Ti v tr B18.
Ngy 25/08/2016.
Gii huy ng: Nguyn Anh Qun,
Huy ng:
Nguyn Vn Th.
T vn chm cng Nguyn Vn Th vo ngy
26/08/2016 v trnh h s thanh ton tng ngy cng
Vn Th = 1 MM.
Ti v tr D3.
Vo ngy 17/08/2016.
V l do vic c nhn nn Phm N Hong Trm tm
thi
ri cng trng v ng Th Thu Nga thay th trong
thi gian Hong Trm vng mt.
T vn trnh h s thanh ton tng ngy cng thng
08
For position D3
On August 17, 2016.
Due to personal reason, Ms. Pham Nu Hoang Tram
leave the Site temporarily and was replaced by Ms.
Dang Thi Thu Nga during her absence.
The Engineer submit payment documents as follows:
Total number of working days on August of D3
position Ms Pham Nu Hoang Tram and Ms. Dang Thi
Thu Nga is 1 month.
Th Thu Nga = 1 MM
2. Chi ph huy ng
T vn trnh h s thanh ton chi ph huy cho ng
nhn s thay th Nguyn Vn Th. Khng trnh h
s thanh ton chi ph huy ng cho nhn s ng
Th Thu Nga
v l do:
- Thu Nga thay th tm thi trong thi gian Hong
Trm vng mt.
n Vit Nam
15/08/2016 Di chuyn ni a ti Nht Bn
16/08/2016 Tokyo HCM 01: 25 ->05:15
Di chuyn ni a ti Vit Nam
16/08/2016 HCM Dalat 05: 50 -> 06: 30
Bt u lm vic lc 08: 00 ti vn phng n
Dng
16/08/2016.
V tr A8 Naoji Nakato A10 Ryosuke Tokunaga
Theo th gii huy ng LDHD 179, 180
Ngy ri cng trng : 28/08/2016
Ngy di chuyn : 29/08/2016
Do chuyn gia hon thnh cng vic v ri cng
2. V my bay
HCM Medan 16/07/2016
Theo th LDHD- 128 T vn trnh Ch u t. Ch
u t ng thanh ton 1 chng t HCM Medan.
Hnh trnh Medan HCM Medan c mua ti
by Nippon Koei