PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA


Jl AP. PETTARANI No. 88 MAKASSAR
SULAWESI SELATAN

MONTHLY CERTIFICATE
MC. NO. 01
SEPTEMBER 2008 25

PAKET PEKERJAAN :

PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING

NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK

: 602.2/4157/DBM
: 16 September 2016
: Rp. 2.954.986.136,50

SUMBER DANA
TAHUN ANGGARAN

: APBD
: 2016

PELAKSANA :

PT. WIJAYA KARYA SEMESTA

OVINSI SULAWESI SELATAN

BINA MARGA

ANI No. 88 MAKASSAR

AWESI SELATAN

THLY CERTIFICATE

MC. NO. 01
SEPTEMBER 2008 25

T PEKERJAAN :

E POINT OF INDONESIA (RAILING)

ELAKSANA :

A KARYA SEMESTA

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA


Jl AP. PETTARANI No. 88 MAKASSAR
SULAWESI SELATAN

MONTHLY CERTIF

MC. NO. 02
OKTOBER 2016

PAKET PEKERJAAN :
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILI

NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK

: 602.2/4157/DBM
: 16 September 2016
: Rp. 2.954.986.136,50

SUMBER DANA
TAHUN ANGGARAN

: APBD
: 2016

PELAKSANA :

PT. WIJAYA KARYA SEMESTA

ROVINSI SULAWESI SELATAN

BINA MARGA

ANI No. 88 MAKASSAR

AWESI SELATAN

MONTHLY CERTIFICATE
MC. NO. 02
OKTOBER 2016 25

T PEKERJAAN :
E POINT OF INDONESIA (RAILING)

ELAKSANA :

A KARYA SEMESTA

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA


Jl AP. PETTARANI No. 88 MAKASSAR
SULAWESI SELATAN

MONTHLY CE

MC. NO
MARET 2

PAKET PEKERJAAN :
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILI

NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK

: 602.2/4157/DBM
: 16 September 2016
: Rp. 2.954.986.136,50

SUMBER DANA
TAHUN ANGGARAN

: APBD
: 2016

PELAKSANA :

PT. WIJAYA KARYA SEMESTA

ROVINSI SULAWESI SELATAN

BINA MARGA

RANI No. 88 MAKASSAR

AWESI SELATAN

MONTHLY CERTIFICATE
MC. NO. 03
MARET 2016 25

ET PEKERJAAN :
E POINT OF INDONESIA (RAILING)

PELAKSANA :

A KARYA SEMESTA

KALAU MAU MENGCOPY HARUS KE BAWAH

*
************
.
1
14,277,600.00 ************ Model (1-3):
.
************ ************ ************ ************
Empat belas juta dua ratus tujuh puluh tujuh ribu enam ratus rupiah.
************ ****************************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh delapan sem ***
************
ribu juta milyar
***
************ 000014277600
***
************ ****************************** ************ ************ ************ ************
************ 600
1
***
************
6
***
************ enam ratus
sepuluh
***
************
0
***
************
0
***
************
***
************ enam ratus
***
************
***
************
***
************ 277
2
***
************
2 tujuh puluh
***
************ dua ratus
tujuh belas
***
************
7 tujuh
***
************
7 tujuh puluh tujuh
***
************ tujuh puluh tujuh
tujuh puluh tujuh
***
************ dua ratus tujuh puluh tujuh ribu
***
************
***
************
***
************ 014
3
***
************
0
***
************
empat belas
***
************
1 empat
***
************
4 empat
***
************ empat belas
empat belas
***
************ empat belas juta
***
************
***
************
***
************ 000
4
***
************
0
***
************
sepuluh
***
************
0
***

************
************
************
************
************ 000
************
************
************
************
************
************
************
************

***
***
***
***
1
***
0
***
sepuluh
***
0
****
0
***
***
***
67 00
0
***
67 ************ ************ ************
67 00
empat belas juta dua ratus tujuh puluh tujuh ribu enam ratus
************ empat belas juta dua ratus empat belas*
empat belas juta dua ratus tujuh puluh tujuh ribu enam ratus
************ empat belas juta dua ratus empat belas*
empat belas juta dua ratus tujuh puluh tujuh ribu enam ratus rupiah
1 Empat belas juta dua ratus tujuh puluh tujuh ribu enam ratus rupiah.
2 Empat belas juta dua ratus tujuh puluh tujuh ribu enam ratus rupiah.
3 Empat belas juta dua ratus tujuh puluh tujuh ribu enam ratus rupiah.
************ ****************************** ************ ************ ************ ************
KALAU MAU MENGCOPY HARUS KE BAWAH

*
************
.
1
134,930,100.00 ************ Model (1-3):
.
************ ************ ************ ************
Seratus tiga puluh empat juta sembilan ratus tiga puluh ribu seratus rupiah.
************ ****************************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh delapan sem ***
************
ribu juta milyar
***
************ 000134930100
***
************ ****************************** ************ ************ ************ ************
************ 100
1
***
************
1
***
************ seratus
sepuluh
***
************
0
***
************
0
***
************
***
************ seratus
***
************
***
************
***

************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************

930

***
***
***
***
***
***
***
***
***
134
3
***
1 tiga puluh
***
seratus
empat belas
***
3 empat
***
4 tiga puluh empat
***
tiga puluh empat
tiga puluh empat
***
seratus tiga puluh empat juta
***
***
***
000
4
***
0
***
sepuluh
***
0
***
0
***
***
***
***
000
1
***
0
***
sepuluh
***
0
****
0
***
***
***
75 00
0
***
75 ************ ************ ************
75 00
seratus tiga puluh empat juta sembilan ratus tiga puluh ribu seratu
************ seratus tiga puluh empat juseratus tiga*
seratus tiga puluh empat juta sembilan ratus tiga puluh ribu seratu
************ seratus tiga puluh empat juseratus tiga*
seratus tiga puluh empat juta sembilan ratus tiga puluh ribu seratu
1 Seratus tiga puluh empat juta sembilan ratus tiga puluh ribu seratus rupiah.
2 Seratus tiga puluh empat juta sembilan ratus tiga puluh ribu seratus rupiah.
3 Seratus tiga puluh empat juta sembilan ratus tiga puluh ribu seratus rupiah.
9 tiga puluh
sembilan ratus
sepuluh
3
0 tiga puluh
tiga puluh
tiga puluh
sembilan ratus tiga puluh ribu

************ ****************************** ************ ************ ************ ************


KALAU MAU MENGCOPY HARUS KE BAWAH

*
************
.
1
3,474,755,305.00 ************ Model (1-3):
.
************ ************ ************ ************
Tiga milyar empat ratus tujuh puluh empat juta tujuh ratus lima puluh lima ribu tiga ratus lima rupiah.
************ ****************************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh delapan sem ***
************
ribu juta milyar
***
************ 003474755305
***
************ ****************************** ************ ************ ************ ************
************ 305
1
***
************
3
***
************ tiga ratus
lima belas
***
************
0 lima
***
************
5 lima
***
************ lima
lima
***
************ tiga ratus lima
***
************
***
************
***
************ 755
2
***
************
7 lima puluh
***
************ tujuh ratus
lima belas
***
************
5 lima
***
************
5 lima puluh lima
***
************ lima puluh lima
lima puluh lima
***
************ tujuh ratus lima puluh lima ribu
***
************
***
************
***
************ 474
3
***
************
4 tujuh puluh
***
************ empat ratus
empat belas
***
************
7 empat
***
************
4 tujuh puluh empat
***
************ tujuh puluh empat
tujuh puluh empat
***
************ empat ratus tujuh puluh empat juta
***
************
***
************
***
************ 003
4
***

************
************
************
************
************ tiga
************ tiga milyar
************
************ 000
************
************
************
************
************
************
************
************

***
***
***
***
***
***
***
1
***
0
***
sepuluh
***
0
****
0
***
***
***
102 00
0
***
102 ************ ************ ************
102 00
tiga milyar empat ratus tujuh puluh empat juta tujuh ratus lima pulu
************ tiga milyar empat ratus tujutiga milyar *
tiga milyar empat ratus tujuh puluh empat juta tujuh ratus lima pulu
************ tiga milyar empat ratus tujutiga milyar *
tiga milyar empat ratus tujuh puluh empat juta tujuh ratus lima pulu
1 Tiga milyar empat ratus tujuh puluh empat juta tujuh ratus lima puluh lima ribu tiga ratus lima rupiah.
2 Tiga milyar empat ratus tujuh puluh empat juta tujuh ratus lima puluh lima ribu tiga ratus lima rupiah.
3 Tiga milyar empat ratus tujuh puluh empat juta tujuh ratus lima puluh lima ribu tiga ratus lima rupiah.
************ ****************************** ************ ************ ************ ************
tiga belas
0 tiga
3 tiga
tiga

KALAU MAU MENGCOPY HARUS KE BAWAH

*
************
.
1
3,500,402,680.00 ************ Model (1-3):
.
************ ************ ************ ************
Tiga milyar lima ratus juta empat ratus dua ribu enam ratus delapan puluh rupiah.
************ ****************************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh delapan sem ***
************
ribu juta milyar
***
************ 003500402680
***
************ ****************************** ************ ************ ************ ************
************ 680
1
***
************
6 delapan puluh
***
************ enam ratus
sepuluh
***
************
8
***
************
0 delapan puluh
***
************ delapan puluh
delapan puluh
***
************ enam ratus delapan puluh
***

************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************

***
***
402
2
***
4
***
empat ratus
dua belas
***
0 dua
***
2 dua
***
dua
dua
***
empat ratus dua ribu
***
***
***
500
3
***
5
***
lima ratus
sepuluh
***
0
***
0
***
***
lima ratus juta
***
***
***
003
4
***
0
***
tiga belas
***
0 tiga
***
3 tiga
***
tiga
tiga
***
tiga milyar
***
***
000
1
***
0
***
sepuluh
***
0
****
0
***
***
***
80 00
0
***
80 ************ ************ ************
80 00
tiga milyar lima ratus juta empat ratus dua ribu enam ratus delapan
************ tiga milyar lima ratus juta tiga milyar *
tiga milyar lima ratus juta empat ratus dua ribu enam ratus delapan
************ tiga milyar lima ratus juta tiga milyar *
tiga milyar lima ratus juta empat ratus dua ribu enam ratus delapan
1 Tiga milyar lima ratus juta empat ratus dua ribu enam ratus delapan puluh rupiah.

2 Tiga milyar lima ratus juta empat ratus dua ribu enam ratus delapan puluh rupiah.
3 Tiga milyar lima ratus juta empat ratus dua ribu enam ratus delapan puluh rupiah.
************ ****************************** ************ ************ ************ ************
KALAU MAU MENGCOPY HARUS KE BAWAH

*
************
.
1
111,533,135.00 ************ Model (1-3):
.
************ ************ ************ ************
Seratus sebelas juta lima ratus tiga puluh tiga ribu seratus tiga puluh lima rupiah.
************ ****************************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh delapan sem ***
************
ribu juta milyar
***
************ 000111533135
***
************ ****************************** ************ ************ ************ ************
************ 135
1
***
************
1 tiga puluh
***
************ seratus
lima belas
***
************
3 lima
***
************
5 tiga puluh lima
***
************ tiga puluh lima
tiga puluh lima
***
************ seratus tiga puluh lima
***
************
***
************
***
************ 533
2
***
************
5 tiga puluh
***
************ lima ratus
tiga belas
***
************
3 tiga
***
************
3 tiga puluh tiga
***
************ tiga puluh tiga
tiga puluh tiga
***
************ lima ratus tiga puluh tiga ribu
***
************
***
************
***
************ 111
3
***
************
1
***
************ seratus
sebelas
***
************
1 satu
***
************
1 satu
***
************ sebelas
sebelas
***
************ seratus sebelas juta
***
************
***
************
***

************ 000
************
************
************
************
************
************
************
************ 000
************
************
************
************
************
************
************
************

***
***
sepuluh
***
0
***
0
***
***
***
***
1
***
0
***
sepuluh
***
0
****
0
***
***
***
83 00
0
***
83 ************ ************ ************
83 00
seratus sebelas juta lima ratus tiga puluh tiga ribu seratus tiga pulu
************ seratus sebelas juta lima raseratus sebe*
seratus sebelas juta lima ratus tiga puluh tiga ribu seratus tiga pulu
************ seratus sebelas juta lima raseratus sebe*
seratus sebelas juta lima ratus tiga puluh tiga ribu seratus tiga pulu
1 Seratus sebelas juta lima ratus tiga puluh tiga ribu seratus tiga puluh lima rupiah.
2 Seratus sebelas juta lima ratus tiga puluh tiga ribu seratus tiga puluh lima rupiah.
3 Seratus sebelas juta lima ratus tiga puluh tiga ribu seratus tiga puluh lima rupiah.
************ ****************************** ************ ************ ************ ************
0

KALAU MAU MENGCOPY HARUS KE BAWAH

*
************
.
1
2,221,796,730.00 ************ Model (1-3):
.
************ ************ ************ ************
Dua milyar dua ratus dua puluh satu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh rupiah.
************ ****************************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh delapan sem ***
************
ribu juta milyar
***
************ 002221796730
***
************ ****************************** ************ ************ ************ ************
************ 730
1
***
************
7 tiga puluh
***
************ tujuh ratus
sepuluh
***
************
3
***
************
0 tiga puluh
***
************ tiga puluh
tiga puluh
***

************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************

tujuh ratus tiga puluh

***
***
***
796
2
***
7 sembilan puluh
***
tujuh ratus
enam belas
***
9 enam
***
6 sembilan puluh enam
***
sembilan puluh enam
sembilan puluh enam
***
tujuh ratus sembilan puluh enam ribu
***
***
***
221
3
***
2 dua puluh
***
dua ratus
sebelas
***
2 satu
***
1 dua puluh satu
***
dua puluh satu
dua puluh satu
***
dua ratus dua puluh satu juta
***
***
***
002
4
***
0
***
dua belas
***
0 dua
***
2 dua
***
dua
dua
***
dua milyar
***
***
000
1
***
0
***
sepuluh
***
0
****
0
***
***
***
107 00
0
***
107 ************ ************ ************
107 00
dua milyar dua ratus dua puluh satu juta tujuh ratus sembilan pulu
************ dua milyar dua ratus dua pudua milyar d*
dua milyar dua ratus dua puluh satu juta tujuh ratus sembilan pulu
************ dua milyar dua ratus dua pudua milyar d*
dua milyar dua ratus dua puluh satu juta tujuh ratus sembilan pulu

1 Dua milyar dua ratus dua puluh satu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh rupiah.
2 Dua milyar dua ratus dua puluh satu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh rupiah.
3 Dua milyar dua ratus dua puluh satu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh rupiah.
************ ****************************** ************ ************ ************ ************

uluh tujuh ribu enam ratus


uluh tujuh ribu enam ratus
uluh tujuh ribu enam ratus rupiah

bilan ratus tiga puluh ribu seratus


bilan ratus tiga puluh ribu seratus
bilan ratus tiga puluh ribu seratus rupiah

h empat juta tujuh ratus lima puluh lima ribu tiga ratus lima
h empat juta tujuh ratus lima puluh lima ribu tiga ratus lima
h empat juta tujuh ratus lima puluh lima ribu tiga ratus lima rupiah
tus lima rupiah.
tus lima rupiah.
tus lima rupiah.

atus dua ribu enam ratus delapan puluh


atus dua ribu enam ratus delapan puluh
atus dua ribu enam ratus delapan puluh rupiah

a puluh tiga ribu seratus tiga puluh lima


a puluh tiga ribu seratus tiga puluh lima
a puluh tiga ribu seratus tiga puluh lima rupiah

tu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh
tu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh
tu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh rupiah

ratus tiga puluh rupiah.


ratus tiga puluh rupiah.
ratus tiga puluh rupiah.

PEMERINTA

DIN

SERT
PEKERJAAN
PA K E T
NO. KONTRAK
Err:509
TGL. KONTRAK

:
Err:509
: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
: 602.2/4157/DBM
: Err:509
:
42629

NILAI ADD. II (K. INDUK)

: Rp. 29.904.711.000,-

TGL. ADD. II (K. INDUK)


SUMBER DANA

: Err:509
: PT. WIJAYA KARYA SEMESTA

DIV.

URAIAN PEKERJAAN

NILAI KONTR
ADD. I
(K. INDUK)
3

1
2
3
4
5
6
7

UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR

3,630,220.00
13,676,000.00
-

A
B
C
D

JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )

17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00

POTONGAN
E
F
G
H
I

SERTIFIKAT S/D BULAN LALU (KUMULATIF)


5 % JAMINAN PEMELIHARAAN ( 5 % x D )
20 % PENGEMBALIAN UANG MUKA ( 20 % x D)
JUMLAH POTONGAN PADA SERTIFIKAT BULAN INI ( E + F + G )
JUMLAH BERSIH YANG DIBAYAR PADA SERTIFIKAT BULAN INI ( D - H ) TERMASUK PPn

DIBULATKAN

TERBILANG :
DIAJUKAN OLEH

Empat belas juta dua ratus tujuh puluh tu

DIPERIKS

PENYEDIA JASA
PT. WIJAYA KARYA SEMESTA

Sofyan Hasan
Direktur Utama

KONSULTAN
PT. TACITA PR

Ir. Erry S
Site Eng

KEPALA BIDANG PEMB


DINAS BINA M

PEMERINTA

DIN

SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
TGL. ADD. II (K. INDUK)
SUMBER DANA

:
:
:
:
:
:
:
:

Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 29.904.711.000,Err:509
PT. WIJAYA KARYA SEMESTA

DIV.

URAIAN PEKERJAAN

NILAI KONTR
ADD. I
(K. INDUK)
3

1
2
3
4
5
6
7

UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR

3,630,220.00
13,676,000.00
-

A
B
C
D

JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )

17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00

POTONGAN
E
F
G
H
I

SERTIFIKAT S/D BULAN LALU (KUMULATIF)


5 % JAMINAN PEMELIHARAAN ( 5 % x D )
20 % PENGEMBALIAN UANG MUKA ( 20 % x D)
JUMLAH POTONGAN PADA SERTIFIKAT BULAN INI ( E + F + G )
JUMLAH BERSIH YANG DIBAYAR PADA SERTIFIKAT BULAN INI ( D - H ) TERMASUK PPn

DIBULATKAN

TERBILANG :
DIAJUKAN OLEH

Seratus tiga puluh empat juta sembilan ra

DIPERIKS

PENYEDIA JASA
PT. WIJAYA KARYA SEMESTA

Sofyan Hasan
Direktur Utama

KONSULTAN
PT. TACITA PR

Ir. Erry S
Site Eng

KEPALA BIDANG PEMB


DINAS BINA M

PEMERINTA

DIN

SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
TGL. ADD. II (K. INDUK)
SUMBER DANA

:
:
:
:
:
:
:
:

Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 29.904.711.000,Err:509
PT. WIJAYA KARYA SEMESTA

DIV.

URAIAN PEKERJAAN

NILAI KONTR
ADD. I
(K. INDUK)
3

1
2
3
4
5
6
7

UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR

3,630,220.00
13,676,000.00
-

A
B
C
D

JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )

17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00

POTONGAN
E
F
G
H
I

SERTIFIKAT S/D BULAN LALU (KUMULATIF)


5 % JAMINAN PEMELIHARAAN ( 5 % x D )
20 % PENGEMBALIAN UANG MUKA ( 20 % x D)
JUMLAH POTONGAN PADA SERTIFIKAT BULAN INI ( E + F + G )
JUMLAH BERSIH YANG DIBAYAR PADA SERTIFIKAT BULAN INI ( D - H ) TERMASUK PPn

DIBULATKAN

TERBILANG :
DIAJUKAN OLEH

Tiga milyar empat ratus tujuh puluh emp

DIPERIKS

PENYEDIA JASA
PT. WIJAYA KARYA SEMESTA

Sofyan Hasan
Direktur Utama

KONSULTAN
PT. TACITA PR

Ir. Erry S
Site Eng

KEPALA BIDANG PEMB


DINAS BINA M

PEMERINTA

DIN

SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
TGL. ADD. II (K. INDUK)
SUMBER DANA

:
:
:
:
:
:
:
:

Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 29.904.711.000,Err:509
PT. WIJAYA KARYA SEMESTA

DIV.

URAIAN PEKERJAAN

NILAI KONTR
ADD. I
(K. INDUK)
3

1
2
3
4
5
6
7

UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR

3,630,220.00
13,676,000.00
-

A
B
C
D

JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )

17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00

POTONGAN
E
F
G
H
I

SERTIFIKAT S/D BULAN LALU (KUMULATIF)


5 % JAMINAN PEMELIHARAAN ( 5 % x D )
20 % PENGEMBALIAN UANG MUKA ( 20 % x D)
JUMLAH POTONGAN PADA SERTIFIKAT BULAN INI ( E + F + G )
JUMLAH BERSIH YANG DIBAYAR PADA SERTIFIKAT BULAN INI ( D - H ) TERMASUK PPn

DIBULATKAN

TERBILANG :
DIAJUKAN OLEH

Tiga milyar lima ratus juta empat ratus d

DIPERIKS

PENYEDIA JASA
PT. WIJAYA KARYA SEMESTA

Sofyan Hasan
Direktur Utama

KONSULTAN
PT. TACITA PR

Ir. Erry S
Site Eng

KEPALA BIDANG PEMB


DINAS BINA M

PEMERINTA

DIN

SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
TGL. ADD. II (K. INDUK)
SUMBER DANA

:
:
:
:
:
:
:
:

Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 29.904.711.000,Err:509
PT. WIJAYA KARYA SEMESTA

DIV.

URAIAN PEKERJAAN

NILAI KONTR
ADD. I
(K. INDUK)
3

1
2
3
4
5
6
7

UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR

3,630,220.00
13,676,000.00
-

A
B
C
D

JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )

17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00

POTONGAN
E
F
G
H
I

SERTIFIKAT S/D BULAN LALU (KUMULATIF)


5 % JAMINAN PEMELIHARAAN ( 5 % x D )
20 % PENGEMBALIAN UANG MUKA ( 20 % x D)
JUMLAH POTONGAN PADA SERTIFIKAT BULAN INI ( E + F + G )
JUMLAH BERSIH YANG DIBAYAR PADA SERTIFIKAT BULAN INI ( D - H ) TERMASUK PPn

DIBULATKAN

TERBILANG :
DIAJUKAN OLEH

Seratus sebelas juta lima ratus tiga puluh

DIPERIKS

PENYEDIA JASA
PT. WIJAYA KARYA SEMESTA

Sofyan Hasan
Direktur Utama

KONSULTAN
PT. TACITA PR

Ir. Erry S
Site Eng

KEPALA BIDANG PEMB


DINAS BINA M

PEMERINTA

DIN

SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
TGL. ADD. II (K. INDUK)
SUMBER DANA

:
:
:
:
:
:
:
:

Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 29.904.711.000,Err:509
PT. WIJAYA KARYA SEMESTA

DIV.

URAIAN PEKERJAAN

NILAI KONTR
ADD. I
(K. INDUK)
3

1
2
3
4
5
6
7

UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR

3,630,220.00
13,676,000.00
-

A
B
C
D

JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )

17,306,219.92
1,730,621.99
19,036,841.91
19,036,000.00

POTONGAN
E
F
G
H
I

SERTIFIKAT S/D BULAN LALU (KUMULATIF)


5 % JAMINAN PEMELIHARAAN ( 5 % x D )
20 % PENGEMBALIAN UANG MUKA ( 20 % x D)
JUMLAH POTONGAN PADA SERTIFIKAT BULAN INI ( E + F + G )
JUMLAH BERSIH YANG DIBAYAR PADA SERTIFIKAT BULAN INI ( D - H ) TERMASUK PPn

DIBULATKAN

TERBILANG :
DIAJUKAN OLEH

Dua milyar dua ratus dua puluh satu juta

DIPERIKS

PENYEDIA JASA
PT. WIJAYA KARYA SEMESTA

Sofyan Hasan
Direktur Utama

KONSULTAN
PT. TACITA PR

Ir. Erry S
Site Eng

KEPALA BIDANG PEMB


DINAS BINA M

ERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA


Err:509

SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN

KONTRAK
ADD. II
(K. INDUK)
4

S/D
BLN LALU

BLN
INI

:
:
:
:

JUMLAH PEMBAYARAN
S/D
BLN INI
7

BOBOT
S/D BLN INI
%
8

3,630,220.00
13,676,000.00
-

3,630,220.00
13,676,000.00
-

#DIV/0!

17,306,220.00
1,730,622.00
19,036,842.00
19,036,800.00

17,306,220.00
1,730,622.00
19,036,842.00
19,036,800.00

#DIV/0!

#DIV/0!
#DIV/0!

951,840.00
951,840.00
18,084,960.00

18,084,960.00

uluh tujuh ribu enam ratus rupiah.

IPERIKSA OLEH

MENGETAHUI OLEH

SULTAN PENGAWAS
CITA PRIMA UTAMA

Ir. Erry Saputra


Site Engineer

MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD

Ir.Fajri, MT
NIP. 110 047 860

PEJABAT PELAKSANA TEKNIS KEGIATAN


PEMB. JALAN DAN JEMBATAN WILAYAH II ACEH B

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

ERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN

KONTRAK
ADD. II
(K. INDUK)
4

S/D
BLN LALU

BLN
INI

:
:
:
:

JUMLAH PEMBAYARAN
S/D
BLN INI
7

3,630,220.00
13,676,000.00
-

#REF!

17,306,220.00
1,730,622.00
19,036,842.00
19,036,800.00

#REF!
#REF!
#REF!
#REF!

#REF!
#VALUE!

#REF!
#REF!
#REF!
#REF!

BOBOT
S/D BLN INI
%
8
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#REF!

18,084,960.00
#REF!
#REF!
#REF!

#REF!

ilan ratus tiga puluh ribu seratus rupiah.

IPERIKSA OLEH

MENGETAHUI OLEH

SULTAN PENGAWAS
CITA PRIMA UTAMA

Ir. Erry Saputra


Site Engineer

MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD

Ir.Fajri, MT
NIP. 110 047 860

PEJABAT PELAKSANA TEKNIS KEGIATAN


PEMB. JALAN DAN JEMBATAN WILAYAH II ACEH B

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

ERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN

KONTRAK
ADD. II
(K. INDUK)
4
-

S/D
BLN LALU

BLN
INI

#REF!
#VALUE!

#REF!
#REF!
#REF!
#REF!

:
:
:
:

JUMLAH PEMBAYARAN
S/D
BLN INI
7

BOBOT
S/D BLN INI
%
8

79,178,065.12
704,314,185.45
2,306,847,479.42
196,709,620.24
-

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

3,287,049,350.23
328,704,935.02
3,615,754,285.25
3,615,754,200.00

#REF!
#REF!
#REF!
#REF!

#REF!

#REF!
#REF!
#REF!
#REF!

#REF!

h empat juta tujuh ratus lima puluh lima ribu tiga ratus lima rupiah.

IPERIKSA OLEH

MENGETAHUI OLEH

SULTAN PENGAWAS
CITA PRIMA UTAMA

Ir. Erry Saputra


Site Engineer

MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD

Ir.Fajri, MT
NIP. 110 047 860

PEJABAT PELAKSANA TEKNIS KEGIATAN


PEMB. JALAN DAN JEMBATAN WILAYAH II ACEH B

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

ERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN

KONTRAK
ADD. II
(K. INDUK)
4

S/D
BLN LALU

BLN
INI

:
:
:
:

JUMLAH PEMBAYARAN
S/D
BLN INI
7

BOBOT
S/D BLN INI
%
8

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

3,249,453,354.27
100,214,350.23
-

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#REF!
#REF!
#REF!
#REF!

3,349,667,704.50
334,966,770.45
3,684,634,474.95
3,684,634,400.00

#REF!
#REF!
#REF!
#REF!

#REF!

#REF!
#REF!
#REF!
#REF!

#REF!

atus dua ribu enam ratus delapan puluh rupiah.

IPERIKSA OLEH

MENGETAHUI OLEH

SULTAN PENGAWAS
CITA PRIMA UTAMA

Ir. Erry Saputra


Site Engineer

MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD

Ir.Fajri, MT
NIP. 110 047 860

PEJABAT PELAKSANA TEKNIS KEGIATAN


PEMB. JALAN DAN JEMBATAN WILAYAH II ACEH B

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

ERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN

KONTRAK
ADD. II
(K. INDUK)
4

S/D
BLN LALU

BLN
INI

:
:
:
:

JUMLAH PEMBAYARAN
S/D
BLN INI
7

BOBOT
S/D BLN INI
%
8

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

106,730,250.00
-

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#REF!
#REF!
#REF!
#REF!

106,730,250.00
10,673,025.00
117,403,275.00
117,403,200.00

#REF!
#REF!
#REF!
#REF!

#REF!

#REF!
#REF!
#REF!
#REF!

#REF!

puluh tiga ribu seratus tiga puluh lima rupiah.

IPERIKSA OLEH

MENGETAHUI OLEH

SULTAN PENGAWAS
CITA PRIMA UTAMA

Ir. Erry Saputra


Site Engineer

MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD

Ir.Fajri, MT
NIP. 110 047 860

PEJABAT PELAKSANA TEKNIS KEGIATAN


PEMB. JALAN DAN JEMBATAN WILAYAH II ACEH B

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

ERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN

KONTRAK
ADD. II
(K. INDUK)
4

S/D
BLN LALU

BLN
INI

:
:
:
:

JUMLAH PEMBAYARAN
S/D
BLN INI
7

BOBOT
S/D BLN INI
%
8

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

2,126,121,246.88
-

#REF!
#VALUE!
#VALUE!

#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

#REF!
#REF!
#REF!
#REF!

2,126,121,246.88
212,612,124.69
2,338,733,371.57
2,338,733,300.00

#REF!
#REF!
#REF!
#REF!

#REF!

#REF!
#REF!
#REF!
#REF!

#REF!

tu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh rupiah.

IPERIKSA OLEH

MENGETAHUI OLEH

SULTAN PENGAWAS
CITA PRIMA UTAMA

Ir. Erry Saputra


Site Engineer

MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD

Ir.Fajri, MT
NIP. 110 047 860

PEJABAT PELAKSANA TEKNIS KEGIATAN


PEMB. JALAN DAN JEMBATAN WILAYAH II ACEH B

Ir. M. Hilal, MT
NIP. 110 053 961

`01
SEPTEMBER
25 / SEPTEMBER / 2008
1 dari 8

JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
11.00
0.00
5.61
0.00
0.00
0.00
0.00
S/D BULAN INI

#DIV/0!
BULAN LALU

#DIV/0!
BULAN INI

#DIV/0!

MENGETAHUI OLEH

PEJABAT PELAKSANA TEKNIS KEGIATAN


B. JALAN DAN JEMBATAN WILAYAH II ACEH BESAR - 1

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

#REF!

1 dari 8

JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
#REF!

S/D BULAN INI

#DIV/0!
BULAN LALU

#DIV/0!
BULAN INI

#REF!

MENGETAHUI OLEH

PEJABAT PELAKSANA TEKNIS KEGIATAN


B. JALAN DAN JEMBATAN WILAYAH II ACEH BESAR - 1

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

08
MARET
25 / MARET / 2008
1 dari 8

JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
S/D BULAN INI

#DIV/0!
BULAN LALU

#DIV/0!
BULAN INI

#DIV/0!
ratus lima rupiah.
MENGETAHUI OLEH

PEJABAT PELAKSANA TEKNIS KEGIATAN


B. JALAN DAN JEMBATAN WILAYAH II ACEH BESAR - 1

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

09
APRIL
25 / APRIL / 2008
1 dari 8

JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
#REF!
#REF!
#REF!
100.00
0.00
#REF!
#REF!
S/D BULAN INI

#DIV/0!
BULAN LALU

#DIV/0!
BULAN INI

#DIV/0!

MENGETAHUI OLEH

PEJABAT PELAKSANA TEKNIS KEGIATAN


B. JALAN DAN JEMBATAN WILAYAH II ACEH BESAR - 1

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

10
MEI
25 / MEI / 2008
1 dari 8

JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
8
#REF!
#REF!
#REF!
100.00
3.68
#REF!
#REF!
S/D BULAN INI

#DIV/0!
BULAN LALU

#DIV/0!
BULAN INI

#DIV/0!

MENGETAHUI OLEH

PEJABAT PELAKSANA TEKNIS KEGIATAN


B. JALAN DAN JEMBATAN WILAYAH II ACEH BESAR - 1

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

11
JUNI
25 / JUNI / 2008
1 dari 8

JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
#REF!
#REF!
#REF!
100.00
76.98
#REF!
#REF!
S/D BULAN INI

#DIV/0!
BULAN LALU

#DIV/0!
BULAN INI

#DIV/0!

h ratus tiga puluh rupiah.


MENGETAHUI OLEH

PEJABAT PELAKSANA TEKNIS KEGIATAN


B. JALAN DAN JEMBATAN WILAYAH II ACEH BESAR - 1

Ir. M. Hilal, MT
NIP. 110 053 961

PEMERINTA

DIN

SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
SUMBER DANA
PENYEDIA BARANG/JASA

:
:
:
:
:

Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
: APBD
: PT. WIJAYA KARYA SEMESTA

DIV.

URAIAN PEKERJAAN

NILAI KONTR
KONTRAK
AWAL
3

1
2
3
4
5
6
7

UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN PELEBARAN BAHU DAN JALAN
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR

A
B
C
D

JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )

33,002,000.00
119,571,750.00
243,806,278.52
132,466,750.00
775,855,600.00
674,706,240.00
988,157,304.97
2,967,565,923.49
296,756,592.35
3,264,322,515.84
3,264,322,000.00

POTONGAN
E
F
G
H
I

SERTIFIKAT S/D BULAN LALU (KUMULATIF)


5 % JAMINAN PEMELIHARAAN ( 5 % x D )
20 % PENGEMBALIAN UANG MUKA ( 20 % x D)
JUMLAH POTONGAN PADA SERTIFIKAT BULAN INI ( E + F + G )
JUMLAH BERSIH YANG DIBAYAR PADA SERTIFIKAT BULAN INI ( D - H ) TERMASUK PPn

DIBULATKAN

TERBILANG :
DISETUJUI OLEH

Empat belas juta dua ratus tujuh puluh tu

DIP

PEJABAT PELAKSANA TEKNIS KEGIATAN


PEMB. JALAN DAN JEMBATAN WILAYAH IX ACEH TIMUR 1

IR. SYAHRUDDIN
NIP. 110 048 084

KONSU
PT. MAXITE
Ass. C

IR.

KEPALA BIDANG PEMB


DINAS BINA M

PEMERINTA

DIN

SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
SUMBER DANA
PENYEDIA BARANG/JASA

:
:
:
:
:
:
:

Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
APBD
PT. WIJAYA KARYA SEMESTA

DIV.

URAIAN PEKERJAAN

NILAI KONTR
KONTRAK
AWAL
3

1
2
3
4
5
6
7

UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN PELEBARAN BAHU DAN JALAN
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR

A
B
C
D

JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )

33,002,000.00
119,571,750.00
243,806,278.52
132,466,750.00
775,855,600.00
674,706,240.00
988,157,304.97
2,967,565,923.49
296,756,592.35
3,264,322,515.84
3,264,322,000.00

POTONGAN
E
F
G
H
I

SERTIFIKAT S/D BULAN LALU (KUMULATIF)


5 % JAMINAN PEMELIHARAAN ( 5 % x D )
20 % PENGEMBALIAN UANG MUKA ( 20 % x D)
JUMLAH POTONGAN PADA SERTIFIKAT BULAN INI ( E + F + G )
JUMLAH BERSIH YANG DIBAYAR PADA SERTIFIKAT BULAN INI ( D - H ) TERMASUK PPn

DIBULATKAN

TERBILANG :
DISETUJUI OLEH

Seratus tiga puluh empat juta sembilan ra

DIP

PEJABAT PELAKSANA TEKNIS KEGIATAN


PEMB. JALAN DAN JEMBATAN WILAYAH IX ACEH TIMUR 1

IR. SYAHRUDDIN
NIP. 110 048 084

KONSU
PT. MAXITE
Ass. C

IR.
SIT

KEPALA BIDANG PEMB


DINAS BINA M

PEMERINTA

DIN

SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
SUMBER DANA
PENYEDIA BARANG/JASA
0

:
:
:
:
:
:
:
:

Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 2.954.986.136,50
APBD
PT. WIJAYA KARYA SEMESTA
0

DIV.

URAIAN PEKERJAAN

NILAI KONTR
ADD. I
(K. INDUK)
3

1
2
3
4
5
6
7

UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR

3,630,220.00
13,676,000.00
-

A
B
C
D

JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )

17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00

POTONGAN
E
F
G
H
I

SERTIFIKAT S/D BULAN LALU (KUMULATIF)


5 % JAMINAN PEMELIHARAAN ( 5 % x D )
20 % PENGEMBALIAN UANG MUKA ( 20 % x D)
JUMLAH POTONGAN PADA SERTIFIKAT BULAN INI ( E + F + G )
JUMLAH BERSIH YANG DIBAYAR PADA SERTIFIKAT BULAN INI ( D - H ) TERMASUK PPn

DIBULATKAN

TERBILANG :
DIAJUKAN OLEH

Tiga milyar empat ratus tujuh puluh emp

DIPERIKS

PENYEDIA JASA
PEMB. JALAN DAN JEMBATAN WILAYAH IX ACEH TIMUR 1

Sofyan Hasan
Direktur Utama

KONSULTAN
PT. TACITA PR

Ir. Erry S
Site Eng

KEPALA BIDANG PEMB


DINAS BINA M

PEMERINTA

DIN

SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
SUMBER DANA
PENYEDIA BARANG/JASA
0

:
:
:
:
:
:
:
:

Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 2.954.986.136,50
APBD
PT. WIJAYA KARYA SEMESTA
0

DIV.

URAIAN PEKERJAAN

NILAI KONTR
ADD. I
(K. INDUK)
3

1
2
3
4
5
6
7

UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR

3,630,220.00
13,676,000.00
-

A
B
C
D

JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )

17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00

POTONGAN
E
F
G
H
I

SERTIFIKAT S/D BULAN LALU (KUMULATIF)


5 % JAMINAN PEMELIHARAAN ( 5 % x D )
20 % PENGEMBALIAN UANG MUKA ( 20 % x D)
JUMLAH POTONGAN PADA SERTIFIKAT BULAN INI ( E + F + G )
JUMLAH BERSIH YANG DIBAYAR PADA SERTIFIKAT BULAN INI ( D - H ) TERMASUK PPn

DIBULATKAN

TERBILANG :
DIAJUKAN OLEH

Tiga milyar lima ratus juta empat ratus d

DIPERIKS

PENYEDIA JASA
PEMB. JALAN DAN JEMBATAN WILAYAH IX ACEH TIMUR 1

Sofyan Hasan
Direktur Utama

KONSULTAN
PT. TACITA PR

Ir. Erry S
Site Eng

KEPALA BIDANG PEMB


DINAS BINA M

PEMERINTA

DIN

SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
SUMBER DANA
PENYEDIA BARANG/JASA
0

:
:
:
:
:
:
:
:

Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 2.954.986.136,50
APBD
PT. WIJAYA KARYA SEMESTA
0

DIV.

URAIAN PEKERJAAN

NILAI KONTR
ADD. I
(K. INDUK)
3

1
2
3
4
5
6
7

UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR

3,630,220.00
13,676,000.00
-

A
B
C
D

JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )

17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00

POTONGAN
E
F
G
H
I

SERTIFIKAT S/D BULAN LALU (KUMULATIF)


5 % JAMINAN PEMELIHARAAN ( 5 % x D )
20 % PENGEMBALIAN UANG MUKA ( 20 % x D)
JUMLAH POTONGAN PADA SERTIFIKAT BULAN INI ( E + F + G )
JUMLAH BERSIH YANG DIBAYAR PADA SERTIFIKAT BULAN INI ( D - H ) TERMASUK PPn

DIBULATKAN

TERBILANG :
DIAJUKAN OLEH

Seratus sebelas juta lima ratus tiga puluh

DIPERIKS

PENYEDIA JASA
PEMB. JALAN DAN JEMBATAN WILAYAH IX ACEH TIMUR 1

Sofyan Hasan
Direktur Utama

KONSULTAN
PT. TACITA PR

Ir. Erry S
Site Eng

KEPALA BIDANG PEMB


DINAS BINA M

PEMERINTA

DIN

SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
SUMBER DANA
PENYEDIA BARANG/JASA
0

:
:
:
:
:
:
:
:

Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 2.954.986.136,50
APBD
PT. WIJAYA KARYA SEMESTA
0

DIV.

URAIAN PEKERJAAN

NILAI KONTR
ADD. I
(K. INDUK)
3

1
2
3
4
5
6
7

UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR

3,630,220.00
13,676,000.00
-

A
B
C
D

JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )

17,306,219.92
1,730,621.99
19,036,841.91
19,036,000.00

POTONGAN
E
F
G
H
I

SERTIFIKAT S/D BULAN LALU (KUMULATIF)


5 % JAMINAN PEMELIHARAAN ( 5 % x D )
20 % PENGEMBALIAN UANG MUKA ( 20 % x D)
JUMLAH POTONGAN PADA SERTIFIKAT BULAN INI ( E + F + G )
JUMLAH BERSIH YANG DIBAYAR PADA SERTIFIKAT BULAN INI ( D - H ) TERMASUK PPn

DIBULATKAN

TERBILANG :
DIAJUKAN OLEH

Dua milyar dua ratus dua puluh satu juta

DIPERIKS

PENYEDIA JASA
PEMB. JALAN DAN JEMBATAN WILAYAH IX ACEH TIMUR 1

Sofyan Hasan
Direktur Utama

KONSULTAN
PT. TACITA PR

Ir. Erry S
Site Eng

KEPALA BIDANG PEMB


DINAS BINA M

ERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA


Err:509

SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN

KONTRAK
ADD. I
(K. INDUK)
4

S/D
BLN LALU

BLN
INI

:
:
:
:

JUMLAH PEMBAYARAN
S/D
BLN INI
7

BOBOT
S/D BLN INI
%
8

3,630,220.00
13,676,000.00
-

3,630,220.00
13,676,000.00
-

0.12
0.46
-

17,306,220.00
1,730,622.00
19,036,842.00
19,036,800.00

17,306,220.00
1,730,622.00
19,036,842.00
19,036,800.00

0.58

951,840.00
3,807,360.00
4,759,200.00
14,277,600.00

14,277,600.00

uluh tujuh ribu enam ratus rupiah.


DIPERIKSA OLEH

DIAJUKAN OLEH :

KONSULTAN SUPERVISI
MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

IR. DJAFAR SIDIK


Site Engineer

MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD

Ir.Fajri, MT
NIP. 110 047 860

PENYEDIA BARANG / JASA


PT. JIA JAYA UTAMA

MUNAWIR IBRAHIM
DIREKTUR UTAMA

ERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN

KONTRAK
ADD. I
(K. INDUK)
4

S/D
BLN LALU

BLN
INI

:
:
:
:

JUMLAH PEMBAYARAN
S/D
BLN INI
7

BOBOT
S/D BLN INI
%
8

3,630,220.00
13,676,000.00
-

24,421,480.00
139,130,150.00
-

28,051,700.00
152,806,150.00
-

0.95
5.15
-

17,306,220.00
1,730,622.00
19,036,842.00
19,036,800.00

163,551,630.00
16,355,163.00
179,906,793.00
179,906,700.00

180,857,850.00
18,085,785.00
198,943,635.00
198,943,600.00

6.09

14,277,600.00
9,947,180.00
39,788,720.00
64,013,500.00
134,930,100.00

134,930,100.00

ilan ratus tiga puluh ribu seratus rupiah.


DIPERIKSA OLEH

DIAJUKAN OLEH :

KONSULTAN SUPERVISI
MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

IR. DJAFAR SIDIK


SITE ENGINEER

MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD

Ir.Fajri, MT
NIP. 110 047 860

PENYEDIA BARANG / JASA


PT. JIA JAYA UTAMA

MUNAWIR IBRAHIM
DIREKTUR

ERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN

KONTRAK
ADD. II
(K. INDUK)
4

S/D
BLN LALU

BLN
INI

JUMLAH PEMBAYARAN
S/D
BLN INI
7

:
:
:
:

BOBOT
S/D BLN INI
%
8

28,051,700.00
152,806,150.00
-

79,178,065.12
704,314,185.45
2,306,847,479.42
196,709,620.24
-

28,051,700.00
79,178,065.12
857,120,335.45
2,306,847,479.42
196,709,620.24
-

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

180,857,850.00
18,085,785.00
198,943,635.00
198,943,600.00

3,287,049,350.23
328,704,935.02
3,615,754,285.25
3,615,754,200.00

3,467,907,200.23
346,790,720.02
3,814,697,920.25
3,814,697,900.00

#DIV/0!

149,207,700.00
190,734,895.00
339,942,595.00
3,474,755,305.00

3,474,755,305.00

h empat juta tujuh ratus lima puluh lima ribu tiga ratus lima rupiah.

IPERIKSA OLEH

MENGETAHUI OLEH

SULTAN PENGAWAS
CITA PRIMA UTAMA

Ir. Erry Saputra


Site Engineer

MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD

Ir.Fajri, MT
NIP. 110 047 860

PEJABAT PELAKSANA TEKNIS KEGIATAN


PEMB. JALAN DAN JEMBATAN WILAYAH II ACEH B

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

ERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN

KONTRAK
ADD. II
(K. INDUK)
4

S/D
BLN LALU

BLN
INI

JUMLAH PEMBAYARAN
S/D
BLN INI
7

:
:
:
:

BOBOT
S/D BLN INI
%
8

28,051,700.00
79,178,065.12
857,120,335.45
2,306,847,479.42
196,709,620.24
-

3,249,453,354.27
100,214,350.23
-

28,051,700.00
79,178,065.12
857,120,335.45
5,556,300,833.69
296,923,970.47
-

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

3,467,907,200.23
346,790,720.02
3,814,697,920.25
3,814,697,900.00

3,349,667,704.50
334,966,770.45
3,684,634,474.95
3,684,634,400.00

6,817,574,904.73
681,757,490.47
7,499,332,395.20
7,499,332,300.00

#DIV/0!

3,623,963,005.00
374,966,615.00
3,998,929,620.00
3,500,402,680.00

3,500,402,680.00

atus dua ribu enam ratus delapan puluh rupiah.

IPERIKSA OLEH

MENGETAHUI OLEH

SULTAN PENGAWAS
CITA PRIMA UTAMA

Ir. Erry Saputra


Site Engineer

MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD

Ir.Fajri, MT
NIP. 110 047 860

PEJABAT PELAKSANA TEKNIS KEGIATAN


PEMB. JALAN DAN JEMBATAN WILAYAH II ACEH B

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

ERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN

KONTRAK
ADD. II
(K. INDUK)
4

S/D
BLN LALU

BLN
INI

JUMLAH PEMBAYARAN
S/D
BLN INI
7

:
:
:
:

BOBOT
S/D BLN INI
%
8

28,051,700.00
79,178,065.12
857,120,335.45
5,556,300,833.69
296,923,970.47
-

106,730,250.00
-

28,051,700.00
79,178,065.12
857,120,335.45
5,556,300,833.69
106,730,250.00
296,923,970.47
-

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

6,817,574,904.73
681,757,490.47
7,499,332,395.20
7,499,332,300.00

106,730,250.00
10,673,025.00
117,403,275.00
117,403,200.00

6,924,305,154.73
692,430,515.47
7,616,735,670.20
7,616,735,600.00

#DIV/0!

7,124,365,685.00
380,836,780.00
7,505,202,465.00
111,533,135.00

111,533,135.00

puluh tiga ribu seratus tiga puluh lima rupiah.

IPERIKSA OLEH

MENGETAHUI OLEH

SULTAN PENGAWAS
CITA PRIMA UTAMA

Ir. Erry Saputra


Site Engineer

MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD

Ir.Fajri, MT
NIP. 110 047 860

PEJABAT PELAKSANA TEKNIS KEGIATAN


PEMB. JALAN DAN JEMBATAN WILAYAH II ACEH B

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

ERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN

KONTRAK
ADD. II
(K. INDUK)
4

S/D
BLN LALU

BLN
INI

JUMLAH PEMBAYARAN
S/D
BLN INI
7

:
:
:
:

BOBOT
S/D BLN INI
%
8

28,051,700.00
79,178,065.12
857,120,335.45
5,556,300,833.69
106,730,250.00
296,923,970.47
-

2,126,121,246.88
-

28,051,700.00
79,178,065.12
857,120,335.45
5,556,300,833.69
2,232,851,496.88
296,923,970.47
-

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

6,924,305,154.73
692,430,515.47
7,616,735,670.20
7,616,735,600.00

2,126,121,246.88
212,612,124.69
2,338,733,371.57
2,338,733,300.00

9,050,426,401.61
905,042,640.17
9,955,469,041.78
9,955,469,000.00

#DIV/0!

7,235,898,820.00
497,773,450.00
7,733,672,270.00
2,221,796,730.00

2,221,796,730.00

tu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh rupiah.

IPERIKSA OLEH

MENGETAHUI OLEH

SULTAN PENGAWAS
CITA PRIMA UTAMA

Ir. Erry Saputra


Site Engineer

MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD

Ir.Fajri, MT
NIP. 110 047 860

PEJABAT PELAKSANA TEKNIS KEGIATAN


PEMB. JALAN DAN JEMBATAN WILAYAH II ACEH B

Ir. M. Hilal, MT
NIP. 110 053 961

`01
SEPTEMBER
25 / SEPTEMBER / 2008
1 dari 8

JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
11.00
0.00
5.61
0.00
0.00
0.00
0.00
S/D BULAN INI

0.58
BULAN LALU

0
BULAN INI

0.58

DIAJUKAN OLEH :

PENYEDIA BARANG / JASA


PT. JIA JAYA UTAMA

MUNAWIR IBRAHIM
DIREKTUR UTAMA

`02
OKTOBER
25 / OKTOBER / 2008
1 dari 8

JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
74.00
0.00
57.07
0.00
0.00
0.00
0.00
S/D BULAN INI

6.09
BULAN LALU

0.58
BULAN INI

5.51

DIAJUKAN OLEH :

PENYEDIA BARANG / JASA


PT. JIA JAYA UTAMA

MUNAWIR IBRAHIM
DIREKTUR

08
MARET
25 / MARET / 2008
1 dari 8

JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
S/D BULAN INI

#DIV/0!
BULAN LALU

6.09
BULAN INI

#DIV/0!
ratus lima rupiah.
MENGETAHUI OLEH

PEJABAT PELAKSANA TEKNIS KEGIATAN


B. JALAN DAN JEMBATAN WILAYAH II ACEH BESAR - 1

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

09
APRIL
25 / APRIL / 2008
1 dari 8

JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
#REF!
#REF!
#REF!
100.00
0.00
#REF!
#REF!
S/D BULAN INI

#DIV/0!
BULAN LALU

#DIV/0!
BULAN INI

#DIV/0!

MENGETAHUI OLEH

PEJABAT PELAKSANA TEKNIS KEGIATAN


B. JALAN DAN JEMBATAN WILAYAH II ACEH BESAR - 1

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

10
MEI
25 / MEI / 2008
1 dari 8

JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
8
#REF!
#REF!
#REF!
100.00
3.68
#REF!
#REF!
S/D BULAN INI

#DIV/0!
BULAN LALU

#DIV/0!
BULAN INI

#DIV/0!

MENGETAHUI OLEH

PEJABAT PELAKSANA TEKNIS KEGIATAN


B. JALAN DAN JEMBATAN WILAYAH II ACEH BESAR - 1

Ir. Zusnan Asraf Wahab, MT


NIP. 110 053 617

11
JUNI
25 / JUNI / 2008
1 dari 8

JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
#REF!
#REF!
#REF!
100.00
76.98
#REF!
#REF!
S/D BULAN INI

#DIV/0!
BULAN LALU

#DIV/0!
BULAN INI

#DIV/0!

h ratus tiga puluh rupiah.


