Contoh Format MC 2008 OK
Contoh Format MC 2008 OK
MONTHLY CERTIFICATE
MC. NO. 01
SEPTEMBER 2008 25
PAKET PEKERJAAN :
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
: 602.2/4157/DBM
: 16 September 2016
: Rp. 2.954.986.136,50
SUMBER DANA
TAHUN ANGGARAN
: APBD
: 2016
PELAKSANA :
BINA MARGA
AWESI SELATAN
THLY CERTIFICATE
MC. NO. 01
SEPTEMBER 2008 25
T PEKERJAAN :
ELAKSANA :
A KARYA SEMESTA
MONTHLY CERTIF
MC. NO. 02
OKTOBER 2016
PAKET PEKERJAAN :
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILI
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
: 602.2/4157/DBM
: 16 September 2016
: Rp. 2.954.986.136,50
SUMBER DANA
TAHUN ANGGARAN
: APBD
: 2016
PELAKSANA :
BINA MARGA
AWESI SELATAN
MONTHLY CERTIFICATE
MC. NO. 02
OKTOBER 2016 25
T PEKERJAAN :
E POINT OF INDONESIA (RAILING)
ELAKSANA :
A KARYA SEMESTA
MONTHLY CE
MC. NO
MARET 2
PAKET PEKERJAAN :
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILI
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
: 602.2/4157/DBM
: 16 September 2016
: Rp. 2.954.986.136,50
SUMBER DANA
TAHUN ANGGARAN
: APBD
: 2016
PELAKSANA :
BINA MARGA
AWESI SELATAN
MONTHLY CERTIFICATE
MC. NO. 03
MARET 2016 25
ET PEKERJAAN :
E POINT OF INDONESIA (RAILING)
PELAKSANA :
A KARYA SEMESTA
*
************
.
1
14,277,600.00 ************ Model (1-3):
.
************ ************ ************ ************
Empat belas juta dua ratus tujuh puluh tujuh ribu enam ratus rupiah.
************ ****************************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh delapan sem ***
************
ribu juta milyar
***
************ 000014277600
***
************ ****************************** ************ ************ ************ ************
************ 600
1
***
************
6
***
************ enam ratus
sepuluh
***
************
0
***
************
0
***
************
***
************ enam ratus
***
************
***
************
***
************ 277
2
***
************
2 tujuh puluh
***
************ dua ratus
tujuh belas
***
************
7 tujuh
***
************
7 tujuh puluh tujuh
***
************ tujuh puluh tujuh
tujuh puluh tujuh
***
************ dua ratus tujuh puluh tujuh ribu
***
************
***
************
***
************ 014
3
***
************
0
***
************
empat belas
***
************
1 empat
***
************
4 empat
***
************ empat belas
empat belas
***
************ empat belas juta
***
************
***
************
***
************ 000
4
***
************
0
***
************
sepuluh
***
************
0
***
************
************
************
************
************ 000
************
************
************
************
************
************
************
************
***
***
***
***
1
***
0
***
sepuluh
***
0
****
0
***
***
***
67 00
0
***
67 ************ ************ ************
67 00
empat belas juta dua ratus tujuh puluh tujuh ribu enam ratus
************ empat belas juta dua ratus empat belas*
empat belas juta dua ratus tujuh puluh tujuh ribu enam ratus
************ empat belas juta dua ratus empat belas*
empat belas juta dua ratus tujuh puluh tujuh ribu enam ratus rupiah
1 Empat belas juta dua ratus tujuh puluh tujuh ribu enam ratus rupiah.
2 Empat belas juta dua ratus tujuh puluh tujuh ribu enam ratus rupiah.
3 Empat belas juta dua ratus tujuh puluh tujuh ribu enam ratus rupiah.
************ ****************************** ************ ************ ************ ************
KALAU MAU MENGCOPY HARUS KE BAWAH
*
************
.
1
134,930,100.00 ************ Model (1-3):
.
************ ************ ************ ************
Seratus tiga puluh empat juta sembilan ratus tiga puluh ribu seratus rupiah.
************ ****************************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh delapan sem ***
************
ribu juta milyar
***
************ 000134930100
***
************ ****************************** ************ ************ ************ ************
************ 100
1
***
************
1
***
************ seratus
sepuluh
***
************
0
***
************
0
***
************
***
************ seratus
***
************
***
************
***
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
930
***
***
***
***
***
***
***
***
***
134
3
***
1 tiga puluh
***
seratus
empat belas
***
3 empat
***
4 tiga puluh empat
***
tiga puluh empat
tiga puluh empat
***
seratus tiga puluh empat juta
***
***
***
000
4
***
0
***
sepuluh
***
0
***
0
***
***
***
***
000
1
***
0
***
sepuluh
***
0
****
0
***
***
***
75 00
0
***
75 ************ ************ ************
75 00
seratus tiga puluh empat juta sembilan ratus tiga puluh ribu seratu
************ seratus tiga puluh empat juseratus tiga*
seratus tiga puluh empat juta sembilan ratus tiga puluh ribu seratu
************ seratus tiga puluh empat juseratus tiga*
seratus tiga puluh empat juta sembilan ratus tiga puluh ribu seratu
1 Seratus tiga puluh empat juta sembilan ratus tiga puluh ribu seratus rupiah.
2 Seratus tiga puluh empat juta sembilan ratus tiga puluh ribu seratus rupiah.
3 Seratus tiga puluh empat juta sembilan ratus tiga puluh ribu seratus rupiah.
9 tiga puluh
sembilan ratus
sepuluh
3
0 tiga puluh
tiga puluh
tiga puluh
sembilan ratus tiga puluh ribu
*
************
.
1
3,474,755,305.00 ************ Model (1-3):
.
************ ************ ************ ************
Tiga milyar empat ratus tujuh puluh empat juta tujuh ratus lima puluh lima ribu tiga ratus lima rupiah.
************ ****************************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh delapan sem ***
************
ribu juta milyar
***
************ 003474755305
***
************ ****************************** ************ ************ ************ ************
************ 305
1
***
************
3
***
************ tiga ratus
lima belas
***
************
0 lima
***
************
5 lima
***
************ lima
lima
***
************ tiga ratus lima
***
************
***
************
***
************ 755
2
***
************
7 lima puluh
***
************ tujuh ratus
lima belas
***
************
5 lima
***
************
5 lima puluh lima
***
************ lima puluh lima
lima puluh lima
***
************ tujuh ratus lima puluh lima ribu
***
************
***
************
***
************ 474
3
***
************
4 tujuh puluh
***
************ empat ratus
empat belas
***
************
7 empat
***
************
4 tujuh puluh empat
***
************ tujuh puluh empat
tujuh puluh empat
***
************ empat ratus tujuh puluh empat juta
***
************
***
************
***
************ 003
4
***
************
************
************
************
************ tiga
************ tiga milyar
************
************ 000
************
************
************
************
************
************
************
************
***
***
***
***
***
***
***
1
***
0
***
sepuluh
***
0
****
0
***
***
***
102 00
0
***
102 ************ ************ ************
102 00
tiga milyar empat ratus tujuh puluh empat juta tujuh ratus lima pulu
************ tiga milyar empat ratus tujutiga milyar *
tiga milyar empat ratus tujuh puluh empat juta tujuh ratus lima pulu
************ tiga milyar empat ratus tujutiga milyar *
tiga milyar empat ratus tujuh puluh empat juta tujuh ratus lima pulu
1 Tiga milyar empat ratus tujuh puluh empat juta tujuh ratus lima puluh lima ribu tiga ratus lima rupiah.
2 Tiga milyar empat ratus tujuh puluh empat juta tujuh ratus lima puluh lima ribu tiga ratus lima rupiah.
3 Tiga milyar empat ratus tujuh puluh empat juta tujuh ratus lima puluh lima ribu tiga ratus lima rupiah.
************ ****************************** ************ ************ ************ ************
tiga belas
0 tiga
3 tiga
tiga
*
************
.
1
3,500,402,680.00 ************ Model (1-3):
.
************ ************ ************ ************
Tiga milyar lima ratus juta empat ratus dua ribu enam ratus delapan puluh rupiah.
