MINISTRY OF ENERGY AND MINERAL RESOURCES

THE GENERAL DIRECTORATE OF ELECTRICITY

ELECTRICITY POLICIES

Presented by

Hasril Nuzahar
Director of Development of Electricity Program
At the event:

Seminar on Energy
Embassy of the Republic of Korea
Jakarta, 14 December 2012

Outline
1.
2.
3.
4.
5.
6.
7.
8.

9.
10.
11.
12.
13.
14.

The current condition of power supply


The current power supply infrastructure
Realization of electrification ratio
Electricity sector policy
Simplicity
Procurement
Projected electricity demand
Economic corridors posture in Masterplan for Acceleration and Expansion of
Indonesian Economy (MP3EI - Masterplan Percepatan dan Perluasan
Pembangunan Ekonomi Indonesia)
Addition of power plant capacity until 2020 to support MP3EI
Power plant development plan
Forecast of system conditions for 10 years to the future
Development of transmission network
Investment requirement
Fast Track Program (FTP) phase 1

15. FTP phase 2

ESDM untuk Kesejahteraan Rakyat


((The Current Condition of Power Supply)

: 43,528 MW (PLN 73%, IPP 23%, and PPU 4%)


: 74,60%
: Batubara 51%, Gas 22%, BBM 16%, Air 6%, Panas Bumi 5%
> /Rate
: USD 9.6 billion /
Investment Requirement

INSTALLED
INSTALLED CAPACITY
CAPACITY

(based on draf t RUKN 2010-2029)

43.528

Juta USD

39.900
33.983
29.688

30.853

31.462

31.959

Power plant
Transmission Network
and Relay Station

Distribution Network

PPU
IPP
PLN

2006
1,321
5,012
23,355

2007
1,354
5,835
23,664

2008
1,414
6,017
24,031

2009
1,414
6,179
24,366

2010
1,448
6,197
26,338

2011
1,704
7,667
30,529

ESDM untuk Kesejahteraan Rakyat

2012
1,729
9,856
31,943

Note:
RUKN: National Electricity General Plan


((National Power Supply Infrastructures)
: Existing transmission network
: Plan transmission network
: Power generation

KALIMANTAN :
Power plant: 1.833 MW (4%)
150 kV : 3.028 kms
70 kV : 528 kms
JTM: 24.384 kms
JTR: 23.382 kms

SUMATERA :
Power plant: 7.310 MW (17%)
275 kV : 1.028 kms
150 kV : 8.597 kms
70 kV : 332 kms
JTM : 79.472 kms
JTR : 88.024 kms

JAMALI :
Power plant: 31.592 MW (73%)
500 kV : 5.052 kms
150 kV : 12.977 kms
70 kV : 3.474 kms
JTM : 143.941 kms
JTR : 237.297 kms

INSTALLED POWER PLANT CAPACITY: 43.528 MW


LENGTH OF TRANSMISSION NETWORK:
- 500 KV : 5.052 kms
- 275 KV : 1.510 kms
- 150 KV : 26.282 kms
- 70 KV : 4.
4.457
457 kms
LENGTH OF DISTRIBUTION NETWORK:
- JTM
: 28
2 88.719 kms
- JTR
: 390.
390 .705 kms

SULAWESI :
Power plant: 1.773 MW (4%)
275 kV: 482 kms
150 kV : 2.988 kms
70 kV : 528 kms
JTM: 24.925 kms
JTR : 27.284 kms
MALUKU :
Power plant: 286 MW (0,7%)
JTM : 4.813 kms
JTR : 2.718 kms
PAPUA :
Power plant: 251 MW (0,6%)
JTM : 2.718 kms
JTR : 3.637 kms
Nusa Tenggara:
Power plant: 484 MW (1%)
JTM : 8.468 kms
JTR : 8.362 kms

Status: Beginning of October 2012

2012 10 43,528 MW 37,301 kms 679,424


kms .
Java-Balis system Sumateras system.
Note: kms: circuit kilometer

ESDM untuk Kesejahteraan Rakyat


((Realization of Electrification Ratio)
(until September 2012)