MENGETAHUI OLEH

PEJABAT PELAKSANA TEKNIS KEGIATAN


B. JALAN DAN JEMBATAN WILAYAH II ACEH BESAR - 1

Ir. M. Hilal, MT
NIP. 110 053 961

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
: Err:509
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 1 UMUM

MATA
PEMBA YARAN
1
1.2

U RAIAN

SATUAN

Mobilisasi

LS

DISETUJUI OLEH :
KORDINATOR LAPANGAN
WILAYAH II ACEH BESAR - 1

KUANTITAS
ADD. I
(K. INDUK)
4
1.00

T. RAHMATSYAH PUTRA, ST
NIP. 110 057 238

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 2 DRAINASE

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

2.1

Galian untuk selokan dan selokan air

m3

13,497.00

2.2

Pasangan Batu dengan Mortar

m3

4,090.00

Gorong 2 Baja Gelombang

m1

2,3(6)

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

T. RAHMATSYAH PUTRA, ST
NIP. 110 057 238

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 3 PEKERJAAN TANAH

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

3.1 (1)

Galian Biasa

m3

47,728.00

3.2 (1)

Timbunan Biasa

m3

93,843.30

3.2 (2)

Timbunan Pilihan

m3

19,228.00

3.3

Penyiapan Badan Jalan

m2

77,710.00

3.4

Pembersihan, Penggarukan dan Pembongkaran

m2

48,070.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN

WILAYAH II ACEH BESAR - 1

T. RAHMATSYAH PUTRA, ST
NIP. 110 057 238

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 5 PERKERASAN BERBUTIR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

5.1 (1)

Lapisan Pondasi Agregat Kelas A

m3

5,214.75

5.2 (2)

Lapisan Pondasi Agregat Kelas B

m3

8,998.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

T. RAHMATSYAH PUTRA, ST
NIP. 110 057 238

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 6 PERKERASAN ASPAL

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

6.1 (1)

Lapis Resap Pengikat

Ltr

26,073.75

6.1 (2)

Lapis Perekat

Ltr

10,736.25

6.3 (5)

Laston-Lapis Aus aspal Beton (AC-WC)

m2

30,675.00

6.3 (6)
6.3 (6)a

Laston-Lapis Pengikat Aspal Beton (AC-BC)


Laston-Lapis Pengikat Aspal Beton (AC-BC)
Leveling

m3
Ton

1,533.75
-

DISETUJUI OLEH :

KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

T. RAHMATSYAH PUTRA, ST
NIP. 110 057 238

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 7 STRUKTUR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

7.1 (5)

Beton K - 250

m3

135.00

7.1 (6)

Beton K - 175

m3

250.00

7.1 (18)

Beton K - 125

m3

16.50

7,2(18)

Pengadaan dan Pemasangan Geotintetik Komposit

m2

18,050.00

7,3(1)

Baja Tulangan U - 24 Polos

kg

14,850.00

Pasangan Batu

m3

161.00

Pembongkaran Bangunan Gedung

m2

Pemasangan Geotextile untuk Perkuatan Tanah

m2

7.9
7.15(4)
7,16(1)

10,830.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

T. RAHMATSYAH PUTRA, ST
NIP. 110 057 238

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
Err:509
PENYEDIA JASA

:
:
:
:
:
:
:
:

PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


0
602.2/4157/DBM
###
Rp. 29.904.711.000,15 JANUARI 2008
PT. WIJAYA KARYA SEMESTA

DEVISI 8 PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

8.2(2)

Penebangan Pohon Diameter 15 s/d 30 cm

Batang

252.00

8.2(3)

Penebangan Pohon Diameter 30 s/d 50 cm

Batang

102.00

8.2(4)

Penebangan Pohon Diameter 50 s/d 75 cm

Batang

44.00

8.2(5)

Penebangan Pohon Diameter > 75 cm

Batang

25.00

8.3(1)

Stabilisasi dengan Tanaman

8.3(3)

Penanaman Pohon

8.4(2)

m2

13,849.87

Batang

361.00

Marka Jalan Thermoplastic

m2

920.25

8.4(10)

Kerb Pracetak

m1

4,090.00

8.4(11)

Kerb Pracetak L

m1

4,090.00

8.4(19)

Lampu Penerangan, Lampu Lengan Tunggal

Tiang

59.00

8.4(20)

Lampu Penerangan, Lampu Lengan Ganda

Tiang

30.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

T. RAHMATSYAH PUTRA, ST
NIP. 110 057 238

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA


Err:509
Err:509

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5
1.00

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=5x6

60,815,000.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

60,815,000.00

60,815,000.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=6x8
#REF!

#REF!

#REF!
#REF!

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5
4,458.82
11.70

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

40,216.00

179,315,905.12

420,081.00
29,503,509.27

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

345,191,058.46

524,506,963.58
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

78,101.78

37,019.00

2,891,249,793.82

#REF!

#REF!

121,844.19

55,804.00

6,799,392,980.64

#REF!

#REF!

17,535.15

88,203.00

1,546,652,835.45

#REF!

#REF!

27,195.00

2,898.00

78,811,110.00

0.00

2,368.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

###
DIPERIKSA OLEH :
KONSULTAN PENGAWAS

#REF!
#REF!

PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

6,539.58

344,025.00

2,249,779,009.50

6,539.58

2,249,779,009.50

10,684.57

309,467.00

3,306,521,824.19

10,684.57

3,306,521,824.19

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

5,556,300,833.69
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

5,556,300,833.69
100.00

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

27,243.28

8,371.00

228,053,496.88

100.00

9,020.00

902,000.00

50.00

69,614.00

3,480,700.00

1,597.13
-

1,670,665.00

2,668,275,038.78
-

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

2,900,711,235.66
DIPERIKSA OLEH :

12,750.00

#REF!

106,730,250.00

106,730,250.00
3.68

KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

494.13

1,149,762.00

568,131,897.06

#REF!

#REF!

54.68

938,092.00

51,294,870.56

#REF!

#REF!

56.12

670,696.00

37,639,459.52

#REF!

#REF!

17,769.00

122,651.00

2,179,385,619.00

#REF!

#REF!

74,218.25

12,159.00

902,419,701.75

#REF!

#REF!

#REF!

#REF!

520,843.00

200.00

56,142.30

11,228,460.00

#REF!

#REF!

28,101.75

38,445.00

1,080,371,778.75

#REF!

#REF!

TOTAL HARGA

4,830,471,786.64

TOTAL PEMBAYARAN
PERSENTASE (%)

DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

#REF!
#REF!

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

478.00

254,064.00

121,442,592.00

#REF!

246.00

403,805.00

99,336,030.00

28.00

736,008.00

20,608,224.00

12.00

864,494.00

10,373,928.00

14,858.00

25,120.88

373,246,035.04

3.00

85,175.00

255,525.00

1,802.09

147,293.33

265,435,722.65

3,910.00

128,821.00

503,690,110.00

3,910.00

154,169.00

602,800,790.00

#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

0.00

10,745,161.00

0.00
15,798,259.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

1,997,188,956.69
DIPERIKSA OLEH :

KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

#REF!
#REF!

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 6 x 10

11
JUNI
25 / JUNI / 2008
2 dari 8

60,815,000.00

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13 = 6 x 12

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

#REF!

#REF!
#REF!

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

11
JUNI
25 / JUNI / 2008
3 dari 8

524,506,963.58

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

#REF!

#REF!

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

#REF!

#REF!
#REF!

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

11
JUNI
25 / JUNI / 2008
4 dari 8

11,316,106,719.91

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA

#REF!
#REF!

PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

11
JUNI
25 / JUNI / 2008
5 dari 8

5,556,300,833.69

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

6,539.58

2,249,779,009.50

10,684.57

3,306,521,824.19

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

5,556,300,833.69
100.00%

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
14,493.28

1,200.00

:
:
:
:

11
JUNI
25 / JUNI / 2008
6 dari 8

2,900,711,235.66

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

121,323,246.88

27,243.28

228,053,496.88

2,004,798,000.00
-

1,200.00
-

2,126,121,246.88
73.30
DIBUAT OLEH :

2,004,798,000.00
-

2,232,851,496.88
76.98

PENYEDIA BARANG / JASA


PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

11
JUNI
25 / JUNI / 2008
7 dari 8

4,830,471,786.64

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

#REF!
#REF!

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

11
JUNI
25 / JUNI / 2008
8 dari 8

1,997,188,956.69

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

#REF!
#REF!

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
: Err:509
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 1 UMUM

MATA
PEMBA YARAN
1
1.2

U RAIAN

SATUAN

Mobilisasi

LS

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

KUANTITAS
ADD. I
(K. INDUK)
4
1.00

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 2 DRAINASE

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

2.1

Galian untuk selokan dan selokan air

m3

13,497.00

2.2

Pasangan Batu dengan Mortar

m3

4,090.00

Gorong 2 Baja Gelombang

m1

2,3(6)

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 3 PEKERJAAN TANAH

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

3.1 (1)

Galian Biasa

m3

47,728.00

3.2 (1)

Timbunan Biasa

m3

93,843.30

3.2 (2)

Timbunan Pilihan

m3

19,228.00

3.3

Penyiapan Badan Jalan

m2

77,710.00

3.4

Pembersihan, Penggarukan dan Pembongkaran

m2

48,070.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN

WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 5 PERKERASAN BERBUTIR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

5.1 (1)

Lapisan Pondasi Agregat Kelas A

m3

5,214.75

5.2 (2)

Lapisan Pondasi Agregat Kelas B

m3

8,998.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 6 PERKERASAN ASPAL

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

6.1 (1)

Lapis Resap Pengikat

Ltr

26,073.75

6.1 (2)

Lapis Perekat

Ltr

10,736.25

6.3 (5)

Laston-Lapis Aus aspal Beton (AC-WC)

m2

30,675.00

6.3 (6)
6.3 (6)a

Laston-Lapis Pengikat Aspal Beton (AC-BC)


Laston-Lapis Pengikat Aspal Beton (AC-BC)
Leveling

m3
Ton

1,533.75
-

DISETUJUI OLEH :

KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 7 STRUKTUR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

7.1 (5)

Beton K - 250

m3

135.00

7.1 (6)

Beton K - 175

m3

250.00

7.1 (18)

Beton K - 125

m3

16.50

7,2(18)

Pengadaan dan Pemasangan Geotintetik Komposit

m2

18,050.00

7,3(1)

Baja Tulangan U - 24 Polos

kg

14,850.00

Pasangan Batu

m3

161.00

Pembongkaran Bangunan Gedung

m2

Pemasangan Geotextile untuk Perkuatan Tanah

m2

7.9
7.15(4)
7,16(1)

10,830.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
Err:509
PENYEDIA JASA

:
:
:
:
:
:
:
:

PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


0
602.2/4157/DBM
###
Rp. 29.904.711.000,15 JANUARI 2008
PT. WIJAYA KARYA SEMESTA

DEVISI 8 PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

8.2(2)

Penebangan Pohon Diameter 15 s/d 30 cm

Batang

252.00

8.2(3)

Penebangan Pohon Diameter 30 s/d 50 cm

Batang

102.00

8.2(4)

Penebangan Pohon Diameter 50 s/d 75 cm

Batang

44.00

8.2(5)

Penebangan Pohon Diameter > 75 cm

Batang

25.00

8.3(1)

Stabilisasi dengan Tanaman

8.3(3)

Penanaman Pohon

8.4(2)

m2

13,849.87

Batang

361.00

Marka Jalan Thermoplastic

m2

920.25

8.4(10)

Kerb Pracetak

m1

4,090.00

8.4(11)

Kerb Pracetak L

m1

4,090.00

8.4(19)

Lampu Penerangan, Lampu Lengan Tunggal

Tiang

59.00

8.4(20)

Lampu Penerangan, Lampu Lengan Ganda

Tiang

30.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA


Err:509
Err:509

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5
1.00

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=5x6

60,815,000.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

60,815,000.00

60,815,000.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=6x8
#REF!

#REF!

#REF!
#REF!

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5
4,458.82
11.70

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

40,216.00

179,315,905.12

420,081.00
29,503,509.27

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

345,191,058.46

524,506,963.58
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

78,101.78

37,019.00

2,891,249,793.82

#REF!

#REF!

121,844.19

55,804.00

6,799,392,980.64

#REF!

#REF!

17,535.15

88,203.00

1,546,652,835.45

#REF!

#REF!

27,195.00

2,898.00

78,811,110.00

0.00

2,368.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

###
DIPERIKSA OLEH :
KONSULTAN PENGAWAS

#REF!
#REF!

PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

6,539.58

344,025.00

2,249,779,009.50

6,539.58

2,249,779,009.50

10,684.57

309,467.00

3,306,521,824.19

10,684.57

3,306,521,824.19

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

5,556,300,833.69
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

5,556,300,833.69
100.00

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

27,243.28

8,371.00

228,053,496.88

100.00

9,020.00

902,000.00

50.00

69,614.00

3,480,700.00

1,597.13
-

1,670,665.00

2,668,275,038.78
-

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

2,900,711,235.66
DIPERIKSA OLEH :

#REF!

KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

494.13

1,149,762.00

568,131,897.06

#REF!

#REF!

54.68

938,092.00

51,294,870.56

#REF!

#REF!

56.12

670,696.00

37,639,459.52

#REF!

#REF!

17,769.00

122,651.00

2,179,385,619.00

#REF!

#REF!

74,218.25

12,159.00

902,419,701.75

#REF!

#REF!

#REF!

#REF!

520,843.00

200.00

56,142.30

11,228,460.00

#REF!

#REF!

28,101.75

38,445.00

1,080,371,778.75

#REF!

#REF!

TOTAL HARGA

4,830,471,786.64

TOTAL PEMBAYARAN
PERSENTASE (%)

DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

#REF!
#REF!

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

478.00

254,064.00

121,442,592.00

#REF!

246.00

403,805.00

99,336,030.00

28.00

736,008.00

20,608,224.00

12.00

864,494.00

10,373,928.00

14,858.00

25,120.88

373,246,035.04

3.00

85,175.00

255,525.00

1,802.09

147,293.33

265,435,722.65

3,910.00

128,821.00

503,690,110.00

3,910.00

154,169.00

602,800,790.00

#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

0.00

10,745,161.00

0.00
15,798,259.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

1,997,188,956.69
DIPERIKSA OLEH :

KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

#REF!
#REF!

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 6 x 10

10
MEI
25 / MEI / 2008
2 dari 8

60,815,000.00

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13 = 6 x 12

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

#REF!

#REF!
#REF!

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

10
MEI
25 / MEI / 2008
3 dari 8

524,506,963.58

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

#REF!

#REF!

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

#REF!

#REF!
#REF!

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

10
MEI
25 / MEI / 2008
4 dari 8

11,316,106,719.91

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA

#REF!
#REF!

PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

10
MEI
25 / MEI / 2008
5 dari 8

5,556,300,833.69

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

6,539.58

2,249,779,009.50

10,684.57

3,306,521,824.19

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

5,556,300,833.69
100.00%

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

10
MEI
25 / MEI / 2008
6 dari 8

2,900,711,235.66

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

12,750.00

106,730,250.00

12,750.00

106,730,250.00
3.68
DIBUAT OLEH :

106,730,250.00

106,730,250.00
3.68

PENYEDIA BARANG / JASA


PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

10
MEI
25 / MEI / 2008
7 dari 8

4,830,471,786.64

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

#REF!
#REF!

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

10
MEI
25 / MEI / 2008
8 dari 8

1,997,188,956.69

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

#REF!
#REF!

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
: Err:509
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 1 UMUM

MATA
PEMBA YARAN
1
1.2

U RAIAN

SATUAN

Mobilisasi

LS

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

KUANTITAS
ADD. I
(K. INDUK)
4
1.00

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 2 DRAINASE

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

2.1

Galian untuk selokan dan selokan air

m3

13,497.00

2.2

Pasangan Batu dengan Mortar

m3

4,090.00

Gorong 2 Baja Gelombang

m1

2,3(6)

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 3 PEKERJAAN TANAH

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

3.1 (1)

Galian Biasa

m3

47,728.00

3.2 (1)

Timbunan Biasa

m3

93,843.30

3.2 (2)

Timbunan Pilihan

m3

19,228.00

3.3

Penyiapan Badan Jalan

m2

77,710.00

3.4

Pembersihan, Penggarukan dan Pembongkaran

m2

48,070.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN

WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 5 PERKERASAN BERBUTIR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

5.1 (1)

Lapisan Pondasi Agregat Kelas A

m3

5,214.75

5.2 (2)

Lapisan Pondasi Agregat Kelas B

m3

8,998.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 6 PERKERASAN ASPAL

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

6.1 (1)

Lapis Resap Pengikat

Ltr

26,073.75

6.1 (2)

Lapis Perekat

Ltr

10,736.25

6.3 (5)

Laston-Lapis Aus aspal Beton (AC-WC)

m2

30,675.00

6.3 (6)
6.3 (6)a

Laston-Lapis Pengikat Aspal Beton (AC-BC)


Laston-Lapis Pengikat Aspal Beton (AC-BC)
Leveling

m3
Ton

1,533.75
-

DISETUJUI OLEH :

KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 7 STRUKTUR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

7.1 (5)

Beton K - 250

m3

135.00

7.1 (6)

Beton K - 175

m3

250.00

7.1 (18)

Beton K - 125

m3

16.50

7,2(18)

Pengadaan dan Pemasangan Geotintetik Komposit

m2

18,050.00

7,3(1)

Baja Tulangan U - 24 Polos

kg

14,850.00

Pasangan Batu

m3

161.00

Pembongkaran Bangunan Gedung

m2

Pemasangan Geotextile untuk Perkuatan Tanah

m2

7.9
7.15(4)
7,16(1)

10,830.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
Err:509
PENYEDIA JASA

:
:
:
:
:
:
:
:

PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


0
602.2/4157/DBM
###
Rp. 29.904.711.000,15 JANUARI 2008
PT. WIJAYA KARYA SEMESTA

DEVISI 8 PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

8.2(2)

Penebangan Pohon Diameter 15 s/d 30 cm

Batang

252.00

8.2(3)

Penebangan Pohon Diameter 30 s/d 50 cm

Batang

102.00

8.2(4)

Penebangan Pohon Diameter 50 s/d 75 cm

Batang

44.00

8.2(5)

Penebangan Pohon Diameter > 75 cm

Batang

25.00

8.3(1)

Stabilisasi dengan Tanaman

8.3(3)

Penanaman Pohon

8.4(2)

m2

13,849.87

Batang

361.00

Marka Jalan Thermoplastic

m2

920.25

8.4(10)

Kerb Pracetak

m1

4,090.00

8.4(11)

Kerb Pracetak L

m1

4,090.00

8.4(19)

Lampu Penerangan, Lampu Lengan Tunggal

Tiang

59.00

8.4(20)

Lampu Penerangan, Lampu Lengan Ganda

Tiang

30.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA


Err:509
Err:509

SERTIFIKAT BULANAN

ILING)

ANTITAS
ADD. II
(K. INDUK)
5
1.00

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=5x6

60,815,000.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

60,815,000.00

60,815,000.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=6x8
#REF!

#REF!

#REF!
#REF!

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ILING)

ANTITAS
ADD. II
(K. INDUK)
5
4,458.82
11.70

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

40,216.00

179,315,905.12

420,081.00
29,503,509.27

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

345,191,058.46

524,506,963.58
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

78,101.78

37,019.00

2,891,249,793.82

#REF!

#REF!

121,844.19

55,804.00

6,799,392,980.64

#REF!

#REF!

17,535.15

88,203.00

1,546,652,835.45

#REF!

#REF!

27,195.00

2,898.00

78,811,110.00

0.00

2,368.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

###
DIPERIKSA OLEH :
KONSULTAN PENGAWAS

#REF!
#REF!

PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

6,539.58

344,025.00

2,249,779,009.50

10,684.57

309,467.00

3,306,521,824.19

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

5,556,300,833.69
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6
7,454.26

2,306,847,479.42

2,306,847,479.42
41.52

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

27,243.28

8,371.00

228,053,496.88

100.00

9,020.00

902,000.00

50.00

69,614.00

3,480,700.00

1,597.13
-

1,670,665.00

2,668,275,038.78
-

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

2,900,711,235.66
DIPERIKSA OLEH :

#REF!

KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

494.13

1,149,762.00

568,131,897.06

#REF!

#REF!

54.68

938,092.00

51,294,870.56

#REF!

#REF!

56.12

670,696.00

37,639,459.52

#REF!

#REF!

17,769.00

122,651.00

2,179,385,619.00

#REF!

#REF!

74,218.25

12,159.00

902,419,701.75

#REF!

#REF!

#REF!

#REF!

520,843.00

200.00

56,142.30

11,228,460.00

#REF!

#REF!

28,101.75

38,445.00

1,080,371,778.75

#REF!

#REF!

TOTAL HARGA

4,830,471,786.64

TOTAL PEMBAYARAN
PERSENTASE (%)

DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

#REF!
#REF!

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

478.00

254,064.00

121,442,592.00

#REF!

246.00

403,805.00

99,336,030.00

28.00

736,008.00

20,608,224.00

12.00

864,494.00

10,373,928.00

14,858.00

25,120.88

373,246,035.04

3.00

85,175.00

255,525.00

1,802.09

147,293.33

265,435,722.65

3,910.00

128,821.00

503,690,110.00

3,910.00

154,169.00

602,800,790.00

#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

0.00

10,745,161.00

0.00
15,798,259.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

1,997,188,956.69
DIPERIKSA OLEH :

KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

#REF!
#REF!

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 6 x 10

09
APRIL
25 / APRIL / 2008
2 dari 8

60,815,000.00

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13 = 6 x 12

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

#REF!

#REF!
#REF!

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

09
APRIL
25 / APRIL / 2008
3 dari 8

524,506,963.58

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

#REF!

#REF!

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

#REF!

#REF!
#REF!

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

09
APRIL
25 / APRIL / 2008
4 dari 8

11,316,106,719.91

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA

#REF!
#REF!

PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

:
:
:
:

Rp

09
APRIL
25 / APRIL / 2008
5 dari 8

5,556,300,833.69

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

6,539.58

2,249,779,009.50

6,539.58

2,249,779,009.50

3,230.31

999,674,344.77

10,684.57

3,306,521,824.19

3,249,453,354.27
58.48
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

5,556,300,833.69
100.00%

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

09
APRIL
25 / APRIL / 2008
6 dari 8

2,900,711,235.66

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

DIBUAT OLEH :

PENYEDIA BARANG / JASA


PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
87.16

0.09

:
:
:
:

09
APRIL
25 / APRIL / 2008
7 dari 8

4,830,471,786.64

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

100,213,255.92

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

1,094.31

100,214,350.23
2.07
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

#REF!
#REF!

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

09
APRIL
25 / APRIL / 2008
8 dari 8

1,997,188,956.69

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

#REF!
#REF!

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
: Err:509
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 1 UMUM

MATA
PEMBA YARAN
1
1.2

U RAIAN

SATUAN

Mobilisasi

LS

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

KUANTITAS
ADD. I
(K. INDUK)
4
1.00

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 2 DRAINASE

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

2.1

Galian untuk selokan dan selokan air

m3

13,497.00

2.2

Pasangan Batu dengan Mortar

m3

4,090.00

Gorong 2 Baja Gelombang

m1

2,3(6)

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 3 PEKERJAAN TANAH

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

3.1 (1)

Galian Biasa

m3

47,728.00

3.2 (1)

Timbunan Biasa

m3

93,843.30

3.2 (2)

Timbunan Pilihan

m3

19,228.00

3.3

Penyiapan Badan Jalan

m2

77,710.00

3.4

Pembersihan, Penggarukan dan Pembongkaran

m2

48,070.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN

WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 5 PERKERASAN BERBUTIR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

5.1 (1)

Lapisan Pondasi Agregat Kelas A

m3

5,214.75

5.2 (2)

Lapisan Pondasi Agregat Kelas B

m3

8,998.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 6 PERKERASAN ASPAL

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

6.1 (1)

Lapis Resap Pengikat

Ltr

26,073.75

6.1 (2)

Lapis Perekat

Ltr

10,736.25

6.3 (5)

Laston-Lapis Aus aspal Beton (AC-WC)

m2

30,675.00

6.3 (6)
6.3 (6)a

Laston-Lapis Pengikat Aspal Beton (AC-BC)


Laston-Lapis Pengikat Aspal Beton (AC-BC)
Leveling

m3
Ton

1,533.75
-

DISETUJUI OLEH :

KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK

: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


:
0
: 602.2/4157/DBM
:
: ###

NILAI ADD. II (K. INDUK)


Err:509
PENYEDIA JASA

: Rp. 29.904.711.000,: 15 JANUARI 2008


: PT. WIJAYA KARYA SEMESTA

DEVISI 7 STRUKTUR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

7.1 (5)

Beton K - 250

m3

135.00

7.1 (6)

Beton K - 175

m3

250.00

7.1 (18)

Beton K - 125

m3

16.50

7,2(18)

Pengadaan dan Pemasangan Geotintetik Komposit

m2

18,050.00

7,3(1)

Baja Tulangan U - 24 Polos

kg

14,850.00

Pasangan Batu

m3

161.00

Pembongkaran Bangunan Gedung

m2

Pemasangan Geotextile untuk Perkuatan Tanah

m2

7.9
7.15(4)
7,16(1)

10,830.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
Err:509
PENYEDIA JASA

:
:
:
:
:
:
:
:

PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)


0
602.2/4157/DBM
###
Rp. 29.904.711.000,15 JANUARI 2008
PT. WIJAYA KARYA SEMESTA

DEVISI 8 PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

8.2(2)

Penebangan Pohon Diameter 15 s/d 30 cm

Batang

252.00

8.2(3)

Penebangan Pohon Diameter 30 s/d 50 cm

Batang

102.00

8.2(4)

Penebangan Pohon Diameter 50 s/d 75 cm

Batang

44.00

8.2(5)

Penebangan Pohon Diameter > 75 cm

Batang

25.00

8.3(1)

Stabilisasi dengan Tanaman

8.3(3)

Penanaman Pohon

8.4(2)

m2

13,849.87

Batang

361.00

Marka Jalan Thermoplastic

m2

920.25

8.4(10)

Kerb Pracetak

m1

4,090.00

8.4(11)

Kerb Pracetak L

m1

4,090.00

8.4(19)

Lampu Penerangan, Lampu Lengan Tunggal

Tiang

59.00

8.4(20)

Lampu Penerangan, Lampu Lengan Ganda

Tiang

30.00

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA


Err:509
Err:509

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5
1.00

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=5x6

60,815,000.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

60,815,000.00

60,815,000.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=6x8
#REF!

#REF!

#REF!
#REF!

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5
4,458.82
11.70

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

40,216.00

179,315,905.12

420,081.00
29,503,509.27

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

345,191,058.46

524,506,963.58
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

78,101.78

37,019.00

2,891,249,793.82

#REF!

#REF!

121,844.19

55,804.00

6,799,392,980.64

#REF!

#REF!

17,535.15

88,203.00

1,546,652,835.45

#REF!

#REF!

27,195.00

2,898.00

78,811,110.00

0.00

2,368.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

###
DIPERIKSA OLEH :
KONSULTAN PENGAWAS

#REF!
#REF!

PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

6,539.58

344,025.00

2,249,779,009.50

#REF!

10,684.57

309,467.00

3,306,521,824.19

#REF!

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

5,556,300,833.69
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

27,243.28

8,371.00

228,053,496.88

#REF!

100.00

9,020.00

902,000.00

#REF!

50.00

69,614.00

3,480,700.00

#REF!

1,597.13
-

1,670,665.00

2,668,275,038.78
-

#REF!

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

2,900,711,235.66
DIPERIKSA OLEH :

KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

494.13

1,149,762.00

568,131,897.06

#REF!

#REF!

54.68

938,092.00

51,294,870.56

#REF!

#REF!

56.12

670,696.00

37,639,459.52

#REF!

#REF!

17,769.00

122,651.00

2,179,385,619.00

#REF!

#REF!

74,218.25

12,159.00

902,419,701.75

#REF!

#REF!

#REF!

#REF!

520,843.00

200.00

56,142.30

11,228,460.00

#REF!

#REF!

28,101.75

38,445.00

1,080,371,778.75

#REF!

#REF!

TOTAL HARGA

4,830,471,786.64

TOTAL PEMBAYARAN
PERSENTASE (%)

DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

#REF!
#REF!

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

AILING)

ANTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

478.00

254,064.00

121,442,592.00

#REF!

246.00

403,805.00

99,336,030.00

28.00

736,008.00

20,608,224.00

12.00

864,494.00

10,373,928.00

14,858.00

25,120.88

373,246,035.04

3.00

85,175.00

255,525.00

1,802.09

147,293.33

265,435,722.65

3,910.00

128,821.00

503,690,110.00

3,910.00

154,169.00

602,800,790.00

#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

0.00

10,745,161.00

0.00
15,798,259.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

1,997,188,956.69
DIPERIKSA OLEH :

KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

M A R W A N, BE
CHIEF INSPECTOR

#REF!
#REF!

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 6 x 10

08
MARET
25 / MARET / 2008
2 dari 8

60,815,000.00

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13 = 6 x 12

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

#REF!

#REF!
#REF!

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
1,968.82

:
:
:
:

08
MARET
25 / MARET / 2008
3 dari 8

524,506,963.58

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

79,178,065.12

#REF!

#REF!

#REF!

79,178,065.12
15.10
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

#REF!

#REF!
#REF!

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

08
MARET
25 / MARET / 2008
4 dari 8

11,316,106,719.91

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

7,985.15

704,314,185.45
-

704,314,185.45
6.22
DIBUAT OLEH :
PENYEDIA BARANG / JASA

#REF!
#REF!

PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

08
MARET
25 / MARET / 2008
5 dari 8

5,556,300,833.69

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

7,454.26

2,306,847,479.42

#REF!

2,306,847,479.42
41.52
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

#REF!

#REF!
#REF!

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

08
MARET
25 / MARET / 2008
6 dari 8

2,900,711,235.66

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

DIBUAT OLEH :

PENYEDIA BARANG / JASA


PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
32.06
8.89
12,656.12

:
:
:
:

08
MARET
25 / MARET / 2008
7 dari 8

4,830,471,786.64

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

36,861,369.72

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

5,962,487.44
153,885,763.08

196,709,620.24
4.07
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

#REF!
#REF!

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

08
MARET
25 / MARET / 2008
8 dari 8

1,997,188,956.69

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP

HASAN BASRI, ST.MM


General Superintendent

#REF!
#REF!

PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK

:
:
:
:
:

Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50

SUMBER DANA
PENYEDIA BARANG/JASA

: APBD
: PT. WIJAYA KARYA SEMESTA

DEVISI 1 UMUM

MATA
PEMBA YARAN
1
1.2

U RAIAN

SATUAN

Mobilisasi

LS

DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD

KUANTITAS
KONTRAK
AWAL
4
1.00

ZAINUDDIN, ST
NIP. 390 036 146

PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK

:
:
:
:
:

###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50

SUMBER DANA
PENYEDIA BARANG/JASA

: APBD
: PT. WIJAYA KARYA SEMESTA

DEVISI 2 DRAINASE

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
KONTRAK
AWAL
4

2.1

Galian untuk selokan Drainase dan Saluran Air

m3

150.00

2.2

Pasangan Batu dengan Mortar

m3

200.00

DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD

ZAINUDDIN, ST
NIP. 390 036 146

PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK

:
:
:
:
:

###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50

SUMBER DANA
PENYEDIA BARANG/JASA

: APBD
: PT. WIJAYA KARYA SEMESTA

DEVISI 3 PEKERJAAN TANAH

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
KONTRAK
AWAL
4

3.1 (1)

Galian Biasa

m3

14.00

3.1 (3)

Galian Struktur dengan Kedalaman 0 - 2 meter

m3

96.00

3.1 (4)

Galian Struktur dengan Kedalaman 2 - 4 meter

m3

96.00

3.1 (6)

Cofferdam, Penyokong, Pengaku dan Pekerjaan yang Berkaitan

LS

1.00

3.2(1)

Timbunan Biasa

m3

200.00

3.2(2)

Timbunan Pilihan

m3

984.00

Penyiapan Badan Jalan

m2

5,200.00

3.3

DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD

ZAINUDDIN, ST
NIP. 390 036 146

PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK

:
:
:
:
:

###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50

SUMBER DANA
PENYEDIA BARANG/JASA

: APBD
: PT. WIJAYA KARYA SEMESTA

DEVISI 4 PELEBARAN DAN PERKERASAN BAHU JALAN

MATA
PEMBA YARAN
1
4.2 (2)

U RAIAN

SATUAN

KUANTITAS
KONTRAK
AWAL
4

m3

325.00

Lapisan Pondasi Agregat Kelas B

DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD

ZAINUDDIN, ST
NIP. 390 036 146

PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK

:
:
:
:
:

###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50

SUMBER DANA
PENYEDIA BARANG/JASA

: APBD
: PT. WIJAYA KARYA SEMESTA

DEVISI 5 PERKERASAN BERBUTIR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
KONTRAK
AWAL
4

5.1 (1)

lapis Pondasi Agregat Kelas A

Ltr

780.00

5.1 (2)

lapis Pondasi Agregat Kelas B

Ltr

1,040.00

6.3 (6)a

Laston-Lapis Pengikat Aspal Beton (AC-BC)


Leveling

Ton

DISETUJUI OLEH :

PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1


DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD

ZAINUDDIN, ST
NIP. 390 036 146

PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK

:
:
:
:
:

###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50

NILAI ADD. II (K. INDUK)


PENYEDIA BARANG/JASA

: APBD
: PT. WIJAYA KARYA SEMESTA

DEVISI 6 PERKERASAN ASPAL

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
KONTRAK
AWAL
4

6.1 (1)

Lapis Resap Pengikat

Ltr

5,200.00

6.3 (6)

Laston - lapis Pengikat Aspal Beton (AC-BC)

m3

260.00

DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD

ZAINUDDIN, ST
NIP. 390 036 146

PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
NILAI ADD. II (K. INDUK)
PENYEDIA BARANG/JASA

:
:
:
:
:
:
:

###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
APBD
PT. WIJAYA KARYA SEMESTA

DEVISI 7 STRUKTUR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

7.1 (5)

Beton K250

M3

178.94

7.1 (6)

Beton K175

M3

2.26

7.1 (7)

Beton Siklop K175

M3

49.86

7.1 (8)

Beton K125

M3

7.20

7.3 (1)

Baja Tulangan U24 Polos

Kg

23,566.00

7.6 (10) b Pengadaan Tiang Pnc. Beton Bertulang Ukuran 40 Cm

M1

200.00

7.6 (12) b Pemancangan Tiang Pancang Beton Bertulang Dia 40cm

M1

200.00

7.7 (1) a

Penyediaan Dinding Sumuran Silinder, Diameter 300cm

M1

8.00

7.7 (2) a

Penurunan Dinding Sumuran Silinder, Diameter 300cm

M1

8.00

7.9
7.10 (3)

Pasangan Batu

M3

168.00

Bronjong

M3

10.00

M1

32.00

7.11 (3)a Expansion Joint Tipe Baja Bersudut


7.12 (2) a Perletakan Elastomeric Bearing
7.13

Sandaran Jembatan Baja

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

Buah
M1

6.00
76.00

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA


Err:509
Err:509

SERTIFIKAT BULANAN

ING)

NTITAS
ADD. I
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=5x6

33,002,000.00

33,002,000.00

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=6x8
0.11

3,630,220.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

33,002,000.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

3,630,220.00
11.00

IR. AMIR RIFAI


CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ING)

NTITAS
ADD. I
(K. INDUK)
5
-

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

38,213.00

5,731,950.00

569,199.00

113,839,800.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

119,571,750.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

IR. AMIR RIFAI


CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ING)

NTITAS
ADD. I
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

34,187.00

478,618.00

35,205.07

3,379,686.72

35,988.05

3,454,852.80

57,998,681.00

57,998,681.00

69,561.00

13,912,200.00

153,360.00

150,906,240.00

2,630.00

13,676,000.00

TOTAL HARGA
TOTAL PEMBAYARAN

243,806,278.52
-

5,200.00

13,676,000.00

13,676,000.00

PERSENTASE (%)

DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

IR. AMIR RIFAI


CHIEF INSPECTOR

5.61

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ING)

NTITAS
ADD. I
(K. INDUK)
5
-

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

407,590.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

132,466,750.00

132,466,750.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6
-

IR. AMIR RIFAI


CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ING)

NTITAS
ADD. I
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

438,820.00

342,279,600.00

416,900.00

433,576,000.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

775,855,600.00
DIPERIKSA OLEH :

KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

IR. AMIR RIFAI


CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ING)

NTITAS
ADD. I
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

9,428.00

49,025,600.00

2,406,464.00

625,680,640.00

TOTAL HARGA

674,706,240.00

TOTAL PEMBAYARAN
PERSENTASE (%)

DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

IR. AMIR RIFAI


CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ING)

NTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

1,114,504.00

199,429,345.76

930,993.00

2,104,044.18

862,490.81

43,003,791.79

802,441.10

5,777,575.92

14,539.00

342,626,074.00

629,209.80

125,841,960.00

207,049.02

41,409,804.00

8,863,481.16

70,907,849.28

2,065,076.54

16,520,612.32

606,688.00

101,923,584.00

659,946.54

6,599,465.40

469,908.51

15,037,072.32

1,241,727.00

7,450,362.00

125,339.00

9,525,764.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

988,157,304.97
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

M A R W A N, BE
CHIEF INSPECTOR

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 6 x 10
0.63

:
:
:
:

Rp

`02
OKTOBER
25 / OKTOBER / 2008
2 dari 8

33,002,000.00

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13 = 6 x 12

20,791,260.00

0.74

20,791,260.00
63.00
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA

24,421,480.00

24,421,480.00
74.00%

SAFRIZAL, ST
General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

:
:
:
:

Rp

`02
OKTOBER
25 / OKTOBER / 2008
3 dari 8

119,571,750.00

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA

0.00%

SAFRIZAL, ST
General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

:
:
:
:

Rp

`02
OKTOBER
25 / OKTOBER / 2008
4 dari 8

243,806,278.52

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

150.00

10,434,150.00

150.00

10,434,150.00

750.00

115,020,000.00

750.00

115,020,000.00

5,200.00

13,676,000.00

125,454,150.00

139,130,150.00

51.46
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA

SAFRIZAL, ST
General Superintendent

57.07%

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
-

:
:
:
:

`02
OKTOBER
25 / OKTOBER / 2008
5 dari 8

132,466,750.00

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA

SAFRIZAL, ST
General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

`02
OKTOBER
25 / OKTOBER / 2008
6 dari 8

775,855,600.00

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

DIBUAT OLEH :

PENYEDIA BARANG / JASA


PT. WIJAYA KARYA SEMESTA

SAFRIZAL, ST
General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

:
:
:
:

Rp

`02
OKTOBER
25 / OKTOBER / 2008
7 dari 8

674,706,240.00

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA

SAFRIZAL, ST
General Superintendent

0.00%

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

:
:
:
:

Rp

`02
OKTOBER
25 / OKTOBER / 2008
8 dari 8

988,157,304.97

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA

SAFRIZAL, ST
General Superintendent

0.00%

PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK

:
:
:
:
:

Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50

SUMBER DANA
PENYEDIA BARANG/JASA

: APBD
: PT. WIJAYA KARYA SEMESTA

DEVISI 1 UMUM

MATA
PEMBA YARAN
1
1.2

U RAIAN

SATUAN

Mobilisasi

LS

DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD

KUANTITAS
KONTRAK
AWAL
4
1.00

ZAINUDDIN, ST
NIP. 390 036 146

PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK

:
:
:
:
:

###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50

SUMBER DANA
PENYEDIA BARANG/JASA

: APBD
: PT. WIJAYA KARYA SEMESTA

DEVISI 2 DRAINASE

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
KONTRAK
AWAL
4

2.1

Galian untuk selokan Drainase dan Saluran Air

m3

150.00

2.2

Pasangan Batu dengan Mortar

m3

200.00

DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD

ZAINUDDIN, ST
NIP. 390 036 146

PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK

:
:
:
:
:

###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50

SUMBER DANA
PENYEDIA BARANG/JASA

: APBD
: PT. WIJAYA KARYA SEMESTA

DEVISI 3 PEKERJAAN TANAH

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
KONTRAK
AWAL
4

3.1 (1)

Galian Biasa

m3

14.00

3.1 (3)

Galian Struktur dengan Kedalaman 0 - 2 meter

m3

96.00

3.1 (4)

Galian Struktur dengan Kedalaman 2 - 4 meter

m3

96.00

3.1 (6)

Cofferdam, Penyokong, Pengaku dan Pekerjaan yang Berkaitan

LS

1.00

3.2(1)

Timbunan Biasa

m3

200.00

3.2(2)

Timbunan Pilihan

m3

984.00

Penyiapan Badan Jalan

m2

5,200.00

3.3

DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD

ZAINUDDIN, ST
NIP. 390 036 146

PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK

:
:
:
:
:

###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50

SUMBER DANA
PENYEDIA BARANG/JASA

: APBD
: PT. WIJAYA KARYA SEMESTA

DEVISI 4 PELEBARAN DAN PERKERASAN BAHU JALAN

MATA
PEMBA YARAN
1
4.2 (2)

U RAIAN

SATUAN

KUANTITAS
KONTRAK
AWAL
4

m3

325.00

Lapisan Pondasi Agregat Kelas B

DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD

ZAINUDDIN, ST
NIP. 390 036 146

PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK

:
:
:
:
:

###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50

SUMBER DANA
PENYEDIA BARANG/JASA

: APBD
: PT. WIJAYA KARYA SEMESTA

DEVISI 5 PERKERASAN BERBUTIR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
KONTRAK
AWAL
4

5.1 (1)

lapis Pondasi Agregat Kelas A

Ltr

780.00

5.1 (2)

lapis Pondasi Agregat Kelas B

Ltr

1,040.00

6.3 (6)a

Laston-Lapis Pengikat Aspal Beton (AC-BC)


Leveling

Ton

DISETUJUI OLEH :

PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1


DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD

ZAINUDDIN, ST
NIP. 390 036 146

PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK

:
:
:
:
:

###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50

NILAI ADD. II (K. INDUK)


PENYEDIA BARANG/JASA

: APBD
: PT. WIJAYA KARYA SEMESTA

DEVISI 6 PERKERASAN ASPAL

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
KONTRAK
AWAL
4

6.1 (1)

Lapis Resap Pengikat

Ltr

5,200.00

6.3 (6)

Laston - lapis Pengikat Aspal Beton (AC-BC)

m3

260.00

DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD

ZAINUDDIN, ST
NIP. 390 036 146

PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
NILAI ADD. II (K. INDUK)
PENYEDIA BARANG/JASA

:
:
:
:
:
:
:

###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
APBD
PT. WIJAYA KARYA SEMESTA

DEVISI 7 STRUKTUR

MATA
PEMBA YARAN
1

U RAIAN

SATUAN

KUANTITAS
ADD. I
(K. INDUK)
4

7.1 (5)

Beton K250

M3

178.94

7.1 (6)

Beton K175

M3

2.26

7.1 (7)

Beton Siklop K175

M3

49.86

7.1 (8)

Beton K125

M3

7.20

7.3 (1)

Baja Tulangan U24 Polos

Kg

23,566.00

7.6 (10) b Pengadaan Tiang Pnc. Beton Bertulang Ukuran 40 Cm

M1

200.00

7.6 (12) b Pemancangan Tiang Pancang Beton Bertulang Dia 40cm

M1

200.00

7.7 (1) a

Penyediaan Dinding Sumuran Silinder, Diameter 300cm

M1

8.00

7.7 (2) a

Penurunan Dinding Sumuran Silinder, Diameter 300cm

M1

8.00

7.9
7.10 (3)

Pasangan Batu

M3

168.00

Bronjong

M3

10.00

M1

32.00

7.11 (3)a Expansion Joint Tipe Baja Bersudut


7.12 (2) a Perletakan Elastomeric Bearing
7.13

Sandaran Jembatan Baja

DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1

BUSTAMI
NIP. 110 046 009

Buah
M1

6.00
76.00

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA


Err:509
Err:509

SERTIFIKAT BULANAN

ING)

NTITAS
ADD. I
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=5x6

33,002,000.00

33,002,000.00

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=6x8
-

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

33,002,000.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

IR. AMIR RIFAI


CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ING)

NTITAS
ADD. I
(K. INDUK)
5
-

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

38,213.00

5,731,950.00

569,199.00

113,839,800.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

119,571,750.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

IR. AMIR RIFAI


CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ING)

NTITAS
ADD. I
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

34,187.00

478,618.00

35,205.07

3,379,686.72

35,988.05

3,454,852.80

57,998,681.00

57,998,681.00

69,561.00

13,912,200.00

153,360.00

150,906,240.00

2,630.00

13,676,000.00

TOTAL HARGA
TOTAL PEMBAYARAN

243,806,278.52
-

PERSENTASE (%)

DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

IR. AMIR RIFAI


CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ING)

NTITAS
ADD. I
(K. INDUK)
5
-

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

407,590.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

132,466,750.00

132,466,750.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6
-

IR. AMIR RIFAI


CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ING)

NTITAS
ADD. I
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

438,820.00

342,279,600.00

416,900.00

433,576,000.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

775,855,600.00
DIPERIKSA OLEH :

KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

IR. AMIR RIFAI


CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ING)

NTITAS
ADD. I
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

9,428.00

49,025,600.00

2,406,464.00

625,680,640.00

TOTAL HARGA

674,706,240.00

TOTAL PEMBAYARAN
PERSENTASE (%)

DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

IR. AMIR RIFAI


CHIEF INSPECTOR

PEMERINTAH PROVINSI SULAWESI SELATAN

DINAS BINA MARGA

SERTIFIKAT BULANAN

ING)

NTITAS
ADD. II
(K. INDUK)
5

HARGA
SATUAN
(Rp)
6

JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6

S/D BULAN LALU


JUMLAH HARGA
KUANTITAS
(Rp)
8
9=8x6

1,114,504.00

199,429,345.76

930,993.00

2,104,044.18

862,490.81

43,003,791.79

802,441.10

5,777,575.92

14,539.00

342,626,074.00

629,209.80

125,841,960.00

207,049.02

41,409,804.00

8,863,481.16

70,907,849.28

2,065,076.54

16,520,612.32

606,688.00

101,923,584.00

659,946.54

6,599,465.40

469,908.51

15,037,072.32

1,241,727.00

7,450,362.00

125,339.00

9,525,764.00

TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)

988,157,304.97
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS

M A R W A N, BE
CHIEF INSPECTOR

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 6 x 10
0.11

:
:
:
:

Rp

`01
SEPTEMBER
25 / SEPTEMBER / 2008
2 dari 8

33,002,000.00

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13 = 6 x 12

3,630,220.00

0.11

3,630,220.00
11.00
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA

3,630,220.00

3,630,220.00
11.00%

SAFRIZAL, ST
General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

:
:
:
:

Rp

`01
SEPTEMBER
25 / SEPTEMBER / 2008
3 dari 8

119,571,750.00

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA

0.00%

SAFRIZAL, ST
General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

:
:
:
:

Rp

`01
SEPTEMBER
25 / SEPTEMBER / 2008
4 dari 8

243,806,278.52

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

5,200.00

13,676,000.00

13,676,000.00

5,200.00

13,676,000.00

13,676,000.00

5.61
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA

SAFRIZAL, ST
General Superintendent

5.61%

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
-

:
:
:
:

`01
SEPTEMBER
25 / SEPTEMBER / 2008
5 dari 8

132,466,750.00

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13
-

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA

SAFRIZAL, ST
General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

:
:
:
:

Rp

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

`01
SEPTEMBER
25 / SEPTEMBER / 2008
6 dari 8

775,855,600.00

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

DIBUAT OLEH :

PENYEDIA BARANG / JASA


PT. WIJAYA KARYA SEMESTA

SAFRIZAL, ST
General Superintendent

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

:
:
:
:

Rp

`01
SEPTEMBER
25 / SEPTEMBER / 2008
7 dari 8

674,706,240.00

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA

SAFRIZAL, ST
General Superintendent

0.00%

SERTIFIKAT
BULAN
TANGGAL
HALAMAN

JUMLAH KONTRAK

BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6

:
:
:
:

Rp

`01
SEPTEMBER
25 / SEPTEMBER / 2008
8 dari 8

988,157,304.97

S/D BULAN INI


JUMLAH HARGA
KUANTITAS
(Rp)
12=8+10
13

DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA

SAFRIZAL, ST
General Superintendent

0.00%

KALAU MAU MENGCOPY HARUS KE BAWAH

*
.
.

************
1
(6,329,686,000.00) ************ Model (1-3):
************ ************ ************ ************

Err:502
************ ******************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh
***
************
ribu juta milyar
***
************ 0-6329686000
***
************ ******************** ************ ************ ************ ************
************
Err:502
1
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502
***
************
***
************
***
************
Err:502
2
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502
***
************
***
************
***
************
Err:502
3
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502
***
************
***
************
***
************
Err:502
4
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***

************
************
************
************
************ 000
************
************
************
************
************
************
************
************

Err:502
Err:502
Err:502

Err:502
Err:502

***
***
***
***
1
***
0
***
sepuluh
***
0
****
0
***
***
***
Err:502 00
0
***
Err:502 ************ ************ ************
Err:502 00
Err:502
************
Err:502 Err:502 *
Err:502
************
Err:502 Err:502 *
Err:502
1
Err:502
2
Err:502
3
Err:502
************ ******************** ************ ************ ************ ************
KALAU MAU MENGCOPY HARUS KE BAWAH

*
.
.

************
1
#REF! ************ Model (1-3):
************ ************ ************ ************

#REF!
************ ******************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh
***
************
ribu juta milyar
***
************
#REF!
***
************ ******************** ************ ************ ************ ************
************
#REF!
1
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***
************
***
************
***

************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
1
2
3

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

2
#REF!
#REF!
#REF!
#REF!
#REF!

***
***
***
***
***
***
***
***
***
3
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
***
4
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
1
***
#REF!
***
#REF!
***
#REF!
****
#REF!
***
#REF!
***
***
#REF!
#REF!
#REF!
***
#REF! ************ ************ ************
#REF!
#REF!
#REF!
#REF! *
#REF!
#REF! *
#REF!

************ ******************** ************ ************ ************ ************


KALAU MAU MENGCOPY HARUS KE BAWAH

*
.
.

************
1
#REF! ************ Model (1-3):
************ ************ ************ ************

#REF!
************ ******************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh
***
************
ribu juta milyar
***
************
#REF!
***
************ ******************** ************ ************ ************ ************
************
#REF!
1
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***
************
***
************
***
************
#REF!
2
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***
************
***
************
***
************
#REF!
3
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***
************
***
************
***
************
#REF!
4
***

************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

***
***
***
***
***
***
***
1
***
#REF!
***
#REF!
***
#REF!
****
#REF!
***
#REF!
***
***
#REF!
#REF!
#REF!
***
#REF! ************ ************ ************
#REF!
#REF!
#REF!
#REF! *
#REF!
#REF! *
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
************
#REF!
************
#REF!
1
#REF!
2
#REF!
3
#REF!
************ ******************** ************ ************ ************ ************
KALAU MAU MENGCOPY HARUS KE BAWAH

*
.
.

************
1
#REF! ************ Model (1-3):
************ ************ ************ ************

#REF!
************ ******************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh
***
************
ribu juta milyar
***
************
#REF!
***
************ ******************** ************ ************ ************ ************
************
#REF!
1
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***

************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
1

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

***
***
2
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
***
3
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
***
4
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
1
***
#REF!
***
#REF!
***
#REF!
****
#REF!
***
#REF!
***
***
#REF!
#REF!
#REF!
***
#REF! ************ ************ ************
#REF!
#REF!
#REF!
#REF! *
#REF!
#REF! *
#REF!

2
#REF!
3
#REF!
************ ******************** ************ ************ ************ ************
KALAU MAU MENGCOPY HARUS KE BAWAH

*
.
.

************
1
#REF! ************ Model (1-3):
************ ************ ************ ************

#REF!
************ ******************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh
***
************
ribu juta milyar
***
************
#REF!
***
************ ******************** ************ ************ ************ ************
************
#REF!
1
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***
************
***
************
***
************
#REF!
2
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***
************
***
************
***
************
#REF!
3
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***
************
***
************
***

************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

4
#REF!
#REF!
#REF!
#REF!
#REF!

***
***
***
***
***
***
***
***
1
***
#REF!
***
#REF!
***
#REF!
****
#REF!
***
#REF!
***
***
#REF!
#REF!
#REF!
***
#REF! ************ ************ ************
#REF!
#REF!
#REF!
#REF! *
#REF!
#REF! *
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
************
#REF!
************
#REF!
1
#REF!
2
#REF!
3
#REF!
************ ******************** ************ ************ ************ ************
KALAU MAU MENGCOPY HARUS KE BAWAH

*
.
.

************
1
#REF! ************ Model (1-3):
************ ************ ************ ************

#REF!
************ ******************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh
***
************
ribu juta milyar
***
************
#REF!
***
************ ******************** ************ ************ ************ ************
************
#REF!
1
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***

************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

***
***
***
2
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
***
3
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
***
4
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
1
***
#REF!
***
#REF!
***
#REF!
****
#REF!
***
#REF!
***
***
#REF!
#REF!
#REF!
***
#REF! ************ ************ ************
#REF!
#REF!
#REF!
#REF! *
#REF!
#REF! *
#REF!

1
#REF!
2
#REF!
3
#REF!
************ ******************** ************ ************ ************ ************

PEMERINTAH PRO
DINA

Jalan Jend. Su

KEGIATAN
PEKERJAAN
NO./PAKET
PENYEDIA BARANG/JASA
KONTRAK NOMOR
KONTRAK TANGGAL
TANGGAL ADDENDUM
TAHUN ANGGARAN

:
:
:
:
:
:
:
:

PENANGANAN JALAN PERKOTAAN NANGGROE ACEH DARU


PEMBANGUNAN JALAN AKSES BANDARA SIM(LANJUTAN) (M
BANG - PROV . 02. 01
PT. ALHAS JAYA GROUP
620/CTR/002/DPW/KT/APBA/2007
27 JULI 2007
15 JANURI 2008
2008

NO. BAB

URAIAN

DIVISI - I

UMUM

DIVISI - II PEKERJAAN DRAINASE

DIVISI - III PEKERJAAN TANAH

DIVISI - IV PELEBARAN DAN PERKERASAN BAHU

DIVISI - V PERKERASAN BERBUTIR

DIVISI - VI PERKERASAN ASPAL

DIVISI - VII STRUKTUR

JUMLAH PHISIK S/D SAAT INI


PAJAK PERTAMBAHAN NILAI (PPN) 10 %
JUMLAH TOTAL ( A )
DI BULATKAN
MATERIAL ON SITE DI LAPANGAN (B)
JUMLAH BRUTO PELAKSANAAN PEKERJAAN S/D BULAN INI ( C ) = ( A ) + (

POTONGAN

1. PEMBAYARAN SERTIFIKAT S/D BULAN LALU


2. PENGEMBALIAN UANG MUKA
3. RETENSI

JUMLAH POTONGAN POTONGAN SERTIFIKAT BULAN INI


JUMLAH NETTO SERTIFIKAT BULAN INI
JUMLAH SERTIFIKAT INI DIBULATKAN MENJADI

Terbilang

: #REF!
PROSENTASE BOBOT YANG DICAPAI :
* PRESTASI S/D BULAN INI
* PRESTASI S/D BULAN LALU
* PRESTASI BULAN INI

=
=
=

#REF!
#REF!
#REF!

