TRANS MOUNTAIN PIPE LINE COMPANY LTD. ENGINEERING STANDARDS AND PRACTICES Revision 3 ‘April 18, 1990 Page 1 oft Title: JOINING PROGRAM ndix B: Welding Procedure Specification TM-2 Number of passes will vary depending on wall thickness sMys Wall Thickness (mm) Pipe Size (NPS) WELDING PROCESS AND METHOD. (as228 This procedure covers the butt-welding of pipe and fitings. td ae ‘Al supplemental requirements of section 40 of Trans Process ‘SMAW. ‘Mountain Standard MP3901 shall apply to this procedure. Tae faa {JOINT GEOMETRY (725222) ‘BASE MATERIALS 7.25223) Standard or (CSA 7245.1, 2246.11, 2245.12; Specification | API SL: ASTMASS, A105, A106, (PNo- Ps) A234 WEB, Grade 241, 280, 917, 359, 413, 448 1B, X42, X46, X52, X80, X65 448 MPa maximum 0.49 maximum 45-127 12-30 a ts Same e POSITION AND DIRECTION TECHNIQUE (7252210 Position 56 Number of Welders 2 Direction Vertical Down, Line-Up Clamps InternaliExternal PREHEATING ANDINTERPASS (725226)| Line-Up Clamp Removal after 50% ‘TEMPERATURES AND CONTROLLED COOLING Removal completion of root Preheat Temp. (°0) 150-175 Bead Either String or Weave TEST DATE: December 18, 1998 Intorpass Temp. (°C) 150-175 No, Of Passes ‘Sminimum ‘Maximum Interval Root to Hot Pass: § min. Powor brush and grind Betwoen Passos Remainder 15 min. cleats ree ‘as required Cooling Controlled por 4.3.7 of MP3901 ‘The second pass shall be started as soon as possible after POSTWELDHEAT TREATMENT (7.252.221) the completion of the fst pass. The crown of the weld shall not be below the surface ofthe adjacent base metal WELDER: L. Verbook, M. Verbeek TESTED BY: Ludwig & Associates APPROVED BY: GA Toth

Anda mungkin juga menyukai