1.

Scope
This leaflet deals with the construction of a pond shell in
concrete. Aspects of pond design and maintenance such as
watercirculationandfiltrationarenotincludedandthereader
isadvisedtogetspecialistinformationontheseatthedesign
stage.

2.Introduction
Themethoddescribedinthisleafletissuitableforpondswith
adiameterorlengthofuptoabout5metres.

The floor and sides of the pond are formed by a fairly thin
continuous concrete shell which is lightly reinforced. No
additionalwaterproofingmembraneisusedandtheconcrete
shell serves as the water container. The surrounding soil is
reliedontosupporttheshellwhenthepondisfullofwater.
Forthesystemtoworksuccessfullyitisimportantthat:

Thepondisconstructedinundisturbedsubsoilandnotin
filledsoil.
The concrete in the shell is thoroughly compacted to
ensurethatitisfreeofvoids.

Manypondsofthistypehaveinrecentyearsbeenconstructed
successfullybothbyprofessionallandscapersanddoityour
selfenthusiasts.

3.Makingprovisionforrainwaterrunoff
Rainwaterwhichfallsonthegardenorpavingsurroundingthe
pond must not be allowed to run into the pond. The area
immediatelyaroundthepondmustthereforebeslopedaway
fromthepondasshowninFigure1.

4.Edgedetail
Itisadvisabletocreateanearlyhorizontal(butslopingdown
awayfromthepond)rimaroundtheedgeofthepond.This
willservetostrengthentheshell.Therimcanbeleftexposed
but will probably look better if it is covered with bricks or
stoneslaidinmortar.SeeFigure1.

Building
afishpond

Figure1:Detailsofedgeofpond

5.Excavating
Excavateinundisturbedsubsoiltotherequiredsizeandshape
allowingforatotalshellthicknessof40to50mm.Thewater
depthshouldbeatleast450mmbut700mmispreferredfor
fish.Thetransitionbetweensideandbottomshouldbecurved
asshowninFigure1sharpcornersaredifficulttobuildand
areweakerthancurves.

6.Liningtheexcavation
Thisisdonetoensurethatthemeshstayscleanandconcrete
usedforthepondisnotcontaminatedbysoil.

Line the excavation with a coat of cement plaster about


15mmthickusing1partofcementto6partsofsand,both
materialsmeasuredinaloosestate.Useenoughwaterinthe
mixtoproduceaworkable,plasticconsistence

7.Spacerblocks

8.Mesh

Youwillneedatleast16blocksforeverysquaremetreofpond
shellincludingtherim.Makespacerblocksofmortarandplace
the head of a75 mm nail in the centre ofeachblock. Block
sizesshouldbe15mmthickby30mmby30mm.Blockdetails
areshowninFigure2.

Figure2:Detailsofspacerblock

Mortarforspacerblocksshouldconsistofamixtureof1part
of cement, 1 part of coarse sand and just enough water to
produceaplasticconsistence.Aftercastingtheblockscover
themwithplasticsheetingfor24hourstopreventdryingout.
Then cure them by keepingthem under water for at least a
week.Fixspacerblocksabout250mmapartinbothdirections
andbypushingthenailthroughtheplasterliningintothesoil
asshowninFigure3.

Figure3:Plasterliningandspacerblock

Placetwolayersofgalvanizedchickenmesh(25mmopenings)
againstthespacerblockssothatthemeshis15mmclearof
theplasterlining.Thetwistedwiresofthetwolayersshould,
asfaraspossible,beatrightanglestoeachotherasshownin
Figure4.Theedgesofthemeshshouldbeoverlappedbyat
least50mmandlapsstaggeredasfaraspossible.Endsofwires
mustbetwistedunderthemeshandnotbeallowedtostick
out.

Figure4:Orientationofmeshlayers

Fixthemeshinpositionwithhookspushedthroughtheplaster
asshowninFigure5.Thehookscanbemadeof4mmthick
wire.

Figure5:Fixingthemesh

Themeshmustbecontinuedintotherimattheedgeofthe
pond.

9.Mixingtheconcrete
AllcementsoldinSouthAfricamustmeettherequirementsof
SANS50197forCommoncementorSANS50413forMasonry
cementandtheNationalRegulatorforCompulsoryStandards
(NRCS)requirementsasdetailedinNRCSVC9085.Bagsshould
beclearlymarkedwiththestrengthgrade,notationindicating
compositionandaLetterofAuthority(LOA)numberissuedby
theNRCS.AnLOAisissuedforeachcementtypefromeach
source. To verify valid LOA numbers contact the NRCS on
0124285199orwww.nrcs.org.za.

NotethatMasonrycementscomplyingwithSANS50413are
notpermittedtobeusedinconcrete.