DISETUJUI OLEH :
PEJABAT PELAKSANA TEKNIS KEGIATAN
PEMB. JALAN DAN JEMBATAN WILAYAH II ACEH BESAR - I

Ir. M. HILAL, MT
NIP. 110 053 961

KEPALA BI
DI
P

H PROVINSI NANGGROE ACEH DARUSSALAM


DINAS PRASARANA WILAYAH
Jalan Jend. Sudirman No.1 Telp.(0651) 46767, 47009 Fax.47232 Banda Aceh 23239

REKAPITULASI

E ACEH DARUSSALAM
LANJUTAN) (MULTY YEARS)

KONTRAK AWAL
BOBOT
(%)

ADD. I

JUMLAH HARGA
( Rp.)

JUMLAH HARGA
( Rp.)

BOBOT
(%)

20.98

3,630,220.00

#DIV/0!

0.00

#DIV/0!

79.02

13,676,000.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

0.00

#DIV/0!

100.00

17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00

0.00
0.00
0.00
0.00

#DIV/0!

C)= (A)+(B)

(D1)
(D2)
(D3)

MC-05+MC-06+MC-07+MC-08+MC-09+MC-10
= ( 20 % x C )
=( 5%xC)

( E )
( F )
( F )

= ( D1 ) + ( D2 ) + ( D3 )
=(C) - (E)

%
%
%

DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA

P
P

Ir. ERRY SAPUTRA


SITE ENGINEER

MENGETAHUI OLEH :
KEPALA BIDANG PEMBANGUNAN JALAN DAN JEMBATAN
DINAS BINA MARGA DAN CIPTA KARYA
Provinsi Nanggroe Aceh Darussalam

Ir. F A J R I, MT
NIP. 110 047 860

ARUSSALAM

ADDENDUM NO
TANGGAL
SERTIFIKAT NO.
TGL./BLN/THN
LEMBAR

:
:
:
:
:

BOBOT S/D
SEKARANG
(%)

02 (Dua)
15 JANURI 2008
11 (Sebelas)
25 J U N I 2008
1/8

TOTAL BIAYA
S/D SEKARANG
(%)

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

DIBUAT OLEH :
PENYEDIA BARANG/JASA
PT. ALHAS JAYA GROUP

SOFYAN HASAN
DIREKTUR UTAMA

DAFTAR REALISASI PELAKSANAAN LAPANGAN


PEKERJAAN
PAKET
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
SUMBER DANA
TAHUN ANGGARAN
NOMOR
PEMBAYARAN
1

:
:
:
:
:

Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
APBD
2016

ITEM PEKERJAAN

SAT.

BULAN AG

VOLUME
VOLUME KONTRAK
KONTRAK
ADD-01
4

VOLUME M
SAAT INI
5

DIVISI - 1
1.2

UMUM
Mobilisasi dan Demobilisasi

Ls

1.00

0.11

DIVISI - 2
2.1
2.2

DRAINASE
Galian untuk selokan Drainase dan Saluran Air
Pasangan Batu dengan Mortar

m3
m3

150.00
200.00

###
###

DIVISI - 3
3.1(1)
3.1 (3)
3.1 (4)
3.1 (6)
3.2(1)
3.2(2)
3.3

PEKERJAAN TANAH
Galian Biasa
Galian Struktur dengan Kedalaman 0 - 2 meter
Galian Struktur dengan Kedalaman 2 - 4 meter
Cofferdam, Penyokong, Pengaku dan Pekerjaan yang Berk
Timbunan Biasa
Timbunan Pilihan
Penyiapan Badan Jalan

M3
M3
M3
LS
M3
M3
M2

14.00
96.00
96.00
1.00
200.00
984.00
5,200.00

###
###

DIVISI - 4
4.2(2)

PELEBARAN PERKERASAN
DAN BAHU JALAN
Lapisan Pondasi Agregat Kelas B

m3

325.00

###

DIVISI - 5
5.1(1)
5.2(2)

PERKERASAN BERBUTIR
Lapisan Pondasi Agregat Kelas A
Lapisan Pondasi Agregat Kelas B

m3
m3

780.00
1,040.00

###
###

DIVISI - 6
6.1(1)
6.3(6)

PERKERASAN ASPAL
Lapis Resap Pengikat
Laston - Lapis Pengikat Aspal Beton (AC-BC)

Ltr
m3

5,200.00
260.00

###
###

DIVISI - 7
7.1 (5)
7.1 (6)
7.1 (7)
7.1 (8)
7.3 (1)
7.6 (10) b
7.6 (12) b
7.7 (1) a
7.7 (2) a
7.9
7.10 (3)
7.11 (3)a
7.12 (2) a
7.13

STRUKTUR
Beton K250
Beton K175
Beton Siklop K175
Beton K125
Baja Tulangan U24 Polos
Pengadaan Tiang Pnc. Beton Bertulang Ukuran 40 Cm
Pemancangan Tiang Pancang Beton Bertulang Dia 40cm
Penyediaan Dinding Sumuran Silinder, Diameter 300cm
Penurunan Dinding Sumuran Silinder, Diameter 300cm
Pasangan Batu
Bronjong
Expansion Joint Tipe Baja Bersudut
Perletakan Elastomeric Bearing
Sandaran Jembatan Baja

M3
M3
M3
M3
Kg
M1
M1
M1
M1
M3
M3
M1
Buah
M1

178.94
2.26
49.86
7.20
23,566.00
200.00
200.00
8.00
8.00
168.00
10.00
32.00
6.00
76.00

###
###
###
###
###
###
###
###
###
###
###
###
###
###

5,200.00

DIVISI - 10
10.1 (1)
10.1 (2)
10.1 (5)

PEMELIHARAAN RUTIN
Pemeliharaan Rutin Perkerasan
Pemeliharaan Rutin Bahu Jalan
Pemeliharaan Rutin Jembatan (Jembatan Darurat)

Ls
Ls
Ls

###
###
###

DAFTAR REALISASI PELAKSANAAN LAPANGAN


PEKERJAAN
PA K E T
KONTRAKTOR
KONTRAK NO.
TANGGAL
NILAI KONTRAK
SUMBER DANA
NO. KONTRAK ADD.
TGL. KONTRAK ADD.
KONSULTAN
NOMOR
PEMBAYARAN
1

:
:
:
:
:
:
:
:
:
:

PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT


BANG 15A

PT. BAHTERA KARANG RAYA


16-AC/CTR/BANG/DPW/APBN/2005
12 JULI 2005

Rp. 4.718.502.000,APBN Murni


01
27 AGUSTUS 2005
PT. BINA CIPTA PERDANA

BULAN AG

ITEM PEKERJAAN

SAT.

DIVISI - 1
1.2

UMUM
Mobilisasi dan Demobilisasi

DIVISI - 2
2.1

DRAINASE
Galian untuk Selokan Drainase
dan Saluran Air
Pasangan Batu dengan Mortar

VOLUME
VOLUME KONTRAK
KONTRAK
ADD-01
4

VOLUME M
SAAT INI
5

Ls

1.00

0.20

m3

57.20

m3

194.00

m3
m3

1,139.00
555.00

659.40
16.00

m3
m3
m2

205.00
14.00
19,050.00

48.00
14.00
###

4.2(2)

PELEBARAN PERKERASAN
DAN BAHU JALAN
Lapisan Pondasi Agregat Kelas B

m3

1,218.00

DIVISI - 5
5.1(1)
5.2(2)

PERKERASAN BERBUTIR
Lapisan Pondasi Agregat Kelas A
Lapisan Pondasi Agregat Kelas B

m3
m3

467.00
510.00

DIVISI - 6
6.1(1)
6.1(2)
6.3(5)
6.3(6)
6.3(6)a

PERKERASAN ASPAL
Lapis Resap Pengikat
Lapis Perekat
Laston - Lapis Aus Aspal Beton (AC-WC)
Laston - Lapis Pengikat Aspal Beton (AC-BC)
Laston - Lapis Pengikat Aspal Beton (AC-BC)L

Ltr
Ltr
m2
m3
Ton

2,880.00
6,809.00
19,050.00
1,395.00
287.00

654.26
738.48
789.60
83.60
153.75

DIVISI - 7
7.1(4)
7.1(5)
7.1(8)
7.3(1)
7.9
7.13

STRUKTUR
Beton K-250
Beton K-175
Beton K-125
Baja Tulangan U - 24 Polos
Pasangan Batu
Sandaran Jembatan Baja (Railing)

m3
m3
m3
Kg
m3
m'

428.60
40.30
26.90
37,512.30
80.00
78.00

289.52
31.92
28,525.60
57.60

DIVISI - 10
10.1 (1)

PEMELIHARAAN RUTIN
Pemeliharaan Rutin Perkerasan

Ls

1.00

0.20

2.2
DIVISI - 3
3.1(1)
3.1(8)
3.2(1)
3.2(2)
3.3
DIVISI - 4

PEKERJAAN TANAH
Galian Biasa
Galian Perkerasan Beraspal Tanpa
Cold Milling Machine
Timbunan Biasa
Timbunan Pilihan
Penyiapan Badan Jalan

10.1 (2)
10.1 (5)

Pemeliharaan Rutin Bahu Jalan


Pemeliharaan Rutin Jembatan (Jembatan Darurat)

Ls
Ls

1.00
1.00

0.20
0.20

DAFTAR REALISASI PELAKSANAAN LAPANGAN


PEKERJAAN
PA K E T
KONTRAKTOR
KONTRAK NO.
TANGGAL
NILAI KONTRAK
SUMBER DANA
NO. KONTRAK ADD.
TGL. KONTRAK ADD.
KONSULTAN
NOMOR
PEMBAYARAN
1

:
:
:
:
:
:
:
:
:
:

PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT


BANG 15A

PT. BAHTERA KARANG RAYA


16-AC/CTR/BANG/DPW/APBN/2005
12 JULI 2005

Rp. 4.718.502.000,APBN Murni


01
27 AGUSTUS 2005
PT. BINA CIPTA PERDANA
ITEM PEKERJAAN
2

DIVISI - 1
1.2

UMUM
Mobilisasi dan Demobilisasi

DIVISI - 2
2.1

DRAINASE
Galian untuk Selokan Drainase
dan Saluran Air
Pasangan Batu dengan Mortar

BULAN SEP
SAT.
3

VOLUME
VOLUME KONTRAK
KONTRAK
ADD-01
4

VOLUME M
SAAT INI
5

Ls

1.00

1.00

m3

57.20

197.20

m3

194.00

179.50

m3
m3

1,139.00
555.00

2,144.10
382.90

356.02

m3
m3
m2

205.00
14.00
19,050.00

129.20
2,649.60
2,536.70

1,281.40
2,147.80

4.2(2)

PELEBARAN PERKERASAN
DAN BAHU JALAN
Lapisan Pondasi Agregat Kelas B

m3

1,218.00

1,320.00

390.00

DIVISI - 5
5.1(1)
5.2(2)

PERKERASAN BERBUTIR
Lapisan Pondasi Agregat Kelas A
Lapisan Pondasi Agregat Kelas B

m3
m3

467.00
510.00

401.70
409.20

322.22
303.22

DIVISI - 6
6.1(1)
6.1(2)
6.3(5)
6.3(6)
6.3(6)a

PERKERASAN ASPAL
Lapis Resap Pengikat
Lapis Perekat
Laston - Lapis Aus Aspal Beton (AC-WC)
Laston - Lapis Pengikat Aspal Beton (AC-BC)
Laston - Lapis Pengikat Aspal Beton (AC-BC)L

Ltr
Ltr
m2
m3
Ton

2,880.00
6,809.00
19,050.00
1,395.00
287.00

7,233.50
14,006.60
28,531.80
452.10
736.30

5,930.86
8,116.49
14,939.91
327.98
573.90

DIVISI - 7
7.1(4)
7.1(5)
7.1(8)
7.3(1)
7.9
7.13

STRUKTUR
Beton K-250
Beton K-175
Beton K-125
Baja Tulangan U - 24 Polos
Pasangan Batu
Sandaran Jembatan Baja (Railing)

m3
m3
m3
Kg
m3
m'

428.60
40.30
26.90
37,512.30
80.00
78.00

416.80
63.20
29.70
42,966.00
147.50
80.00

80.50
9.43
5.33
8,140.50
22.40

DIVISI - 10
10.1 (1)

PEMELIHARAAN RUTIN
Pemeliharaan Rutin Perkerasan

Ls

1.00

1.00

0.45

2.2
DIVISI - 3
3.1(1)
3.1(8)
3.2(1)
3.2(2)
3.3
DIVISI - 4

PEKERJAAN TANAH
Galian Biasa
Galian Perkerasan Beraspal Tanpa
Cold Milling Machine
Timbunan Biasa
Timbunan Pilihan
Penyiapan Badan Jalan

0.05

10.1 (2)
10.1 (5)

Pemeliharaan Rutin Bahu Jalan


Pemeliharaan Rutin Jembatan (Jembatan Darurat)

Ls
Ls

1.00
1.00

1.00
1.00

0.45
0.10

DAFTAR REALISASI PELAKSANAAN LAPANGAN


PEKERJAAN
PA K E T
KONTRAKTOR
KONTRAK NO.
TANGGAL
NILAI KONTRAK
SUMBER DANA
NO. KONTRAK ADD.
TGL. KONTRAK ADD.
KONSULTAN

NOMOR
PEMBAYARAN
1

:
:
:
:
:
:
:
:
:
:

PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT


BANG 15A

PT. BAHTERA KARANG RAYA


16-AC/CTR/BANG/DPW/APBN/2005
12 JULI 2005

Rp. 4.718.502.000,APBN Murni


01
27 AGUSTUS 2005
PT. BINA CIPTA PERDANA

BULAN OK

ITEM PEKERJAAN

SAT.

DIVISI - 1
1.2

UMUM
Mobilisasi dan Demobilisasi

DIVISI - 2
2.1

DRAINASE
Galian untuk Selokan Drainase
dan Saluran Air
Pasangan Batu dengan Mortar

VOLUME
VOLUME KONTRAK
KONTRAK
ADD-01
4

VOLUME M
SAAT INI
5

Ls

1.00

1.00

m3

57.20

197.20

m3

194.00

179.50

m3
m3

1,139.00
555.00

2,144.10
382.90

m3
m3
m2

205.00
14.00
19,050.00

129.20
2,649.60
2,536.70

4.2(2)

PELEBARAN PERKERASAN
DAN BAHU JALAN
Lapisan Pondasi Agregat Kelas B

m3

1,218.00

1,320.00

DIVISI - 5
5.1(1)
5.2(2)

PERKERASAN BERBUTIR
Lapisan Pondasi Agregat Kelas A
Lapisan Pondasi Agregat Kelas B

m3
m3

467.00
510.00

401.70
409.20

DIVISI - 6
6.1(1)
6.1(2)
6.3(5)
6.3(6)
6.3(6)a

PERKERASAN ASPAL
Lapis Resap Pengikat
Lapis Perekat
Laston - Lapis Aus Aspal Beton (AC-WC)
Laston - Lapis Pengikat Aspal Beton (AC-BC)
Laston - Lapis Pengikat Aspal Beton (AC-BC)L

Ltr
Ltr
m2
m3
Ton

2,880.00
6,809.00
19,050.00
1,395.00
287.00

7,233.50
14,006.60
28,531.80
452.10
736.30

DIVISI - 7
7.1(4)
7.1(5)
7.1(8)
7.3(1)
7.9
7.13

STRUKTUR
Beton K-250
Beton K-175
Beton K-125
Baja Tulangan U - 24 Polos
Pasangan Batu
Sandaran Jembatan Baja (Railing)

m3
m3
m3
Kg
m3
m'

428.60
40.30
26.90
37,512.30
80.00
78.00

416.80
63.20
29.70
42,966.00
147.50
80.00

DIVISI - 10

PEMELIHARAAN RUTIN

2.2
DIVISI - 3
3.1(1)
3.1(8)
3.2(1)
3.2(2)
3.3
DIVISI - 4

PEKERJAAN TANAH
Galian Biasa
Galian Perkerasan Beraspal Tanpa
Cold Milling Machine
Timbunan Biasa
Timbunan Pilihan
Penyiapan Badan Jalan

#VALUE!
73.03

10.1 (1)
10.1 (2)
10.1 (5)

Pemeliharaan Rutin Perkerasan


Pemeliharaan Rutin Bahu Jalan
Pemeliharaan Rutin Jembatan (Jembatan Darurat)

Ls
Ls
Ls

1.00
1.00
1.00

1.00
1.00
1.00

SI PELAKSANAAN LAPANGAN

BULAN AGUSTUS 2008


VOLUME MC - 1
SEBELUM
6

JUMLAH
7

PERSEN
TASE
%
8

0.11

5,200.00

11.00

100.00

Dibuat Oleh :
PT. JIA JAYA UTAMA

SAFRIZAL, ST
GENERAL SUPERINTENDENT

SI PELAKSANAAN LAPANGAN

BULAN AGUSTUS 2005


VOLUME MC - 2
SEBELUM
6

JUMLAH
7

PERSEN
TASE
%
8

0.11

0.31

31.00

659.40
16.00

57.89
2.88

48.00
14.00
-

23.41
100.00
-

#REF!

654.26

22.72

#REF!

83.60

5.99

289.52
31.92
28,525.60
57.60

67.55
79.21
76.04
73.85

0.20

20.00

0.20
0.20

20.00
20.00

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI PELAKSANAAN LAPANGAN

BULAN SEPTEMBER 2005


VOLUME MC - 3
SEBELUM
6

JUMLAH
7

0.31

0.36

PERSEN
TASE
%
8

36.00

659.40
16.00

659.40
372.02

30.75
97.16

48.00
14.00
-

48.00
1,295.40
2,147.80

37.15
48.89
84.67

390.00

29.55

322.22
303.22

80.21
74.10

654.26

6,585.12

91.04

83.60

411.58

91.04

289.52
31.92
28,525.60
57.60

370.02
41.35
5.33
36,666.10
80.00

88.78
65.43
17.95
85.34
100.00

0.20

0.65

65.00

0.20
0.20

0.65
0.30

65.00
30.00

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI PELAKSANAAN LAPANGAN

BULAN OKTOBER 2005

VOLUME MC - 4
SEBELUM
6

JUMLAH
7

0.36

0.36

PERSEN
TASE
%
8

36.00

659.40
372.02

659.40
372.02

30.75
97.16

48.00
1,295.40
2,147.80

48.00
1,295.40
2,147.80

37.15
48.89
84.67

390.00

390.00

29.55

322.22
303.22

322.22
303.22

80.21
74.10

6,585.12

6,585.12

91.04

411.58

28,531.80
484.61
#VALUE!

100.00
107.19

370.02
41.35
5.33
36,666.10
80.00

370.02
41.35
5.33
36,666.10
80.00

88.78
65.43
17.95
85.34
100.00

0.65
0.65
0.30

0.65
0.65
0.30

65.00
65.00
30.00

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
HAL 4

No

S TAT I O N E R

Agregat Kelas A
Agregat Kelas B
Aspal Lama

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

490 + 100

Galian Perkerasan Tanpa Colt Miling

STA

400 + 000

Galian Perkerasan Tanpa Colt Miling


Aspal AC / BC

'm 6

491

000

2.70

8.60

0.14

3.25

491

000

2.60

19.90

0.14

7.24

490

900

5.75

50.00

0.14

40.25

490

850

5.75

20.00

0.14

16.10

490

800

3.00

35.00

0.14

14.70

490

750

5.74

20.00

0.14

16.07

490

750

5.75

10.00

0.14

8.05

490

700

5.90

50.00

0.14

41.30

490

650

1.00

1.20

0.14

0.17

10

490

650

1.20

29.00

0.14

4.87

11

490

650

3.00

50.00

0.14

21.00

12

490

650

3.00

10.00

0.14

4.20

13

490

600

3.00

50.00

0.14

21.00

14

490

600

3.00

40.00

0.14

16.80

15

490

550

2.50

20.00

0.14

7.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 4-1
Jumlah Lalu MC-2
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

413.70 M1
68.00 M1
481.70 M1

MARWAN, BE
CHIEF INSPECTOR

222.00
95.20
317.20
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
HAL 4

No

S TAT I O N E R

Agregat Kelas A
Agregat Kelas B
Aspal Lama

Galian Perkerasan Tanpa Colt Miling

STA

400 + 000

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

490 + 100

Galian Perkerasan Tanpa Colt Miling


Aspal AC / BC

'm 6

16

490

550

3.00

50.00

0.14

21.00

17

490

550

2.50

20.00

0.14

7.00

18

490

500

1.20

29.00

0.14

4.87

19

490

500

1.00

1.50

0.14

0.21

20

490

450

2.70

6.00

0.14

2.27

21

490

450

1.20

1.00

0.14

0.17

22

490

400

3.00

25.00

0.14

10.50

23

490

150

0.70

5.60

0.14

0.55

24

490

150

0.80

1.45

0.14

0.16

25

490

150

0.85

5.00

0.14

0.60

26

490

150

0.58

3.00

0.14

0.24

27

490

150

1.56

5.40

0.14

1.18

28

490

150

0.50

5.60

0.14

0.39

29

490

150

0.50

0.90

0.14

0.06

30

490

150

0.60

0.50

0.14

0.04

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 4-2
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

159.95 M1
481.70 M1
641.65 M1

49.24
317.20
366.44
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
HAL 4

No

S TAT I O N E R

Agregat Kelas A
Agregat Kelas B
Aspal Lama

Galian Perkerasan Tanpa Colt Miling

STA

400 + 000

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

490 + 100

Galian Perkerasan Tanpa Colt Miling


Aspal AC / BC

'm 6

31

490

150

0.58

0.60

0.14

0.05

32

490

150

0.55

4.33

0.14

0.33

33

490

150

0.80

1.95

0.14

0.22

34

490

050

2.30

0.80

0.14

0.26

35

490

050

1.50

0.90

0.14

0.19

36

490

050

1.50

0.90

0.14

0.19

37

490

050

1.00

4.80

0.14

0.67

38

490

050

1.00

8.30

0.14

1.16

39

489

900

1.55

4.50

0.14

0.98

40

489

900

2.60

9.20

0.14

3.35

41

489

900

1.90

1.10

0.14

0.29

42

489

900

4.20

3.00

0.14

1.76

43

489

900

3.40

5.10

0.14

2.43

44

489

500

0.70

0.70

0.14

0.07

45

489

500

1.20

0.90

0.14

0.15

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 4-3
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

47.08 M1
641.65 M1
688.73 M1

12.10
366.44
378.54
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
HAL 4

No

S TAT I O N E R

LEBAR

JARAK

TEBAL

VOLUME

Agregat Kelas A
Agregat Kelas B
Aspal Lama

M1

M1

M1

s/d

490 + 100

Galian Perkerasan Tanpa Colt Miling

STA

400 + 000

M3

Galian Perkerasan Tanpa Colt Miling


Aspal AC / BC

'm 6

46

489

500

1.30

0.60

0.14

0.11

47

489

500

1.31

1.60

0.14

0.29

48

489

500

1.50

1.00

0.14

0.21

49

489

500

1.26

1.00

0.14

0.18

50

489

400

1.50

2.60

0.14

0.55

51

489

400

0.60

1.65

0.14

0.14

52

489

400

0.70

2.35

0.14

0.23

53

489

150

2.26

1.62

0.14

0.51

54

489

150

0.30

1.70

0.14

0.07

55

489

150

2.72

2.30

0.14

0.88

56

489

050

5.90

18.00

0.14

14.87

57

488

600

1.20

1.50

0.14

0.25

58

488

600

0.60

2.30

0.14

0.19

59

488

600

1.50

0.35

0.14

0.07

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 4-4
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

Aspal
Laston
Lama
AC-BC

'm 6

38.57 M1
688.73 M1
727.30 M1

18.55
378.54
397.09
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
HAL 4

No

S TAT I O N E R

Agregat Kelas A
Agregat Kelas B
Aspal Lama

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

490 + 100

Galian Perkerasan Tanpa Colt Miling

STA

400 + 000

Galian Perkerasan Tanpa Colt Miling


Aspal AC / BC

'm 6

60

488

600

1.23

1.45

0.14

0.25

61

488

600

0.83

0.80

0.14

0.09

Jumlah 4-5

2.25 M1

0.34

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

727.30 M1
729.55 M1

397.09
397.43
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Box Culvert Jalan Banda Aceh Medan
HAL 4

No

S TAT I O N E R

Agregat Kelas A
Agregat Kelas B
Aspal Lama

Galian Perkerasan Tanpa Colt Miling

STA

400 + 000

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

490 + 100

Galian Perkerasan Tanpa Colt Miling


Aspal AC / BC

'm 6

62

Alue Lhok

KM 409 + 100

10.00

12.10

0.14

16.94

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 4-6
Jumlah Lalu
Jumlah Total MC-3
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

12.10 M1
729.55 M1
741.65 M1

MARWAN, BE
CHIEF INSPECTOR

16.94
397.43
414.37
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Box Culvert Jalan Banda Aceh Medan
HAL 4

No

S TAT I O N E R

Agregat Kelas A
Agregat Kelas B
Aspal Lama

Galian Perkerasan Tanpa Colt Miling

STA

400 + 000

'm 6

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

490 + 100

Galian Perkerasan Tanpa Colt Miling


Aspal AC / BC

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 4-1
Jumlah Lalu MC-1
Jumlah Total MC-2
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

- M1
68.00 M1
68.00 M1

MARWAN, BE
CHIEF INSPECTOR

95.20
95.20
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 1
BULAN : JULI 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Box Culvert Jalan Banda Aceh Medan
HAL 4

No

S TAT I O N E R

Agregat Kelas A

Galian Perkerasan Tanpa Colt Miling

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

Galian Perkerasan Tanpa Colt Miling

Agregat Kelas A
Agregat Kelas B
Aspal Lama

Galian Perkerasan Tanpa Colt Miling

STA

400 + 000

s/d

490 + 100

Galian Perkerasan Tanpa Colt Miling


Aspal AC / BC

'm 6

Sarah Teube

KM 421 + 500

10.00

13.60

0.14

19.04

Alue Dua

KM 433 + 600

10.00

13.60

0.14

19.04

Nicah Awe

KM 343 + 500

10.00

13.60

0.14

19.04

Damar Tutong

KM 400 + 000

10.00

13.60

0.14

19.04

Lhok Bhani

KM 2 + 400

10.00

13.60

0.14

19.04

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 4-1
Jumlah Lalu
Jumlah Total MC-1
Diperiksa Oleh :
TIM SUPERVISI SEMENTARA

IR. A M R I

68.00 M1
- M1
68.00 M1

95.20
95.20
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 4 - 1

Galian Perkerasan Tanpa Colt Miling

M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 4 - 2
KET

Galian Perkerasan Tanpa Colt Miling

K
9
1
L
0
a
e
m
sl
m
a't'
o
s'
n
A
B
A
C
W
B
C

M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 4 - 3
KET

Galian Perkerasan Tanpa Colt Miling

M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 4 - 4
KET

Galian Perkerasan Tanpa Colt Miling

M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 4 - 5
KET

Galian Perkerasan Tanpa Colt Miling

M3

M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 4 - 6
KET

Galian Perkerasan Tanpa Colt Miling

M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 4 - 1
KET

Galian Perkerasan Tanpa Colt Miling

M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 4 - 1
KET

Galian Perkerasan Tanpa Colt Miling

Galian Perkerasan Tanpa Colt Miling

M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+850

Sta 490+900

Sta 490+950

Sta 491+000

Sta 491+050

Sta 491+100

Sta 491+150

Sta 491+200

Sta 491+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+100

Sta 490+150

Sta 490+200

Sta 490+250

Sta 490+300

Sta 490+350

Sta 490+400

Sta 490+450

Sta 490+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 489+350

Sta 489+400

Sta 489+450

Sta 489+500

Sta 489+550

Sta 489+600

Sta 489+650

Sta 489+700

Sta 489+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 400+000

Sta 400+050

Sta 400+100

Sta 400+150

Sta 400+200

Sta 400+250

Sta 400+300

Sta 400+350

Sta 400+400

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 343+000

Sta 343+050

KOTA LANGSA

Sta 343+100

Sta 343+150

Sta 343+200

Sta 343+250

Sta 343+300

Sta 343+350

Sta 343+400

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 2+000

Sta 2+050

Sta 2+100

Sta 2+150

Sta 2+200

Sta 2+250

Sta 2+300

Sta 2+350

Sta 2+400

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST

MARWAN, BE

KORDINATOR LAPANGAN

CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 409+000

Sta 409+050

Sta 409+100

Sta 409+150

Sta 409+200

Sta 409+250

Sta 409+300

Sta 409+350

Sta 409+400

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 433+000

Sta 433+050

Sta 433+100

Sta 433+150

Sta 433+200

Sta 433+250

Sta 433+300

Sta 433+350

Sta 433+400

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 1
BULAN : JULI 2005

No. Mata Pembayaran

: 3.1(8)

Item Pekerjaan
Lokasi

: Galian Perkerasan Beraspal Tanpa Colt Milling Machine


: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 421+000

Sta 421+050

Sta 421+100

Sta 421+150

Sta 421+200

Sta 421+250

Sta 421+300

Sta 421+350

Sta 421+400

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

R 2005

HAL. 4 - 1

BAR

PERBATASAN
SUMUT
Sta 491+300

Sta 491+350

Sta 491+400

Sta 491+450

Sta 491+500

Sta 491+550

Sta 491+600

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

ATA

ER 2005

HAL. 4 - 2

BAR

Sta 490+550

Sta 490+600

Sta 490+650

Sta 490+700

Sta 490+750

Sta 490+800

Sta 490+850

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

ER 2005

HAL. 4 - 3

BAR

Sta 489+800

Sta 489+850

Sta 489+900

Sta 489+950

Sta 490+000

Sta 490+050

Sta 490+100

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

ER 2005

BAR

HAL. 4 - 4

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

Sta 489+250

Sta 489+300

Sta 489+350

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

ER 2005

HAL. 4 - 5

BAR

Sta 400+450

Sta 400+500

Sta 400+550

Sta 400+600

Sta 400+650

Sta 400+700

Sta 400+800

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

ER 2005

HAL. 4 - 6

BAR

Sta 343+450

Sta 343+500

Sta 343+550

Sta 343+600

Sta 343+650

Sta 343+700

MEDAN

Sta 343+750

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

ER 2005

HAL. 4 - 7

BAR

h:
rvisi
RDANA

Sta 2+450

Sta 2+500

Sta 2+550

Sta 2+600

Sta 2+650

Sta 2+700

Sta 2+750

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO

TOR

GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

ER 2005

HAL. 4 - 8

BAR

Sta 409+450

Sta 409+500

Sta 409+550

Sta 409+600

Sta 409+650

Sta 409+700

Sta 409+750

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

S 2005

HAL. 4 - 1

BAR

Sta 433+450

Sta 433+500

Sta 433+550

Sta 433+600

Sta 433+650

Sta 433+700

Sta 433+750

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

005

HAL. 4 - 1

BAR

Sta 421+450

Sta 421+500

Sta 421+550

Sta 421+600

Sta 421+650

Sta 421+700

Sta 421+750

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+850

Sta 490+900

Sta 490+950

Sta 491+000

Sta 491+050

Sta 491+100

Sta 491+150

Sta 491+200

Sta 491+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+100

Sta 490+150

Sta 490+200

Sta 490+250

Sta 490+300

Sta 490+350

Sta 490+400

Sta 490+450

Sta 490+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 489+350

Sta 489+400

Sta 489+450

Sta 489+500

Sta 489+550

Sta 489+600

Sta 489+650

Sta 489+700

Sta 489+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA
2005

HAL. 7 - 1

BAR

PERBATASAN
SUMUT
Sta 491+300

Sta 491+350

Sta 491+400

Sta 491+450

Sta 491+500

Sta 491+550

Sta 491+600

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

ATA

ER 2005

HAL. 7 - 2

BAR

Sta 490+550

Sta 490+600

Sta 490+650

Sta 490+700

Sta 490+750

Sta 490+800

Sta 490+850

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

ER 2005

HAL. 7 - 3

BAR

Sta 489+800

Sta 489+850

Sta 489+900

Sta 489+950

Sta 490+000

Sta 490+050

Sta 490+100

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

ER 2005

BAR

HAL. 7 - 4

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

Sta 489+250

Sta 489+300

Sta 489+350

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
S TAT I O N E R

Penyiapan Badan Jalan

STA

Aspal Lama

491 + 000

LEBAR

JARAK

LUAS

M1

M1

M2

s/d

490 + 550

'm 6

491

000

2.70

8.60

491

000

2.60

19.90

490

900

5.75

50.00

490

850

5.75

20.00

490

800

3.00

35.00

490

750

5.75

20.00

490

750

5.75

10.00

490

700

5.90

50.00

490

650

1.00

1.20

10

490

650

1.20

29.00

11

490

650

3.00

50.00

12

490

650

3.00

10.00

13

490

600

3.00

50.00

14

490

600

3.00

40.00

15

490

550

2.50

20.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 7-1
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

413.70 M1
- M1
413.70 M1

Dibuat Oleh :
PT. BAHTERA KARAN

ARMAN SUROS
GENERAL SUPERINT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
S TAT I O N E R

Penyiapan Badan Jalan

STA

Aspal Lama

490 + 550

LEBAR

JARAK

LUAS

M1

M1

M2

s/d

490 + 150

'm 6

16

490

550

3.00

50.00

17

490

550

2.50

20.00

18

490

500

1.20

29.00

19

490

500

1.00

1.50

20

490

450

2.70

6.00

21

490

450

1.20

1.00

22

490

400

3.00

25.00

23

490

150

0.70

5.60

24

490

150

0.80

1.45

25

490

150

0.85

5.00

26

490

150

0.58

3.00

27

490

150

1.56

5.40

28

490

150

0.50

5.60

29

490

150

0.50

0.90

30

490

150

0.60

0.50

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 7-2
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

159.95 M1
413.70 M1
573.65 M1

Dibuat Oleh :
PT. BAHTERA KARAN

ARMAN SUROS
GENERAL SUPERINT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
S TAT I O N E R

Penyiapan Badan Jalan

STA

Aspal Lama

490 + 150

LEBAR

JARAK

LUAS

M1

M1

M2

s/d

489 + 500

'm 6

31

490

150

0.58

0.60

32

490

150

0.55

4.33

33

490

150

0.80

1.95

34

490

050

2.30

0.80

35

490

050

1.50

0.90

36

490

050

1.50

0.90

37

490

050

1.00

4.80

38

490

050

1.00

8.30

39

489

900

1.55

4.50

40

489

900

2.60

9.20

41

489

900

1.90

1.10

42

489

900

4.20

3.00

43

489

900

3.40

5.10

44

489

500

0.70

0.70

45

489

500

1.20

0.90

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 7-3
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

47.08 M1
573.65 M1
620.73 M1

Dibuat Oleh :
PT. BAHTERA KARAN

ARMAN SUROS
GENERAL SUPERINT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
S TAT I O N E R

LEBAR

JARAK

LUAS

M1

M1

M2

s/d

488 + 600

Penyiapan Badan Jalan

STA

Aspal Lama

489 + 500

'm 6

46

489

500

1.30

0.60

47

489

500

1.31

1.60

48

489

500

1.50

1.00

49

489

500

1.26

1.00

50

489

400

1.50

2.60

51

489

400

0.60

1.65

52

489

400

0.70

2.35

53

489

150

2.26

1.62

54

489

150

0.30

1.70

55

489

150

2.72

2.30

56

489

050

5.86

18.00

57

488

600

1.20

1.50

58

488

600

0.60

2.30

59

488

600

1.50

0.35

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 7-4
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

Aspal
Laston
Lama
AC-BC

'm 6

38.57 M1
620.73 M1
659.30 M1

Dibuat Oleh :
PT. BAHTERA KARAN

ARMAN SUROS
GENERAL SUPERINT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
S TAT I O N E R

Penyiapan Badan Jalan

STA

Aspal Lama

488 + 600

LEBAR

JARAK

LUAS

M1

M1

M2

s/d

488 + 600

'm 6

60

488

600

1.23

1.45

61

488

600

0.83

0.80

Jumlah 7-5

2.25 M1

Jumlah Lalu
Jumlah Total MC - 3
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

659.30 M1
661.55 M1

Dibuat Oleh :
PT. BAHTERA KARAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROS
GENERAL SUPERINT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
S TAT I O N E R

Agregat Kelas A
Aspal Lama

STA

489 + 600

LEBAR

JARAK

LUAS

M1

M1

M2

s/d

490 + 200

'm 6

Damar Tutong

KM 400 + 000

10.00

13.60

Lhok Bhani

KM 2 + 400

10.00

13.60

Alue Lhok

KM 409 + 100

10.00

12.10

Alue Dua

KM 433 + 600

10.00

13.60

Nicah Awe

KM 343 + 500

10.00

13.60

Sarah Teube

KM 421 + 500

10.00

13.60

Agregat Kelas B

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 7-1
Jumlah Lalu MC-3
Jumlah Total MC-4
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

80.10 M1
661.55 M1
741.65 M1

Dibuat Oleh :
PT. BAHTERA KARAN

ARMAN SUROS
GENERAL SUPERINT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 7 - 1
LUAS

KET

M2

23.22
51.74
287.50
115.00
105.00
115.00
57.50
295.00
1.20
34.80
150.00
30.00
150.00
120.00
50.00

1,585.96 M2
- M2
1,585.96 M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 7 - 2
LUAS

KET

M2

150.00
50.00
34.80
1.50
16.20
1.20
75.00
3.92
1.16

K
9
1
L
0
a
e
m
sl
m
a't
o
s'
n
A
B
A
C
W
B
C

4.25
1.74
8.42
2.80
0.45
0.30
351.74 M2
1,585.96 M2
1,937.70 M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 7 - 3
LUAS

KET

M2

0.35
2.38

1.56
1.84
1.35
1.35
4.80
8.30
6.98
23.92
2.09
12.60
17.34
0.49
1.08
86.43 M2
1,937.70 M2
2,024.13 M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 7 - 4
LUAS

KET

M2

0.78
2.10
1.50
1.26
3.90
0.99
1.65
3.66
0.51
6.26
105.48
1.80
1.38
0.53

131.80 M2
2,024.13 M2
2,155.93 M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 7 - 5
LUAS

KET

M2

1.78
0.66

2.44 M2

2,155.93 M2
2,158.37 M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 7 - 1
LUAS

KET

M2
Agregat Kelas B

136.00
136.00
121.00
136.00
136.00
136.00

801.00 M3
2,158.37 M3
2,959.37 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMP

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+850

Sta 490+900

Sta 490+950

Sta 491+000

Sta 491+050

Sta 491+100

Sta 491+150

Sta 491+200

Sta 491+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMP

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+100

Sta 490+150

Sta 490+200

Sta 490+250

Sta 490+300

Sta 490+350

Sta 490+400

Sta 490+450

Sta 490+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMP

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 489+350

Sta 489+400

Sta 489+450

Sta 489+500

Sta 489+550

Sta 489+600

Sta 489+650

Sta 489+700

Sta 489+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMP

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan

SKET/GAMBAR

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMP

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMP

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 487+850

Sta 487+900

Sta 487+950

Sta 488+000

Sta 488+050

Sta 488+100

Sta 488+150

Sta 488+200

Sta 488+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMP

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 487+100

Sta 487+150

KOTA LANGSA

Sta 487+200

Sta 487+250

Sta 487+300

Sta 487+350

Sta 487+400

Sta 487+450

Sta 487+500

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ATA
2005

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


KOTA LANGSA - BATAS SUMUT

ATA

R 2005

HAL. 6 - 1

BAR

:
visi
RDANA

OR

PERBATASAN
SUMUT
Sta 491+300

Sta 491+350

Sta 491+400

Sta 491+450

Sta 491+500

Sta 491+550

Sta 491+600

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

KOTA LANGSA - BATAS SUMUT

ATA

R 2005

HAL. 6 - 2

BAR

Sta 490+550

Sta 490+600

Sta 490+650

Sta 490+700

Sta 490+750

Sta 490+800

Sta 490+850

MEDAN

:
visi
RDANA

OR

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


KOTA LANGSA - BATAS SUMUT

ATA

R 2005

ATA

R 2005

HAL. 6 - 3

BAR

Sta 489+800

Sta 489+850

Sta 489+900

Sta 489+950

Sta 490+000

Sta 490+050

Sta 490+100

MEDAN

:
visi
RDANA

OR

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


KOTA LANGSA - BATAS SUMUT

ATA

R 2005

BAR

HAL. 6 - 4

BAR

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

Sta 489+250

Sta 489+300

Sta 489+350

MEDAN

:
visi
RDANA

OR

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


KOTA LANGSA - BATAS SUMUT

ATA
2005

BAR

HAL. 6 - 1

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

Sta 489+250

Sta 489+300

Sta 489+350

MEDAN

:
visi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

OR

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


KOTA LANGSA - BATAS SUMUT

ATA
2005

HAL. 6 - 2

BAR

Sta 488+300

Sta 488+350

Sta 488+400

Sta 488+450

Sta 488+500

Sta 488+550

Sta 488+600

MEDAN

:
visi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

OR

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


KOTA LANGSA - BATAS SUMUT

ATA
2005

HAL. 6 - 3

BAR

Sta 487+550

Sta 487+600

Sta 487+650

Sta 487+700

Sta 487+750

Sta 487+800

MEDAN

Sta 487+850

:
visi
RDANA

OR

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

BACK UP DATA
MC. No. 2
BULANPROVINSI
: AGUSTUSNANGGROE
2005
DINAS PRASARANA WILAYAH
ACEH DARUSSALAM
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
HAL 8

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

491 + 600

m 0,1

491

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

490 + 900

Timbunan Pilihan

m 0,1

'm 6

m 0,4 m 1,5

LEBAR

600

m 1,5 m 0,4

3.00

0.15

75.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

75.00

50.00
2

491

550

3.00
50.00

491

500

3.00
50.00

491

450

3.00

491

400

3.00

50.00
50.00
6

491

350

3.00
50.00

491

300

3.00

491

250

3.00

50.00
50.00
9

491

200

3.00
50.00

10

491

150

3.00
50.00

11

491

100

3.00
50.00

12

491

050

3.00
50.00

13

491

000

3.00
50.00

14

490

950

3.00
50.00

15

490

900

3.00

Jumlah 8 - 1
700.00 M1
2,025.00
1
Jumlah Lalu
- M
1
Jumlah Total
700.00 M
2,025.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
HAL 8

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

490 + 900

m 0,1

490

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

490 + 200

Timbunan Pilihan

m 0,1

'm 6

m 0,4 m 1,5

16

LEBAR

900

m 1,5 m 0,4

3.00

0.15

75.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

50.00
17

490

850

3.00

18

490

800

3.00

50.00
50.00
19

490

750

3.00
50.00

20

490

700

3.00
50.00

21

490

650

3.00
50.00

22

490

600

3.00
50.00

23

490

550

3.00
50.00

24

490

500

3.00

50.00
25

490

450

3.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

75.00

50.00
26

490

400

3.00

27

490

350

3.00

50.00
50.00
28

490

300

3.00
50.00

29

490

250

3.00
50.00

30

490

200

3.00

Jumlah 8 - 2
700.00 M1
2,100.00
Jumlah Lalu
700.00 M1
2,025.00
1
Jumlah Total
1,400.00 M
4,125.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
HAL 8

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

490 + 200

m 0,1

490

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

489 + 500

Timbunan Pilihan

m 0,1

'm 6

m 0,4 m 1,5

31

LEBAR

200

m 1,5 m 0,4

3.00

0.15

75.00

0.15

150.00

50.00
32

490

150

3.00
50.00

33

490

100

3.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

75.00

50.00
34

490

050

3.00
50.00

35

490

000

3.00
50.00

36

489

950

3.00
50.00

37

489

900

3.00

38

489

850

3.00

50.00
50.00
39

489

800

3.00
50.00

40

489

750

3.00

41

489

700

3.00

50.00
50.00
42

489

650

3.00
50.00

43

489

600

3.00
50.00

44

489

550

3.00
50.00

45

489

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

500

3.00

Jumlah 8 - 3
700.00 M1
2,100.00
1
Jumlah Lalu
1,400.00 M
4,125.00
Jumlah Total
2,100.00 M1
6,225.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
HAL 8

No

S TAT I O N E R

LEBAR

JARAK

TEBAL

LUAS

M1

M1

s/d

489 + 000

M1

M2

Laston AC-WC

STA

Aspal Lama

489 + 500

m 0,1

Timbunan Pilihan

m 0,1

'm 6

m 0,4 m 1,5

m 1,5 m 0,4

46

489

500

3.00

47

489

450

3.00

0.15

75.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

75.00

50.00
50.00
48

489

400

3.00
50.00

49

489

350

3.00

50

489

300

3.00

50.00
50.00
51

489

250

3.00
50.00

52

489

200

3.00
50.00

53

489

150

3.00
50.00

54

489

100

3.00
50.00

55

489

050

3.00
50.00

56

489

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

000

3.00

Jumlah 8 - 4
500.00 M1
1,500.00
1
Jumlah Lalu
2,100.00 M
6,225.00
1
Jumlah Total MC - 3
2,600.00 M
7,725.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
HAL 8

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

489 + 000

m 0,1

489

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

488 + 300

Timbunan Pilihan

m 0,1

'm 6

m 0,4 m 1,5

LEBAR

000

m 1,5 m 0,4

3.00

0.15

75.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

75.00

50.00
2

488

950

3.00

488

900

3.00

50.00
50.00
4

488

850

3.00
50.00

488

800

3.00
50.00

489

750

3.00
50.00

489

700

3.00
50.00

489

650

3.00
50.00

489

600

3.00
50.00

10

489

550

3.00

11

489

500

3.00

50.00
50.00
12

488

450

3.00
50.00

13

488

400

3.00

14

488

350

3.00

50.00
50.00
15

488

300
Jumlah 8 - 1

3.00
700.00 M1

2,100.00

Jumlah Lalu MC - 3
2,600.00 M1
7,725.00
1
Jumlah Total
3,300.00 M
9,825.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
HAL 8

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

488 + 300

m 0,1

488

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

487 + 600

Timbunan Pilihan

m 0,1

'm 6

m 0,4 m 1,5

LEBAR

300

m 1,5 m 0,4

3.00

0.15

75.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

50.00
2

488

250

3.00
50.00

488

200

3.00
50.00

488

150

3.00
50.00

488

100

3.00
50.00

488

050

3.00

488

000

3.00

50.00
50.00
8

487

950

3.00
50.00

487

900

3.00

10

487

850

3.00

50.00

50.00
11

487

800

3.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

75.00

50.00
12

487

750

3.00

13

487

700

3.00

50.00
50.00
14

487

650

3.00
50.00

15

487

600

3.00

Jumlah 8 - 2
700.00 M1
2,100.00
1
Jumlah Lalu
3,300.00 M
9,825.00
1
Jumlah Total
4,000.00 M
11,925.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
HAL 8

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

490 + 900

m 0,1

LEBAR

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

490 + 300

Timbunan Pilihan

m 0,1

'm 6

m 0,4 m 1,5

m 1,5 m 0,4

16

487

600

3.00

17

487

550

3.00

0.15

75.00

0.15

150.00

0.15

150.00

50.00
50.00
18

487

500

3.00
50.00

19

487

450

3.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

150.00

0.15

100.50

0.15

25.50

50.00
20

487

400

3.00
50.00

21

487

350

3.00
50.00

22

487

300

3.00
50.00

23

487

250

3.00

24

487

200

3.00

50.00
17.00
25

487

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN
Aspal
LastonLama
AC-WC

183

3.00

Jumlah 8 - 3
417.00 M1
1,251.00
Jumlah Lalu
4,000.00 M1
11,925.00
Jumlah Total MC - 4
4,417.00 M1
13,176.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR
6
BACK'mUP
DATA

MC. No. 4
BULAN : OKTOBER 2005

ARMAN SUROSO
GENERAL SUPERINTENDENT
Timbunan Pilihan

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 8 - 1
VOL
M3
Timbunan Pilihan

11.25
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
11.25

315.00
315.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 8 - 2
VOL
M3
Timbunan Pilihan

11.25
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50

K
9
1
L
0
a
e
msl
m
a't
os'
n
A
B
A
C
W
B
C

22.50
22.50
22.50
22.50
22.50
11.25
315.00
315.00
630.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 8 - 3
VOL
M3
Timbunan Pilihan

11.25
22.50

22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
11.25
315.00
630.00
945.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 8 - 4
VOL

M3
Timbunan Pilihan

11.25
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
11.25

225.00
945.00
1,170.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 8 - 1
VOL
M3
Timbunan Pilihan

11.25
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
11.25
315.00

1,170.00
1,485.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 8 - 2
VOL
M3
Timbunan Pilihan

11.25
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50

22.50
22.50
22.50
22.50
11.25
315.00
1,485.00
1,800.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 8 - 3
VOL
M3
Timbunan Pilihan

11.25
22.50
22.50

22.50
22.50
22.50
22.50
22.50
15.08
3.83

187.65
1,800.00
1,987.65
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT
Timbunan Pilihan

BACK UP DATA
MC. No. 2
BULANPROVINSI
: AGUSTUSNANGGROE
2005
DINAS PRASARANA WILAYAH
ACEH DARUSSALAM
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

491 + 600

m 0,1

491

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

490 + 900

Pondasi Agregat Kelas B

m 0,1

'm 6

m 0,4 m 1,5

LEBAR

600

m 1,5 m 0,4

3.00

0.10

75.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

75.00

50.00
2

491

550

3.00
50.00

491

500

3.00
50.00

491

450

3.00

491

400

3.00

50.00
50.00
6

491

350

3.00
50.00

491

300

3.00

491

250

3.00

50.00
50.00
9

491

200

3.00
50.00

10

491

150

3.00
50.00

11

491

100

3.00
50.00

12

491

050

3.00
50.00

13

491

000

3.00
50.00

14

490

950

3.00
50.00

15

490

900

3.00

Jumlah 8 - 1
650.00 M1
2,025.00
1
Jumlah Lalu
- M
1
Jumlah Total
650.00 M
2,025.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

490 + 900

m 0,1

490

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

490 + 300

Pondasi Agregat Kelas B

m 0,1

'm 6

m 0,4 m 1,5

16

LEBAR

900

m 1,5 m 0,4

3.00

0.10

75.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

50.00
17

490

850

3.00

18

490

800

3.00

50.00
50.00
19

490

750

3.00
50.00

20

490

700

3.00
50.00

21

490

650

3.00
50.00

22

490

600

3.00
50.00

23

490

550

3.00
50.00

24

490

500

3.00

50.00
25

490

450

3.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

75.00

50.00
26

490

400

3.00

27

490

350

3.00

50.00
50.00
28

490

300

3.00
50.00

29

490

250

3.00
50.00

30

490

200

3.00

Jumlah 8 - 2
700.00 M1
2,100.00
Jumlah Lalu
650.00 M1
2,025.00
1
Jumlah Total MC - 3
1,350.00 M
4,125.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

490 + 900

m 0,1

490

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

490 + 300

Pondasi Agregat Kelas B

m 0,1

'm 6

m 0,4 m 1,5

31

LEBAR

200

m 1,5 m 0,4

3.00

0.10

75.00

0.10

150.00

50.00
32

490

150

3.00
50.00

33

490

100

3.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

75.00

50.00
34

490

050

3.00
50.00

35

490

000

3.00
50.00

36

489

950

3.00
50.00

37

489

900

3.00

38

489

850

3.00

50.00
50.00
39

489

800

3.00
50.00

40

489

750

3.00

41

489

700

3.00

50.00
50.00
42

489

650

3.00
50.00

43

489

600

3.00
50.00

44

489

550

3.00
50.00

45

489

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

500

3.00

Jumlah 8 - 1
700.00 M1
2,100.00
1
Jumlah Lalu MC - 3
1,350.00 M
4,125.00
Jumlah Total
2,050.00 M1
6,225.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8

No

S TAT I O N E R

LEBAR

JARAK

TEBAL

LUAS

M1

M1

s/d

490 + 300

M1

M2

Laston AC-WC

STA

Aspal Lama

490 + 900

m 0,1

Pondasi Agregat Kelas B

m 0,1

'm 6

m 0,4 m 1,5

m 1,5 m 0,4

46

489

500

3.00

47

489

450

3.00

0.10

75.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

75.00

50.00
50.00
48

489

400

3.00
50.00

49

489

350

3.00

50

489

300

3.00

50.00
50.00
51

489

250

3.00
50.00

52

489

200

3.00
50.00

53

489

150

3.00
50.00

54

489

100

3.00
50.00

55

489

50

3.00
50.00

56

489

000

3.00
50.00

57

488

950

3.00

58

488

900

3.00

50.00
50.00
59

488

850

3.00
50.00

60

488

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

800

3.00

Jumlah 8 - 2
700.00 M1
2,100.00
1
Jumlah Lalu
2,050.00 M
6,225.00
1
Jumlah Total
2,750.00 M
8,325.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

