches

Cancel query

Cancel/exit without saving

Apply updates/execute

Comma delimited text file

Add record

Delete serial numbers

Delete record

Halt job

Edit record

Demand reset history

Table 5 - Common Buttons


in TNS

Production Code

20

Distribution Control Systems, Inc.

Chapter 3: TNS System Design


Query Tip
When querying
information, fields
are typically case
sensitive.

TWACS Basics

Query Options

When performing queries on a form, the user may wish to view all
the information or
just a subset of the
information in the
database.
Depending on
needs, the user can
vary the query to
view exactly the
subset of records
the user wishes to
view. The
following table
Figure 14 Query Page Example
lists examples that will help the user
understand how to perform queries that
meet user needs.
I want to view
All records in the
database

Meter with serial


number 17999

Steps for query


Click the Query
on the screen.

button once to clear all fields

Click the Query


records.

button once more to query all

Click the Query


button once to clear all fields
on the screen.
Enter 17999 in the Serial Number field
button once more to search for
Click the Query
the meter with serial number 17999.

Records where serial #


is greater than 17999

Click the Query


button once to clear all fields
on the screen.
Enter >17999 in the Serial Number field
Click the Query
button once more to search for
all meters with serial number greater than 17999.

All meters on
substation TNS, first
bus, first feeder

Click the Query


button once to clear all fields
on the screen.
Type TNS in the Substation field.
Type BUS1 in the Bus field.
Type FDR1 in the Feeder field.
Click the Query
button once more to search for
all meters that meet the criteria.
Table 6 - Steps for Queries

Production Code

21

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

TWACS Basics

Freezing Display Data

The TNS system allows the user to freeze


data so it will not change while the user is
viewing it. There are various ways on
different forms to freeze the display screen
including the use of a drop-down window, a
check box, or radio buttons to select the
freeze function. Notice that the user can
select the auto-refresh function in some
forms. The refresh rate can be set for
whatever time period desired. The refresh
rate in the TNS system can be adjusted by
the System Administrator.

Figure 15 Freeze Options

Option

Result

Freeze

Hold data in the form or window while the display is


open.
Release data for update upon next refresh.
Refresh data instantly.
Refresh rate dependent upon form.

Unfreeze
Refresh
Auto-Refresh

Table 7 - Steps for Queries

Production Code

22

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

TWACS Basics

TNS Common User Elements Review

Review
The main points of
this section

TNS is divided into application program groups. Each group


defines forms or applications with a common update theme.
TNS has common user elements that permeate throughout the
TNS program.
The TNS Watchdog provides a graphical view of the server
status.
TNS has an alerting function that can notify an email recipient of
major TNS problems.

TNS Common User Elements Practice


Practice
Lets take a minute to
practice what we have
covered in this
section:

1. Which application program group allows the user to set up


substations?

2. Which application program group allows the user to search and


read meters.

3. What benefit does the user have by opening an application tool bar
instead of the individual applications?

4. On any query screen, how would a user query all records in the
database?

Production Code

23

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

TWACS Basics

TNS Common User Elements Practice Answers


Practice Answers
Review answers and
ask for questions

1. Which application program group allows the user to set up


substations?
TNS SCE Maintenance
2. Which application program group allows the user to search and
read meters.
TNS Metering Maintenance
3. What benefit does the user have by opening an application tool bar
instead of the individual applications?
The toolbar only has the user authenticate
(username/password) once.
4. On any query screen, how would a user query all records in the
database?
Click the query button twice.

Chapter Review
Review
The main points of
this chapter

Production Code

TNS has many system components including various server


processes, databases, and tables that integrate to perform various
TNS functions.
TNS has several diagnostic tools including the Watchdog
application, log files, and alerting functions that help the TNS
Operator manage TNS operations.
TNS is very flexible when integrating TNS data to other systems
such as the utility billing system or Customer Information
System.
TNS is grouped into logical program segments that make it
easier for the user to find applications for specific purposes.
TNS has common user elements that recur throughout TNS
programs that make using TNS easier.

24

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

TWACS Basics

Chapter Practice
1. In which database does TNS track meters it has not yet found?
Practice
Lets take a minute to
practice what we have
covered in this
chapter:

2. In what table does TNS track meter pulse conversions to KWH


readings?

3. In what program can the TNS Operator set up alerts for TNS
failures?

4. In which of the following TNS program elements can the user


select one and only one option?
a. Radio buttons
b. Check boxes
c. Drop-down option lists
d. A and C

Production Code

25

Distribution Control Systems, Inc.

Chapter 3: TNS System Design

TWACS Basics

Chapter Practice Answers


Practice Answers
Review answers and
ask for questions

1. In which database does TNS track meters it has not yet found?
Temporary meter database
2. In what table does TNS track meter pulse conversions to KWH
readings?
Meter Conversions
3. In what program can the TNS Operator set up alerts for TNS
failures?
In the TNS Watchdog application under Project > Options
4. In which of the following TNS program elements can the user
select one and only one option?
a. Radio buttons
b. Check boxes
c. Drop-down option lists
d. A and C

Production Code

26

Distribution Control Systems, Inc.

Chapter 3: TNS System Design


Version Record
Item
Product Reference
Current Version
Date Issued
Owner
Change History
Date
Version
8/12/03
0.1
8/12/03
0.2.
8/12/03
0.3
8/14/03
0.4
8/14/03
1.0
9/3/03
1.1
9/17/03
1.2
9/17/03
1.3
10/23/03
2.0
10/28/03
2.2

Record
B CHA 3 TNS System Design
3.2
11/11/03
Steve Seyer

Summary of Changes
First informal reviewed version created 8/8 8/12
Kellees updates
Steves upates per Kellees changes
Kellees Updates
Update to DCSI
Update per Johns changes
Update per Steve Lees changes
Update per Rick Wills changes
Updates for instructor notes, review questions
Kellee applied formatting, additional instructor notes, protocol issues, vocab clean up, style
clean up to ready for Sandys review
Sandys review
Kellee up dated with Sandys review
Sandys updates applied

10/30/03
10/30/03
11/11/03

2.3
3.0
3.2

Approval
Date

Version Name

Production Code

TWACS Basics

Signature

27

Distribution Control Systems, Inc.

Anda mungkin juga menyukai