************ ****************************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh delapan sem ***
************
ribu juta milyar
***
************ 003500402680
***
************ ****************************** ************ ************ ************ ************
************ 680
1
***
************
6 delapan puluh
***
************ enam ratus
sepuluh
***
************
8
***
************
0 delapan puluh
***
************ delapan puluh
delapan puluh
***
************ enam ratus delapan puluh
***
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
***
***
402
2
***
4
***
empat ratus
dua belas
***
0 dua
***
2 dua
***
dua
dua
***
empat ratus dua ribu
***
***
***
500
3
***
5
***
lima ratus
sepuluh
***
0
***
0
***
***
lima ratus juta
***
***
***
003
4
***
0
***
tiga belas
***
0 tiga
***
3 tiga
***
tiga
tiga
***
tiga milyar
***
***
000
1
***
0
***
sepuluh
***
0
****
0
***
***
***
80 00
0
***
80 ************ ************ ************
80 00
tiga milyar lima ratus juta empat ratus dua ribu enam ratus delapan
************ tiga milyar lima ratus juta tiga milyar *
tiga milyar lima ratus juta empat ratus dua ribu enam ratus delapan
************ tiga milyar lima ratus juta tiga milyar *
tiga milyar lima ratus juta empat ratus dua ribu enam ratus delapan
1 Tiga milyar lima ratus juta empat ratus dua ribu enam ratus delapan puluh rupiah.
2 Tiga milyar lima ratus juta empat ratus dua ribu enam ratus delapan puluh rupiah.
3 Tiga milyar lima ratus juta empat ratus dua ribu enam ratus delapan puluh rupiah.
************ ****************************** ************ ************ ************ ************
KALAU MAU MENGCOPY HARUS KE BAWAH
*
************
.
1
111,533,135.00 ************ Model (1-3):
.
************ ************ ************ ************
Seratus sebelas juta lima ratus tiga puluh tiga ribu seratus tiga puluh lima rupiah.
************ ****************************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh delapan sem ***
************
ribu juta milyar
***
************ 000111533135
***
************ ****************************** ************ ************ ************ ************
************ 135
1
***
************
1 tiga puluh
***
************ seratus
lima belas
***
************
3 lima
***
************
5 tiga puluh lima
***
************ tiga puluh lima
tiga puluh lima
***
************ seratus tiga puluh lima
***
************
***
************
***
************ 533
2
***
************
5 tiga puluh
***
************ lima ratus
tiga belas
***
************
3 tiga
***
************
3 tiga puluh tiga
***
************ tiga puluh tiga
tiga puluh tiga
***
************ lima ratus tiga puluh tiga ribu
***
************
***
************
***
************ 111
3
***
************
1
***
************ seratus
sebelas
***
************
1 satu
***
************
1 satu
***
************ sebelas
sebelas
***
************ seratus sebelas juta
***
************
***
************
***
************ 000
************
************
************
************
************
************
************
************ 000
************
************
************
************
************
************
************
************
***
***
sepuluh
***
0
***
0
***
***
***
***
1
***
0
***
sepuluh
***
0
****
0
***
***
***
83 00
0
***
83 ************ ************ ************
83 00
seratus sebelas juta lima ratus tiga puluh tiga ribu seratus tiga pulu
************ seratus sebelas juta lima raseratus sebe*
seratus sebelas juta lima ratus tiga puluh tiga ribu seratus tiga pulu
************ seratus sebelas juta lima raseratus sebe*
seratus sebelas juta lima ratus tiga puluh tiga ribu seratus tiga pulu
1 Seratus sebelas juta lima ratus tiga puluh tiga ribu seratus tiga puluh lima rupiah.
2 Seratus sebelas juta lima ratus tiga puluh tiga ribu seratus tiga puluh lima rupiah.
3 Seratus sebelas juta lima ratus tiga puluh tiga ribu seratus tiga puluh lima rupiah.
************ ****************************** ************ ************ ************ ************
0
*
************
.
1
2,221,796,730.00 ************ Model (1-3):
.
************ ************ ************ ************
Dua milyar dua ratus dua puluh satu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh rupiah.
************ ****************************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh delapan sem ***
************
ribu juta milyar
***
************ 002221796730
***
************ ****************************** ************ ************ ************ ************
************ 730
1
***
************
7 tiga puluh
***
************ tujuh ratus
sepuluh
***
************
3
***
************
0 tiga puluh
***
************ tiga puluh
tiga puluh
***
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
***
***
***
796
2
***
7 sembilan puluh
***
tujuh ratus
enam belas
***
9 enam
***
6 sembilan puluh enam
***
sembilan puluh enam
sembilan puluh enam
***
tujuh ratus sembilan puluh enam ribu
***
***
***
221
3
***
2 dua puluh
***
dua ratus
sebelas
***
2 satu
***
1 dua puluh satu
***
dua puluh satu
dua puluh satu
***
dua ratus dua puluh satu juta
***
***
***
002
4
***
0
***
dua belas
***
0 dua
***
2 dua
***
dua
dua
***
dua milyar
***
***
000
1
***
0
***
sepuluh
***
0
****
0
***
***
***
107 00
0
***
107 ************ ************ ************
107 00
dua milyar dua ratus dua puluh satu juta tujuh ratus sembilan pulu
************ dua milyar dua ratus dua pudua milyar d*
dua milyar dua ratus dua puluh satu juta tujuh ratus sembilan pulu
************ dua milyar dua ratus dua pudua milyar d*
dua milyar dua ratus dua puluh satu juta tujuh ratus sembilan pulu
1 Dua milyar dua ratus dua puluh satu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh rupiah.
2 Dua milyar dua ratus dua puluh satu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh rupiah.
3 Dua milyar dua ratus dua puluh satu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh rupiah.
************ ****************************** ************ ************ ************ ************
h empat juta tujuh ratus lima puluh lima ribu tiga ratus lima
h empat juta tujuh ratus lima puluh lima ribu tiga ratus lima
h empat juta tujuh ratus lima puluh lima ribu tiga ratus lima rupiah
tus lima rupiah.
tus lima rupiah.
tus lima rupiah.
tu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh
tu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh
tu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh rupiah
PEMERINTA
DIN
SERT
PEKERJAAN
PA K E T
NO. KONTRAK
Err:509
TGL. KONTRAK
:
Err:509
: PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
: 602.2/4157/DBM
: Err:509
:
42629
: Rp. 29.904.711.000,-
: Err:509
: PT. WIJAYA KARYA SEMESTA
DIV.
URAIAN PEKERJAAN
NILAI KONTR
ADD. I
(K. INDUK)
3
1
2
3
4
5
6
7
UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR
3,630,220.00
13,676,000.00
-
A
B
C
D
JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )
17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00
POTONGAN
E
F
G
H
I
DIBULATKAN
TERBILANG :
DIAJUKAN OLEH
DIPERIKS
PENYEDIA JASA
PT. WIJAYA KARYA SEMESTA
Sofyan Hasan
Direktur Utama
KONSULTAN
PT. TACITA PR
Ir. Erry S
Site Eng
PEMERINTA
DIN
SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
TGL. ADD. II (K. INDUK)
SUMBER DANA
:
:
:
:
:
:
:
:
Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 29.904.711.000,Err:509
PT. WIJAYA KARYA SEMESTA
DIV.
URAIAN PEKERJAAN
NILAI KONTR
ADD. I
(K. INDUK)
3
1
2
3
4
5
6
7
UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR
3,630,220.00
13,676,000.00
-
A
B
C
D
JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )
17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00
POTONGAN
E
F
G
H
I
DIBULATKAN
TERBILANG :
DIAJUKAN OLEH
DIPERIKS
PENYEDIA JASA
PT. WIJAYA KARYA SEMESTA
Sofyan Hasan
Direktur Utama
KONSULTAN
PT. TACITA PR
Ir. Erry S
Site Eng
PEMERINTA
DIN
SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
TGL. ADD. II (K. INDUK)
SUMBER DANA
:
:
:
:
:
:
:
:
Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 29.904.711.000,Err:509
PT. WIJAYA KARYA SEMESTA
DIV.
URAIAN PEKERJAAN
NILAI KONTR
ADD. I
(K. INDUK)
3
1
2
3
4
5
6
7
UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR
3,630,220.00
13,676,000.00
-
A
B
C
D
JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )
17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00
POTONGAN
E
F
G
H
I
DIBULATKAN
TERBILANG :
DIAJUKAN OLEH
DIPERIKS
PENYEDIA JASA
PT. WIJAYA KARYA SEMESTA
Sofyan Hasan
Direktur Utama
KONSULTAN
PT. TACITA PR
Ir. Erry S
Site Eng
PEMERINTA
DIN
SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
TGL. ADD. II (K. INDUK)
SUMBER DANA
:
:
:
:
:
:
:
:
Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 29.904.711.000,Err:509
PT. WIJAYA KARYA SEMESTA
DIV.
URAIAN PEKERJAAN
NILAI KONTR
ADD. I
(K. INDUK)
3
1
2
3
4
5
6
7
UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR
3,630,220.00
13,676,000.00
-
A
B
C
D
JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )
17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00
POTONGAN
E
F
G
H
I
DIBULATKAN
TERBILANG :
DIAJUKAN OLEH
DIPERIKS
PENYEDIA JASA
PT. WIJAYA KARYA SEMESTA
Sofyan Hasan
Direktur Utama
KONSULTAN
PT. TACITA PR
Ir. Erry S
Site Eng
PEMERINTA
DIN
SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
TGL. ADD. II (K. INDUK)
SUMBER DANA
:
:
:
:
:
:
:
:
Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 29.904.711.000,Err:509
PT. WIJAYA KARYA SEMESTA
DIV.
