REKAPITULASI

RENCANA ANGGARAN BIAYA (RAB)


PROYEK PEMBANGUNAN RENOVASI STADION ANDI MATTALATTA MAKASSAR
SUMBER DANA
ANGGARAN

:
: TAHUN 2011

NO

J E N I S PE K E R JAAN

TOTAL HARGA (Rp.)

I.

PEKERJAAN PERSIAPAN

Rp.

50,600,000.00

II.

PEKERJAAN TANAH DAN PONDASI

Rp.

344,285,659.57

III.

PEKERJAAN BETON BERTULANG

Rp.

1,684,767,402.02

IV.

PEKERJAAN PASANGAN BATA DAN PLESTERAN

Rp.

208,863,735.07

V.

PEKERJAAN LAIN-LAIN

Rp.

146,398,382.39

REAL COST

Rp.

2,434,915,179.05

PPN 10%

Rp.

243,491,517.90

BIAYA PERENCANAAN

Rp.

123,667,394.01

BIAYA PENGAWASAN

Rp.

86,941,081.38

BIAYA PENGELOLAAN KEGIATAN

Rp.

110,993,173.52

TOTAL BIAYA

Rp.

3,000,008,345.87

DIBULATKAN

Rp.

3,000,000,000.00

TERBILANG : TIGA MILYAR RUPIAH,Makassar,


Disetujui,
KEPALA DINAS PEMUDA DAN OLAHRAGA
PENGENDALIAN MUTU DAN PEMELIHARAAN

Drs. H. ILHAM GAZALING M.Si.


Pangkat: Pembina Utama Muda
NIP. 1963 0703 198803 1 016

Konsultan Perencana,
CV. MALLOMO ENGINEERING

S J A M S I R, ST
Direktur

2011

RENCANA ANGGARAN BIAYA (RAB)


PROYEK PEMBANGUNAN RENOVASI STADION ANDI MATTALATTA MAKASSAR
SUMBER DANA

ANGGARAN

: TAHUN 2011

NO
I.

URAIAN PEKERJAAN

VOL.

SAT.

HRG. SAT. (Rp.)

JML. HARGA

PEKERJAAN PERSIAPAN
1. Direksi Keet dan Gudang Bahan

Ls

12,000,000.00

12,000,000.00

2. Listrik dan Air Kerja

Ls

4,000,000.00

4,000,000.00

3. Mobilisasi dan Demobilisasi Alat

Ls

5,000,000.00

5,000,000.00

4. Pekerjaan Pembongkaran

Ls

11,100,000.00

11,100,000.00

5. Pengukuran dan Pas. Bownplank

Ls

18,500,000.00

18,500,000.00
50,600,000.00

II.

PEKERJAAN TANAH DAN PONDASI


1. Galian Pondasi Poer

93.58

m3

45,000.00

4,210,875.00

2. Rabat Beton Alas Poer t = 7cm

93.58

m2

42,415.17

3,968,999.22

3. Pondasi Poer P1
~Beton K225
~Besi Beton
~Bekisting 2x Pakai

3.21

m3

729,592.86

2,342,722.66

433.49

Kg

13,095.00

5,676,486.08

45.22

m2

110,000.00

4,974,200.00

17.10

m3

729,592.86

12,476,037.86

4. Pondasi Poer P2
~Beton K225
~Besi Beton
~Bekisting 2x Pakai

2,308.50

Kg

13,095.00

30,229,807.50

69.16

m2

110,000.00

7,607,600.00

5. Stek Pondasi Poer P1


~Beton K225
~Besi Beton
~Bekisting 2x Pakai

2.38

m3

729,592.86

1,732,783.04

439.38

Kg

13,095.00

5,753,615.63

38.00

m2

199,100.00

7,565,800.00

6. Stek Pondasi Poer P2


~Beton K225
~Besi Beton

18.62

m3

729,592.86

13,585,019.00

3,444.70

Kg

13,095.00

45,108,346.50
21,184,240.00

~Bekisting 2x Pakai

106.40

m2

199,100.00

7. Urugan Kembali Galian

70.18

m3

13,541.67

950,371.09

8. Timbunan/Urugan Tanah

909.61

m3

194,500.00

176,918,756.00
344,285,659.57

III.

