SAEP-334
17 March 2013
Retrieval, Certification and Submittal
of Saudi Aramco Engineering and Vendor Drawings
Document Responsibility: Engineering Knowledge and Resources Division
Scope............................................................. 2
Definitions....................................................... 2
Applicable Documents.................................... 4
Engineering Drawing Access......................... 5
Requesting Drawing Number......................... 8
Retrieving Existing Drawing........................... 8
Tag Number................................................. 10
Plant Number............................................... 13
Project Proposal........................................... 15
Drawing Cancellation................................... 15
Demolition Drawing...................................... 16
As-Built......................................................... 16
Certification.................................................. 17
DCC Number Formats.................................. 19
Submittal...................................................... 20
Overdue Drawings....................................... 23
EK&RD Acceptance..................................... 26
Vendor Drawings.......................................... 26
29
30
39
40
Page 1 of 48
Scope
1.1
1.2
Per this procedure, all Engineering Drawings developed (if new) and/or revised
(if existing) by Saudi Aramco organizations or by others for Saudi Aramco,
must be developed or revised by means of Saudi Aramco approved electronic
software and formats as specified in the Saudi Aramco Engineering Standard
SAES-A-202 and this SAEP.
Definitions
For the purpose of this SAEP, the following definitions apply:
As-Built Drawing: an Engineering drawing that has been revised to reflect actual field
conditions after the completion of construction. Additions or changes to a drawing
resulting from facility modification must also be verified as As-Built and referenced to
the Job Order (JO) in case of PMT, Engineering Work Order (EWO) in case of Design
office and organization code in case of operation.
CADD Drawings: are Engineering Drawings generated electronically using software
approved by Saudi Aramco as its standard medium for development and permanent
retention (see Appendix C of this procedure for details). Prior approval is required from
the Drawing Management Unit Supervisor for the use of any other software.
Contractor(s): shall mean the Design, Construction and Service Contractors,
Manufacturers, Vendors, Government Agencies, and other similar organizations, having
a contractual relationship or a prospective contractual relationship with Saudi Aramco
that may receive drawings from, or generate drawings for Saudi Aramco.
Subcontractors shall also be considered as Contractors.
Data-Centric System: is a design program used to develop Instrumentation,
Electrical, Mechanical and Piping related engineering information in a database format.
These formats will be used to generate 2D/3D modules that are derived from the
database. For more details refer to Section 15.11 of this procedure.
DCC Number: is a unique number that identifies a specific DCC for the purpose of
cross-referencing the certified DCC against the Engineering Drawings covered by that
DCC. It also acts as a log number for the permanent archival of the DCC with EK&RD.
Demolition Drawing: is any existing drawing that shows the extent of the demolition
work to be done. For more details refer to Section 11 of this procedure.
Page 2 of 48
Project Management Team (PMT): refers to the Saudi Aramco organization that
contracts engineering, procurement and/or construction work to outside contractors
under their supervision.
Proponent or OEO: Shall means all Saudi Aramco operating engineering organizations
including engineering services (OEO) are responsible for operation, maintenance,
engineering, safety and protection of a Saudi Aramco facilities, equipment or properties.
QVP: Query, View, and Print.
Responsible Engineering Office or REO: Is a Saudi Aramco office that has been
entrusted with the production or revision of an Engineering Drawing. Non-Saudi
Aramco firms or companies are not allowed to be the designated REO. Certain
individuals within the REO shall be authorized to track issued existing Engineering
Drawings and Facility Data.
Revision Validation: Refers to the area on the title block of the drawings identifying
the approval/certification requirements of a specific revision of an Engineering Drawing
are covered by an approved DCC.
Saudi Aramco: shall mean Saudi Arabian Oil Company and its affiliated companies,
including, but not limited to Aramco Overseas Company (AOC) and Aramco Services
Company (ASC).
Vendor drawing: is any document developed by a manufacturer that supports the
technical requirements of material or equipment and received as part of a purchase
order. The vendor drawings are governed by this procedure Section 18.
3
Applicable Documents
The requirements contained in the following documents and forms apply, to the extent
specified in this procedure:
Saudi Aramco Engineering Procedure
SAEP-127
SAES-J-004
SAES-J-005
SAES-L-105
SAES-P-104
Page 4 of 48
AE-036411
AD-036204
SA-2864-ENG
SA-2781A-ENG
SA-2781E-ENG
SA-2799-ENG
SA-7076-ENG
SA-9594-ENG
SA-9601-ENG
Page 5 of 48
4.2
4.1.1
4.1.2
Saudi Aramco employees who fail to submit their drawing access form
through system must have their manual drawing access request form
SA-9601-ENG signed by their Division Heads to access the drawings of
their organizations. Access to Engineering Drawings under the
responsibility of other organizations requires the approval of the
requesting employees Department Head or Project Manager in case of
PMT. In addition, the requestor will have QVP access to library and
standard drawings. Refer to Section 4.3 for Signature Authority Table
Summary.