URAIAN PEKERJAAN
NILAI KONTR
ADD. I
(K. INDUK)
3
1
2
3
4
5
6
7
UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR
3,630,220.00
13,676,000.00
-
A
B
C
D
JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )
17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00
POTONGAN
E
F
G
H
I
DIBULATKAN
TERBILANG :
DIAJUKAN OLEH
DIPERIKS
PENYEDIA JASA
PT. WIJAYA KARYA SEMESTA
Sofyan Hasan
Direktur Utama
KONSULTAN
PT. TACITA PR
Ir. Erry S
Site Eng
PEMERINTA
DIN
SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
TGL. ADD. II (K. INDUK)
SUMBER DANA
:
:
:
:
:
:
:
:
Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 29.904.711.000,Err:509
PT. WIJAYA KARYA SEMESTA
DIV.
URAIAN PEKERJAAN
NILAI KONTR
ADD. I
(K. INDUK)
3
1
2
3
4
5
6
7
UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR
3,630,220.00
13,676,000.00
-
A
B
C
D
JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )
17,306,219.92
1,730,621.99
19,036,841.91
19,036,000.00
POTONGAN
E
F
G
H
I
DIBULATKAN
TERBILANG :
DIAJUKAN OLEH
DIPERIKS
PENYEDIA JASA
PT. WIJAYA KARYA SEMESTA
Sofyan Hasan
Direktur Utama
KONSULTAN
PT. TACITA PR
Ir. Erry S
Site Eng
SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
KONTRAK
ADD. II
(K. INDUK)
4
S/D
BLN LALU
BLN
INI
:
:
:
:
JUMLAH PEMBAYARAN
S/D
BLN INI
7
BOBOT
S/D BLN INI
%
8
3,630,220.00
13,676,000.00
-
3,630,220.00
13,676,000.00
-
#DIV/0!
17,306,220.00
1,730,622.00
19,036,842.00
19,036,800.00
17,306,220.00
1,730,622.00
19,036,842.00
19,036,800.00
#DIV/0!
#DIV/0!
#DIV/0!
951,840.00
951,840.00
18,084,960.00
18,084,960.00
IPERIKSA OLEH
MENGETAHUI OLEH
SULTAN PENGAWAS
CITA PRIMA UTAMA
MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD
Ir.Fajri, MT
NIP. 110 047 860
SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
KONTRAK
ADD. II
(K. INDUK)
4
S/D
BLN LALU
BLN
INI
:
:
:
:
JUMLAH PEMBAYARAN
S/D
BLN INI
7
3,630,220.00
13,676,000.00
-
#REF!
17,306,220.00
1,730,622.00
19,036,842.00
19,036,800.00
#REF!
#REF!
#REF!
#REF!
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
BOBOT
S/D BLN INI
%
8
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
18,084,960.00
#REF!
#REF!
#REF!
#REF!
IPERIKSA OLEH
MENGETAHUI OLEH
SULTAN PENGAWAS
CITA PRIMA UTAMA
MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD
Ir.Fajri, MT
NIP. 110 047 860
SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
KONTRAK
ADD. II
(K. INDUK)
4
-
S/D
BLN LALU
BLN
INI
#REF!
#VALUE!
#REF!
#REF!
#REF!
#REF!
:
:
:
:
JUMLAH PEMBAYARAN
S/D
BLN INI
7
BOBOT
S/D BLN INI
%
8
79,178,065.12
704,314,185.45
2,306,847,479.42
196,709,620.24
-
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,287,049,350.23
328,704,935.02
3,615,754,285.25
3,615,754,200.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
h empat juta tujuh ratus lima puluh lima ribu tiga ratus lima rupiah.
IPERIKSA OLEH
MENGETAHUI OLEH
SULTAN PENGAWAS
CITA PRIMA UTAMA
MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD
Ir.Fajri, MT
NIP. 110 047 860
SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
KONTRAK
ADD. II
(K. INDUK)
4
S/D
BLN LALU
BLN
INI
:
:
:
:
JUMLAH PEMBAYARAN
S/D
BLN INI
7
BOBOT
S/D BLN INI
%
8
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
3,249,453,354.27
100,214,350.23
-
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#REF!
#REF!
#REF!
3,349,667,704.50
334,966,770.45
3,684,634,474.95
3,684,634,400.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
IPERIKSA OLEH
MENGETAHUI OLEH
SULTAN PENGAWAS
CITA PRIMA UTAMA
MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD
Ir.Fajri, MT
NIP. 110 047 860
SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
KONTRAK
ADD. II
(K. INDUK)
4
S/D
BLN LALU
BLN
INI
:
:
:
:
JUMLAH PEMBAYARAN
S/D
BLN INI
7
BOBOT
S/D BLN INI
%
8
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
106,730,250.00
-
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#REF!
#REF!
#REF!
106,730,250.00
10,673,025.00
117,403,275.00
117,403,200.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
IPERIKSA OLEH
MENGETAHUI OLEH
SULTAN PENGAWAS
CITA PRIMA UTAMA
MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD
Ir.Fajri, MT
NIP. 110 047 860
SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
KONTRAK
ADD. II
(K. INDUK)
4
S/D
BLN LALU
BLN
INI
:
:
:
:
JUMLAH PEMBAYARAN
S/D
BLN INI
7
BOBOT
S/D BLN INI
%
8
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
2,126,121,246.88
-
#REF!
#VALUE!
#VALUE!
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#REF!
#REF!
#REF!
#REF!
2,126,121,246.88
212,612,124.69
2,338,733,371.57
2,338,733,300.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
tu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh rupiah.
IPERIKSA OLEH
MENGETAHUI OLEH
SULTAN PENGAWAS
CITA PRIMA UTAMA
MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD
Ir.Fajri, MT
NIP. 110 047 860
Ir. M. Hilal, MT
NIP. 110 053 961
`01
SEPTEMBER
25 / SEPTEMBER / 2008
1 dari 8
JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
11.00
0.00
5.61
0.00
0.00
0.00
0.00
S/D BULAN INI
#DIV/0!
BULAN LALU
#DIV/0!
BULAN INI
#DIV/0!
MENGETAHUI OLEH
#REF!
1 dari 8
JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
#REF!
#DIV/0!
BULAN LALU
#DIV/0!
BULAN INI
#REF!
MENGETAHUI OLEH
08
MARET
25 / MARET / 2008
1 dari 8
JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
S/D BULAN INI
#DIV/0!
BULAN LALU
#DIV/0!
BULAN INI
#DIV/0!
ratus lima rupiah.
MENGETAHUI OLEH
09
APRIL
25 / APRIL / 2008
1 dari 8
JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
#REF!
#REF!
#REF!
100.00
0.00
#REF!
#REF!
S/D BULAN INI
#DIV/0!
BULAN LALU
#DIV/0!
BULAN INI
#DIV/0!
MENGETAHUI OLEH
10
MEI
25 / MEI / 2008
1 dari 8
JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
8
#REF!
#REF!
#REF!
100.00
3.68
#REF!
#REF!
S/D BULAN INI
#DIV/0!
BULAN LALU
#DIV/0!
BULAN INI
#DIV/0!
MENGETAHUI OLEH
11
JUNI
25 / JUNI / 2008
1 dari 8
JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
#REF!
#REF!
#REF!
100.00
76.98
#REF!
#REF!
S/D BULAN INI
#DIV/0!
BULAN LALU
#DIV/0!
BULAN INI
#DIV/0!
Ir. M. Hilal, MT
NIP. 110 053 961
PEMERINTA
DIN
SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
SUMBER DANA
PENYEDIA BARANG/JASA
:
:
:
:
:
Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
: APBD
: PT. WIJAYA KARYA SEMESTA
DIV.
URAIAN PEKERJAAN
NILAI KONTR
KONTRAK
AWAL
3
1
2
3
4
5
6
7
UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN PELEBARAN BAHU DAN JALAN
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
A
B
C
D
JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )
33,002,000.00
119,571,750.00
243,806,278.52
132,466,750.00
775,855,600.00
674,706,240.00
988,157,304.97
2,967,565,923.49
296,756,592.35
3,264,322,515.84
3,264,322,000.00
POTONGAN
E
F
G
H
I
DIBULATKAN
TERBILANG :
DISETUJUI OLEH
DIP
IR. SYAHRUDDIN
NIP. 110 048 084
KONSU
PT. MAXITE
Ass. C
IR.
PEMERINTA
DIN
SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
SUMBER DANA
PENYEDIA BARANG/JASA
:
:
:
:
:
:
:
Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
APBD
PT. WIJAYA KARYA SEMESTA
DIV.
URAIAN PEKERJAAN
NILAI KONTR
KONTRAK
AWAL
3
1
2
3
4
5
6
7
UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN PELEBARAN BAHU DAN JALAN
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
A
B
C
D
JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )
33,002,000.00
119,571,750.00
243,806,278.52
132,466,750.00
775,855,600.00
674,706,240.00
988,157,304.97
2,967,565,923.49
296,756,592.35
3,264,322,515.84
3,264,322,000.00
POTONGAN
E
F
G
H
I
DIBULATKAN
TERBILANG :
DISETUJUI OLEH
DIP
IR. SYAHRUDDIN
NIP. 110 048 084
KONSU
PT. MAXITE
Ass. C
IR.
