Tinggi/
L (mm) Kedalama Jumlah titik
P (mm)
n
No.
Type
pondasi
1
2
3
4
5
Type P1A
Type P1
Type P2
Type P3
Type P4
300
300
300
300
300
300
300
300
300
300
12
24
24
24
24
Volume
2
2
22
18
28
Total
24
48
528
432
672
1704
Rencana Hari
1704
12
Total
m/hari
Uraian
Qt'y
A. Matrial
Disel oil
Lubricant
0.7815
0.0521
mandor
kepala tukang
Mechanic
Electrician
Operator
Pekerja
Jointing
Cutt off pile
0.0052
0.0156
0.0052
0.0052
0.0052
0.026
0.0417
0.0417
0.0521
0.0521
142.0
142.0
=
=
110.97
7.40
142.0
142.0
142.0
142.0
142.0
142.0
142.0
142.0
=
=
=
=
=
=
=
=
1
2
1
1
1
4
6
6
142.0
142.0
=
=
7
7
B. Pekerja
C. Peralatan
Crawler Crane 45 ton
Diesel Hammer K-35
D. Sub Total (A + B + C ):
E. Overhead & Profit (10% X D
F. Total
G. Dibulatkan
Satuan
m
m
m
m
m
m
Panjang tiang
12
Harga Satuan
Liter
Liter
1,850
15,000
orang
orang
orang
orang
orang
orang
orang
orang
20,000
17,500
30,000
30,000
40,000
10,000
50,000
25,000
Total tiang
m/hari
12
Total harga
1445.775
781.5
2,227
104
273
156
156
208
260
2085
1042.5
4,285
Jam
Jam
250000
80000
13025
4168
17,193
23704.775
2370.4775
2370.4775
2,370