4.1.3
4.1.4
Accessing Saudi Aramco Engineering Drawings by In-Kingdom or OutKingdom contractors requires the approval of the responsible Department
Manager (or his authorized delegates) on form SA-9601-ENG.
4.1.5
PMT Mobilization: the Project Manager for the subject BI shall request
assignment of an iPlant Project manager for the subject BI by submitting
the automated form SA-9601-ENG to EK&RD. Refer to the table in
Section 4.3 for approval authority. All the applicable organizations for
the subject BI shall be listed in the form.
4.2.2
Page 6 of 48
4.3
4.2.3
4.2.4
User
Type
iPlant Project
Manager
Project
Manager
PMT
Dept. Head
Revision Control
QVP
iPlant Project
Manager
OEO
Div. Head
Dept. Head
Revision Control
QVP
QVP
Dept. Head
Div. Head
Revision Control
Div. Head
iPlant Project
Manager
IDO
Access Given
Dept. Head
Page 7 of 48
Note:
OEO user having privilege of revision controller can revise only the drawings under his
own organizations responsibility. Special access can be requested by OEO user for
BI/JO/EWO or other OEO as project manager / revision control.
5.2
REO must return all unused drawing numbers through iPlant. Numbers retained
by REO after completion of a project will be treated as overdue drawings.
5.3
Any Saudi Aramco engineering office or Project Management Team (PMT) that
has been issued an engineering drawing number will assume the role as REO.
This REO will be held accountable for the proper production and control of the
drawings until formally submitted to EK&RD.
Note: Documents such as: Material take-off sheets, Construction Specifications,
Operating Specifications/Instructions, Technical Specification, Painting
Specifications, Inspection Records, Equipment List, Construction Schedule,
Construction Bar Charts, Cover Sheets, Calculation Sheets, Meter Reading
Tables, Manuals, Design Criteria, Sketches, Requisitions, Quotations, Spare Part
Lists, Performance/Calibration Curves, Purchase Orders, Installation Witness
Reports, will not be assigned an engineering drawing numbers. However, if these
drawings are considered critical to the operation organization, these drawings
SHALL BE assigned engineering drawing numbers after consulting Drawing
Management Unit Supervisor and submitted for archival into the iPlant.
Revision Number
6.1.1
6.1.2
Page 8 of 48
6.1.3
6.1.2.1
6.1.2.2
The first certified and approved issue of a new drawing must be revision
00. The Initials of approvers must appear in the title block.
All projects weather LSTK or non LSTK shall submit all key drawings
as Issued for Construction IFC with revision 00 at the 60% completion
of the project.
6.1.4
The REO must use the revision number(s) assigned to the existing
drawing(s) for a particular project (Job Order or EWO) and shall not use
them for any other job.
6.1.5
Only one revision number shall be issued at one time for one job
(Job Order or EWO). A revision for the same job shall be issued upon
submittal of the previously issued revision for that job; revision number
shall be requested through iPlant. Each revision level must be
individually recorded into iPlant.
Exception:
A separate design revision may be assigned for demolition purposes in
addition to the regular Design or As Built revision.
6.1.6
6.1.7
6.1.8
The iPlant Project Manager is responsible for requesting drawings for the
projects assigned to him.
6.1.9
Page 9 of 48
Tag Number
7.1
Requirements
7.1.1
7.1.2
7.1.3
7.2
7.1.4
7.1.5
7.1.6
7.1.7
7.1.8
7.4
7.5
Building Numbers
7.3.1
7.3.2
For the purpose of identification, all cables and conduits excluding single
and interconnecting wiring are assigned special codes. Refer to
Engineering Standard SAES-P-104 for complete instructions related to
cables and conduits.
7.4.2
Cable and Conduit Schedule (CCS) must be prepared for the assigned
tag numbers on Form SA-2864-ENG.
7.4.3
User(s) shall use the existing Cable and Conduit Schedule (CCS)
drawing by revising the existing sheet or adding new drawing/sheet.
7.5.2
7.5.3
Page 11 of 48
7.5.4
7.6
7.7
7.6.2
The tag numbers are controlled in numeric sequence for each voltage code
per each equipment type (marking) per each power source (normally
Substation) in each plant. For offshore platforms the switchgear Van tag
number will be used as feeder source instead of substation.
7.6.3
7.7.2
7.7.3
7.7.4
7.7.5
Page 12 of 48
7.8
Line Numbers
7.8.1
7.8.2
7.8.3
Line Designation Table (LDT) must be prepared for the assigned line
numbers on form SA-2824-ENG.
7.8.4
User(s) shall use the existing Line Designation Table (LDT) drawing by
revising the existing sheet or adding new drawing/sheet.
7.8.5
Line numbers must include line designation as outlined per Line Class
Designator System, SAES-L-105 Item 7 and Standard Drawing
AD-036204.