490 + 900

m 0,1

488

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

490 + 300

Pondasi Agregat Kelas B

m 0,1

'm 6

m 0,4 m 1,5

61

LEBAR

800

m 1,5 m 0,4

3.00

0.10

75.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

75.00

50.00
62

488

750

3.00

63

488

700

3.00

50.00
50.00
64

488

650

3.00
50.00

65

488

600

3.00
50.00

66

488

550

3.00
50.00

67

488

500

3.00
50.00

68

488

450

3.00
50.00

69

488

400

3.00
50.00

70

488

350

3.00

71

488

300

3.00

50.00
50.00
72

488

250

3.00
50.00

73

488

200

3.00

74

488

150

3.00

50.00
50.00
75

488

100
Jumlah 8 - 3

3.00
700.00 M1

2,100.00

Jumlah Lalu
2,750.00 M1
8,325.00
1
Jumlah Total
3,450.00 M
10,425.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

490 + 900

m 0,1

488

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

490 + 300

Pondasi Agregat Kelas B

m 0,1

'm 6

m 0,4 m 1,5

76

LEBAR

100

m 1,5 m 0,4

3.00

0.10

75.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

50.00
77

488

050

3.00
50.00

78

488

000

3.00
50.00

79

487

950

3.00
50.00

80

487

900

3.00
50.00

81

487

850

3.00

82

487

800

3.00

50.00
50.00
83

487

750

3.00
50.00

84

487

700

3.00

85

487

650

3.00

50.00

50.00
86

487

600

3.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

150.00

0.10

75.00

50.00
87

487

550

3.00

88

487

500

3.00

50.00
50.00
89

487

450

3.00
50.00

90

487

400

3.00

Jumlah 8 - 4
700.00 M1
2,100.00
1
Jumlah Lalu
3,450.00 M
10,425.00
1
Jumlah Total MC - 4
4,150.00 M
12,525.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

490 + 900

m 0,1

LEBAR

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

490 + 300

Pondasi Agregat Kelas B

m 0,1

'm 6

m 0,4 m 1,5

m 1,5 m 0,4

91

487

400

3.00

92

487

350

3.00

0.10

75.00

0.10

150.00

0.10

150.00

50.00
50.00
93

487

300

3.00
50.00

94

487

250

3.00

0.10

150.00

0.10

100.50

0.10

25.50

50.00
95

487

200

3.00
17.00

96

487

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

183

3.00

Jumlah 8 - 5
217.00 M1
651.00
Jumlah Lalu
4,150.00 M1
12,525.00
Jumlah Total
4,367.00 M1
13,176.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8

No

S TAT I O N E R

LEBAR

JARAK

TEBAL

LUAS

M1

M1

M1

M2

Laston AC-WC
Pondasi Agregat Kelas B

Laston AC-WC
Aspal Lama

STA

490 + 900

m 0,1

Damar Tutong

Lhok Bhani

490 + 300

Pondasi Agregat Kelas B

m 0,1

'm 6

m 0,4 m 1,5

s/d

m 1,5 m 0,4

KM 400 + 000

10.00

13.60

0.10

136.00

KM 2 + 400

10.00

13.60

0.10

136.00

Alue Lhok

KM 409 + 100

10.00

12.10

0.10

121.00

Alue Dua

KM 433 + 600

10.00

13.60

0.10

136.00

Nicah Awe

KM 343 + 500

10.00

13.60

0.10

136.00

Sarah Teube

KM 421 + 500

10.00

13.60

0.10

136.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 8 - 5
80.10 M1
801.00
1
Jumlah Lalu
4,367.00 M
13,176.00
1
Jumlah Total MC - 4
4,447.10 M
13,977.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM

MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


GUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 8 - 1
VOL
M3
Pondasi Agregat Kelas B

7.50
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
7.50

210.00
210.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM

MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


GUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 8 - 2
VOL
M3
Pondasi Agregat Kelas B

7.50
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00

K
9
1
L
0
a
e
msl
m
a't
os'
n
A
B
A
C
W
B
C

15.00
15.00
15.00
15.00
15.00
7.50
210.00
210.00
420.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM

MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


GUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 8 - 1
VOL
M3
Pondasi Agregat Kelas B

7.50
15.00

15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
7.50
210.00
420.00
630.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM

MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


GUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 8 - 2
VOL

M3
Pondasi Agregat Kelas B

7.50
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
7.50
210.00
630.00
840.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM

MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


GUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 8 - 3
VOL
M3
Pondasi Agregat Kelas B

7.50
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
7.50
210.00

840.00
1,050.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM

MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


GUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 8 - 4
VOL
M3
Pondasi Agregat Kelas B

7.50
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00

15.00
15.00
15.00
15.00
7.50
210.00
1,050.00
1,260.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM

MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


GUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 8 - 5
VOL
M3
Pondasi Agregat Kelas B

7.50
15.00
15.00

15.00
10.05
2.55

65.10
1,260.00
1,325.10
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM

MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


GUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 8 - 5
VOL
M3
Pondasi Agregat Kelas B

Pondasi Agregat Kelas B

13.60
13.60
12.10
13.60
13.60
13.60

80.10
1,325.10
1,405.20
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMP

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+850

Sta 490+900

Sta 490+950

Sta 491+000

Sta 491+050

Sta 491+100

Sta 491+150

Sta 491+200

Sta 491+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMP

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+100

Sta 490+150

Sta 490+200

Sta 490+250

Sta 490+300

Sta 490+350

Sta 490+400

Sta 490+450

Sta 490+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ATA
2005

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


KOTA LANGSA - BATAS SUMUT

ATA

R 2005

HAL. 8 - 1

BAR

PERBATASAN
SUMUT
Sta 491+300

Sta 491+350

Sta 491+400

Sta 491+450

Sta 491+500

Sta 491+550

Sta 491+600

MEDAN

:
visi
RDANA

OR

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


KOTA LANGSA - BATAS SUMUT

ATA

R 2005

HAL. 8 - 2

BAR

:
visi
RDANA

OR

Sta 490+550

Sta 490+600

Sta 490+650

Sta 490+700

Sta 490+750

Sta 490+800

Sta 490+850

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+850

Sta 490+900

Sta 490+950

Sta 491+000

Sta 491+050

Sta 491+100

Sta 491+150

Sta 491+200

Sta 491+250

Sta 491+300

Sta 491+350

Sta 491+400

Sta 491+450

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+100

Sta 490+150

KOTA LANGSA

Sta 490+200

Sta 490+250

Sta 490+300

Sta 490+350

Sta 490+400

Sta 490+450

Sta 490+500

Sta 490+550

Sta 490+600

Sta 490+650

Sta 490+700

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 489+350

Sta 489+400

Sta 489+450

Sta 489+500

Sta 489+550

Sta 489+600

Sta 489+650

Sta 489+700

Sta 489+750

Sta 489+800

Sta 489+850

Sta 489+900

Sta 489+950

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 487+850

Sta 487+900

Sta 487+950

Sta 488+000

Sta 488+050

Sta 488+100

Sta 488+150

Sta 488+200

Sta 488+250

Sta 488+300

Sta 488+350

Sta 488+400

Sta 488+450

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 11 - 1

ET/GAMBAR

PERBATASAN
SUMUT
Sta 491+500

Sta 491+550

Sta 491+600

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 11 - 2

ET/GAMBAR

Sta 490+750

Sta 490+800

MEDAN

Sta 490+850

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 11 - 3

ET/GAMBAR

Sta 490+000

Sta 490+050

Sta 490+100

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

ET/GAMBAR

HAL. 11 - 4

Sta 489+250

Sta 489+300

Sta 489+350

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 11 - 1

ET/GAMBAR

Sta 489+250

Sta 489+300

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

Sta 489+350

HAL. 11 - 2

ET/GAMBAR

Sta 488+500

Sta 488+550

Sta 488+600

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Resap Pengikat

STA

Aspal Lama

490 + 950

LEBAR

JARAK

M1

M1

s/d

490 + 400

KOEF

LUAS
M2

'm 6

490

950

5.80

0.80

145.00

0.80

287.50

0.80

287.50

0.80

287.00

0.80

287.50

0.80

295.00

0.80

295.00

0.80

282.50

0.80

141.25

50.00
2

490

900

5.75
50.00

490

850

5.75
50.00

490

800

5.74

490

750

5.75

50.00
50.00
6

490

700

5.90
50.00

490

650

5.90

490

600

5.65

50.00
50.00
9

490

550

5.65

10

490

500

1.20

29.00

0.80

34.80

11

490

500

1.50

1.00

0.80

1.50

12

490

450

2.70

6.00

0.80

16.20

13

490

450

1.00

1.20

0.80

1.20

14

490

400

3.00

25.00

0.80

75.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 11-1
462.20 M1
2,436.95
1
Jumlah Lalu MC - 2
350.00 M
1,777.75
1
Jumlah Total
812.20 M
4,214.70
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Resap Pengikat

STA

Aspal Lama

490 + 300

LEBAR

JARAK

M1

M1

s/d

489 + 400

KOEF

LUAS
M2

'm 6

15

490

300

3.00

15.00

0.80

45.00

16

490

250

3.00

35.00

0.80

105.00

17

490

200

3.00

50.00

0.80

150.00

18

490

150

5.83

50.00

0.80

291.50

19

490

100

3.00

50.00

0.80

150.00

20

490

050

3.00

50.00

0.80

150.00

21

489

950

5.70

50.00

0.80

285.00

22

489

900

3.00

50.00

0.80

150.00

23

489

800

5.53

50.00

0.80

276.50

24

489

750

5.53

50.00

0.80

276.50

25

489

550

3.00

15.00

0.80

45.00

26

489

500

3.00

25.00

0.80

75.00

27

489

500

3.00

35.00

0.80

105.00

28

489

450

5.65

0.80

113.00

0.80

116.00

50.00
29

489

400

5.80

Jumlah 11-2
575.00 M1
2,333.50
Jumlah Lalu
812.20 M1
4,214.70
1
Jumlah Total
1,387.20 M
6,548.20
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Resap Pengikat

STA

Aspal Lama

489 + 350

LEBAR

JARAK

M1

M1

s/d

488 + 600

KOEF

LUAS
M2

'm 6

30

489

400

5.80

0.80

116.00

0.80

117.00

50.00
31

489

350

5.85

32

489

300

3.00

50.00

0.80

150.00

33

489

250

3.00

50.00

0.80

150.00

34

489

200

3.00

50.00

0.80

150.00

35

489

150

1.62

2.26

0.80

3.66

36

489

150

0.30

1.70

0.80

0.51

37

489

150

2.72

2.30

0.80

6.26

38

489

100

5.90

12.95

0.80

76.41

39

489

050

5.86

15.00

0.80

87.90

40

489

000

5.86

0.80

293.00

0.80

292.50

25.00
50.00
41

488

950

5.85
25.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 11-3
334.21 M1
1,443.24
1
Jumlah Lalu
1,387.20 M
6,548.20
Jumlah Total MC - 3
1,721.41 M1
7,991.44
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

Aspal
Laston
Lama
AC-BC

ARMAN SUROSO
GENERAL SUPERINTENDEN

'm 6

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

LEBAR

JARAK

KOEF

LUAS

M1

M1

s/d

488 + 600

M2

Resap Pengikat

STA

Aspal Lama

489 + 350

'm 6

488

900

5.80

15.00

0.80

87.00

488

600

3.00

40.00

0.80

120.00

487

950

5.85

0.80

117.00

0.80

116.00

50.00
4

487

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

900

5.80

Jumlah 11-3
105.00 M1
440.00
1
Jumlah Lalu
1,721.41 M
7,991.44
1
Jumlah Total MC - 3
1,826.41 M
8,431.44
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Resap Pengikat

STA

Aspal Lama

488 + 200

LEBAR

JARAK

M1

M1

s/d

488 + 850

KOEF

LUAS
M2

'm 6

488

900

5.80

0.80

145.00

0.80

145.00

50.00
2

488

850

5.80

488

800

3.00

50.00

0.80

150.00

488

750

3.00

50.00

0.80

150.00

488

600

5.96

0.80

149.00

0.80

297.50

0.80

150.00

0.80

147.50

0.80

295.00

0.80

148.75

50.00
6

488

550

5.95
50.00

488

500

6.00

488

300

5.90
50.00

488

250

5.90

10

488

200

5.95

50.00

Jumlah 11-1

350.00 M1

1,777.75

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah Lalu
- M1
1
Jumlah Total MC - 2
350.00 M
1,777.75
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Resap Pengikat

STA

Aspal Lama

489 + 350

LEBAR

JARAK

M1

M1

s/d

488 + 600

KOEF

LUAS
M2

'm 6

487

900

5.80

0.80

116.00

0.80

116.00

50.00
2

487

850

5.80

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 11-1
50.00 M1
232.00
1
Jumlah Lalu MC - 3
1,826.41 M
8,431.44
1
Jumlah Total
1,876.41 M
8,663.44
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Laston AC-BC
Aspal Lama

STA

489 + 600

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

490 + 200

'm 6

Nicah Awe

10.00

9.60

0.80

76.80

Damar Tutong

10.00

9.60

0.80

76.80

Alue Lhok

9.00

8.10

0.80

58.32

Sarah Teube

10.00

9.60

0.80

76.80

Alue Dua

10.00

9.60

0.80

76.80

Lhok Bhani

10.00

9.60

0.80

76.80

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 11-2
56.10 M1
442.32
Jumlah Lalu
1,876.41 M1
8,663.44
Jumlah Total MC - 4
1,932.51 M1
9,105.76
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 11 - 1
VOL
LITER

116.00
230.00
230.00
229.60
230.00
236.00
236.00
226.00
113.00

27.84
1.20
12.96
0.96
60.00

1,949.56
1,422.20
3,371.76
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 11 - 2
VOL
LITER

36.00
84.00
120.00
233.20
120.00
120.00
228.00
120.00
221.20

K
9
1
L
0
a
e
m
sl
m
a't
o
s'
n
A
B
A
C
W
B
C

221.20
36.00
60.00
84.00
90.40
92.80
1,866.80
3,371.76
5,238.56
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 11 - 3
VOL
LITER

92.80
93.60

120.00
120.00
120.00
2.93
0.41
5.01
61.13
70.32

234.40
234.00

1,154.59
5,238.56
6,393.15
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 11 - 3
VOL

LITER

69.60
96.00

93.60
92.80

352.00
6,393.15
6,745.15
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 11 - 1
VOL
LITER

116.00
116.00
120.00
120.00

119.20
238.00
120.00

118.00
236.00
119.00

1,422.20

1,422.20
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 11 - 1
VOL
LITER

92.80
92.80

185.60
6,745.15
6,930.75
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 11 - 2
VOL
LITER

61.44
61.44
46.66

61.44
61.44
61.44

353.86
6,930.75
7,284.61
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+850

Sta 490+900

Sta 490+950

Sta 491+000

Sta 491+050

Sta 491+100

Sta 491+150

Sta 491+200

Sta 491+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+100

Sta 490+150

Sta 490+200

Sta 490+250

Sta 490+300

Sta 490+350

Sta 490+400

Sta 490+450

Sta 490+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan

: 6.1(2)
: Lapis Perekat

Lokasi

: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 489+350

Sta 489+400

Sta 489+450

Sta 489+500

Sta 489+550

Sta 489+600

Sta 489+650

Sta 489+700

Sta 489+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 487+850

Sta 487+900

Sta 487+950

Sta 488+000

Sta 488+050

Sta 488+100

Sta 488+150

Sta 488+200

Sta 488+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 487+100

Sta 487+150

KOTA LANGSA

Sta 487+200

Sta 487+250

Sta 487+300

Sta 487+350

Sta 487+400

Sta 487+450

Sta 487+500

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 486+350

Sta 486+400

Sta 486+450

Sta 486+500

Sta 486+550

Sta 486+600

Sta 486+650

Sta 486+700

Sta 486+750

KOTA LANGSA

Diperiksa Oleh :

Diperiksa Oleh :

BAG. PELAKSANA KEG. SKS


LINTAS TIMUR III

Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 485+600

Sta 485+650

Sta 485+700

Sta 485+750

Sta 485+800

Sta 485+850

Sta 485+900

Sta 485+950

Sta 486+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 484+850

Sta 484+900

Sta 484+950

Sta 485+000

Sta 485+050

Sta 485+100

Sta 485+150

Sta 485+200

Sta 485+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 484+100

Sta 484+150

Sta 484+200

Sta 484+250

Sta 484+300

Sta 484+350

Sta 484+400

Sta 484+450

Sta 484+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 483+350

Sta 483+400

Sta 483+450

Sta 483+500

Sta 483+550

Sta 483+600

Sta 483+650

Sta 483+700

Sta 483+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 482+600

Sta 482+650

Sta 482+700

Sta 482+750

Sta 482+800

Sta 482+850

Sta 482+900

Sta 482+950

Sta 483+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 481+850

Sta 481+900

Sta 481+950

Sta 482+000

Sta 482+050

Sta 482+100

Sta 482+150

Sta 482+200

Sta 482+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 481+100

Sta 481+150

KOTA LANGSA

Sta 481+200

Sta 481+250

Sta 481+300

Sta 481+350

Sta 481+400

Sta 481+450

Sta 481+500

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 480+350

Sta 480+400

KOTA LANGSA

Sta 480+450

Sta 480+500

Sta 480+550

Sta 480+600

Sta 480+650

Sta 480+700

Sta 480+750

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 487+850

Sta 487+900

Sta 487+950

Sta 488+000

Sta 488+050

Sta 488+100

Sta 488+150

Sta 488+200

Sta 488+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 480+350

Sta 480+400

Sta 480+450

Sta 480+500

Sta 480+550

Sta 480+600

Sta 480+650

Sta 480+700

Sta 480+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 479+600

Sta 479+650

Sta 479+700

Sta 479+750

Sta 479+800

Sta 479+850

Sta 479+900

Sta 479+950

Sta 480+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 478+850

Sta 478+900

Sta 478+950

Sta 479+000

Sta 479+050

Sta 479+100

Sta 479+150

Sta 479+200

Sta 479+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 478+100

Sta 478+150

Sta 478+200

Sta 478+250

Sta 478+300

Sta 478+350

Sta 478+400

Sta 478+450

Sta 478+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 477+350

Sta 477+400

Sta 477+450

Sta 477+500

Sta 477+550

Sta 477+600

Sta 477+650

Sta 477+700

Sta 477+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 476+600

Sta 476+650

KOTA LANGSA

Sta 476+700

Sta 476+750

Sta 476+800

Sta 476+850

Sta 476+900

Sta 476+950

Sta 477+000

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 475+850

Sta 475+900

Sta 475+950

Sta 476+000

Sta 476+050

Sta 476+100

Sta 476+150

Sta 476+200

Sta 476+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 475+100

Sta 475+150

Sta 475+200

Sta 475+250

Sta 475+300

Sta 475+350

Sta 475+400

Sta 475+450

Sta 475+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 474+350

Sta 474+400

Sta 474+450

Sta 474+500

Sta 474+550

Sta 474+600

Sta 474+650

Sta 474+700

Sta 474+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 12 - 15

MBAR

PERBATASAN
SUMUT
Sta 491+300

Sta 491+350

Sta 491+400

Sta 491+450

Sta 491+500

Sta 491+550

Sta 491+600

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 12 - 14

MBAR

Sta 490+550

Sta 490+600

Sta 490+650

Sta 490+700

Sta 490+750

Sta 490+800

Sta 490+850

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 12 - 13

MBAR

Sta 489+800

Sta 489+850

Sta 489+900

Sta 489+950

Sta 490+000

Sta 490+050

Sta 490+100

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

MBAR

HAL. 12 - 12

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

Sta 489+250

Sta 489+300

Sta 489+350

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 12 - 11

MBAR

Sta 488+300

Sta 488+350

Sta 488+400

Sta 488+450

Sta 488+500

Sta 488+550

Sta 488+600

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 12 - 10

MBAR

Sta 487+550

Sta 487+600

Sta 487+650

Sta 487+700

Sta 487+750

Sta 487+800

MEDAN

Sta 487+850

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 12 - 9

MBAR

eh :

Sta 486+800

Sta 486+850

Sta 486+900

Sta 486+950

Sta 487+000

Sta 487+050

MEDAN

Dibuat Oleh :

Sta 487+100

ervisi
ERDANA

PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 12 - 8

MBAR

Sta 486+050

Sta 486+100

Sta 486+150

Sta 486+200

Sta 486+250

Sta 486+300

Sta 486+350

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 12 - 7

MBAR

Sta 485+300

Sta 485+350

Sta 485+400

Sta 485+450

Sta 485+500

Sta 485+550

Sta 485+600

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 12 - 6

MBAR

Sta 484+550

Sta 484+600

Sta 484+650

Sta 484+700

Sta 484+750

Sta 484+800

Sta 484+850

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

DATA

3
BER 2005

HAL. 12 - 5

MBAR

Sta 483+800

Sta 483+850

Sta 483+900

Sta 483+950

Sta 484+000

Sta 484+050

Sta 484+100

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

MBAR

HAL. 12 - 4

Sta 483+050

Sta 483+100

Sta 483+150

Sta 483+200

Sta 483+250

Sta 483+300

Sta 483+350

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 12 - 3

MBAR

Sta 482+300

Sta 482+350

Sta 482+400

Sta 482+450

Sta 482+500

Sta 482+550

Sta 482+600

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 12 - 2

MBAR

Sta 481+550

Sta 481+600

Sta 481+650

Sta 481+700

Sta 481+750

Sta 481+800

Sta 481+850

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 12 - 1

MBAR

Sta 480+800

Sta 480+850

Sta 480+900

Sta 480+950

Sta 481+000

Sta 481+050

MEDAN

Sta 481+100

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

US 2005

HAL. 12 - 12

MBAR

eh :
ervisi
ERDANA

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

Sta 489+250

Sta 489+300

Sta 489+350

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

2
US 2005

HAL. 12 - 11

MBAR

Sta 488+300

Sta 488+350

Sta 488+400

Sta 488+450

Sta 488+500

Sta 488+550

Sta 488+600

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

2
US 2005

HAL. 12 - 10

MBAR

Sta 480+800

Sta 480+850

Sta 480+900

Sta 480+950

Sta 481+000

Sta 481+050

Sta 481+100

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 12 - 9

MBAR

Sta 480+050

Sta 480+100

Sta 480+150

Sta 480+200

Sta 480+250

Sta 480+300

Sta 480+350

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 12 - 8

MBAR

Sta 479+300

Sta 479+350

Sta 479+400

Sta 479+450

Sta 479+500

Sta 479+550

Sta 479+600

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

MBAR

HAL. 12 - 7

Sta 478+550

Sta 478+600

Sta 478+650

Sta 478+700

Sta 478+750

Sta 478+800

Sta 478+850

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 12 - 6

MBAR

Sta 477+800

Sta 477+850

Sta 477+900

Sta 477+950

Sta 478+000

Sta 478+050

MEDAN

Sta 478+100

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 12 - 5

MBAR

Sta 477+050

Sta 477+100

Sta 477+150

Sta 477+200

Sta 477+250

Sta 477+300

MEDAN

Sta 477+350

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 12 - 4

MBAR

eh :
ervisi
ERDANA

Sta 476+300

Sta 476+350

Sta 476+400

Sta 476+450

Sta 476+500

Sta 476+550

Sta 476+600

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 12 - 3

MBAR

Sta 475+550

Sta 475+600

Sta 475+650

Sta 475+700

Sta 475+750

Sta 475+800

Sta 475+850

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 12 - 2

MBAR

Sta 474+800

Sta 474+850

Sta 474+900

Sta 474+950

Sta 475+000

Sta 475+050

Sta 475+100

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

I NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 12 - 1

MBAR
KOTA KUALA
SIMPANG

Sta 474+000

Sta 474+050

Sta 474+150

Sta 474+200

Sta 474+250

Sta 474+300

Sta 474+350

KOTA LANGSA

MEDAN

eh :
ervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

476+ 500

LEBAR

JARAK

M1

M1

s/d

474 + 250

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

474

250

0.90

1.87

0.40

1.68

474

250

2.40

43.80

0.40

105.12

474

500

1.44

1.76

0.40

2.53

474

700

0.70

1.00

0.40

0.70

474

750

1.00

1.10

0.40

1.10

474

800

1.50

6.10

0.40

9.15

474

850

1.20

5.00

0.40

6.00

475

300

2.00

24.20

0.40

48.40

475

450

2.00

2.60

0.40

5.20

10

475

500

2.00

14.40

0.40

28.80

11

476

050

2.40

0.80

0.40

1.92

12

476

050

1.60

0.80

0.40

1.28

13

476

050

0.80

0.80

0.40

0.64

14

476

450

1.20

24.00

0.40

28.80

15

476

500

1.60

23.00

0.40

36.80

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 12 - 1
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

151.23 M1
- M1
151.23 M1

278.12
###
278.12
Dibuat Oleh :
PT. BAHTERA KARANG RAY

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

478 + 000

LEBAR

JARAK

M1

M1

s/d

476 + 550

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

16

476

550

1.60

40.00

0.40

64.00

17

476

600

1.80

11.50

0.40

20.70

18

477

050

2.00

27.82

0.40

55.64

19

477

050

1.00

0.56

0.40

0.56

20

477

050

1.00

1.64

0.40

1.64

21

477

100

2.70

20.76

0.40

56.05

22

477

450

2.10

9.44

0.40

19.82

23

477

550

2.33

8.73

0.40

20.34

24

477

550

2.23

6.03

0.40

13.45

25

477

550

2.63

12.10

0.40

31.82

26

477

600

2.60

12.80

0.40

33.28

27

477

600

2.33

10.00

0.40

23.30

28

477

700

3.94

37.65

0.40

148.34

29

477

950

2.78

42.00

0.40

116.76

30

478

000

2.70

25.15

0.40

67.91

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 12 - 2
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

266.18 M1
151.23 M1
417.41 M1

673.61
278.12
951.73
Dibuat Oleh :
PT. BAHTERA KARANG RAY

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

480+ 300

LEBAR

JARAK

M1

M1

s/d

478 + 200

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

31

478

200

2.70

27.70

0.40

74.79

32

478

300

2.70

5.26

0.40

14.20

33

478

350

2.70

11.80

0.40

31.86

34

478

650

2.85

3.10

0.40

8.84

35

478

650

2.50

0.83

0.40

2.08

36

478

250

2.90

2.72

0.40

7.89

37

479

300

2.90

6.85

0.40

19.87

38

479

300

1.30

3.10

0.40

4.03

39

479

750

2.90

22.86

0.40

66.29

40

479

950

1.02

7.99

0.40

8.15

41

479

950

0.63

2.40

0.40

1.51

42

479

950

3.53

1.23

0.40

4.34

43

479

950

3.82

0.94

0.40

3.59

44

480

100

3.30

11.85

0.40

39.11

45

480

350

3.52

31.80

0.40

111.94

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 12 - 3
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

140.43 M1
417.41 M1
557.84 M1

398.49
951.73
1,350.22
Dibuat Oleh :
PT. BAHTERA KARANG RAY

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

LEBAR

JARAK

KOEF

VOLUME

M1

M1

M2

s/d

488 + 200

Lapisan Perekat

STA

Aspal Lama

488+ 800

Agregat Kelas A

'm 6

46

488

200

0.96

2.20

0.40

2.11

47

488

300

1.93

2.85

0.40

5.50

48

488

300

1.46

0.97

0.40

1.42

49

488

300

1.57

5.30

0.40

8.32

50

488

350

0.95

1.00

0.40

0.95

51

488

350

1.85

15.58

0.40

28.82

52

488

400

1.30

2.90

0.40

3.77

53

488

550

1.82

9.58

0.40

17.44

54

488

750

1.99

11.71

0.40

23.30

55

488

750

1.90

11.15

0.40

21.19

56

488

750

1.71

9.70

0.40

16.59

57

488

750

3.33

9.72

0.40

32.37

58

488

750

1.63

3.35

0.40

5.46

59

488

750

3.16

1.16

0.40

3.67

60

488

800

0.90

1.20

0.40

1.08

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 12 - 4
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

88.37 M1
557.84 M1
646.21 M1

171.99
1,350.22
1,522.21
Dibuat Oleh :
PT. BAHTERA KARANG RAY

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

488+ 850

LEBAR

JARAK

M1

M1

s/d

488 + 800

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

61

488

800

1.50

15.20

0.40

22.80

62

488

800

4.53

9.42

0.40

42.67

63

488

850

4.53

5.30

0.40

24.01

64

488

850

2.95

0.85

0.40

2.51

65

488

850

2.80

9.95

0.40

27.86

66

488

850

1.97

10.00

0.40

19.70

67

488

850

1.65

11.80

0.40

19.47

68

488

850

3.37

4.27

0.40

14.39

Jumlah 12 - 5

66.79 M1

173.41

Jumlah Lalu
Jumlah MC - 2
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

646.21 M1
713.00 M1

MARWAN, BE
CHIEF INSPECTOR

1,522.21
1,695.62
Dibuat Oleh :
PT. BAHTERA KARANG RAY

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

480+ 450

LEBAR

JARAK

M1

M1

s/d

482 + 600

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

480

450

1.39

4.44

0.40

6.17

480

500

2.90

31.95

0.40

92.66

481

000

2.75

16.90

0.40

46.48

481

500

2.57

5.10

0.40

13.11

481

550

0.66

0.80

0.40

0.53

481

550

1.20

0.30

0.40

0.36

481

750

2.92

9.30

0.40

27.16

481

800

2.95

24.07

0.40

71.01

481

850

2.82

11.83

0.40

33.36

10

481

900

3.00

37.35

0.40

112.05

11

481

950

2.70

29.30

0.40

79.11

12

482

500

1.63

8.26

0.40

13.46

13

482

550

2.80

19.03

0.40

53.28

14

482

550

2.80

18.03

0.40

50.48

15

482

600

2.30

3.45

0.40

7.94

Jumlah 12 - 1
Jumlah Lalu MC - 2
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

220.11 M1
713.00 M1
933.11 M1

MARWAN, BE
CHIEF INSPECTOR

607.16
1,695.62
2,302.78
Dibuat Oleh :
PT. BAHTERA KARANG RAY

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

482+ 650

LEBAR

JARAK

M1

M1

s/d

483 + 150

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

16

482

650

2.90

21.50

0.40

62.35

17

482

700

3.20

45.60

0.40

145.92

18

482

750

1.50

1.80

0.40

2.70

19

482

750

0.30

2.10

0.40

0.63

20

482

750

1.45

1.72

0.40

2.49

21

482

750

0.82

2.14

0.40

1.75

22

482

800

0.82

4.43

0.40

3.63

23

482

850

2.70

18.83

0.40

50.84

24

482

900

2.97

2.40

0.40

7.13

25

482

900

0.44

3.70

0.40

1.63

26

482

900

2.88

16.30

0.40

46.94

27

482

950

2.85

6.97

0.40

19.86

28

482

950

2.79

8.10

0.40

22.60

29

483

050

2.65

36.60

0.40

96.99

30

483

150

1.35

6.20

0.40

8.37

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 12 - 2
178.39 M1
473.83
Jumlah Lalu
933.11 M1
2,302.78
Jumlah Total
1,111.50 M1
2,776.61
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

LEBAR

JARAK

M1

M1

KOEF

VOLUME
M2

Lapisan Perekat

STA

Aspal Lama

483+ 350

s/d

485 + 050

Agregat Kelas A

'm 6

31

483

350

2.10

4.00

0.40

8.40

32

483

350

1.89

6.79

0.40

12.83

33

483

400

1.73

2.73

0.40

4.72

34

483

500

3.15

22.80

0.40

71.82

35

483

500

1.69

1.45

0.40

2.45

36

483

550

1.93

7.30

0.40

14.09

37

483

600

1.90

6.30

0.40

11.97

38

483

600

1.67

3.37

0.40

5.63

39

483

650

1.40

6.10

0.40

8.54

40

483

700

1.40

32.00

0.40

44.80

41

483

850

1.30

6.30

0.40

8.19

42

484

050

1.60

4.95

0.40

7.92

43

484

150

1.05

2.00

0.40

2.10

44

484

450

1.00

3.58

0.40

3.58

45

485

050

1.85

17.25

0.40

31.91

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 12 - 3
126.92 M1
238.95
1
Jumlah Lalu
1,111.50 M
2,776.61
1
Jumlah Total
1,238.42 M
3,015.56
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

485+ 050

LEBAR

JARAK

M1

M1

s/d

485 + 550

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

46

485

050

3.70

2.60

0.40

9.62

47

485

100

3.47

9.10

0.40

31.58

48

485

200

1.20

26.40

0.40

31.68

49

485

250

1.10

5.06

0.40

5.57

50

485

450

0.60

8.90

0.40

5.34

51

485

450

1.30

7.34

0.40

9.54

52

485

450

1.20

9.85

0.40

11.82

53

485

450

1.60

6.05

0.40

9.68

54

485

450

1.00

7.08

0.40

7.08

55

485

500

1.60

5.00

0.40

8.00

56

485

500

1.30

3.95

0.40

5.14

57

485

500

2.10

5.60

0.40

11.76

58

485

500

0.50

0.60

0.40

0.30

59

485

550

0.65

0.80

0.40

0.52

60

485

550

1.15

15.40

0.40

17.71

Jumlah 12 - 4
Jumlah Lalu
Jumlah Total

113.73 M1
1,238.42 M1
1,352.15 M1

165.34
3,015.56
3,180.90

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAY

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

Aspal
Laston
Lama
AC-BC

'm 6

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

485+ 750

LEBAR

JARAK

M1

M1

s/d

486 + 050

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

61

485

750

0.70

5.50

0.40

3.85

62

485

750

1.00

8.20

0.40

8.20

63

485

750

0.80

1.66

0.40

1.33

64

485

800

3.10

3.89

0.40

12.06

65

485

800

0.70

1.40

0.40

0.98

66

485

800

1.00

12.20

0.40

12.20

67

485

800

0.80

12.00

0.40

9.60

68

485

800

3.50

4.85

0.40

16.98

69

486

050

2.20

3.10

0.40

6.82

70

486

050

4.33

0.62

0.40

2.68

71

486

050

0.87

3.30

0.40

2.87

72

486

050

0.90

0.60

0.40

0.54

73

486

050

1.20

4.30

0.40

5.16

74

486

050

0.73

7.16

0.40

5.23

75

486

050

3.64

0.48

0.40

1.75

Jumlah 12 - 5
69.26 M1
90.25
1
Jumlah Lalu
1,352.15 M
3,180.90
Jumlah Total
1,421.41 M1
3,271.15
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

Aspal
Laston
Lama
AC-BC

ARMAN SUROSO
GENERAL SUPERINTENDEN

'm 6

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

486+ 100

LEBAR

JARAK

M1

M1

s/d

486 + 400

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

76

486

100

0.73

7.71

0.40

5.63

77

486

150

0.80

8.90

0.40

7.12

78

486

150

0.55

3.10

0.40

1.71

79

486

150

1.50

0.70

0.40

1.05

80

486

150

0.71

6.40

0.40

4.54

81

486

200

0.70

0.70

0.40

0.49

82

486

200

2.30

0.55

0.40

1.27

83

486

200

0.90

2.65

0.40

2.39

84

486

250

1.40

6.08

0.40

8.51

85

486

250

0.36

6.08

0.40

2.19

86

486

300

0.70

11.00

0.40

7.70

87

486

300

0.40

8.50

0.40

3.40

88

486

400

0.99

11.88

0.40

11.76

89

486

400

0.99

17.10

0.40

16.93

90

486

400

0.80

6.22

0.40

4.98

Jumlah 12 - 6
97.57 M1
79.67
1
Jumlah Lalu
1,421.41 M
3,271.15
1
Jumlah Total
1,518.98 M
3,350.82
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat
Aspal Lama

STA

486+ 450

LEBAR

JARAK

M1

M1

s/d

487 + 400

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

91

486

450

0.66

0.67

0.40

0.44

92

486

450

0.95

2.39

0.40

2.27

93

486

500

1.40

5.90

0.40

8.26

94

486

550

0.40

6.65

0.40

2.66

95

486

850

1.92

8.30

0.40

15.94

96

486

900

2.04

23.68

0.40

48.31

97

486

900

0.70

14.00

0.40

9.80

98

486

900

1.28

6.50

0.40

8.32

99

486

900

0.36

4.02

0.40

1.45

100

486

900

0.13

2.30

0.40

0.30

101

486

900

2.30

2.64

0.40

6.07

102

486

950

1.90

27.88

0.40

52.97

103

487

200

0.81

3.07

0.40

2.49

104

487

250

1.35

4.45

0.40

6.01

105

487

400

0.92

2.93

0.40

2.70

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 12 - 7
115.38 M1
167.99
1
Jumlah Lalu
1,518.98 M
3,350.82
Jumlah Total
1,634.36 M1
3,518.81
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

487+ 400

LEBAR

JARAK

M1

M1

s/d

487 + 850

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

106

487

400

0.90

1.40

0.40

1.26

107

487

450

1.83

9.60

0.40

17.57

108

487

450

2.20

1.70

0.40

3.74

109

487

450

2.20

10.60

0.40

23.32

110

487

450

4.40

8.45

0.40

37.18

111

487

500

1.33

3.30

0.40

4.39

112

487

500

1.90

16.29

0.40

30.95

113

487

500

3.57

7.01

0.40

25.03

114

487

500

1.94

10.40

0.40

20.18

115

487

550

2.54

3.67

0.40

9.32

116

487

550

2.10

5.37

0.40

11.28

117

487

600

1.85

16.70

0.40

30.90

118

487

750

2.13

9.24

0.40

19.68

119

487

850

2.10

7.80

0.40

16.38

120

487

850

3.93

10.60

0.40

41.66

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS

Jumlah 12 - 8
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi

122.13 M1
1,634.36 M1
1,756.49 M1

292.84
3,518.81
3,811.65
Dibuat Oleh :
PT. BAHTERA KARANG RAY

LINTAS TIMUR III

PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

487+ 850

LEBAR

JARAK

M1

M1

s/d

488 + 150

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

121

487

850

1.20

2.10

0.40

2.52

122

487

850

1.90

7.06

0.40

13.41

123

487

850

4.60

6.63

0.40

30.50

124

487

850

4.60

16.66

0.40

76.64

125

487

850

0.80

30.00

0.40

24.00

126

487

900

0.80

19.00

0.40

15.20

127

487

900

1.93

20.50

0.40

39.57

128

487

900

1.00

7.74

0.40

7.74

129

487

900

0.77

6.90

0.40

5.31

130

487

950

2.49

0.88

0.40

2.19

131

487

950

1.30

9.00

0.40

11.70

132

488

150

2.88

7.31

0.40

21.05

133

488

150

1.30

1.20

0.40

1.56

134

488

150

1.66

9.94

0.40

16.50

135

488

150

2.88

8.67

0.40

24.97

Jumlah 12 - 9
153.59 M1
292.86
Jumlah Lalu
1,756.49 M1
3,811.65
Jumlah Total
1,910.08 M1
4,104.51
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 12
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

488+ 600

LEBAR

JARAK

M1

M1

s/d

489 + 100

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

136

488

600

1.20

1.50

0.40

1.80

137

488

600

0.60

2.30

0.40

1.38

138

488

600

1.50

0.35

0.40

0.53

139

488

600

1.23

1.45

0.40

1.78

140

488

600

0.83

0.80

0.40

0.66

141

489

050

3.37

27.45

0.40

92.51

142

489

100

2.50

34.00

0.40

85.00

Jumlah 12 - 10
67.85 M1
183.66
1
Jumlah Lalu
1,910.08 M
4,104.51
Jumlah Total
1,977.93 M1
4,288.17
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 12
No

S TAT I O N E R

Lapisan Perekat
Aspal Lama

STA

489+ 150

LEBAR

JARAK

M1

M1

s/d

489 + 400

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

143

489

150

2.00

15.80

0.40

31.60

144

489

200

2.30

2.60

0.40

5.98

145

489

250

1.60

3.90

0.40

6.24

146

489

250

1.60

2.40

0.40

3.84

147

489

300

1.80

8.40

0.40

15.12

148

489

300

1.90

3.80

0.40

7.22

149

489

300

1.50

2.80

0.40

4.20

150

489

300

1.60

1.10

0.40

1.76

151

489

350

1.60

2.10

0.40

3.36

152

489

350

2.80

4.00

0.40

11.20

153

489

350

2.70

5.20

0.40

14.04

154

489

350

2.58

14.80

0.40

38.18

155

489

350

1.50

1.80

0.40

2.70

156

489

400

1.50

2.60

0.40

3.90

157

489

400

0.60

1.65

0.40

0.99

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 12 - 11
72.95 M1
150.33
Jumlah Lalu
1,977.93 M1
4,288.17
Jumlah Total
2,050.88 M1
4,438.50
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 12
No

S TAT I O N E R

LEBAR

JARAK

M1

M1

s/d

489 + 650

KOEF

VOLUME
M2

Lapisan Perekat

STA

Aspal Lama

489+ 400

Agregat Kelas A

'm 6

158

489

400

0.70

2.35

0.40

1.65

159

489

400

2.90

43.00

0.40

124.70

160

489

450

2.90

6.45

0.40

18.71

161

489

500

0.70

0.70

0.40

0.49

162

489

500

0.90

1.20

0.40

1.08

163

489

500

0.60

1.30

0.40

0.78

164

489

500

1.60

1.31

0.40

2.10

165

489

500

1.00

1.50

0.40

1.50

166

489

500

1.00

1.26

0.40

1.26

167

489

550

0.90

1.65

0.40

1.49

168

489

550

2.30

6.20

0.40

14.26

169

489

550

1.00

1.30

0.40

1.30

170

489

600

2.28

16.20

0.40

36.94

171

489

650

0.50

10.00

0.40

5.00

172

489

650

1.50

5.50

0.40

8.25

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 12 - 12
99.92 M1
219.51
Jumlah Lalu
2,050.88 M1
4,438.50
Jumlah Total
2,150.80 M1
4,658.01
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 12
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

489+ 650

LEBAR

JARAK

M1

M1

s/d

489 + 800

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

173

489

650

3.40

11.00

0.40

37.40

174

489

650

1.60

1.90

0.40

3.04

175

489

700

1.50

6.57

0.40

9.86

176

489

700

0.40

5.60

0.40

2.24

177

489

750

2.10

3.10

0.40

6.51

178

489

750

3.40

4.10

0.40

13.94

179

489

750

1.65

4.00

0.40

6.60

180

489

750

2.10

5.85

0.40

12.29

181

489

750

2.80

10.80

0.40

30.24

182

489

750

1.30

5.56

0.40

7.23

183

489

800

1.35

0.70

0.40

0.95

184

489

800

2.60

5.25

0.40

13.65

185

489

800

1.00

5.00

0.40

5.00

186

489

800

0.90

1.30

0.40

1.17

187

489

800

0.80

0.80

0.40

0.64

Jumlah 12 - 13
71.53 M1
150.76
1
Jumlah Lalu
2,150.80 M
4,658.01
1
Jumlah Total
2,222.33 M
4,808.77
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 12
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

489+ 850

LEBAR

JARAK

M1

M1

s/d

489 + 950

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

188

489

850

1.70

3.70

0.40

6.29

189

489

850

11.04

2.80

0.40

30.91

190

489

900

1.55

4.50

0.40

6.98

191

489

900

2.60

9.20

0.40

23.92

192

489

900

1.90

1.10

0.40

2.09

193

489

900

4.20

3.00

0.40

12.60

194

489

900

3.40

5.10

0.40

17.34

195

489

950

2.60

4.00

0.40

10.40

196

489

950

2.60

3.20

0.40

8.32

197

489

950

3.80

2.70

0.40

10.26

198

489

950

2.20

1.30

0.40

2.86

199

489

950

2.27

27.70

0.40

62.88

200

489

950

0.40

3.60

0.40

1.44

201

489

950

3.10

10.50

0.40

32.55

202

489

950

1.80

8.55

0.40

15.39

Jumlah 12 - 14
90.95 M1
244.23
Jumlah Lalu
2,222.33 M1
4,808.77
Jumlah Total
2,313.28 M1
5,053.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 12
No

S TAT I O N E R

Lapisan Perekat
Aspal Lama

STA

489+ 950

'm 6

LEBAR

JARAK

M1

M1

s/d

490 + 100

KOEF

VOLUME
M2

Agregat Kelas A

203

489

950

4.40

3.40

0.40

14.96

204

489

950

2.00

4.70

0.40

9.40

205

489

950

0.40

13.00

0.40

5.20

206

490

000

1.96

13.35

0.40

26.17

207

490

000

2.70

11.75

0.40

31.73

208

490

000

2.70

21.00

0.40

56.70

209

490

050

0.80

2.30

0.40

1.84

210

490

050

0.90

1.50

0.40

1.35

211

490

050

0.90

1.50

0.40

1.35

212

490

050

1.00

4.80

0.40

4.80

213

490

050

1.00

8.30

0.40

8.30

214

490

100

1.60

13.80

0.40

22.08

215

490

100

1.30

6.70

0.40

8.71

216

490

100

1.50

3.80

0.40

5.70

217

490

100

0.60

50.00

0.40

30.00

Jumlah 12 - 15
159.90 M1
228.29
1
Jumlah Lalu
2,313.28 M
5,053.00
Jumlah Total
2,473.18 M1
5,281.29
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan

: 6.1(2)
: Lapis Perekat

Lokasi

: Jalan Banda Aceh - Medan

HAL 12
No

S TAT I O N E R

LEBAR

JARAK

M1

M1

s/d

490 + 250

KOEF

VOLUME
M2

Lapisan Perekat

STA

Aspal Lama

490+ 150

Agregat Kelas A

'm 6

218

490

150

0.70

5.60

0.40

3.92

219

490

150

0.80

1.45

0.40

1.16

220

490

150

0.85

5.00

0.40

4.25

221

490

150

0.58

3.00

0.40

1.74

222

490

150

1.56

5.40

0.40

8.42

223

490

150

0.50

5.60

0.40

2.80

224

490

150

0.50

0.90

0.40

0.45

225

490

150

0.60

0.50

0.40

0.30

226

490

150

0.58

0.60

0.40

0.35

227

490

150

0.55

4.33

0.40

2.38

228

490

150

0.80

1.95

0.40

1.56

229

490

200

0.95

18.50

0.40

17.58

230

490

200

0.98

3.00

0.40

2.94

231

490

200

2.10

6.10

0.40

12.81

232

490

250

1.50

8.10

0.40

12.15

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 12 - 16
70.03 M1
72.81
1
Jumlah Lalu
2,473.18 M
5,281.29
1
Jumlah Total
2,543.21 M
5,354.10
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 12
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

490 + 250

LEBAR

JARAK

M1

M1

s/d

490 + 750

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

233

490

250

0.80

2.00

0.40

1.60

234

490

300

1.40

1.55

0.40

2.17

235

490

300

1.80

11.70

0.40

21.06

236

490

400

1.50

6.10

0.40

9.15

237

490

400

0.50

8.50

0.40

4.25

238

490

400

2.00

4.20

0.40

8.40

239

490

450

1.60

10.50

0.40

16.80

240

490

500

1.70

13.60

0.40

23.12

241

490

550

2.50

20.00

0.40

50.00

242

490

550

2.50

20.00

0.40

50.00

243

490

600

2.70

6.00

0.40

16.20

244

490

650

1.00

1.20

0.40

1.20

245

490

650

1.20

29.00

0.40

34.80

246

490

650

1.50

1.00

0.40

1.50

247

490

2.10

750

6.00

0.40

12.60

Jumlah 12 - 17
141.35 M1
252.85
1
Jumlah Lalu
2,543.21 M
5,354.10
Jumlah Total
2,684.56 M1
5,606.95
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 12
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

490+ 750

LEBAR

JARAK

M1

M1

s/d

491 + 350

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

248

490

750

1.50

3.60

0.40

5.40

249

490

800

2.40

4.00

0.40

9.60

250

490

800

3.00

44.00

0.40

132.00

251

490

850

3.00

10.00

0.40

30.00

252

490

850

2.30

15.00

0.40

34.50

253

491

000

2.70

8.60

0.40

23.22

254

491

000

2.60

19.90

0.40

51.74

255

491

100

2.00

7.50

0.40

15.00

256

491

150

1.30

7.80

0.40

10.14

257

491

200

1.40

6.90

0.40

9.66

258

491

200

0.80

12.80

0.40

10.24

259

491

200

3.00

30.00

0.40

90.00

260

491

200

2.50

24.00

0.40

60.00

261

491

200

3.00

32.00

0.40

96.00

262

491

350

2.00

19.60

0.40

39.20

Jumlah 12 - 18
245.70 M1
616.70
1
Jumlah Lalu
2,684.56 M
5,606.95
1
Jumlah Total
2,930.26 M
6,223.65
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 12
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

491+ 350

LEBAR

JARAK

M1

M1

s/d

491 + 550

KOEF

VOLUME
M2

Agregat Kelas A

'm 6

263

491

350

2.90

5.30

0.40

15.37

264

491

400

2.80

37.80

0.40

105.84

265

491

450

2.00

7.00

0.40

14.00

266

491

450

2.70

13.70

0.40

36.99

267

491

450

1.60

9.20

0.40

14.72

268

491

500

2.00

24.00

0.40

48.00

269

491

500

3.40

12.00

0.40

40.80

270

491

500

5.40

9.00

0.40

48.60

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 12 - 19
118.00 M1
324.32
Jumlah Lalu
2,930.26 M1
6,223.65
Jumlah MC - 3
3,048.26 M1
6,547.97
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 1
VOL
LITER

0.67
42.05
1.01
0.28
0.44
3.66
2.40
19.36
2.08
11.52
0.77
0.51
0.26
11.52
14.72

111.25
111.25
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 2
VOL
LITER

25.60
8.28
22.26
0.22
0.66
22.42
7.93
8.14
5.38

K
9
1
L
0
a
e
msl
m
a't
os'
n
A
B
A
C
W
B
C

12.73
13.31
9.32
59.34
46.70
27.16
269.45
111.25
380.70
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 3
VOL
LITER

29.92
5.68

12.74
3.54
0.83
3.16
7.95
1.61
26.52
3.26
0.60
1.74
1.44
15.64
44.78
159.41
380.70
540.11
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 4
VOL

LITER

0.84
2.20
0.57
3.33
0.38
11.53
1.51
6.98
9.32
8.48
6.64
12.95
2.18
1.47
0.43
68.81
540.11
608.92
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 5
VOL
LITER

9.12
17.07
9.60
1.00
11.14
7.88
7.79
5.76

69.36

608.92
678.28
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 1
VOL
LITER

2.47
37.06
18.59
5.24
0.21
0.14
10.86
28.40
13.34
44.82

31.64
5.38
21.31
20.19
3.18
242.83
678.28
921.11
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 2
VOL
LITER

24.94
58.37
1.08

0.25
1.00
0.70
1.45
20.34
2.85
0.65
18.78
7.94
9.04
38.80
3.35
189.54
921.11
1,110.65
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 3
VOL
LITER

3.36
5.13
1.89
28.73
0.98
5.64
4.79
2.25
3.42
17.92
3.28
3.17
0.84
1.43
12.76
95.59
1,110.65
1,206.24
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 4
VOL
LITER

3.85
12.63
12.67
2.23
2.14
3.82
4.73
3.87
2.83
3.20
2.06
4.70
0.12
0.21
7.08
66.14
1,206.24
1,272.38

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 5
VOL
LITER

1.54
3.28
0.53
4.82
0.39
4.88
3.84
6.79
2.73
1.07
1.15

0.22
2.06
2.09
0.70
36.09
1,272.38
1,308.47
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 6
VOL
LITER

2.25
2.85
0.68
0.42

1.82
0.20
0.51
0.96
3.40
0.88
3.08
1.36
4.70
6.77
1.99
31.87
1,308.47
1,340.34
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 7
VOL
LITER

0.18
0.91
3.30
1.06
6.38
19.32
3.92
3.33
0.58
0.12
2.43
21.19
1.00
2.40
1.08
67.20
1,340.34
1,407.54
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 8
VOL
LITER

0.50
7.03
1.50
9.33
14.87
1.76
12.38
10.01
8.07
3.73
4.51
12.36
7.87
6.55
16.66
117.13
1,407.54
1,524.67
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 9
VOL
LITER

1.01
5.36
12.20
30.66
9.60
6.08
15.83
3.10
2.12
0.88
4.68
8.42

0.62
6.60
9.99
117.15
1,524.67
1,641.82
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 10
VOL
LITER

0.72
0.55
0.21
0.71
0.26

37.00
34.00

73.45
1,641.82
1,715.27
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 11
VOL
LITER

12.64
2.39
2.50
1.54
6.05
2.89
1.68
0.70
1.34
4.48
5.62
15.27
1.08
1.56
0.40
60.14
1,715.27
1,775.41
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 12
VOL
LITER

0.66
49.88
7.48
0.20
0.43
0.31
0.84
0.60
0.50
0.60
5.70
0.52
14.78
2.00
3.30
87.80
1,775.41
1,863.21
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 13
VOL
LITER

14.96
1.22
3.94
0.90
2.60
5.58
2.64
4.92
12.10
2.89
0.38
5.46
2.00

0.47
0.26
60.32
1,863.21
1,923.53
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 14
VOL
LITER

2.52
12.36
2.79
9.57
0.84
5.04

6.94
4.16
3.33
4.10
1.14
25.15
0.58
13.02
6.16
97.70
1,923.53
2,021.23
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 15
VOL
LITER

5.98
3.76
2.08
10.47
12.69
22.68
0.74
0.54
0.54
1.92
3.32
8.83
3.48
2.28
12.00
91.31
2,021.23
2,112.54
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 16
VOL
LITER

1.57
0.46
1.70
0.70
3.37
1.12
0.18
0.12
0.14
0.95
0.62
7.03
1.18
5.12
4.86
29.12
2,112.54
2,141.66
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 17
VOL
LITER

0.64
0.87
8.42
3.66
1.70
3.36
6.72
9.25
20.00
20.00
6.48
0.48
13.92
0.60

5.04
101.14
2,141.66
2,242.80
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 18
VOL
LITER