SIT
PEMERINTA
DIN
SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
SUMBER DANA
PENYEDIA BARANG/JASA
0
:
:
:
:
:
:
:
:
Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 2.954.986.136,50
APBD
PT. WIJAYA KARYA SEMESTA
0
DIV.
URAIAN PEKERJAAN
NILAI KONTR
ADD. I
(K. INDUK)
3
1
2
3
4
5
6
7
UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR
3,630,220.00
13,676,000.00
-
A
B
C
D
JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )
17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00
POTONGAN
E
F
G
H
I
DIBULATKAN
TERBILANG :
DIAJUKAN OLEH
DIPERIKS
PENYEDIA JASA
PEMB. JALAN DAN JEMBATAN WILAYAH IX ACEH TIMUR 1
Sofyan Hasan
Direktur Utama
KONSULTAN
PT. TACITA PR
Ir. Erry S
Site Eng
PEMERINTA
DIN
SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
SUMBER DANA
PENYEDIA BARANG/JASA
0
:
:
:
:
:
:
:
:
Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 2.954.986.136,50
APBD
PT. WIJAYA KARYA SEMESTA
0
DIV.
URAIAN PEKERJAAN
NILAI KONTR
ADD. I
(K. INDUK)
3
1
2
3
4
5
6
7
UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR
3,630,220.00
13,676,000.00
-
A
B
C
D
JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )
17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00
POTONGAN
E
F
G
H
I
DIBULATKAN
TERBILANG :
DIAJUKAN OLEH
DIPERIKS
PENYEDIA JASA
PEMB. JALAN DAN JEMBATAN WILAYAH IX ACEH TIMUR 1
Sofyan Hasan
Direktur Utama
KONSULTAN
PT. TACITA PR
Ir. Erry S
Site Eng
PEMERINTA
DIN
SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
SUMBER DANA
PENYEDIA BARANG/JASA
0
:
:
:
:
:
:
:
:
Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 2.954.986.136,50
APBD
PT. WIJAYA KARYA SEMESTA
0
DIV.
URAIAN PEKERJAAN
NILAI KONTR
ADD. I
(K. INDUK)
3
1
2
3
4
5
6
7
UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR
3,630,220.00
13,676,000.00
-
A
B
C
D
JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )
17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00
POTONGAN
E
F
G
H
I
DIBULATKAN
TERBILANG :
DIAJUKAN OLEH
DIPERIKS
PENYEDIA JASA
PEMB. JALAN DAN JEMBATAN WILAYAH IX ACEH TIMUR 1
Sofyan Hasan
Direktur Utama
KONSULTAN
PT. TACITA PR
Ir. Erry S
Site Eng
PEMERINTA
DIN
SERT
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
SUMBER DANA
PENYEDIA BARANG/JASA
0
:
:
:
:
:
:
:
:
Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
42629
Rp. 2.954.986.136,50
APBD
PT. WIJAYA KARYA SEMESTA
0
DIV.
URAIAN PEKERJAAN
NILAI KONTR
ADD. I
(K. INDUK)
3
1
2
3
4
5
6
7
UMUM
DRAINASE
PEKERJAAN TANAH
PERKERASAN BERBUTIR
PERKERASAN ASPAL
PEKERJAAN STRUKTUR
PENGEMBALIAN KONDISI PADA PEKERJAAN MINOR
3,630,220.00
13,676,000.00
-
A
B
C
D
JUMLAH
PAJAK PERTAMBAHAN NILAI (PPn 10 %)
JUMLAH HARGA TERMASUK PPn 10%
JUMLAH KOTOR SERTIFIKAT BULAN INI ( A + B )
17,306,219.92
1,730,621.99
19,036,841.91
19,036,000.00
POTONGAN
E
F
G
H
I
DIBULATKAN
TERBILANG :
DIAJUKAN OLEH
DIPERIKS
PENYEDIA JASA
PEMB. JALAN DAN JEMBATAN WILAYAH IX ACEH TIMUR 1
Sofyan Hasan
Direktur Utama
KONSULTAN
PT. TACITA PR
Ir. Erry S
Site Eng
SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
KONTRAK
ADD. I
(K. INDUK)
4
S/D
BLN LALU
BLN
INI
:
:
:
:
JUMLAH PEMBAYARAN
S/D
BLN INI
7
BOBOT
S/D BLN INI
%
8
3,630,220.00
13,676,000.00
-
3,630,220.00
13,676,000.00
-
0.12
0.46
-
17,306,220.00
1,730,622.00
19,036,842.00
19,036,800.00
17,306,220.00
1,730,622.00
19,036,842.00
19,036,800.00
0.58
951,840.00
3,807,360.00
4,759,200.00
14,277,600.00
14,277,600.00
DIAJUKAN OLEH :
KONSULTAN SUPERVISI
MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD
Ir.Fajri, MT
NIP. 110 047 860
MUNAWIR IBRAHIM
DIREKTUR UTAMA
SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
KONTRAK
ADD. I
(K. INDUK)
4
S/D
BLN LALU
BLN
INI
:
:
:
:
JUMLAH PEMBAYARAN
S/D
BLN INI
7
BOBOT
S/D BLN INI
%
8
3,630,220.00
13,676,000.00
-
24,421,480.00
139,130,150.00
-
28,051,700.00
152,806,150.00
-
0.95
5.15
-
17,306,220.00
1,730,622.00
19,036,842.00
19,036,800.00
163,551,630.00
16,355,163.00
179,906,793.00
179,906,700.00
180,857,850.00
18,085,785.00
198,943,635.00
198,943,600.00
6.09
14,277,600.00
9,947,180.00
39,788,720.00
64,013,500.00
134,930,100.00
134,930,100.00
DIAJUKAN OLEH :
KONSULTAN SUPERVISI
MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD
Ir.Fajri, MT
NIP. 110 047 860
MUNAWIR IBRAHIM
DIREKTUR
SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
KONTRAK
ADD. II
(K. INDUK)
4
S/D
BLN LALU
BLN
INI
JUMLAH PEMBAYARAN
S/D
BLN INI
7
:
:
:
:
BOBOT
S/D BLN INI
%
8
28,051,700.00
152,806,150.00
-
79,178,065.12
704,314,185.45
2,306,847,479.42
196,709,620.24
-
28,051,700.00
79,178,065.12
857,120,335.45
2,306,847,479.42
196,709,620.24
-
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
180,857,850.00
18,085,785.00
198,943,635.00
198,943,600.00
3,287,049,350.23
328,704,935.02
3,615,754,285.25
3,615,754,200.00
3,467,907,200.23
346,790,720.02
3,814,697,920.25
3,814,697,900.00
#DIV/0!
149,207,700.00
190,734,895.00
339,942,595.00
3,474,755,305.00
3,474,755,305.00
h empat juta tujuh ratus lima puluh lima ribu tiga ratus lima rupiah.
IPERIKSA OLEH
MENGETAHUI OLEH
SULTAN PENGAWAS
CITA PRIMA UTAMA
MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD
Ir.Fajri, MT
NIP. 110 047 860
SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
KONTRAK
ADD. II
(K. INDUK)
4
S/D
BLN LALU
BLN
INI
JUMLAH PEMBAYARAN
S/D
BLN INI
7
:
:
:
:
BOBOT
S/D BLN INI
%
8
28,051,700.00
79,178,065.12
857,120,335.45
2,306,847,479.42
196,709,620.24
-
3,249,453,354.27
100,214,350.23
-
28,051,700.00
79,178,065.12
857,120,335.45
5,556,300,833.69
296,923,970.47
-
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
3,467,907,200.23
346,790,720.02
3,814,697,920.25
3,814,697,900.00
3,349,667,704.50
334,966,770.45
3,684,634,474.95
3,684,634,400.00
6,817,574,904.73
681,757,490.47
7,499,332,395.20
7,499,332,300.00
#DIV/0!
3,623,963,005.00
374,966,615.00
3,998,929,620.00
3,500,402,680.00
3,500,402,680.00
IPERIKSA OLEH
MENGETAHUI OLEH
SULTAN PENGAWAS
CITA PRIMA UTAMA
MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD
Ir.Fajri, MT
NIP. 110 047 860
SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
KONTRAK
ADD. II
(K. INDUK)
4
S/D
BLN LALU
BLN
INI
JUMLAH PEMBAYARAN
S/D
BLN INI
7
:
:
:
:
BOBOT
S/D BLN INI
%
8
28,051,700.00
79,178,065.12
857,120,335.45
5,556,300,833.69
296,923,970.47
-
106,730,250.00
-
28,051,700.00
79,178,065.12
857,120,335.45
5,556,300,833.69
106,730,250.00
296,923,970.47
-
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
6,817,574,904.73
681,757,490.47
7,499,332,395.20
7,499,332,300.00
106,730,250.00
10,673,025.00
117,403,275.00
117,403,200.00
6,924,305,154.73
692,430,515.47
7,616,735,670.20
7,616,735,600.00
#DIV/0!
