Anda di halaman 1dari 13

DISEO HIDRULICO DE TUBERIAS (PRIMER NIVEL)

TRAMO
UNIDADES HUNTER
Litros / Seg.
Dimetro
(m) V=0.60 m/seg
Dimetro
(pulg)
Dimetro
(Comercial)
Dimetro
(m) V= 3.00 m/seg
Dimetro
(pulg)
Dimetro
(Comercial Asumido)

A-B

B-C

C-D

D-E

E-F

Longitud (m)
Cantidad
Long.
Equivalente
Sub Total
Cantidad
Codo A
Longitud
45
Equivalente
Sub Total
Cantidad
Giro A
L. E.
90
Sub Total
Tee
Cantidad
Paso
L. E.
Recta
Sub Total
Cantidad
Comp.
L. E.
Sub Total
Valvula
Cantidad
Globo
L. E.
Sub Total
Longitud Adicional
Longitud Total
Sf (m/m)
Prdida De Carga
Altura Del Ap. Ms
Desfav.
Presin De Salida
Perdida De Carga En
Medidor
Presin Necesaria
Codo A
90

Presin Necesaria Total

13.51

m.c.a.

19.18

F-G

G-H

TH-TE
75
1.41

D-E
25
0.64

C-D
16
0.46

B-C
12
0.38

A-B
6
0.25

Inodoro-A
4
0.16

0.055

0.037

0.031

0.028

0.023

0.018

2.15

1.45

1.23

1.12

0.91

0.73

1 1/ 2

1 1/ 2

1 1/ 2

1 1/ 4

1 1/ 4

0.024

0.016

0.014

0.013

0.010

0.008

0.96

0.65

0.55

0.50

0.41

0.32

1 1/2

1/2

1/2

3.35
3
2.16
6.48

7.22
5
1.42
7.10

2.34

2.72

0.00

0.00

5.46
6
0.70
4.20

1.33
3
0.70
2.10

0.00
1
2.15
2.15

0.00
2
1.50
3.00

0.00

0.00

0.00

0.00

0.00

0.00
1
0.68
0.68

0.00
1
0.68
0.68

0.00
2
0.90
1.80

0.00

0.00

0.00

0.00

0.00

0.00
0.68
3.02
0.028
0.08
0.00
8.14

0.00
0.68
3.40
0.019
0.07
0.00
8.07

0.00
1
5.91
5.91
11.91
17.37
0.265
4.60
0.00
3.47

0.00

0.00
8.63
11.98
0.035
0.42
0.00
12.68

0.00
1
11.36
11.36
21.46
28.68
0.054
1.56
2.90
8.22

0.00
2.10
3.43
0.108
0.37
1.10
2.00

13.09

12.68

8.22

8.14

8.07

3.47

PSI
12.01

0.00

CALCULO DEL TANQUE HIDRONEUMATICO

Dotacin De Agua (UH)

1 Nivel 2 Nivel 3 Nivel 4 Nivel


75.00
75.00
75.00
75.00

Luego en el R.N.E. tenemos:


La Capacidad De La Bomba Ser:

Total
300.00

300.00

UH

6.00

litros/se
g.

96.00

100.00

GPM

Presiones:

PC Unitario
(m/m)

1 Nivel 2 Nivel 3 Nivel 4 Nivel


0.104
0.104
0.104
0.104

PC Unit. Prom.

Presin Mnima

0.104

Alt. Est. + Perdida De Carga + P. Mn. De


Salida

Alt. Est.
Long. Tanque - Ap. Mas
Desfavorable
P. Carga Total
P. Mn. Salida Cual.
Aparato
Presin Mnima

m/m

19.05

Luego El Rango De Presiones Adecuada


Ser:

=
=
=
=

8 1/9
85 8/9
8.95
2.00

m
m
m
m

m.c.a.

