QINGJIAN INTERNATIONAL (MYANMAR) GROUP DEVELOPMENT CO.

, LTD
QUOTATIONS (TENDER) EVALUATION FORM
COMMERCIAL EVALUATION
PROJECT : SULE SQUARE, YANGON
TYPE OF WORKS : CARPARK MARKING LINE
DATE: 18 November 2015
Item

Description

TENDER BUDGET

Unit

SKK PTE TLD


Person : Mr Paul
Contact: +65 96205710
Email: paulinskk@gmail.com

Qty

Rate (USD)

Amount ( USD )

Unit

Qty

Myanmar Traffic Co Ltd


Person : Ms Myo
Contact: 09 420123358
Email:

Rate (USD)

Amount (USD)

Unit

Qty

Rate (USD)

Amount (USD)

Road, driveway direction signs and carpark marking painted with


thermo plastic coating as per the Drawings and Specifications

Straight arrow Type A

no.

71.00 $

5.55 $

394.05

nos

47.00 $

Straight and Right arrow Type B

no.

1.00 $

6.70 $

6.70

nos

Right arrow Type C

no.

7.00 $

5.55 $

38.85

nos

28.00 $

55.00 $

Straight and Left arrow Type D

no.

4.00 $

6.70 $

26.80

nos

5.00 $

Right and Left arrow Type E

no.

NA

6.40

nos

7.00 $

Straight, Right and Left arrow Type F

no.

NA

6.40

nos

7
8

Handicap logo, rubberized Carpark paint sign


Handicap Logo ( No side givem)
Rubberized carperk paint sign

nos
nos

6.00 $
597.00 $

52.31 $
31.39 $

313.86
18,739.83

Left Arrow

no

3.00 $

5.55 $

16.65

10
11

Traffic line painted for car-park


Handicap carpark ( 100 mm thk Lot Marking at Corner only)
Rubberized carperk paint ( 100 mm thk Lot marling at Corner only)

m
m

15.60 $
1,911.00 $

3.14 $
3.14 $

48.98
6,000.54

I = 500 x 100 mm
L = (500+300) x 100 mm
T = (500+300+300) x 100 mm
Sub-Total
Less Discount
TOTAL less discount
Profit / Loss

25,586.26

25,586.26

55.00 $

nos

47.00 $

nos

1,540.00

nos

28.00 $

23.27 $

651.56

70.00 $

350.00

nos

5.00 $

27.27 $

136.35

70.00 $

490.00

nos

7.00 $

27.27 $

190.89

2,585.00
-

nos

24.27 $

1,140.69

55.00 $

nos
nos

6.00 $
2,340.00 $

200.00 $
8.00 $

1,200.00
18,720.00

nos
nos

6.00 $
2,340.00 $

22.00 $
7.00 $

132.00
16,380.00

Nos
Nos
Nos

800.00 $
430.00 $
366.00 $

10.00 $
14.00 $
18.00 $

8,000.00
6,020.00
6,588.00

Nos
Nos
Nos

800.00 $
430.00 $
366.00 $

4.08 $
6.52 $
8.98 $

3,264.00
2,803.60
3,286.68

$
33% $
$
$

45,493.00
(15,012.69)
30,480.31
(4,894.05)

27,985.77

$
$

27,985.77
(2,399.51)

Note:
Myanmar traffic cannot follow architect specification and
using normal cold paint.
A
A1

Terms and Conditions :


Terms of payment (Monthly / Fortnightly)

A2
A3

Retention Sum (Nil / 5% / 10%)


Delivery / Construction Schedule

- 10% retention, maximum at 5%

B
C
D

Terms & Conditions


Include
Exclude
Result of Evaluation:

- 3 Years Warranty

- Material on Site claim


- Balance : based on progress claim

Prepared By:

Verified By:

Checked By:

Ms. Khine Zar Tun


Snr. Quantity Surveyor/ Date

Mr. Clement Lin


Senior Commercial Manager/ Date

Mr. Loh Chee Foo


Project Manager/ Date

Recommended & Checked By:

Approved By :

Approved By :

Mr. Klaus Kucyk


Assistant General Manager/ Date

Mr. Sun Guo Zhen


Deputy General Manager/ Date

Mr. Raymond Ho
General Manager/ Date

338089454.xls

Payment term is 50% deposit to be paid when sign sale contract,


30% to be paid when the appalication start
Balance 20% to be paid after finish installation.
Nil
Delivery peroid is within 45 day after receipt of your deposit.
- 2 Years Warranty

Page 1 of 4

QINGJIAN INTERNATIONAL (MYANMAR) GROUP DEVELOPMENT CO., LTD


QUOTATIONS (TENDER) EVALUATION FORM
COMMERCIAL EVALUATION
PROJECT : SULE SQUARE, YANGON
TYPE OF WORKS : CARPARK MARKING LINE
DATE: 15 December 2015
Item

Description

TENDER BUDGET

Unit

SKK PTE TLD


Person : Mr Paul
Contact: +65 96205710
Email: paulinskk@gmail.com

Qty

Rate (USD)

Amount ( USD )

Road, driveway direction signs and carpark marking painted as


per the Drawings and Specifications

Unit

Qty

Myanmar Traffic Co Ltd


Person : Ms Myo
Contact: 09 420123358
Email:

Rate (USD)

Amount (USD)

Using Polyurethene Paint

Straight arrow Type A

no.