Aceh
89,28%

Category :
Sumut
86,25%

Kaltim
73,07%

Kepri
72,69%

Riau
77,53%

Kalbar
85,36%

Kalteng
55,35%

> 60 %

Gorontalo
56,93%

Sulut
74,98%

41 - 60 %
Malut
63,50%

20 - 40 %
Papua Barat
62,93%

Sumsel
65,21%

Sumbar
80,19%

Sulbar
88,65%

Sulteng
64,04%

Babel
90,03%

Jambi
68,53%

Jakarta
99,9%

Bengkulu
68,45%
Lampung
66,57%

Kalsel
73,91%

Sultra
66,36%
Bali
72,44%

Sulsel
79,71%

Banten
78,54%
Jabar
74,08%

Jateng
78,46%

DIY
76,54%

Jatim
73,53%

Maluku
67,51%
Papua
31,41%

NTT
47,11%

NTB
50,95%

Realisasi
2006
Rasio

2007

63%Rakyat
64,3%
ESDM untuk
Kesejahteraan
Elektrifikasi

2008

2009

2010

Target
2011

Sep 2012

2012

2013

2014

65,1% 65,8% 67,2% 72,95% 74,60% 75,30% 77,65% 80,0%


((Electicity Sector Policy)
(Based on Act 30 of 2009 on Electricity)
Electricity )

Electricity Development Goal:

,
;
(Article 2 paragraph (2)).

Utilization of Primary Energy Resources:


(the National Energy Policy)
(Article 6, paragraph (1)).
(Article 6
paragraph (3)).

ESDM untuk Kesejahteraan Rakyat


((Electricity Sector Policy)
(SOE - BUMN)
, (IPP)

3.
Build G, T, D through FTP 1, FTP 2, regular program


4.




1.
2.

ESDM untuk Kesejahteraan Rakyat

((Simplicity)


a)
b) Spare parts
c)
d) ,

2.
3. (Feed in tariff)
1.

ESDM untuk Kesejahteraan Rakyat

((Procurement)

1.
2. (Direct election)
3. (Direct appointment)
(Excess power)


Maximum capacity = existing
Capacity > existing:


Electric power required by system

ESDM untuk Kesejahteraan Rakyat

((Indonesian Projected Electricity Demand

emand))
(based on National Electric General Plan/ RUKN 20102010-2029)

TWh

200

GW

800

180

700

160
600
140
500

120
100

400

80

300

60
200
40
100

20
0
Kebutuhan
daya
The need fortambahan
additional power

2010

2011

2012

2013

2014 2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025 2026

2027

2028

2029

12

16

20

25

30

36

42

48

54

62

70

79

89

100

112

125

140

156

*)
Kapasitas
Existing capacity
Existing
(GW)
*)

30

30

29

28

28

27

26

26

25

24

24

23

23

22

22

22

21

21

20

20

Beban
Peak load
Puncak
(GW)

26

28

31

33

36

39

42

46

50

54

58

64

69

76

83

91

99

109

119

131

145

157

169

183

198

215

233

253

274

298

325

353

385

419

458

500

546

597

653

716

(GW)

Power requirement
(TWh)
Kebutuhan
Tenaga
Listrik

*) Installed capacity having a decreased ability (derating)

Assumption (average of 20 years) :


Economic growth
: 6,9 %
Population growth
: 1,4 %
Reserve Margin
: 35 %
The projection (average of 20 years) :
Growth of electric power
: 9,5 %/ year
The need for additional power : 7.816 MW/ year

ESDM untuk Kesejahteraan Rakyat

2010 743 kWh/capita


2011 788 kWh/capita

Economic corridors posture in MP3EI 2011


2011--2025
1. Sumatra Corridor National
Production and Processing
Center of Agricultural Products
and Energy Barn
2. Java Corridor Drivers of
National Industries and Services
3. Kalimantan Corridor National
Production and Processing
Center of Mining Products and
Energy Barn
4. Sulawesi Corridor National
Production and Processing
Center of Agriculture, Plantation,
Fisheries, Oil and Gas, and
Mining Products
5. Bali Nusa Tenggara Corridor
Gateway of Tourism and National
Food Supporters

. To support MP3EI
, 2011 2025 90,000 MW
.

6. Papua Kepulauan Maluku


Corridor National Development
Center of Food, Fisheries,
Energy, and Mining

Addition of Power Plant Capacity Until 2020 to Support MP3EI

MP3EI
Power Requirements

55.795
MW

By PLN (State Electricity Company):


Company)
FTP I
FTP II
Regular Program
TOTAL

: 9.361
: 3.757
: 18.302
: 31.370

By Private
Private:
IPP in FTP II
IPP in PPP
IPP Regular Program
TOTAL

MW
MW
MW
MW
*)

: 6.290
: 5.060
: 12.725
: 23.975

MW
MW *)
MW
MW

including PLTA (hydro power plant) Karama 450 MW, West


Sulawesi


((Power Plant Development Plan)
8,000
7,000
6,000
5,000
4,000
3,000
2,000
1,000
2011
1