27.05
27.00

PSI
PSI

40
60
PSI
(Condicin Mnima De Servicio)

Volumen Del Tanque Hidroneumtico:


En la tabla:
Factor De Multiplicacin

Vol. Del Tanque Calculado

Vol. Del Tanque Comercial

Vol. Del Tanque Comercial

10.50
1050.00 Galones
2 de
600

Galones

1200.00 Galones

Luego La Configuracin De Los Tanques Hidroneumticos


Sern:
8 Unidades de
150 Galones
Cada Uno

h
h

=
=

0.78
1.30
1.50

m
m
m

DISEO HIDRULICO DE TUBERIAS (SEGUNDO NIVEL)

TRAMO
A-B
B-C
C-D
D-E
E-F
F-G
G-H
H-I
I-J
J-K
UNIDADES HUNTER
192
192
144
96
48
24
18
12
9
6
Litros / Seg.
2.39
2.39
2.01
1.63
1.09
0.61
0.50
0.38
0.32
0.25
Dimetro
0.071
0.071
0.065
0.059
0.048
0.036
0.033
0.028
0.026
0.023
(m) V=0.60 m/seg
Dimetro
2.80
2.80
2.57
2.32
1.89
1.42
1.28
1.12
1.03
0.91
(pulg)
Dimetro
3
3
3
3
2
1 1/ 2
1 1/ 2
1 1/ 2
1 1/ 2
1
(Comercial)
Dimetro
0.033
0.033
0.031
0.027
0.022
0.017
0.015
0.013
0.012
0.011
(m) V= 2.75 m/seg
Dimetro
1.31
1.31
1.20
1.08
0.88
0.66
0.60
0.52
0.48
0.42
(pulg)
Dimetro
1 1/2
1 1/2
1 1/2
1 1/2
1
3/4
3/4
3/4
1/2
1/2
(Comercial)
Luego en el reglamento para = 1 1/2", Velocidad Mxima: 3.00 m/seg > 2.75 m/seg
Longitud (m)
0.85
3.43
6.90
24.00
8.50
5.42
6.08
2.49
3.23
1.36
Cantidad
1
4
8
5
Codo A
Long.
2.16
2.16
1.08
0.75
90
Equivalente
Sub Total
2.16
8.64
0.00
0.00
0.00
8.64
0.00
0.00
0.00
3.75
Cantidad
Codo A
Longitud
45
Equivalente
Sub Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cantidad
1
1
Giro A
L. E.
2.11
2.04
90
Sub Total
0.00
2.11
0.00
0.00
2.04
0.00
0.00
0.00
0.00
0.00
Tee
Cantidad
1
1
1
1
1
1
Paso
L. E.
1.04
1.04
0.52
0.52
0.52
0.35
Recto
Sub Total
0.00
0.00
1.04
1.04
0.00
0.52
0.52
0.52
0.35
0.00
Cantidad
1
1
1
Comp.
L. E.
0.33
0.16
0.11
Sub Total
0.00
0.33
0.00
0.00
0.00
0.16
0.00
0.00
0.00
0.11
Valvula
Cantidad
Globo
L. E.
Sub Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud Adicional
2.16
11.08
1.04
1.04
2.04
9.32
0.52
0.52
0.35
3.86
Longitud Total
3.01
14.51
7.94
25.04
10.54
14.74
6.60
3.01
3.58
5.22
Sf (m/m)
0.100
0.100
0.070
0.046
0.157
0.208
0.140
0.081
0.434
0.265
Prdida De Carga
0.30
1.45
0.56
1.16
1.66
3.06
0.92
0.24
1.55
1.38
Altura Del Ap. Ms
Desfav.
Presin De Salida
Perdida De Carga En
1.82
1.51
Medidor
Presin Necesaria
0.30
3.27
0.56
1.16
1.66
4.57
0.92
0.24
1.55
1.38
Presin Necesaria Total

22.09

m.c.a.

K-L
6
0.25
0.023
0.91
1
0.011
0.42
1/2
1.98
1
0.75
0.75

0.00

0.00
2
0.35
0.70

0.00
1
5.91
5.91
7.36
9.34
0.265
2.47
2.00
2.00

6.47

DISEO HIDRULICO DE TUBERIAS (TERCER NIVEL)

