M A S T E Q U I P M E N T PA C K A G E
for tender -assisted drilling
I.
CORPORATE OVERVIEW
CORPORATE OVERVIEW
Corporate Structure
Pressure Products
BOPs
BOP Control Units
Valves, Chokes and Actuators
Manifolds and Xmas Trees
MUX Systems
Discrete Pods
Downhole Products
Drilling Products
Top Drives
Makeup / Breakout Units
Pipe Handling
Rig Floor Controls
Screens
Robotic Welding System
DM-2 Automatic Driller
Hydraulic Power Units
Tubular Products
FLEXTM
Premium Connections
Oilfield Drilling Tubulars
CORPORATE OVERVIEW
Rig Packages
Equipment & System Integration
Rig Modifications
Engineering Studies
Electrical Products
5
Global Footprint
CORPORATE OVERVIEW
Tender-assisted Rigs
Semi-submersible Rigs
Jack-up Rigs
Platform Rigs
Drill Ships
Well Service Vessels
Offshore Coiled Tubing Units
Modular Rigs
Land Rigs
CORPORATE OVERVIEW
MEP OVERVIEW
MEP Overview
GENERAL INFORMATION
MEP Overview
DRILLING EQUIPMENT
Telescoping Mast: 152 ft clear working height
Drawworks: AXON 1,500 hp
Top Drive: AXON 500T AC Top Drive
Rotary Table: 375 750T (AC) 1,150 HP
Iron Roughnecks: AXON 120k (well) & 80k (OAC)
Drilling Line: 1.5 in
MEP Overview
OFFLINE ACTIVITY CAPABILITY
AXON OAC Crane: 12K
OAC Power Tong: 2,800 12,000 ft-lb @
2500 psi; 156 31 RPM @ 85 GPM
WELL CONTROL
BOP (Surface):
AXON 13-5/8", 5K Annular BOP
AXON 13-5/8", 10K Double Ram BOP
AXON 13-5/8", 10K Single Ram BOP
AXON 13-5/8", 10K Drilling Spool
BOP Handling: BOP Lifting & Trolley
System (comprised of 4 hoists)
C&K Manifold: AXON 10K psi, API Spec 6A
MEP Overview
MUD SYSTEM
Mud Pumps: AXON 3 x 1,600 hp
Mud Tanks: 30m3 (200 bbl)
Pressure Rating: 7,500 psi WP
Shale Shakers: Customer Specification
4 x triple deck scalping units
Mud Gas Separator: AXON 48" OD, 10-ft
mud seal, 8" gas vent line
Degasser: 1,200+ GPM
Equipment List
EQUIPMENT LIST
317.40
317.40
Substructure
Lift and Roll System, Substructure Control Panel
Lift and Roll System, Substructure
301.10
301.10
301.10
301.10
301.10
Mast
Mast Erection System Cyl. 1
Mast Erection System Cyl. 2
Erection Cylinder Pinning Cyl. 1
Erection Cylinder Pinning Cyl. 2
Mast Erection Control Console
302.00
313.70
Crown Block
Traveling Block
316.10
316.20
317.10
Deadline Anchor
312.10
Drawworks
313.10
Rotary Table
313.40
Top Drive
317.20
Mousehole
311.10
311.20
Drillers Controls
Driller's Cabin and Station
Local Equipment Room
317.40
317.40
Equipment List
EQUIPMENT LIST
317.50
324.10
324.50
324.80
325.30
325.30
325.40
326.10
326.10
326.10
326.10
326.10
326.15
326.20
326.30
326.30
326.30
326.40
326.90
326.90
336.60
331.60
332.10
332.20
337.20
337.30
336.10
331.70
331.80
336.70
Equipment List
EQUIPMENT LIST
329.20
334.50
334.60
337.50
Bell Nipple
Flowline
Well control hoses
341.10
341.10
341.30
342.20
344.20
345.20
345.40
346.20
346.20
346.30
346.30
346.50
346.50
Pipe Handling
Offline Bridge Racker Control Panel
Offline Bridge Racker
Racking Board Hoist
Mechanical Stabbing/Manipulator Arm
Mechanized Slips
Drill Pipe Elevators
Elevator Links
Power Tongs-Large
Power Tongs-Small
Hydraulic Catheads Control Panel
Hydraulic Catheads
Mechanical Roughneck, Well