7.8.6
Plant Number
8.1
8.1.2
To apply for a new Plant Number, a request letter from the Division
Head or above of the Operations Engineering organization must be
submitted to EK&RD stating the following information:
a)
b)
c)
d)
Page 13 of 48
8.2
e)
f)
g)
One or more units shall be created under each plant to ensure that all
tags and drawings are requested under unit level.
8.1.3
8.1.4
8.1.5
8.2.2
b)
Revise the drawing that includes changing the plant number and
plant description in the title block.
c)
d)
e)
f)
g)
iPlant data will be modified with the new plant number by EK&RD.
The present owner shall request the next (As-built full numeric)
revision number.
Page 14 of 48
10
b)
The proposed owner shall revise the drawing that includes changing
the plant number and plant description in the title block.
c)
d)
e)
f)
g)
iPlant data will be modified with the new plant number by EK&RD.
Project Proposal
9.1
9.2
9.3
When the Job Number is not available for a drawing/tag number during request,
it can be requested under the BI directly without specifying the Job Number.
At the time of submittal, the Job Number shall be assigned to the drawings/tag
numbers.
Drawing Cancellation
10.1
Drawings being cancelled shall follow the same procedures and levels of
certification and approval as followed for revised drawings:
a)
b)
Page 15 of 48
10.2
11
c)
d)
b)
c)
d)
It is related to more than one plant or facility unless consent is secured from
the proponents of all the facilities involved.
Demolition Drawing
11.1
11.2
When preparing demolition design drawings, the following steps must be taken:
a)
b)
Submit the drawing through iPlant along with other drawings if any.
c)
12
As-Built
All approved and certified drawings must be updated to reflect the As-Built condition
of the facility.
12.1
All As-Built drawings are processed in the same manner as normal drawing
revisions.
12.2
13
12.3
The drawings can be issued for construction with holds (clouded areas).
These drawings must be revised to As-Built condition and certified.
12.4
12.5
12.6
12.7
12.8
In case of revising a Data Centric drawing, a copy of the original data base is
issued for design or partial as built and saved separately as revisions 01A, 01B,
etc. The REO is responsible for the integrity of the data base and shall merge
the applicable changes under next as-built revision.
Certification
Certification of a drawing indicates that it meets Saudi Aramco Engineering Standards
and Procedures. Drawings are certified by an online Drawing Completion Certificate
(DCC) approval process.
13.1
All Saudi Aramco Engineering Drawings must be approved, certified and dated
as required, herein, by means of routing a DCC through the approval process
and completing the title block of each drawing per Appendix B. Uncertified
drawings will not be accepted for inclusion into the corporate drawing system
(iPlant).
13.2
One single project (Job Order or EWO) may have more than one DCC.
Drawings of the same Engineering Discipline (Piping, Mechanical, Electrical,
Page 17 of 48
PMT, IDO, and OEO are the three types of organizations that submit and/or
revise drawings using a DCC. The DCCs issued to PMT and IDO organizations
require approvals from the Discipline Project Engineer, Project Manager, and
OEO representative. On the other hand, DCCs issued to OEO organizations
require approvals from the Discipline Engineer and the OEO Supervisor.
Any DCC may require an approval from another Saudi Aramco organization
depending on the content of the drawing. The table in Appendix B lists the
approvals required for a DCC based on the type of organization.
13.4
The Design Agency is responsible for completing the drawing title blocks and
routing the DCC through the approval/certification process. The guidelines
below are to be followed, when applicable, by the Design Agency while
completing this process.
a)
b)
The approvers initials that appear on the drawings must match the DCC
approvers names.
c)
13.5
The approval of a DCC affirms that qualified personnel have reviewed the
drawings and that they agree with the design in principle. The DCC approval
does not relieve the Design/Construction Agency of its full responsibility for
compliance with all relevant project scope, standards, procedures, specifications,
codes, contract documents, etc.
13.6
13.7
After a DCC has been approved by all necessary parties, each drawing must
indicate that it is covered by that DCC. For approval and certification
requirements, the Revision Validation information must be added to the DCC.
This information includes the following:
a)
The revision number of the drawing being certified. Note that new
drawings issued for construction must bear the revision number 00.
Page 18 of 48
b)
13.8
14
14.2
xxxxxx
MMYY
nnn
For drawings developed by an Internal Design Office (IDO) using EWO, the
DCC number format shall be:
YYaxxx-nnn
14.3
Example: 765200-1003-001
Example: 04C123-001
YY
xxx
nnn
For drawings developed by a Design Agency (PMT) under a Job Order (JO)
number, the DCC number shall be:
xx-xxxxx-xxxx-nnn
Example: 10-12345-1234-001
xx-xxxxx-xxxx
nnn
Page 19 of 48
15
Submittal
Per this procedure, all key and non-key (new, revised, cancelled and cancelled /
superseded) Saudi Aramco Engineering Drawings must be submitted to iPlant for
permanent retention and management.
