NCSXProjectWorkBreakdownStructure(WBS)Dictionary

CentralI&CandDataAcquisitionSystems(WBS5)
NCSXWBS0502
April5,2007

Preparedby:

R.Simmons
Reviewedby:
WBS5
(Instrumentation&ControlSystems)
P.Sichta(WBSManager)
WBS5
(ElectricalSystems)
A.vonHalle(RLM)
Approvedby:

H.Neilson

WorkBreakdownStructure(WBS)Dictionary
CentralI&CandDataAcquisitionSystems(WBS5)
RecordofRevisions

Revision

Date

Author

Description

0
1

9/8/2003
2/17/2004

Simmons
Simmons

4/5/2007

Simmons

Initialissue
UpdatedWBSdictionaryto
deletetechnicalrequirements
andreflectCD2milestone
scope.
UpdatedWBStoReflect
Scopefor2007Rebaseline.

Revision2

WorkBreakdownStructure(WBS)Dictionary
CentralI&CandDataAcquisitionSystems(WBS5)

WBSElement:5
WBSTitle:
Description:

WBSLevel:2
CentralFacilityI&CandDateAcquisitionSystems
The Central Facility Instrumentation and Control and Date Acquisition System
(WBS 5) will provide integrated control and monitoring, diagnostic data acquisition
and data management, and timing and synchronization for NCSX.
ThissummarylevelWBSelementconsistsoftheequipmentandsoftwarethatprovide
centralcomputing,control,andsynchronizationforNCSX.Thesesystemsinterface
with the subsystems local I&C systems and allow for control and monitoring of
NCSXexperimentsfromthecontrolroomandincludesanalysisanddisplayofthe
data.ThesystemscoveredunderthisWBSelementsinclude:
Network&FiberInfrastructureSystems(WBS51);
CentralInstrumentationandControlSystems(WBS52);
DataAcquisitionandFacilityComputingSystems(WBS53);
FacilityTimingandSynchronizationSystems(WBS54);
RealTimeControlSystems(WBS55);
CentralSafety&InterlockSystems(WBS56);
ControlRoomFacility(WBS57);and
ManagementandIntegration(WBS58).
MIE Project Scope: Definedinlowerlevel WBS elements.Ingeneral thecentral
facilityI&Csystemsandcapabilitieswillbelimitedtothoseonlyneededtosatisfy
CD4requirements.
Future Scope: Future central facility I&C and data acquisition systems and
capabilitieswillbeaddedasthecapabilitiesoftheNCSXProjectareexpanded.

WorkBreakdownStructure(WBS)Dictionary
CentralI&CandDataAcquisitionSystems(WBS5)
WBSElement:51
WBSLevel:3
WBSTitle:
Network&FiberInfrastructureSystems
The Network&FiberInfrastructureSystemswillprovidethecommonbackbonefor
Description:
all data acquisition, andI&C communications. These systemsshall bedesigned to
meetthefollowingbasicrequirements:
Network Communications for critical and highenergy subsystems are
requiredtobeprotectedfromintrusionfromthelocalPPPLnetworkandthe
widearea.
NetworkCommunicationsforcriticalprotectivesystemswillbeimplemented
withdualpowersupplyswitchesfedfromhouseandUPSsources.
Thenetworkisrequiredtooperateinahighnoiseenvironmentclosetothe
machineanditspowersources.
Isolation of diagnostic data acquisition network traffic and the facility
subsystemsnetworktrafficisrequiredtoinsurethathighdataloadwillnot
impactfacilitycontrolandmonitoring.
AfiberopticfacilitywillberequiredfortheTimingandSynchronization
System, diagnostic video cameras and real time plasma control system
communications.
The network infrastructure will be implemented with fiber optic cable,
twistedpair cable, and wireless communications as appropriate for the
application.

MIE ProjectScope: Whereappropriate,thePPPLsexistinginfrastructurewillbe


usedtoprovidenetworkconnectionstoCD4subsystems.Additionalinfrastructure
willbeaddedasneeded.
FutureScope: Additionalinfrastructurewillbeaddedasadditionalcapabilitiesare
addedtotheNCSXProject.

WBSElement:52
WBSLevel:3
WBSTitle:
CentralInstrumentationandControlSystems
The Central Instrumentation and Control system (CI&C) will provide integrated
Description:
controlofNCSXthroughsupervisorycontrolandacommonuserinterfacetoselected
engineeringsubsystemsanddiagnosticsinstruments.Itwillprovideprocesscontrol
and monitoring functions, interprocess synchronization, operator displays, alarm
management, and historical trending,. It will be designed using the Experimental
PhysicsandIndustrialControlSystem(EPICS).
MIEProjectScope:TheEPICSinfrastructurefortheNCSXFabricationProjectwill
provideaninterfacewiththefollowingsystems:
WBS23FirstWallConditioningThermocouplesandStrainGauges;and
OtherWBS5elements.
Future Scope: Additional central I&C systems will be added as additional
capabilitiesareaddedtotheNCSXProject.

