No.: MB/2016/015
Date-15/07/2016
INCLUDEPICTURE
"cid:image004.jpg@01C93
07F.E3860200" \*
MERGEFORMATINET
INCLUDEPICTURE
"cid:image004.jpg@01C93
07F.E3860200" \*
MERGEFORMATINET
INCLUDEPICTURE
"cid:image004.jpg@01C93
07F.E3860200" \*
MERGEFORMATINET
INCLUDEPICTURE
"cid:image004.jpg@01C93
07F.E3860200" \*
MERGEFORMATINET
INCLUDEPICTURE
"cid:image004.jpg@01C93
07F.E3860200" \*
MERGEFORMATINET
INCLUDEPICTURE
"cid:image004.jpg@01C93
07F.E3860200" \*
MERGEFORMATINET
INCLUDEPICTURE
"cid:image004.jpg@01C93
07F.E3860200" \*
MERGEFORMATINET
INCLUDEPICTURE
"cid:image004.jpg@01C93
07F.E3860200" \*
MERGEFORMATINET
INCLUDEPICTURE
"cid:image004.jpg@01C93
07F.E3860200" \*
MERGEFORMATINET
INCLUDEPICTURE
"cid:image004.jpg@01C93
07F.E3860200" \*
MERGEFORMATINET
INCLUDEPICTURE
"cid:image004.jpg@01C93
07F.E3860200" \*
MERGEFORMATINET
1.
2.
Name of Owner
:
:
3.
Consultant
IND-008103
Bharat Petroleum Corporation Limited. Kochi.
--
4.
Project
5.
EP Contractor
Buyer/Supplier
6.
7.
8.
Scope of Inspection
9.
Material offered
As per annexure A.
10.
11.
12.
13.
Contacted person
Place & Date of attendance
Time in :-10.00 AM
SPECIAL REMARKS :-
:
:
14.
All equipments/instrumentsused by customer/vendor during inspection are verified for suitability by having accreditation to
ISO/IEC 17025 for the relevant tests, range accuracy and calibration validity. OR
Equipment is suitable in
Equipment calibrated
Facilities & Environmental
YES/
YES/
YES/
terms of range, least count,
traceably to national or
conditions for measurement are
NO
NO
NO
accuracy
iinternational standards
maintained
Unique identification of
YES/ Use of equipment by
YES/ Validity of Calibration
YES/
equipment
NO
competent person
NO
NO
Stamped / Punched / Stenciled / Stickered (for identification only):TUV SUD Stamp Sticker put on inspected
items as
15.
OIL/3104/16-17/PP/07/0335 Dated:05/07/2016
Polybond Insulation Unit I Bhilai& Unit II Rasmada Date: 14/07/2016 & 15/07/2016
Result of Inspection :-
Remarks
Conform / Satisfactory
Not Conform
Accepted under Deviation (with written document from Purchaser mandatory)
Pending for Further Work in progress
a) Testing/Painting / Finishing / Packing / Marking -16.
X
X
X
Companys
representative
(B) Detail of Inspection Activity: 1. Identification and Marking visually checked for Pipe sections, packed inside corrugated box for protection &
found acceptable as per specification.
2. Sample were selected randomly as per relevant specification.
3. Visual, Dimensional & Bulk density check witnessed on selected samples and found acceptable.
4. Recovery after compressions, Linear shrinkage, compressive strength, shot content, Incombustibility,
Sulpher content, Alkalinity witnessed on 14.07.2016 at manufacturer laboratory at Bhilai and the result found
within specified limits as per Material specification and EIL specification.
5. Chloride content tests witnessed on 15.07.2016 at manufacturer laboratory at Bhilai and found acceptable as
per QAP, Material Specification and EIL Specification.
(C) Document Reviewed : Below mentioned documents are reviewed and found in order.
1.
2.
3.
Steel Tape.
Steel Scale
Weighing Machine.
(E) Conclusion:1.
Companys
representative
Date: 15.07.2016
ANNEXURE: A
Doc. No. TSSA_IS_IN_FR_04 Rev.1Dt. 01-02-16
For any suggestions/complaint please write to Quality.Industryservices@tuv-sud.in
PIPE SECTION
SL No.
P.O. Sl.
No.
Dia (Inch)
THICK
(MM)
Total Ord.
Qty. (RMT)
Prev. Insp.
Qty. (RMT)
Offered Qty.
(RMT)
1.50
55.0
1000
500
500
2.00
25.0
325
325
3.00
55.0
450
200
250
6.00
55.0
1500
300
1200
8.00
25.0
700
200
500
12.00
25.0
2350
150
2200
6325
1675
4650