15.1
All drawings must be submitted through iPlant. Scanned copy of the DCC shall
be loaded into iPlant during submittal. Each DCC must not exceed 150 drawings
in each submittal, and limited to one submittal. The signed original DCC shall be
mailed to EK&RD for processing and record.
15.2
15.2.2
15.2.3
15.3
Drawings issued for revision in VECTOR files must be revised and submitted as
VECTOR only. Unless required in other format as per Appendix C.
15.4
2)
3)
4)
5)
6)
This is to ensure that all tag numbers assigned for this project are
requested from EK&RD. Also, to avoid after-the fact acceptance of
project drawings without checking the tag numbers issued.
Page 20 of 48
15.4.2
15.4.3
At the end of the project, REO must submit to EK&RD the following:
1)
2)
3)
15.5
15.6
15.7
When the drawings are accepted for inclusion into iPlant, the user can check the
status of his submitted drawings on-line. The Saudi Aramco organization
responsible for the development of the drawings must maintain a temporary
backup of all the submitted drawings. When confirmed as accepted, the backups
must, then be deleted unless deemed justified to maintain longer (refer to
SAEP-127).
15.8
Any drawing found not in compliance with the Saudi Aramco CADD standards
and procedures will be returned on-line to the Saudi Aramco Project Manager or
REO for correction through iPlant. After correction, the drawings shall be resubmitted through iPlant under the same job maintaining the same DCC.
The copy of the DCC shall be submitted along with the transmittal through
iPlant as a second submittal and so on.
15.9
A Drawing Control Sheet must be submitted for each Job Order or EWO.
All engineering drawings (revised and new) for the project must be listed in this
Drawing Control Sheet.
15.10 REO should not release any drawing (CADD file) to other users or for any other
projects. All drawings MUST be requested through IPlant.
15.11 Data-Centric
15.11.1
Page 21 of 48
SmartPlant P&ID
SmartPlant Instrumentation
SmartPlant Electrical
Plant Design System (PDS 3D)
15.11.2
15.11.3
15.11.4
15.11.5
15.11.6
15.11.7
Page 22 of 48
15.11.8
15.11.9
Overdue Drawings
16.1
16.2
Page 23 of 48
16.2.2
Page 24 of 48
16.2.3
17
EK&RD Acceptance
When a drawing is reviewed and accepted by EK&RD for inclusion into iPlant, EK&RD
Verification is automatically notified into iPlant.
18
Vendor Drawings
18.1
18.2
Development
18.1.1
18.1.2
18.1.3
18.1.4
Certification
18.2.1
Page 26 of 48
18.2.2
18.3
File Formats
Vendor drawings shall be submitted to the iPlant in electronic media only. iPlant
will only support viewing and printing of the following formats; Word, Excel,
AutoCAD, Microstation, PDF, JPG and TIFF.
File Type
18.4
File Extension
WORD
DOC
EXCEL
XLS
AUTOCAD
DWG
MICROSTATION
DGN
ACROBAT PDF
JPG
JPG
TIFF
TIF
Naming Convention!
Vendor drawings shall be numbered as the original drawing number received
from the manufacturer. It is optional to show the Dummy increment numbers
used for non-procurement purchase/requisition items of LSTK projects on
vendor drawings. No Drawing (name) can be duplicated under the given
Org-ID and Plant-ID.
18.5
Submittal
Vendor drawings are submitted into iPlant based on the following:
18.5.1
Mandatory Data
18.5.1.1
18.5.1.2
18.5.1.3
Page 27 of 48
18.5.2
18.5.1.4
18.5.1.5
18.5.1.6
18.5.1.7
18.6
Access
Vendor Drawings will be treated in iPlant exactly as Engineering Drawings with
respect to iPlant Privilege. Anyone having Revision Control privilege will be
able to submit these drawings into iPlant. Anyone having QVP privilege to the
ORG will be able to view vendor drawings of that particular organization/plant.
18.7
Conversion
Any Vendor Drawing that has been designated by Project Management Team
(PMT) or Proponent as having high significance for continued equipment
operation and having the potential of being revised by Saudi Aramco at any time
in the future shall be converted to Engineering Drawing as per the Saudi
Aramco Engineering Standard SAES-A-202 and this procedure.
18.8
18.9
17 March 2013
Revision Summary
Revised the Next Planned Update. Reaffirmed the content of the document, and reissued
with minor revisions as mentioned in the Audit report.
Page 28 of 48
Submittal
Submit certified drawings through iPlant (item 15)
Send original DCC to EK&RD (item 15)
EK&RD verification
Review for compliance (item 16)
Return
For correction
Accept
Complete EK&RD verification
Process into iPlant
Archive original DCC
Page 29 of 48
Appendix B - Certification
1.
2.
Engineering: Type the initial and date of the individual charged, on behalf of the
Design Agency (PMT) for the correctness of the engineering design of the drawing.
This shall be the same individual whose full name and signature are on the DCC.
1.2
Certified By: Type the initial and date of the individual bearing the overall
responsibility the project in the capacity of a Project Manager at minimum.
