Sl. No.

Document No

Description

NFPE/AIL/DRG-478

TerminationDiagram of CO2 Snuffing System

NFPE/AIL/DRG-483

Block Diagram of CO2 Snuffing System

NFPE/CFA/TDS-9.7

Cable Schedule

NFPE/CFA/TDS-9.6

Technical Datasheet of Manual Release Switch

NFPE/CFA/TDS-9.8

Technical Datasheet of FS Cables

NFPE/CO/TDS-1.13A

Technical Datasheet of CO2 Discharge Nozzle POP-UP


type with matching flange

NFPE/AIL/DRG-472

General Arrangment of CO2 Cylinder Cabinet

NFPE/AIL/DRG-471

P & ID for CO2 Snuffing System

NFPE/AIL/DRG-479

Design Calculation for CO2 Snuffing System

10

NFPE/AIL/DRG-481

Operation Philosophy of CO2 Snuffing System

11

NFPE.AIL/TDS-485

Cause & Effect Chart

IDC Register for CO2 Snuffing System


Department

IDC Release Date IDC Return Date

Forwarded Department

Electrical

25-Nov-16

28-Nov-16

Instrumentation

Electrical

25-Nov-16

N/A

Instrumentation

Electrical

25-Nov-16

N/A

Instrumentation

Electrical

25-Nov-16

N/A

Instrumentation

Electrical

25-Nov-16

N/A

Instrumentation

Piping

25-Nov-16

N/A

Piping

25-Nov-16

N/A

Process

25-Nov-16

N/A

Process

25-Nov-16

N/A

Process

25-Nov-16

N/A

Process

8-Dec-16

IDC Release Date

IDC Return Date

30-Nov-16

30-Nov-16

30-Nov-16

30-Nov-16

30-Nov-16

30-Nov-16

30-Nov-16

30-Nov-16

30-Nov-16

30-Nov-16

Remarks
As per discussion cables are
part of Instumentation scope
and hence shall be reviewed
by Instrumentation. Only
power input provided from
platform is taken care by
Electrical.