PEKERJAAN BETON BERTULANG


1. Sloof 25/30
~Beton K225
~Besi Beton
~Bekisting 2x Pakai

33.30

m3

729,592.86

24,295,442.14

14,985.00

Kg

13,095.00

196,228,575.00

377.40

m2

199,100.00

75,140,340.00

83.79

m3

729,592.86

61,132,585.50

2. Kolom K1 (70/70)
~Beton K225
~Besi Beton
~Bekisting 2x Pakai

15,501.15

Kg

13,095.00

202,987,559.25

478.80

m2

199,100.00

95,329,080.00

3. Balok 30/40
~Beton K225
~Besi Beton
~Bekisting 2x Pakai

41.74

m3

729,592.86

30,450,287.49

8,138.52

Kg

13,095.00

106,573,919.40

382.58

m2

205,100.00

78,467,158.00

4. Balok 25/30
~Beton K225
~Besi Beton
~Bekisting 2x Pakai

6.77

m3

729,592.86

4,940,073.24

1,320.35

Kg

13,095.00

17,289,917.78

76.74

m2

205,100.00

15,738,963.80

40.26

m3

729,592.86

29,370,490.06

6,642.24

Kg

13,095.00

86,980,132.80

5. Poer Menerus/Balok Tempat Duduk Tribun (32/10)


~Beton K225
~Besi Beton

NO

URAIAN PEKERJAAN
~Bekisting 2x Pakai

VOL.
654.16

SAT.
m2

HRG. SAT. (Rp.)


205,100.00

JML. HARGA
134,168,216.00

NO

URAIAN PEKERJAAN

VOL.

SAT.

HRG. SAT. (Rp.)

JML. HARGA

6. Stek Poer Menerus/Balok Tempat Duduk Tribun (12/45)


~Beton K225
~Besi Beton
~Bekisting 2x Pakai

71.93

m3

729,592.86

52,478,155.03

11,868.12

Kg

13,095.00

155,413,031.40

692.64

m2

205,100.00

142,060,464.00

7. Plat Beton Pembatas Tribun Bagian Belakang tebal = 10 cm


~Beton K225
~Besi Beton
~Bekisting 2x Pakai

28.12

m3

729,592.86

20,516,151.14

2,812.00

Kg

13,095.00

36,823,140.00

577.20

m2

205,100.00

118,383,720.00
1,684,767,402.02

IV.

PEKERJAAN PASANGAN BATA DAN PLESTERAN


1. Pasangan Bata Trassram Tebal 1 Bata (1:2)

276.76

m2

173,687.50

48,069,752.50

2. Plesteran Beton Kolom K1 (1:2)

383.04

m2

38,754.60

14,844,561.98

2,104.86

m2

38,754.60

81,572,852.34

222.00

m2

38,754.60

8,603,521.20

2,709.90

m2

20,581.25

55,773,047.05

3. Plesteran Beton Lantai Tribun (1:2)


4. Plesteran Tembok Trassran (1:2)
4. Acian Semen

208,863,735.07
V.

PEKERJAAN LAIN-LAIN
1. Lantai Rabat Beton Tribun Terbuka

1,258.00

m2

42,415.17

53,358,279.67

2. Pekerjaan Persiapan Pengecatan Rangka Atap Tribun Tertutup

Ls

12,500,000.00

12,500,000.00

3. Pekerjaan Pengecatan Rangka Kuda-kuda Atap Tribun Tertutup

1,088.83

m2

29,600.00

32,229,462.72

4. Pekerjaan Pengecatan Rangka Gording Atap Tribun Tertutup

1,478.40

m2

29,600.00

43,760,640.00

Ls

4,550,000.00

4,550,000.00

5. Pekerjaan Pembersihan

146,398,382.39

Catatan :

- Jumlah Modul Tribun Terbuka Yang Direncanakan : 37 Modul


- Jarak/Panjang 1 Modul : 4 meter

DAFTAR SATUAN HARGA BAHAN


No.