This shall be the same individual whose full name and signature are on the DCC.
Construction Agency: Type the initial and date of the Saudi Aramco senior
Engineer, familiar with the nature and Company requirements of the project
design, representing the Construction Agency. This shall be the same individual
whose full name and signature are on the DCC.
2.2
Operations: Type the initial and date of the Saudi Aramco senior Representative
of the Saudi Aramco proponent Operations organization. This shall be the same
individual whose full name and signature are on the DCC.
3.
4.
5.
Submittal
The users information that is granted authority to submit drawings through iPlant shall
complete this section.
6.
DCC Workflow
See the below diagram for an illustration of the workflow process for completing an
online DCC. See the iPlant User Manual for more details.
Cancel Submittal
Created
Pending
Upload Drawing
Cancel Workflow
Create Workflow
Submitted
Reject Workflow
Approve Workflow
Approved
Rejected
Page 31 of 48
6.
Required Approvals
There are three types of Design Agencies (PMT, IDO, and OEO) that submit and/or
revise drawings using a DCC. The table below lists the required approvals with respect to
the type of Design Agency.
Design Agency
PMT
IDO
Required Signatures
Discipline Engineer
Project Manager
Project Manager
OEO Supervisor
OEO representative
OEO representative
7.
OEO
7.2.
Discipline Project Engineer: Type the initial and date of the individual
charged, on behalf of the Design Agency for the correctness of the
engineering design of the drawing. This shall be the same individual that
approves the online DCC.
7.1.2.
Certified By: Type the initial and date of the individual bearing the
overall responsibility of the project in the capacity of a Project Manager.
This shall be the same individual that approves the online DCC.
7.1.3.
Construction Agency: Type the initial and date of the Saudi Aramco
Discipline Project Engineer, familiar with the nature and Company
requirements of the project design, representing the Construction Agency.
This shall be the same individual who approves the online DCC.
Page 32 of 48
7.2.2.
7.3.
7.4.
7.4.2.
Page 33 of 48
3.2
3.4.1
3.1.2
3.4.2
3.4
3.1
3.1.1
3.1.2
3.1.3
3.3
**
3.2.2
3.2.1 *
3.4.1
*
**
Page 34 of 48
3.1
3.1.1
3.1.2
3.1.3
3.3
3.3
Page 35 of 48
8.
8.2.
Discipline Engineer: Type the initial and date of the individual charged,
on behalf of the Operation Engineering Organization for the correctness
of the engineering design of the drawing. This shall be the same
individual that approves the online DCC.
8.1.2.
Certified By: Type the initial and date of the OEO Supervisor that is
responsible for the plant or location affected by the drawings being
revised. This shall be the same individual that certifies the online DCC.
8.3.
8.4.
8.4.2.
Page 36 of 48
4.2
4.3
**
4.2.1
4.4.1
3.1.2
4.4.2
3.4
4.1
4.1.1
4.1.2
4.4.1
*
**
Page 37 of 48
3.3
Page 38 of 48
Dwg.
Size
File Format
Requirement
Scope of Work
Microsoft Word
List of Material
D, E
Microsoft Excel
A-D
MicroStation/AutoCAD
D, E
Excel
A-E
PDF Acrobat
A-E
PDF Acrobat
A-E
Note:
1.
All drawings must be prepared and generated using corresponding Saudi Aramco Standard Engineering
Forms.
Page 39 of 48
Index
Prop.
Dept.
0375
P&CSD
EXCEL
2504
P&CSD
EXCEL
2505-1
CSD
EXCEL
2505-2
CSD
EXCEL
2505M-1
CSD
EXCEL
2505M-2
CSD
EXCEL
2507M-1
CSD
EXCEL
2507M-2
CSD
EXCEL
2514-1
CSD
EXCEL
2514-2
CSD
EXCEL
2514M-1
CSD
EXCEL
2514M-2
CSD
EXCEL
2517
P&CSD
EXCEL
2519
CSD
EXCEL
2527
ENG
DGN
2527-1
ENG
DGN
2601
INSP
EXCEL
2615
ENG
DGN
2615-1
ENG
DGN
2616
ENG
W/E/DGN
2616-1
ENG
DGN/XLS
2617
ENG
EXCEL
2634
ENG
DGN
2634-1
ENG
DGN
2635
ENG
DGN
2635-1
ENG
DGN
2636
ENG
DGN/XLS
2636-1
ENG
DGN
2693
CSD
EXCEL
2694
CSD
EXCEL
2696
CSD
DGN
2696-1
CSD
DGN
2696-2
CSD
DGN
2713
CSD
EXCEL
2714
CSD
EXCEL
SDS-ME-02714
CSD
EXCEL
2716
CSD
EXCEL
SDS-ME-02716
CSD
EXCEL
2731
CSD
EXCEL
2731M
CSD
EXCEL
2741-1
CSD
EXCEL
2741-2
CSD
EXCEL
Form #
Title
Format
Page 40 of 48
Index
Prop.
