Anda di halaman 1dari 1

+102.

00

1000.00
420.00

URUGAN BIASA

+101.00

GALIAN

URUGAN PILIHAN T : 20 CM
URUGAN BIASA

DINAS PEKERJAAN UMUM


PROVINSI SULAWESI TENGGARA

URUGAN PILIHAN T : 20 CM
URUGAN BIASA

KEGIATAN

GALIAN

PERENCANAAN PEMBANGUNAN DRAINASE JALAN


PROVINSI POROS ANDOLO - PALANGGA
(RUAS PUNGGALUKU - ALANGGA)

+100.00

253.00
286.00

278.00

244.00
237.00

+99.00

PEKERJAAN
PEMBANGUNAN DRAINASE JALAN PROVINSI POROS
ANDOLO - PALANGGA
(RUAS PUNGGALUKU - ALANGGA)

CATATAN / REVISI

+98.00

AB

PATOK (STA)
JARAK TITIK (cm)

CD

P2 (0+100)

100.53
100.86

ELEVASI EXISTING

100.78

100.44
100.37

1000

ELEVASI RENCANA
KEMIRINGAN EXISTING (%)
KEMIRINGAN RENCANA (%)

2%
2%

2%
2%

MENGETAHUI / MENYETUJUI
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)
DINAS PEKERJAAN UMUM
PROVINSI SULAWESI TENGGARA

+103.00

1000.00
420.00

+102.00
GALIAN

URUGAN PILIHAN T : 20 CM
URUGAN BIASA

URUGAN PILIHAN T : 20 CM
URUGAN BIASA

GALIAN

HAMKA, ST
NIP. 19770630 201001 1 010

+101.00

230.00
238.00

229.00

227.00
199.00

+100.00

KONSULTAN PERENCANA

TEAM PERENCANA
SIPIL
JASMAN, ST

+99.00

CD

P3 (0+150)

101.30
101.38

1000
101.29

ELEVASI EXISTING

AB
101.27
100.99

PATOK (STA)
JARAK TITIK (cm)

ELEVASI RENCANA
KEMIRINGAN EXISTING (%)
KEMIRINGAN RENCANA (%)

SURVEYOR

RIJAL ANSAPUTRA, ST

MUH. SAID, ST
DIREKTUR

DRAFTER
IRFAN M. MANOPPO, ST

NAMA GAMBAR
PROFIL MELINTANG SEGMEN 2
STA. 0+100 - 0+150

2%
2%

2%
2%

NO. LEMBAR
03

SKALA
H = 1 : 20
V = 1 : 10

JML. LEMBAR KODE GAMBAR


05