2012
0

2013
-

2014
8

2015
-

2016
-

2017
1

2018
-

2019
1

2020
-

PLTD

33

41

41

22

22

17

18

PS

1,040

450

950

PLTM

20

38

234

139

51

PLTA

18

220

49

312

804

581

362

294

135

PLTP

24

63

115

258

1,090

426

957

1,290

1,610

415

PLTGU

594

873

296

750

750

PLTG

222

509

1,132

790

140

30

85

480

75

630

PLTGB

32

81

43

22

22

14

10

PLTU

4,698

5,141

3,073

2,947

4,289

4,832

4,785

2,008

1,829

1,972

EBT Skala Kecil

ESDM untuk Kesejahteraan Rakyat

2,718

3,355

533

563
156

184

2012

2020

2012

767

331

2,051

2020

332

0 .8 %

2012

2020

38,742

19,739

20,332

7 6 .5 %

47,681

2012

0 .5 %

105

133

2020

0 . 3%

2012

591

1,156

1,340

2020

273

2020

2,992

2012

4,463

1,134

1,161

3 . 7%

LEGEND:
: Power Capable (MW)
: Peak Load (MW)
: Electricity Consumption

3 .6 %

2012

9,641

4,662

4,777

1 4. 6 %

18,596

Forecast of System Conditions for 10 Years to The Future

2020

Source : RUPTL PLN 2011-2020 and PLN Statistic 2011

(the Power Supply Business Plan RUPTL of PLN 2011-2020) ,


8.46% .
MP3EI 2020 55,795 MW
( 5,580 MW) .

ESDM untuk Kesejahteraan Rakyat


(Development of Transmission and Distribution Network)

transmission distribution

10,126

6,355

7,531
1,018

80,566

52,209

2012 2020 2012 2020

2012 2020
transmission distribution

22,255

16,830

555,204

381,238

40,558
21,503

2012 2020 2012 2020

2012 2020

transmission distribution

transmission distribution

2,419

2012 2020 2012 2020


transmission distribution

3,997

9,867

transmission distribution

918

2012 2020 2012 2020

11,243

151,558

47,766

1,843

268,077

167,496

9,957

28,057

9,995

(dalam kms)

2012 2020 2012 2020


transmission

distribution
Source: RUPTL PLN 2011-2020

2020 49,299 kms . (500 kV 150 kV Java-Bali system, 500 kV, 275 kV, 150 kV, 70 kV )
2020, the total length of distribution network to be constructed is around
416,906 kms,
.

ESDM untuk Kesejahteraan Rakyat


((Investment Requirement)
(dalam USD
Juta)

22,534

3,904
921

439

1,682

125

Power
Transmission Distribution
Generation & Substation

Power
Transmission Distribution
Generation & Substation

4,321

94

3,469

4,817

Power
Transmission Distribution
Generation & Substation

910

894

710

85

112

Power
Generation

Transmission &
Substation

Distribution

Power
Transmission & Distribution
Generation
Substation

33,920

1,491
8,374

6,933

Power
Generation

223

247

Transmission &
Substation

Distribution

Power
Transmission Distribution
Generation & Substation

Source: RUPTL PLN 201 1-2020

2020 USD 96,205 million (


USD 9,621 million), USD 67,815 million , USD 14,928 million
, USD 13,461 million
, .

ESDM untuk Kesejahteraan Rakyat

PETA LOKASI PROGRAM PERCEPATAN 10.000 MW TAHAP I


SUMATERA 10 PROJECTS (1,431 MW)

TOTAL CAPACITY:
9.877 MW (33 Projects)
WEST INDONESIA
(10 projects: 1566 MW)

EAST INDONESIA
(13 Projects: 821 MW)

1
2

30
4

25

34

31

26

37

28
27
9

35
32

36

10
13

14

16

20

12

JAWA-BALI
(10 Projects:
7490 MW)

15

MALUKU 2 PROJECTS(44 MW)


34. PLTU MALUT - Tidore (2x7 MW)
35. PLTU MALUKU Ambon (2x15 MW)

19

17
18

23
22

ESDM untuk Kesejahteraan Rakyat

KALIMANTAN 5 PROJECTS (625 MW)


25. PLTU 1 KALBAR Parit Baru (2x50 MW)
26. PLTU 2 KALBAR Bengkayan (2x27,5 MW)
27. PLTU 1 KALTENG Pulang Pisau (2x60 MW)
28. PLTU 1 KALSEL Asam Asam (2x65 MW)
29. PLTU KALTIM Tl. Balikpapan (2x11 0 MW)
SULAWESI 4 PROJECTS (220 MW)
30. PLTU SULUT Amurang (2x25 MW)
31. PLTU GORONTALO Anggrek (2x25 MW) *)
32. PLTU SULTRA Kendari (2x10 MW)
33. PLTU SULSEL Barru (2x50 MW)