NAMA BAHAN

HARGA BAHAN

SATUAN

A
-

BAHAN DASAR
Batu Kali Utuh
Batu Gunung
Split 7 - 10 cm
Split 5 - 7 cm
Split 3 - 5 cm
Split 2 - 3 cm
Split 1 - 2 cm
Tanah Timbunan
Pasir Timbunan / Urugan
Pasir Pasangan
Pasir Beton
Kerikil
Portland Cement (Tonasa 50 kg)
Semen Bosowa
Batu Merah
Paving Blok Mutu C (K 400)
Cansteen Beton K. 225
Semen Warna
Gorong - Gorong Dia 80 CM
Gorong - Gorong dia. 90 cm, h = 50 cm
Buis Beton 1/2 diameter 30 cm, Panjang 60 cm
Beton ready mix K 225

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

140,000.00
160,000.00
200,000.00
240,000.00
250,000.00
225,000.00
225,000.00
150,000.00
116,000.00
120,000.00
145,000.00
175,000.00
1,025.00
38,000.00
500.00
2,100.00
55,250.00
1,650.00
125,000.00
108,000.00
85,000.00
595,000.00

B
-

BAHAN KAYU
Kayu Kelas I (Balok) Sawmil
Kayu Kelas I (Papan) Sawmil
Kayu Kelas II (Balok)
Kayu Kelas II (Papan)
Kayu Kelas III (Balok)
Kayu Kelas III (Papan)
Al Coteks
Sungaki 4 mm
Bambu
Kayu Dolken dia 8 - 10/4 meter

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,500,000.00
9,000,000.00
4,000,000.00
4,500,000.00
2,600,000.00
2,850,000.00
479,800.00
110,000.00
15,000.00
22,000.00

C
-

BAHAN LANTAI
Tegel Keramik Warna
Tegel Keramik Warna
Tegel Keramik Warna
Tegel Keramik Warna

Rp
Rp
Rp
Rp

52,000.00
4,545.45
1,900.00
2,400.00

/Dos
/Bh
/Bh
/Bh

D
-

BAHAN ATAP / PLAFOND


Atap Metal Roof Permukaan Kasar Uk. 100X77 cm
Atap Spandek KR 5-750
Bubungan Atap Metal Model U, Pjg = 110 cm
Nok Atap Spandek
multipleks 9 mm
Karet Pelapis Genteng
Bubungan Genteng Beton
Paku Biasa 4 cm
Paku Biasa
GRC T. 4 mm
Eternit 1 x 1 m
Gypsum Board 9 mm
Woodplank T. 8 mm
Hollow Galvanize 4x4
Hollow Galvanize 2x4
Hollow Galvanize 3 x 3
Ramsel Nails

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

83,500.00
68,000.00
55,000.00
40,000.00
125,000.00
8,500.00
5,750.00
25,000.00
25,000.00
55,000.00
15,000.00
58,000.00
18,750.00
6,875.00
5,500.00
5,500.00
4,680.00

/Lbr
/M2
/Lbr
/M1
/Lbr
/M1
/M1
/Kg
/Kg
/Lbr
/Lbr
/Lbr
/M'
/m1
/m1
/m1
/Bh

40x40 cm
30x30 cm
20x20 cm
20x25 cm

/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/Kg
/Zak
/Buah
/Bh
/Bh
/Kg
/Bh
/Bh
/Bh
/m3

/m3
/m3
/m3
/m3
/m3
/m3
/M2
/Lbr
/Batang
/Batang

UB 888/400 Compoud

Rp

129,250.00

/Zak

Isolasi Gypsum (Paper Tape)


Screws / Sekrup
Kertas Amplas
List Profil Kayu 4 x 4 cm
Baut - Baut
Baut Dia 16
Profil Gypsum Type CE (Sedang)
Profil Gypsum Type CE (Kecil)
Profil Gypsum Type CE (Besar)

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

12,650.00
310.00
3,000.00
5,000.00
4,500.00
6,000.00
35,000.00
25,000.00
40,000.00

/Roll
/Bh
/Lbr
/m1
/Bh
/Bh
/m1
/m1
/m1

E
-

BAHAN BESI / BAJA


Besi Siku 30.30.3
Besi Siku 40.40.4
Besi Siku 40.40.3
Besi Siku 50.50.4
Besi Siku 50.50.5
Besi Siku 60.60.6
Besi Siku 70.70.7
Besi Baja Canal C. 125X50X20X2.3 mm
Besi Baja hollow 40X40X2 mm
Besi Baja hollow 40X20X2 mm
Besi Strip / Baut
Besi Strip 30.3 mm
Besi Strip 35,4 mm
Besi Angker dia 8 mm - 35 cm
Baja INP
Kawat Las
Mesin Las
Besi Tulang Beton
Besi Plat 10 mm
Besi Plat 12 mm
Kawat Baja
Kawat Beton
Ramsel Nails

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,800.25
5,324.15
8,600.00
4,381.08
3,699.12
5,739.69
6,559.16
46,850.00
29,833.33
23,833.33
9,700.00
8,750.00
12,900.00
2,615.00
8,662.50
0.00
50,000.00
11,400.00
8,662.50
8,662.50
12,650.00
17,500.00
5,670.00