TRAMO
A-B
B-C
C-D
D-E
E-F
F-G
G-H
H-I
I-J
J-K
UNIDADES HUNTER
192
192
144
96
48
24
18
12
9
6
Litros / Seg.
2.39
2.39
2.01
1.63
1.09
0.61
0.50
0.38
0.32
0.25
Dimetro
0.071
0.071
0.065
0.059
0.048
0.036
0.033
0.028
0.026
0.023
(m) V=0.60 m/seg
Dimetro
2.80
2.80
2.57
2.32
1.89
1.42
1.28
1.12
1.03
0.91
(pulg)
Dimetro
3
3
3
3
2
1 1/ 2
1 1/ 2
1 1/ 2
1 1/ 2
1
(Comercial)
Dimetro
0.033
0.033
0.031
0.027
0.022
0.017
0.015
0.013
0.012
0.011
(m) V= 2.75 m/seg
Dimetro
1.31
1.31
1.20
1.08
0.88
0.66
0.60
0.52
0.48
0.42
(pulg)
Dimetro
1 1/2
1 1/2
1 1/2
1 1/2
1
3/4
3/4
3/4
1/2
1/2
(Comercial)
Luego en el reglamento para = 1 1/2", Velocidad Mxima: 3.00 m/seg > 2.75 m/seg
Longitud (m)
0.85
3.43
6.90
24.00
8.50
5.42
6.08
2.49
3.23
1.36
Cantidad
1
4
8
5
Codo A
Long.
2.16
2.16
1.08
0.75
90
Equivalente
Sub Total
2.16
8.64
0.00
0.00
0.00
8.64
0.00
0.00
0.00
3.75
Cantidad
Codo A
Longitud
45
Equivalente
Sub Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cantidad
1
1
Giro A
L. E.
2.11
2.04
90
Sub Total
0.00
2.11
0.00
0.00
2.04
0.00
0.00
0.00
0.00
0.00
Tee
Cantidad
1
1
1
1
1
1
Paso
L. E.
1.04
1.04
0.52
0.52
0.52
0.35
Recto
Sub Total
0.00
0.00
1.04
1.04
0.00
0.52
0.52
0.52
0.35
0.00
Cantidad
1
1
1
Comp.
L. E.
0.33
0.16
0.11
Sub Total
0.00
0.33
0.00
0.00
0.00
0.16
0.00
0.00
0.00
0.11
Valvula
Cantidad
Globo
L. E.
Sub Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud Adicional
2.16
11.08
1.04
1.04
2.04
9.32
0.52
0.52
0.35
3.86
Longitud Total
3.01
14.51
7.94
25.04
10.54
14.74
6.60
3.01
3.58
5.22
Sf (m/m)
0.100
0.100
0.070
0.046
0.157
0.208
0.140
0.081
0.434
0.265
Prdida De Carga
0.30
1.45
0.56
1.16
1.66
3.06
0.92
0.24
1.55
1.38
Altura Del Ap. Ms
Desfav.
Presin De Salida
Perdida De Carga En
1.82
1.51
Medidor
Presin Necesaria
0.30
3.27
0.56
1.16
1.66
4.57
0.92
0.24
1.55
1.38
Presin Necesaria Total

22.09

m.c.a.

K-L
6
0.25
0.023
0.91
1
0.011
0.42
1/2
1.98
1
0.75
0.75

0.00

0.00
2
0.35
0.70

0.00
1
5.91
5.91
7.36
9.34
0.265
2.47
2.00
2.00

6.47

DISEO HIDRULICO DE TUBERIAS (CUARTO NIVEL)

