Anda di halaman 1dari 1

Chilled Water

SI. No

16
17
18
19
20
21
22
23

Legend & abbreviations


Drawings reference in title block e.g. reference to relative:
Issued for construction, MEP layout drawings
Issued for construction, MEP schematic drawings
Issued for construction, Architectural drawings
Issued for construction, Structural drawings
Issued for construction, Fire zoning
Shop drawings, MEP layout drawings
Shop drawings, MEP schematic drawings
Match line should be shown wherever required as per continuation of services
Fire Zoning Lines need to show on Shop drawing
Text should not overlap. Moreover dont repeat the text of service unless the size or elevation is changed
No element should be in 3D, every thing should be in 2D, (Flex duct, fittings etc.).
Services support are to be shown
Services support section details e.g. show Anchor Bolt to connect the hanger rod with slab - standard details references
Minimum distance between equipment and wall/obstructions as per manufacturer recommendation
Equipment mounting details (concrete pads, supports etc.) - standard details references
Schedule of Equipment: chiller, HEX, Pump, AHU, BCU, FCU, CCU, ECU, VRV, DXetc.
Material Submittal reference with approved code number below the equipment & accessories schedule
Equipment tag with CHW flow rate as applicable /AHU, BCU, FCU, CCU, ECU, VRV, DX
Elevation, bottom of equipment/unit - BOU
Elevation, bottom of pipe - BOP
Space with min. 200 mm below and aside the FCUs for future maintenance

24

Chilled water pipe size with insulation and aluminium cladding on external/exposed/plantroom and indicate flow rate l/s or gpm

25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

Distance between insulation of pipework of min 50mm


Sizes of the refrigerant pipe with insulation thickness
Refrigerant pipe tray with size, thickness and cover on external runs
Valve set - standard connection details of the hook-up to equipment - standard details reference
Valve set - reference to standard details drawings
Air vent in valve packge is to be added - standard details reference
Access panel for valves
Drip tray below valve package
Flexible connection to be used where pipe crossing building expansion joint
Supports distances and sizes are to be shown on drawings
Cross sectional details for the pipe insulation and supports - standard details reference
Table of threaded rods sizes with the pipes sizes - standard details reference
Pipe risers: reference to coordinated services riser drawing for sizes, flow rate and supports details
Coordination with 3D Layout
FCU height should be accessible below 5000mm
Actual size of the equipment as per latest material submittal
Layout should be as per contract drawing
CHW piping to avoid electrical room
The dimensions used in pump head calculation must be consulted
Ensure Bypass for Backflushing is provided
Check RFI's raised for this area

46

Select pipework components and layouts to ensure the system is as inherently stable and self-balancing as can be economically justified. This will
reduce the time to regulate branch flow rates and will often make it unnecessary to balance flows through terminal units

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Priority

Shop drawings check list

N/A

Anda mungkin juga menyukai