/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/m1
/m1
/m1
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Hr
/Kg
/Kg
/Kg
/Kg
/Kg
/Bh

F
-

BAHAN ALUMINIUM , KACA, PENGGANTUNG / JENDELA / PINTU


Kusen Aluminium 4' x 1 3/4" (YKK)
Rp
Kusen Aluminium 3' x 1 1/2" (YKK)
Rp
Kusen Aluminium 2" x 1"
Rp
Kaca Rayband 5 mm
Rp
Kaca Buram 5 mm
Rp
Kaca Bening 5 mm
Rp
Kaca 12 mm
Rp
Paku Sirap 2 - 3 cm
Rp
List Kayu Profil 4x4 cm
Rp
Pintu Panil PVC + Kosen
Rp
Engsel Pintu Ex. Ses
Rp
Engsel Jendela (Ex. Ses)
Rp
Engsel Pintu Coboy
Rp
Engsel Tanam Otomatis (Ex Dorma)
Rp
Engsel Pintu Coboy
Rp
Engsel Pintu Aluminium
Rp
Hak Angin Besar
Rp
Kunci Pintu (Ex. Kand)
Rp
Kunci Pintu Bulat (Ex Kand)
Rp
Kunci Union 2 x Slag
Rp
Grendel Besar
Rp
Grendel Tanam
Rp
Grendel Kodok
Rp
Door Holder
Rp
Expanyolet/ Door Closer
Rp

65,000.00
55,000.00
40,000.00
130,000.00
160,000.00
85,000.00
325,000.00
18,000.00
15,000.00
350,000.00
30,000.00
25,000.00
56,000.00
1,150,000.00
56,000.00
55,000.00
25,000.00
500,000.00
350,000.00
180,000.00
17,500.00
25,000.00
26,000.00
32,500.00
121,000.00

/M1
/M1
/M1
/m2
/m2
/m2
/m2
/Kg
/M'
/Lbr
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh

G
-

BAHAN CAT DAN SANITASI


Cat Tembok Kelas A (Ex Mowilex)
Cat Tembok Avitex
Cat Tembok Kelas A (Ex Mowilex Exteri)
Cat Tembok Mowilex
Cat Tembok Kimex
Cat Tembok Vinikex Nippon Paint
Cat Sungkai / Sendin ( Lapisan untuk Pori Sungkai)
Thinner
Cat Warna Sungkai
Cat Clear Doft (Lapisan Akhir Sungkai)
Plamir
Cat Meni
Cat Dasar
Cat Kayu Gloteks
Cat Kayu ICI
Cat Residu
Minyak Cat
Cat Aqua Seal
Cat Dulux
Lem Kayu
Cat Waterproofing
Kloset Duduk KIA ( lengkap)
Kloset Jongkok
Urinoir
Hand Shower Mini
Shower Gantung Untuk Mandi
Kran Air
Stop Kran
Wastafel Ex. Toto Lengkap
Kran Wastafel
Floor Drain
Pipa Steril (Ex ATP TORO 25) Dia 1 1/2"
Pipa Steril (Ex ATP TORO 25) Dia 1 1/2"
Pipa Steril (Ex ATP TORO 25) Dia 1 1/4"

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

65,000.00
29,000.00
65,000.00
65,000.00
10,000.00
11,000.00
23,100.00
18,000.00
42,000.00
21,000.00
7,000.00
27,500.00
12,500.00
40,000.00
30,000.00
7,500.00
5,000.00
27,500.00
26,620.00
25,850.00
65,000.00
430,000.00
90,000.00
198,000.00
234,000.00
385,800.00
35,000.00
25,000.00
250,000.00
22,000.00
30,800.00
101,145.00
101,146.10
65,725.00

/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Ltr
/Ltr
/Ltr
/Ltr
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Ltr
/Ltr
/Ltr
/Ltr
/Ltr
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/m1
/m1
/m1

Pipa Steril (Ex ATP TORO 25) Dia 1" - 25 mm

Rp

42,955.00

/m1

Pipa Steril (Ex ATP TORO 25) Dia 3/4" - 20 mm

Rp

26,620.00

/m1

Pipa Steril (Ex ATP TORO 25) Dia 1/2" - 15 mm

Rp

19,250.00

/m1

Pipa GIP Med Dia 4"