7,124,365,685.00
380,836,780.00
7,505,202,465.00
111,533,135.00
111,533,135.00
IPERIKSA OLEH
MENGETAHUI OLEH
SULTAN PENGAWAS
CITA PRIMA UTAMA
MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD
Ir.Fajri, MT
NIP. 110 047 860
SERTIFIKAT BULANAN
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
KONTRAK
ADD. II
(K. INDUK)
4
S/D
BLN LALU
BLN
INI
JUMLAH PEMBAYARAN
S/D
BLN INI
7
:
:
:
:
BOBOT
S/D BLN INI
%
8
28,051,700.00
79,178,065.12
857,120,335.45
5,556,300,833.69
106,730,250.00
296,923,970.47
-
2,126,121,246.88
-
28,051,700.00
79,178,065.12
857,120,335.45
5,556,300,833.69
2,232,851,496.88
296,923,970.47
-
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
6,924,305,154.73
692,430,515.47
7,616,735,670.20
7,616,735,600.00
2,126,121,246.88
212,612,124.69
2,338,733,371.57
2,338,733,300.00
9,050,426,401.61
905,042,640.17
9,955,469,041.78
9,955,469,000.00
#DIV/0!
7,235,898,820.00
497,773,450.00
7,733,672,270.00
2,221,796,730.00
2,221,796,730.00
tu juta tujuh ratus sembilan puluh enam ribu tujuh ratus tiga puluh rupiah.
IPERIKSA OLEH
MENGETAHUI OLEH
SULTAN PENGAWAS
CITA PRIMA UTAMA
MENYETUJUI :
NG PEMBANGUNAN JALAN DAN JEMBATAN
S BINA MARGA DAN CIPTA KARYA
PROVINSI NAD
Ir.Fajri, MT
NIP. 110 047 860
Ir. M. Hilal, MT
NIP. 110 053 961
`01
SEPTEMBER
25 / SEPTEMBER / 2008
1 dari 8
JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
11.00
0.00
5.61
0.00
0.00
0.00
0.00
S/D BULAN INI
0.58
BULAN LALU
0
BULAN INI
0.58
DIAJUKAN OLEH :
MUNAWIR IBRAHIM
DIREKTUR UTAMA
`02
OKTOBER
25 / OKTOBER / 2008
1 dari 8
JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
74.00
0.00
57.07
0.00
0.00
0.00
0.00
S/D BULAN INI
6.09
BULAN LALU
0.58
BULAN INI
5.51
DIAJUKAN OLEH :
MUNAWIR IBRAHIM
DIREKTUR
08
MARET
25 / MARET / 2008
1 dari 8
JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
S/D BULAN INI
#DIV/0!
BULAN LALU
6.09
BULAN INI
#DIV/0!
ratus lima rupiah.
MENGETAHUI OLEH
09
APRIL
25 / APRIL / 2008
1 dari 8
JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
#REF!
#REF!
#REF!
100.00
0.00
#REF!
#REF!
S/D BULAN INI
#DIV/0!
BULAN LALU
#DIV/0!
BULAN INI
#DIV/0!
MENGETAHUI OLEH
10
MEI
25 / MEI / 2008
1 dari 8
JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
8
#REF!
#REF!
#REF!
100.00
3.68
#REF!
#REF!
S/D BULAN INI
#DIV/0!
BULAN LALU
#DIV/0!
BULAN INI
#DIV/0!
MENGETAHUI OLEH
11
JUNI
25 / JUNI / 2008
1 dari 8
JUMLAH PEMBAYARAN
BOBOT
PEKERJAAN (%)
9
#REF!
#REF!
#REF!
100.00
76.98
#REF!
#REF!
S/D BULAN INI
#DIV/0!
BULAN LALU
#DIV/0!
BULAN INI
#DIV/0!
Ir. M. Hilal, MT
NIP. 110 053 961
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
DEVISI 1 UMUM
MATA
PEMBA YARAN
1
1.2
U RAIAN
SATUAN
Mobilisasi
LS
DISETUJUI OLEH :
KORDINATOR LAPANGAN
WILAYAH II ACEH BESAR - 1
KUANTITAS
ADD. I
(K. INDUK)
4
1.00
T. RAHMATSYAH PUTRA, ST
NIP. 110 057 238
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
DEVISI 2 DRAINASE
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
2.1
m3
13,497.00
2.2
m3
4,090.00
m1
2,3(6)
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
T. RAHMATSYAH PUTRA, ST
NIP. 110 057 238
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
3.1 (1)
Galian Biasa
m3
47,728.00
3.2 (1)
Timbunan Biasa
m3
93,843.30
3.2 (2)
Timbunan Pilihan
m3
19,228.00
3.3
m2
77,710.00
3.4
m2
48,070.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
T. RAHMATSYAH PUTRA, ST
NIP. 110 057 238
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
5.1 (1)
m3
5,214.75
5.2 (2)
m3
8,998.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
T. RAHMATSYAH PUTRA, ST
NIP. 110 057 238
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
6.1 (1)
Ltr
26,073.75
6.1 (2)
Lapis Perekat
Ltr
10,736.25
6.3 (5)
m2
30,675.00
6.3 (6)
6.3 (6)a
m3
Ton
1,533.75
-
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
T. RAHMATSYAH PUTRA, ST
NIP. 110 057 238
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
DEVISI 7 STRUKTUR
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
7.1 (5)
Beton K - 250
m3
135.00
7.1 (6)
Beton K - 175
m3
250.00
7.1 (18)
Beton K - 125
m3
16.50
7,2(18)
m2
18,050.00
7,3(1)
kg
14,850.00
Pasangan Batu
m3
161.00
m2
m2
7.9
7.15(4)
7,16(1)
10,830.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
T. RAHMATSYAH PUTRA, ST
NIP. 110 057 238
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
Err:509
PENYEDIA JASA
:
:
:
:
:
:
:
:
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
8.2(2)
Batang
252.00
8.2(3)
Batang
102.00
8.2(4)
Batang
44.00
8.2(5)
Batang
25.00
8.3(1)
8.3(3)
Penanaman Pohon
8.4(2)
m2
13,849.87
Batang
361.00
m2
920.25
8.4(10)
Kerb Pracetak
m1
4,090.00
8.4(11)
Kerb Pracetak L
m1
4,090.00
8.4(19)
Tiang
59.00
8.4(20)
Tiang
30.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
T. RAHMATSYAH PUTRA, ST
NIP. 110 057 238
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
1.00
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=5x6
60,815,000.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
60,815,000.00
60,815,000.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
#REF!
#REF!
#REF!
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
4,458.82
11.70
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
40,216.00
179,315,905.12
420,081.00
29,503,509.27
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
345,191,058.46
524,506,963.58
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
78,101.78
37,019.00
2,891,249,793.82
#REF!
#REF!
121,844.19
55,804.00
6,799,392,980.64
#REF!
#REF!
17,535.15
88,203.00
1,546,652,835.45
#REF!
#REF!
27,195.00
2,898.00
78,811,110.00
0.00
2,368.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
###
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
#REF!
#REF!
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
6,539.58
344,025.00
2,249,779,009.50
6,539.58
2,249,779,009.50
10,684.57
309,467.00
3,306,521,824.19
10,684.57
3,306,521,824.19
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
5,556,300,833.69
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
5,556,300,833.69
100.00
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
27,243.28
8,371.00
228,053,496.88
100.00
9,020.00
902,000.00
50.00
69,614.00
3,480,700.00
1,597.13
-
1,670,665.00
2,668,275,038.78
-
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
2,900,711,235.66
DIPERIKSA OLEH :
12,750.00
#REF!
106,730,250.00
106,730,250.00
3.68
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
494.13
1,149,762.00
568,131,897.06
#REF!
#REF!
54.68
938,092.00
51,294,870.56
#REF!
#REF!
56.12
670,696.00
37,639,459.52
#REF!
#REF!
17,769.00
122,651.00
2,179,385,619.00
#REF!
#REF!
74,218.25
12,159.00
902,419,701.75
#REF!
#REF!
#REF!
#REF!
520,843.00
200.00
56,142.30
11,228,460.00
#REF!
#REF!
28,101.75
38,445.00
1,080,371,778.75
#REF!
#REF!
TOTAL HARGA
4,830,471,786.64
TOTAL PEMBAYARAN
PERSENTASE (%)
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
M A R W A N, BE
CHIEF INSPECTOR
#REF!
#REF!
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
478.00
254,064.00
121,442,592.00
#REF!
