Anda di halaman 1dari 8

DAFTAR ISI

LEMBARAN TUGAS ........................................................................................

LEMBARAN PENGESAHAN ..........................................................................

ii

KATA PENGANTAR ......................................................................................... iii


ABSTRAK ...........................................................................................................

DAFTAR ISI .......................................................................................................

vi

DAFTAR LAMPIRAN........................................................................................

BAB I

PENDAHULUAN ............................................................................

1.1

Latar Belakang ..........................................................................

1.2

Maksud dan Tujuan Proyek ......................................................

1.3

Permasalahan.............................................................................

1.4

Tujuan Magang..........................................................................

1.5

Penempatan penulis...................................................................

TINJAUAN PUSTAKA ...................................................................

2.1

pondasi.......................................................................................

2.2

Beton.........................................................................................

2.3

Arsitektur...................................................................................

2.4

Struktur Atas Gedung................................................................

2.4.1

Kolom...........................................................................

2.4.2

Balok Lantai.................................................................

2.4.3

Pelat Lantai...................................................................

BAB II

BAB III KEGIATAN PERENCANAAN........................................................


3.1

11

Organisasi Konsultan................................................................. 11
3.1.1

Konsultan Pengawas Proyek (Consultant/Supervisor).


6

12

3.1.2
3.2

Pelaksana Pembangunan (Contractor).......................... 13

Struktur Organisasi Konsultan .................................................. 14


3.3.1

Fungsi Dan Tugas ........................................................ 14


A. Direktur............................................................. 14
B. Wakil Direktur................................................... 15
C. General Superintendent..................................... 15
D. Site Engineer Manager...................................... 16
E. Site Adm. Manager........................................... 16
F. Site Operation Manager.................................... 16
G. Quality Control................................................. 16
H. Suveryor/Drawing............................................. 17
I. Tender dan Dokumentasi.................................. 17
J. Keuangan/ADM................................................ 17
K. Divisi Teknik..................................................... 18
L. Divisi Research dan Pengembangan................. 18
M. Ketua Studio dan Asisten Studio....................... 18
N. Drafter............................................................... 19

3.3

Syarat-syarat Konsultan ............................................................ 19

3.4

Ruang Lingkup penggawasan.................................................... 20

3.5

3.6

3.4.1

Menentukan Tujuan...................................................... 21

3.4.2

Penjadwalan.................................................................. 21

3.4.3

Pengendalian................................................................. 22

3.4.3

Menyusun Planning...................................................... 22

Kegiatan Perencanaan............................................................... 25
3.6.1

Waktu dan Tanggal........................................................ 25

3.6.2

Pelaksanaan Kegiatan................................................... 26

Menghitung RAB Dermaga....................................................... 26

3.6.1

Pekerjaan pembersihan lapangan...................................................................... 26

3.6.2

Pekerjaan penggeringan

3.6.3

Pekerjaan tanah dan lumpur ........................................................................27

........................................................................26

3.7.4

Pekerjaan tanah biasa.................................................... 28

3.7.5

Pekerjaan tanah dan galian............................................ 28

3.7.6

Pekerjaan tanah di datangkan........................................ 29

3.7.7

Pekerjaan pasangan batu kali 1/4.................................. 29

3.7.8

Pekerjaan plasteran....................................................... 30

3.7.9

Pekerjaan beton cor....................................................... 30

3.7.10 Pekerjaan cerucum bamboo ......................................... 30


3.7.11 Pekerjaan pipa pvc........................................................ 31
3.7.12 Pekerjaan Lain-lain....................................................... 31

BAB IV

KEGIATAN PELAKSANAAN........................................................ 32
4.1

4.2

Pekerjaan Persiapan................................................................... 32
4.1.1

Pembersihan Lapangan................................................. 32

4.1.2

Penggeringan/dewatering.............................................. 32

4.1.3

Kantor Lapangan Konsultan Pengawas (Direksi Keet) 33

4.1.4

Pembuatan Papan Nama Proyek................................... 34

Pekerjaan pokok........................................................................ 34
4.2.1

Galian tanah lumpur...................................................... 35

4.2.2

Galian tanah biasa.......................................................

4.2.3

Timbunan tanah galian.................................................. 36

4.2.4

Timbunan tanah di datangkan....................................... 37

4.3.1

Pasangan batu kalii 1:4................................................. 38

4.3.2

Plasteran 1:3 tebal 10 mm............................................. 39

4.3.1

Beton cor 1:2:3.............................................................. 38

4.3.2

besi beton...................................................................... 39

4.3.3

bekisting........................................................................ 40

35

4.4.1 pipa PVC dia 1.............................................................. 41


4.1.2 cerucuk bamboo panjang 2 m, dia 8 cm-10 cm............ 42

4.4.3 galian tanah biasa dengan (ab)...................................... 43

BAB V

HASIL DAN PEMBAHASAN......................................................... 45


5.1

5.2

Pekerjaan Persiapan.................................................................. 45
5.1.1

Pembersihan Lapangan................................................. 45

5.1.2

Gudang Bahan dan Barak Pekerja................................ 45

5.1.3

Pekerjaan Tanah............................................................ 45

Pekerjaan Balok, Pelat Lantai dan Kolom................................ 46


5.2.1

Pekerjaan Balok Lantai................................................. 46


A). Perhitungan Volume dan Kebutuhan Besi BL-1..... 46
B). Perhitungan Volume dan Kebutuhan Besi BL-4..... 48

5.2.2

Pekerjaan Pelat Lantai................................................... 51


A). Menghitung Volume Pelat Lantai........................... 51
B). Pemasangan Bondek (Floordeck)........................... 51
C). Menghitung Kebutuhan Bondek (Floordeck)......... 52
D). Kebutuhan Besi Wiremesh...................................... 53

