% of mean
% prob
% prob
% of mean
% prob
% prob
*Right Skewed
4.00
1.00
99.00
*Left Skewed
5.00
1.00
99.00
COSTING
Capital Cost
Trade-in Value
Residual
Replacement Life
Replacement Life
Depreciation Type
Depreciation Rate
Equipment Rental Cost
Operating Labour Cost
Maintenance Labour Cost
Other labour Cost
Electrical Energy Cost
Electrical Demand Cost
Lube Cost
Tyre Replacement Cost
Wear Items Cost
Repair Parts Cost
Major Overhaul Cost
Liquid Fuel Cost
Total Operating Cost
$
$
%
Op. Hrs
years
%
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
0.00
0.00
0.00
0.00
0.00
Straight Line
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Motor Power
Transmission Speed Factor
Fuel Consumption: 0% Power
kW
962.00
1.00
litre/OpHr
Talpac
litre/OpHr
tonne
tonne
tonne
cu.metres
tonne
min
min
min
%
154.57
94.90
154.57
77.29
249.48
0.50
0.50
0.50
80.00
STOCHASTIC
Availability Distribution
Availability Spread
Availability Minimum
Availability Maximum
Travel Time Distribution
Travel Time Spread
Travel Time Minimum
Travel Time Maximum
Dumping Time Distribution
Dumping Time Spread
Dumping Time Minimum
Dumping Time Maximum
% of mean
% probability
% probability
% of mean
% probability
% probability
% of mean
% probability
% probability
*Normal
15.00
1.00
100.00
*Right Skewed
15.00
1.00
99.00
*Right Skewed
15.00
1.00
99.00
COSTING
Capital Cost
Trade-in Value
Replacement Life
Replacement Life
Depreciation Type
Depreciation Rate
Operating Labour Cost
Maintenance Labour Cost
Other labour Cost
Electrical Energy Cost
Electrical Demand Cost
Liquid Fuel Cost
Lube Cost
Tyre Replacement Cost
Wear Items Cost
Repair Parts Cost
Major Overhaul Cost
Total Operating Cost
$
$
Op. Hrs
years
%
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
0.00
0.00
0.00
0.00
Straight Line
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Production Measurement
Insitu Bank Density
Bank to Loader Bucket Swell
Bank to Truck Tray Swell
Loading Unit Bucket Fill Factor
Roster: [PRJ] 5 day Week - 8 Hour Shifts
tonnes/cu.m
Weight
2.50
1.25
1.25
0.98
Talpac
Scheduled Shifts
Loading Unit Maintenance Shifts
Unscheduled Lost Shifts
Fleet Operating Shifts
Shift Duration
Non-operating Delays
In Shift Operating Time
Operating Delays
In Shift Working Time
Shifts/year
Shifts/year
Shifts/year
Shifts/year
Mins
Mins
Mins
Mins
Mins
756.00
113.00
42
601.00
480
60
420
30
390
36.0
Yes
15.0
No
50.0
%
%
%
90.0
30.0
2.5
tonnes/cu.m
tonnes/cu.m
tonnes/cu.m
tonnes/cu.m
tonnes/cu.m
0.55
0.85
0.70
1.03
0.50
Loading Options
Talpac
Talpac
Roster: [PR Roster: [PR Roster: [PR Roster: [PR Roster: [PR Roster: [PRJ] 5 day Week - 8 Hour Shifts
Talpac