L&T CONSTRUCTION

TRANSPORTATION INFRASTRUCTURE
QUALITY WEEK CELEBRATIONS FROM
QUIZ FOR STAFF
NAME OF THE STAFF

PS NO

TOTAL MARKS OBTAINED

DATE

1
A
2

The room temperature to be maintained during conducting cement tests


27 2C

27 1C

27 0.5C

No. of cubes required in two sets of concrete cubes for 28days are:

A
3

How many strokes are applied to each layer with the tamping rod for slu

15

25

20

30

Slump required for underwater concreting is

50-75 mm

Frequency of conducting the core cutting test is: One for every

500 sqm

Core diameter is

150 mm

B
B
B

75-100 mm

300 sqm

100 mm

100-200 mm

250 sqm

200 mm

D Below 50m
700 sqm

175 mm

The degree of expansivness for FSI > 50% is

Low

In CBR test, the soil is placed in the mould in how many layers?

A
9
A
10
A
11

B
5

100-105C

105-110C

WMM

B Base course

105-115C

C Sub-base course

D Sub

Surface level Tolerance for Subgrade should be


+ 15 mm to -25 mm

High

Bottom most layer of pavement crust is known as

13

+ 20 mm to -25 mm

What should be temperature of the oven in Moisture test?

A
12

Moderate

+ 20 mm to -20 mm

Static weight of Vibratory roller used during laying is


80-100 KN

70-90 KN

80-120 KN

Liquid Limit for GSB should be


<35

<40

<30

<25

L&T CONSTRUCTION
TRANSPORTATION INFRASTRUCTURE
QUALITY WEEK CELEBRATIONS FROM
QUIZ FOR STAFF
NAME OF THE STAFF

PS NO

TOTAL MARKS OBTAINED

DATE

14
A
15
A
16
A
17
A
18
A
19
A
20
A
21
A
22
A
23
A
24
A
25

Maximum thickness of single layer WMM should be


150mm

200mm

250mm

300mm

7 km/hr

10 km/hr

4 layer

What is the Rolling speed of roller:


3 km/hr

5 km/hr

In how many layers DBM is generally laid:


1 layer

2 layer

3 layer

What should be the temperature of the mix during laying of DBM?


110c to 120c

100c to 120c

130c to 150c

1500 mm/km

Maximum allowable bumps on the road is:


2500mm/km

B 1800 mm/km

230

Rate of spray of Tack coat on bituminous surface is between


0.1 to 0.15 kg/m2

B 0.2 to 0.25 kg/m2

0.3 to 0.35 kg/m2

Surface level tolerances of bituminous surface is


- 4mm to +4mm

B - 5mm to+ 5mm

- 3mm to+ 3mm

Which of the following equipment is not used in Thermoplastic Paint Mar


Applicator

Glass Beads

Paver

Pre he

Thermoplastic material is heated at temperature:


B

180-200 0C

200-210 0C

150-180 0C

The thickness applied thermoplastic paint should be :


2.5 mm

3 mm

3.5 mm

2 mm

0.60 kg

What is the weight of Zinc coating for MBCB per sqm?


0.45 Kg

0.5 kg

0.55 kg

The Slump shall be within following limits on the specified value:

25 mm or 1/3 of the specifeid value whichever is less

20 mm or 1/3 of the specified value whichever is less

25 mm or 1/2 of the specified value whichever is less

20 mm or 1/2 of the specified value whichever is less

CONSTRUCTION

ATION INFRASTRUCTURE

EK CELEBRATIONS FROM

UIZ FOR STAFF

ed during conducting cement tests is


28 1C

h layer with the tamping rod for slump cone

D Below 50mm

Very high

110 - 115 oC

D Subgrade
C

+ 10 mm to -30 mm

100-120 KN

CONSTRUCTION

ATION INFRASTRUCTURE

EK CELEBRATIONS FROM

UIZ FOR STAFF

130c to 160c
D

2300 mm/km
D

0.3 to 0.4 kg/m2

- 6mm to+ 6mm

ot used in Thermoplastic Paint Marking?


D

Pre heated Kettle


D

180-210 0C