Dept.
2741-3
CSD
EXCEL
2741-4
CSD
EXCEL
2741M-1
CSD
EXCEL
2741M-2
CSD
EXCEL
2741M-3
CSD
EXCEL
2741M-4
CSD
EXCEL
2742
CSD
EXCEL
2742M
CSD
EXCEL
2748-1
CSD
EXCEL
2748-2
CSD
EXCEL
2748-3
CSD
EXCEL
2748-4
CSD
EXCEL
2748M-1
CSD
EXCEL
2748M-2
CSD
EXCEL
2748M-3
CSD
EXCEL
2748M-4
CSD
EXCEL
2773
P&CSD
EXCEL
2773M
P&CSD
EXCEL
2775
P&CSD
EXCEL
2775M
P&CSD
EXCEL
2777
P&CSD
EXCEL
2777M
P&CSD
EXCEL
2778
P&CSD
EXCEL
2778M
P&CSD
EXCEL
2780
P&CSD
EXCEL
2780M
P&CSD
EXCEL
2786M
P&CSD
EXCEL
2787
P&CSD
EXCEL
2787M
P&CSD
EXCEL
2788
P&CSD
EXCEL
2788M
P&CSD
EXCEL
2790
P&CSD
EXCEL
2790M
P&CSD
EXCEL
2793M
P&CSD
EXCEL
2794
P&CSD
EXCEL
2794M
P&CSD
EXCEL
2811-1
CSD
EXCEL
2811-2
CSD
EXCEL
2811-3
CSD
EXCEL
2811-4
CSD
EXCEL
2811M-1
CSD
EXCEL
2811M-2
CSD
EXCEL
2811M-3
CSD
EXCEL
2811M-4
CSD
EXCEL
2812-1
CSD
EXCEL
2812-2
CSD
EXCEL
Form #
Title
Format
Page 41 of 48
Index
Prop.
Dept.
2812-3
CSD
EXCEL
2812-4
CSD
EXCEL
2812-5
CSD
EXCEL
2812-6
CSD
EXCEL
2812-7
CSD
EXCEL
2812M-1
CSD
EXCEL
2812M-2
CSD
EXCEL
2812M-3
CSD
EXCEL
2812M-4
CSD
EXCEL
2812M-5
CSD
EXCEL
2812M-6
CSD
EXCEL
2812M-7
CSD
EXCEL
2821
CSD
EXCEL
2821M
INSP
EXCEL
SDS-ME-02821
INSP
EXCEL
2825
ENG
DGN
2825-1
ENG
DGN
2825-2
ENG
DGN
2829
CSD
EXCEL
2871
ENG
DGN
3063
CSD
EXCEL
3063M
CSD
EXCEL
3175
P&CSD
EXCEL
3175-A
P&CSD
EXCEL
3176
P&CSD
EXCEL
3176-A
P&CSD
EXCEL
3176M
P&CSD
EXCEL
3177
P&CSD
EXCEL
3185-1
P&CSD
EXCEL
3185-2
P&CSD
EXCEL
3185-3
P&CSD
EXCEL
3185-4
P&CSD
EXCEL
3185-5
P&CSD
EXCEL
3185-6
P&CSD
EXCEL
3185-7
P&CSD
EXCEL
3185-8
P&CSD
EXCEL
3185-A
P&CSD
EXCEL
3186
P&CSD
EXCEL
3186M
P&CSD
EXCEL
3188
P&CSD
EXCEL
3188M
P&CSD
EXCEL
3195
P&CSD
EXCEL
3195M
P&CSD
EXCEL
5645-1
CSD
EXCEL
5645-2
CSD
EXCEL
5645-3
CSD
EXCEL
Form #
Title
Format
Page 42 of 48
Index
Prop.
Dept.
SDS-ME-05645
CSD
EXCEL
5994
ENG
DGN
5994-1
ENG
DGN
6078
P&CSD
EXCEL
6078M
P&CSD
EXCEL
6079
P&CSD
EXCEL
6079M
P&CSD
EXCEL
6080
P&CSD
EXCEL
6080M
P&CSD
EXCEL
6081
P&CSD
EXCEL
6081M
P&CSD
EXCEL
6225
ENG
FACE SHEET FOR D SIZE DRAWINGS (FOR IIS, CCS & LDT)
EXCEL
6227
CSD
EXCEL
6231
CSD
EXCEL
Form #
Title
Format
6231-M
CSD
EXCEL
6232
CSD
DGN
6233
CSD
EXCEL
6233-1
CSD
EXCEL
6236
CSD
EXCEL
6236-M
CSD
EXCEL
6237-1
CSD
EXCEL
6237-2
CSD
EXCEL
6237-3
CSD
EXCEL
6237M-1
CSD
EXCEL
6237M-2
CSD
EXCEL
6237M-3
CSD
EXCEL
6238
CSD
EXCEL
6239
P&CSD
ISS GENERAL
EXCEL
6285
ENG
DGN
6286-1
CSD
EXCEL
6286-2
CSD
EXCEL
6286M-1
CSD
EXCEL
6286M-2
CSD
EXCEL
6736
CSD
EXCEL
6880-1
CSD
EXCEL
6880-2
CSD
EXCEL
6880M-1
CSD
EXCEL
6880M-2
CSD
EXCEL
7305
CSD
EXCEL
7460
ENG
DGN
7460-1
ENG
DGN
7460-2
ENG
DGN
8001-1
CSD
EXCEL
8001-2
CSD
EXCEL
8001-3
CSD
EXCEL
8001-4
CSD
EXCEL
Page 43 of 48
Index
Prop.