2.16
3.84
52.80
12.00
13.80
9.29
20.70

6.00
4.06
3.86
4.10
36.00
24.00
38.40
15.68
246.69
2,242.80
2,489.49
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 19
VOL
LITER

6.15

42.34
5.60
14.80
5.89
19.20
16.32
19.44

129.74
2,489.49
2,619.23
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+850

Sta 490+900

Sta 490+950

Sta 491+000

Sta 491+050

Sta 491+100

Sta 491+150

Sta 491+200

Sta 491+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+850

Sta 490+900

Sta 490+950

Sta 491+000

Sta 491+050

Sta 491+100

Sta 491+150

Sta 491+200

Sta 491+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan

: 6.1(2)
: Lapis Perekat

Lokasi

: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+100

Sta 490+150

Sta 490+200

Sta 490+250

Sta 490+300

Sta 490+350

Sta 490+400

Sta 490+450

Sta 490+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 489+350

Sta 489+400

Sta 489+450

Sta 489+500

Sta 489+550

Sta 489+600

Sta 489+650

Sta 489+700

Sta 489+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

KOTA LANGSA

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 487+850

Sta 487+900

Sta 487+950

Sta 488+000

Sta 488+050

Sta 488+100

Sta 488+150

Sta 488+200

Sta 488+250

KOTA LANGSA

Diperiksa Oleh :

Diperiksa Oleh :

BAG. PELAKSANA KEG. SKS


LINTAS TIMUR III

Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 487+100

Sta 487+150

Sta 487+200

Sta 487+250

Sta 487+300

Sta 487+350

Sta 487+400

Sta 487+450

Sta 487+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 486+350

Sta 486+400

Sta 486+450

Sta 486+500

Sta 486+550

Sta 486+600

Sta 486+650

Sta 486+700

Sta 486+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 485+600

Sta 485+650

Sta 485+700

Sta 485+750

Sta 485+800

Sta 485+850

Sta 485+900

Sta 485+950

Sta 486+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 484+850

Sta 484+900

Sta 484+950

Sta 485+000

Sta 485+050

Sta 485+100

Sta 485+150

Sta 485+200

Sta 485+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 484+100

Sta 484+150

Sta 484+200

Sta 484+250

Sta 484+300

Sta 484+350

Sta 484+400

Sta 484+450

Sta 484+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 483+350

Sta 483+400

Sta 483+450

Sta 483+500

Sta 483+550

Sta 483+600

Sta 483+650

Sta 483+700

Sta 483+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 482+600

Sta 482+650

KOTA LANGSA

Sta 482+700

Sta 482+750

Sta 482+800

Sta 482+850

Sta 482+900

Sta 482+950

Sta 483+000

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 481+850

Sta 481+900

KOTA LANGSA

Sta 481+950

Sta 482+000

Sta 482+050

Sta 482+100

Sta 482+150

Sta 482+200

Sta 482+250

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 481+100

Sta 481+150

Sta 481+200

Sta 481+250

Sta 481+300

Sta 481+350

Sta 481+400

Sta 481+450

Sta 481+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 480+350

Sta 480+400

Sta 480+450

Sta 480+500

Sta 480+550

Sta 480+600

Sta 480+650

Sta 480+700

Sta 480+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 479+600

Sta 479+650

Sta 479+700

Sta 479+750

Sta 479+800

Sta 479+850

Sta 479+900

Sta 479+950

Sta 480+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 478+850

Sta 478+900

Sta 478+950

Sta 479+000

Sta 479+050

Sta 479+100

Sta 479+150

Sta 479+200

Sta 479+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 478+100

Sta 478+150

Sta 478+200

Sta 478+250

Sta 478+300

Sta 478+350

Sta 478+400

Sta 478+450

Sta 478+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 477+350

Sta 477+400

Sta 477+450

Sta 477+500

Sta 477+550

Sta 477+600

Sta 477+650

Sta 477+700

Sta 477+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 476+600

Sta 476+650

KOTA LANGSA

Sta 476+700

Sta 476+750

Sta 476+800

Sta 476+850

Sta 476+900

Sta 476+950

Sta 477+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 475+850

Sta 475+900

KOTA LANGSA

Sta 475+950

Sta 476+000

Sta 476+050

Sta 476+100

Sta 476+150

Sta 476+200

Sta 476+250

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 475+100

Sta 475+150

Sta 475+200

Sta 475+250

Sta 475+300

Sta 475+350

Sta 475+400

Sta 475+450

Sta 475+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 474+350

Sta 474+400

Sta 474+450

Sta 474+500

Sta 474+550

Sta 474+600

Sta 474+650

Sta 474+700

Sta 474+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

2
US 2005

HAL. 12 - 17

MBAR

PERBATASAN
SUMUT
Sta 491+300

Sta 491+350

Sta 491+400

Sta 491+450

Sta 491+500

Sta 491+550

Sta 491+600

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 12 - 16

MBAR

PERBATASAN
SUMUT
Sta 491+300

Sta 491+350

Sta 491+400

Sta 491+450

Sta 491+500

Sta 491+550

Sta 491+600

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 12 - 17

MBAR

Sta 490+550

Sta 490+600

Sta 490+650

Sta 490+700

Sta 490+750

Sta 490+800

Sta 490+850

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

MBAR

HAL. 12 - 18

Sta 489+800

Sta 489+850

Sta 489+900

Sta 489+950

Sta 490+000

Sta 490+050

Sta 490+100

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 12 - 19

MBAR

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

Sta 489+250

Sta 489+300

Sta 489+350

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

4
ER 2005

HAL. 12 - 19

MBAR

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

Sta 489+250

Sta 489+300

MEDAN

Sta 489+350

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

4
ER 2005

HAL. 12 - 1

MBAR

eh :

Sta 488+300

Sta 488+350

Sta 488+400

Sta 488+450

Sta 488+500

Sta 488+550

MEDAN

Dibuat Oleh :

Sta 488+600

pervisi
ERDANA

PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

4
ER 2005

HAL. 1 - 1

MBAR

Sta 487+550

Sta 487+600

Sta 487+650

Sta 487+700

Sta 487+750

Sta 487+800

Sta 487+850

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 1 - 1

MBAR

Sta 486+800

Sta 486+850

Sta 486+900

Sta 486+950

Sta 487+000

Sta 487+050

Sta 487+100

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 1 - 1

MBAR

Sta 486+050

Sta 486+100

Sta 486+150

Sta 486+200

Sta 486+250

Sta 486+300

Sta 486+350

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 485+300

Sta 485+350

Sta 485+400

Sta 485+450

Sta 485+500

Sta 485+550

Sta 485+600

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

MBAR

HAL. 1 - 1

Sta 484+550

Sta 484+600

Sta 484+650

Sta 484+700

Sta 484+750

Sta 484+800

Sta 484+850

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 12 - 16

MBAR

Sta 483+800

Sta 483+850

Sta 483+900

Sta 483+950

Sta 484+000

Sta 484+050

Sta 484+100

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 483+050

Sta 483+100

Sta 483+150

Sta 483+200

Sta 483+250

Sta 483+300

MEDAN

Sta 483+350

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 482+300

Sta 482+350

Sta 482+400

Sta 482+450

Sta 482+500

Sta 482+550

MEDAN

Sta 482+600

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

eh :
pervisi
ERDANA

Sta 481+550

Sta 481+600

Sta 481+650

Sta 481+700

Sta 481+750

Sta 481+800

Sta 481+850

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 480+800

Sta 480+850

Sta 480+900

Sta 480+950

Sta 481+000

Sta 481+050

Sta 481+100

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 12 - 15

MBAR

Sta 480+050

Sta 480+100

Sta 480+150

Sta 480+200

Sta 480+250

Sta 480+300

Sta 480+350

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 479+300

Sta 479+350

Sta 479+400

Sta 479+450

Sta 479+500

Sta 479+550

Sta 479+600

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 12 - 14

MBAR

Sta 478+550

Sta 478+600

Sta 478+650

Sta 478+700

Sta 478+750

Sta 478+800

Sta 478+850

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

MBAR

HAL. 12 - 13

Sta 477+800

Sta 477+850

Sta 477+900

Sta 477+950

Sta 478+000

Sta 478+050

Sta 478+100

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 477+050

Sta 477+100

Sta 477+150

Sta 477+200

Sta 477+250

Sta 477+300

MEDAN

Sta 477+350

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 476+300

Sta 476+350

Sta 476+400

Sta 476+450

Sta 476+500

Sta 476+550

MEDAN

Sta 476+600

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

eh :
pervisi
ERDANA

Sta 475+550

Sta 475+600

Sta 475+650

Sta 475+700

Sta 475+750

Sta 475+800

Sta 475+850

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 474+800

Sta 474+850

Sta 474+900

Sta 474+950

Sta 475+000

Sta 475+050

Sta 475+100

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR
KOTA KUALA
SIMPANG

Sta 474+000

Sta 474+050

KOTA LANGSA

Sta 474+150

Sta 474+200

Sta 474+250

Sta 474+300

Sta 474+350

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

477 + 794

LEBAR

JARAK

M1

M1

s/d

483 + 514

KOEF

LUAS
M2

'm 6

477

794

5.96

477

800

6.50

6.00

0.40

35.76

0.40

162.50

0.40

286.00

0.40

42.70

50.00
3

477

850

6.50
19.00

478

610

6.10
14.00

478

624

6.10

0.40

42.70

480

300

5.57

0.40

38.99

480

314

5.57

0.40

38.99

483

500

5.82

0.40

40.74

10

483

514

5.82

0.40

40.74

14.00

14.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 12 - 1
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

117.00 M1
- M1
117.00 M1

729.12
729.12
Dibuat Oleh :
PT. BAHTERA KARANG RAY

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

491 + 600

LEBAR

JARAK

M1

M1

s/d

491 + 550

KOEF

LUAS
M2

'm 6

11

491

600

5.70

0.40

142.50

0.40

144.00

50.00
12

491

550

5.76

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 12 - 2
Jumlah Lalu
Jumlah Total MC - 2
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

50.00 M1
117.00 M1
167.00 M1

MARWAN, BE
CHIEF INSPECTOR

286.50
729.12
1,015.62
Dibuat Oleh :
PT. BAHTERA KARANG RAY

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

491 + 550

LEBAR

JARAK

M1

M1

s/d

490 + 900

KOEF

LUAS
M2

'm 6

491

550

5.76

0.40

144.00

0.40

291.00

50.00
2

491

500

5.82
50.00

491

450

5.82

0.40

291.00

0.40

293.50

0.40

295.00

0.40

295.00

0.40

299.00

0.40

299.00

0.40

302.50

0.40

305.00

0.40

292.50

0.40

305.00

0.40

290.00

0.40

143.75

50.00
4

491

400

5.87
50.00

491

350

5.90
50.00

491

300

5.90
50.00

491

250

5.98

491

200

5.98

50.00
50.00
9

491

150

6.05
50.00

10

491

100

6.10

11

491

050

5.85

50.00
50.00
12

491

000

6.10
50.00

13

490

950

5.80
50.00

14

490

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

900

5.75

Jumlah 12 - 1
Jumlah Lalu MC - 2
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

650.00 M1
167.00 M1
817.00 M1

MARWAN, BE
CHIEF INSPECTOR

3,846.25
1,015.62
4,861.87
Dibuat Oleh :
PT. BAHTERA KARANG RAY

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

LEBAR

JARAK

KOEF

LUAS

M1

M1

s/d

490 + 200

M2

Lapisan Perekat

STA

Aspal Lama

490 + 900

'm 6

15

490

900

5.75

16

490

850

5.75

0.40

143.75

0.40

287.50

0.40

287.00

0.40

287.50

0.40

295.00

0.40

295.00

0.40

282.50

0.40

282.50

0.40

286.50

0.40

283.50

0.40

290.00

0.40

290.00

0.40

290.00

0.40

290.00

0.40

145.75

50.00
50.00
17

490

800

5.74
50.00

18

490

750

5.75

19

490

700

5.90

50.00
50.00
20

490

650

5.90
50.00

21

490

600

5.65
50.00

22

490

550

5.65
50.00

23

490

500

5.73
50.00

24

490

450

5.67
50.00

25

490

400

5.80
50.00

26

490

350

5.80

27

490

300

5.80

50.00
50.00
28

490

250

5.80
50.00

29

490

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

200

5.83

Jumlah 12 - 2
700.00 M1
4,036.50
1
Jumlah Lalu
817.00 M
4,861.87
1
Jumlah Total
1,517.00 M
8,898.37
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

490 + 200

LEBAR

JARAK

M1

M1

s/d

489 + 500

KOEF

LUAS
M2

'm 6

30

490

200

5.83

0.40

145.75

0.40

291.50

0.40

295.00

0.40

295.00

0.40

285.00

0.40

285.00

0.40

290.00

0.40

285.00

0.40

276.50

0.40

276.50

0.40

287.50

0.40

287.50

0.40

282.50

0.40

282.50

0.40

143.75

50.00
31

490

150

5.83

32

490

100

5.90

50.00
50.00
33

490

050

5.90
50.00

34

490

000

5.70
50.00

35

489

950

5.70
50.00

36

489

900

5.80
50.00

37

489

850

5.70
50.00

38

489

800

5.53
50.00

39

489

750

5.53

40

489

700

5.75

50.00
50.00
41

489

650

5.75
50.00

42

489

600

5.65

43

489

550

5.65

50.00
50.00
44

489

500
Jumlah 12 - 3

5.75
700.00 M1

4,009.00

Jumlah Lalu
1,517.00 M1
8,898.37
1
Jumlah Total
2,217.00 M
12,907.37
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

489 + 500

LEBAR

JARAK

M1

M1

s/d

489 + 000

KOEF

LUAS
M2

'm 6

45

489

500

5.75

0.40

143.75

0.40

282.50

0.40

290.00

0.40

292.50

0.40

292.50

0.40

292.50

0.40

292.50

0.40

295.00

0.40

295.00

0.40

293.00

50.00
46

489

450

5.65
50.00

47

489

400

5.80
50.00

48

489

350

5.85
50.00

49

489

300

5.85
50.00

50

489

250

5.85

51

489

200

5.85

50.00
50.00
52

489

150

5.90
50.00

53

489

100

5.90

54

489

050

5.86

50.00

50.00
55

489

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

000

5.86

0.40

146.50

Jumlah 12 - 4
500.00 M1
2,915.75
1
Jumlah Lalu
2,217.00 M
12,907.37
1
Jumlah Total MC - 3
2,717.00 M
15,823.12
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

489 + 000

LEBAR

JARAK

M1

M1

s/d

488 + 400

KOEF

LUAS
M2

'm 6

489

000

5.86

488

950

5.85

0.40

146.50

0.40

292.50

0.40

290.00

50.00
50.00
3

488

900

5.80
50.00

488

850

5.80

0.40

290.00

0.40

295.00

0.40

294.00

0.40

292.50

0.40

292.50

0.40

298.00

0.40

297.50

0.40

290.00

0.40

294.00

0.40

142.50

50.00
5

488

800

5.90
50.00

488

750

5.88
50.00

488

700

5.85
50.00

488

650

5.85

488

600

5.96

50.00
50.00
10

488

550

5.95
50.00

11

488

500

5.80

12

488

450

5.88

50.00
50.00
13

488

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

400

5.70

Jumlah 12 - 1
600.00 M1
3,515.00
Jumlah Lalu MC - 3
2,717.00 M1
15,823.12
Jumlah Total
3,317.00 M1
19,338.12
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

LEBAR

JARAK

M1

M1

KOEF

LUAS
M2

Lapisan Perekat

STA

Aspal Lama

488 + 400

s/d

487 + 700

'm 6

14

488

400

5.70

15

488

350

5.70

0.40

142.50

0.40

285.00

0.40

295.00

0.40

295.00

0.40

297.50

0.40

295.00

0.40

297.50

0.40

297.50

0.40

296.50

0.40

296.50

0.40

290.00

0.40

290.00

0.40

295.00

0.40

295.00

0.40

148.75

50.00
50.00
16

488

300

5.90
50.00

17

488

250

5.90

18

488

200

5.95

50.00
50.00
19

488

150

5.90
50.00

20

488

100

5.95
50.00

21

488

050

5.95
50.00

22

488

000

5.93
50.00

23

487

950

5.93
50.00

24

487

900

5.80
50.00

25

487

850

5.80

26

487

800

5.90

50.00
50.00
27

487

750

5.90
50.00

28

487

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

700

5.95

Jumlah 12 - 2
700.00 M1
4,116.75
1
Jumlah Lalu
3,317.00 M
19,338.12
1
Jumlah Total
4,017.00 M
23,454.87
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

487 + 700

LEBAR

JARAK

M1

M1

s/d

487 + 150

KOEF

LUAS
M2

'm 6

29

487

700

5.95

0.40

148.75

0.40

297.50

0.40

296.50

0.40

296.50

0.40

295.00

0.40

295.00

0.40

294.50

0.40

295.00

0.40

296.00

0.40

296.00

0.40

197.65

0.40

49.30

50.00
30

488

650

5.95
50.00

31

488

600

5.93
50.00

32

488

550

5.93
50.00

33

488

500

5.90
50.00

34

488

450

5.90

35

488

400

5.89

50.00
50.00
36

488

350

5.90
50.00

37

488

300

5.92

38

487

250

5.92

50.00
50.00
39

487

200

5.90
17.00

40

487

183

Jumlah 12 - 3
Jumlah Lalu
Jumlah Total

5.80

517.00 M1
4,017.00 M1
4,534.00 M1

3,057.70
23,454.87
26,512.57

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAY

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat

STA

Aspal Lama

487 + 000

LEBAR

JARAK

M1

M1

s/d

481 + 050

KOEF

LUAS
M2

'm 6

487

000

2.93

0.40

73.25

0.40

146.50

0.40

143.00

0.40

105.00

0.40

30.00

0.40

29.70

0.40

105.00

0.40

141.10

50.00
2

486

950

2.93
50.00

486

900

2.86
50.00

486

850

3.00

486

830

3.00

486

870

2.97

20.00

20.00
7

486

850

3.00
50.00

486

800

3.40
33.00

486

767

3.40

0.40

56.10

10

485

500

6.20

0.40

155.00

50.00
11

485

450

6.20

0.40

310.00

0.40

315.00

0.40

155.00

0.40

314.00

50.00
12

485

400

6.30

13

485

350

6.20

14

481

050

6.28

50.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

50.00

Jumlah 12 - 4
473.00 M1
2,078.65
1
Jumlah Lalu
4,534.00 M
26,512.57
Jumlah Total MC - 4
5,007.00 M1
28,591.22
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 5
BULAN : NOPEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Lapisan Perekat
Aspal Lama

STA

487 + 000

LEBAR

JARAK

M1

M1

s/d

481 + 500

KOEF

LUAS
M2

'm 6

Nicah Awe

10.00

9.60

0.40

96.00

Damar Tutong

10.00

9.60

0.40

96.00

Alue Lhok

9.00

8.10

0.40

72.90

Sarah Teube

10.00

9.60

0.40

96.00

Alue Dua

10.00

9.60

0.40

96.00

Lhok Bhani

10.00

9.60

0.40

96.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 12 - 1
56.10 M1
552.90
1
Jumlah Lalu MC - 4
5,007.00 M
28,591.22
1
Jumlah Total MC - 5
5,063.10 M
29,144.12
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

YAH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 6
VOL
LITER

14.30

65.00
114.40

17.08
17.08

15.60
15.60

16.30
16.30

291.66
291.66
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 7
VOL
LITER

57.00
57.60

114.60
291.66
406.26
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 1
VOL
LITER

57.60
116.40

116.40
117.40
118.00
118.00
119.60
119.60
121.00
122.00
117.00
122.00
116.00
57.50

1,538.50
406.26
1,944.76
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 2
VOL

K
9
1
L
0
a
e
msl
m
a't'
o
s'
n
A
B
A
C
W
B
C

LITER

57.50
115.00
114.80
115.00
118.00
118.00
113.00
113.00
114.60
113.40
116.00
116.00
116.00
116.00
58.30
1,614.60
1,944.76
3,559.36
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 3
VOL
LITER

58.30
116.60
118.00
118.00
114.00
114.00
116.00
114.00
110.60
110.60
115.00
115.00
113.00
113.00
57.50
1,603.60

3,559.36
5,162.96
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 4
VOL
LITER

57.50
113.00
116.00
117.00
117.00
117.00
117.00
118.00
118.00
117.20

58.60

1,166.30
5,162.96
6,329.26
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 1
VOL
LITER

58.60
117.00
116.00

116.00
118.00
117.60
117.00
117.00
119.20
119.00
116.00
117.60
57.00

1,406.00
6,329.26
7,735.26
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 2
VOL
LITER

57.00
114.00
118.00
118.00
119.00
118.00
119.00
119.00
118.60
118.60
116.00
116.00
118.00
118.00
59.50
1,646.70
7,735.26
9,381.96
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 3
VOL
LITER

59.50
119.00
118.60
118.60
118.00
118.00
117.80
118.00
118.40
118.40
79.06
19.72

1,223.08
9,381.96
10,605.04

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 4
VOL
LITER

29.30
58.60
57.20
42.00
12.00

11.88
42.00
56.44
22.44

62.00

124.00
126.00
62.00
125.60
831.46
10,605.04
11,436.50
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

YAH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 12 - 1
VOL
LITER

38.40
38.40
29.16
38.40

38.40
38.40

221.16
11,436.50
11,657.66
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 477+ 794 - Sta 477+ 800


AC-WC 4 Cm

Sta 477+ 794 - Sta 477+ 800

6.00

Sta 477+ 800 - Sta 477+ 825

25.00

Sta 477+ 825 - Sta 477+ 850

25.00

Sta 477+ 850 - Sta 477+ 869

19.00

Sta 478+610 - Sta 478+624

14.00

Aspal Lama

5.96 m'
Sta 477+ 800 - Sta 477+ 825
AC-WC 4 Cm

Aspal Lama

6.50 m'
Sta 477+ 825 - Sta 477+ 850
AC-WC 4 Cm

Aspal Lama

6.50 m'
Sta 477+ 850 - Sta 477+ 869
AC-WC 4 Cm

Aspal Lama

6.50 m'
Sta 478+610 - Sta 478+624
AC-WC 4 Cm

Aspal Lama

6.10 m'

Sta 480+300 - Sta 480+314


Sta 480+300 - Sta 480+314
AC-WC 4 Cm

14.00

Aspal Lama

5.57 m'
JUMLAH 13 - 1
JUMLAH LALU
JUMLAH TOTAL

103.00
103.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 483+500 - Sta 483+514


AC-WC 4 Cm

Sta 483+500 - Sta 483+514

14.00

Sta 491+575 - Sta 491+600

25.00

Aspal Lama

5.82 m'
Sta 491+575 - Sta 491+600
AC-WC 4 Cm

Aspal Lama

5.70 m'

Sta 491+550 - Sta 491+575


Sta 491+550 - Sta 491+575
AC-WC 4 Cm

25.00

Aspal Lama

5.76 m'

JUMLAH 13 - 2
JUMLAH LALU
JUMLAH TOTAL MC - 2

64.00
103.00
167.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA

MC. No. 3
BULAN : SEPTEMBER 2005

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

AC-WC 4 Cm

Sta 491+525 - Sta 491+550

AC-WC 4 Cm

Sta 491+525 - Sta 491+550

25.00

Sta 491+475 - Sta 491+525

50.00

Sta 491+425 - Sta 491+475

50.00

Sta 491+375 - Sta 491+425

50.00

Sta 491+350 - Sta 491+375

25.00

Aspal Lama

5.76 m'
Sta 491+475 - Sta 491+525
AC-WC 4 Cm

Aspal Lama

5.82 m'
Sta 491+425 - Sta 491+475
AC-WC 4 Cm

Aspal Lama

5.82 m'
Sta 491+375 - Sta 491+425
AC-WC 4 Cm

Aspal Lama

5.87 m'
Sta 491+350 - Sta 491+375
AC-WC 4 Cm

Aspal Lama

5.96 m'

JUMLAH 13 - 1
JUMLAH LALU MC - 2
JUMLAH TOTAL

200.00
167.00
367.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 491+325 - Sta 491+350


AC-WC 4 Cm

Sta 491+325 - Sta 491+350

25.00

Sta 491+275 - Sta 491+325

50.00

Sta 491+225 - Sta 491+275

50.00

Aspal Lama

5.96 m'
Sta 491+275 - Sta 491+325
AC-WC 4 Cm

Aspal Lama

5.80 m'
Sta 491+225 - Sta 491+275
AC-WC 4 Cm

Aspal Lama

5.80 m'

Sta 491+175 - Sta 491+225


AC-WC 4 Cm

Sta 491+175 - Sta 491+225

50.00

Sta 491+125 - Sta 491+175

50.00

Sta 491+100 - Sta 491+125

25.00

Aspal Lama

5.82 m'
Sta 491+125 - Sta 491+175
AC-WC 4 Cm

Aspal Lama

5.80 m'
Sta 491+100 - Sta 491+125
AC-WC 4 Cm

Aspal Lama

5.80 m'
JUMLAH 13 - 2
JUMLAH LALU
JUMLAH TOTAL

250.00
367.00
617.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 491+075 - Sta 491+100


AC-WC 4 Cm

Sta 491+075 - Sta 491+100

25.00

Sta 491+025 - Sta 491+075

50.00

Sta 490+975 - Sta 491+025

50.00

Sta 490+925 - Sta 490+975

50.00

Sta 490+875 - Sta 490+925

50.00

Sta 490+850 - Sta 490+875

25.00

Aspal Lama

5.80 m'
Sta 491+025 - Sta 491+075
AC-WC 4 Cm

Aspal Lama

5.83 m'
Sta 490+975 - Sta 491+025
AC-WC 4 Cm

Aspal Lama

5.83 m'
Sta 490+925 - Sta 490+975
AC-WC 4 Cm

Aspal Lama

6.00 m'
Sta 490+875 - Sta 490+925
AC-WC 4 Cm

Aspal Lama

6.00 m'
Sta 490+850 - Sta 490+875
AC-WC 4 Cm

Aspal Lama

5.90 m'
JUMLAH 13 - 3
JUMLAH LALU
JUMLAH TOTAL
Diperiksa Oleh :

250.00
617.00
867.00
Diperiksa Oleh :

BAG. PELAKSANA KEG. SKS


LINTAS TIMUR III

Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+825 - Sta 490+850


AC-WC 4 Cm

Sta 490+825 - Sta 490+850

25.00

Sta 490+775 - Sta 490+825

50.00

Sta 490+725 - Sta 490+775

50.00

Sta 490+675 - Sta 490+725

50.00

Aspal Lama

5.90 m'
Sta 490+775 - Sta 490+825
AC-WC 4 Cm

Aspal Lama

5.70 m'
Sta 490+725 - Sta 490+775
AC-WC 4 Cm

Aspal Lama

5.80 m'
Sta 490+675 - Sta 490+725
AC-WC 4 Cm

Aspal Lama

5.80 m'
Sta 490+625 - Sta 490+675
AC-WC 4 Cm

Sta 490+625 - Sta 490+675

50.00

Sta 490+600 - Sta 490+625

25.00

Aspal Lama

5.90 m'
Sta 490+600 - Sta 490+625
AC-WC 4 Cm

Aspal Lama

5.85 m'
JUMLAH 13 - 4
JUMLAH LALU
JUMLAH TOTAL

250.00
867.00
1,117.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+575 - Sta 490+600


Sta 490+575 - Sta 490+600
AC-WC 4 Cm

Aspal Lama

5.85 m'

25.00

Sta 490+525 - Sta 490+575


AC-WC 4 Cm

Sta 490+525 - Sta 490+575

50.00

Sta 490+475 - Sta 490+525

50.00

Sta 490+425 - Sta 490+475

50.00

Sta 490+375 - Sta 490+425

50.00

Sta 490+350 - Sta 490+375

25.00

Aspal Lama

5.80 m'
Sta 490+475 - Sta 490+525
AC-WC 4 Cm

Aspal Lama

5.76 m'
Sta 490+425 - Sta 490+475
AC-WC 4 Cm

Aspal Lama

5.77 m'
Sta 490+375 - Sta 490+425
AC-WC 4 Cm

Aspal Lama

5.80 m'
Sta 490+350 - Sta 490+375
AC-WC 4 Cm

Aspal Lama

5.90 m'
JUMLAH 13 - 5
JUMLAH LALU
JUMLAH TOTAL

250.00
1,117.00
1,367.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST

MARWAN, BE

KORDINATOR LAPANGAN

CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+325 - Sta 490+350


AC-WC 4 Cm

Sta 490+325 - Sta 490+350

25.00

Sta 490+275 - Sta 490+325

50.00

Sta 490+225 - Sta 490+275

50.00

Sta 490+175 - Sta 490+225

50.00

Sta 490+125 - Sta 490+175

50.00

Aspal Lama

5.90 m'
Sta 490+275 - Sta 490+325
AC-WC 4 Cm

Aspal Lama

5.90 m'
Sta 490+225 - Sta 490+275
AC-WC 4 Cm

Aspal Lama

5.80 m'
Sta 490+175 - Sta 490+225
AC-WC 4 Cm

Aspal Lama

5.90 m'
Sta 490+125 - Sta 490+175
AC-WC 4 Cm

Aspal Lama

5.90 m'
Sta 490+100 - Sta 490+125
Sta 490+100 - Sta 490+125
AC-WC 4 Cm

25.00

Aspal Lama

5.90 m'
JUMLAH 13 - 6
JUMLAH LALU
JUMLAH TOTAL

250.00
1,367.00
1,617.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+075 - Sta 490+100


AC-WC 4 Cm

Sta 490+075 - Sta 490+100

25.00

Sta 490+025 - Sta 490+075

50.00

Aspal Lama

5.90 m'
Sta 490+025 - Sta 490+075
AC-WC 4 Cm

Aspal Lama

5.90 m'
Sta 489+975 - Sta 490+025
AC-WC 4 Cm

Sta 489+975 - Sta 490+025

50.00

Sta 489+925 - Sta 489+975

50.00

Sta 489+875 - Sta 489+925

50.00

Sta 489+850 - Sta 489+875

25.00

Aspal Lama

5.87 m'
Sta 489+925 - Sta 489+975
AC-WC 4 Cm

Aspal Lama

5.70 m'
Sta 489+875 - Sta 489+925
AC-WC 4 Cm

Aspal Lama

5.70 m'
Sta 489+850 - Sta 489+875
AC-WC 4 Cm

Aspal Lama

5.70 m'
JUMLAH 13 - 7
JUMLAH LALU
JUMLAH TOTAL

250.00
1,617.00
1,867.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 489+825 - Sta 489+850


AC-WC 4 Cm

Sta 489+825 - Sta 489+850

25.00

Sta 489+775 - Sta 489+825

50.00

Sta 489+725 - Sta 489+775

50.00

Sta 489+675 - Sta 489+725

50.00

Sta 489+625 - Sta 489+675

50.00

Sta 489+600 - Sta 489+625

25.00

Aspal Lama

5.70 m'
Sta 489+775 - Sta 489+825
AC-WC 4 Cm

Aspal Lama

5.80 m'
Sta 489+725 - Sta 489+775
AC-WC 4 Cm

Aspal Lama

5.80 m'
Sta 489+675 - Sta 489+725
AC-WC 4 Cm

Aspal Lama

5.75 m'
Sta 489+625 - Sta 489+675
AC-WC 4 Cm

Aspal Lama

5.75 m'
Sta 489+600 - Sta 489+625
AC-WC 4 Cm

Aspal Lama

5.70 m'
JUMLAH 13 - 8
JUMLAH LALU
JUMLAH TOTAL

250.00
1,867.00
2,117.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA

MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 489+575 - Sta 489+600


AC-WC 4 Cm

Sta 489+575 - Sta 489+600

25.00

Sta 489+525 - Sta 489+575

50.00

Sta 489+475 - Sta 489+525

50.00

Aspal Lama

5.70 m'
Sta 489+525 - Sta 489+575
AC-WC 4 Cm

Aspal Lama

5.75 m'
Sta 489+475 - Sta 489+525
AC-WC 4 Cm

Aspal Lama

5.75 m'
Sta 489+425 - Sta 489+475
AC-WC 4 Cm

Sta 489+425 - Sta 489+475

50.00

Sta 489+375 - Sta 489+425

50.00

Sta 489+350 - Sta 489+375

25.00

Aspal Lama

5.70 m'
Sta 489+375 - Sta 489+425
AC-WC 4 Cm

Aspal Lama

5.75 m'
Sta 489+350 - Sta 489+375
AC-WC 4 Cm

Aspal Lama

5.70 m'
JUMLAH 13 - 9
JUMLAH LALU
JUMLAH TOTAL

250.00
2,117.00
2,367.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA

MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 489+325 - Sta 489+350


AC-WC 4 Cm

Sta 489+325 - Sta 489+350

25.00

Sta 489+275 - Sta 489+325

50.00

Sta 489+225 - Sta 489+275

50.00

Sta 489+175 - Sta 489+225

50.00

Sta 489+125 - Sta 489+175

50.00

Sta 489+100 - Sta 489+125

25.00

Aspal Lama

5.70 m'
Sta 489+275 - Sta 489+325
AC-WC 4 Cm

Aspal Lama

5.70 m'
Sta 489+225 - Sta 489+275
AC-WC 4 Cm

Aspal Lama

5.80 m'
Sta 489+175 - Sta 489+225
AC-WC 4 Cm

Aspal Lama

5.80 m'
Sta 489+125 - Sta 489+175
AC-WC 4 Cm

Aspal Lama

5.90 m'
Sta 489+100 - Sta 489+125
AC-WC 4 Cm

Aspal Lama

5.90 m'
JUMLAH 13 - 10
JUMLAH LALU
JUMLAH TOTAL MC - 3

250.00
2,367.00
2,617.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 489+075 - Sta 489+100


AC-WC 4 Cm

Sta 489+075 - Sta 489+100

25.00

Sta 489+025 - Sta 489+075

50.00

Sta 489+000 - Sta 489+025

25.00

Aspal Lama

5.90 m'
Sta 489+025 - Sta 489+075
AC-WC 4 Cm

Aspal Lama

5.86 m'
Sta 489+000 - Sta 489+025
AC-WC 4 Cm

Aspal Lama

5.86 m'

JUMLAH 13 - 11
JUMLAH LALU
JUMLAH TOTAL MC - 3

100.00
2,617.00
2,717.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 13 - 1
LUAS
M2

5.96

0.04

35.76

6.50

0.04

162.50

6.50

0.04

162.50

6.50

0.04

123.50

6.10

0.04

85.40

LEBAR
M'

5.57

0.04

77.98

647.64
647.64
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

LEBAR
M'
5.82

5.70

TEBAL
M'

HAL 13 - 2
LUAS
M2

0.04

81.48

0.04

142.50

5.76

0.04

144.00

367.98
647.64
1,015.62
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 13 - 1
LUAS
M2

0.04

144.00

5.82

0.04

291.00

5.82

0.04

291.00

5.87

0.04

293.50

5.96

0.04

149.00

LEBAR
M'
5.76

1,168.50
1,015.62
2,184.12
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 13 - 2
LUAS
M2

5.96

0.04

149.00

5.80

0.04

290.00

5.80

0.04

290.00

LEBAR
M'

5.82

0.04

291.00

5.80

0.04

290.00

5.80

0.04

145.00

1,455.00
2,184.12
3,639.12
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

LEBAR
M'

TEBAL
M'

HAL 13 - 3
LUAS
M2

5.80

0.04

145.00

5.83

0.04

291.50

5.83

0.04

291.50

6.00

0.04

300.00

6.00

0.04

300.00

5.90

0.04

147.50

1,475.50
3,639.12
5,114.62
Dibuat Oleh :

PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 13 - 4
LUAS
M2

5.90

0.04

147.50

5.70

0.04

285.00

5.80

0.04

290.00

5.80

0.04

290.00

LEBAR
M'

5.90

0.04

295.00

5.85

0.04

146.25

1,453.75
5,114.62
6,568.37
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

LEBAR
M'
5.85

TEBAL
M'

HAL 13 - 5
LUAS
M2

0.04

146.25

5.80

0.04

290.00

5.76

0.04

288.00

5.77

0.04

288.50

5.80

0.04

290.00

5.90

0.04

147.50

1,450.25
6,568.37
8,018.62
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO

GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 13 - 6
LUAS
M2

5.90

0.04

147.50

5.90

0.04

295.00

5.80

0.04

290.00

5.90

0.04

295.00

5.90

0.04

295.00

LEBAR
M'

5.90

0.04

147.50

1,470.00
8,018.62
9,488.62
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 13 - 7
LUAS
M2

5.90

0.04

147.50

5.90

0.04

295.00

LEBAR
M'

5.87

0.04

293.50

5.70

0.04

285.00

5.70

0.04

285.00

5.70

0.04

142.50

1,448.50
9,488.62
10,937.12
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 13 - 8
LUAS
M2

5.70

0.04

142.50

5.80

0.04

290.00

5.80

0.04

290.00

5.75

0.04

287.50

5.75

0.04

287.50

5.70

0.04

142.50

LEBAR
M'

1,440.00
10,937.12
12,377.12
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 13 - 9
LUAS
M2

5.70

0.04

142.50

5.75

0.04

287.50

5.75

0.04

287.50

LEBAR
M'

5.70

0.04

285.00

5.75

0.04

287.50

5.70

0.04

142.50

1,432.50
12,377.12
13,809.62
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 13 - 10

LEBAR
M'

TEBAL
M'

LUAS
M2

5.70

0.04

142.50

5.70

0.04

285.00

5.80

0.04

290.00

5.80

0.04

290.00

5.90

0.04

295.00

5.90

0.04

147.50

1,450.00
13,809.62
15,259.62

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 13 - 11
LUAS
M2

5.90

0.04

147.50

5.86

0.04

293.00

5.86

0.04

146.50

LEBAR
M'

587.00
15,259.62
15,846.62
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

477 + 794

LEBAR

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

483 + 514

'm 6

477

794

5.96

477

800

6.50

6.00

0.04

35.76

0.04

162.50

0.04

286.00

0.04

42.70

50.00
3

477

850

6.50
19.00

478

610

6.10
14.00

478

624

6.10

0.04

42.70

480

300

5.57

0.04

38.99

480

314

5.57

0.04

38.99

483

500

5.82

0.04

40.74

10

483

514

5.82

0.04

40.74

14.00

14.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 13 - 1
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

117.00 M1
- M1
117.00 M1

729.12
729.12
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

491 + 600

LEBAR

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

491 + 550

'm 6

11

491

600

5.70

0.04

142.50

0.04

144.00

50.00
12

491

550

5.76

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 13 - 2
Jumlah Lalu
Jumlah Total MC - 2
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

50.00 M1
117.00 M1
167.00 M1

MARWAN, BE
CHIEF INSPECTOR

286.50
729.12
1,015.62
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

491 + 550

LEBAR

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

490 + 900

'm 6

491

550

5.76

0.04

144.00

0.04

291.00

50.00
2

491

500

5.82
50.00

491

450

5.82

0.04

291.00

0.04

293.50

0.04

295.00

0.04

295.00

0.04

299.00

0.04

299.00

0.04

302.50

0.04

305.00

0.04

292.50

0.04

305.00

0.04

290.00

0.04

143.75

50.00
4

491

400

5.87
50.00

491

350

5.90
50.00

491

300

5.90
50.00

491

250

5.98

491

200

5.98

50.00
50.00
9

491

150

6.05
50.00

10

491

100

6.10

11

491

050

5.85

50.00
50.00
12

491

000

6.10
50.00

13

490

950

5.80
50.00

14

490

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

900

5.75

Jumlah 13 - 1
Jumlah Lalu MC - 2
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

650.00 M1
167.00 M1
817.00 M1

MARWAN, BE
CHIEF INSPECTOR

3,846.25
1,015.62
4,861.87
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13

No

S TAT I O N E R

LEBAR

JARAK

TEBAL

LUAS

M1

M1

s/d

490 + 200

M1

M2

Laston AC-WC

STA

Aspal Lama

490 + 900

'm 6

15

490

900

5.75

16

490

850

5.75

0.04

143.75

0.04

287.50

0.04

287.00

0.04

287.50

0.04

295.00

0.04

295.00

0.04

282.50

0.04

282.50

0.04

286.50

0.04

283.50

0.04

290.00

0.04

290.00

0.04

290.00

0.04

290.00

0.04

145.75

50.00
50.00
17

490

800

5.74
50.00

18

490

750

5.75

19

490

700

5.90

50.00
50.00
20

490

650

5.90
50.00

21

490

600

5.65
50.00

22

490

550

5.65
50.00

23

490

500

5.73
50.00

24

490

450

5.67
50.00

25

490

400

5.80
50.00

26

490

350

5.80

27

490

300

5.80

50.00
50.00
28

490

250

5.80
50.00

29

490

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

200

5.83

Jumlah 13-2
700.00 M1
4,036.50
1
Jumlah Lalu
817.00 M
4,861.87
1
Jumlah Total
1,517.00 M
8,898.37
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

490 + 200

LEBAR

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

489 + 500

'm 6

30

490

200

5.83

0.04

145.75

0.04

291.50

0.04

295.00

0.04

295.00

0.04

285.00

0.04

285.00

0.04

290.00

0.04

285.00

0.04

276.50

0.04

276.50

0.04

287.50

0.04

287.50

0.04

282.50

0.04

282.50

0.04

143.75

50.00
31

490

150

5.83

32

490

100

5.90

50.00
50.00
33

490

050

5.90
50.00

34

490

000

5.70
50.00

35

489

950

5.70
50.00

36

489

900

5.80
50.00

37

489

850

5.70
50.00

38

489

800

5.53
50.00

39

489

750

5.53

40

489

700

5.75

50.00
50.00
41

489

650

5.75
50.00

42

489

600

5.65

43

489

550

5.65

50.00
50.00
44

489

500
Jumlah 13-3

5.75
700.00 M1

4,009.00

Jumlah Lalu
1,517.00 M1
8,898.37
1
Jumlah Total
2,217.00 M
12,907.37
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

489 + 500

LEBAR

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

489 + 000

'm 6

45

489

500

5.75

0.04

143.75

0.04

282.50

0.04

290.00

0.04

292.50

0.04

292.50

0.04

292.50

0.04

292.50

0.04

295.00

0.04

295.00

0.04

293.00

50.00
46

489

450

5.65
50.00

47

489

400

5.80
50.00

48

489

350

5.85
50.00

49

489

300

5.85
50.00

50

489

250

5.85

51

489

200

5.85

50.00
50.00
52

489

150

5.90
50.00

53

489

100

5.90

54

489

050

5.86

50.00

50.00
55

489

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

000

5.86

0.04

146.50

Jumlah 13-4
500.00 M1
2,915.75
1
Jumlah Lalu
2,217.00 M
12,907.37
1
Jumlah Total MC - 3
2,717.00 M
15,823.12
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

489 + 000

LEBAR

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

488 + 400

'm 6

489

000

5.86

488

950

5.85

0.04

146.50

0.04

292.50

0.04

290.00

50.00
50.00
3

488

900

5.80
50.00

488

850

5.80

0.04

290.00

0.04

295.00

0.04

294.00

0.04

292.50

0.04

292.50

0.04

298.00

0.04

297.50

0.04

290.00

0.04

294.00

0.04

142.50

50.00
5

488

800

5.90
50.00

488

750

5.88
50.00

488

700

5.85
50.00

488

650

5.85

488

600

5.96

50.00
50.00
10

488

550

5.95
50.00

11

488

500

5.80

12

488

450

5.88

50.00
50.00
13

488

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

400

5.70

Jumlah 13-1
600.00 M1
3,515.00
Jumlah Lalu MC - 3
2,717.00 M1
15,823.12
Jumlah Total
3,317.00 M1
19,338.12
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13

No

S TAT I O N E R

Laston AC-WC

LEBAR

JARAK

TEBAL

LUAS

M1

M1

M1

M2

Laston AC-WC

STA

Aspal Lama

488 + 400

s/d

487 + 700

'm 6

14

488

400

5.70

15

488

350

5.70

0.04

142.50

0.04

285.00

0.04

295.00

0.04

295.00

0.04

297.50

0.04

295.00

0.04

297.50

0.04

297.50

0.04

296.50

0.04

296.50

0.04

290.00

0.04

290.00

0.04

295.00

0.04

295.00

0.04

148.75

50.00
50.00
16

488

300

5.90
50.00

17

488

250

5.90

18

488

200

5.95

50.00
50.00
19

488

150

5.90
50.00

20

488

100

5.95
50.00

21

488

050

5.95
50.00

22

488

000

5.93
50.00

23

487

950

5.93
50.00

24

487

900

5.80
50.00

25

487

850

5.80

26

487

800

5.90

50.00
50.00
27

487

750

5.90
50.00

28

487

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

700

5.95

Jumlah 13-2
700.00 M1
4,116.75
1
Jumlah Lalu
3,317.00 M
19,338.12
1
Jumlah Total
4,017.00 M
23,454.87
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

487 + 700

LEBAR

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

487 + 183

'm 6

29

487

700

5.95

0.04

148.75

0.04

297.50

0.04

296.50

0.04

296.50

0.04

295.00

0.04

295.00

0.04

294.50

0.04

295.00

0.04

296.00

0.04

296.00

0.04

197.65

0.04

49.30

50.00
30

488

650

5.95
50.00

31

488

600

5.93
50.00

32

488

550

5.93
50.00

33

488

500

5.90
50.00

34

488

450

5.90

35

488

400

5.89

50.00
50.00
36

488

350

5.90
50.00

37

488

300

5.92

38

487

250

5.92

50.00
50.00
39

487

200

5.90
17.00

40

487

183

Jumlah 13-3
Jumlah Lalu
Jumlah Total

5.80

517.00 M1
4,017.00 M1
4,534.00 M1

3,057.70
23,454.87
26,512.57

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13

No

S TAT I O N E R

Laston AC-WC

STA

Aspal Lama

487 + 700

LEBAR

JARAK

TEBAL

LUAS

M1

M1

M1

M2

s/d

487 + 150

'm 6

41

487

000

2.93

0.04

73.25

0.04

146.50

0.04

143.00

0.04

105.00

0.04

30.00

0.04

29.70

0.04

105.00

0.04

141.10

50.00
42

486

950

2.93
50.00

43

486

900

2.86
50.00

44

486

850

3.00

45

486

830

3.00

46

486

870

2.97

20.00

20.00
47

486

850

3.00
50.00

48

486

800

3.40
33.00

49

486

767

3.40

0.04

56.10

50

485

500

6.20

0.04

155.00

50.00
51

485

450

6.20

0.04

310.00

0.04

315.00

0.04

155.00

0.04

314.00

50.00
52

485

400

6.30

53

485

350

6.20

54

481

050

6.28

50.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

50.00

Jumlah 13-4
473.00 M1
2,078.65
1
Jumlah Lalu
4,534.00 M
26,512.57
Jumlah Total MC - 4
5,007.00 M1
28,591.22
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 5
BULAN : NOPEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13

No

S TAT I O N E R

LEBAR

JARAK

TEBAL

LUAS

M1

M1

M1

M2

Laston AC-WC
Laston AC-BC

'm 10

Nicah Awe

10.00

9.60

0.04

96.00

Damar Tutong

10.00

9.60

0.04

96.00

Alue Lhok

9.00

8.10

0.04

72.90

Sarah Teube

10.00

9.60

0.04

96.00

Alue Dua

10.00

9.60

0.04

96.00

Lhok Bhani

10.00

9.60

0.04

96.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 13-1
56.10 M1
552.90
1
Jumlah Lalu MC - 4
5,007.00 M
28,591.22
1
Jumlah Total MC - 5
5,063.10 M
29,144.12
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 13 - 1
KET

M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 13 - 2
KET

M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 13 - 1
KET

M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 13 - 2
KET

K
9
1
L
0
a
e
msl
m
a't'
os'
n
A
B
A
C
W
B
C

M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 13 - 3
KET

M2

M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 13 - 4
KET

M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 13 - 1
KET

M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 13 - 2
KET

M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 13 - 3
KET

M2
M2
M2

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 13 - 4
KET

M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 13 - 1
KET

M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+850

Sta 490+900

Sta 490+950

Sta 491+000

Sta 491+050

Sta 491+100

Sta 491+150

Sta 491+200

Sta 491+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+850

Sta 490+900

Sta 490+950

Sta 491+000

Sta 491+050

Sta 491+100

Sta 491+150

Sta 491+200

Sta 491+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)

Lokasi

: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+100

Sta 490+150

Sta 490+200

Sta 490+250

Sta 490+300

Sta 490+350

Sta 490+400

Sta 490+450

Sta 490+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 489+350

Sta 489+400

Sta 489+450

Sta 489+500

Sta 489+550

Sta 489+600

Sta 489+650

Sta 489+700

Sta 489+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

KOTA LANGSA

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 487+850

Sta 487+900

Sta 487+950

Sta 488+000

Sta 488+050

Sta 488+100

Sta 488+150

Sta 488+200

Sta 488+250

KOTA LANGSA

Diperiksa Oleh :

Diperiksa Oleh :

BAG. PELAKSANA KEG. SKS


LINTAS TIMUR III

Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 487+100

Sta 487+150

Sta 487+200

Sta 487+250

Sta 487+300

Sta 487+350

Sta 487+400

Sta 487+450

Sta 487+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 486+350

Sta 486+400

Sta 486+450

Sta 486+500

Sta 486+550

Sta 486+600

Sta 486+650

Sta 486+700

Sta 486+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 485+600

Sta 485+650

Sta 485+700

Sta 485+750

Sta 485+800

Sta 485+850

Sta 485+900

Sta 485+950

Sta 486+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 484+850

Sta 484+900

Sta 484+950

Sta 485+000

Sta 485+050

Sta 485+100

Sta 485+150

Sta 485+200

Sta 485+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 484+100

Sta 484+150

Sta 484+200

Sta 484+250

Sta 484+300

Sta 484+350

Sta 484+400

Sta 484+450

Sta 484+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 483+350

Sta 483+400

Sta 483+450

Sta 483+500

Sta 483+550

Sta 483+600

Sta 483+650

Sta 483+700

Sta 483+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 482+600

Sta 482+650

KOTA LANGSA

Sta 482+700

Sta 482+750

Sta 482+800

Sta 482+850

Sta 482+900

Sta 482+950

Sta 483+000

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 481+850

Sta 481+900

KOTA LANGSA

Sta 481+950

Sta 482+000

Sta 482+050

Sta 482+100

Sta 482+150

Sta 482+200

Sta 482+250

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 481+100

Sta 481+150

Sta 481+200

Sta 481+250

Sta 481+300

Sta 481+350

Sta 481+400

Sta 481+450

Sta 481+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 480+350

Sta 480+400

Sta 480+450

Sta 480+500

Sta 480+550

Sta 480+600

Sta 480+650

Sta 480+700

Sta 480+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 479+600

Sta 479+650

Sta 479+700

Sta 479+750

Sta 479+800

Sta 479+850

Sta 479+900

Sta 479+950

Sta 480+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 478+850

Sta 478+900

Sta 478+950

Sta 479+000

Sta 479+050

Sta 479+100

Sta 479+150

Sta 479+200

Sta 479+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 478+100

Sta 478+150

Sta 478+200

Sta 478+250

Sta 478+300

Sta 478+350

Sta 478+400

Sta 478+450

Sta 478+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 477+350

Sta 477+400

Sta 477+450

Sta 477+500

Sta 477+550

Sta 477+600

Sta 477+650

Sta 477+700

Sta 477+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 476+600

Sta 476+650

KOTA LANGSA

Sta 476+700

Sta 476+750

Sta 476+800

Sta 476+850

Sta 476+900

Sta 476+950

Sta 477+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 475+850

Sta 475+900

KOTA LANGSA

Sta 475+950

Sta 476+000

Sta 476+050

Sta 476+100

Sta 476+150

Sta 476+200

Sta 476+250

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 475+100

Sta 475+150

Sta 475+200

Sta 475+250

Sta 475+300

Sta 475+350

Sta 475+400

Sta 475+450

Sta 475+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 474+350

Sta 474+400

Sta 474+450

Sta 474+500

Sta 474+550

Sta 474+600

Sta 474+650

Sta 474+700

Sta 474+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SI

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATA

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

2
US 2005

HAL. 13 - 5

MBAR

PERBATASAN
SUMUT
Sta 491+300

Sta 491+350

Sta 491+400

Sta 491+450

Sta 491+500

Sta 491+550

Sta 491+600

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 13 - 1

MBAR

PERBATASAN
SUMUT
Sta 491+300

Sta 491+350

Sta 491+400

Sta 491+450

Sta 491+500

Sta 491+550

Sta 491+600

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 13 - 2

MBAR

Sta 490+550

Sta 490+600

Sta 490+650

Sta 490+700

Sta 490+750

Sta 490+800

Sta 490+850

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

MBAR

HAL. 13 - 3

Sta 489+800

Sta 489+850

Sta 489+900

Sta 489+950

Sta 490+000

Sta 490+050

Sta 490+100

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 13 - 4

MBAR

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

Sta 489+250

Sta 489+300

Sta 489+350

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

4
ER 2005

HAL. 13 - 1

MBAR

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

Sta 489+250

Sta 489+300

MEDAN

Sta 489+350

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

4
ER 2005

HAL. 13 - 2

MBAR

eh :

Sta 488+300

Sta 488+350

Sta 488+400

Sta 488+450

Sta 488+500

Sta 488+550

MEDAN

Dibuat Oleh :

