Talpac

Haulage System: Haulage System-1


Loading Unit: [PRJ] DEMONSTRATION Demo Rope Shovel

Database LoaderDEMONSTRATION Demo Rope Shovel


Attachment / Bucket Name
Nominal Dipper
Rated Heaped Capacity
cu.metres
42.90
Rated Struck Capacity
cu.metres
42.90
Rated Suspended Load
tonne
0.00
Actual Bucket Payload
tonne
83.92
Actual Bucket Payload
cu.metres
42.90
Bucket Cycle Time Mean
Mins
0.50
First Bucket Pass Delay Time
Mins
0.50
Availability
%
85.00
Loading Methodology: Truck Position
Single Sided
Loading Methodology: Bucket Passes
Full Truck
STOCHASTIC

Bucket Cycle Time Distribution


Bucket Cycle Time Spread
Bucket Cycle Time Minimum
Bucket Cycle Time Maximum
Bucket Payload Distribution
Bucket Payload Spread
Bucket Payload Minimum
Bucket Payload Maximum

% of mean
% prob
% prob
% of mean
% prob
% prob

*Right Skewed
4.00
1.00
99.00
*Left Skewed
5.00
1.00
99.00

COSTING

Capital Cost
Trade-in Value
Residual
Replacement Life
Replacement Life
Depreciation Type
Depreciation Rate
Equipment Rental Cost
Operating Labour Cost
Maintenance Labour Cost
Other labour Cost
Electrical Energy Cost
Electrical Demand Cost
Lube Cost
Tyre Replacement Cost
Wear Items Cost
Repair Parts Cost
Major Overhaul Cost
Liquid Fuel Cost
Total Operating Cost

$
$
%
Op. Hrs
years
%
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr

0.00
0.00
0.00
0.00
0.00
Straight Line
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TRUCK: [PRJ] DEMONSTRATION Demo Rear Dump Truck 150t


ATION Demo Rear Dump Truck 150t
Database Truck

Motor Power
Transmission Speed Factor
Fuel Consumption: 0% Power

kW

962.00
1.00

litre/OpHr

22-Sep-2016 16:30:59 Page 1

Talpac

Fuel Consumption: 100% Power


Rated Payload
Empty Weight
Nominal Payload
Nominal Payload
Full Weight
Default Spot Time at Loader
Default Spot Time at Dump
Dumping Time Mean
Availability Mean

litre/OpHr
tonne
tonne
tonne
cu.metres
tonne
min
min
min
%

154.57
94.90
154.57
77.29
249.48
0.50
0.50
0.50
80.00

STOCHASTIC

Availability Distribution
Availability Spread
Availability Minimum
Availability Maximum
Travel Time Distribution
Travel Time Spread
Travel Time Minimum
Travel Time Maximum
Dumping Time Distribution
Dumping Time Spread
Dumping Time Minimum
Dumping Time Maximum

% of mean
% probability
% probability
% of mean
% probability
% probability
% of mean
% probability
% probability

*Normal
15.00
1.00
100.00
*Right Skewed
15.00
1.00
99.00
*Right Skewed
15.00
1.00
99.00

COSTING

Capital Cost
Trade-in Value
Replacement Life
Replacement Life
Depreciation Type
Depreciation Rate
Operating Labour Cost
Maintenance Labour Cost
Other labour Cost
Electrical Energy Cost
Electrical Demand Cost
Liquid Fuel Cost
Lube Cost
Tyre Replacement Cost
Wear Items Cost
Repair Parts Cost
Major Overhaul Cost
Total Operating Cost

$
$
Op. Hrs
years
%
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr
$/OpHr

0.00
0.00
0.00
0.00
Straight Line
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Material: [PRJ] Waste Hard rock

Production Measurement
Insitu Bank Density
Bank to Loader Bucket Swell
Bank to Truck Tray Swell
Loading Unit Bucket Fill Factor
Roster: [PRJ] 5 day Week - 8 Hour Shifts

tonnes/cu.m

Weight
2.50
1.25
1.25
0.98

Roster: [PRJ] 5 day Roster: [PRJ] 5 day Roster: [PR

22-Sep-2016 16:30:59 Page 2

Talpac

Scheduled Shifts
Loading Unit Maintenance Shifts
Unscheduled Lost Shifts
Fleet Operating Shifts
Shift Duration
Non-operating Delays
In Shift Operating Time
Operating Delays
In Shift Working Time

Shifts/year
Shifts/year
Shifts/year
Shifts/year
Mins
Mins
Mins
Mins
Mins

756.00
113.00
42
601.00
480
60
420
30
390

Marginal Tax Rate


Losses Carried Forward
Required DCF Rate of Return
Write off Residuals in Final Year
No. of years for DCF Analysis

36.0
Yes
15.0
No
50.0

Full Bucket Loading Option


Full Truck Loading Option
Maximum Overloading of Trucks

%
%
%

90.0
30.0
2.5

tonnes/cu.m
tonnes/cu.m
tonnes/cu.m
tonnes/cu.m
tonnes/cu.m

0.55
0.85
0.70
1.03
0.50

Cash Flow Options

Loading Options

Bucket Construction Options

Front End Loader


Electric Rope Shovel
Hydraulic Backhoe
Hydraulic Shovel
Other

22-Sep-2016 16:30:59 Page 3

Talpac

22-Sep-2016 16:30:59 Page 4

Talpac

Roster: [PR Roster: [PR Roster: [PR Roster: [PR Roster: [PR Roster: [PRJ] 5 day Week - 8 Hour Shifts

22-Sep-2016 16:30:59 Page 5

Talpac

22-Sep-2016 16:30:59 Page 6