Dept.
8001M-1
CSD
EXCEL
8001M-2
CSD
EXCEL
8001M-3
CSD
EXCEL
8001M-4
CSD
EXCEL
8002-1
CSD
EXCEL
8002-2
CSD
EXCEL
8002-3
CSD
EXCEL
8002-4
CSD
EXCEL
8002-5
CSD
EXCEL
8002-6
CSD
EXCEL
8002-7
CSD
EXCEL
8002-8
CSD
EXCEL
8002-9
CSD
EXCEL
8002M-1
CSD
EXCEL
8002M-2
CSD
EXCEL
8002M-3
CSD
EXCEL
8002M-4
CSD
EXCEL
8002M-5
CSD
EXCEL
8002M-6
CSD
EXCEL
8002M-7
CSD
EXCEL
8002M-8
CSD
EXCEL
8002M-9
CSD
EXCEL
8003-1
CSD
DATA SHEET - GEAR UNIT (INCRSRS & RED. OF PARALL. SHFT DES.)
EXCEL
8003-2
CSD
DATA SHEET - GEAR UNIT (INCRSRS & RED. OF PARALL. SHFT DES.)
EXCEL
8003-3
CSD
DATA SHEET - GEAR UNIT (INCRSRS & RED. OF PARALL. SHFT DES.)
EXCEL
8003M-1
CSD
DATA SHEET - GEAR UNIT (INCRSRS & RED. OF PARALL. SHFT DES.)
EXCEL
8003M-2
CSD
DATA SHEET - GEAR UNIT (INCRSRS & RED. OF PARALL. SHFT DES.)
EXCEL
8003M-3
CSD
DATA SHEET - GEAR UNIT (INCRSRS & RED. OF PARALL. SHFT DES.)
EXCEL
8004-1
CSD
EXCEL
8004-2
CSD
EXCEL
8004-3
CSD
EXCEL
8004-4
CSD
EXCEL
8004M-1
CSD
EXCEL
8004M-2
CSD
EXCEL
8004M-3
CSD
EXCEL
8004M-4
CSD
EXCEL
8009-1
CSD
EXCEL
8009-2
CSD
EXCEL
8009-3
CSD
EXCEL
8009-4
CSD
EXCEL
8009-5
CSD
EXCEL
8009-6
CSD
EXCEL
8009M-1
CSD
EXCEL
8009M-2
CSD
EXCEL
8009M-3
CSD
EXCEL
8009M-4
CSD
EXCEL
Form #
Title
Format
Page 44 of 48
Index
Prop.
Dept.
8009M-5
CSD
EXCEL
8009M-6
CSD
EXCEL
SDS-ME-8009
CSD
EXCEL
8010-1
CSD
EXCEL
8010-2
CSD
EXCEL
8010M-1
CSD
EXCEL
8010M-2
CSD
EXCEL
8012
CSD
EXCEL
8014
CSD
EXCEL
8014-M
CSD
EXCEL
8020-111
P&CSD
EXCEL
8020-111M
P&CSD
EXCEL
8020-112
P&CSD
EXCEL
8020-115
P&CSD
EXCEL
8020-115M
P&CSD
EXCEL
8020-116
P&CSD
EXCEL
8020-116M
P&CSD
EXCEL
8020-117
P&CSD
EXCEL
8020-117M
P&CSD
EXCEL
8020-118
P&CSD
EXCEL
8020-119
P&CSD
EXCEL
8020-124
P&CSD
EXCEL
8020-124M
P&CSD
EXCEL
8020-200
P&CSD
EXCEL
8020-212
P&CSD
EXCEL
8020-213-1
P&CSD
EXCEL
8020-213-2
P&CSD
EXCEL
8020-312
P&CSD
EXCEL
8020-314
P&CSD
EXCEL
8020-318
P&CSD
EXCEL
8020-319
P&CSD
EXCEL
8020-320
P&CSD
EXCEL
8020-400
P&CSD
EXCEL
8020-413
P&CSD
EXCEL
8020-415-1
P&CSD
EXCEL
8020-415-2
P&CSD
EXCEL
8020-415M-1
P&CSD
EXCEL
8020-415M-2
P&CSD
EXCEL
8020-416-1
P&CSD
EXCEL
8020-416-2
P&CSD
EXCEL
8020-418-1
P&CSD
ISS THERMOWELL
EXCEL
8020-418-2
P&CSD
ISS THERMOWELL
EXCEL
8020-418M-1
P&CSD
ISS THERMOWELL
EXCEL
8020-418M-2
P&CSD
ISS THERMOWELL
EXCEL
8020-419-1
P&CSD
EXCEL
8020-419-2
P&CSD
EXCEL
Form #
Title
Format
Page 45 of 48
Index
Prop.
