Perhitungan Volume Tiang Pancang

Tinggi/
L (mm) Kedalama Jumlah titik
P (mm)
n

No.

Type
pondasi

1
2
3
4
5

Type P1A
Type P1
Type P2
Type P3
Type P4

300
300
300
300
300

300
300
300
300
300

12
24
24
24
24

Volume

2
2
22
18
28
Total

24
48
528
432
672
1704

Pemancangan Tiang Pancang Dia.300x300 mm (Asumsi Panjang Tiang


Volume Tiang Pancang

Rencana Hari

1704

12

Total
m/hari

Tenaga dan bahan

Uraian

Qt'y

A. Matrial
Disel oil
Lubricant

0.7815
0.0521

mandor
kepala tukang
Mechanic
Electrician
Operator
Pekerja
Jointing
Cutt off pile

0.0052
0.0156
0.0052
0.0052
0.0052
0.026
0.0417
0.0417

0.0521
0.0521

142.0
142.0

=
=

110.97
7.40

142.0
142.0
142.0
142.0
142.0
142.0
142.0
142.0

=
=
=
=
=
=
=
=

1
2
1
1
1
4
6
6

142.0
142.0

=
=

7
7

B. Pekerja

C. Peralatan
Crawler Crane 45 ton
Diesel Hammer K-35

D. Sub Total (A + B + C ):
E. Overhead & Profit (10% X D
F. Total
G. Dibulatkan

Satuan
m
m
m
m
m
m

mm (Asumsi Panjang Tiang 24 m)/m


Total
m/hari
142.0
Satuan

Panjang tiang
12
Harga Satuan

Liter
Liter

1,850
15,000

orang
orang
orang
orang
orang
orang
orang
orang

20,000
17,500
30,000
30,000
40,000
10,000
50,000
25,000

Total tiang
m/hari
12
Total harga
1445.775
781.5
2,227
104
273
156
156
208
260
2085
1042.5
4,285

Jam
Jam

250000
80000

13025
4168
17,193
23704.775
2370.4775
2370.4775
2,370