246.00
403,805.00
99,336,030.00
28.00
736,008.00
20,608,224.00
12.00
864,494.00
10,373,928.00
14,858.00
25,120.88
373,246,035.04
3.00
85,175.00
255,525.00
1,802.09
147,293.33
265,435,722.65
3,910.00
128,821.00
503,690,110.00
3,910.00
154,169.00
602,800,790.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
10,745,161.00
0.00
15,798,259.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
1,997,188,956.69
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
M A R W A N, BE
CHIEF INSPECTOR
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 6 x 10
11
JUNI
25 / JUNI / 2008
2 dari 8
60,815,000.00
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
11
JUNI
25 / JUNI / 2008
3 dari 8
524,506,963.58
#REF!
#REF!
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
11
JUNI
25 / JUNI / 2008
4 dari 8
11,316,106,719.91
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
11
JUNI
25 / JUNI / 2008
5 dari 8
5,556,300,833.69
6,539.58
2,249,779,009.50
10,684.57
3,306,521,824.19
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
5,556,300,833.69
100.00%
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
14,493.28
1,200.00
:
:
:
:
11
JUNI
25 / JUNI / 2008
6 dari 8
2,900,711,235.66
121,323,246.88
27,243.28
228,053,496.88
2,004,798,000.00
-
1,200.00
-
2,126,121,246.88
73.30
DIBUAT OLEH :
2,004,798,000.00
-
2,232,851,496.88
76.98
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
11
JUNI
25 / JUNI / 2008
7 dari 8
4,830,471,786.64
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
11
JUNI
25 / JUNI / 2008
8 dari 8
1,997,188,956.69
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
DEVISI 1 UMUM
MATA
PEMBA YARAN
1
1.2
U RAIAN
SATUAN
Mobilisasi
LS
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
KUANTITAS
ADD. I
(K. INDUK)
4
1.00
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
DEVISI 2 DRAINASE
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
2.1
m3
13,497.00
2.2
m3
4,090.00
m1
2,3(6)
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
3.1 (1)
Galian Biasa
m3
47,728.00
3.2 (1)
Timbunan Biasa
m3
93,843.30
3.2 (2)
Timbunan Pilihan
m3
19,228.00
3.3
m2
77,710.00
3.4
m2
48,070.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
5.1 (1)
m3
5,214.75
5.2 (2)
m3
8,998.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
6.1 (1)
Ltr
26,073.75
6.1 (2)
Lapis Perekat
Ltr
10,736.25
6.3 (5)
m2
30,675.00
6.3 (6)
6.3 (6)a
m3
Ton
1,533.75
-
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
DEVISI 7 STRUKTUR
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
7.1 (5)
Beton K - 250
m3
135.00
7.1 (6)
Beton K - 175
m3
250.00
7.1 (18)
Beton K - 125
m3
16.50
7,2(18)
m2
18,050.00
7,3(1)
kg
14,850.00
Pasangan Batu
m3
161.00
m2
m2
7.9
7.15(4)
7,16(1)
10,830.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
Err:509
PENYEDIA JASA
:
:
:
:
:
:
:
:
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
8.2(2)
Batang
252.00
8.2(3)
Batang
102.00
8.2(4)
Batang
44.00
8.2(5)
Batang
25.00
8.3(1)
8.3(3)
Penanaman Pohon
8.4(2)
m2
13,849.87
Batang
361.00
m2
920.25
8.4(10)
Kerb Pracetak
m1
4,090.00
8.4(11)
Kerb Pracetak L
m1
4,090.00
8.4(19)
Tiang
59.00
8.4(20)
Tiang
30.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
1.00
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=5x6
60,815,000.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
60,815,000.00
60,815,000.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
#REF!
#REF!
#REF!
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
4,458.82
11.70
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
40,216.00
179,315,905.12
420,081.00
29,503,509.27
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
345,191,058.46
524,506,963.58
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
78,101.78
37,019.00
2,891,249,793.82
#REF!
#REF!
121,844.19
55,804.00
6,799,392,980.64
#REF!
#REF!
17,535.15
88,203.00
1,546,652,835.45
#REF!
#REF!
27,195.00
2,898.00
78,811,110.00
0.00
2,368.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
###
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
#REF!
#REF!
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
6,539.58
344,025.00
2,249,779,009.50
6,539.58
2,249,779,009.50
10,684.57
309,467.00
3,306,521,824.19
10,684.57
3,306,521,824.19
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
5,556,300,833.69
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
5,556,300,833.69
100.00
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
27,243.28
8,371.00
228,053,496.88
100.00
9,020.00
902,000.00
50.00
69,614.00
3,480,700.00
1,597.13
-
1,670,665.00
2,668,275,038.78
-
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
2,900,711,235.66
DIPERIKSA OLEH :
#REF!
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
494.13
1,149,762.00
568,131,897.06
#REF!
#REF!
54.68
938,092.00
51,294,870.56
#REF!
#REF!
56.12
670,696.00
37,639,459.52
#REF!
#REF!
17,769.00
122,651.00
2,179,385,619.00
#REF!
#REF!
74,218.25
12,159.00
902,419,701.75
#REF!
#REF!
#REF!
#REF!
520,843.00
200.00
56,142.30
11,228,460.00
#REF!
#REF!
28,101.75
38,445.00
1,080,371,778.75
#REF!
#REF!
TOTAL HARGA
4,830,471,786.64
TOTAL PEMBAYARAN
PERSENTASE (%)
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
M A R W A N, BE
CHIEF INSPECTOR
#REF!
#REF!
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
478.00
254,064.00
121,442,592.00
#REF!
246.00
403,805.00
99,336,030.00
28.00
736,008.00
20,608,224.00
12.00
864,494.00
10,373,928.00
14,858.00
25,120.88
373,246,035.04
3.00
85,175.00
255,525.00
1,802.09
147,293.33
265,435,722.65
3,910.00
128,821.00
503,690,110.00
3,910.00
154,169.00
602,800,790.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
10,745,161.00
0.00
15,798,259.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
1,997,188,956.69
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
M A R W A N, BE
CHIEF INSPECTOR
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 6 x 10
10
MEI
25 / MEI / 2008
2 dari 8
60,815,000.00
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
10
MEI
25 / MEI / 2008
3 dari 8
524,506,963.58
#REF!
#REF!
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
10
MEI
25 / MEI / 2008
4 dari 8
11,316,106,719.91
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
10
MEI
25 / MEI / 2008
5 dari 8
5,556,300,833.69
6,539.58
2,249,779,009.50
10,684.57
3,306,521,824.19
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
5,556,300,833.69
100.00%
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
10
MEI
25 / MEI / 2008
6 dari 8
2,900,711,235.66
12,750.00
106,730,250.00
12,750.00
106,730,250.00
3.68
DIBUAT OLEH :
106,730,250.00
106,730,250.00
3.68
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
10
MEI
25 / MEI / 2008
7 dari 8
4,830,471,786.64
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
10
MEI
25 / MEI / 2008
8 dari 8
1,997,188,956.69
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
DEVISI 1 UMUM
MATA
PEMBA YARAN
1
1.2
U RAIAN
SATUAN
Mobilisasi
LS
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
KUANTITAS
ADD. I
(K. INDUK)
4
1.00
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
DEVISI 2 DRAINASE
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
2.1
m3
13,497.00
2.2
m3
4,090.00
m1
2,3(6)
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
3.1 (1)
Galian Biasa
m3
47,728.00
3.2 (1)
Timbunan Biasa
m3
93,843.30
3.2 (2)
Timbunan Pilihan
m3
19,228.00
3.3
m2
77,710.00
3.4
m2
48,070.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
5.1 (1)
m3
5,214.75
5.2 (2)
m3
8,998.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
6.1 (1)
Ltr
26,073.75
6.1 (2)
Lapis Perekat
Ltr
10,736.25
6.3 (5)
m2
30,675.00
6.3 (6)
6.3 (6)a
m3
Ton
1,533.75
-
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
DEVISI 7 STRUKTUR
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
7.1 (5)
Beton K - 250
m3
135.00
7.1 (6)
Beton K - 175
m3
250.00
7.1 (18)
Beton K - 125
m3
16.50
7,2(18)
m2
18,050.00
7,3(1)
kg
14,850.00
Pasangan Batu
m3
161.00
m2
m2
7.9
7.15(4)
7,16(1)
10,830.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
Err:509
PENYEDIA JASA
:
:
:
:
:
:
:
:
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
8.2(2)
Batang
252.00
8.2(3)
Batang
102.00
8.2(4)
Batang
44.00
8.2(5)
Batang
25.00
8.3(1)
8.3(3)
Penanaman Pohon
8.4(2)
m2
13,849.87
Batang
361.00
m2
920.25
8.4(10)
Kerb Pracetak
m1
4,090.00
8.4(11)
Kerb Pracetak L
m1
4,090.00
8.4(19)
Tiang
59.00
8.4(20)
Tiang
30.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
SERTIFIKAT BULANAN
ILING)
ANTITAS
ADD. II
(K. INDUK)
5
1.00
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=5x6
60,815,000.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
60,815,000.00
60,815,000.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
#REF!
#REF!
#REF!