Dept.
8020-419M-1
P&CSD
EXCEL
8020-419M-2
P&CSD
EXCEL
8020-511-1
P&CSD
ISS CHROMATOGRAPHS
EXCEL
8020-511-2
P&CSD
ISS CHROMATOGRAPHS
EXCEL
8020-512
P&CSD
EXCEL
8020-514
P&CSD
EXCEL
8020-515
P&CSD
EXCEL
8020-517
P&CSD
EXCEL
8020-525
P&CSD
EXCEL
8020-605
P&CSD
EXCEL
8020-611-1
P&CSD
EXCEL
8020-611-1M
P&CSD
EXCEL
8020-611-2
P&CSD
EXCEL
8020-611-2M
P&CSD
EXCEL
8020-611-3
P&CSD
EXCEL
8020-611-3M
P&CSD
EXCEL
8020-612-1
P&CSD
EXCEL
8020-612-2
P&CSD
EXCEL
8020-612-3
P&CSD
EXCEL
8020-613-1
P&CSD
EXCEL
8020-613-2
P&CSD
EXCEL
8020-617
P&CSD
EXCEL
8020-623-1
P&CSD
EXCEL
8020-623-2
P&CSD
EXCEL
8020-625-1
P&CSD
EXCEL
8020-625-2
P&CSD
EXCEL
8020-625-3
P&CSD
EXCEL
8020-625-4
P&CSD
EXCEL
8020-625-5
P&CSD
EXCEL
8020-625-6
P&CSD
EXCEL
8020-634
P&CSD
EXCEL
8020-711-1
P&CSD
EXCEL
8020-711-2
P&CSD
EXCEL
8020-712-1
P&CSD
EXCEL
8020-712-2
P&CSD
EXCEL
8020-713-1
P&CSD
EXCEL
8020-713-2
P&CSD
EXCEL
8020-716
P&CSD
EXCEL
8020-717
P&CSD
EXCEL
8020-718
P&CSD
EXCEL
8020-815-1
P&CSD
ISS ANNUNCIATORS
EXCEL
8020-815-2
P&CSD
ISS ANNUNCIATORS
EXCEL
8020-825
P&CSD
EXCEL
8020-827
P&CSD
EXCEL
8020-828
P&CSD
EXCEL
8020-830
P&CSD
EXCEL
Form #
Title
Format
Page 46 of 48
Size
Index
Prop.
Dept.
P&CSD
EXCEL
Title
Format
8020-913
P&CSD
EXCEL
8110
CSD
DGN
8110-1
CSD
DGN
8110-2
CSD
DGN
8111
ENG
DGN
8111-1
ENG
DGN
8111-2
ENG
DGN
8114
CSD
DGN
8117M-1
CSD
EXCEL
8117M-2
CSD
EXCEL
8118
CSD
EXCEL
8130-1
CSD
EXCEL
8130-2
CSD
EXCEL
8130M-1
CSD
EXCEL
8130M-2
CSD
EXCEL
8150-1
CSD
EXCEL
8150-2
CSD
EXCEL
8150-3
CSD
EXCEL
8150-4
CSD
EXCEL
8150-5
CSD
EXCEL
8150-6
CSD
EXCEL
8150M-1
CSD
EXCEL
8150M-2
CSD
EXCEL
8150M-3
CSD
EXCEL
8150M-4
CSD
EXCEL
8150M-5
ENG
EXCEL
8150M-6
CSD
EXCEL
8172
CSD
EXCEL
8173
CSD
EXCEL
9336
CSD
EXCEL
9524
P&CSD
EXCEL
9524-1
P&CSD
EXCEL
P&CSD
9524-2
EXCEL
9527
CSD
DGN
SDS-ME-09527
CSD
EXCEL
9541
CSD
EXCEL
9543
P&CSD
EXCEL
9544
P&CSD
EXCEL
9547
P&CSD
EXCEL
9548
P&CSD
EXCEL
9549
PCSD
EXCEL
9550-1
CSD
EXCEL
9550-2
CSD
EXCEL
SDS-ME-09550
CSD
EXCEL
9561
P&CSD
EXCEL
Page 47 of 48
Index
Prop.
Dept.
9562
P&CSD
9570
9580
9594
9597-1
Form #
Title
Format
EXCEL
CSD
EXCEL
CSD
EXCEL
ENG
WORD
CSD
EXCEL
The index of face sheets to follow the same discipline (index) for which the face sheet has been made.
Page 48 of 48