Rp

104,720.00

/m1

Pipa Galvanise (Gip) Dia 3/4 "

Rp

30,083.33

/m1

Pipa Galvanise (Gip) Dia 1 "

Rp

30,833.33

/m1

Pipa Galvanise (Gip) Dia 2 "

Rp

79,300.00

/m1

Pipa Galvanise (Gip) Dia 3 "

Rp

135,000.00

/m1

Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

115,833.33
209,166.67
5,625.00
6,000.00
7,375.00
6,500.00
18,000.00
30,500.00
31,666.67
51,966.67
68,666.67
9,000.00
27,500.00
26,450.00
46,900.00

/m1
/m1
/m1
/m1
/m1
/m1
/m1
/m1
/m1
/m1
/m1
/m1
/m1
/m1
/m1

Galvanise (Gip) Dia 4 "


Galvanise Black Steel Medium A Dia 4 "
Galvanise Black Steel Mediun A Dia 6 "
Pralon PVC Dia 1/2" (Air Bersih)
Pralon PVC Dia 3/4" (Air Bersih)
Pralon PVC Dia 1" (Air Bersih)
Pralon PVC Dia 1 1/2" (Air Bersih)
Pralon PVC Dia 2" (Air Bersih)
Pralon PVC Dia 2 1/2" (Air Bersih)
Pralon PVC Dia 3" (Air Bersih)
Pralon PVC Dia 4" (Air Bersih)
Pralon PVC Dia 6" (Air Bersih)
Pralon PVC Dia 2" (Air Kotor)
Pralon PVC Dia 3" (Air Kotor)
Pralon PVC Dia 4" (Air Kotor)
Pralon PVC Dia 6" (Air Kotor)

H
-

BAHAN JADI / LAIN - LAIN


Minyak Bekisting
Formite/penjaga jarak bekisting/spacer
Ijuk
Gorong - Gorong Beton
Klem Kabel No. 10
Pipa PVC 5/8
Kabel NYM (2x2,5) mm
Kabel NYM (3x2,5) mm
Las Dop
Isolasi Dari Plastik
T - Dos 5/8"
Stop Kontak Ex. Clipsal
Stop Kontak Bias Broco
Klem Kabel No. 12
Pipa PVC 5/8" + Sambungan + Pasang

Inbow Dos
Lampu
Lampu
Lampu
Lampu

RM 2x36 Watt Philips


RM 2x20 Watt Fhilifs
Downlight Besar + Balon (Ex. National)
Pijar 40 Watt

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,500.00
6,325.00
85,767.00
55,000.00
250.00
10,000.00
10,000.00
12,000.00
350.00
6,000.00
1,500.00
25,000.00
15,000.00
500.00
101,145.00
4,500.00
620,000.00
465,000.00
148,500.00
4,950.00

Makassar,

/Ltr
/Bh
/M2
/Bh
/Bh
/Btg
/m1
/m1
/m1
/Roll
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Set
/Bh

2011

Konsultan Perencana,
CV. MALLOMO ENGINEERING

SJAMSIR, ST
Direktur

DAFTAR SATUAN HARGA UPAH


No.

NAMA TENAGA KERJA

Pekerja

Tukang :

HARGA UPAH

SATUAN

Rp

45,000.00

Org/Hr

Tukang Kayu

Rp

65,000.00

Org/Hr

Tukang Batu

Rp

65,000.00

Org/Hr

Tukang Cat

Rp

65,000.00

Org/Hr

Tukang Listrik

Rp

65,000.00

Org/Hr

Tukang Pipa

Rp

65,000.00

Org/Hr

Tukang Besi

Rp

65,000.00

Org/Hr

Kepala Tukang Kayu

Rp

75,000.00

Org/Hr

Kepala Tukang Batu

Rp

75,000.00

Org/Hr

Kepala Tukang Cat

Rp

75,000.00

Org/Hr

Kepala Tukang Listrik

Rp

75,000.00

Org/Hr

Kepala Tukang Pipa

Rp

75,000.00

Org/Hr

Kepala Tukang Besi

Rp

75,000.00

Org/Hr

Mandor

Rp

100,000.00

Org/Hr

Kepala Tukang :

Makassar,

2011

Konsultan Perencana,
CV. MALLOMO ENGINEERING

SJAMSIR, ST
Direktur

RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN:

PROYEK PEMBANGUNAN RENOVASI STADION ANDI MATTALATTA MAKASSAR