JOB HAZARD ANALYISIS
Doc. No: 2029-PJ-JHA-014

Rev no:01

Date: 22/08/2016
Location: Inside Port of
Salalah, MCC Room.

Job description: JHA FOR HILL CUTTING ACTIVITIES.


Member present: HSE Department, Project department, Operation Department.

S.
No.

Activity job
stages

1.

Preparing of
Temporary
Access base for
Excavator

Hazards
(What can go wrong)

Controls
(How to prevent it)

Action
party

Working without Valid Permit


People hit by moving vehicles.
Damage to U/G Utilities.
Personnel Injuries due to slips,
trips & falls.
Manual Handling.
Dust.
Noise.
Unauthorized entry.
Unauthorized drivers /
operators.
Insufficient space.
Collapse of Access Base.
Poor housekeeping.
Adverse weather condition like
Extreme heat, Extreme high
winds, Extreme dust lightening,
etc.
Heat stress.

Valid permit to be obtained from POS


and ORPIC before starting any job.
All people should undergo POS &
ORPIC Induction.
A Tool Box Talk to be conducted
before starting any job on daily basis.
A Competent supervisor should be
available at site at all times.
First Aider and First Aid facility
should be present all time at site
The area to be checked for U/G
utilities and approval to be obtained
from concerned parties before
starting the job.
Area to be barricaded and adequate
signboard to be placed to avoid any
unauthorized person entering the
work area.
All vehicle should be fitted with
audible reverse alarm.
Plan & control vehicle / equipment
movement with the presence of an
authorized banksman.
Reflective jacket to be worn by all
people while working near

AWS

Page 1 of 8

Contingency
(If control fails & result in
accident)
If in case of any incident
initiate Emergency Response
Plan.
Seek Medical assistance
POS Emergency
contact:23220000 (ext:666),
99247666
AWS Emergency Contact No.:
91409583, 91395892,
91395890

Remarks

CLIENT
CONTRACT NO.: 4600002029

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)

CONTRACTOR.

JOB HAZARD ANALYISIS


Doc. No: 2029-PJ-JHA-014

Rev no:01

Date: 22/08/2016
Location: Inside Port of
Salalah, MCC Room.

Job description: JHA FOR HILL CUTTING ACTIVITIES.


Member present: HSE Department, Project department, Operation Department.

equipment's.
The Access base should be wide
enough to accommodate the
excavator.
Access base to be compacted
adequately.
Manual handling to be avoided if not
possible group lifting to be carried
out.
Adequate water to be sprayed to
control the dust.
Adequate drinking water facility
available at site all times.
Adequate rotation and intervals will
be provided to the crew to avoid
heat stress.
Dedicated flagmen to be appointed
to control traffic while entering and
exiting the work site.
Only competent and authorized
operator / driver should operate the
equipment.
In any adverse weather condition
work activities will be suspended and
renewed only after the weather
condition is apt for the activities.
Ensure adequacy of resources
required and plan the work area

Page 2 of 8

CLIENT
CONTRACT NO.: 4600002029

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)

CONTRACTOR.

JOB HAZARD ANALYISIS


Doc. No: 2029-PJ-JHA-014

Rev no:01

Date: 22/08/2016
Location: Inside Port of
Salalah, MCC Room.

Job description: JHA FOR HILL CUTTING ACTIVITIES.


Member present: HSE Department, Project department, Operation Department.

2.

Breaking of Rock Working without Valid Permit


using Hydraulic
Vibration.
Breaker
Fall of loose rocks.
Damage to U/G Utilities.
Damage to Nearby Structures.
Manual Handling.
Dust.
Noise.
Unauthorized entry.
Unauthorized drivers /
operators.

properly to avoid accumulation of


materials, spills, wastages, etc., that
harm personnel at site.
Establish clearly maintained
walkways and for movement of
vehicles / equipment, wherever
possible.
Establish a site clean-up schedule for
collection & disposal of wastes, spills,
accumulations, etc.
Use of PPEs Safety Shoes, coverall,
goggles, helmet, Hand gloves, Nose
mask, safety Harness and Earplug is
must.).
After finishing the work,
housekeeping to be carried out.
Valid permit to be obtained from POS
& ORPIC before starting any job.
All people should undergo POS &
ORPIC Induction.
A Tool box talk to be conducted
before starting any job on daily basis.
Ensure sufficient water is available at
site and also convey the message in
Daily Tool Box Talk.
A Competent Supervisor should be
available at site at all times.
Loose rocks to be removed from top

Page 3 of 8

AWS

If in case of any incident


initiate Emergency Response
Plan.
Seek Medical assistance
POS Emergency
contact:23220000 (ext:666),
99247666
AWS Emergency Contact No.:
91409583, 91395892,
91395890

CLIENT
CONTRACT NO.: 4600002029

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)

CONTRACTOR.

JOB HAZARD ANALYISIS


Doc. No: 2029-PJ-JHA-014

Rev no:01

Location: Inside Port of


Salalah, MCC Room.

Job description: JHA FOR HILL CUTTING ACTIVITIES.


Member present: HSE Department, Project department, Operation Department.

Insufficient space.
Personnel Injuries due to slips,
trips & falls.
Injuries resulting from
inattention, or lack of
awareness.
Poor housekeeping.
Adverse weather condition like
Extreme heat, Extreme high
winds, Extreme dust lightening,
etc.
Heat stress.

Date: 22/08/2016

before starting any breaking.


