Anda di halaman 1dari 1

30/11/2016

PeaCHDetalheH5(Terreo)

AltoQiHydrosV4
ddd
ddd

30/11/2016
10:07:45

PeaCHDetalheH5(Terreo)
Conexoanalisada:
Chuveiro25mmx1/2"(PVCrgidosoldvel)
PavimentoTerreo
Nvelgeomtrico:2.10m
Processodeclculo:Universal
Tomadad'gua:
Tomadasdguasadascurtas1"(PVCrgidosoldvel)
Nvelgeomtrico:3.70m
Pressoinicial:0.00m.c.a
Vazo
(l/s)

(mm)

Veloc.
(m/s)

Comprimento(m)

Presses(m.c.a.)

Equiv.

Total

J
(m/m)

Perda
(m.c.a)

Altura
(m)

Desnvel
(m)

Disp.

Jusante

0.50
1.02
0.70
1.20
12
25.00
0.50
1.02
2.22
0.70
23
25.00
0.25
0.80
0.73
1.50
34
20.00
0.25
0.80
0.10
0.60
45
20.00
0.25
0.80
1.10
0.00
56
20.00
0.25
0.80
1.20
0.20
67
20.00
0.25
0.80
0.23
1.50
78
20.00
0.10
0.32
0.50
3.10
89
20.00
0.10
0.32
1.00
0.20
910
20.00
0.10
0.32
0.00
1.50
1011
20.00
Aviso:Existe1conexocompeasindefinidas

1.90

0.0515

0.10

3.70

0.70

0.70

0.60

2.92

0.0515

0.15

3.00

0.00

0.60

0.45

2.23

0.0442

0.06

3.00

0.00

0.45

0.40

0.70

0.0442

0.03

3.00

0.10

0.50

0.47

1.10

0.0442

0.05

2.90

1.10

1.57

1.52

1.40

0.0442

0.05

1.80

1.20

2.72

2.66

1.73

0.0442

0.08

0.60

0.00

2.66

2.59

3.60

0.0090

0.03

0.60

0.50

2.09

2.06

1.20

0.0090

0.01

1.10

1.00

1.06

1.05

1.50

0.0090

0.01

2.10

0.00

1.05

1.03

Trecho

Tubo

Presses(m.c.a.)
Esttica
inicial

Perdade
carga

Dinmica
disponvel

Mnima
necessria

1.60

0.57

1.03

1.00

Situao:Pressosuficiente
Lequivalente(m)
Material

PVC
PVC
PVC
PVC
Metal
PVC
PVC
Metal

Grupo
Tomadasdguasadascurtas
Curva90soldvel
Tedereduo90soldvelc/reduolateral
Curva90soldvel
RegistrodegavetabrutoABNT
Joelho90soldvel
Te90soldvel
RegistropressosoldvelbrutoPVC

Item
1"
32mm
32mm25mm25mm
25mm
3/4"
25mm
25mm
25mm

Quant.

Unitria

1
1
1
1
1
1
1
1

1.20
0.70
1.50
0.60
0.20
1.50
3.10
0.20

file:///C:/Users/davinote/Desktop/Marli/Relat%C3%B3rios/PlanilhaPressoes_Terreo_Pe%C3%A7a_CH__Detalhe_H5.html

Total
1.20
0.70
1.50
0.60
0.20
1.50
3.10
0.20

1/1

Anda mungkin juga menyukai