Rab Rype 70M2
Rab Rype 70M2
Uraian Pekerjaan
No
Sat
Pek
Hrg satuan
(Rp)
Jumlah harga
(Rp)
1
2
3
4
5
Pekerjan Persiapan
Pekerjaan pembersihan
Pengukuran/pas. bouwplank
Biaya pengurusan IMB
Biaya air kerja pelaksanaan
Pembersihan/perapian akhir
150.00
48.00
150.00
1.00
1.00
m2
m'
m2
ls
ls
7,500.00
30,429.00
50,000.00
500,000.00
250,000.00
1,125,000.00
1,460,592.00
7,500,000.00
500,000.00
250,000.00
10,835,592.00
1
2
3
4
5
6
7
8
Pekerjaan Pondasi
Galian tanah pondasi
Pasir urug bawah pondasi
Lantai kerja ad. 1:2:5
Pondasi plat setempat ad.1:2:3
Pondasi batu bata ad. 1:4
Berapen pondasi
Urugan tanah kembali
Timbunan tanah peninggian lantai
30.25
4.32
0.06
0.31
1.28
89.10
7.56
11.97
m3
m3
m3
m3
m3
m2
m3
m3
19,400.00
110,500.00
602,685.00
3,996,400.00
686,234.00
17,647.40
9,312.00
71,550.00
586,850.00
477,360.00
36,161.10
1,238,884.00
878,379.52
1,572,383.34
70,398.72
856,453.50
5,716,870.18
1
2
3
4
5
6
7
8
1.52
0.90
0.20
0.12
0.29
0.81
0.30
0.22
m3
m3
m3
m3
m3
m3
m3
m3
4,229,200.00
4,229,200.00
4,229,200.00
4,229,200.00
4,229,200.00
4,229,200.00
4,229,200.00
4,229,200.00
6,428,384.00
3,806,280.00
845,840.00
507,504.00
1,226,468.00
3,425,652.00
1,268,760.00
930,424.00
18,439,312.00
1
2
3
4
5
6
7
8
24.72
188.09
49.44
376.18
9.72
2.80
12.77
0.30
m2
m2
m2
m2
m2
m2
m2
m'
86,636.00
79,040.00
30,266.40
26,939.00
35,344.90
127,821.40
127,821.40
47,652.75
2,141,641.92
14,866,633.60
1,496,370.82
10,133,913.02
343,552.43
357,899.92
1,632,279.28
14,295.83
30,986,586.81
0.35
0.15
m3
m3
6,837,000.00
6,307,500.00
2,392,950.00
946,125.00
1.00
1.00
134.93
21.30
8.00
134.96
7.00
ls
ls
m2
m'
m'
m2
m'
500,000.00
750,000.00
69,966.50
73,025.00
115,000.00
87,600.00
87,287.50
500,000.00
750,000.00
9,440,579.85
1,555,432.50
920,000.00
11,822,496.00
611,012.50
II
III
IV
Vol
Pek
28,938,595.85
No
VI
1
2
3
4
5
6
7
8
9
10
11
12
Uraian Pekerjaan
Pek. Kusen, Pintu dan Jendela
Kusen pintu dan jendela kelas II
Pasangan pintu panel papan
Pasangan pintu PVC KM/WC
Pasangan jendela panel kaca 5mm
Pasangan kaca polos 5mm
Pasangan engsel pintu 4"
Pasangan engsel jendela 3"
Pasangan sloop tanam 2 slaag
Pasangan handle jendela
Pasangan gerendel jendela
pasangan kait angin jendela
ventilasi loster
Pek.
Sat
Pek.
0.78
9.24
1.00
10.96
0.40
18.00
22.00
18.00
11.00
22.00
22.00
14.00
m3
m2
unit
m2
m2
bh
bh
bh
bh
bh
bh
bh
Hrg satuan
(Rp)
6,454,500.00
375,450.00
350,000.00
379,250.00
108,488.75
17,188.75
12,292.50
124,405.00
12,292.50
12,292.50
12,292.50
Jumlah harga
(Rp)
5,034,510.00
3,469,158.00
350,000.00
4,156,580.00
43,395.50
309,397.50
270,435.00
2,239,290.00
135,217.50
270,435.00
270,435.00
16,548,853.50
91.69
117.00
m2
m'
128,490.00
12,085.00
11,781,248.10
1,413,945.00
13,195,193.10
VIII
1
2
3
4
5
6
7
9.00
5.00
9.00
5.00
2.00
5.00
1.00
ttk
ttk
bh
bh
bh
bh
bh
115,000.00
115,000.00
27,000.00
25,000.00
25,000.00
20,000.00
50,000.00
1,035,000.00
575,000.00
243,000.00
125,000.00
50,000.00
100,000.00
50,000.00
2,178,000.00
IX
1
2
3
4
5
6
7
Pekerjaan Lantai
Pasir urug dibawah lantai
Beton cor lantai ad. 1:3:5
Keramik lantai 40 x 40 cm
Plint keramik 10 x 40 cm
Keramik lantai 20 x 20 cm
Beton cor rabat ad. 1:3:5
Saluran keliling bangunan
9.05
4.53
86.50
60.50
4.00
5.87
19.50
m3
m3
m2
m'
m2
m3
m'
110,500.00
602,685.00
128,921.40
29,142.75
123,421.40
602,685.00
86,094.00
1,000,025.00
2,730,163.05
11,151,701.10
1,763,136.38
493,685.60
3,537,760.95
1,678,833.00
22,355,305.08
1
2
3
4
5
7
8
9
14.00
4.00
4.00
1.00
1.00
1.00
1.00
1.00
m'
m'
m'
bh
bh
bh
bh
bh
12,483.00
37,811.00
45,311.00
550,000.00
238,520.00
43,212.50
43,175.00
1,955,000.00
174,762.00
151,244.00
181,244.00
550,000.00
238,520.00
43,212.50
43,175.00
1,955,000.00
3,337,157.50
366.29
m2
31,862.50
11,670,915.13
XI
Pekerjaan Pengecatan
1 Pengecatan dinding tembok
2 Pengecatan plafond
3 Pengecatan listplank + kusen + pintu
91.69
59.76
m2
m2
21,290.00
48,038.00
1,952,080.10
2,870,750.88
16,493,746.11
R E KAP I T U LAS I
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN
LOKASI
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
Pekerjaan Persiapan
Pekerjaan Pondasi
Pekerjaan Beton K 225
Pek. Pasangan dan Plasteran
Pekerjaan Kuda-kuda dan Atap
Pek. Kusen, Pintu dan Jendela
Pekerjaan Plafond
Pek. Inst. Listrik dan Armature
Pekerjaan Lantai
Pek. Plumbing dan Alat Sanitas
Pekerjaan Pengecatan
Jumlah
Dibulatkan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
10,835,592.00
5,716,870.18
18,439,312.00
30,986,586.81
28,938,595.85
16,548,853.50
13,195,193.10
2,178,000.00
22,355,305.08
3,337,157.50
16,493,746.11
Rp
Rp
169,025,212.11
169,025,000.00
Terbilang : Seratus enam puluh sembilan juta dua puluh lima ribu rupiah
Palembang
Dihitung Oleh,
Muhammad Iqbal