71.00 $

5.55 $

394.05

nos

47.00 $

Straight and Right arrow Type B

no.

1.00 $

6.70 $

6.70

nos

Right arrow Type C

no.

7.00 $

5.55 $

38.85

nos

28.00 $

36.00 $

Straight and Left arrow Type D

no.

4.00 $

6.70 $

26.80

nos

5.00 $

Right and Left arrow Type E

no.

NA

6.40

nos

7.00 $

Straight, Right and Left arrow Type F

no.

NA

6.40

nos

7
8

Handicap logo, rubberized Carpark paint sign


Handicap Logo ( No side givem)
Rubberized carperk paint sign

nos
nos

6.00 $
597.00 $

52.31 $
31.39 $

Left Arrow

no

3.00 $

5.55 $

10
11

Traffic line painted for car-park


Handicap carpark ( 100 mm thk Lot Marking at Corner only)
Rubberized carperk paint ( 100 mm thk Lot marling at Corner only)

m
m

15.60 $
1,911.00 $

3.14 $
3.14 $

313.86
18,739.83

nos

36.00 $

1,692.00

Rate (USD)

Amount (USD)

nos

47.00 $

nos

1,008.00

nos

28.00 $

23.27 $

651.56

46.00 $

230.00

nos

5.00 $

27.27 $

136.35

46.00 $

322.00

nos

7.00 $

27.27 $

190.89

55.00 $

6.00 $

120.00 $

720.00

nos

24.27 $

1,140.69

nos
nos

6.00 $
2,340.00 $

22.00 $
7.00 $

132.00
16,380.00

Nos
Nos
Nos

800.00 $
430.00 $
366.00 $

4.08 $
6.52 $
8.98 $

3,264.00
2,803.60
3,286.68

27,985.77

$
$

27,985.77
(2,399.51)

Carpark Lot/ Mortor Cycle "T" Lot type including 150 mm ht


16.65 Numbering up to Maximum 4 digits

48.98
6,000.54

Lot

585.00 $

46.00 $

26,910.00

I = 500 x 100 mm
L = (500+300) x 100 mm
T = (500+300+300) x 100 mm
Sub-Total
Less Discount
TOTAL less discount
Profit / Loss

Qty

Using Normal Cold Paint

Unit

25,586.26

25,586.26

$
$
$
$

30,882.00
(3,882.00)
27,000.00
(1,413.74)

Note:
Myanmar traffic cannot follow architect specification and
using normal cold paint.
A
1

Terms and Conditions :


Terms of payment (Monthly / Fortnightly)

Retention Sum (Nil / 5% / 10%)

Delivery / Construction Schedule

Performance Bond

Terms & Conditions

Scope Included

Scope Excluded

- Material on Site claim


- Balance : based on progress claim
- 10% retention, maximum at 5%

Payment term is 50% deposit to be paid when sign sale contract,


30% to be paid when the appalication start
Balance 20% to be paid after finish installation.
Nil
Delivery peroid is within 45 day after receipt of your deposit.

- 3 Years Warranty

- 2 Years Warranty

8
Result of Evaluation:

SKK was selected.


NOTE: Due to Capark floor coating use Polyurethene paint from SKK, carpark marking paint to be used SKK as well to match. If
use other marking line paint, architect worry that there will be chemical reaction between SKK polyurethene floor coating pating
and other cold paint. So, choose SKK.

Prepared By:

Verified By:

Checked By:

Ms. Khine Zar Tun


Snr. Quantity Surveyor/ Date

Mr. Lian Sin Shong


Senior Commercial Manager/ Date

Mr. Loh Chee Foo


Project Manager/ Date

Recommended & Checked By:

Approved By :

Approved By :

Mr. Klaus Kucyk


Assistant General Manager/ Date

Mr. Sun Guo Zhen


Deputy General Manager/ Date

Mr. Raymond Ho
General Manager/ Date

338089454.xls

Page 2 of 4

QUOTATIONS (TENDER) EVALUATION FORM


TECHNICAL EVALUATION

#REF!
#REF!
Tender/Contract Specification
Item

Volume

Page

Clause

Subcontractor A

Description

Subcontractor B

Result of Evaluation:
Prepared By:

Verified By:

Recommended By:

Approved By:

Quantity Surveyor/Date

Contracts Manager/Date

Project Manager/Date

Executive Director/Date

CA - Sub-Contract - Quotation (Tender) Evaluation Form (Rev 0 - 090501)

Page 3 of 4

#REF!
#REF!
Tender/Contract Specification
Item

Volume

Page

Clause

Description

Subcontractor C

Result of Evaluation:
Prepared By:

Verified By:

Quantity Surveyor/Date

Contracts Manager/Date

CA - Sub-Contract - Quotation (Tender) Evaluation Form (Rev 0 - 090501)

Page 4 of 4

Anda mungkin juga menyukai