Sta 488+600

pervisi
ERDANA

PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

4
ER 2005

HAL. 13 - 3

MBAR

Sta 487+550

Sta 487+600

Sta 487+650

Sta 487+700

Sta 487+750

Sta 487+800

Sta 487+850

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 1 - 1

MBAR

Sta 486+800

Sta 486+850

Sta 486+900

Sta 486+950

Sta 487+000

Sta 487+050

Sta 487+100

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

DATA

3
BER 2005

HAL. 1 - 1

MBAR

Sta 486+050

Sta 486+100

Sta 486+150

Sta 486+200

Sta 486+250

Sta 486+300

Sta 486+350

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 485+300

Sta 485+350

Sta 485+400

Sta 485+450

Sta 485+500

Sta 485+550

Sta 485+600

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

MBAR

HAL. 1 - 1

Sta 484+550

Sta 484+600

Sta 484+650

Sta 484+700

Sta 484+750

Sta 484+800

Sta 484+850

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 13 - 4

MBAR

Sta 483+800

Sta 483+850

Sta 483+900

Sta 483+950

Sta 484+000

Sta 484+050

Sta 484+100

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 483+050

Sta 483+100

Sta 483+150

Sta 483+200

Sta 483+250

Sta 483+300

MEDAN

Sta 483+350

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 482+300

Sta 482+350

Sta 482+400

Sta 482+450

Sta 482+500

Sta 482+550

MEDAN

Sta 482+600

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

eh :
pervisi
ERDANA

Sta 481+550

Sta 481+600

Sta 481+650

Sta 481+700

Sta 481+750

Sta 481+800

Sta 481+850

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 480+800

Sta 480+850

Sta 480+900

Sta 480+950

Sta 481+000

Sta 481+050

Sta 481+100

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 13 - 3

MBAR

Sta 480+050

Sta 480+100

Sta 480+150

Sta 480+200

Sta 480+250

Sta 480+300

Sta 480+350

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 479+300

Sta 479+350

Sta 479+400

Sta 479+450

Sta 479+500

Sta 479+550

Sta 479+600

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 13 - 2

MBAR

Sta 478+550

Sta 478+600

Sta 478+650

Sta 478+700

Sta 478+750

Sta 478+800

Sta 478+850

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

MBAR

HAL. 13 - 1

Sta 477+800

Sta 477+850

Sta 477+900

Sta 477+950

Sta 478+000

Sta 478+050

Sta 478+100

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 477+050

Sta 477+100

Sta 477+150

Sta 477+200

Sta 477+250

Sta 477+300

MEDAN

Sta 477+350

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 476+300

Sta 476+350

Sta 476+400

Sta 476+450

Sta 476+500

Sta 476+550

MEDAN

Sta 476+600

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

eh :
pervisi
ERDANA

Sta 475+550

Sta 475+600

Sta 475+650

Sta 475+700

Sta 475+750

Sta 475+800

Sta 475+850

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR

Sta 474+800

Sta 474+850

Sta 474+900

Sta 474+950

Sta 475+000

Sta 475+050

Sta 475+100

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

SI NANGGROE ACEH DARUSSALAM

AN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

AS KOTA LANGSA - BATAS SUMUT

HAL. 1 - 1

MBAR
KOTA KUALA
SIMPANG

Sta 474+000

Sta 474+050

KOTA LANGSA

Sta 474+150

Sta 474+200

Sta 474+250

Sta 474+300

Sta 474+350

MEDAN

eh :
pervisi
ERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

BE
CTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Aus Aspal Beton (AC-WC)
HAL - 1
PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

477 + 750
477 + 800
477 + 850

6.00
50.00
19.00

###
6.50
6.37

0.05
0.05
0.05

36.00
325.00
121.03

1.80 AC-WC
16.25 AC-WC
6.05 AC-WC

478 + 600

14.00

6.10

0.05

85.40

4.27 AC-WC

JUMLAH SAAT INI


JUMLAH LALU

567.43
-

28.37
###

JUMLAH TOTAL

567.43

28.37

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83

INDIKASI
STA
STA
AWAL
AKHIR

480 + 300

JUMLAH SAAT INI

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Aus Aspal Beton (AC-WC)
HAL - 2

PANJANG
m

14.20

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

5.57

0.05

VOL
m3

KET

79.09

3.95 AC-WC

79.09

3.95

JUMLAH LALU
JUMLAH TOTAL

567.43
646.52

28.37
32.32

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

84 483 + 500
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Aus Aspal Beton (AC-WC)
HAL - 3

PANJANG
m
14.66

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
5.82

0.05

85.32

VOL
m3

KET

4.27 ACWC

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

85.32
646.52
731.84

4.27
32.32
36.59

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Aus Aspal Beton (AC-WC)
HAL - 4

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

731.84
731.84

36.59
36.59

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Aus Aspal Beton (AC-WC)
HAL - 5

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

731.84
731.84

36.59
36.59

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Aus Aspal Beton (AC-WC)
HAL - 6

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

231
232
233
234
235
JUMLAH SAAT INI
JUMLAH LALU
JUMLAH TOTAL

731.84
731.84

36.59
36.59

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Aus Aspal Beton (AC-WC)
HAL - 7

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

272
273
274
275
276
JUMLAH SAAT INI
JUMLAH LALU
JUMLAH TOTAL

731.84
731.84

36.59
36.59

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Aus Aspal Beton (AC-WC)
HAL - 8

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

312
313
314
315
316

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

731.84
731.84

36.59
36.59

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

317
318
319
320
321
322
323
324
325

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Aus Aspal Beton (AC-WC)
HAL - 9

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

731.84
731.84

36.59
36.59

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

INDIKASI
STA
STA
AWAL
AKHIR
474 + 250
474 + 250
474 + 500
474 + 700
474 + 750
474 + 800
474 + 850
475 + 300
475 + 450
475 + 500
476 + 050

476 + 450
476 + 500
476 + 550
476 + 600
477 + 050

477 + 100
477 + 450
477 + 550

477 + 600
477 + 700
477 + 950
478 + 000
478 + 200
478 + 300
478 + 350
478 + 650
479 + 250
479 + 300
479 + 750
479 + 950

JUMLAH SAAT INI


JUMLAH LALU

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
PANJANG
m
1.87
43.80
1.76
1.00
1.10
6.10
5.00
24.20
2.60
14.40
0.80
0.80
0.80
24.00
23.00
40.00
11.50
27.82
0.56
1.64
20.76
9.44
8.73
6.03
12.10
12.80
10.00
37.65
42.00
25.15
27.70
5.26
11.80
3.10
0.83
2.72
6.85
3.10
22.86
7.99
2.40
1.23
0.94

LEBAR
m
0.90
2.40
1.44
0.70
1.00
1.50
1.20
2.00
2.00
2.00
2.40
1.60
0.80
1.20
1.60
1.60
1.80
2.00
1.00
1.00
2.70
2.10
2.33
2.23
2.63
2.60
2.33
3.94
2.78
2.70
2.70
2.70
2.70
2.85
2.50
2.90
2.90
1.30
2.90
1.02
0.63
3.53
3.82

PENANGANAN
TEBAL
LUAS
m
m2
0.05
1.68
0.05
105.12
0.05
2.53
0.05
0.70
0.05
1.10
0.05
9.15
0.05
6.00
0.05
48.40
0.05
5.20
0.05
28.80
0.05
1.92
0.05
1.28
0.05
0.64
0.05
28.80
0.05
36.80
0.05
64.00
0.05
20.70
0.05
55.64
0.05
0.56
0.05
1.64
0.05
56.05
0.05
19.82
0.05
20.34
0.05
13.45
0.05
31.82
0.05
33.28
0.05
23.30
0.05
148.34
0.05
116.76
0.05
67.91
0.05
74.79
0.05
14.20
0.05
31.86
0.05
8.84
0.05
2.08
0.05
7.89
0.05
19.87
0.05
4.03
0.05
66.29
0.05
8.15
0.05
1.51
0.05
4.34
0.05
3.59
1,199.17
-

HAL - 1
VOL
m3
0.08
5.26
0.13
0.04
0.06
0.46
0.30
2.42
0.26
1.44
0.10
0.06
0.03
1.44
1.84
3.20
1.04
2.78
0.03
0.08
2.80
0.99
1.02
0.67
1.59
1.66
1.17
7.42
5.84
3.40
3.74
0.71
1.59
0.44
0.10
0.39
0.99
0.20
3.31
0.41
0.08
0.22
0.18

k=2,25
Ton
0.18
11.84
0.29
0.09
0.14
1.04
0.68
5.45
0.59
3.24
0.23
0.14
0.07
3.24
4.14
7.20
2.34
6.26
0.07
0.18
6.30
2.23
2.30
1.51
3.58
3.74
2.63
16.70
13.14
7.65
8.42
1.60
3.58
0.99
0.23
0.88
2.23
0.45
7.45
0.92
0.18
0.50
0.41

59.97
-

135.03
###

JUMLAH TOTAL

1,199.17

59.97

135.03

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

44
45
46
47
48

INDIKASI
STA
STA
AWAL
AKHIR
480 + 100
480 + 350
480 + 450
480 + 500
481 + 000
JUMLAH SAAT INI
JUMLAH LALU
JUMLAH TOTAL

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

PANJANG
m
11.85
31.80
4.44
31.95
16.90

LEBAR
m
3.30
3.52
1.39
2.90
2.75

PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05

39.11
111.94
6.17
92.66
46.48
296.36
1,199.17
1,495.53

HAL - 2

VOL
m3
1.96
5.60
0.31
4.63
2.32
14.82
59.97
74.79

k=2,25
Ton
4.41
12.60
0.70
10.42
5.22
33.35
135.03
168.38

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89

INDIKASI
STA
STA
AWAL
AKHIR
481 + 500
481 + 550
481 + 750
481 + 800
481 + 850
481 + 900
481 + 950
482 + 500
482 + 550
482 + 600
482 + 650
482 + 700
482 + 750

482 + 800
482 + 850
482 + 900

482 + 950
483 + 050
483 + 150
483 + 350
483 + 400
483 + 500
483 + 550
483 + 600
483 + 650
483 + 700
483 + 850
484 + 050
484 + 150
484 + 450

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

PANJANG
m
5.10
0.80
0.30
9.30
24.07
11.83
37.35
29.30
8.26
19.03
18.03
3.45
21.50
45.60
1.80
2.10
1.72
2.14
4.43
18.83
2.40
3.70
16.30
6.97
8.10
36.60
6.20
4.00
6.79
2.73
22.80
1.45
7.30
6.30
3.37
6.10
32.00
6.30
4.95
2.00
3.58

LEBAR
m
2.57
0.66
1.20
2.92
2.95
2.82
3.00
2.70
1.63
2.80
2.80
2.30
2.90
3.20
1.50
0.30
1.45
0.82
0.82
2.70
2.97
0.44
2.88
2.85
2.79
2.65
1.35
2.10
1.89
1.73
3.15
1.69
1.93
1.90
1.67
1.40
1.40
1.30
1.60
1.05
1.00

PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

13.11
0.53
0.36
27.16
71.01
33.36
112.05
79.11
13.46
53.28
50.48
7.94
62.35
145.92
2.70
0.63
2.49
1.75
3.63
50.84
7.13
1.63
46.94
19.86
22.60
96.99
8.37
8.40
12.83
4.72
71.82
2.45
14.09
11.97
5.63
8.54
44.80
8.19
7.92
2.10
3.58

HAL - 2

VOL
m3

k=2,25
Ton
0.66
0.03
0.02
1.36
3.55
1.67
5.60
3.96
0.67
2.66
2.52
0.40
3.12
7.30
0.14
0.03
0.12
0.09
0.18
2.54
0.36
0.08
2.35
0.99
1.13
4.85
0.42
0.42
0.64
0.24
3.59
0.12
0.70
0.60
0.28
0.43
2.24
0.41
0.40
0.11
0.18

1.49
0.07
0.05
3.06
7.99
3.76
12.60
8.91
1.51
5.99
5.67
0.90
7.02
16.43
0.32
0.07
0.27
0.20
0.41
5.72
0.81
0.18
5.29
2.23
2.54
10.91
0.95
0.95
1.44
0.54
8.08
0.27
1.58
1.35
0.63
0.97
5.04
0.92
0.90
0.25
0.41

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

1,142.72
1,495.53
2,638.25

57.16
74.79
131.95

128.68
168.38
297.06

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129

INDIKASI
STA
STA
AWAL
AKHIR
485 + 050
485 + 100
485 + 200
485 + 250
485 + 450

485 + 500

485 + 550
485 + 750

485 + 800

486 + 050

486 + 100
486 + 150

486 + 200

486 + 250

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

PANJANG
m
17.25
2.60
9.10
26.40
5.06
8.90
7.34
9.85
6.05
7.08
5.00
3.95
5.60
0.60
0.80
15.40
5.50
8.20
1.66
3.89
1.40
12.20
12.00
4.85
3.10
0.62
3.30
0.60
4.30
7.16
0.48
7.71
8.90
3.10
0.70
6.40
0.70
0.55
2.65
6.08

LEBAR
m
1.85
3.70
3.47
1.20
1.10
0.60
1.30
1.20
1.60
1.00
1.60
1.30
2.10
0.50
0.65
1.15
0.70
1.00
0.80
3.10
0.70
1.00
0.80
3.50
2.20
4.33
0.87
0.90
1.20
0.73
3.64
0.73
0.80
0.55
1.50
0.71
0.70
2.30
0.90
1.40

PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
1.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

31.91
9.62
31.58
31.68
5.57
5.34
9.54
11.82
9.68
7.08
8.00
5.14
11.76
0.30
0.52
17.71
3.85
8.20
1.33
12.06
0.98
12.20
9.60
16.98
6.82
2.68
2.87
0.54
5.16
5.23
1.75
5.63
7.12
1.71
1.05
4.54
0.49
1.27
2.39
8.51

HAL - 3

VOL
m3

k=2,25
Ton
1.60
0.48
1.58
1.58
0.28
0.27
0.48
0.59
0.48
7.43
0.40
0.26
0.59
0.02
0.03
0.89
0.19
0.41
0.07
0.60
0.05
0.61
0.48
0.85
0.34
0.13
0.14
0.03
0.26
0.26
0.09
0.28
0.36
0.09
0.05
0.23
0.02
0.06
0.12
0.43

3.60
1.08
3.56
3.56
0.63
0.61
1.08
1.33
1.08
16.72
0.90
0.59
1.33
0.05
0.07
2.00
0.43
0.92
0.16
1.35
0.11
1.37
1.08
1.91
0.77
0.29
0.32
0.07
0.59
0.59
0.20
0.63
0.81
0.20
0.11
0.52
0.05
0.14
0.27
0.97

130

6.08

0.36

0.05

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

2.19

0.11

0.25

322.40
2,638.25
2,960.65

23.22
131.95
155.17

52.30
297.06
349.36

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169

INDIKASI
STA
STA
AWAL
AKHIR
486 + 300
486 + 400

486 + 450
486 + 500
486 + 550
486 + 850
486 + 900

486 + 950
487 + 200
487 + 250
487 + 400
487 + 450

487 + 500

487 + 550
487 + 600
487 + 750
487 + 850

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

PANJANG
m
11.00
8.50
11.88
17.10
6.22
0.67
2.39
5.90
6.65
8.30
23.68
14.00
6.50
4.02
2.30
2.64
27.88
3.07
4.45
2.93
1.40
9.60
1.70
10.60
8.45
3.30
16.29
7.01
10.40
3.67
5.37
16.70
9.24
7.80
10.60
2.10
7.06
6.63
16.66

LEBAR
m
0.70
0.40
0.99
0.99
0.80
0.66
0.95
1.40
0.40
1.92
2.04
0.70
1.28
0.36
0.13
2.30
1.90
0.81
1.35
0.92
0.90
1.83
2.20
2.20
4.40
1.33
1.90
3.57
1.94
2.54
2.10
1.85
2.13
2.10
3.93
1.20
1.90
4.60
4.60

PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

7.70
3.40
11.76
16.93
4.98
0.44
2.27
8.26
2.66
15.94
48.31
9.80
8.32
1.45
0.30
6.07
52.97
2.49
6.01
2.70
1.26
17.57
3.74
23.32
37.18
4.39
30.95
25.03
20.18
9.32
11.28
30.90
19.68
16.38
41.66
2.52
13.41
30.50
76.64

HAL - 4

VOL
m3

k=2,25
Ton
0.39
0.17
0.59
0.85
0.25
0.02
0.11
0.41
0.13
0.80
2.42
0.49
0.42
0.07
0.02
0.30
2.65
0.12
0.30
0.14
0.06
0.88
0.19
1.17
1.86
0.22
1.55
1.25
1.01
0.47
0.56
1.55
0.98
0.82
2.08
0.13
0.67
1.53
3.83

0.88
0.38
1.33
1.91
0.56
0.05
0.25
0.92
0.29
1.80
5.45
1.10
0.95
0.16
0.05
0.68
5.96
0.27
0.68
0.32
0.14
1.98
0.43
2.63
4.19
0.50
3.49
2.81
2.27
1.06
1.26
3.49
2.21
1.85
4.68
0.29
1.51
3.44
8.62

30.00

0.80

0.05

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

24.00

1.20

2.70

652.67
2,960.65
3,613.32

32.66
155.17
187.83

73.54
349.36
422.90

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206

INDIKASI
STA
STA
AWAL
AKHIR
487 + 900

487 + 950
488 + 150

488 + 200
488 + 300

488 + 350
488 + 400
488 + 550
488 + 600

488 + 750

488 + 800

488 + 850

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

PANJANG
m
19.00
20.50
7.74
6.90
0.88
9.00
7.31
1.20
9.94
8.67
2.20
2.85
0.97
5.30
1.00
15.58
2.90
9.58
1.50
2.30
0.35
1.45
0.80
11.71
11.15
9.70
9.72
3.35
1.16
1.20
15.20
9.42
5.30
0.85
9.95
10.00
11.80

LEBAR
m
0.80
1.93
1.00
0.77
2.49
1.30
2.88
1.30
1.66
2.88
0.96
1.93
1.46
1.57
0.95
1.85
1.30
1.82
1.20
0.60
1.50
1.23
0.83
1.99
1.90
1.71
3.33
1.63
3.16
0.90
1.50
4.53
4.53
2.95
2.80
1.97
1.65

PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

15.20
39.57
7.74
5.31
2.19
11.70
21.05
1.56
16.50
24.97
2.11
5.50
1.42
8.32
0.95
28.82
3.77
17.44
1.80
1.38
0.53
1.78
0.66
23.30
21.19
16.59
32.37
5.46
3.67
1.08
22.80
42.67
24.01
2.51
27.86
19.70
19.47

HAL - 5

VOL
m3

k=2,25
Ton
0.76
1.98
0.39
0.27
0.11
0.59
1.05
0.08
0.83
1.25
0.11
0.28
0.07
0.42
0.05
1.44
0.19
0.87
0.09
0.07
0.03
0.09
0.03
1.17
1.06
0.83
1.62
0.27
0.18
0.05
1.14
2.13
1.20
0.13
1.39
0.99
0.97

1.71
4.46
0.88
0.61
0.25
1.33
2.36
0.18
1.87
2.81
0.25
0.63
0.16
0.95
0.11
3.24
0.43
1.96
0.20
0.16
0.07
0.20
0.07
2.63
2.39
1.87
3.65
0.61
0.41
0.11
2.57
4.79
2.70
0.29
3.13
2.23
2.18

207
208
209

4.27
27.45
34.00

489 + 050
489 + 100

3.37
3.37
2.50

0.05
0.05
0.05

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

14.39
92.51
85.00

0.72
4.63
4.25

1.62
10.42
9.56

674.85
3,613.32
4,288.17

33.78
187.83
221.61

76.05
422.90
498.95

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

PANJANG
m

LEBAR
m

PENANGANAN
TEBAL
LUAS
m
m2

HAL - 6

VOL
m3

k=2,25
Ton

489 + 150

15.80

2.00

0.05

31.60

1.58

3.56

489 + 200
489 + 250

2.60
3.90
2.40
8.40
3.80
2.80
1.10
2.10
4.00
5.20
14.80
1.80
2.60
1.65
2.35
43.00
6.45
0.70
1.20
1.30
1.31
1.50
1.26
1.65
6.20
1.30
16.20
10.00
5.50
11.00
1.90
6.57
5.60

2.30
1.60
1.60
1.80
1.90
1.50
1.60
1.60
2.80
2.70
2.58
1.50
1.50
0.60
0.70
2.90
2.90
0.70
0.90
0.60
1.60
1.00
1.00
0.90
2.30
1.00
2.28
0.50
1.50
3.40
1.60
1.50
0.40

0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

5.98
6.24
3.84
15.12
7.22
4.20
1.76
3.36
11.20
14.04
38.18
2.70
3.90
0.99
1.65
124.70
18.71
0.49
1.08
0.78
2.10
1.50
1.26
1.49
14.26
1.30
36.94
5.00
8.25
37.40
3.04
9.86
2.24

0.30
0.31
0.19
0.76
0.36
0.21
0.09
0.17
0.56
0.70
1.91
0.14
0.20
0.05
0.08
6.24
0.94
0.02
0.05
0.04
0.11
0.08
0.06
0.07
0.71
0.07
1.85
0.25
0.41
1.87
0.15
0.49
0.11

0.68
0.70
0.43
1.71
0.81
0.47
0.20
0.38
1.26
1.58
4.30
0.32
0.45
0.11
0.18
14.04
2.12
0.05
0.11
0.09
0.25
0.18
0.14
0.16
1.60
0.16
4.16
0.56
0.92
4.21
0.34
1.10
0.25

489 + 300

489 + 350

489 + 400

489 + 450
489 + 500

489 + 550

489 + 600
489 + 650

489 + 700

247
248
249
250
251
252

489 + 750

3.10
4.10
4.00
5.85
10.80
5.56

2.10
3.40
1.65
2.10
2.80
1.30

0.05
0.05
0.05
0.05
0.05
0.05

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

6.51
13.94
6.60
12.29
30.24
7.23

0.33
0.70
0.33
0.61
1.51
0.36

0.74
1.58
0.74
1.37
3.40
0.81

499.19
4,288.17
4,787.36

24.97
221.61
246.58

56.22
498.95
555.17

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286

INDIKASI
STA
STA
AWAL
AKHIR
489 + 800

489 + 850
489 + 900

489 + 950

490 + 000

490 + 050

490 + 100

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

PANJANG
m
0.70
5.25
5.00
1.30
0.80
3.70
2.80
4.50
9.20
1.10
3.00
5.10
4.00
3.20
2.70
1.30
27.70
3.60
10.50
8.55
3.40
4.70
13.00
13.35
11.75
21.00
2.30
1.50
1.50
4.80
8.30
13.80
6.70
3.80

LEBAR
m
1.35
2.60
1.00
0.90
0.80
1.70
11.04
1.55
2.60
1.90
4.20
3.40
2.60
2.60
3.80
2.20
2.27
0.40
3.10
1.80
4.40
2.00
0.40
1.96
2.70
2.70
0.80
0.90
0.90
1.00
1.00
1.60
1.30
1.50

PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

0.95
13.65
5.00
1.17
0.64
6.29
30.91
6.98
23.92
2.09
12.60
17.34
10.40
8.32
10.26
2.86
62.88
1.44
32.55
15.39
14.96
9.40
5.20
26.17
31.73
56.70
1.84
1.35
1.35
4.80
8.30
22.08
8.71
5.70

HAL - 7

VOL
m3

k=2,25
Ton
0.05
0.68
0.25
0.06
0.03
0.31
1.55
0.35
1.20
0.10
0.63
0.87
0.52
0.42
0.51
0.14
3.14
0.07
1.63
0.77
0.75
0.47
0.26
1.31
1.59
2.84
0.09
0.07
0.07
0.24
0.42
1.10
0.44
0.29

0.11
1.53
0.56
0.14
0.07
0.70
3.49
0.79
2.70
0.23
1.42
1.96
1.17
0.95
1.15
0.32
7.07
0.16
3.67
1.73
1.69
1.06
0.59
2.95
3.58
6.39
0.20
0.16
0.16
0.54
0.95
2.48
0.99
0.65

287

50.00

0.60

0.05

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

30.00

1.50

3.38

493.93
4,787.36
5,281.29

24.72
246.58
271.30

55.69
555.17
610.86

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322

INDIKASI
STA
STA
AWAL
AKHIR
490 + 150

490 + 200

490 + 250
490 + 300
490 + 400

490 + 450
490 + 500
490 + 550
490 + 600
490 + 650

490 + 750
490 + 800
490 + 850

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

PANJANG
m
5.60
1.45
5.00
3.00
5.40
5.60
0.90
0.50
0.60
4.33
1.95
18.50
3.00
6.10
8.10
2.00
1.55
11.70
6.10
8.50
4.20
10.50
13.60
20.00
20.00
6.00
1.20
29.00
1.00
6.00
3.60
4.00
44.00
10.00
15.00

LEBAR
m
0.70
0.80
0.85
0.58
1.56
0.50
0.50
0.60
0.58
0.55
0.80
0.95
0.98
2.10
1.50
0.80
1.40
1.80
1.50
0.50
2.00
1.60
1.70
2.50
2.50
2.70
1.00
1.20
1.50
2.10
1.50
2.40
3.00
3.00
2.30

PENANGANAN
TEBAL
LUAS
m
m2
0.05
3.92
0.05
1.16
0.05
4.25
0.05
1.74
0.05
8.42
0.05
2.80
0.05
0.45
0.05
0.30
0.05
0.35
0.05
2.38
0.05
1.56
0.05
17.58
0.05
2.94
0.05
12.81
0.05
12.15
0.05
1.60
0.05
2.17
0.05
21.06
0.05
9.15
0.05
4.25
0.05
8.40
0.05
16.80
0.05
23.12
0.05
50.00
0.05
50.00
0.05
16.20
0.05
1.20
0.05
34.80
0.05
1.50
0.05
12.60
0.05
5.40
0.05
9.60
0.05
132.00
0.05
30.00
0.05
34.50

HAL - 8

VOL
m3
0.20
0.06
0.21
0.09
0.42
0.14
0.02
0.02
0.02
0.12
0.08
0.88
0.15
0.64
0.61
0.08
0.11
1.05
0.46
0.21
0.42
0.84
1.16
2.50
2.50
0.81
0.06
1.74
0.08
0.63
0.27
0.48
6.60
1.50
1.73

k=2,25
Ton
0.45
0.14
0.47
0.20
0.95
0.32
0.05
0.05
0.05
0.27
0.18
1.98
0.34
1.44
1.37
0.18
0.25
2.36
1.04
0.47
0.95
1.89
2.61
5.63
5.63
1.82
0.14
3.92
0.18
1.42
0.61
1.08
14.85
3.38
3.89

323
324
325
326
327
328
329
330
331

491 + 000

8.60
19.90
7.50
7.80
6.90
12.80
30.00
24.00
32.00

491 + 100
491 + 150
491 + 200
491 + 200

2.70
2.60
2.00
1.30
1.40
0.80
3.00
2.50
3.00

0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

23.22
51.74
15.00
10.14
9.66
10.24
90.00
60.00
96.00
903.16
5,281.29
6,184.45

1.16
2.59
0.75
0.51
0.48
0.51
4.50
3.00
4.80
45.19
271.30
316.49

2.61
5.83
1.69
1.15
1.08
1.15
10.13
6.75
10.80
101.75
610.86
712.61

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

332
333
334
335
336
337
338
339
340

INDIKASI
STA
STA
AWAL
AKHIR
491 + 350
491 + 400
491 + 450

491 + 500

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

PANJANG
m
19.60
5.30
37.80
7.00
13.70
9.20
24.00
12.00
9.00

LEBAR
m
2.00
2.90
2.80
2.00
2.70
1.60
2.00
3.40
5.40

PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

39.20
15.37
105.84
14.00
36.99
14.72
48.00
40.80
48.60

HAL - 9

VOL
m3

k=2,25
Ton
1.96
0.77
5.29
0.70
1.85
0.74
2.40
2.04
2.43

4.41
1.73
11.90
1.58
4.16
1.67
5.40
4.59
5.47

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

363.52
6,184.45
6,547.97

18.18
316.49
334.67

40.91
712.61
753.52

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

INDIKASI
STA
STA
AWAL
AKHIR
474 + 250
474 + 250
474 + 500
474 + 700
474 + 750
474 + 800
474 + 850
475 + 300
475 + 450
475 + 500
476 + 050

476 + 450
476 + 500
476 + 550
476 + 600
477 + 050

477 + 100
477 + 450
477 + 550

477 + 600
477 + 700
477 + 950
478 + 000
478 + 200
478 + 300
478 + 350
478 + 650
479 + 250
479 + 300
479 + 750
479 + 950

JUMLAH SAAT INI


JUMLAH LALU

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
LEBAR
m
0.90
2.40
1.44
0.70
1.00
1.50
1.20
2.00
2.00
2.00
2.40
1.60
0.80
1.20
1.60
1.60
1.80
2.00
1.00
1.00
2.70
2.10
2.33
2.23
2.63
2.60
2.33
3.94
2.78
2.70
2.70
2.70
2.70
2.85
2.50
2.90
2.90
1.30
2.90
1.02
0.63
3.53
3.82

PANJANG
m
1.87
43.80
1.76
1.00
1.10
6.10
5.00
24.20
2.60
14.40
0.80
0.80
0.80
24.00
23.00
40.00
11.50
27.82
0.56
1.64
20.76
9.44
8.73
6.03
12.10
12.80
10.00
37.65
42.00
25.15
27.70
5.26
11.80
3.10
0.83
2.72
6.85
3.10
22.86
7.99
2.40
1.23
0.94

PENANGANAN
TEBAL
LUAS
m
m2
0.05
1.68
0.05
105.12
0.05
2.53
0.05
0.70
0.05
1.10
0.05
9.15
0.05
6.00
0.05
48.40
0.05
5.20
0.05
28.80
0.05
1.92
0.05
1.28
0.05
0.64
0.05
28.80
0.05
36.80
0.05
64.00
0.05
20.70
0.05
55.64
0.05
0.56
0.05
1.64
0.05
56.05
0.05
19.82
0.05
20.34
0.05
13.45
0.05
31.82
0.05
33.28
0.05
23.30
0.05
148.34
0.05
116.76
0.05
67.91
0.05
74.79
0.05
14.20
0.05
31.86
0.05
8.84
0.05
2.08
0.05
7.89
0.05
19.87
0.05
4.03
0.05
66.29
0.05
8.15
0.05
1.51
0.05
4.34
0.05
3.59
1,199.17
-

HAL - 1
VOL
m3
0.08
5.26
0.13
0.04
0.06
0.46
0.30
2.42
0.26
1.44
0.10
0.06
0.03
1.44
1.84
3.20
1.04
2.78
0.03
0.08
2.80
0.99
1.02
0.67
1.59
1.66
1.17
7.42
5.84
3.40
3.74
0.71
1.59
0.44
0.10
0.39
0.99
0.20
3.31
0.41
0.08
0.22
0.18

k=2,25
Ton
0.18
11.84
0.29
0.09
0.14
1.04
0.68
5.45
0.59
3.24
0.23
0.14
0.07
3.24
4.14
7.20
2.34
6.26
0.07
0.18
6.30
2.23
2.30
1.51
3.58
3.74
2.63
16.70
13.14
7.65
8.42
1.60
3.58
0.99
0.23
0.88
2.23
0.45
7.45
0.92
0.18
0.50
0.41

59.97
-

135.03
###

JUMLAH TOTAL

1,199.17

59.97

135.03

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

44
45
46
47
48

INDIKASI
STA
STA
AWAL
AKHIR
480 + 100
480 + 350
480 + 450
480 + 500
481 + 000
JUMLAH SAAT INI
JUMLAH LALU
JUMLAH TOTAL

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

LEBAR
m
3.30
3.52
1.39
2.90
2.75

PANJANG
m
11.85
31.80
4.44
31.95
16.90

PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05

39.11
111.94
6.17
92.66
46.48
296.36
1,199.17
1,495.53

HAL - 2

VOL
m3
1.96
5.60
0.31
4.63
2.32
14.82
59.97
74.79

k=2,25
Ton
4.41
12.60
0.70
10.42
5.22
33.35
135.03
168.38

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89

INDIKASI
STA
STA
AWAL
AKHIR
481 + 500
481 + 550
481 + 750
481 + 800
481 + 850
481 + 900
481 + 950
482 + 500
482 + 550
482 + 600
482 + 650
482 + 700
482 + 750

482 + 800
482 + 850
482 + 900

482 + 950
483 + 050
483 + 150
483 + 350
483 + 400
483 + 500
483 + 550
483 + 600
483 + 650
483 + 700
483 + 850
484 + 050
484 + 150
484 + 450

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

LEBAR
m
2.57
0.66
1.20
2.92
2.95
2.82
3.00
2.70
1.63
2.80
2.80
2.30
2.90
3.20
1.50
0.30
1.45
0.82
0.82
2.70
2.97
0.44
2.88
2.85
2.79
2.65
1.35
2.10
1.89
1.73
3.15
1.69
1.93
1.90
1.67
1.40
1.40
1.30
1.60
1.05
1.00

PANJANG
m
5.10
0.80
0.30
9.30
24.07
11.83
37.35
29.30
8.26
19.03
18.03
3.45
21.50
45.60
1.80
2.10
1.72
2.14
4.43
18.83
2.40
3.70
16.30
6.97
8.10
36.60
6.20
4.00
6.79
2.73
22.80
1.45
7.30
6.30
3.37
6.10
32.00
6.30
4.95
2.00
3.58

PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

13.11
0.53
0.36
27.16
71.01
33.36
112.05
79.11
13.46
53.28
50.48
7.94
62.35
145.92
2.70
0.63
2.49
1.75
3.63
50.84
7.13
1.63
46.94
19.86
22.60
96.99
8.37
8.40
12.83
4.72
71.82
2.45
14.09
11.97
5.63
8.54
44.80
8.19
7.92
2.10
3.58

HAL - 2

VOL
m3

k=2,25
Ton
0.66
0.03
0.02
1.36
3.55
1.67
5.60
3.96
0.67
2.66
2.52
0.40
3.12
7.30
0.14
0.03
0.12
0.09
0.18
2.54
0.36
0.08
2.35
0.99
1.13
4.85
0.42
0.42
0.64
0.24
3.59
0.12
0.70
0.60
0.28
0.43
2.24
0.41
0.40
0.11
0.18

1.49
0.07
0.05
3.06
7.99
3.76
12.60
8.91
1.51
5.99
5.67
0.90
7.02
16.43
0.32
0.07
0.27
0.20
0.41
5.72
0.81
0.18
5.29
2.23
2.54
10.91
0.95
0.95
1.44
0.54
8.08
0.27
1.58
1.35
0.63
0.97
5.04
0.92
0.90
0.25
0.41

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

1,142.72
1,495.53
2,638.25

57.16
74.79
131.95

128.68
168.38
297.06

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129

INDIKASI
STA
STA
AWAL
AKHIR
485 + 050
485 + 100
485 + 200
485 + 250
485 + 450

485 + 500

485 + 550
485 + 750

485 + 800

486 + 050

486 + 100
486 + 150

486 + 200

486 + 250

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

LEBAR
m
1.85
3.70
3.47
1.20
1.10
0.60
1.30
1.20
1.60
1.00
1.60
1.30
2.10
0.50
0.65
1.15
0.70
1.00
0.80
3.10
0.70
1.00
0.80
3.50
2.20
4.33
0.87
0.90
1.20
0.73
3.64
0.73
0.80
0.55
1.50
0.71
0.70
2.30
0.90
1.40

PANJANG
m
17.25
2.60
9.10
26.40
5.06
8.90
7.34
9.85
6.05
7.08
5.00
3.95
5.60
0.60
0.80
15.40
5.50
8.20
1.66
3.89
1.40
12.20
12.00
4.85
3.10
0.62
3.30
0.60
4.30
7.16
0.48
7.71
8.90
3.10
0.70
6.40
0.70
0.55
2.65
6.08

PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

31.91
9.62
31.58
31.68
5.57
5.34
9.54
11.82
9.68
7.08
8.00
5.14
11.76
0.30
0.52
17.71
3.85
8.20
1.33
12.06
0.98
12.20
9.60
16.98
6.82
2.68
2.87
0.54
5.16
5.23
1.75
5.63
7.12
1.71
1.05
4.54
0.49
1.27
2.39
8.51

HAL - 3

VOL
m3

k=2,25
Ton
1.60
0.48
1.58
1.58
0.28
0.27
0.48
0.59
0.48
0.35
0.40
0.26
0.59
0.02
0.03
0.89
0.19
0.41
0.07
0.60
0.05
0.61
0.48
0.85
0.34
0.13
0.14
0.03
0.26
0.26
0.09
0.28
0.36
0.09
0.05
0.23
0.02
0.06
0.12
0.43

3.60
1.08
3.56
3.56
0.63
0.61
1.08
1.33
1.08
0.79
0.90
0.59
1.33
0.05
0.07
2.00
0.43
0.92
0.16
1.35
0.11
1.37
1.08
1.91
0.77
0.29
0.32
0.07
0.59
0.59
0.20
0.63
0.81
0.20
0.11
0.52
0.05
0.14
0.27
0.97

130

0.36

6.08

0.05

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

2.19

0.11

0.25

322.40
2,638.25
2,960.65

16.14
131.95
148.09

36.37
297.06
333.43

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169

INDIKASI
STA
STA
AWAL
AKHIR
486 + 300
486 + 400

486 + 450
486 + 500
486 + 550
486 + 850
486 + 900

486 + 950
487 + 200
487 + 250
487 + 400
487 + 450

487 + 500

487 + 550
487 + 600
487 + 750
487 + 850

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

LEBAR
m
0.70
0.40
0.99
0.99
0.80
0.66
0.95
1.40
0.40
1.92
2.04
0.70
1.28
0.36
0.13
2.30
1.90
0.81
1.35
0.92
0.90
1.83
2.20
2.20
4.40
1.33
1.90
3.57
1.94
2.54
2.10
1.85
2.13
2.10
3.93
1.20
1.90
4.60
4.60

PANJANG
m
11.00
8.50
11.88
17.10
6.22
0.67
2.39
5.90
6.65
8.30
23.68
14.00
6.50
4.02
2.30
2.64
27.88
3.07
4.45
2.93
1.40
9.60
1.70
10.60
8.45
3.30
16.29
7.01
10.40
3.67
5.37
16.70
9.24
7.80
10.60
2.10
7.06
6.63
16.66

PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

7.70
3.40
11.76
16.93
4.98
0.44
2.27
8.26
2.66
15.94
48.31
9.80
8.32
1.45
0.30
6.07
52.97
2.49
6.01
2.70
1.26
17.57
3.74
23.32
37.18
4.39
30.95
25.03
20.18
9.32
11.28
30.90
19.68
16.38
41.66
2.52
13.41
30.50
76.64

HAL - 4

VOL
m3

k=2,25
Ton
0.39
0.17
0.59
0.85
0.25
0.02
0.11
0.41
0.13
0.80
2.42
0.49
0.42
0.07
0.02
0.30
2.65
0.12
0.30
0.14
0.06
0.88
0.19
1.17
1.86
0.22
1.55
1.25
1.01
0.47
0.56
1.55
0.98
0.82
2.08
0.13
0.67
1.53
3.83

0.88
0.38
1.33
1.91
0.56
0.05
0.25
0.92
0.29
1.80
5.45
1.10
0.95
0.16
0.05
0.68
5.96
0.27
0.68
0.32
0.14
1.98
0.43
2.63
4.19
0.50
3.49
2.81
2.27
1.06
1.26
3.49
2.21
1.85
4.68
0.29
1.51
3.44
8.62

0.80

30.00

0.05

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

24.00

1.20

2.70

652.67
2,960.65
3,613.32

32.66
148.09
180.75

73.54
333.43
406.97

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206

INDIKASI
STA
STA
AWAL
AKHIR
487 + 900

487 + 950
488 + 150

488 + 200
488 + 300

488 + 350
488 + 400
488 + 550
488 + 600

488 + 750

488 + 800

488 + 850

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

LEBAR
m
0.80
1.93
1.00
0.77
2.49
1.30
2.88
1.30
1.66
2.88
0.96
1.93
1.46
1.57
0.95
1.85
1.30
1.82
1.20
0.60
1.50
1.23
0.83
1.99
1.90
1.71
3.33
1.63
3.16
0.90
1.50
4.53
4.53
2.95
2.80
1.97
1.65

PANJANG
m
19.00
20.50
7.74
6.90
0.88
9.00
7.31
1.20
9.94
8.67
2.20
2.85
0.97
5.30
1.00
15.58
2.90
9.58
1.50
2.30
0.35
1.45
0.80
11.71
11.15
9.70
9.72
3.35
1.16
1.20
15.20
9.42
5.30
0.85
9.95
10.00
11.80

PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

15.20
39.57
7.74
5.31
2.19
11.70
21.05
1.56
16.50
24.97
2.11
5.50
1.42
8.32
0.95
28.82
3.77
17.44
1.80
1.38
0.53
1.78
0.66
23.30
21.19
16.59
32.37
5.46
3.67
1.08
22.80
42.67
24.01
2.51
27.86
19.70
19.47

HAL - 5

VOL
m3

k=2,25
Ton
0.76
1.98
0.39
0.27
0.11
0.59
1.05
0.08
0.83
1.25
0.11
0.28
0.07
0.42
0.05
1.44
0.19
0.87
0.09
0.07
0.03
0.09
0.03
1.17
1.06
0.83
1.62
0.27
0.18
0.05
1.14
2.13
1.20
0.13
1.39
0.99
0.97

1.71
4.46
0.88
0.61
0.25
1.33
2.36
0.18
1.87
2.81
0.25
0.63
0.16
0.95
0.11
3.24
0.43
1.96
0.20
0.16
0.07
0.20
0.07
2.63
2.39
1.87
3.65
0.61
0.41
0.11
2.57
4.79
2.70
0.29
3.13
2.23
2.18

207
208
209

3.37
3.37
2.50

489 + 050
489 + 100

4.27
27.45
34.00

0.05
0.05
0.05

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

14.39
92.51
85.00

0.72
4.63
4.25

1.62
10.42
9.56

674.85
3,613.32
4,288.17

33.78
180.75
214.53

76.05
406.97
483.02

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

LEBAR
m

PANJANG
m

PENANGANAN
TEBAL
LUAS
m
m2

HAL - 6

VOL
m3

k=2,25
Ton

489 + 150

2.00

15.80

0.05

31.60

1.58

3.56

489 + 200
489 + 250

2.30
1.60
1.60
1.80
1.90
1.50
1.60
1.60
2.80
2.70
2.58
1.50
1.50
0.60
0.70
2.90
2.90
0.70
0.90
0.60
1.60
1.00
1.00
0.90
2.30
1.00
2.28
0.50
1.50
3.40
1.60
1.50
0.40

2.60
3.90
2.40
8.40
3.80
2.80
1.10
2.10
4.00
5.20
14.80
1.80
2.60
1.65
2.35
43.00
6.45
0.70
1.20
1.30
1.31
1.50
1.26
1.65
6.20
1.30
16.20
10.00
5.50
11.00
1.90
6.57
5.60

0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

5.98
6.24
3.84
15.12
7.22
4.20
1.76
3.36
11.20
14.04
38.18
2.70
3.90
0.99
1.65
124.70
18.71
0.49
1.08
0.78
2.10
1.50
1.26
1.49
14.26
1.30
36.94
5.00
8.25
37.40
3.04
9.86
2.24

0.30
0.31
0.19
0.76
0.36
0.21
0.09
0.17
0.56
0.70
1.91
0.14
0.20
0.05
0.08
6.24
0.94
0.02
0.05
0.04
0.11
0.08
0.06
0.07
0.71
0.07
1.85
0.25
0.41
1.87
0.15
0.49
0.11

0.68
0.70
0.43
1.71
0.81
0.47
0.20
0.38
1.26
1.58
4.30
0.32
0.45
0.11
0.18
14.04
2.12
0.05
0.11
0.09
0.25
0.18
0.14
0.16
1.60
0.16
4.16
0.56
0.92
4.21
0.34
1.10
0.25

489 + 300

489 + 350

489 + 400

489 + 450
489 + 500

489 + 550

489 + 600
489 + 650

489 + 700

247
248
249
250
251
252

489 + 750

2.10
3.40
1.65
2.10
2.80
1.30

3.10
4.10
4.00
5.85
10.80
5.56

0.05
0.05
0.05
0.05
0.05
0.05

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

6.51
13.94
6.60
12.29
30.24
7.23

0.33
0.70
0.33
0.61
1.51
0.36

0.74
1.58
0.74
1.37
3.40
0.81

499.19
4,288.17
4,787.36

24.97
214.53
239.50

56.22
483.02
539.24

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286

INDIKASI
STA
STA
AWAL
AKHIR
489 + 800

489 + 850
489 + 900

489 + 950

490 + 000

490 + 050

490 + 100

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

LEBAR
m
1.35
2.60
1.00
0.90
0.80
1.70
11.04
1.55
2.60
1.90
4.20
3.40
2.60
2.60
3.80
2.20
2.27
0.40
3.10
1.80
4.40
2.00
0.40
1.96
2.70
2.70
0.80
0.90
0.90
1.00
1.00
1.60
1.30
1.50

PANJANG
m
0.70
5.25
5.00
1.30
0.80
3.70
2.80
4.50
9.20
1.10
3.00
5.10
4.00
3.20
2.70
1.30
27.70
3.60
10.50
8.55
3.40
4.70
13.00
13.35
11.75
21.00
2.30
1.50
1.50
4.80
8.30
13.80
6.70
3.80

PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

0.95
13.65
5.00
1.17
0.64
6.29
30.91
6.98
23.92
2.09
12.60
17.34
10.40
8.32
10.26
2.86
62.88
1.44
32.55
15.39
14.96
9.40
5.20
26.17
31.73
56.70
1.84
1.35
1.35
4.80
8.30
22.08
8.71
5.70

HAL - 7

VOL
m3

k=2,25
Ton
0.05
0.68
0.25
0.06
0.03
0.31
1.55
0.35
1.20
0.10
0.63
0.87
0.52
0.42
0.51
0.14
3.14
0.07
1.63
0.77
0.75
0.47
0.26
1.31
1.59
2.84
0.09
0.07
0.07
0.24
0.42
1.10
0.44
0.29

0.11
1.53
0.56
0.14
0.07
0.70
3.49
0.79
2.70
0.23
1.42
1.96
1.17
0.95
1.15
0.32
7.07
0.16
3.67
1.73
1.69
1.06
0.59
2.95
3.58
6.39
0.20
0.16
0.16
0.54
0.95
2.48
0.99
0.65

287

0.60

50.00

0.05

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

30.00

1.50

3.38

493.93
4,787.36
5,281.29

24.72
239.50
264.22

55.69
539.24
594.93

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322

INDIKASI
STA
STA
AWAL
AKHIR
490 + 150

490 + 200

490 + 250
490 + 300
490 + 400

490 + 450
490 + 500
490 + 550
490 + 600
490 + 650

490 + 750
490 + 800
490 + 850

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

LEBAR
m
0.70
0.80
0.85
0.58
1.56
0.50
0.50
0.60
0.58
0.55
0.80
0.95
0.98
2.10
1.50
0.80
1.40
1.80
1.50
0.50
2.00
1.60
1.70
2.50
2.50
2.70
1.00
1.20
1.50
2.10
1.50
2.40
3.00
3.00
2.30

PANJANG
m
5.60
1.45
5.00
3.00
5.40
5.60
0.90
0.50
0.60
4.33
1.95
18.50
3.00
6.10
8.10
2.00
1.55
11.70
6.10
8.50
4.20
10.50
13.60
20.00
20.00
6.00
1.20
29.00
1.00
6.00
3.60
4.00
44.00
10.00
15.00

PENANGANAN
TEBAL
LUAS
m
m2
0.05
3.92
0.05
1.16
0.05
4.25
0.05
1.74
0.05
8.42
0.05
2.80
0.05
0.45
0.05
0.30
0.05
0.35
0.05
2.38
0.05
1.56
0.05
17.58
0.05
2.94
0.05
12.81
0.05
12.15
0.05
1.60
0.05
2.17
0.05
21.06
0.05
9.15
0.05
4.25
0.05
8.40
0.05
16.80
0.05
23.12
0.05
50.00
0.05
50.00
0.05
16.20
0.05
1.20
0.05
34.80
0.05
1.50
0.05
12.60
0.05
5.40
0.05
9.60
0.05
132.00
0.05
30.00
0.05
34.50

HAL - 8

VOL
m3
0.20
0.06
0.21
0.09
0.42
0.14
0.02
0.02
0.02
0.12
0.08
0.88
0.15
0.64
0.61
0.08
0.11
1.05
0.46
0.21
0.42
0.84
1.16
2.50
2.50
0.81
0.06
1.74
0.08
0.63
0.27
0.48
6.60
1.50
1.73

k=2,25
Ton
0.45
0.14
0.47
0.20
0.95
0.32
0.05
0.05
0.05
0.27
0.18
1.98
0.34
1.44
1.37
0.18
0.25
2.36
1.04
0.47
0.95
1.89
2.61
5.63
5.63
1.82
0.14
3.92
0.18
1.42
0.61
1.08
14.85
3.38
3.89