33
11
11

11. PLTU 1 BANTEN Suralaya (1x625 MW)


12. PLTU 2 BANTEN - Labuan (2x300 MW)
13. PLTU 3 BANTEN - Lontar (3x315 MW)
14. PLTU 1 JABAR - Indramayu (3x330 MW)
15. PLTU 2 JABAR Pelabuhan Ratu (2x350 MW)
16. PLTU 1 JATENG Rembang (2x315 MW)
17. PLTU 2 JATENG Cilacap Baru (1x660 MW)
18. PLTU 1JATIM Pacitan (2x315 MW)
19. PLTU 2 JATIM - Paiton (1x 660 MW)
20. PLTU 3JATIM Tj. Awar Awar (2x350 MW)

21. PLTU 1 NTB Bima (2x10 MW)


22. PLTU 2 NTB Lombok (2x25 MW)
23. PLTU 1 NTT Ende (2x7 MW)
24. PLTU 2 NTT Kupang (2x16,5 MW)

29

JAWA-BALI 10 PROJECTS (7,490 MW)

NUSA TENGGARA 4 PROJECTS (117 MW)

5
3

1.Steam Power Plant (PLTU) NAD Meulaboh


(2x110 MW)
1.PLTU SUMUT Pangkalansusu (2x220 MW)
2.PLTU SUMBAR Teluk Sirih (2x112 MW)
3.PLTU 1 RIAU - Bengkalis (2x10 MW)**)
4.PLTU 2 RIAU Selat Panjang (2x7 MW) *)
5.PLTU KEP. RIAU -Tj. Balai Karimun (2x7 MW)
6.PLTU RIAU - Tenayan (2x110 MW)
7.PLTU 3 BANGKA Bangka Baru (2x30 MW)
8.PLTU 4 BANGKA Belitung (2x16,5 MW
9.PLTU LAMPUNG Tj. Selaki (2x100 MW)

21
24

Note : *) Project terminated


**) In the process of termination

PAPUA 2 PROJECTS (34 MW)


36. PLTU 1 PAPUA - Timika (2x7 MW) **)
37. PLTU 2 PAPUA Jayapura (2x10 MW)

REALIZATION AND TARGET OF


COMMERCIAL OPERATION PLTU 10.000 MW PHASE I
(MW)
3500

3000

1.
2.
3.
4.

Jabar - Indramayu 3x330 MW


Banten Suralaya 1x625 MW
Banten Lontar #1 (315 MW)
Jateng - Rembang 2x315 MW

2500

1. Jabar Pelabuhan Ratu3x350 MW


2. Jatim Pacitan (2x315 MW)
3. Jatim Tj.Awar-awar 2x350 MW
4. NAD Nagan Raya 2x110 MW
5. Sumbar Teluk Sirih 2x112 MW
6. Babel Bangka Baru (2x30 MW)
7. Babel Belitung#1 (16,5 MW)
8. Lampung Tarahan Baru#2 (100 MW)
9. Kaltim Teluk Balikpapan#1 (110 MW)
10. NTB Bima 2x10 MW
11. NTB Lombok 2x25 MW
12. NTT Kupang 2x16,5 MW
13. Maluku Ambon#1 (15 MW)
14. Malut Tidore 2x7 MW
15. Papua Jayapura 2x10 MW
16. NTT Ende#2 (7 MW)

2000
1. Banten - Lontar #2 & #3 (630 MW)
2. Jatim Paiton 1x660 MW)

3269.5

1. Jateng Adipala 1x660 MW


2. Sumut Pangkalan Susu 2x220
MW
3. Babel Belitung#2 (16,5 MW)
4. Riau Tenayan 2x110 MW
5. Kalbar Parit Baru 2x50 MW
6. Kalbar Bengkayang 2x27,5 MW
7. Kaltim Teluk Balikpapan#2 (110
MW)
8. Maluku Ambon #2 (15 MW)
9. Kalteng Pulang Pisau 2x60 MW

1500
1.

2560

2.

1000

3.

500

4.
5.
6.
7.