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
ILING)
ANTITAS
ADD. II
(K. INDUK)
5
4,458.82
11.70
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
40,216.00
179,315,905.12
420,081.00
29,503,509.27
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
345,191,058.46
524,506,963.58
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
ILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
78,101.78
37,019.00
2,891,249,793.82
#REF!
#REF!
121,844.19
55,804.00
6,799,392,980.64
#REF!
#REF!
17,535.15
88,203.00
1,546,652,835.45
#REF!
#REF!
27,195.00
2,898.00
78,811,110.00
0.00
2,368.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
###
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
#REF!
#REF!
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
ILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
6,539.58
344,025.00
2,249,779,009.50
10,684.57
309,467.00
3,306,521,824.19
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
5,556,300,833.69
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
2,306,847,479.42
2,306,847,479.42
41.52
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
ILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
27,243.28
8,371.00
228,053,496.88
100.00
9,020.00
902,000.00
50.00
69,614.00
3,480,700.00
1,597.13
-
1,670,665.00
2,668,275,038.78
-
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
2,900,711,235.66
DIPERIKSA OLEH :
#REF!
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
ILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
494.13
1,149,762.00
568,131,897.06
#REF!
#REF!
54.68
938,092.00
51,294,870.56
#REF!
#REF!
56.12
670,696.00
37,639,459.52
#REF!
#REF!
17,769.00
122,651.00
2,179,385,619.00
#REF!
#REF!
74,218.25
12,159.00
902,419,701.75
#REF!
#REF!
#REF!
#REF!
520,843.00
200.00
56,142.30
11,228,460.00
#REF!
#REF!
28,101.75
38,445.00
1,080,371,778.75
#REF!
#REF!
TOTAL HARGA
4,830,471,786.64
TOTAL PEMBAYARAN
PERSENTASE (%)
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
M A R W A N, BE
CHIEF INSPECTOR
#REF!
#REF!
SERTIFIKAT BULANAN
ILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
478.00
254,064.00
121,442,592.00
#REF!
246.00
403,805.00
99,336,030.00
28.00
736,008.00
20,608,224.00
12.00
864,494.00
10,373,928.00
14,858.00
25,120.88
373,246,035.04
3.00
85,175.00
255,525.00
1,802.09
147,293.33
265,435,722.65
3,910.00
128,821.00
503,690,110.00
3,910.00
154,169.00
602,800,790.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
10,745,161.00
0.00
15,798,259.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
1,997,188,956.69
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
M A R W A N, BE
CHIEF INSPECTOR
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 6 x 10
09
APRIL
25 / APRIL / 2008
2 dari 8
60,815,000.00
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
09
APRIL
25 / APRIL / 2008
3 dari 8
524,506,963.58
#REF!
#REF!
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
09
APRIL
25 / APRIL / 2008
4 dari 8
11,316,106,719.91
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
:
:
:
:
Rp
09
APRIL
25 / APRIL / 2008
5 dari 8
5,556,300,833.69
6,539.58
2,249,779,009.50
6,539.58
2,249,779,009.50
3,230.31
999,674,344.77
10,684.57
3,306,521,824.19
3,249,453,354.27
58.48
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
5,556,300,833.69
100.00%
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
09
APRIL
25 / APRIL / 2008
6 dari 8
2,900,711,235.66
DIBUAT OLEH :
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
87.16
0.09
:
:
:
:
09
APRIL
25 / APRIL / 2008
7 dari 8
4,830,471,786.64
100,213,255.92
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1,094.31
100,214,350.23
2.07
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
09
APRIL
25 / APRIL / 2008
8 dari 8
1,997,188,956.69
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
DEVISI 1 UMUM
MATA
PEMBA YARAN
1
1.2
U RAIAN
SATUAN
Mobilisasi
LS
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
KUANTITAS
ADD. I
(K. INDUK)
4
1.00
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
DEVISI 2 DRAINASE
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
2.1
m3
13,497.00
2.2
m3
4,090.00
m1
2,3(6)
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
3.1 (1)
Galian Biasa
m3
47,728.00
3.2 (1)
Timbunan Biasa
m3
93,843.30
3.2 (2)
Timbunan Pilihan
m3
19,228.00
3.3
m2
77,710.00
3.4
m2
48,070.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
5.1 (1)
m3
5,214.75
5.2 (2)
m3
8,998.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
6.1 (1)
Ltr
26,073.75
6.1 (2)
Lapis Perekat
Ltr
10,736.25
6.3 (5)
m2
30,675.00
6.3 (6)
6.3 (6)a
m3
Ton
1,533.75
-
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
DEVISI 7 STRUKTUR
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
7.1 (5)
Beton K - 250
m3
135.00
7.1 (6)
Beton K - 175
m3
250.00
7.1 (18)
Beton K - 125
m3
16.50
7,2(18)
m2
18,050.00
7,3(1)
kg
14,850.00
Pasangan Batu
m3
161.00
m2
m2
7.9
7.15(4)
7,16(1)
10,830.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
PEKERJAAN
PA K E T
KONTRAK NO.
NILAI KONTRAK INDUK
TGL. KONTRAK
NILAI ADD. II (K. INDUK)
Err:509
PENYEDIA JASA
:
:
:
:
:
:
:
:
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
8.2(2)
Batang
252.00
8.2(3)
Batang
102.00
8.2(4)
Batang
44.00
8.2(5)
Batang
25.00
8.3(1)
8.3(3)
Penanaman Pohon
8.4(2)
m2
13,849.87
Batang
361.00
m2
920.25
8.4(10)
Kerb Pracetak
m1
4,090.00
8.4(11)
Kerb Pracetak L
m1
4,090.00
8.4(19)
Tiang
59.00
8.4(20)
Tiang
30.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
1.00
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=5x6
60,815,000.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
60,815,000.00
60,815,000.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
#REF!
#REF!
#REF!
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
4,458.82
11.70
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
40,216.00
179,315,905.12
420,081.00
29,503,509.27
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
345,191,058.46
524,506,963.58
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
78,101.78
37,019.00
2,891,249,793.82
#REF!
#REF!
121,844.19
55,804.00
6,799,392,980.64
#REF!
#REF!
17,535.15
88,203.00
1,546,652,835.45
#REF!
#REF!
27,195.00
2,898.00
78,811,110.00
0.00
2,368.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
###
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
#REF!
#REF!
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
6,539.58
344,025.00
2,249,779,009.50
#REF!
10,684.57
309,467.00
3,306,521,824.19
#REF!
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
5,556,300,833.69
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
27,243.28
8,371.00
228,053,496.88
#REF!
100.00
9,020.00
902,000.00
#REF!
50.00
69,614.00
3,480,700.00
#REF!
1,597.13
-
1,670,665.00
2,668,275,038.78
-
#REF!
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
2,900,711,235.66
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
494.13
1,149,762.00
568,131,897.06
#REF!
#REF!
54.68
938,092.00
51,294,870.56
#REF!
#REF!
56.12
670,696.00
37,639,459.52
#REF!
#REF!
17,769.00
122,651.00
2,179,385,619.00
#REF!
#REF!
74,218.25
12,159.00
902,419,701.75
#REF!
#REF!
#REF!
#REF!
520,843.00
200.00
56,142.30
11,228,460.00
#REF!
#REF!
28,101.75
38,445.00
1,080,371,778.75
#REF!
#REF!
TOTAL HARGA
4,830,471,786.64
TOTAL PEMBAYARAN
PERSENTASE (%)
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
M A R W A N, BE
CHIEF INSPECTOR
#REF!
#REF!
SERTIFIKAT BULANAN
AILING)
ANTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
478.00
254,064.00
121,442,592.00
#REF!
246.00
403,805.00
99,336,030.00
28.00
736,008.00
20,608,224.00
12.00
864,494.00
10,373,928.00
14,858.00
25,120.88
373,246,035.04
3.00
85,175.00
255,525.00
1,802.09
147,293.33
265,435,722.65
3,910.00
128,821.00
503,690,110.00
3,910.00
154,169.00
602,800,790.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
10,745,161.00
0.00
15,798,259.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
1,997,188,956.69
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
M A R W A N, BE
CHIEF INSPECTOR
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 6 x 10
08
MARET
25 / MARET / 2008
2 dari 8
60,815,000.00
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
1,968.82
:
:
:
:
08
MARET
25 / MARET / 2008
3 dari 8
524,506,963.58
79,178,065.12
#REF!
#REF!
#REF!
79,178,065.12
15.10
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
08
MARET
25 / MARET / 2008
4 dari 8
11,316,106,719.91
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
7,985.15
704,314,185.45
-
704,314,185.45
6.22
DIBUAT OLEH :
PENYEDIA BARANG / JASA
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
08
MARET
25 / MARET / 2008
5 dari 8
5,556,300,833.69
7,454.26
2,306,847,479.42
#REF!