Revision2

WorkBreakdownStructure(WBS)Dictionary
CentralI&CandDataAcquisitionSystems(WBS5)
WBSElement:53
WBSLevel:3
WBSTitle:
DataAcquisition&FacilityComputingSystems
TheDiagnosticDataAcquisitionSystemwillprovideasoftwarestructuretocollect,
Description:
catalog,andmanageexperimentalresultsforanalysisandsubsequentretrieval. The
design will use the MITdeveloped MDSplus software for data acquisition, data
archivinganddisplay.
Thissystemwill:
Be a shot mode time system where initialization sequences are started
before the experimental discharge and data archival iscompleted at some
periodafterthedischarge.
Support shots dedicated to an individual systems test or calibration
function.
Achieve high performance and fault tolerance by storing all experimental
dataonreliablestorageunits.
Provideonlineaccess,forthelifeofthemachine,allexperimentaldata.
WillhavesoftwareinterfacestoEPICSsoftware(WBS51).
MIEProjectScope:ThereisrelativelyasmallamountofstorageneedsfortheCD4
milestone.Therefore,theNSTXDataAcquisitionandStorageequipmentwillbeused
asmuchaspossible.
FutureScope: NCSXdatawillbetransferredtotheNCSXspecificsysteminthe
future.

WBSElement:54
WBSLevel:3
WBSTitle:
FacilityTimingandSynchronizationSystems
The FacilityTimingandSynchronization System will support upto256hardware
Description:
eventstosynchronizeNCSXequipmentanddiagnosticswiththeNCSXshotcycle.
The events will be distributed using a network of fiber optic and hardwired
components. These systems will utilize a new PPPLdeveloped timing and
synchronizationsystem.Thenewsystemwillusea10MHZtimebase.
MIE Project Scope: Provide a timing & synchronization system sufficient to
synchronizetheequipmentusedforachievingtheMIEProjectrequirements.
FutureScope: Additionalfacilitytimingandsynchronizationssystems/capabilities
willbeaddedasneeded.

Revision2

WorkBreakdownStructure(WBS)Dictionary
CentralI&CandDataAcquisitionSystems(WBS5)
WBSElement:55
WBSLevel:3
WBSTitle:
RealTimePlasmaandPowerSupplyControlSystems
The real time control systems will provide real time control for the NCSX power
Description:
supplies(WBS4)andthemaingasinjectors(WBS2).
MIE Project Scope: Provide a PCoriented, LabVIEWlike system to produce
synchronized,openlooppowersupplycommandsandgasinjectioncommands.The
systemwillalsocontrolafewgasdeliveryvalves.
Future Scope: Additional real time plasma and power supply control
systems/capabilitieswillbeaddedasneeded.

WBSElement:56
WBSLevel:3
WBSTitle:
CentralSafetyandInterlockSystems
The Central Safety and Interlock System (CSIS) will provide experimentwide
Description:
coordination of personnel and hardware interlocks. The failsafe system will be
constructed from mechanical components, hardwired devices, and safetyrated
programmable/electronic components, networks, and software. Each NCSX high
energy subsystem will interface with the CSIS. An access control system will be
incorporated to grant access to (hazardous) experimental areas for only
authorized/trainedpersonnel,whenthoseareasaresafe.UPSandStandbypowerwill
beusedforcriticalcomponents.
MIEProjectScope: ProvidealimitedCSIS,sufficienttoachievesafeoperationof
theNCSXdevice.
FutureScope: Additionalcentralsafetyandinterlocksystems/capabilitieswillbe
addedasneeded.

WBSElement:57
WBSLevel:3
WBSTitle:
ControlRoomFacility
Description:
MIE Project Scope: None. NCSX will utilize the old PBXMcontrol room and
refurbishmentofthisfacilityiscoveredbyPPPLinfrastructureimprovementproject
funds.
WBS Level: 3
WBSElement:58
WBSTitle:
CentralFacilityI&CManagementandIntegration
Description:
MIEProjectScope:PlanningandinterfacedefinitionforCI&Csystems.

Revision2

WorkBreakdownStructure(WBS)Dictionary
CentralI&CandDataAcquisitionSystems(WBS5)

Revision2

WorkBreakdownStructure(WBS)Dictionary
CentralI&CandDataAcquisitionSystems(WBS5)

Revision2

Anda mungkin juga menyukai