5.2.3

Pekerjaan Kolom........................................................... 53
A). Perhitungan Volume dan Kebutuhan Besi KL-1..... 54
B). Perhitungan Volume dan Kebutuhan Besi KL-2..... 56

BAB VI

5.3

Jadwal Pengerjaan Proyek/Time Schedule................................ 57

5.4

Kendala-kendala Yang Dihadapi Dalam Penyesaian Proyek.... 58

KESIMPULAN DAN SARAN......................................................... 58


6.1

Kesimpulan............................................................................... 60

6.2

Saran......................................................................................... 61

DAFTAR PUSTAKA........................................................................................... 62
LAMPIRAN A KEGIATAN PERENCANAAN
LAMPIRAN B SHOP DRAWING KEGIATAN PELAKSANAAN

LAMPIRAN C SURAT-SURAT

DAFTAR GAMBAR DAN TABEL

Gambar

1.1

Peta Lokasi Proyek.................................................................

Gambar

2.1

Pelat Bondek...........................................................................

Gambar

2.2

Besi Wiremesh........................................................................ 10

Gambar

3.1

Struktur Organisasi Proyek..................................................... 14

Gambar

4.1

Pekerjaan Barak Pekerja......................................................... 33

Gambar

4.2

Pekerjaan Direksi Keet........................................................... 34

Gambar

4.3

Pemasangan Cetakan Balok Lantai........................................ 35

Gambar

4.4

Proses Pembesian Balok Lantai.............................................. 36

10

Gambar

4.5

Proses Pengecoran Balok Lantai............................................ 37

Gambar

4.6

Proses Pembukaaan Cetakan Balok Lantai............................ 38

Gambar

4.7

Pemasangan Cetakan Pelat Bondek........................................ 39

Gambar

4.8

Pemasangan Besi Wiremesh................................................... 39

Gambar

4.9

Proses Pengecoran Pelat Lantai.............................................. 40

Gambar

4.10

Pembesian Kolom................................................................... 41

Gambar

4.11

Proses Pengerjaan cetakan Kolom.......................................... 42

Gambar

4.12

Proses Pengecoran Kolom...................................................... 43

Gambar

4.13

Proses Pembukaan Cetakan Kolom........................................ 44

Gambar

5.1

Detail Pembesian Balok-1...................................................... 46

Gambar

5.2

Detail Pembesian Balok-4...................................................... 49

Gambar

5.3

Detail Pembesian Kolom-1 dan Kolom-2.............................. 55

Tabel

5.1

Volume Pelat Lantai................................................................ 51

Tabel

5.2

Kebutuhan Pelat Bondek........................................................ 52

DAFTAR LAMPIRAN

LAMPIRAN A KEGIATAN PERENCANAAN


Lampiran A.1.1

Daftar Kegiatan...................................................................... 63

Lampiran A.1.2

Rencana Anggaran Biaya ...................................................... 64

Lampiran A.1.3

Rekapitulasi............................................................................ 65

Lampiran A.1.3

Back-up Data Gedung............................................................ 66

Lampiran A.1.4

Tampak Gedung...................................................................... 67

Lampiran A.1.5

Denah Lantai 1....................................................................... 68

11

Lampiran A.1.6

Denah Lantai 2....................................................................... 69

Lampiran A.1.7

Denah Lantai 3....................................................................... 70

Lampiran A.1.8

Potongan A-A......................................................................... 71

Lampiran A.1.9

Potongan B-B......................................................................... 72

Lampiran A.2.1

Denah Dinding Lantai 1......................................................... 73

Lampiran A.2.2

Denah Dinding Lantai 2......................................................... 74

Lampiran A.2.3

Denah Dinding Lantai 3......................................................... 75

Lampiran A.2.4

Denah Kusen Lantai 1............................................................ 76

Lampiran A.2.5

Denah Kusen Lantai 2............................................................ 77

Lampiran A.2.6

Denah Kusen Lantai 3............................................................ 78

Lampiran A.2.7

Detail Kusen Jendela Tipe J1 J5.......................................... 79

Lampiran A.2.8

Detail Kusen Pintu Tipe P1 P10.......................................... 80

Lampiran A.2.9

Denah Kolom Lantai 2........................................................... 81

Lampiran A.3.1

Denah Kolom Lantai 3........................................................... 82

Lampiran A.3.2

Denah Balok Lantai 1............................................................. 83

Lampiran A.3.3

Denah Balok Lantai 2............................................................. 84

Lampiran A.3.4

Detail Pembesian Kolom........................................................ 85

Lampiran A.3.5

Detail Pembesian Balok Lantai.............................................. 86

LAMPIRAN B SHOP DRAWING KEGIATAN PELAKSANAAN


Lampiran B.1.1

Lokasi Pekerjaan.................................................................... 87

Lampiran B.1.2

Denah Balok Lantai 2............................................................. 88

Lampiran B.1.3

Detail Pembesian Balok......................................................... 89

Lampiran B.1.4

Denah Pengecoran Pelat Lantai 2.......................................... 90

Lampiran B.1.5

Denah Floordeck Lantai 2...................................................... 91

Lampiran B.1.6

Denah Tulangan Wiremesh Lantai 2...................................... 92

Lampiran B.1.7

Denah Kolom Lantai 2........................................................... 93

Lampiran B.1.8

Detail Pembesian Kolom Lantai 2.......................................... 94

Lampiran B.1.9

Volume Pekerjaan Balok, Pelat Lantai dan Kolom................ 95

12

Lampiran B.1.9

Jadwal Pengerjaan Proyek/Time Schedule.............................. 96

LAMPIRAN C SURAT-SURAT

13

Anda mungkin juga menyukai