The area to be checked for U/G
utilities and approval to be obtained
from concerned parties before
starting the job.
Area to be barricaded and adequate
signboard to be placed to avoid any
unauthorized person entering the
work area.
Adequate no of watchers to be
provided to warn the people when
work is going on.
Rock breaking should be only carried
out during daylight.
Protection of sound structure to be
provided to existing Booster Pump.
In any adverse weather condition
work activities will be suspended and
renewed only after the weather
condition is apt for the activities.
Adequate PPE to be used for the job.
Whistles shall be provided to
watchers and supervisors to warn
any trespassers.
The work area to be kept clean and
free of obstruction.
After finishing the work,
housekeeping to be carried out.

Page 4 of 8

CLIENT
CONTRACT NO.: 4600002029

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)

CONTRACTOR.

JOB HAZARD ANALYISIS


Doc. No: 2029-PJ-JHA-014

Rev no:01

Date: 22/08/2016
Location: Inside Port of
Salalah, MCC Room.

Job description: JHA FOR HILL CUTTING ACTIVITIES.


Member present: HSE Department, Project department, Operation Department.

3.

Loading and
Disposing of
Excavated Rock
using Excavator.

Working without Valid Permit


Vibration.
Fall of loose rocks.
Damage to U/G Utilities.
Damage to Nearby Structures.
Manual Handling.
Dust.
Noise.
Unauthorized entry.
Unauthorized drivers /
operators.
Insufficient space.
Personnel Injuries due to slips,
trips & falls.
Injuries resulting from
inattention, or lack of
awareness.
Poor housekeeping.
Adverse weather condition like
Extreme heat, Extreme high
winds, Extreme dust lightening,
etc.
Heat stress.

Valid permit to be obtained from POS


and ORPIC before starting any job.
All people should undergo POS &
ORPIC Induction.
A Tool Box Talk to be conducted
before starting any job on daily basis.
A Competent supervisor should be
available at site at all times.
First Aider and First Aid facility
should be present all time at site
The area to be checked for U/G
utilities and approval to be obtained
from concerned parties before
starting the job.
Area to be barricaded and adequate
signboard to be placed to avoid any
unauthorized person entering the
work area.
All vehicle should be fitted with
audible reverse alarm.
Breaking to be stopped while loading
is in progress.
Plan & control vehicle / equipment
movement with the presence of an
authorized banksman.
Reflective jacket to be worn by all
people while working near
equipment's.

Page 5 of 8

AWS

If in case of any incident


initiate Emergency Response
Plan.
Seek Medical assistance
POS Emergency
contact:23220000 (ext:666),
99247666
AWS Emergency Contact No.:
91409583, 91395892,
91395890

CLIENT
CONTRACT NO.: 4600002029

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)

CONTRACTOR.

JOB HAZARD ANALYISIS


Doc. No: 2029-PJ-JHA-014

Rev no:01

Date: 22/08/2016
Location: Inside Port of
Salalah, MCC Room.

Job description: JHA FOR HILL CUTTING ACTIVITIES.


Member present: HSE Department, Project department, Operation Department.

Manual handling to be avoided if not


possible group lifting to be carried
out.
Protection of sound structure to be
provided to existing Booster Pump.
Adequate water to be sprayed to
control the dust.
Adequate drinking water facility
available at site all times.
Adequate rotation and intervals will
be provided to the crew to avoid
heat stress.
Whistles shall be provided to
watchers and supervisors to warn
any trespassers.
Dedicated flagmen to be appointed
to control traffic while entering and
exiting the work site.
Only competent and authorized
operator / driver should operate the
equipment.
In any adverse weather condition
work activities will be suspended and
renewed only after the weather
condition is apt for the activities.
Ensure adequacy of resources
required and plan the work area
properly to avoid accumulation of

Page 6 of 8

CLIENT
CONTRACT NO.: 4600002029

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)

CONTRACTOR.

JOB HAZARD ANALYISIS


Doc. No: 2029-PJ-JHA-014

Rev no:01

Date: 22/08/2016
Location: Inside Port of
Salalah, MCC Room.

Job description: JHA FOR HILL CUTTING ACTIVITIES.


Member present: HSE Department, Project department, Operation Department.

materials, spills, wastages, etc., that


harm personnel at site.
Establish clearly maintained
walkways and for movement of
vehicles / equipment, wherever
possible.
Establish a site clean-up schedule for
collection & disposal of wastes, spills,
accumulations, etc.
Use of PPEs Safety Shoes, coverall,
goggles, helmet, Hand gloves, Nose
mask, safety Harness and Earplug is
must.).
After finishing the work,
housekeeping to be carried out.

Note: During execution if any disturbance or emergency occurs to the process the job will be suspended immediately and shall be
resumed after the issue has been resolved.

Page 7 of 8

CLIENT
CONTRACT NO.: 4600002029

EPC for Revamp of Oil Pier Jetty at Port of Salalah


(Raysut)

CONTRACTOR.

JOB HAZARD ANALYISIS


Doc. No: 2029-PJ-JHA-014

Rev no:01

Date: 22/08/2016
Location: Inside Port of
Salalah, MCC Room.

Job description: JHA FOR HILL CUTTING ACTIVITIES.


Member present: HSE Department, Project department, Operation Department.

PPE to be used during execution of the Job:


Hard hat, Safety Googles, Protective Clothing, Hand Gloves, Ear Plug / Muff, Nose mask, Safety Boots, Safety Harness.
Other Misc. Equipments to be used during execution of the Job:
Hand Tools, Cement Mixer, Road Barriers, Safety Cones.