1290
Banten - Labuan#1

Banten - Labuan#2

300

300

2009

2010

Kepri Tj. Balai Karimun


(2x7 MW)
Lampung Tarahan Baru #1
(100 MW)
Kalsel Asam-asam (2x65
MW)
Sulut Amurang (2x25 MW)
Sultra Kendari #1 (10 MW)
Sulsel Barru (2x50 MW)
NTT Ende #1 (7 MW)

1736.5

421

0
2011

Realization
4,460 MW (45%)

2012 (Jan s.d Okt)

2012 (Nov s.d Des)

2013

2014

Year

Target
(5,417 MW)
Status : End of October 2012

10,000 MW PHASE I PROJECT (


(
))
COD

Capacity
(MW)

Total
(MW)

#1

#2

#3

A. Jawa - Bali
1. PLTU 2 Banten - Labuan
2. PLTU 1 Jabar - Indramayu
3. PLTU 1 Banten - Suralaya
4. PLTU 3 Banten Lontar

2x300
3x330
1x625
3x315

600
990
625
945

Oct '09
Jan '11
Oct '11
Dec '11

Apr '10
Mar '11

Sept '11

Feb '12

Apr '12

5. PLTU 1 Jateng - Rembang

2x315

630

Dec '11

Dec '11

6. PLTU 2 Jatim - Paiton

1x660

660

Jun '12

Num

Projects Name

Total Jawa - Bali


B. West Indonesia
Total West Indonesia
C. East Indonesia
Total East Indonesia

4450

Total Indonesia

4450

0
0

Status : End of October 2012

10.000 MW PHASE II FAST TRACK PROGRAM


(Energy and Mineral Resources Ministerial Regulation Permen ESDM No. 01/2012)

TOTAL
SUMATERA
PLTA
PLTP
PLTU
PLTGB
TOTAL

: 476 MW
: 2.670 MW
: 531 MW
:
16 MW
: 3.693 MW

PLTA
PLTP
PLTU
PLTGB
PLTG
TOTAL

KALIMANTAN
PLTU
PLTGB
PLTG
TOTAL

SULAWESI

: 548 MW
:
8 MW
: 280 MW
: 836 MW

PLTA
PLTP
PLTU
PLTGB
TOTAL

: 190 MW
: 145 MW
: 360 MW
: 16 MW
: 711 MW

BALI + NUSA TENGGARA

JAWA
PLTA
PLTP
PLTU
TOTAL

:
:
:
:

1.087 MW
2.010 MW
1.400 MW
4.497 MW

ESDM untuk Kesejahteraan Rakyat

PLTP
PLTU
PLTGB
TOTAL

: 65 MW
: 70 MW
: 8 MW
: 143 MW

MALUKU + PAPUA
PLTP
PLTU
PLTGB
TOTAL

: 35 MW
: 116 MW
: 16 MW
: 167 MW

: 1.753
: 4.925
: 3.025
:
64
: 280
: 10.047

MW
MW
MW
MW
MW
MW

PROGRESS SUMMARY OF
10,000 MW PHASE II PROGRAM
PLNs Projects:

(STATUS SEPTEMBER 2012)

*)

2 projects (1.1%)

40 MW

*)

3 projects (35%)

1,314 MW

5 projects (8.5%)

320 MW

Funding Process

1 project (26.6%)

1,000 MW

Auction Process

13 projects (26.8%)

1,008 MW

WKP (Mining Working Area)


Determination Process

1 project (0.5%)

20 MW

Feasibility Study

1 project (1.5%)

55 MW

Total

26 projects

3,757 MW

Notes :
*) : PLTU Ketapang (2x10 MW), PLTU Bau-Bau (2x10 MW)
**) : PLTA Upper Cisokan (4x260 MW), PLTA Asahan 3 (2x87 MW), dan PLTU Parit Baru (2x50 MW)

PROGRESS SUMMARY OF
10,000 MW PHASE II PROGRAM
IPPs Projects:

(STATUS SEPTEMBER 2012)

*)

2 projects (1.67%)

105 MW

3 projects (4.29%)

270 MW

7 projects(13%)

820 MW

Funding Process

3 projects(6.1%)

381 MW

PPA (Power Performance Area) Process

26 projects(47.9%)

3,013 MW

Feasibility Warranty Process

2 projects (4.2%)

267 MW

Letter of Intent (LOI) Process

4 projects (2.9%)

184 MW

Negotiation Process

7 projects (4.1%)

258 MW

Direct Appointment Process

1 project (1.3%)

83 MW

WKP (Mining Working Area) Auction Process

13 projects(12.8%)

805 MW

PLTU (Steam Power Plant) Auction Process

5 projects (1.7%)

104 MW

Total

72 projects

Note:
*) : PLTA Wampu (3x15 MW), PLTP Patuha #1 (60 MW)

6,290 MW

www.esdm.go.id