PAGE :
CLIENT :
JOB NO. :
DESIGN BY :
REVIEW BY :
DATE :
Design of PT Slabs on Expansive Soil Ground Based on Standards of PTI 3rd Edition
1. DESIGN METHODS
1.1
MAKE SURE THAT THE FOUNDATION PLAN SATISFIES THE SHAPE FACTOR REQUIREMENT:
SF = (ENTIRE FOUNDATION PERIMETER) / (ENTIRE FOUNDATION AREA) 24 , (Sec. 4.5.1)
1.2
1.3
ONCE THE RIBBED FOUNDATION HAS BEEN DESIGNED TO SATISFY MOMENT, SHEAR, AND
DIFFERENTIAL DEFLECTION REQUIREMENTS, IT MAY BE CONVERTED TO AN EQUIVALENT
UNIFORM THICKNESS FOUNDATION.
qallow
em
ym
=
=
=
=
=
=
2000
=
=
=
=
=
=
=
=
=
=
=
=
42
ft
24
ft
psf
5.2
0.07
0.46
0.75
SLAB WIDTH
SLAB THICKNESS
PERIMETER LOADING
Pb
DL
LIVE LOAD
LL
SL
SB
b
f'c
CONCRETE STRENGTH
in
695
plf
2700
plf
150
psf
40
psf
40
ft
40
ft
14.5
in
12
in
ksi
tendons w/
0.153
tendons w/
0.153
tendons w/
0.153
174
fe
ksi
No
THE DESIGN IS ADEQUATE.
SUGGESTED RATIO OF EXPECTED ELONGATION IS 0.00777
B DIRECTION
yb
10.71
in
yb
10.77
in
1530
in2
St
5267
in3
2646
in2
St
9046
in3
19969
in4
Sb
1865
in3
33706
in4
Sb
3129
in3
CGS
9.03
in
-1.68
in
CGS
9.20
in
-1.58
in
ML = A0 (B em1.238 + C) =
Where
ft
2.05
ft
ft-kips / ft
0.383
2.29
ft-kips / ft
2.95
ft-kips / ft
2.49
ft-kips / ft
-0.31
10.06
ML = A0 (B em1.238 + C) =
Where
2.81
=
=
C
ML =
ft (Sec. 4.3.2)
ft-kips / ft
USE
For em =
ft (Sec. 4.3.2)
0.383
1.00
0.00
2.81
ft-kips / ft
USE
MB =
2.95
ft-kips / ft
2.33
ft-kips / ft
ft,allow = - 6 (fc')0.5 =
-0.329
ksi
1.350
ksi
(cont'd)
5.2 TOP STRESS, FOR CENTER LIFT MOMENT, AT L DIRECTION
f= Pr / A - ML / St + Pr e / St =
-0.092
f = Pr / A - MB / St + Pr e / St =
ksi
Pr = Pe - SG =
Where
182.71
Pe = fe Aps =
212.98
kips
Pe = fe Aps =
30.27
>
ft,allow
[Satisfactory]
<
fc,allow
[Satisfactory]
Then
>
<
0.718
Then
[Satisfactory]
[Satisfactory]
Then
Then
>
<
[Satisfactory]
[Satisfactory]
Then
Then
>
<
[Satisfactory]
[Satisfactory]
kips
ft,allow
[Satisfactory]
<
fc,allow
[Satisfactory]
>
<
0.778
ksi
ft,allow
[Satisfactory]
fc,allow
[Satisfactory]
>
<
-0.100
ksi
ft,allow
[Satisfactory]
fc,allow
[Satisfactory]
f = Pr / A + MB / St + Pr e / St =
fc,allow
30.27
ksi
ft,allow
kips
>
f = Pr / A - MB / Sb - Pr e / Sb =
fc,allow
0.189
342.44
ksi
ft,allow
f= Pr / A + ML / St + Pr e / St =
kips / ft
f = Pr / A + MB / Sb - Pr e / Sb =
fc,allow
-0.077
372.71
ksi
ft,allow
f = Pr / A - ML / Sb - Pr e / Sb =
ksi
SG = W slab m / 2000 =
kips
-0.095
Pr = Pe - SG =
Where
kips
SG = W slab m / 2000 =
Then
Then
>
<
0.209
ksi
ft,allow
[Satisfactory]
fc,allow
[Satisfactory]
6.323
1.5
Ecr = (0.5) 33 w
Where
(fc')
0.5
ft
=
1660280
Es =
1000
psi
w =
150
pcf
psi
Where
Es =
1000
1660280
psi
psi
12000 ML B CD zL / Ecr =
6660
CD
in
360
zL = min(L , 6b) =
37.94
IL =
<
IL
[Satisfactory]
19969
ft
in4
11060
in4
12000 MB L CD zB / Ecr =
7741
360
Where
CD
zB = min(B , 6b) =
IB =
24.00
in4
<
IB
[Satisfactory]
33706
ft
in4
13082
in4
12000 ML B CD zL / Ecr =
Where
ft
Where
7.208
CD
720
<
IL
12000 MB L CD zB / Ecr =
[Satisfactory]
Where
CD
<
720
IB
[Satisfactory]
1.260
kips/ft
1.836
kips/ft
1.101
kips/ft
>
50 psi
1.145
kips/ft
Where
0.155
ksi
0.119
ksi
>
50 psi
0.157
ksi
fp =
0.129
ksi
Where
[Satisfactory]
[Satisfactory]
v = V B / (n h b) =
0.058
<
ksi
vc
v = V L / (n h b) =
0.089
<
ksi
[Satisfactory]
vc
[Satisfactory]
v = V B / (n h b) =
0.053
<
ksi
vc
v = V L / (n h b) =
0.053
<
ksi
[Satisfactory]
vc
[Satisfactory]
150 L B t
50400
lbs
ADDED DL
DL L B
15120
lbs
SOIL PRESSURE
LIVE LOAD
LL L B
40320
lbs
<
BEAM WEIGHT
30319
lbs
[Satisfactory]
PERIMETER LOAD
P (2L + 2B)
91740
lbs
811.44
281
ft2
psf
qallow
8.10
ks =
lb / in3
12
ft
Where
8.10
ft-kips / ft
ks =
lb / in3
>
Mmax = Pb b / 4 =
ft-kips / ft
ft,allow
ksi
[Satisfactory]
f = Pr / A - Mmax / 2 t2 =
>
-0.124
ft,allow
ksi
[Satisfactory]
12
ft