ACTIVITIES

DURATION
A

Surveying

Clearing and Staking

Construction of Bunkhouse

Excavation (A)

Footing Reinforcements

Concreting Footing (A)

Excavation (B)

Footing Reinforcements

Concreting Footing (B)

Frameworks for Column from Footing to Tie Beam

Concreting Column from Footing to Tie Beam

Steelworks and Installation of Tie Beam Reinforcements

Frameworks for Tie Beams

Concreting Tie Beams

Embanking (Filling and Levelling)

Column Reinforcement (Ground Floor)

Frameworks for Columns (A)

Concreting Columns (A)

Frameworks for Columns (B)

Concreting Columns Part (B)

Staging

CHB laying (Ground Floor)

Beam Reinforcements

Frameworks for Beams and Slab (2nd Floor)

Slab Reinforcement (2nd floor)

Electrical Works (2nd Floor)

AA

Plumbing Works (Ground Floor)

BB

Concreting Beams and Slab (2nd Floor)

CC

Plastering (Ground Floor)

DD

Flooring Reinforcement (Ground Floor)

EE

Concreting of GF Flooring

FF

Column Reinforcement ( Second Floor )

GG

Frameworks for Columns (A)

HH

Concreting Columns (A)

II

Frameworks for Columns (B)

JJ

Concreting Columns (B)

KK

Staging (Second Floor)

LL

CHB laying (Second Floor)

MM

Beam Reinforcements

NN

Frameworks for Beams and Slab (3rd Floor)

OO

Slab Reinforcement (3rd floor)

PP

Electrical Works (3rd Floor)

QQ

Plumbing Works (3rd Floor)

RR

Concreting Beams and Slab (3rd Floor)

SS

Plastering (Second Floor)

TT

Column Reinforcement ( 3rd Floor )

UU

Frameworks for Columns (A)

VV

Concreting Columns (A)

WW

Frameworks for Columns (B)

XX

Concreting Columns (B)

YY

Staging (Third Floor)

ZZ

CHB laying (Third Floor)

Roof Beam Reinforcements

Frameworks for Roof Beams and Slab

Slab Reinforcement (Top)

ACTIVITIES
DURATION
d

Electrical Works (3rd Floor)

Concreting Roof Beams and Slab

Plastering (Third Floor)

Outside and Inside Plumbing

Doors and Windows Installation

Tile Works

Paint Works