Anda di halaman 1dari 28

NO

LAP
SUMUR
PMB-15
R1
PMB-17
R1
PMB-18
TAF/V2
PMB-19
R1
PMB-20
W
PMB-21
PB23b
PMB-22
PB25A
PMB-23
PB23B
PMB-24
PB25G
PMB-25
PB24B
PMB-26
PB25A
PMB-27
PB25F_a
PMB-28
PB25A
Total Prabumulih Barat

2013
2014

Gas
(MMscfd)
12
30 - 40

2013
2014

5122
4931

TAHUN

LIFTING

POTENSI (BBLS)
Gross

Nett

ESP
SB/OF
SB/OF
ESP/ING-1300
SA/11
SA/11
SA/11
SA/13
SA/11
SA/11
SA/11
SB/OF
SA/13

798
384
1090
1353
233
83
131
338
129
275
217
211
75
5318

33
37
61
73
187
79
90
250
84
130
178
31
57
1289

Air
BPD
5122
4931

Minyak
BOPD
823
793

Gross
BPD
4299
5724

1
24
1500

36000

TANGKI
T-001
T-002
T-003
T-004
T-005

FUNGSI
Tanki Produksi

I (BBLS)

LAMA

PRODUKSI (BBLS)

LOW / GAIN

TEKANAN (PSI)

KA (%)

UJI

Gross

Nett

KA (%)

Gross

Nett

CAS

TUB

96
90
94
95
20
5
31
26
34
53
18
85
25
76

4
2
4
4
6
4
4
4
4
4
4
4
4

912
420
1454
1429
255
52
51
30
134
606
147
159
75
5724

38
38
97
70
204
35
26
24
89
45
57
17
53

96
91
93
95
20
33
49
20
34
93
61
89
30
793

114
36
364
76
22
-31
-80
-308
5
331
-70
-52
0

5
0
37
-3
17
-44
-64
-226
5
-85
-121
-13
-4

90
450
540
120
600
0
500
520
460
400
1260
500
420

90
130
120
120
1200
1400
630
1310
1250
680
1150
180
950

HP

MP

LP

KANAN (PSI)

GAS
FL

IN

90
130
120
120
650
600
610
630
670
600
630
180
620

0
0.31
0.31
0
0
0
0
0
0
0
0
0.31
0

OUT

PROD. GAS (MMscf)


HP

0
0
0.894
0
0.59
0.00
0
0.00
0
4.68
0
4.91
0
1.89
0
6.28
0
3.50
0
2.37
0
4.21
0.689
0.00
0
3.98
-495.8448084399
31.82

SEPARATOR (PSI)

MP

LP

HP

MP

LP

0
0
0
0
0.756
0.401
0.43
0.36
0
0.83
0.46
0
0.79

0.67
0
0.28
0.48
0.647
0.66
0.21
0.82
0.19
0.52
0.25
0.379
0.29

0
0
0
0
600
580
580
600
630
580
580
0
600

0
0
0
0
80
80
80
80
0
80
80
0
80

70
70
70
70
50
40
40
40
20
40
50
70
50

4.03

3.97

39.81
255
52
51
30
134
606
147
159
75
1509

912
420
1454
1429

4215

Tanggal
Test
08-Jul-14
12-Jul-14
13-Jul-14
14-Jul-14
03-Jul-14
12-Jul-14
13-Jul-14
14-Jul-14
09-Jun-14
08-Jul-14
13-Jul-14
11-Jul-14
14-Jul-14

KETERANGAN
Prod tgl 05.02.13 Observasi produksi
prod 23-02-2014 jam 17.00 eks kupl
Bor baru; Prod tgl 09.02.2009
Prod tgl 01.09.12 eks perbaikan ESP
Prod tgl 23.04.2014 Eks KUPL
eks kupl tgl 21.05.2014
Bor baru; Prod tgl 25.09.2011
Produksi Tgl. 12.10.2012 Eks Pes
Bor baru; Prod tgl 14.05.2012
Bor baru; Prod tgl 27.03.2013
Bor baru; Prod tgl 22.09.2013
Bor baru; Prod tgl 07.03.2014
Bor baru; Prod tgl 17.03.2014

PRODUKSI SP PMB

2013
2014

Gas
(MMscfd)
12
30 - 40

2013
2014

5122
4931

TAHUN

Air
BPD
4299
4931

24
24
5000

Minyak
BOPD
823
793

Gross
BPD
5122
5724

5000

TANGKI
T-001
T-002
T-003
T-004
T-005

300,000

250,000

200,000

ANALISIS KAPASITAS TANKI

250,000

200,000

BPD

150,000

100,000

50,000

10

WAKTU TINGGAL (JAM)

11

12

13

14

FUNGSI
Tanki Produksi (Direncankan sebagai Tanki Test)
Tanki Produksi
Tanki Produksi
Tanki Produksi
Tanki Produksi
TOTAL

Kapasitas
(BBL)
500
500
1500
1500
1500
5000

11

12

13

14

15

16

17

WAKTU TINGGAL

KAPASITAS

(JAM)

(BPD)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

264,000
132,000
88,000
66,000
52,800
44,000
37,714
33,000
29,333
26,400
24,000
22,000
20,308
18,857
17,600
16,500
15,529
14,667
13,895
13,200
12,571
12,000
11,478
11,000

5000
6000
11000

96

ANALISIS KAPASITAS SHIPPING T


275,000
250,000
225,000
200,000
175,000
150,000

BARREL/DAY

225,000
200,000
175,000
150,000

BARREL/DAY

125,000
100,000
75,000
50,000
25,000
-

10

12

WAKTU TINGGAL (JA

25

10,560

SITAS SHIPPING TANK

10

12

14

WAKTU TINGGAL (JAM)

16

18

20

22

24

PRODUKSI SP PMB

2013
2014

Gas
(MMscfd)
12
30 - 40

2013
2014

5122
4931

TAHUN

Air
BPD
4299
4931

24
24
5000

Minyak
BOPD
823
793

Gross
BPD
5122
5724

5000

TANGKI
T-001
T-002
T-003
T-004
T-005

60,000

50,000

40,000

ANALISIS KAPASITAS TANKI

50,000

40,000

BPD

30,000

20,000

10,000

10

WAKTU TINGGAL (JAM)

11

12

13

14

FUNGSI
Tanki Produksi (Direncankan sebagai Tanki Test)
Tanki Produksi
Tanki Produksi
Tanki Produksi
Tanki Produksi
TOTAL

Kapasitas
(BBL)
500
500
1500
1500
1500
5000

11

12

13

14

15

16

17

WAKTU TINGGAL

KAPASITAS

(JAM)

(BPD)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

48,000
24,000
16,000
12,000
9,600
8,000
6,857
6,000
5,333
4,800
4,364
4,000
3,692
3,429
3,200
3,000
2,824
2,667
2,526
2,400
2,286
2,182
2,087
2,000

2000

96

ANALISIS KAPASITAS WASH


50,000
45,000
40,000
35,000
30,000
25,000

40,000
35,000
30,000

BARREL/DAY

25,000
20,000
15,000
10,000
5,000
-

10

12

WAKTU TINGGAL (JA

25

1,920

ASITAS WASH TANK

10

12

14

WAKTU TINGGAL (JAM)

16

18

20

22

24

Anda mungkin juga menyukai