CERTIFICATE
(2011 specification)
Candidates observation
sheet
Observations
Control measures
Timescale
Location: Entrance
1
Immediate:
Install at least three CCTV security
cameras at the entrance and total 8
security camera for (OPD, Emergency
Radiotherapy and Pathology) Section of
hospital.
More number of cameras will provide
high security.
Immediate:
2 Month
Long term:
Every 3 months
Immediate :
1 week
Regularly
Immediate:
Provide Hospital Layout on 64 inches
board. Well design attractive.
Immediate :
1 Month
1|Page
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)
Candidates observation
sheet
Immediate :
1 Month
Immediate :
1 day
Medium:
2 month
immediate :
2 days
Long term:
6 months
Immediate :
1 week
Medium:
2 week
On going
Immediate:
2 day
2|Page
On going
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)
Candidates observation
sheet
11
12
13
Immediate:
Provide PPE to the x-ray machine
operator. set the X-ray machine in corner
of the Hall and Shield with sheets,
provide job rotation
Immediate :
3 week
Medium:
information , instruction and Train the
operator about hazards of X-ray machine
and precautions
Medium:
1 month
Immediate:
Correct the sewerage system ,
Keep clean and provide lighting
Immediate :
2 week
Immediate:
Immediate :
Maintenance the entire four freezers fitted 3 week
at different sections, on supply water,
keeps clean and provides disposable
glasses.
Immediate:
Immediate :
Develop Emergency plan provide exit
3 week
route and exit door signs. Mention
assembly area. And care full procedure of
evacuation of patient, vulnerable, childs
etc
3|Page
On going
On going
Medium:
3 month
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)
Candidates observation
sheet
15
16
17
18
Immediate:
To reduce the consequence provide
Harness and Fall arrest system
Immediate:
Remove the damper from working area ,
Immediate:
Provide barriers and sign boards
Immediate :
2 day
Regularly
4|Page
Immediate :
2 week
On going
Immediate:
Use proper standards provide clamps
,base plates and barricade the area
Immediate :
2 week
On going
Immediate :
At the moment
Medium:
1 month
Immediate:
Immediate:
Provide No gloves, hard hat and goggles. 5 day
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)
Candidates observation
sheet
20
21
22
23
24
5|Page
Immediate:
Immediate:
Provide face piece, gloves and goggles to 2 day
operator while operating material lift.
Immediate:
Provide ear muff or ear plugs
Medium: ensure maintenance of the lift
Immediate :
2 day
Condition based
Immediate:
Immediate :
Provide respiratory apparatus e.g. face
2 day
piece and half face respiratory equipment
Long term: inspection of respirator
apparatus
Regularly
Immediate:
Protect the platform edges with guard
rails and install toe boards.
Immediate :
1 week
Regularly
Immediate :
2 day
Immediate :
2 day
Regularly
INTERNATIONAL GENERAL
CERTIFICATE
(2011 specification)
Candidates observation
sheet
Good Practices
Maintain
Keep it up
Keep up
Keep up
Keep up
Keep up
Good Practices:
6|Page