TRANSPORTATION INFRASTRUCTURE
QUALITY WEEK CELEBRATIONS FROM
QUIZ FOR STAFF
NAME OF THE STAFF
PS NO
DATE
1
A
2
27 1C
27 0.5C
No. of cubes required in two sets of concrete cubes for 28days are:
A
3
How many strokes are applied to each layer with the tamping rod for slu
15
25
20
30
50-75 mm
Frequency of conducting the core cutting test is: One for every
500 sqm
Core diameter is
150 mm
B
B
B
75-100 mm
300 sqm
100 mm
100-200 mm
250 sqm
200 mm
D Below 50m
700 sqm
175 mm
Low
In CBR test, the soil is placed in the mould in how many layers?
A
9
A
10
A
11
B
5
100-105C
105-110C
WMM
B Base course
105-115C
C Sub-base course
D Sub
High
13
+ 20 mm to -25 mm
A
12
Moderate
+ 20 mm to -20 mm
70-90 KN
80-120 KN
<40
<30
<25
L&T CONSTRUCTION
TRANSPORTATION INFRASTRUCTURE
QUALITY WEEK CELEBRATIONS FROM
QUIZ FOR STAFF
NAME OF THE STAFF
PS NO
DATE
14
A
15
A
16
A
17
A
18
A
19
A
20
A
21
A
22
A
23
A
24
A
25
200mm
250mm
300mm
7 km/hr
10 km/hr
4 layer
5 km/hr
2 layer
3 layer
100c to 120c
130c to 150c
1500 mm/km
B 1800 mm/km
230
Glass Beads
Paver
Pre he
180-200 0C
200-210 0C
150-180 0C
3 mm
3.5 mm
2 mm
0.60 kg
0.5 kg
0.55 kg
CONSTRUCTION
ATION INFRASTRUCTURE
EK CELEBRATIONS FROM
D Below 50mm
Very high
110 - 115 oC
D Subgrade
C
+ 10 mm to -30 mm
100-120 KN
CONSTRUCTION
ATION INFRASTRUCTURE
EK CELEBRATIONS FROM
130c to 160c
D
2300 mm/km
D
180-210 0C