323
324
325
326
327
328
329
330
331

491 + 000

2.70
2.60
2.00
1.30
1.40
0.80
3.00
2.50
3.00

491 + 100
491 + 150
491 + 200
491 + 200

8.60
19.90
7.50
7.80
6.90
12.80
30.00
24.00
32.00

0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

23.22
51.74
15.00
10.14
9.66
10.24
90.00
60.00
96.00
903.16
5,281.29
6,184.45

1.16
2.59
0.75
0.51
0.48
0.51
4.50
3.00
4.80
45.19
264.22
309.41

2.61
5.83
1.69
1.15
1.08
1.15
10.13
6.75
10.80
101.75
594.93
696.68

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

332
333
334
335
336
337
338
339
340

INDIKASI
STA
STA
AWAL
AKHIR
491 + 350
491 + 400
491 + 450

491 + 500

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

LEBAR
m
2.00
2.90
2.80
2.00
2.70
1.60
2.00
3.40
5.40

PANJANG
m
19.60
5.30
37.80
7.00
13.70
9.20
24.00
12.00
9.00

PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

39.20
15.37
105.84
14.00
36.99
14.72
48.00
40.80
48.60

HAL - 9

VOL
m3

k=2,25
Ton
1.96
0.77
5.29
0.70
1.85
0.74
2.40
2.04
2.43

4.41
1.73
11.90
1.58
4.16
1.67
5.40
4.59
5.47

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

363.52
6,184.45
6,547.97

18.18
309.41
327.59

40.91
696.68
737.59

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+850

Sta 490+900

Sta 490+950

Sta 491+000

Sta 491+050

Sta 491+100

Sta 491+150

Sta 491+200

Sta 491+250

Sta 491+300

Sta 491+350

Sta 491+400

Sta 491+450

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+100

Sta 490+150

KOTA LANGSA

Sta 490+200

Sta 490+250

Sta 490+300

Sta 490+350

Sta 490+400

Sta 490+450

Sta 490+500

Sta 490+550

Sta 490+600

Sta 490+650

Sta 490+700

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 489+350

Sta 489+400

Sta 489+450

Sta 489+500

Sta 489+550

Sta 489+600

Sta 489+650

Sta 489+700

Sta 489+750

Sta 489+800

Sta 489+850

Sta 489+900

Sta 489+950

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 487+850

Sta 487+900

Sta 487+950

Sta 488+000

Sta 488+050

Sta 488+100

Sta 488+150

Sta 488+200

Sta 488+250

Sta 488+300

Sta 488+350

Sta 488+400

Sta 488+450

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 487+100

Sta 487+150

Sta 487+200

Sta 487+250

Sta 487+300

Sta 487+350

Sta 487+400

Sta 487+450

Sta 487+500

Sta 487+550

Sta 487+600

Sta 487+650

Sta 487+700

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 486+350

Sta 486+400

Sta 486+450

Sta 486+500

Sta 486+550

Sta 486+600

Sta 486+650

Sta 486+700

Sta 486+750

Sta 486+800

Sta 486+850

Sta 486+900

Sta 486+950

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 485+600

Sta 485+650

KOTA LANGSA

Sta 485+700

Sta 485+750

Sta 485+800

Sta 485+850

Sta 485+900

Sta 485+950

Sta 486+000

Sta 486+050

Sta 486+100

Sta 486+150

Sta 486+200

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 484+850

Sta 484+900

KOTA LANGSA

Sta 484+950

Sta 485+000

Sta 485+050

Sta 485+100

Sta 485+150

Sta 485+200

Sta 485+250

Sta 485+300

Sta 485+350

Sta 485+400

Sta 485+450

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 484+100

Sta 484+150

Sta 484+200

Sta 484+250

Sta 484+300

Sta 484+350

Sta 484+400

Sta 484+450

Sta 484+500

Sta 484+550

Sta 484+600

Sta 484+650

Sta 484+700

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

SKET/GAMBAR

Sta 483+350

Sta 483+400

Sta 483+450

Sta 483+500

Sta 483+550

Sta 483+600

Sta 483+650

Sta 483+700

Sta 483+750

Sta 483+800

Sta 483+850

Sta 483+900

Sta 483+950

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 482+600

Sta 482+650

Sta 482+700

Sta 482+750

Sta 482+800

Sta 482+850

Sta 482+900

Sta 482+950

Sta 483+000

Sta 483+050

Sta 483+100

Sta 483+150

Sta 483+200

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 481+850

Sta 481+900

Sta 481+950

Sta 482+000

Sta 482+050

Sta 482+100

Sta 482+150

Sta 482+200

Sta 482+250

Sta 482+300

Sta 482+350

Sta 482+400

Sta 482+450

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 481+100

Sta 481+150

KOTA LANGSA

Sta 481+200

Sta 481+250

Sta 481+300

Sta 481+350

Sta 481+400

Sta 481+450

Sta 481+500

Sta 481+550

Sta 481+600

Sta 481+650

Sta 481+700

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 480+350

Sta 480+400

KOTA LANGSA

Sta 480+450

Sta 480+500

Sta 480+550

Sta 480+600

Sta 480+650

Sta 480+700

Sta 480+750

Sta 480+800

Sta 480+850

Sta 480+900

Sta 480+950

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 487+850

Sta 487+900

Sta 487+950

Sta 488+000

Sta 488+050

Sta 488+100

Sta 488+150

Sta 488+200

Sta 488+250

Sta 488+300

Sta 488+350

Sta 488+400

Sta 488+450

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 480+350

Sta 480+400

Sta 480+450

Sta 480+500

Sta 480+550

Sta 480+600

Sta 480+650

Sta 480+700

Sta 480+750

Sta 480+800

Sta 480+850

Sta 480+900

Sta 480+950

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 479+600

Sta 479+650

Sta 479+700

Sta 479+750

Sta 479+800

Sta 479+850

Sta 479+900

Sta 479+950

Sta 480+000

Sta 480+050

Sta 480+100

Sta 480+150

Sta 480+200

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 478+850

Sta 478+900

KOTA LANGSA

Sta 478+950

Sta 479+000

Sta 479+050

Sta 479+100

Sta 479+150

Sta 479+200

Sta 479+250

Sta 479+300

Sta 479+350

Sta 479+400

Sta 479+450

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 478+100

Sta 478+150

Sta 478+200

Sta 478+250

Sta 478+300

Sta 478+350

Sta 478+400

Sta 478+450

Sta 478+500

Sta 478+550

Sta 478+600

Sta 478+650

Sta 478+700

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 477+350

Sta 477+400

Sta 477+450

Sta 477+500

Sta 477+550

Sta 477+600

Sta 477+650

Sta 477+700

Sta 477+750

Sta 477+800

Sta 477+850

Sta 477+900

Sta 477+950

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 476+600

Sta 476+650

Sta 476+700

Sta 476+750

Sta 476+800

Sta 476+850

Sta 476+900

Sta 476+950

Sta 477+000

Sta 477+050

Sta 477+100

Sta 477+150

Sta 477+200

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 475+850

Sta 475+900

Sta 475+950

Sta 476+000

Sta 476+050

Sta 476+100

Sta 476+150

Sta 476+200

Sta 476+250

Sta 476+300

Sta 476+350

Sta 476+400

Sta 476+450

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 475+100

Sta 475+150

Sta 475+200

Sta 475+250

Sta 475+300

Sta 475+350

Sta 475+400

Sta 475+450

Sta 475+500

Sta 475+550

Sta 475+600

Sta 475+650

Sta 475+700

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 474+350

Sta 474+400

KOTA LANGSA

Sta 474+450

Sta 474+500

Sta 474+550

Sta 474+600

Sta 474+650

Sta 474+700

Sta 474+750

Sta 474+800

Sta 474+850

Sta 474+900

Sta 474+950

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

SKET/GAMBAR
KOTA KUALA
SIMPANG

Sta 474+000

Sta 474+050

KOTA LANGSA

Sta 474+150

Sta 474+200

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 15

ET/GAMBAR

PERBATASAN
SUMUT
Sta 491+500

Sta 491+550

Sta 491+600

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 14

ET/GAMBAR

Sta 490+750

Sta 490+800

MEDAN

Sta 490+850

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 13

ET/GAMBAR

Sta 490+000

Sta 490+050

Sta 490+100

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

ET/GAMBAR

HAL. 15 - 12

Sta 489+250

Sta 489+300

Sta 489+350

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 11

ET/GAMBAR

Sta 488+500

Sta 488+600

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

Sta 488+550

HAL. 15 - 10

ET/GAMBAR

Sta 487+750

Sta 487+800

Sta 487+850

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 9

ET/GAMBAR

Sta 487+000

Sta 487+050

Sta 487+100

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 8

ET/GAMBAR

Sta 486+250

Sta 486+300

MEDAN

Sta 486+350

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 7

ET/GAMBAR

Sta 485+500

Sta 485+550

Sta 485+600

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

ET/GAMBAR

HAL. 15 - 6

Sta 484+750

Sta 484+800

Sta 484+850

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

ET/GAMBAR

HAL. 15 - 5

ET/GAMBAR

Sta 484+000

Sta 484+050

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

Sta 484+100

HAL. 15 - 4

ET/GAMBAR

Sta 483+250

Sta 483+300

Sta 483+350

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 3

ET/GAMBAR

Sta 482+500

Sta 482+550

Sta 482+600

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 2

ET/GAMBAR

Sta 481+750

Sta 481+800

MEDAN

Sta 481+850

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 1

ET/GAMBAR

Sta 481+000

Sta 481+050

MEDAN

Sta 481+100

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 12

ET/GAMBAR

Sta 489+250

Sta 489+300

Sta 489+350

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

ET/GAMBAR

HAL. 15 - 11

Sta 488+500

Sta 488+600

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

Sta 488+550

HAL. 15 - 10

ET/GAMBAR

Sta 481+000

Sta 481+050

Sta 481+100

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 9

ET/GAMBAR

Sta 480+250

Sta 480+300

Sta 480+350

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 8

ET/GAMBAR

Sta 479+500

Sta 479+550

MEDAN

Sta 479+600

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 7

ET/GAMBAR

Sta 478+750

Sta 478+800

MEDAN

Sta 478+850

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 6

ET/GAMBAR

Sta 478+000

Sta 478+050

Sta 478+100

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

ET/GAMBAR

HAL. 15 - 5

Sta 477+250

Sta 477+300

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

Sta 477+350

HAL. 15 - 4

ET/GAMBAR

Sta 476+500

Sta 476+550

Sta 476+600

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 3

ET/GAMBAR

Sta 475+750

Sta 475+800

Sta 475+850

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 2

ET/GAMBAR

Sta 475+000

Sta 475+050

MEDAN

Sta 475+100

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 15 - 1

ET/GAMBAR

Sta 474+250

Sta 474+300

Sta 474+350

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

476+ 500

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

474 + 250

Agregat Kelas A

'm 6

474

250

0.90

1.87

0.05

0.08

474

250

2.40

43.80

0.05

5.26

474

500

1.44

1.76

0.05

0.13

474

700

0.70

1.00

0.05

0.04

474

750

1.00

1.10

0.05

0.06

474

800

1.50

6.10

0.05

0.46

474

850

1.20

5.00

0.05

0.30

475

300

2.00

24.20

0.05

2.42

475

450

2.00

2.60

0.05

0.26

10

475

500

2.00

14.40

0.05

1.44

11

476

050

2.40

0.80

0.05

0.10

12

476

050

1.60

0.80

0.05

0.06

13

476

050

0.80

0.80

0.05

0.03

14

476

450

1.20

24.00

0.05

1.44

15

476

500

1.60

23.00

0.05

1.84

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 15 - 1
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

151.23 M1
- M1
151.23 M1

13.92
###
13.92
Dibuat Oleh :
PT. BAHTERA KARANG RAY

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

478 + 000

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

476 + 550

Agregat Kelas A

'm 6

16

476

550

1.60

40.00

0.05

3.20

17

476

600

1.80

11.50

0.05

1.04

18

477

050

2.00

27.82

0.05

2.78

19

477

050

1.00

0.56

0.05

0.03

20

477

050

1.00

1.64

0.05

0.08

21

477

100

2.70

20.76

0.05

2.80

22

477

450

2.10

9.44

0.05

0.99

23

477

550

2.33

8.73

0.05

1.02

24

477

550

2.23

6.03

0.05

0.67

25

477

550

2.63

12.10

0.05

1.59

26

477

600

2.60

12.80

0.05

1.66

27

477

600

2.33

10.00

0.05

1.17

28

477

700

3.94

37.65

0.05

7.42

29

477

950

2.78

42.00

0.05

5.84

30

478

000

2.70

25.15

0.05

3.40

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 15 - 2
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

266.18 M1
151.23 M1
417.41 M1

33.69
13.92
47.61
Dibuat Oleh :
PT. BAHTERA KARANG RAY

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

480+ 350

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

478 + 200

Agregat Kelas A

'm 6

31

478

200

2.70

27.70

0.05

3.74

32

478

300

2.70

5.26

0.05

0.71

33

478

350

2.70

11.80

0.05

1.59

34

478

650

2.85

3.10

0.05

0.44

35

478

650

2.50

0.83

0.05

0.10

36

478

250

2.90

2.72

0.05

0.39

37

479

300

2.90

6.85

0.05

0.99

38

479

300

1.30

3.10

0.05

0.20

39

479

750

2.90

22.86

0.05

3.31

40

479

950

1.02

7.99

0.05

0.41

41

479

950

0.63

2.40

0.05

0.08

42

479

950

3.53

1.23

0.05

0.22

43

479

950

3.82

0.94

0.05

0.18

44

480

100

3.30

11.85

0.05

1.96

45

480

350

3.52

31.80

0.05

5.60

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 15 - 3
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

140.43 M1
417.41 M1
557.84 M1

19.92
47.61
67.53
Dibuat Oleh :
PT. BAHTERA KARANG RAY

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

s/d

488 + 200

M3

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

488+ 800

Agregat Kelas A

'm 6

46

488

200

0.96

2.20

0.05

0.11

47

488

300

1.93

2.85

0.05

0.28

48

488

300

1.46

0.97

0.05

0.07

49

488

300

1.57

5.30

0.05

0.42

50

488

350

0.95

1.00

0.05

0.05

51

488

350

1.85

15.58

0.05

1.44

52

488

400

1.30

2.90

0.05

0.19

53

488

550

1.82

9.58

0.05

0.87

54

488

750

1.99

11.71

0.05

1.17

55

488

750

1.90

11.15

0.05

1.06

56

488

750

1.71

9.70

0.05

0.83

57

488

750

3.33

9.72

0.05

1.62

58

488

750

1.63

3.35

0.05

0.27

59

488

750

3.16

1.16

0.05

0.18

60

488

800

0.90

1.20

0.05

0.05

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 15 - 4
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

88.37 M1
557.84 M1
646.21 M1

8.61
67.53
76.14
Dibuat Oleh :
PT. BAHTERA KARANG RAY

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

488+ 850

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

488 + 800

Agregat Kelas A

'm 6

61

488

800

1.50

15.20

0.05

1.14

62

488

800

4.53

9.42

0.05

2.13

63

488

850

4.53

5.30

0.05

1.20

64

488

850

2.95

0.85

0.05

0.13

65

488

850

2.80

9.95

0.05

1.39

66

488

850

1.97

10.00

0.05

0.99

67

488

850

1.65

11.80

0.05

0.97

68

488

850

3.37

4.27

0.05

0.72

Jumlah 15 - 5

66.79 M1

8.67

Jumlah Lalu
Jumlah Total MC-2
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

646.21 M1
713.00 M1

MARWAN, BE
CHIEF INSPECTOR

76.14
84.81
Dibuat Oleh :
PT. BAHTERA KARANG RAY

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

482 + 600

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

480+ 450

Agregat Kelas A

'm 6

480

450

1.39

4.44

0.05

0.31

480

500

2.90

31.95

0.05

4.63

481

000

2.75

16.90

0.05

2.32

481

500

2.57

5.10

0.05

0.66

481

550

0.66

0.80

0.05

0.03

481

550

1.20

0.30

0.05

0.02

481

750

2.92

9.30

0.05

1.36

481

800

2.95

24.07

0.05

3.55

481

850

2.82

11.83

0.05

1.67

10

481

900

3.00

37.35

0.05

5.60

11

481

950

2.70

29.30

0.05

3.96

12

482

500

1.63

8.26

0.05

0.67

13

482

550

2.80

19.03

0.05

2.66

14

482

550

2.80

18.03

0.05

2.52

15

482

600

2.30

3.45

0.05

0.40

Jumlah 15 - 1
Jumlah Lalu MC - 2
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

220.11 M1
713.00 M1
933.11 M1

MARWAN, BE
CHIEF INSPECTOR

30.36
84.81
115.17
Dibuat Oleh :
PT. BAHTERA KARANG RAY

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

483 + 150

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

482+ 650

Agregat Kelas A

'm 6

16

482

650

2.90

21.50

0.05

3.12

17

482

700

3.20

45.60

0.05

7.30

18

482

750

1.50

1.80

0.05

0.14

19

482

750

0.30

2.10

0.05

0.03

20

482

750

1.45

1.72

0.05

0.12

21

482

750

0.82

2.14

0.05

0.09

22

482

800

0.82

4.43

0.05

0.18

23

482

850

2.70

18.83

0.05

2.54

24

482

900

2.97

2.40

0.05

0.36

25

482

900

0.44

3.70

0.05

0.08

26

482

900

2.88

16.30

0.05

2.35

27

482

950

2.85

6.97

0.05

0.99

28

482

950

2.79

8.10

0.05

1.13

29

483

050

2.65

36.60

0.05

4.85

30

483

150

1.35

6.20

0.05

0.42

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 15 - 2
178.39 M1
23.70
Jumlah Lalu
933.11 M1
115.17
Jumlah Total
1,111.50 M1
138.87
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

485 + 050

s/d

483+ 350

Agregat Kelas A

'm 6

31

483

350

2.10

4.00

0.05

0.42

32

483

350

1.89

6.79

0.05

0.64

33

483

400

1.73

2.73

0.05

0.24

34

483

500

3.15

22.80

0.05

3.59

35

483

500

1.69

1.45

0.05

0.12

36

483

550

1.93

7.30

0.05

0.70

37

483

600

1.90

6.30

0.05

0.60

38

483

600

1.67

3.37

0.05

0.28

39

483

650

1.40

6.10

0.05

0.43

40

483

700

1.40

32.00

0.05

2.24

41

483

850

1.30

6.30

0.05

0.41

42

484

050

1.60

4.95

0.05

0.40

43

484

150

1.05

2.00

0.05

0.11

44

484

450

1.00

3.58

0.05

0.18

45

485

050

1.85

17.25

0.05

1.60

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 15 - 3
126.92 M1
11.96
1
Jumlah Lalu
1,111.50 M
138.87
1
Jumlah Total
1,238.42 M
150.83
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

485 + 550

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

485+ 050

Agregat Kelas A

'm 6

46

485

050

3.70

2.60

0.05

0.48

47

485

100

3.47

9.10

0.05

1.58

48

485

200

1.20

26.40

0.05

1.58

49

485

250

1.10

5.06

0.05

0.28

50

485

450

0.60

8.90

0.05

0.27

51

485

450

1.30

7.34

0.05

0.48

52

485

450

1.20

9.85

0.05

0.59

53

485

450

1.60

6.05

0.05

0.48

54

485

450

1.00

7.08

0.05

0.35

55

485

500

1.60

5.00

0.05

0.40

56

485

500

1.30

3.95

0.05

0.26

57

485

500

2.10

5.60

0.05

0.59

58

485

500

0.50

0.60

0.05

0.02

59

485

550

0.65

0.80

0.05

0.03

60

485

550

1.15

15.40

0.05

0.89

Jumlah 15 - 4
Jumlah Lalu
Jumlah Total

113.73 M1
1,238.42 M1
1,352.15 M1

8.28
150.83
159.11

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAY

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

Aspal
Laston
Lama
AC-BC

'm 6

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

485+ 750

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

486 + 050

Agregat Kelas A

'm 6

61

485

750

0.70

5.50

0.05

0.19

62

485

750

1.00

8.20

0.05

0.41

63

485

750

0.80

1.66

0.05

0.07

64

485

800

3.10

3.89

0.05

0.60

65

485

800

0.70

1.40

0.05

0.05

66

485

800

1.00

12.20

0.05

0.61

67

485

800

0.80

12.00

0.05

0.48

68

485

800

3.50

4.85

0.05

0.85

69

486

050

2.20

3.10

0.05

0.34

70

486

050

4.33

0.62

0.05

0.13

71

486

050

0.87

3.30

0.05

0.14

72

486

050

0.90

0.60

0.05

0.03

73

486

050

1.20

4.30

0.05

0.26

74

486

050

0.73

7.16

0.05

0.26

75

486

050

3.64

0.48

0.05

0.09

Jumlah 15 - 5
69.26 M1
4.51
1
Jumlah Lalu
1,352.15 M
159.11
Jumlah Total
1,421.41 M1
163.62
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

Aspal
Laston
Lama
AC-BC

ARMAN SUROSO
GENERAL SUPERINTENDEN

'm 6

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

486+ 100

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

486 + 400

Agregat Kelas A

'm 6

76

486

100

0.73

7.71

0.05

0.28

77

486

150

0.80

8.90

0.05

0.36

78

486

150

0.55

3.10

0.05

0.09

79

486

150

1.50

0.70

0.05

0.05

80

486

150

0.71

6.40

0.05

0.23

81

486

200

0.70

0.70

0.05

0.02

82

486

200

2.30

0.55

0.05

0.06

83

486

200

0.90

2.65

0.05

0.12

84

486

250

1.40

6.08

0.05

0.43

85

486

250

0.36

6.08

0.05

0.11

86

486

300

0.70

11.00

0.05

0.39

87

486

300

0.40

8.50

0.05

0.17

88

486

400

0.99

11.88

0.05

0.59

89

486

400

0.99

17.10

0.05

0.85

90

486

400

0.80

6.22

0.05

0.25

Jumlah 15 - 6
97.57 M1
4.00
1
Jumlah Lalu
1,421.41 M
163.62
1
Jumlah Total
1,518.98 M
167.62
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling


Aspal Lama

STA

486+ 450

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

487 + 400

Agregat Kelas A

'm 6

91

486

450

0.66

0.67

0.05

0.02

92

486

450

0.95

2.39

0.05

0.11

93

486

500

1.40

5.90

0.05

0.41

94

486

550

0.40

6.65

0.05

0.13

95

486

850

1.92

8.30

0.05

0.80

96

486

900

2.04

23.68

0.05

2.42

97

486

900

0.70

14.00

0.05

0.49

98

486

900

1.28

6.50

0.05

0.42

99

486

900

0.36

4.02

0.05

0.07

100

486

900

0.13

2.30

0.05

0.01

101

486

900

2.30

2.64

0.05

0.30

102

486

950

1.90

27.88

0.05

2.65

103

487

200

0.81

3.07

0.05

0.12

104

487

250

1.35

4.45

0.05

0.30

105

487

400

0.92

2.93

0.05

0.13

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 15 - 7
115.38 M1
8.38
1
Jumlah Lalu
1,518.98 M
167.62
Jumlah Total
1,634.36 M1
176.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

487+ 400

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

487 + 850

Agregat Kelas A

'm 6

106

487

400

0.90

1.40

0.05

0.06

107

487

450

1.83

9.60

0.05

0.88

108

487

450

2.20

1.70

0.05

0.19

109

487

450

2.20

10.60

0.05

1.17

110

487

450

4.40

8.45

0.05

1.86

111

487

500

1.33

3.30

0.05

0.22

112

487

500

1.90

16.29

0.05

1.55

113

487

500

3.57

7.01

0.05

1.25

114

487

500

1.94

10.40

0.05

1.01

115

487

550

2.54

3.67

0.05

0.47

116

487

550

2.10

5.37

0.05

0.56

117

487

600

1.85

16.70

0.05

1.54

118

487

750

2.13

9.24

0.05

0.98

119

487

850

2.10

7.80

0.05

0.82

120

487

850

3.93

10.60

0.05

2.08

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS

Jumlah 15 - 8
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi

122.13 M1
1,634.36 M1
1,756.49 M1

14.64
176.00
190.64
Dibuat Oleh :
PT. BAHTERA KARANG RAY

LINTAS TIMUR III

PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 1
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

487+ 850

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

488 + 150

Agregat Kelas A

'm 6

121

487

850

1.20

2.10

0.05

0.13

122

487

850

1.90

7.06

0.05

0.67

123

487

850

4.60

6.63

0.05

1.52

124

487

850

4.60

16.66

0.05

3.83

125

487

850

0.80

30.00

0.05

1.20

126

487

900

0.80

19.00

0.05

0.76

127

487

900

1.93

20.50

0.05

1.98

128

487

900

1.00

7.74

0.05

0.39

129

487

900

0.77

6.90

0.05

0.27

130

487

950

2.49

0.88

0.05

0.11

131

487

950

1.30

9.00

0.05

0.59

132

488

150

2.88

7.31

0.05

1.05

133

488

150

1.30

1.20

0.05

0.08

134

488

150

1.66

9.94

0.05

0.83

135

488

150

2.88

8.67

0.05

1.25

Jumlah 15 - 9
153.59 M1
14.66
Jumlah Lalu
1,756.49 M1
190.64
Jumlah Total
1,910.08 M1
205.30
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 15
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

488+ 600

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

489 + 100

Agregat Kelas A

'm 6

136

488

600

1.20

1.50

0.05

0.09

137

488

600

0.60

2.30

0.05

0.07

138

488

600

1.50

0.35

0.05

0.03

139

488

600

1.23

1.45

0.05

0.09

140

488

600

0.83

0.80

0.05

0.03

141

489

050

3.37

27.45

0.05

4.63

142

489

100

2.50

34.00

0.05

4.25

Jumlah 15 - 10
67.85 M1
9.19
1
Jumlah Lalu
1,910.08 M
205.30
Jumlah Total
1,977.93 M1
214.49
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 15
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling


Aspal Lama

STA

489+ 150

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

489 + 400

Agregat Kelas A

'm 6

143

489

150

2.00

15.80

0.05

1.58

144

489

200

2.30

2.60

0.05

0.30

145

489

250

1.60

3.90

0.05

0.31

146

489

250

1.60

2.40

0.05

0.19

147

489

300

1.80

8.40

0.05

0.76

148

489

300

1.90

3.80

0.05

0.36

149

489

300

1.50

2.80

0.05

0.21

150

489

300

1.60

1.10

0.05

0.09

151

489

350

1.60

2.10

0.05

0.17

152

489

350

2.80

4.00

0.05

0.56

153

489

350

2.70

5.20

0.05

0.70

154

489

350

2.58

14.80

0.05

1.91

155

489

350

1.50

1.80

0.05

0.14

156

489

400

1.50

2.60

0.05

0.20

157

489

400

0.60

1.65

0.05

0.05

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 15 - 11
72.95 M1
7.53
Jumlah Lalu
1,977.93 M1
214.49
Jumlah Total
2,050.88 M1
222.02
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 15
No

S TAT I O N E R

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

489 + 650

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

489+ 400

Agregat Kelas A

'm 6

158

489

400

0.70

2.35

0.05

0.08

159

489

400

2.90

43.00

0.05

6.24

160

489

450

2.90

6.45

0.05

0.94

161

489

500

0.70

0.70

0.05

0.02

162

489

500

0.90

1.20

0.05

0.05

163

489

500

0.60

1.30

0.05

0.04

164

489

500

1.60

1.31

0.05

0.10

165

489

500

1.00

1.50

0.05

0.08

166

489

500

1.00

1.26

0.05

0.06

167

489

550

0.90

1.65

0.05

0.07

168

489

550

2.30

6.20

0.05

0.71

169

489

550

1.00

1.30

0.05

0.07

170

489

600

2.28

16.20

0.05

1.85

171

489

650

0.50

10.00

0.05

0.25

172

489

650

1.50

5.50

0.05

0.41

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 15 - 12
99.92 M1
10.97
Jumlah Lalu
2,050.88 M1
222.02
Jumlah Total
2,150.80 M1
232.99
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 15
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

489+ 650

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

489 + 800

Agregat Kelas A

'm 6

173

489

650

3.40

11.00

0.05

1.87

174

489

650

1.60

1.90

0.05

0.15

175

489

700

1.50

6.57

0.05

0.49

176

489

700

0.40

5.60

0.05

0.11

177

489

750

2.10

3.10

0.05

0.33

178

489

750

3.40

4.10

0.05

0.70

179

489

750

1.65

4.00

0.05

0.33

180

489

750

2.10

5.85

0.05

0.61

181

489

750

2.80

10.80

0.05

1.51

182

489

750

1.30

5.56

0.05

0.36

183

489

800

1.35

0.70

0.05

0.05

184

489

800

2.60

5.25

0.05

0.68

185

489

800

1.00

5.00

0.05

0.25

186

489

800

0.90

1.30

0.05

0.06

187

489

800

0.80

0.80

0.05

0.03

Jumlah 15 - 13
71.53 M1
7.53
1
Jumlah Lalu
2,150.80 M
232.99
1
Jumlah Total
2,222.33 M
240.52
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 15
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

489+ 850

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

489 + 950

Agregat Kelas A

'm 6

188

489

850

1.70

3.70

0.05

0.31

189

489

850

2.80

11.04

0.05

1.55

190

489

900

1.55

4.50

0.05

0.35

191

489

900

2.60

9.20

0.05

1.20

192

489

900

1.90

1.10

0.05

0.10

193

489

900

4.20

3.00

0.05

0.63

194

489

900

3.40

5.10

0.05

0.87

195

489

950

2.60

4.00

0.05

0.52

196

489

950

2.60

3.20

0.05

0.42

197

489

950

3.80

2.70

0.05

0.51

198

489

950

2.20

1.30

0.05

0.14

199

489

950

2.27

27.70

0.05

3.14

200

489

950

0.40

3.60

0.05

0.07

201

489

950

3.10

10.50

0.05

1.63

202

489

950

1.80

8.55

0.05

0.77

Jumlah 15 - 14
99.19 M1
12.21
Jumlah Lalu
2,222.33 M1
240.52
Jumlah Total
2,321.52 M1
252.73
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 15
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling


Aspal Lama

STA

489+ 950

'm 6

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

490 + 100

Agregat Kelas A

203

489

950

4.40

3.40

0.05

0.75

204

489

950

2.00

4.70

0.05

0.47

205

489

950

0.40

13.00

0.05

0.26

206

490

000

1.96

13.35

0.05

1.31

207

490

000

2.70

11.75

0.05

1.59

208

490

000

2.70

21.00

0.05

2.84

209

490

050

0.80

2.30

0.05

0.09

210

490

050

0.90

1.50

0.05

0.07

211

490

050

0.90

1.50

0.05

0.07

212

490

050

1.00

4.80

0.05

0.24

213

490

050

1.00

8.30

0.05

0.42

214

490

100

1.60

13.80

0.05

1.10

215

490

100

1.30

6.70

0.05

0.44

216

490

100

1.50

3.80

0.05

0.29

217

490

100

0.60

50.00

0.05

1.50

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 15 - 15
159.90 M1
11.44
1
Jumlah Lalu
2,321.52 M
252.73
Jumlah Total
2,481.42 M1
264.17
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling

Lokasi

: Jalan Banda Aceh - Medan

HAL 15
No

S TAT I O N E R

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

490 + 250

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

490+ 150

Agregat Kelas A

'm 6

218

490

150

0.70

5.60

0.05

0.20

219

490

150

0.80

1.45

0.05

0.06

220

490

150

0.85

5.00

0.05

0.21

221

490

150

0.58

3.00

0.05

0.09

222

490

150

1.56

5.40

0.05

0.42

223

490

150

0.50

5.60

0.05

0.14

224

490

150

0.50

0.90

0.05

0.02

225

490

150

0.60

0.50

0.05

0.02

226

490

150

0.58

0.60

0.05

0.02

227

490

150

0.55

4.33

0.05

0.12

228

490

150

0.80

1.95

0.05

0.08

229

490

200

0.95

18.50

0.05

0.88

230

490

200

0.98

3.00

0.05

0.15

231

490

200

2.10

6.10

0.05

0.64

232

490

250

1.50

8.10

0.05

0.61

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 15 - 16
70.03 M1
3.66
1
Jumlah Lalu
2,481.42 M
264.17
1
Jumlah Total
2,551.45 M
267.83
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 15
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

490 + 250

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

490 + 750

Agregat Kelas A

'm 6

233

490

250

0.80

2.00

0.05

0.08

234

490

300

1.40

1.55

0.05

0.11

235

490

300

1.80

11.70

0.05

1.05

236

490

400

1.50

6.10

0.05

0.46

237

490

400

0.50

8.50

0.05

0.21

238

490

400

2.00

4.20

0.05

0.42

239

490

450

1.60

10.50

0.05

0.84

240

490

500

1.70

13.60

0.05

1.16

241

490

550

2.50

20.00

0.05

2.50

242

490

550

2.50

20.00

0.05

2.50

243

490

600

2.70

6.00

0.05

0.81

244

490

650

1.00

1.20

0.05

0.06

245

490

650

1.20

29.00

0.05

1.74

246

490

650

1.50

1.00

0.05

0.08

247

490

2.10

750

6.00

0.05

0.63

Jumlah 15 - 17
141.35 M1
12.65
1
Jumlah Lalu
2,551.45 M
267.83
Jumlah Total
2,692.80 M1
280.48
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 15
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

490+ 750

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

491 + 350

Agregat Kelas A

'm 6

248

490

750

1.50

3.60

0.05

0.27

249

490

800

2.40

4.00

0.05

0.48

250

490

800

3.00

44.00

0.05

6.60

251

490

850

3.00

10.00

0.05

1.50

252

490

850

2.30

15.00

0.05

1.73

253

491

000

2.70

8.60

0.05

1.16

254

491

000

2.60

19.90

0.05

2.59

255

491

100

2.00

7.50

0.05

0.75

256

491

150

1.30

7.80

0.05

0.51

257

491

200

1.40

6.90

0.05

0.48

258

491

200

0.80

12.80

0.05

0.51

259

491

200

3.00

30.00

0.05

4.50

260

491

200

2.50

24.00

0.05

3.00

261

491

200

3.00

32.00

0.05

4.80

262

491

350

2.00

19.60

0.05

1.96

Jumlah 15 - 18
245.70 M1
30.84
1
Jumlah Lalu
2,692.80 M
280.48
1
Jumlah Total
2,938.50 M
311.32
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan

HAL 15
No

S TAT I O N E R

Aspal Beton (AC-BC) Leveling

STA

Aspal Lama

491+ 350

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

491 + 550

Agregat Kelas A

'm 6

263

491

350

2.90

5.30

0.05

0.77

264

491

400

2.80

37.80

0.05

5.29

265

491

450

2.00

7.00

0.05

0.70

266

491

450

2.70

13.70

0.05

1.85

267

491

450

1.60

9.20

0.05

0.74

268

491

500

2.00

24.00

0.05

2.40

269

491

500

3.40

12.00

0.05

2.04

270

491

500

5.40

9.00

0.05

2.43

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 15 - 19
118.00 M1
16.22
Jumlah Lalu
2,938.50 M1
311.32
Jumlah Total MC - 3
3,056.50 M1
327.54
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDEN

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 1
VOLUME
2.25
TON

0.18
11.84
0.29
0.09
0.14
1.04
0.68
5.45
0.59
3.24
0.23
0.14
0.07
3.24
4.14

31.36
31.36
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 2
VOLUME
2.25
TON

7.20
2.34
6.26
0.07
0.18
6.30
2.23
2.30
1.51

K
9
1
L
0
a
e
msl
m
a't
os'
n
A
B
A
C
W
B
C

3.58
3.74
2.63
16.70
13.14
7.65
75.83
31.36
107.19
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 3
VOLUME
2.25
TON

8.42
1.60

3.58
0.99
0.23
0.88
2.23
0.45
7.45
0.92
0.18
0.50
0.41
4.41
12.60
44.85
107.19
152.04
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 4
VOLUME
2.25

TON

0.25
0.63
0.16
0.95
0.11
3.24
0.43
1.96
2.63
2.39
1.87
3.65
0.61
0.41
0.11
19.40
152.04
171.44
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 5
VOLUME
2.25
TON

2.57
4.79
2.70
0.29
3.13
2.23
2.18
1.62

19.51

171.44
190.95
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 1
VOLUME
2.25
TON

0.70
10.42
5.22
1.49
0.07
0.05
3.06
7.99
3.76
12.60

8.91
1.51
5.99
5.67
0.90
68.34
190.95
259.29
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 2
VOLUME
2.25
TON

7.02
16.43
0.32

0.07
0.27
0.20
0.41
5.72
0.81
0.18
5.29
2.23
2.54
10.91
0.95
53.35
259.29
312.64
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 3
VOLUME
2.25
TON

0.95
1.44
0.54
8.08
0.27
1.58
1.35
0.63
0.97
5.04
0.92
0.90
0.25
0.41
3.60
26.93
312.64
339.57
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 4
VOLUME
2.25
TON

1.08
3.56
3.56
0.63
0.61
1.08
1.33
1.08
0.79
0.90
0.59
1.33
0.05
0.07
2.00
18.66
339.57
358.23

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 5
VOLUME
2.25
TON

0.43
0.92
0.16
1.35
0.11
1.37
1.08
1.91
0.77
0.29
0.32

0.07
0.59
0.59
0.20
10.16
358.23
368.39
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 6
VOLUME
2.25
TON

0.63
0.81
0.20
0.11

0.52
0.05
0.14
0.27
0.97
0.25
0.88
0.38
1.33
1.91
0.56
9.01
368.39
377.40
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 7
VOLUME
2.25
TON

0.05
0.25
0.92
0.29
1.80
5.45
1.10
0.95
0.16
0.02
0.68
5.96
0.27
0.68
0.29
18.87
377.40
396.27
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 8
VOLUME
2.25
TON

0.14
1.98
0.43
2.63
4.19
0.50
3.49
2.81
2.27
1.06
1.26
3.47
2.21
1.85
4.68
32.97
396.27
429.24
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 9
VOLUME
2.25
TON

0.29
1.51
3.42
8.62
2.70
1.71
4.46
0.88
0.61
0.25
1.33
2.36

0.18
1.87
2.81
33.00
429.24
462.24
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 10
VOLUME
2.25
TON

0.20
0.16
0.07
0.20
0.07

10.42
9.56

20.68
462.24
482.92
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 11
VOLUME
2.25
TON

3.56
0.68
0.70
0.43
1.71
0.81
0.47
0.20
0.38
1.26
1.58
4.30
0.32
0.45
0.11
16.96
482.92
499.88
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 12
VOLUME
2.25
TON

0.18
14.04
2.12
0.05
0.11
0.09
0.23
0.18
0.14
0.16
1.60
0.16
4.16
0.56
0.92
24.70
499.88
524.58
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 13
VOLUME
2.25
TON

4.21
0.34
1.10
0.25
0.74
1.58
0.74
1.37
3.40
0.81
0.11
1.53
0.56

0.14
0.07
16.95
524.58
541.53
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 14
VOLUME
2.25
TON

0.70
3.49
0.79
2.70
0.23
1.42

1.96
1.17
0.95
1.15
0.32
7.07
0.16
3.67
1.73
27.51
541.53
569.04
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 15
VOLUME
2.25
TON

1.69
1.06
0.59
2.95
3.58
6.39
0.20
0.16
0.16
0.54
0.95
2.48
0.99
0.65
3.38
25.77
569.04
594.81
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 16
VOLUME
2.25
TON

0.45
0.14
0.47
0.20
0.95
0.32
0.05
0.05
0.05
0.27
0.18
1.98
0.34
1.44
1.37
8.26
594.81
603.07
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 17
VOLUME
2.25
TON

0.18
0.25
2.36
1.04
0.47
0.95
1.89
2.61
5.63
5.63
1.82
0.14
3.92
0.18

1.42
28.49
603.07
631.56
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 18
VOLUME
2.25
TON

0.61
1.08
14.85
3.38
3.89
2.61
5.83

1.69
1.15
1.08
1.15
10.13
6.75
10.80
4.41
69.41
631.56
700.97
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AYAH PROVINSI NANGGROE ACEH DARUSSALAM

BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


NAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 15 - 19
VOLUME
2.25
TON

1.73

11.90
1.58
4.16
1.67
5.40
4.59
5.47

36.50
700.97
737.47
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+925 - Sta 490+950


AC-BC 5 Cm

Sta 490+925 - Sta 490+950

25.00

Sta 490+875 - Sta 490+925

50.00

Sta 490+825 - Sta 490+875

50.00

Sta 490+775 - Sta 490+825

50.00

Sta 490+725 - Sta 490+775

50.00

Aspal Lama

6.00 m'
Sta 490+875 - Sta 490+925
AC-BC 5 Cm

Aspal Lama

6.00 m'
Sta 490+825 - Sta 490+875
AC-BC 5 Cm

Aspal Lama

5.90 m'
Sta 490+775 - Sta 490+825
AC-BC 5 Cm

Aspal Lama

5.70 m'
Sta 490+725 - Sta 490+775
AC-BC 5 Cm

Aspal Lama

5.80 m'

Sta 490+700 - Sta 490+725


Sta 490+700 - Sta 490+725
AC-BC 5 Cm

25.00

Aspal Lama

5.80 m'
JUMLAH 1-1
JUMLAH LALU MC - 2
JUMLAH TOTAL

250.00
350.00
600.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+675 - Sta 490+700


AC-BC 5 Cm

Sta 490+675 - Sta 490+700

25.00

Sta 490+650 - Sta 490+675

25.00

Aspal Lama

5.80 m'
Sta 490+650 - Sta 490+675
AC-BC 5 Cm

Aspal Lama

5.90 m'

JUMLAH 1-1
JUMLAH LALU
JUMLAH TOTAL MC - 2

50.00
600.00
650.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA

MC. No. 3
BULAN : SEPTEMBER 2005

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+625 - Sta 490+650


AC-BC 5 Cm

Sta 490+625 - Sta 490+650

25.00

Sta 490+575 - Sta 490+625

50.00

Sta 490+550 - Sta 490+575

25.00

Sta 490+500

29.00

Sta 490+500

1.00

Sta 490+450

6.00

Aspal Lama

5.90 m'
AC-BC 5 Cm

Sta 490+575 - Sta 490+625

AC-BC 5 Cm

Aspal Lama

5.85 m'
Sta 490+550 - Sta 490+575
AC-BC 5 Cm

Aspal Lama

5.80 m'
Sta 490+500
AC-BC 5 Cm

Aspal Lama

0.20 1.20

4.60

Sta 490+500
AC-BC 5 Cm

Aspal Lama

0.40 1.50

4.10

Sta 490+450
AC-BC 5 Cm

Aspal Lama

2.70

3.30

JUMLAH 1-1
JUMLAH LALU MC - 2
JUMLAH TOTAL

136.00
650.00
786.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+450
AC-BC 5 Cm

Sta 490+450

1.20

Sta 490+400 - Sta 490+425

25.00

Sta 490+300 - Sta 490+315

15.00

Aspal Lama

0.20 1.00

4.80

Sta 490+400 - Sta 490+425


AC-BC 5 Cm

Aspal Lama

3.00

3.00

Sta 490+300 - Sta 490+315


AC-BC 5 Cm

Aspal Lama

3.00

3.00

Sta 490+265 - Sta 490+300


AC-BC 5 Cm

Sta 490+265 - Sta 490+300

35.00

Sta 490+200 - Sta 490+250

50.00

Sta 490+150 - Sta 490+200

50.00

Aspal Lama

3.00

3.00

Sta 490+200 - Sta 490+250


AC-BC 5 Cm

Aspal Lama

3.00

3.00

Sta 490+150 - Sta 490+200


AC-BC 5 Cm

Aspal Lama

5.90 m'
JUMLAH 1-1
JUMLAH LALU
JUMLAH TOTAL

176.20
786.00
962.20

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA

MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+100 - Sta 490+150


AC-BC 5 Cm

Sta 490+100 - Sta 490+150

50.00

Sta 490+050 - Sta 490+100

50.00

Sta 489+950 - Sta 490+000

50.00

Sta 489+900 - Sta 489+950

50.00

Sta 489+800 - Sta 489+850

50.00

Sta 489+750 - Sta 489+800

50.00

Aspal Lama

3.00

3.00

Sta 490+050 - Sta 490+100


AC-BC 5 Cm

Aspal Lama

3.00

3.00

Sta 489+950 - Sta 490+000


AC-BC 5 Cm

Aspal Lama

5.70 m'
Sta 489+900 - Sta 489+950
AC-BC 5 Cm

Aspal Lama

3.00

3.00

Sta 489+800 - Sta 489+850


AC-BC 5 Cm

Aspal Lama

5.80 m'
Sta 489+750 - Sta 489+800
AC-BC 5 Cm

Aspal Lama

5.80 m'
JUMLAH 1-1
JUMLAH LALU
JUMLAH TOTAL
Diperiksa Oleh :

300.00
962.20
1,262.20
Diperiksa Oleh :

BAG. PELAKSANA KEG. SKS


LINTAS TIMUR III

Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 489+550 - Sta 489+565


AC-BC 5 Cm

Sta 489+550 - Sta 489+565

15.00

Sta 489+515 - Sta 489+550

35.00

Sta 489+500 - Sta 489+525

25.00

Sta 489+450 - Sta 489+475

25.00

Aspal Lama

3.00

3.00

Sta 489+515 - Sta 489+550


AC-BC 5 Cm

Aspal Lama

3.00

3.00

Sta 489+500 - Sta 489+525


AC-BC 5 Cm

Aspal Lama

3.00

3.00

Sta 489+450 - Sta 489+475


AC-BC 5 Cm

Aspal Lama

3.00

3.00

Sta 489+425 - Sta 489+450


AC-BC 5 Cm

Sta 489+425 - Sta 489+450

25.00

Sta 489+350 - Sta 489+400

50.00

Aspal Lama

3.00

3.00

Sta 489+350 - Sta 489+400


AC-BC 5 Cm

Aspal Lama

3.00

3.00

JUMLAH 1-2
JUMLAH LALU
JUMLAH TOTAL

175.00
1,262.20
1,437.20

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 489+300 - Sta 489+350


Sta 489+300 - Sta 489+350
AC-BC 5 Cm

Aspal Lama

3.00

3.00

50.00

Sta 489+250 - Sta 489+300


AC-BC 5 Cm

Sta 489+250 - Sta 489+300

50.00

Sta 489+200 - Sta 490+250

50.00

Aspal Lama

3.00

3.00

Sta 489+200 - Sta 490+250


AC-BC 5 Cm

Aspal Lama

3.00

3.00

Sta 489+150
AC-BC 5 Cm

Sta 489+150

2.26

Sta 489+150

1.70

Sta 489+150

2.30

Aspal Lama

2.40

1.62

1.98

Sta 489+150
AC-BC 5 Cm

Aspal Lama

2.85

0.30

2.85

Sta 489+150
AC-BC 5 Cm

Aspal Lama

3.00

2.72

0.28

JUMLAH 1-3
JUMLAH LALU
JUMLAH TOTAL

156.26
1,437.20
1,593.46

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST

MARWAN, BE

KORDINATOR LAPANGAN

CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 489+100
AC-BC 5 Cm

Sta 489+100

18.00

Sta 489+025 - Sta 489+040

15.00

Sta 488+975 - Sta 489+025

50.00

Sta 488+925 - Sta 488+975

50.00

Sta 488+910 - Sta 488+925

15.00

Aspal Lama

5.90 m'
Sta 489+025 - Sta 489+040
AC-BC 5 Cm

Aspal Lama

5.86 m'
Sta 488+975 - Sta 489+025
AC-BC 5 Cm

Aspal Lama

5.86 m'
Sta 488+925 - Sta 488+975
AC-BC 5 Cm

Aspal Lama

5.85 m'
Sta 488+910 - Sta 488+925
AC-BC 5 Cm

Aspal Lama

5.78 m'
Sta 488+600
Sta 488+600
AC-BC 5 Cm

40.00

Aspal Lama

3.00 m'
JUMLAH 1-3
JUMLAH LALU
JUMLAH TOTAL

188.00
1,593.46
1,781.46

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA

MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 487+950 - Sta 487+900


AC-BC 5 Cm

Sta 487+950 - Sta 487+900

25.00

Sta 487+900 - Sta 487+850

25.00

Aspal Lama

6.00 m'
Sta 487+900 - Sta 487+850
AC-BC 5 Cm

Aspal Lama

6.00 m'
Sta 487+850 - Sta 487+800
AC-BC 5 Cm

Sta 487+850 - Sta 487+800

25.00

Sta 487+800 - Sta 487+750

25.00

Aspal Lama

6.00 m'
Sta 487+800 - Sta 487+750
AC-BC 5 Cm

Aspal Lama

6.00 m'

JUMLAH 14-9
JUMLAH LALU
JUMLAH TOTAL MC - 3

100.00
1,781.46
1,881.46

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 488+800 - Sta 488+850


AC-BC 5 Cm

Sta 488+800 - Sta 488+850

50.00

Sta 488+750 - Sta 488+800

50.00

Sta 488+600 - Sta 488+630

50.00

Sta 488+575 - Sta 488+600

25.00

Sta 488+525 - Sta 488+575

50.00

Sta 488+500 - Sta 488+525

25.00

Aspal Lama

5.90

0.10

Sta 488+750 - Sta 488+800


AC-BC 5 Cm

Aspal Lama

3.00

3.00

Sta 488+600 - Sta 488+630


AC-BC 5 Cm

Aspal Lama

3.00

3.00

Sta 488+575 - Sta 488+600


AC-BC 5 Cm

Aspal Lama

5.96 m'
Sta 488+525 - Sta 488+575
AC-BC 5 Cm

Aspal Lama

5.95 m'
Sta 488+500 - Sta 488+525
AC-BC 5 Cm

Aspal Lama

6.00 m'
JUMLAH 1-2
JUMLAH LALU
JUMLAH TOTAL MC - 2

250.00
100.00
350.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 488+275 - Sta 488+300


AC-BC 5 Cm

Sta 488+275 - Sta 488+300

25.00

Sta 488+225 - Sta 488+275

50.00

Sta 488+200 - Sta 488+225

25.00

Aspal Lama

5.90 m'
Sta 488+225 - Sta 488+275
AC-BC 5 Cm

Aspal Lama

5.90 m'
Sta 488+200 - Sta 488+225
AC-BC 5 Cm

Aspal Lama

5.95 m'

JUMLAH 1-1
JUMLAH LALU
JUMLAH TOTAL

100.00
100.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 14 - 1
V0LUME
M3

6.00

0.05

7.50

6.00

0.05

15.00

5.90

0.05

14.75

5.70

0.05

14.25

5.80

0.05

14.50

LEBAR
M'

5.80

0.05

7.25

73.25
89.15
162.40
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 14 - 2
V0LUME
M3

5.80

0.05

7.25

5.90

0.05

7.38

LEBAR
M'

14.63
162.40
177.03
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 14 - 3
V0LUME
M3

5.90

0.05

7.38

5.85

0.05

14.63

5.80

0.05

7.25

1.20

0.05

1.74

1.50

0.05

0.08

0.05

0.81

LEBAR
M'

2.70

31.89
177.03
208.92
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 14 - 4
V0LUME
M3

1.00

0.05

0.06

3.00

0.05

3.75

3.00

0.05

2.25

LEBAR
M'

3.00

0.05

5.25

3.00

0.05

7.50

0.05

14.75

5.90

33.56
208.92
242.48
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

LEBAR
M'

TEBAL
M'

HAL 14 - 5
V0LUME
M3

3.00

0.05

7.50

3.00

0.05

7.50

0.05

14.25

0.05

7.50

5.80

0.05

14.50

5.80

0.05

14.50

5.70

3.00

65.75
242.48
308.23
Dibuat Oleh :

PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 14 - 6
V0LUME
M3

3.00

0.05

2.25

3.00

0.05

5.25

3.00

0.05

3.75

3.00

0.05

3.75

LEBAR
M'

3.00

0.05

3.75

3.00

0.05

7.50

26.25
308.23
334.48
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

LEBAR
M'
3.00

TEBAL
M'

HAL 14 - 7
V0LUME
M3

0.05

7.50

3.00

0.05

7.50

3.00

0.05

7.50

1.62

0.05

0.18

0.30

0.05

0.03

2.72

0.05

0.31

23.02
334.48
357.50
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO

GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 14 - 8
V0LUME
M3

5.90

0.05

5.31

5.86

0.05

4.40

5.86

0.05

14.65

5.85

0.05

14.63

5.78

0.05

4.34

LEBAR
M'

3.00

0.05

6.00

49.33
357.50
406.83
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 14 - 9
V0LUME
M3

6.00

0.05

7.50

6.00

0.05

7.50

LEBAR
M'

6.00

0.05

7.50

6.00

0.05

7.50

30.00
406.83
436.83
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 14 - 2
V0LUME
M3

0.05

14.75

3.00

0.05

7.50

3.00

0.05

7.50

5.96

0.05

7.45

5.95

0.05

14.88

0.05

7.50

LEBAR
M'
5.90

6.00

59.58
29.57
89.15
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 14 - 1
V0LUME
M3

5.90

0.05

7.38

5.90

0.05

14.75

5.95

0.05

7.44

LEBAR
M'

29.57
29.57
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)
: Laston Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
HAL 14

No

S TAT I O N E R

Laston AC-BC

STA

Aspal Lama

490 + 950

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

490 + 400

'm 6

490

950

5.80

0.05

7.25

0.05

14.38

0.05

14.38

0.05

14.35

0.05

14.38

0.05

14.75

0.05

14.75

0.05

14.13

0.05

7.06

50.00
2

490

900

5.75
50.00

490

850

5.75
50.00

490

800

5.74

490

750

5.75

50.00
50.00
6

490

700

5.90
50.00

490

650

5.90

490

600

5.65

50.00
50.00
9

490

550

5.65

10

490

500

1.20

29.00

0.05

1.74

11

490

500

1.50

1.00

0.05

0.08

12

490

450

2.70

6.00

0.05

0.81

13

490

450

1.00

1.20

0.05

0.06

14

490

400

3.00

25.00

0.05

3.75

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 14-1
Jumlah Lalu MC - 2
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

462.20 M1
350.00 M1
812.20 M1

MARWAN, BE
CHIEF INSPECTOR

121.87
88.65
210.52
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)
: Laston Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
HAL 14

No

S TAT I O N E R

Laston AC-BC

STA

Aspal Lama

490 + 300

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

489 + 400

'm 6

15

490

300

3.00

15.00

0.05

2.25

16

490

250

3.00

35.00

0.05

5.25

17

490

200

3.00

50.00

0.05

7.50

18

490

150

5.83

50.00

0.05

14.58

19

490

100

3.00

50.00

0.05

7.50

20

490

050

3.00

50.00

0.05

7.50

21

489

950

5.70

50.00

0.05

14.25

22

489

900

3.00

50.00

0.05

7.50

23

489

800

5.53

50.00

0.05

13.83

24

489

750

5.53

50.00

0.05

13.83

25

489

550

3.00

15.00

0.05

2.25

26

489

500

3.00

25.00

0.05

3.75

27

489

500

3.00

35.00

0.05

5.25

28

489

450

5.65

0.05

7.06

0.05

7.25

50.00
29

489

400

5.80

Jumlah 14-2
575.00 M1
119.55
Jumlah Lalu
812.20 M1
210.52
Jumlah Total
1,387.20 M1
330.07
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)
: Laston Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
HAL 14

No

S TAT I O N E R

Laston AC-BC

STA

Aspal Lama

489 + 400

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

488 + 950

'm 6

30

489

400

5.80

0.05

7.25

0.05

7.31

50.00
31

489

350

5.85

32

489

300

3.00

50.00

0.05

7.50

33

489

250

3.00

50.00

0.05

7.50

34

489

200

3.00

50.00

0.05

7.50

35

489

150

1.62

2.26

0.05

0.18

36

489

150

0.30

1.70

0.05

0.03

37

489

150

2.72

2.30

0.05

0.31

38

489

100

5.90

12.95

0.05

3.82

39

489

050

5.86

15.00

0.05

4.40

40

489

000

5.86

0.05

14.65

0.05

14.63

25.00
50.00
41

488

950

5.85
25.00

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 14-3
334.21 M1
75.08
1
Jumlah Lalu
1,387.20 M
330.07
Jumlah Total
1,721.41 M1
405.15
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)
: Laston Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
HAL 14

No

S TAT I O N E R

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

s/d

487 + 900

M1

M3

Laston AC-BC

STA

Aspal Lama

488 + 900

'm 6

42

488

900

5.80

15.00

0.05

4.35

43

488

600

3.00

40.00

0.05

6.00

44

487

950

5.85

0.05

7.31

0.05

7.25

50.00
45

487

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN
Aspal
Laston
Lama
AC-BC

900

5.80

Jumlah 14-4
105.00 M1
24.91
1
Jumlah Lalu
1,721.41 M
405.15
1
Jumlah Total MC - 3
1,826.41 M
430.06
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR
'm 6

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)
: Laston Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
HAL 14

No

S TAT I O N E R

Laston AC-BC

STA

Aspal Lama

488 + 900

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

488 + 200

'm 6

488

900

5.80

0.05

7.25

0.05

7.25

50.00
2

488

850

5.80

488

800

3.00

50.00

0.05

7.50

488

750

3.00

50.00

0.05

7.50

488

600

5.96

0.05

7.45

0.05

14.88

0.05

7.25

0.05

7.38

0.05

14.75

0.05

7.44

50.00
6

488

550

5.95
50.00

488

500

5.80

488

300

5.90
50.00

488

250

5.90

10

488

200

5.95

50.00

Jumlah 14-1

350.00 M1

88.65

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah Lalu
Jumlah Total MC - 2
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

- M1
350.00 M1

MARWAN, BE
CHIEF INSPECTOR

88.65
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)
: Laston Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
HAL 14

No

S TAT I O N E R

Laston AC-BC

STA

Aspal Lama

487 + 900

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

487 + 850

'm 6

487

900

5.80

0.05

7.25

0.05

7.25

50.00
2

487

850

5.80

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 14-1
50.00 M1
14.50
1
Jumlah Lalu MC - 3
1,826.41 M
430.06
1
Jumlah Total
1,876.41 M
444.56
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)
: Laston Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
HAL 14