Concretefortheshellismixedintheproportions:

TypeCEMIorCEMII:
1bag(50kg)
Coarseconcretesand:
65(1xWheelbarrow)
Finepit(plaster)sand:
20
6mmstone:
65(1xWheelbarrow)

Plus enough water to give a plastic consistence similar to


plaster.

10.Notes:
Batchingofconcretematerialsmustbedoneaccurately.
Donotmixmorethanaonebagbatchatatime.
Mixingmaybedoneinaconcretemixerorbyhandona
concreteslaborsteelplate.
Leveloffthewheelbarrowsofsandandstonebyscraping
aplankacrosstherimofthewheelbarrow.

11.Placingandcuringtheconcrete
It is important to place the entire shell in one continuous
operationtoavoidcreatingjointswhichmaybecomelinesof
weakness.Makesurethereforethatsufficientmaterialsand
labourareavailable.

Beforestartingtoplacetheconcreteremoveanyforeign
objectsordebrissuchasleaves,twigs,soillumps,etc.from
theexcavation.

Concreteplacingshouldbedoneintheshadeifatallpossible.

Usingaplastererstrowelwiththecornersroundedoff,press
the concrete through the mesh, filling up to the mesh and
removingthewirehooksasplacingprogresses.

Apply immediately afterwards another 15 mm of concrete


overthemeshsothatthetotalconcretethicknessis30mm.
Itisveryimportanttopresstheconcretefirmlyintoposition
tocompactitthoroughly.

Wood float the concrete to give a fairly rough texture. If a


smoothtextureisrequired,useasteeltrowelbutonlyafter
theconcretehasstartedtostiffen.Donottrowelifalayerof
wateriscoveringthesurfaceoftheconcrete.Ifplacingisnot
doneintheshade,keepthesurfaceoftheconcretemoistby
sprayinglightlybutfrequentlywithwaterusingagardeners
mistsprayer.Useonlyenoughwatertomaintainasheenon
thesurface.

Coverassoonaspossiblewithplasticsheetingtoensurethat
theconcretecuresinamoiststate.Theplasticsheetingshould
preferablybelightcolouredwhiteorclearbecausedark
colourscancauseheattobuildupintheconcrete.Thepond
canbefilledslowlytwodaysafterplacingtheconcretebutthe
covershouldremaininpositionuntilfillingiscomplete.Parts
oftheconcreteshellabovethewaterlevelshouldbekeptwet
andcoveredfortwoweeks.

Iffillinghastobedelayed,keepthecoverovertheshellforat
least two weeks during which time the concrete should be
keptvisiblywet.

Changethewaterafterithasbeeninthepondforafortnight
before stocking with fish and plants. (Several water changes
arebetter.)

12.Quantitiesofmaterials
Aonebagbatchmixedtotheproportionsgivenaboveshould
besufficienttodoabout3m2ofshell.

13.Repairs
Drainthepondbeforeattemptingrepairs.Cracksintheshell
canberepairedasfollows:

(a) Cutoutabandofconcrete15mmdeepby150mmwide
along the crack so that the crack is in the centre of the
band.Donotcutthroughthemesh.

(b)Remove all loose material including dust from the area


whichhasbeencutoutifpossibleuseanindustrialvacuum
cleanertodothis.

(c) Fix a 140 mm wide strip of galvanised mesh (25 mm or


preferably 13 mm openings) to the existing mesh where
theconcretehasbeencutout.

(d)Primethebackandsidesofthegroovewithamixtureof
cementandwatermadetotheconsistenceofthincream.
Theprimingcoatmustbeappliedinaverythinlayer.Do
notprewettheconcretebeforepriming.

(e)Immediatelyafterwards,beforetheprimingcoatcandry
out,packafairlydrymixtureof1partcementand2parts
sandintothegroove.Thesandshouldbefairlycoarseand
whichhasbeenpassedthrougha2,36mmsieve.Compact
the patch using an orbital sander, fitted with a smooth
steelplateonthesurface,fillinganylowareasandscraping
offhighareas.

(f) Keepthepatchdampuntilthepondisfilled.

14.Additionalwaterproofing
For additional waterproofing, if needed, a two part polymer
modified cementitious waterproofing slurry or bituminous
emulsionmaybeappliedtothesurfaceoftheconcrete.

TheConcreteInstitute

The Concrete Institute, its directors, officers, employees,


representatives and agents are not liable for any death, harm or
injury caused to any person or any loss, destruction or damage
causedtoanypersonspropertyorpossessionsarisingfromgoods
suppliedorservicesrenderedbyTheConcreteInstitute.

POBox168,HalfwayHouse,1685
BlockD,LoneCreek,WaterfallPark,BekkerRoad,Midrand
T0113150300F0113150315
Email:info@theconcreteinstitute.org.za
Website:www.theconcreteinstitute.org.za

Publishedby:TheConcreteInstitute,Midrand,2016