TRAMO
A-B
B-C
C-D
D-E
E-F
F-G
G-H
H-I
I-J
J-K
UNIDADES HUNTER
192
192
144
96
48
24
18
12
9
6
Litros / Seg.
2.39
2.39
2.01
1.63
1.09
0.61
0.50
0.38
0.32
0.25
Dimetro
0.071
0.071
0.065
0.059
0.048
0.036
0.033
0.028
0.026
0.023
(m) V=0.60 m/seg
Dimetro
2.80
2.80
2.57
2.32
1.89
1.42
1.28
1.12
1.03
0.91
(pulg)
Dimetro
3
3
3
3
2
1 1/ 2
1 1/ 2
1 1/ 2
1 1/ 2
1
(Comercial)
Dimetro
0.033
0.033
0.031
0.027
0.022
0.017
0.015
0.013
0.012
0.011
(m) V= 2.75 m/seg
Dimetro
1.31
1.31
1.20
1.08
0.88
0.66
0.60
0.52
0.48
0.42
(pulg)
Dimetro
1 1/2
1 1/2
1 1/2
1 1/2
1
3/4
3/4
3/4
1/2
1/2
(Comercial)
Luego en el reglamento para = 1 1/2", Velocidad Mxima: 3.00 m/seg > 2.75 m/seg
Longitud (m)
0.85
3.43
6.90
24.00
8.50
5.42
6.08
2.49
3.23
1.36
Cantidad
1
4
8
5
Codo A
Long.
2.16
2.16
1.08
0.75
90
Equivalente
Sub Total
2.16
8.64
0.00
0.00
0.00
8.64
0.00
0.00
0.00
3.75
Cantidad
Codo A
Longitud
45
Equivalente
Sub Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Cantidad
1
1
Giro A
L. E.
2.11
2.04
90
Sub Total
0.00
2.11
0.00
0.00
2.04
0.00
0.00
0.00
0.00
0.00
Tee
Cantidad
1
1
1
1
1
1
Paso
L. E.
1.04
1.04
0.52
0.52
0.52
0.35
Recto
Sub Total
0.00
0.00
1.04
1.04
0.00
0.52
0.52
0.52
0.35
0.00
Cantidad
1
1
1
Comp.
L. E.
0.33
0.16
0.11
Sub Total
0.00
0.33
0.00
0.00
0.00
0.16
0.00
0.00
0.00
0.11
Valvula
Cantidad
Globo
L. E.
Sub Total
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Longitud Adicional
2.16
11.08
1.04
1.04
2.04
9.32
0.52
0.52
0.35
3.86
Longitud Total
3.01
14.51
7.94
25.04
10.54
14.74
6.60
3.01
3.58
5.22
Sf (m/m)
0.100
0.100
0.070
0.046
0.157
0.208
0.140
0.081
0.434
0.265
Prdida De Carga
0.30
1.45
0.56
1.16
1.66
3.06
0.92
0.24
1.55
1.38
Altura Del Ap. Ms
Desfav.
Presin De Salida
Perdida De Carga En
1.82
1.51
Medidor
Presin Necesaria
0.30
3.27
0.56
1.16
1.66
4.57
0.92
0.24
1.55
1.38
Presin Necesaria Total

22.09

m.c.a.

K-L
6
0.25
0.023
0.91
1
0.011
0.42
1/2
1.98
1
0.75
0.75

0.00

0.00
2
0.35
0.70

0.00
1
5.91
5.91
7.36
9.34
0.265
2.47
2.00
2.00

6.47

DISEO HIDRULICO DE TUBERIAS (ANALISIS VERTICAL)

TRAMO
1
1 - 2 2 - 3 3 - 4
UNIDADES HUNTER
576
576
384
192
Litros / Seg.
5.19
5.19
3.73
2.39
Dimetro
0.105
0.105
0.089
0.071
(m) V=0.60 m/seg
Dimetro
4.13
4.13
3.50
2.80
(pulg)
Dimetro
5
5
4
3
(Comercial)
Dimetro
0.049
0.049
0.042
0.033
(m) V= 2.75 m/seg
Dimetro
1.93
1.93
1.64
1.31
(pulg)
Dimetro
2
2
2
1 1/2
(Comercial)
Luego en el reglamento para de 1 1/2" a mayores,
Velocidad Mxima: 3.00 m/seg > 2.75 m/seg
Longitud (m)
12.69
3.00
3.00
3.00
Cantidad
4
1
Codo A
Long.
2.84
2.16
90
Equivalente
Sub Total
11.36
0.00
0.00
2.16
Cantidad
Codo A
Longitud
45
Equivalente
Sub Total
0.00
0.00
0.00
0.00
Cantidad
1
1
1
1
Giro A
L. E.
4.09
4.09
4.09
3.11
90
Sub Total
4.09
4.09
4.09
3.11
Tee
Cantidad
1
1
Paso
L. E.
1.36
1.36
Recto
Sub Total
0.00
1.36
1.36
0.00
Cantidad
Comp.
L. E.
Sub Total
0.00
0.00
0.00
0.00
Valvula
Cantidad
Globo
L. E.
Sub Total
0.00
0.00
0.00
0.00
Longitud Adicional
15.45
5.45
5.45
5.27
Longitud Total
28.14
8.45
8.45
8.27
Sf (m/m)
0.111
0.111
0.058
0.100
Prdida De Carga
3.14
0.94
0.49
0.82
Altura Del Ap. Ms
Desfav.
Presin De Salida
Perdida De Carga En
Medidor
Presin Necesaria
3.14
0.94
0.49
0.82
Presin Necesaria Total

5.39

m.c.a.