Mechanical Roughneck, OAC
357.10
357.20
364.10
364.20
364.30
365.10
365.20
365.30
Equipment List
EQUIPMENT LIST
365.30
365.30
366.10
367.10
367.20
317.60
317.70
317.80
322.40
Rig Blower
Vacuum System
Pressure Washer
Bulk air receivers
385.10
386.10
386.20
386.30
386.40
386.40
386.40
387.10
387.20
387.30
387.40
Electrical Umbilicals
Dragchain
Utility Interface Station, Electrical
Utility Interface Station
Umbilical hoses HTB to Platform
Jumper hoses Platform to MEP
Spill Kits
Hand washing basin
Safety Showers
Drill floor matting
425.10
428.10
867.10
VFD Line Up
HMI-Driller's Cabin
HMI-Client Discretion
HMI-Office
UPS-1, UPS-2
Competitive Advantages
Telescoping Mast
x B
9.14m
x 5.50m
11.80m
x 5.00m
13.72m
x 7.40m
16.00m
x 10.00m
17.20m
x 11.00m
19.00m
x 13.42m
x B
11.80m
x 5.00m
13.72m
x 7.40m
16.00m
x 10.00m
THIRD
PARTY
DECK
THIRD PARTY
DECK
Designed to accommodate
substantial quantity and
range of equipment
Additional deck space available
on top of drawworks shelter
Additional storage modules for
OFE and OCFE
Mud Module
OFF
DRILLERS
SIDE
OPTION 1
DRAWWORKS
SIDE
OPTION 2
OPTION 3
DRILLERS
SIDE
Compact
Seawater-cooled (vs. fans)
Simplified flow paths
Designed for serviceability
(ease of access, maintenance,
operation)
Skidding System
Skidding beams
accessible on both
sides via walkways
LIFT DETAIL
Weight Table
LIFT DESCRIPTION
SIX (6)
MAJOR
LIFTS
LIFT DETAIL
WEIGHT (MT)
37
143
5
81
5
145
20
9
5
138
117
131
14
0
850
31
6
18
Major Lift #1
SUBSTRUCTURE
143 MT
SHORT MODE
For narrower capping
beam spacings
EXTENSION
For wider capping
beam spacings
LIFT DETAIL
Major Lift #2
MUD MODULE
LIFT DETAIL
81 MT
Major Lift #3
RIG FLOOR CENTER STEEL
145 MT
LIFT DETAIL
Major Lift #4
DRAWWORKS SUPPORT STRUCTURE 137 MT
LIFT DETAIL
Major Lift #5
DRILLERS SIDE WING (LER MODULE)
117 MT
LIFT DETAIL
Major Lift #6
MAST
TELESCOPING
CANTILEVER
LIFT DETAIL
140 MT
LIFT SEQUENCE
Lift Sequence
LIFT
DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
LIFT SEQUENCE
Lift Sequence
LIFT
DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
SHORT MODE
For narrower
capping beam
spacings
EXTENSION
For wider
capping beam
spacings
LIFT SEQUENCE
Lift Sequence
LIFT
DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
LIFT SEQUENCE
Lift Sequence
LIFT
DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
LIFT SEQUENCE
Lift Sequence
LIFT
DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
LIFT SEQUENCE
Lift Sequence
LIFT
DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
LIFT SEQUENCE
Lift Sequence
LIFT
DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
LIFT SEQUENCE
Lift Sequence
LIFT
DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
LIFT SEQUENCE
Mast Erection
LIFT
DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
LIFT SEQUENCE
DECK LAYOUT
Escape Routes
DRAWWORKS SHED ROOF
DECK LAYOUT
Escape Routes
HPU & LER DECK
DECK LAYOUT
Escape Routes
DRILL FLOOR
DECK LAYOUT
Escape Routes
WALKWAYS UNDER SUBSTRUCTURE
DECK LAYOUT
Escape Routes
LOGGING CANTILEVER & MUD MODULES
DECK LAYOUT
DECK LAYOUT
DECK LAYOUT
DECK LAYOUT
DECK LAYOUT