No

S TAT I O N E R

Laston AC-BC
Aspal Lama

STA

343 + 500

LEBAR

JARAK

TEBAL

VOLUME

M1

M1

M1

M3

s/d

2 + 400

'm 6

Nicah Awe

KM 343 + 500

10.00

13.60

0.05

6.80

Damar Tutong

KM 400 + 000

10.00

13.60

0.05

6.80

Alue Lhok

KM 409 + 100

10.00

12.10

0.05

6.05

Sarah Teube

KM 421 + 500

10.00

13.60

0.05

6.80

Alue Dua

KM 433 + 600

10.00

13.60

0.05

6.80

Lhok Bhani

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

KM 2 + 400

10.00

13.60

0.05

6.80

Jumlah 14-2
80.10 M1
40.05
1
Jumlah Lalu
1,876.41 M
444.56
Jumlah Total MC - 4
1,956.51 M1
484.61
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 14 - 1
KET

M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 14 - 2
KET

K
9
1
L
0
a
e
msl
m
a't'
os'
n
A
B
A
C
W
B
C

M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 14 - 3
KET

M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 14 - 4
KET

M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 14 - 1
KET

M3

M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

AH PROVINSI NANGGROE ACEH DARUSSALAM

ANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


AN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 14 - 1
KET

M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

HAL 14 - 2
KET

M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)
: Laston - Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+850

Sta 490+900

Sta 490+950

Sta 491+000

Sta 491+050

Sta 491+100

Sta 491+150

Sta 491+200

Sta 491+250

Sta 491+300

Sta 491+350

Sta 491+400

Sta 491+450

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)
: Laston - Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+100

Sta 490+150

KOTA LANGSA

Sta 490+200

Sta 490+250

Sta 490+300

Sta 490+350

Sta 490+400

Sta 490+450

Sta 490+500

Sta 490+550

Sta 490+600

Sta 490+650

Sta 490+700

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)
: Laston - Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 489+350

Sta 489+400

Sta 489+450

Sta 489+500

Sta 489+550

Sta 489+600

Sta 489+650

Sta 489+700

Sta 489+750

Sta 489+800

Sta 489+850

Sta 489+900

Sta 489+950

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)
: Laston - Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)
: Laston - Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 2

BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 6.3(6)
: Laston - Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 487+850

Sta 487+900

Sta 487+950

Sta 488+000

Sta 488+050

Sta 488+100

Sta 488+150

Sta 488+200

Sta 488+250

Sta 488+300

Sta 488+350

Sta 488+400

Sta 488+450

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 14 - 1

ET/GAMBAR

PERBATASAN
SUMUT
Sta 491+500

Sta 491+550

Sta 491+600

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 14 - 2

ET/GAMBAR

Sta 490+750

Sta 490+800

MEDAN

Sta 490+850

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 14 - 3

ET/GAMBAR

Sta 490+000

Sta 490+050

Sta 490+100

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

ET/GAMBAR

HAL. 14 - 4

Sta 489+250

Sta 489+300

Sta 489+350

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 14 - 1

ET/GAMBAR

Sta 489+250

Sta 489+300

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

Sta 489+350

HAL. 14 - 2

ET/GAMBAR

Sta 488+500

Sta 488+550

Sta 488+600

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 5

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

488 + 200

50.00

6.00

0.05

300.00

15.00 ACBC

488 + 250

50.00

6.00

0.05

300.00

15.00 ACBC

488 + 500

50.00

6.00

0.05

300.00

15.00 ACBC

488 + 550

50.00

6.00

0.05

300.00

15.00 ACBC

488 + 600

40.00

3.00

0.05

120.00

6.00

488 + 750

50.00

3.00

0.05

150.00

7.50

488 + 800

50.00

3.00

0.05

150.00

7.50

488 + 850

50.00

6.00

0.05

300.00

15.00

488 + 900

40.00

6.00

0.05

240.00

12.00 ACBC

488 + 950

50.00

6.00

0.05

300.00

15.00 ACBC

489 + 000

40.00

6.00

0.05

240.00

12.00 ACBC

489 + 050

12.95

6.00

0.05

77.70

3.89 ACBC

489 + 150

1.62
1.70
2.72

2.26
0.30
2.30

0.05
0.05
0.05

3.66
0.51
6.26

0.18
0.03
0.31

489 + 200

50.00

3.00

0.05

150.00

7.50

489 + 250

50.00

3.00

0.05

150.00

7.50

489 + 300

50.00

3.00

0.05

150.00

7.50

489 + 350

50.00

3.00

0.05

150.00

7.50

489 + 400

25.00

3.00

0.05

75.00

3.75

489 + 450

25.00

3.00

0.05

75.00

3.75

489 + 500

35.00
25.00

3.00
3.00

0.05
0.05

105.00
75.00

5.25
3.75

489 + 550

15.00

3.00

0.05

45.00

2.25

489 + 750

50.00

6.00

0.05

300.00

15.00 ACBC

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

4,063.13
4,063.13

203.16
203.16

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 5

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

489 + 800

50.00

6.00

0.05

300.00

15.00 ACBC

489 + 900

50.00

3.00

0.05

150.00

7.50 ACBC

489 + 950

50.00

6.00

0.05

300.00

15.00 ACBC

490 + 050

50.00

3.00

0.05

150.00

7.50 ACBC

490 + 100

50.00

3.00

0.05

150.00

7.50 ACBC

490 + 150

50.00

6.00

0.05

300.00

15.00 ACBC

490 + 200

50.00

3.00

0.05

150.00

7.50 ACBC

490 + 250

35.00

3.00

0.05

105.00

5.25 ACBC

490 + 300

15.00

3.00

0.05

45.00

2.25 ACBC

490 + 400

25.00

3.00

0.05

75.00

3.75 ACBC

490 + 450

6.00
1.20

2.70
1.00

0.05
0.05

16.20
1.20

0.81 ACBC
0.06 ACBC

490 + 500

29.00
1.00

1.20
1.50

0.05
0.05

34.80
1.50

1.74 ACBC
0.08 ACBC

490 + 550

50.00

6.00

0.05

300.00

15.00 ACBC

490 + 600

50.00

6.00

0.05

300.00

15.00 ACBC

490 + 650

50.00

6.00

0.05

300.00

15.00 ACBC

490 + 700

50.00

6.00

0.05

300.00

15.00 ACBC

490 + 750

50.00

6.00

0.05

300.00

15.00 ACBC

490 + 800

50.00

6.00

0.05

300.00

15.00 ACBC

490 + 850

50.00

6.00

0.05

300.00

15.00 ACBC

490 + 900

50.00

6.00

0.05

300.00

15.00 ACBC

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

4,178.70
4,063.13
8,241.83

208.94
203.16
412.10

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 5

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

Box Alue Lhok

12.60

10.00

0.05

126.00

6.30 ACBC

Box Alue Bhani

13.60

10.00

0.05

136.00

6.80 ACBC

Box Alur Dua

13.60

10.00

0.05

136.00

6.80 ACBC

Box Sarah Teube

13.60

10.00

0.05

136.00

6.80 ACBC

Box Damar Tutong

13.60

10.00

0.05

136.00

6.80 ACBC

Box Nicah Awe

13.60

10.00

0.05

136.00

6.80 ACBC

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

806.00
8,241.83
9,047.83

40.30
412.10
452.40

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan
STA

SKET/GAMBAR

PANJANG
M'

Sta 491+ 000


Sta 491+ 000

19.90

Sta 491+ 000

8.60

Sta 490+900 - Sta 490+950

50.00

Sta 490+880 - Sta 490+900

20.00

Sta 490+815 - Sta 490+850

35.00

Agregat Kelas A
Agregat Kelas B

Aspal Lama

3.40

2.60

Sta 491+ 000


Agregat Kelas A
Agregat Kelas B

Aspal Lama

3.30

2.70

Sta 490+900 - Sta 490+950


Agregat Kelas A
Agregat Kelas B

6.00 m'
Sta 490+880 - Sta 490+900
Agregat Kelas A
Agregat Kelas B

5.90 m'
Sta 490+815 - Sta 490+850
Aspal Lama

0.30

Agregat Kelas A
Agregat Kelas B

0.30

Sta 490+780 - Sta 490+800


Sta 490+780 - Sta 490+800

20.00

Agregat Kelas A
Agregat Kelas B

Lap. Base Lama

5.80 m'
JUMLAH SAAT INI
JUMLAH LALU
JUMLAH TOTAL

153.50
153.50

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+755 - Sta 490+765


Sta 490+755 - Sta 490+765

10.00

Sta 490+700 - Sta 490+750

50.00

Agregat Kelas A
Agregat Kelas B

Lap. Base Lama

5.80 m'
Sta 490+700 - Sta 490+750
Agregat Kelas A
Agregat Kelas B

Lap. Base Lama

5.80 m'

Sta 490+650 - Sta 490+700


Sta 490+650 - Sta 490+700

50.00

Sta 490+650 - Sta 490+700

1.20

Sta 490+650 - Sta 490+700

29.00

Sta 490+650 - Sta 490+700

10.00

Agregat Kelas A
Agregat Kelas B

Aspal Lama

3.00

3.00

Sta 490+650 - Sta 490+700


Agregat Kelas A
Aspal Lama

Agregat Kelas B

0.20 1.00

4.80

Sta 490+650 - Sta 490+700


Agregat Kelas A
Aspal Lama

Agregat Kelas B

1.20

4.80

Sta 490+650 - Sta 490+700


Agregat Kelas A
Aspal Lama

Agregat Kelas B

3.00

3.00

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

150.20
153.50
303.70

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

BACK UP DATA

MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+600 - Sta 490+650


Sta 490+600 - Sta 490+650

50.00

Sta 490+610 - Sta 490+650

40.00

Sta 490+550 - Sta 490+600

50.00

Sta 490+550 - Sta 490+570

20.00

Sta 490+575 - Sta 490+595

20.00

Sta 490+500

1.50

Agregat Kelas A
Agregat Kelas B

Aspal Lama

3.00

3.00

Sta 490+610 - Sta 490+650


Agregat Kelas A
Aspal Lama

Agregat Kelas B

3.00

3.00

Sta 490+550 - Sta 490+600


Agregat Kelas A
Agregat Kelas B

Aspal Lama

3.00

3.00

Sta 490+550 - Sta 490+570


Agregat Kelas A
Aspal Lama

Agregat Kelas B

2.50

3.50

Sta 490+575 - Sta 490+595


Agregat Kelas A
Aspal Lama

Agregat Kelas B

2.50

3.50
Sta 490+500

Agregat Kelas B

Agregat Kelas A
Aspal Lama

0.20 1.00

4.80

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

181.50
303.70
485.20

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA

MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+500
Sta 490+500

29.00

Sta 490+450

1.00

Sta 490+450

6.00

Agregat Kelas A
Aspal Lama

Agregat Kelas B

0.20 1.20

4.60

Sta 490+450
Agregat Kelas A

Agregat Kelas B

Aspal Lama

0.10 1.20

4.70

Sta 490+450
Agregat Kelas B

2.70

Agregat Kelas A
Aspal Lama

3.30

Sta 490+400
Sta 490+400

25.00

Sta 490+150

1.45

Sta 490+150

5.00

Agregat Kelas A
Aspal Lama

Agregat Kelas B

3.00

3.00

Sta 490+150
Agregat Kelas A
Agregat Kelas B

Aspal Lama

3.00

0.80

2.20

Sta 490+150
Agregat Kelas B

Agregat Kelas A
Aspal Lama

1.20 0.85

3.95

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

67.45
485.20
552.65

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+150
Sta 490+150

3.00

Sta 490+150

5.40

Sta 490+150

5.60

Sta 490+150

0.90

Sta 490+150

0.50

Sta 490+150

0.60

Agregat Kelas A
Agregat Kelas B

Aspal Lama

3.00

0.58

2.42

Sta 490+150
Agregat Kelas A
Aspal Lama

Agregat Kelas B

1.20 1.56

3.24

Sta 490+150
Agregat Kelas A
Aspal Lama

Agregat Kelas B

1.20 0.50

4.30

Sta 490+150
Agregat Kelas A
Aspal Lama

Agregat Kelas B

0.20 0.50

5.30

Sta 490+150
Agregat Kelas A
Aspal Lama

Agregat Kelas B

0.20 0.60

5.20

Sta 490+150
Agregat Kelas A
Agregat Kelas B

Aspal Lama

3.00

0.58

2.42

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL
Diperiksa Oleh :

16.00
552.65
568.65
Diperiksa Oleh :

BAG. PELAKSANA KEG. SKS


LINTAS TIMUR III

Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan
STA

SKET/GAMBAR

PANJANG
M'

Sta 490+150
Sta 490+150

5.60

Sta 490+150

4.33

Sta 490+150

0.80

Sta 490+050

2.30

Agregat Kelas A
Agregat Kelas B

Aspal Lama

5.30

0.70

Sta 490+150
Agregat Kelas A
Agregat Kelas B

Aspal Lama

5.45

0.55

Sta 490+150
Agregat Kelas A
Agregat Kelas B

Aspal Lama

3.00

1.95

1.05

Sta 490+050
Aspal Lama

Agregat Kelas A
Agregat Kelas B

3.00

0.80

2.20

Sta 490+050
Aspal Lama

3.00

Sta 490+050

1.50

Sta 490+050

1.50

Agregat Kelas A
Agregat Kelas B

0.90

2.10

Sta 490+050
Agregat Kelas A
Aspal Lama

Agregat Kelas B

2.10

0.90

3.00

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

16.03
568.65
584.68

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA

MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+050
Sta 490+050
Agregat Kelas B

1.00

Agregat Kelas A
Aspal Lama

5.00

4.80

Sta 490+050
Sta 490+050

8.30

Sta 489+900

4.50

Sta 489+900

9.20

Sta 489+900

1.10

Sta 489+900

3.00

Agregat Kelas A
Aspal Lama

Agregat Kelas B

1.00

5.00
Sta 489+900
Agregat Kelas A
Aspal Lama

Agregat Kelas B

0.25 1.55

4.20

Sta 489+900
Agregat Kelas A
Aspal Lama

Agregat Kelas B

2.60

3.40
Sta 489+900
Agregat Kelas A
Aspal Lama

Agregat Kelas B

0.10 1.90

4.00

Sta 489+900
Agregat Kelas A
Aspal Lama

Agregat Kelas B

4.20

1.80

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

30.90
584.68
615.58

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST

MARWAN, BE

KORDINATOR LAPANGAN

CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 489+900
Sta 489+900

5.10

Sta 489+500

0.70

Sta 489+500

0.90

Sta 489+500

0.60

Sta 489+500

1.60

Agregat Kelas A
Aspal Lama

Agregat Kelas B

3.40

2.60

Sta 489+500
Agregat Kelas A
Agregat Kelas B

Aspal Lama

2.60

0.70

2.70

Sta 489+500
Agregat Kelas A
Aspal Lama

Agregat Kelas B

0.60 1.20

4.20

Sta 489+500
Agregat Kelas A
Aspal Lama

Agregat Kelas B

0.50 1.30

4.20

Sta 489+500
Agregat Kelas B

Agregat Kelas A
Aspal Lama

0.99 1.31

3.70

Sta 489+500
Sta 489+500

1.00

Agregat Kelas A
Aspal Lama

Agregat Kelas B

1.50

4.50

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

9.90
615.58
625.48

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 489+500
Sta 489+500

1.00

Sta 489+400

2.60

Agregat Kelas A
Aspal Lama

Agregat Kelas B

0.54 1.26

4.20

Sta 489+400
Agregat Kelas B

Agregat Kelas A
Aspal Lama

0.50 1.50

4.00

Sta 489+400
Sta 489+400

2.35

Sta 489+400

1.65

Sta 489+150

1.62

Sta 489+150

1.70

Agregat Kelas A
Aspal Lama

Agregat Kelas B

0.30 0.70

5.00

Sta 489+400
Agregat Kelas A
Aspal Lama

Agregat Kelas B

1.90 0.60

3.50

Sta 489+150
Agregat Kelas A
Agregat Kelas B

Aspal Lama

1.04

2.26

2.70

Sta 489+150
Agregat Kelas A

Agregat Kelas B

Aspal Lama

0.30

5.70

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

10.92
625.48
636.40

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 489+150
Sta 489+150

2.30

Sta 489+050

18.00

Sta 488+600

1.50

Sta 488+600

2.30

Sta 488+600

0.35

Sta 488+600

1.45

Agregat Kelas A

Aspal Lama

Agregat Kelas B

3.00

2.72

0.28

Sta 489+050
Agregat Kelas A
Agregat Kelas B

Lap. Base Lama

5.86 m'
Sta 488+600
Agregat Kelas A
Aspal Lama

Agregat Kelas B

0.80 1.20

4.00

Sta 488+600
Agregat Kelas A
Agregat Kelas B

Aspal Lama

5.00

0.60

0.40

Sta 488+600
Agregat Kelas A

Agregat Kelas B

1.50

Aspal Lama

1.50

3.00

Sta 488+600
Aspal Lama

Agregat Kelas A
Agregat Kelas B

3.00

1.23

1.77

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

25.90
636.40
662.30

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 488+600
Sta 488+600
Agregat Kelas A
Agregat Kelas B

Aspal Lama

3.17

0.83

2.00

0.80

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

0.80
662.30
663.10

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 9 - 1
V0LUME
M3

2.60

0.15

7.76

2.70

0.15

3.48

6.00

0.15

45.00

5.90

0.15

17.70

3.00

0.15

15.75

LEBAR
M'

5.80

0.15

17.40

107.09
###
107.09
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 9 - 2
V0LUME
M3

5.80

0.15

8.70

5.80

0.15

43.50

LEBAR
M'

3.00

0.15

22.50

1.00

0.15

0.18

1.20

0.15

5.22

3.00

0.15

4.50

84.60
107.09
191.69
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 9 - 3
V0LUME
M3

3.00

0.15

22.50

3.00

0.15

18.00

3.00

0.15

22.50

2.50

0.15

7.50

2.50

0.15

7.50

1.00

0.15

0.23

LEBAR
M'

78.23
191.69
269.92
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 9 - 4
V0LUME
M3

1.20

0.15

5.22

1.20

0.15

0.18

2.70

0.15

2.43

LEBAR
M'

3.00

0.15

11.25

0.80

0.15

0.17

0.85

0.15

0.64

19.89
269.92
289.81
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

LEBAR
M'

TEBAL
M'

HAL 9 - 5
V0LUME
M3

0.58

0.15

0.26

1.56

0.15

1.26

0.50

0.15

0.42

0.50

0.15

0.07

0.60

0.15

0.05

0.58

0.15

0.05

2.11
289.81
291.92
Dibuat Oleh :

PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 9 - 6
V0LUME
M3

0.70

0.15

0.59

0.55

0.15

0.36

1.95

0.15

0.23

0.80

0.15

0.28

LEBAR
M'

0.90

0.15

0.20

0.90

0.15

0.20

1.86
291.92
293.78
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

LEBAR
M'
1.00

TEBAL
M'

HAL 9 - 7
V0LUME
M3

0.15

0.72

1.00

0.15

1.25

1.55

0.15

1.05

2.60

0.15

3.59

1.90

0.15

0.31

4.20

0.15

1.89

8.81
293.78
302.59
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO

GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 9 - 8
V0LUME
M3

3.40

0.15

2.60

0.70

0.15

0.07

1.20

0.15

0.16

1.30

0.15

0.12

1.31

0.15

0.31

LEBAR
M'

1.50

0.15

0.23

3.49
302.59
306.08
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 9 - 9
V0LUME
M3

1.26

0.15

0.19

1.50

0.15

0.59

LEBAR
M'

0.70

0.15

0.25

0.60

0.15

0.15

2.26

0.15

0.55

0.3

0.15

0.08

1.81
306.08
307.89
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 9 - 10
V0LUME
M3

2.72

0.15

0.94

5.86

0.15

15.82

1.20

0.15

0.27

0.60

0.15

0.21

1.50

0.15

0.08

1.23

0.15

0.27

LEBAR
M'

17.59
307.89
325.48
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

LEBAR
M'
0.83

TEBAL
M'

HAL 9 - 11
V0LUME
M3

0.15

0.10

0.10
325.48
325.58
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
S TAT I O N E R

Agregat Kelas A

STA

Aspal Lama

491 + 000

LEBAR

JARAK

TEBAL

M1

M1

M1

s/d

490 + 550

Agregat Kelas B

'm 6

491

000

2.70

8.60

0.15

491

000

2.60

19.90

0.15

490

900

5.75

50.00

0.15

490

850

5.75

20.00

0.15

490

800

3.00

35.00

0.15

490

750

5.75

20.00

0.15

490

750

5.75

10.00

0.15

490

700

5.90

50.00

0.15

490

650

1.00

1.20

0.15

10

490

650

1.20

29.00

0.15

11

490

650

3.00

50.00

0.15

12

490

650

3.00

10.00

0.15

13

490

600

3.00

50.00

0.15

14

490

600

3.00

40.00

0.15

15

490

550

2.50

20.00

0.15

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 9-1
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

413.70 M1
- M1
413.70 M1

Dibuat Oleh :
PT. BAHTERA KARAN

ARMAN SUROS
GENERAL SUPERINT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
S TAT I O N E R

Agregat Kelas A

STA

Aspal Lama

490 + 550

LEBAR

JARAK

TEBAL

M1

M1

M1

s/d

490 + 150

Agregat Kelas B

'm 6

16

490

550

3.00

50.00

0.15

17

490

550

2.50

20.00

0.15

18

490

500

1.20

29.00

0.15

19

490

500

1.00

1.50

0.15

20

490

450

2.70

6.00

0.15

21

490

450

1.20

1.00

0.15

22

490

400

3.00

25.00

0.15

23

490

150

0.70

5.60

0.15

24

490

150

0.80

1.45

0.15

25

490

150

0.85

5.00

0.15

26

490

150

0.58

3.00

0.15

27

490

150

1.56

5.40

0.15

28

490

150

0.50

5.60

0.15

29

490

150

0.50

0.90

0.15

30

490

150

0.60

0.50

0.15

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 9-2
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

159.95 M1
413.70 M1
573.65 M1

Dibuat Oleh :
PT. BAHTERA KARAN

ARMAN SUROS
GENERAL SUPERINT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
S TAT I O N E R

Agregat Kelas A

STA

Aspal Lama

489 + 150

LEBAR

JARAK

TEBAL

M1

M1

M1

s/d

489 + 500

Agregat Kelas B

'm 6

31

490

150

0.58

0.60

0.15

32

490

150

0.55

4.33

0.15

33

490

150

0.80

1.95

0.15

34

490

050

2.30

0.80

0.15

35

490

050

1.50

0.90

0.15

36

490

050

1.50

0.90

0.15

37

490

050

1.00

4.80

0.15

38

490

050

1.00

8.30

0.15

39

489

900

1.55

4.50

0.15

40

489

900

2.60

9.20

0.15

41

489

900

1.90

1.10

0.15

42

489

900

4.20

3.00

0.15

43

489

900

3.40

5.10

0.15

44

489

500

0.70

0.70

0.15

45

489

500

1.20

0.90

0.15

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 9-3
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

47.08 M1
573.65 M1
620.73 M1

Dibuat Oleh :
PT. BAHTERA KARAN

ARMAN SUROS
GENERAL SUPERINT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
S TAT I O N E R

LEBAR

JARAK

TEBAL

M1

M1

M1

s/d

488 + 600

Agregat Kelas A

STA

Aspal Lama

489 + 500

Agregat Kelas B

'm 6

46

489

500

1.30

0.60

0.15

47

489

500

1.31

1.60

0.15

48

489

500

1.50

1.00

0.15

49

489

500

1.26

1.00

0.15

50

489

400

1.50

2.60

0.15

51

489

400

0.60

1.65

0.15

52

489

400

0.70

2.35

0.15

53

489

150

2.26

1.62

0.15

54

489

150

0.30

1.70

0.15

55

489

150

2.72

2.30

0.15

56

489

050

5.86

18.00

0.15

57

488

600

1.20

1.50

0.15

58

488

600

0.60

2.30

0.15

59

488

600

1.50

0.35

0.15

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 9-4
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

Aspal
Laston
Lama
AC-BC

'm 6

38.57 M1
620.73 M1
659.30 M1

Dibuat Oleh :
PT. BAHTERA KARAN

ARMAN SUROS
GENERAL SUPERINT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
S TAT I O N E R

Agregat Kelas A

STA

Aspal Lama

488 + 600

LEBAR

JARAK

TEBAL

M1

M1

M1

s/d

488 + 600

Agregat Kelas B

'm 6

60

488

600

1.23

1.45

0.15

61

488

600

0.83

0.80

0.15

Jumlah 9-5

2.25 M1

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah Lalu
Jumlah Total MC-3
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

659.30 M1
661.55 M1

Dibuat Oleh :
PT. BAHTERA KARAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SUROS
GENERAL SUPERINT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
S TAT I O N E R

Agregat Kelas A
Aspal Lama

STA

433 + 500

LEBAR

JARAK

TEBAL

M1

M1

M1

s/d

2 + 400

Agregat Kelas B

'm 6

Nicah Awe

KM 343 + 500

10.00

13.60

0.15

Damar Tutong

KM 400 + 000

10.00

13.60

0.15

Alue Lhok

KM 409 + 100

10.00

12.10

0.15

Sarah Teube

KM 421 + 500

10.00

13.60

0.15

Alue Dua

KM 433 + 600

10.00

13.60

0.15

Lhok Bhani

KM 2 + 400

10.00

13.60

0.15

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 1-3
Jumlah Lalu MC-3
Jumlah Total MC-4
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

80.10 M1
661.55 M1
741.65 M1

Dibuat Oleh :
PT. BAHTERA KARAN

ARMAN SUROS
GENERAL SUPERINT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 9 - 1
VOLUME
M3
Agregat Kelas B

3.48
7.76
43.13
17.25
15.75
17.25
8.63
44.25
0.18
5.22
22.50
4.50
22.50
18.00
7.50

KET

237.90 M3
- M3
237.90 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 9 - 2
VOLUME
M3
Agregat Kelas B

22.50
7.50
5.22
0.23
2.43
0.18
11.25
0.59
0.17

KET

K
9
1
L
0
a
e
m
sl
m
a't
o
s'
n
A
B
A
C
W
B
C

0.64
0.26
1.26
0.42
0.07
0.05
52.77 M3
237.90 M3
290.67 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 9 - 3
VOLUME
M3
Agregat Kelas B

0.05
0.36

KET

0.23
0.28
0.20
0.20
0.72
1.25
1.05
3.59
0.31
1.89
2.60
0.07
0.16
12.96 M3
290.67 M3
303.63 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 9 - 4
VOLUME

KET

M3
Agregat Kelas B

0.12
0.31
0.23
0.19
0.59
0.15
0.25
0.55
0.08
0.94
15.82
0.27
0.21
0.08

19.79 M3
303.63 M3
323.42 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 9 - 5
VOLUME
M3
Agregat Kelas B

0.27
0.10

0.37 M3

KET

323.42 M3
323.79 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 9 - 5
VOLUME
M3
Agregat Kelas B

20.40
20.40
18.15
20.40
20.40
20.40

KET

120.15 M3
323.79 M3
443.94 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+850

Sta 490+900

Sta 490+950

Sta 491+000

Sta 491+050

Sta 491+100

Sta 491+150

Sta 491+200

Sta 491+250

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+100

Sta 490+150

Sta 490+200

Sta 490+250

Sta 490+300

Sta 490+350

Sta 490+400

Sta 490+450

Sta 490+500

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 489+350

Sta 489+400

Sta 489+450

Sta 489+500

Sta 489+550

Sta 489+600

Sta 489+650

Sta 489+700

Sta 489+750

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE A

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIM

PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

R 2005

HAL. 9 - 1

BAR

PERBATASAN
SUMUT
Sta 491+300

Sta 491+350

Sta 491+400

Sta 491+450

Sta 491+500

Sta 491+550

Sta 491+600

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

ATA

ER 2005

HAL. 9 - 2

BAR

Sta 490+550

Sta 490+600

Sta 490+650

Sta 490+700

Sta 490+750

Sta 490+800

Sta 490+850

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

ER 2005

HAL. 9 - 3

BAR

Sta 489+800

Sta 489+850

Sta 489+900

Sta 489+950

Sta 490+000

Sta 490+050

Sta 490+100

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

NANGGROE ACEH DARUSSALAM

N LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

S KOTA LANGSA - BATAS SUMUT

ATA

ER 2005

BAR

HAL. 9 - 4

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

Sta 489+250

Sta 489+300

Sta 489+350

MEDAN

h:
rvisi
RDANA

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

E
TOR

ARMAN SUROSO
GENERAL SUPERINTENDENT

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 1
PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

AC-WC
AC-WC
AC-WC

AC-WC

JUMLAH SAAT INI


JUMLAH LALU

JUMLAH TOTAL

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 2

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83

JUMLAH SAAT INI

JUMLAH LALU
JUMLAH TOTAL

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 3

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 4

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

488 + 600

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 5

PANJANG
m

1.50
2.30
0.35

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

1.20
0.60
1.50

0.15
0.15
0.15

1.80
1.38
0.53

VOL
m3

KET

0.27
0.21
0.08 oke

1.45
0.80

1.23
0.83

0.15
0.15

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

1.78
0.66

0.27
0.10

6.15
6.15

0.93
0.93

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 6

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

489 + 050

12.95

6.00

0.15

77.70

11.66 oke

489 + 150

1.62
1.70
2.72

2.26
0.30
2.30

0.15
0.15
0.15

3.66
0.51
6.26

0.55
0.08 oke
0.94

489 + 400

2.60
1.65
2.35

1.50
0.60
0.70

0.15
0.15
0.15

3.90
0.99
1.65

0.59
0.15 oke
0.25

489 + 500

0.70
1.20
1.30
1.31
1.50
1.26

###
0.90
0.60
1.60
1.00
1.00

0.15
0.15
0.15
0.15
0.15
0.15

0.49
1.08
0.78
2.10
1.50
1.26
101.88

0.07
0.16
0.12
0.32 oke
0.23
0.19
15.31

JUMLAH SAAT INI

JUMLAH LALU
JUMLAH TOTAL

6.15
108.03

0.93
16.24

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

489 + 900

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 7

PANJANG
m

4.50
9.20
1.10
3.00
5.10

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

1.55
2.60
1.90
4.20
3.40

0.15
0.15
0.15
0.15
0.15

6.98
23.92
2.09
12.60
17.34

VOL
m3

KET

1.05
3.59
0.31 oke
1.89
2.60

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

62.93
108.03
170.96

9.44
16.24
25.68

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 8

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

490 + 150

5.60
1.45
5.00
3.00
5.40
5.60
0.90
0.50
0.60
4.33
1.95

0.70
0.80
0.85
0.58
1.56
0.50
0.50
0.60
0.58
0.55
0.80

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

3.92
1.16
4.25
1.74
8.42
2.80
0.45
0.30
0.35
2.38
1.56

0.59
0.17
0.64
0.26
1.26
0.42 oke
0.07
0.05
0.05
0.36
0.23

490 + 600
490 + 650

6.00
1.20
29.00
1.00

2.70
1.00
1.20
1.50

0.15
0.15
0.15
0.15

16.20
1.20
34.80
1.50

2.43
0.18 oke
5.22
0.23

8.60
19.90

2.70
2.60

0.15
0.15

23.22
51.74

3.48
7.76 oke

490 + 700

491 + 000

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

155.99
170.96
326.95

23.40
25.68
49.08

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

490 + 050

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 9

PANJANG
m

2.30
1.50
1.50
4.80
8.30

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

0.80
0.90
0.90
1.00
1.00

0.15
0.15
0.15
0.15
0.15

1.84
1.35
1.35
4.80
8.30

VOL
m3

KET

0.28
0.20 oke
0.20
0.72
1.25

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

17.64
326.95
344.59

2.65
49.08
51.73

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan
STA

SKET/GAMBAR

PANJANG
M'

Sta 491+ 000


Aspal Lama

Sta 491+ 000

19.90

Sta 490+900 - Sta 490+950

50.00

Sta 490+880 - Sta 490+900

20.00

Sta 490+815 - Sta 490+850

35.00

Sta 490+780 - Sta 490+800

20.00

Agregat Kelas B

3.40

2.60

Sta 490+900 - Sta 490+950


Lap. Base Lama

Agregat Kelas B

6.00 m'
Sta 490+880 - Sta 490+900
Lap. Base Lama

Agregat Kelas B

5.90 m'
Sta 490+815 - Sta 490+850
Aspal Lama

Agregat Kelas B

5.70

5.70

Sta 490+780 - Sta 490+800


Lap. Base Lama

Agregat Kelas B

5.80 m'

Sta 490+700 - Sta 490+750


Sta 490+700 - Sta 490+750

50.00

Lap. Base Lama

Agregat Kelas B

5.80 m'
JUMLAH SAAT INI
JUMLAH LALU
JUMLAH TOTAL

194.90
194.90

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+650 - Sta 490+700


Aspal Lama

Sta 490+650 - Sta 490+700

50.00

Sta 490+650 - Sta 490+700

1.20

Agregat Kelas B

3.00

3.00

Sta 490+650 - Sta 490+700


Agregat Kelas B

0.20 1.00

Aspal Lama

4.80

Sta 490+650 - Sta 490+700


Agregat Kelas B

Sta 490+650 - Sta 490+700

29.00

Sta 490+650 - Sta 490+700

10.00

Sta 490+600 - Sta 490+650

50.00

Sta 490+600 - Sta 490+650

40.00

Aspal Lama

1.20

4.80

Sta 490+650 - Sta 490+700


Agregat Kelas B

Aspal Lama

3.00

3.00

Sta 490+600 - Sta 490+650


Aspal Lama

Agregat Kelas B

3.00

3.00

Sta 490+600 - Sta 490+650


Agregat Kelas B

Aspal Lama

3.00

3.00

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL MC - 2

180.20
194.90
375.10

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA

MC. No. 3
BULAN : SEPTEMBER 2005

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+550 - Sta 490+600


Aspal Lama

Sta 490+550 - Sta 490+600

50.00

Sta 490+500

1.50

Sta 490+450

1.00

Sta 490+450

6.00

Sta 490+150

1.45

Sta 490+150

5.00

Agregat Kelas B

3.00

3.00

Sta 490+500
Agregat Kelas B

Aspal Lama

0.20 1.00

4.80

Sta 490+450
Agregat Kelas B

Aspal Lama

0.10 1.20

4.70

Sta 490+450
Agregat Kelas B

Aspal Lama

2.70

3.30

Sta 490+150
Aspal Lama

3.00

Agregat Kelas B

0.80

2.20

Sta 490+150
Agregat Kelas B

Aspal Lama

1.20 0.85

3.95

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

64.95
375.10
440.05

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan
STA

SKET/GAMBAR

PANJANG
M'

Sta 490+150
Aspal Lama

Sta 490+150

3.00

Sta 490+150

5.40

Sta 490+150

5.60

Agregat Kelas B

3.00

0.58

2.42

Sta 490+150
Agregat Kelas B

Aspal Lama

1.20 1.56

3.24

Sta 490+150
Agregat Kelas B

1.20 0.50

Aspal Lama

4.30

Sta 490+150
Agregat Kelas B

Sta 490+150

0.90

Sta 490+150

0.50

Sta 490+150

0.60

Aspal Lama

0.20 0.50

5.30

Sta 490+150
Agregat Kelas B

Aspal Lama

0.20 0.60

5.20

Sta 490+150
Aspal Lama

3.00

Agregat Kelas B

0.58

2.42

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

16.00
440.05
456.05

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA

MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+150
Aspal Lama

Sta 490+150

5.60

Sta 490+150

4.33

Sta 490+150

0.80

Sta 490+050

2.30

Sta 490+050

1.50

Sta 490+050

1.50

Agregat Kelas B

5.30

0.70

Sta 490+150
Aspal Lama

Agregat Kelas B

5.45

0.55

Sta 490+150
Aspal Lama

Agregat Kelas B

3.00

1.95

1.05

Sta 490+050
Aspal Lama

Agregat Kelas B

3.00

0.80

2.20

Sta 490+050
Aspal Lama

3.00

Agregat Kelas B

0.90

2.10

Sta 490+050
Agregat Kelas B

2.10

Aspal Lama

0.90

3.00

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL
Diperiksa Oleh :

16.03
456.05
472.08
Diperiksa Oleh :

BAG. PELAKSANA KEG. SKS


LINTAS TIMUR III

Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 490+050
Agregat Kelas B

Sta 490+050

4.80

Sta 490+050

8.30

Sta 489+900

4.50

Sta 489+900

9.20

Aspal Lama

1.00

5.00
Sta 490+050

Agregat Kelas B

Aspal Lama

1.00

5.00
Sta 489+900

Agregat Kelas B

Aspal Lama

0.25 1.55

4.20

Sta 489+900
Agregat Kelas B

Aspal Lama

2.60

3.40
Sta 489+900

Agregat Kelas B

Sta 489+900

1.10

Sta 489+900

3.00

Aspal Lama

0.10 1.90

4.00

Sta 489+900
Agregat Kelas B

Aspal Lama

4.20

1.80

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

30.90
472.08
502.98

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 489+900
Sta 489+900
Agregat Kelas B

Aspal Lama

3.40

2.60

5.10

Sta 489+500
Aspal Lama

Sta 489+500

0.70

Sta 489+500

0.90

Sta 489+500

0.60

Sta 489+500

1.60

Sta 489+500

1.00

Agregat Kelas B

2.60

0.70

2.70

Sta 489+500
Agregat Kelas B

Aspal Lama

0.60 1.20

4.20

Sta 489+500
Agregat Kelas B

Aspal Lama

0.50 1.30

4.20

Sta 489+500
Agregat Kelas B

Aspal Lama

0.99 1.31

3.70

Sta 489+500
Agregat Kelas B

1.50

Aspal Lama

4.50

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

9.90
502.98
512.88

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST

MARWAN, BE

KORDINATOR LAPANGAN

CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 489+500
Agregat Kelas B

Sta 489+500

1.00

Sta 489+400

2.60

Sta 489+400

2.35

Sta 489+400

1.65

Sta 489+150

1.62

Aspal Lama

0.54 1.26

4.20

Sta 489+400
Agregat Kelas B

Aspal Lama

0.50 1.50

4.00

Sta 489+400
Agregat Kelas B

Aspal Lama

0.30 0.70

5.00

Sta 489+400
Agregat Kelas B

Aspal Lama

1.90 0.60

3.50

Sta 489+150
Aspal Lama

Agregat Kelas B

1.04

2.26

2.70

Sta 489+150
Sta 489+150
Agregat Kelas B

1.70

Aspal Lama

0.30

5.70

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

10.92
512.88
523.80

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATA
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan

SKET/GAMBAR

STA

PANJANG
M'

Sta 489+150
Aspal Lama

3.00

Sta 489+150

2.30

Sta 488+600

1.50

Agregat Kelas B

2.72

0.28

Sta 488+600
Agregat Kelas B

Aspal Lama

0.80 1.20

4.00

Sta 488+600
Aspal Lama

5.00

Sta 488+600

2.30

Sta 488+600

0.35

Sta 488+600

1.45

Sta 488+600

0.80

Agregat Kelas B

0.60

0.40

Sta 488+600
Agregat Kelas B

1.50

Aspal Lama

1.50

3.00

Sta 488+600
Aspal Lama

3.00

Agregat Kelas B

1.23

1.77

Sta 488+600
Aspal Lama

3.17

Agregat Kelas B

0.83

2.00

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

8.70
523.80
532.50

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 10 - 1
V0LUME
M3

2.60

0.20

10.35

6.00

0.20

60.00

5.90

0.20

23.60

5.70

0.20

39.90

5.80

0.20

23.20

LEBAR
M'

5.80

0.20

58.00

215.05
215.05
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 10 - 2
V0LUME
M3

3.00

0.20

30.00

1.00

0.20

0.24

LEBAR
M'

1.20

0.20

6.96

3.00

0.20

6.00

3.00

0.20

30.00

3.00

0.20

24.00

97.20
215.05
312.25
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 10 - 3
V0LUME
M3

3.00

0.20

30.00

1.00

0.20

0.30

1.20

0.20

0.24

2.70

0.20

3.24

0.80

0.20

0.23

0.85

0.20

0.85

LEBAR
M'

34.86
312.25
347.11
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 10 - 4
V0LUME
M3

0.58

0.20

0.35

1.56

0.20

1.68

0.50

0.20

0.56

LEBAR
M'

0.50

0.20

0.09

0.60

0.20

0.06

0.58

0.20

0.07

2.81
347.11
349.92
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

LEBAR
M'

TEBAL
M'

HAL 10 - 5
V0LUME
M3

0.70

0.20

0.78

0.55

0.20

0.48

1.95

0.20

0.31

0.80

0.20

0.37

0.90

0.20

0.27

0.90

0.20

0.27

2.48
349.92
352.40
Dibuat Oleh :

PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 10 - 6
V0LUME
M3

1.00

0.20

0.96

1.00

0.20

1.66

1.55

0.20

1.40

2.60

0.20

4.78

LEBAR
M'

1.90

0.20

0.42

4.20

0.20

2.52

11.74
352.40
364.14
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

LEBAR
M'
3.40

TEBAL
M'

HAL 10 - 7
V0LUME
M3

0.20

3.47

0.70

0.20

0.10

1.20

0.20

0.22

1.30

0.20

0.16

1.31

0.20

0.42

1.50

0.20

0.30

4.67
364.14
368.81
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO

GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 10 - 8
V0LUME
M3

1.26

0.20

0.25

1.50

0.20

0.78

0.70

0.20

0.33

0.60

0.20

0.20

2.26

0.20

0.73

LEBAR
M'

0.3

0.20

0.10

2.39
368.81
371.20
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

LAYAH PROVINSI NANGGROE ACEH DARUSSALAM


MBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
UNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

TEBAL
M'

HAL 10 - 9
V0LUME
M3

2.72

0.20

1.25

1.20

0.20

0.36

LEBAR
M'

0.60

0.20

0.28

1.50

0.20

0.11

1.23

0.20

0.36

0.83

0.20

0.13

2.49
371.20
373.69
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
S TAT I O N E R

Agregat Kelas B

KM

Lapisan Base Lama

491 + 000

LEBAR

JARAK

TEBAL

M1

M1

M1

s/d

490 + 450

'm 6

491

000

2.60

19.90

0.20

490

900

5.75

50.00

0.20

490

850

5.75

20.00

0.20

490

800

3.00

35.00

0.20

490

750

5.75

20.00

0.20

490

700

5.90

50.00

0.20

490

650

1.00

1.20

0.20

490

650

1.20

29.00

0.20

490

650

3.00

50.00

0.20

10

490

650

3.00

10.00

0.20

11

490

600

3.00

50.00

0.20

12

490

600

3.00

40.00

0.20

13

490

550

3.00

50.00

0.20

14

490

500

1.00

1.50

0.20

15

490

450

2.70

6.00

0.20

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 10-1
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

432.60 M1
- M1
432.60 M1

Dibuat Oleh :
PT. BAHTERA KARAN

ARMAN SUROS
GENERAL SUPERINT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
S TAT I O N E R

Agregat Kelas B

KM

Lapisan Base Lama

490 + 450

LEBAR

JARAK

TEBAL

M1

M1

M1

s/d

490 + 050

'm 6

16

490

450

1.20

1.00

0.20

17

490

150

0.70

5.60

0.20

18

490

150

0.80

1.45

0.20

19

490

150

0.85

5.00

0.20

20

490

150

0.58

3.00

0.20

21

490

150

1.56

5.40

0.20

22

490

150

0.50

5.60

0.20

23

490

150

0.50

0.90

0.20

24

490

150

0.60

0.50

0.20

25

490

150

0.58

0.60

0.20

26

490

150

0.55

4.33

0.20

27

490

150

0.80

1.95

0.20

28

490

050

2.30

0.80

0.20

29

490

050

1.50

0.90

0.20

30

490

050

1.50

0.90

0.20

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 10-2
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

37.93 M1
432.60 M1
470.53 M1

Dibuat Oleh :
PT. BAHTERA KARAN

ARMAN SUROS
GENERAL SUPERINT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
S TAT I O N E R

Agregat Kelas B

KM

Lapisan Base Lama

490 + 050

LEBAR

JARAK

TEBAL

M1

M1

M1

s/d

489 + 400

'm 6

31

490

050

1.00

4.80

0.20

32

490

050

1.00

8.30

0.20

33

489

900

1.55

4.50

0.20

34

489

900

2.60

9.20

0.20

35

489

900

1.90

1.10

0.20

36

489

900

4.20

3.00

0.20

37

489

900

3.40

5.10

0.20

38

489

500

0.70

0.70

0.20

39

489

500

1.20

0.90

0.20

40

489

500

1.30

0.60

0.20

41

489

500

1.31

1.60

0.20

42

489

500

1.50

1.00

0.20

43

489

500

1.26

1.00

0.20

44

489

400

1.50

2.60

0.20

45

489

400

0.70

2.35

0.20

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Jumlah 10-3
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

46.75 M1
470.53 M1
517.28 M1

Dibuat Oleh :
PT. BAHTERA KARAN

ARMAN SUROS
GENERAL SUPERINT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
S TAT I O N E R

LEBAR

JARAK

TEBAL

M1

M1

M1

s/d

488 + 600

Agregat Kelas B

KM

Lapisan Base Lama

489 + 400

'm 6

46

489

400

0.60

1.65

0.20

47

489

150

2.26

1.62

0.20

48

489

150

0.30

1.70

0.20

49

489

150

2.72

2.30

0.20

50

488

600

1.20

1.50

0.20

51

488

600

0.60

2.30

0.20

52

488

600

1.50

0.35

0.20

53

488

600

1.23

1.45

0.20

54

488

600

0.83

0.80

0.20

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah 10-4
Jumlah Lalu
Jumlah Total MC - 3
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

13.67 M1
517.28 M1
530.95 M1

Dibuat Oleh :
PT. BAHTERA KARAN

ARMAN SUROS
GENERAL SUPERINT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi
No

: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Box Culvert Jalan Banda Aceh - Medan
S TAT I O N E R

Agregat Kelas B
Lapisan Base Lama

KM

433 + 500

LEBAR

JARAK

TEBAL

M1

M1

M1

s/d

2 + 400

'm 6

Nicah Awe

KM 343 + 500

10.00

13.60

0.20

Damar Tutong

KM 400 + 000

10.00

13.60

0.20

Alue Lhok

KM 409 + 100

10.00

12.10

0.20

Sarah Teube

KM 421 + 500

10.00

13.60

0.20

Alue Dua

KM 433 + 600

10.00

13.60

0.20

Lhok Bhani

KM 2 + 400

10.00

13.60

0.20

Jumlah 10-1

80.10 M1

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

BOB ISMED, ST
KORDINATOR LAPANGAN

Jumlah Lalu MC - 3
Jumlah Total MC - 4
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

MARWAN, BE
CHIEF INSPECTOR

530.95 M1
611.05 M1

Dibuat Oleh :
PT. BAHTERA KARAN

ARMAN SUROS
GENERAL SUPERINT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 10 - 1
VOLUME
M3

10.35
57.50
23.00
21.00
23.00
59.00
0.24
6.96
30.00
6.00
30.00
24.00
30.00
0.30
3.24

KET

324.59 M3
- M3
324.59 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 10 - 2
VOLUME
M3

0.24
0.78
0.23
0.85
0.35
1.68
0.56
0.09
0.06

KET

K
9
1
L
0
a
e
m
sl
m
a't
o
s'
n
A
B
A
C
W
B
C

0.07
0.48
0.31
0.37
0.27
0.27
6.61 M3
324.59 M3
331.20 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 10 - 3
VOLUME
M3

0.96
1.66

KET

1.40
4.78
0.42
2.52
3.47
0.10
0.22
0.16
0.42
0.30
0.25
0.78
0.33
17.77 M3
331.20 M3
348.97 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 10 - 4
VOLUME

KET

M3

0.20
0.73
0.10
1.25
0.36
0.28
0.11
0.36
0.13

3.52 M3
348.97 M3
352.49 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

A WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM

S PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT


BANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL 10 - 1
VOLUME
M3

27.20
27.20
24.20
27.20
27.20
27.20

160.20 M3

KET

352.49 M3
512.69 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+850

Sta 490+900

Sta 490+950

Sta 491+000

Sta 491+050

Sta 491+100

Sta 491+150

Sta 491+200

Sta 491+250

Sta 491+300

Sta 491+350

Sta 491+400

Sta 491+450

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 490+100

Sta 490+150

KOTA LANGSA

Sta 490+200

Sta 490+250

Sta 490+300

Sta 490+350

Sta 490+400

Sta 490+450

Sta 490+500

Sta 490+550

Sta 490+600

Sta 490+650

Sta 490+700

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 489+350

Sta 489+400

Sta 489+450

Sta 489+500

Sta 489+550

Sta 489+600

Sta 489+650

Sta 489+700

Sta 489+750

Sta 489+800

Sta 489+850

Sta 489+900

Sta 489+950

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

DINAS PRASARANA WILAYAH PROVINSI NANGGROE ACEH DARUSSALAM


BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT

BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005

No. Mata Pembayaran


Item Pekerjaan
Lokasi

: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan

SKET/GAMBAR

Sta 488+600

Sta 488+650

Sta 488+700

Sta 488+750

Sta 488+800

Sta 488+850

Sta 488+900

Sta 488+950

Sta 489+000

Sta 489+050

Sta 489+100

Sta 489+150

Sta 489+200

KOTA LANGSA

Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III

Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA

Dibuat O
PT. BAHTERA K

BOB ISMED, ST
KORDINATOR LAPANGAN

MARWAN, BE
CHIEF INSPECTOR

ARMAN SU
GENERAL SUPE

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 10 - 1

ET/GAMBAR

PERBATASAN
SUMUT
Sta 491+500

Sta 491+550

Sta 491+600

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 10 - 2

ET/GAMBAR

Sta 490+750

Sta 490+800

MEDAN

Sta 490+850

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

HAL. 10 - 3

ET/GAMBAR

Sta 490+000

Sta 490+050

Sta 490+100

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

ROVINSI NANGGROE ACEH DARUSSALAM

UNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT

JALAN BATAS KOTA LANGSA - BATAS SUMUT

ET/GAMBAR

HAL. 10 - 4

Sta 489+250

Sta 489+300

Sta 489+350

MEDAN

Dibuat Oleh :
PT. BAHTERA KARANG RAYA

ARMAN SUROSO
GENERAL SUPERINTENDENT

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 1
PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

AC-WC
AC-WC
AC-WC

AC-WC

JUMLAH SAAT INI


JUMLAH LALU

JUMLAH TOTAL

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 2

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83

JUMLAH SAAT INI

JUMLAH LALU
JUMLAH TOTAL

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 3

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 4

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

488 + 600

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 5

PANJANG
m

1.50
2.30
0.35

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

1.20
0.60
1.50

0.20
0.20
0.20

1.80
1.38
0.53

VOL
m3

0.36
0.28
0.11

KET

1.45
0.80

1.23
0.83

0.20
0.20

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

1.78
0.66

0.36
0.13

6.15
6.15

1.24
1.24

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 6

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

489 + 000

12.95

6.07

0.20

78.61

15.72 b

489 + 100

3.00
1.34
2.40
3.00
1.30

2.50
1.50
2.00
2.50
2.30

0.20
0.20
0.20
0.20
0.20

7.50
2.01
4.80
7.50
2.99

1.50
0.40
0.96
1.50
0.60

489 + 150

1.62
1.70
2.72

2.26
0.30
2.30

0.20
0.20
0.20

3.66
0.51
6.26

0.73
0.10
1.25

489 + 400

2.60
1.65
2.35

1.50
0.60
0.70

0.20
0.20
0.20

3.90
0.99
1.65

0.78
0.20
0.33

489 + 500

0.70

###

0.20

0.49

0.10

KET

1.20
1.30
1.31
1.50
1.26

0.90
0.60
1.60
1.00
1.00

0.20
0.20
0.20
0.20
0.20

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

1.08
0.78
2.10
1.50
1.26
127.59
6.15
133.74

0.22
0.16
0.42
0.30
0.25
25.52
1.24
26.76

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 7

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

KET

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

133.74
133.74

26.76
26.76

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

490 + 650
490 + 700

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 8

PANJANG
m

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

VOL
m3

6.00
1.20
29.00
1.00

2.70
1.00
1.20
1.50

0.20
0.20
0.20
0.20

16.20
1.20
34.80
1.50

3.24
0.24
6.96
0.30

490 + 700

1.20
29.00

1.00
1.20

0.20
0.20

1.20
34.80

0.24
6.96

491 + 000

8.60

2.70

0.20

23.22

4.64 b

490 + 750

KET

19.90

2.60

0.20

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

51.74

164.66
133.74
298.40

10.35 b

32.93
26.76
59.69

PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN

No

INDIKASI
STA
STA
AWAL
AKHIR

490 + 050

:
:
:
:

PEMBANGUNAN JALAN Bts KOTA LANGSA - Bts. SUMUT


BANG - 15A
BAHTERA KARANG RAYA
Laston - Lapis Pengikat Aspal Beton (AC-BC)
HAL - 9

PANJANG
m

2.30
1.50
1.50
4.80
8.30

PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2

0.80
0.90
0.90
1.00
1.00

0.20
0.20
0.20
0.20
0.20

1.84
1.35
1.35
4.80
8.30

VOL
m3

0.37
0.27
0.27
0.96
1.66

KET

JUMLAH SAAT INI


JUMLAH LALU
JUMLAH TOTAL

17.64
298.40
316.04

3.53
59.69
63.22