Determinacin del Volumen del Tanque Cisterna

Tenemos la siguiente configuracin del edificio, asi como la dotacin de agua de los ambientes

rea
1 Nivel

rea Administrativa Edificio:


Administracin
3 Dormitorios
1 Local Comercial
1 Cyber Caf

2 Nivel

3 Nivel
4 Nivel
5 Nivel

Luego Sumamos:

Restaurant:
Comedor
Oficina
1 Dorm. Vigilancia
8 Locales
comerciales

Dotacin de Agua (Litros/da)

35.00

m2

6 L/d por m2
Para 3
dormitorios
6 L/d por m2
6 L/d por m2

210.00
1200.00
348.00
324.00

58.00
54.00

m2
m2

600.00
18.00

m2
m2

40 L/d por m2
6 L/d por m2
Para 1 dormitorio

###
108.00
500.00

160.00

m2

6 L/d por m2

960.00

Para 4
Dormitorios Por
Departamento
(1350 L/d x Dep.)

###
###
###

8 Departamentos de 4 Dormitorios Cada Uno


8 Departamentos de 4 Dormitorios Cada Uno
8 Departamentos de 4 Dormitorios Cada Uno

Dotacin Total

59090.00

Lit. / Da

Ahora Calculamos el Volumen del Tanque Cisterna al 100% de la Dotacin Diaria para el Tanque Hidroneumtico
Vol. Tanque Cisterna
Vol. Tanque Cisterna

59090.00
59.09

Litros / Da
m3

32400.00

24300.00

Sistema de Proteccin Contra Incendios

1 Diseo (Para Los Ocupantes)


Suministro
:
Almacenamient

:
o

Indirecto - No Convencional
Tanque Cisterna - Tanque Hidroneumtico

Presion Mnima
Salida,
:
Gabinete
Mas
Desfavorable

Volumen de Almacenamiento
2 Mangueras Por 1/2 Hora
Longitud De Mangueras: Mayor De 20 m
Consumo De La Manguera:
4.00
lit/seg.
Volumen Total
14.40 m3

10.00

m.c.a.

2 1/2" (Para todas las alimentadoras en todos los niveles)

2 Diseo (Para El Cuerpo de Bomberos)

Primera Posibilidad (Sistema Con Hidrantes En La Fachada Principal)

Segunda Posibilidad (Sistema Con Hidrantes En La Fachada Principal con una


vlvula Check para que el agua no regrese hacia la cisterna)

Ver Planos adjuntos para ver todos estos detalles

Dotacin De Agua Caliente

Para esto usaremos termas electricas

Primera Configuracin: Cuarto de Bao, con (1) ducha, (1)


lavatorio
Segunda Configuracin: Cuarto de Bao, con (1) tina, (1)
lavatorio)

Otros: (1) Lavatorio, (1) Lavadero

Calculamos el volumen en litros por hora de cada aparato en funcin de las


tablas que propuestas en el RNE.

Primer Caso

Ducha
Lavatori
o

=
=

280.00
8.00

L/h
L/h

TOTAL

288.00

L/h

Coeficiente de demanda probable


Coeficiente de demanda probable

=
=

0.30
0.70

Volumen minimo de la therma:

60.48

70.00

Litros

Volumen comercial de la therma:

(Therma Bryant Electrica)

70.00

Litros

Segundo Caso

Tina
Lavatori
o

=
=

75.00
8.00

L/h
L/h

TOTAL

83.00

L/h

Coeficiente de demanda probable


Coeficiente de demanda probable

=
=

0.30
0.70

Volumen minimo de la therma:

17.43

50.00

Litros

Volumen comercial de la therma:


(Therma Bryant Electrica - Para
2 SS.HH.)

Otros

Lavader
o
Lavatori
o

=
=

75.00
20.00

L/h
L/h

TOTAL

95.00

L/h

Coeficiente de demanda probable


Coeficiente de demanda probable

=
=

0.30
0.70

Volumen minimo de la therma:

19.95

20.00

Litros

Volumen comercial de la therma:

Ahora para la parte primer y ultima abasteceremos con una


Therma Bryan Electrica de 90 Litros.