2,306,847,479.42
41.52
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
08
MARET
25 / MARET / 2008
6 dari 8
2,900,711,235.66
DIBUAT OLEH :
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
32.06
8.89
12,656.12
:
:
:
:
08
MARET
25 / MARET / 2008
7 dari 8
4,830,471,786.64
36,861,369.72
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
5,962,487.44
153,885,763.08
196,709,620.24
4.07
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
08
MARET
25 / MARET / 2008
8 dari 8
1,997,188,956.69
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. ALHAS JAYA GROUP
#REF!
#REF!
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
:
:
:
:
:
Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
SUMBER DANA
PENYEDIA BARANG/JASA
: APBD
: PT. WIJAYA KARYA SEMESTA
DEVISI 1 UMUM
MATA
PEMBA YARAN
1
1.2
U RAIAN
SATUAN
Mobilisasi
LS
DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD
KUANTITAS
KONTRAK
AWAL
4
1.00
ZAINUDDIN, ST
NIP. 390 036 146
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
:
:
:
:
:
###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
SUMBER DANA
PENYEDIA BARANG/JASA
: APBD
: PT. WIJAYA KARYA SEMESTA
DEVISI 2 DRAINASE
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
KONTRAK
AWAL
4
2.1
m3
150.00
2.2
m3
200.00
DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD
ZAINUDDIN, ST
NIP. 390 036 146
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
:
:
:
:
:
###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
SUMBER DANA
PENYEDIA BARANG/JASA
: APBD
: PT. WIJAYA KARYA SEMESTA
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
KONTRAK
AWAL
4
3.1 (1)
Galian Biasa
m3
14.00
3.1 (3)
m3
96.00
3.1 (4)
m3
96.00
3.1 (6)
LS
1.00
3.2(1)
Timbunan Biasa
m3
200.00
3.2(2)
Timbunan Pilihan
m3
984.00
m2
5,200.00
3.3
DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD
ZAINUDDIN, ST
NIP. 390 036 146
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
:
:
:
:
:
###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
SUMBER DANA
PENYEDIA BARANG/JASA
: APBD
: PT. WIJAYA KARYA SEMESTA
MATA
PEMBA YARAN
1
4.2 (2)
U RAIAN
SATUAN
KUANTITAS
KONTRAK
AWAL
4
m3
325.00
DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD
ZAINUDDIN, ST
NIP. 390 036 146
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
:
:
:
:
:
###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
SUMBER DANA
PENYEDIA BARANG/JASA
: APBD
: PT. WIJAYA KARYA SEMESTA
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
KONTRAK
AWAL
4
5.1 (1)
Ltr
780.00
5.1 (2)
Ltr
1,040.00
6.3 (6)a
Ton
DISETUJUI OLEH :
ZAINUDDIN, ST
NIP. 390 036 146
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
:
:
:
:
:
###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
: APBD
: PT. WIJAYA KARYA SEMESTA
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
KONTRAK
AWAL
4
6.1 (1)
Ltr
5,200.00
6.3 (6)
m3
260.00
DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD
ZAINUDDIN, ST
NIP. 390 036 146
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
NILAI ADD. II (K. INDUK)
PENYEDIA BARANG/JASA
:
:
:
:
:
:
:
###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
APBD
PT. WIJAYA KARYA SEMESTA
DEVISI 7 STRUKTUR
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
7.1 (5)
Beton K250
M3
178.94
7.1 (6)
Beton K175
M3
2.26
7.1 (7)
M3
49.86
7.1 (8)
Beton K125
M3
7.20
7.3 (1)
Kg
23,566.00
M1
200.00
M1
200.00
7.7 (1) a
M1
8.00
7.7 (2) a
M1
8.00
7.9
7.10 (3)
Pasangan Batu
M3
168.00
Bronjong
M3
10.00
M1
32.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
Buah
M1
6.00
76.00
SERTIFIKAT BULANAN
ING)
NTITAS
ADD. I
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=5x6
33,002,000.00
33,002,000.00
3,630,220.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
33,002,000.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
3,630,220.00
11.00
SERTIFIKAT BULANAN
ING)
NTITAS
ADD. I
(K. INDUK)
5
-
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
38,213.00
5,731,950.00
569,199.00
113,839,800.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
119,571,750.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
SERTIFIKAT BULANAN
ING)
NTITAS
ADD. I
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
34,187.00
478,618.00
35,205.07
3,379,686.72
35,988.05
3,454,852.80
57,998,681.00
57,998,681.00
69,561.00
13,912,200.00
153,360.00
150,906,240.00
2,630.00
13,676,000.00
TOTAL HARGA
TOTAL PEMBAYARAN
243,806,278.52
-
5,200.00
13,676,000.00
13,676,000.00
PERSENTASE (%)
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
5.61
SERTIFIKAT BULANAN
ING)
NTITAS
ADD. I
(K. INDUK)
5
-
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
407,590.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
132,466,750.00
132,466,750.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
SERTIFIKAT BULANAN
ING)
NTITAS
ADD. I
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
438,820.00
342,279,600.00
416,900.00
433,576,000.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
775,855,600.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
SERTIFIKAT BULANAN
ING)
NTITAS
ADD. I
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
9,428.00
49,025,600.00
2,406,464.00
625,680,640.00
TOTAL HARGA
674,706,240.00
TOTAL PEMBAYARAN
PERSENTASE (%)
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
SERTIFIKAT BULANAN
ING)
NTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
1,114,504.00
199,429,345.76
930,993.00
2,104,044.18
862,490.81
43,003,791.79
802,441.10
5,777,575.92
14,539.00
342,626,074.00
629,209.80
125,841,960.00
207,049.02
41,409,804.00
8,863,481.16
70,907,849.28
2,065,076.54
16,520,612.32
606,688.00
101,923,584.00
659,946.54
6,599,465.40
469,908.51
15,037,072.32
1,241,727.00
7,450,362.00
125,339.00
9,525,764.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
988,157,304.97
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 6 x 10
0.63
:
:
:
:
Rp
`02
OKTOBER
25 / OKTOBER / 2008
2 dari 8
33,002,000.00
20,791,260.00
0.74
20,791,260.00
63.00
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA
24,421,480.00
24,421,480.00
74.00%
SAFRIZAL, ST
General Superintendent
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
:
:
:
:
Rp
`02
OKTOBER
25 / OKTOBER / 2008
3 dari 8
119,571,750.00
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA
0.00%
SAFRIZAL, ST
General Superintendent
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
:
:
:
:
Rp
`02
OKTOBER
25 / OKTOBER / 2008
4 dari 8
243,806,278.52
150.00
10,434,150.00
150.00
10,434,150.00
750.00
115,020,000.00
750.00
115,020,000.00
5,200.00
13,676,000.00
125,454,150.00
139,130,150.00
51.46
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA
SAFRIZAL, ST
General Superintendent
57.07%
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
-
:
:
:
:
`02
OKTOBER
25 / OKTOBER / 2008
5 dari 8
132,466,750.00
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA
SAFRIZAL, ST
General Superintendent
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
`02
OKTOBER
25 / OKTOBER / 2008
6 dari 8
775,855,600.00
DIBUAT OLEH :
SAFRIZAL, ST
General Superintendent
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
:
:
:
:
Rp
`02
OKTOBER
25 / OKTOBER / 2008
7 dari 8
674,706,240.00
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA
SAFRIZAL, ST
General Superintendent
0.00%
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
:
:
:
:
Rp
`02
OKTOBER
25 / OKTOBER / 2008
8 dari 8
988,157,304.97
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA
SAFRIZAL, ST
General Superintendent
0.00%
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
:
:
:
:
:
Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
SUMBER DANA
PENYEDIA BARANG/JASA
: APBD
: PT. WIJAYA KARYA SEMESTA
DEVISI 1 UMUM
MATA
PEMBA YARAN
1
1.2
U RAIAN
SATUAN
Mobilisasi
LS
DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD
KUANTITAS
KONTRAK
AWAL
4
1.00
ZAINUDDIN, ST
NIP. 390 036 146
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
:
:
:
:
:
###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
SUMBER DANA
PENYEDIA BARANG/JASA
: APBD
: PT. WIJAYA KARYA SEMESTA
DEVISI 2 DRAINASE
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
KONTRAK
AWAL
4
2.1
m3
150.00
2.2
m3
200.00
DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD
ZAINUDDIN, ST
NIP. 390 036 146
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
:
:
:
:
:
###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
SUMBER DANA
PENYEDIA BARANG/JASA
: APBD
: PT. WIJAYA KARYA SEMESTA
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
KONTRAK
AWAL
4
3.1 (1)
Galian Biasa
m3
14.00
3.1 (3)
m3
96.00
3.1 (4)
m3
96.00
3.1 (6)
LS
1.00
3.2(1)
Timbunan Biasa
m3
200.00
3.2(2)
Timbunan Pilihan
m3
984.00
m2
5,200.00
3.3
DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD
ZAINUDDIN, ST
NIP. 390 036 146
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
:
:
:
:
:
###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
SUMBER DANA
PENYEDIA BARANG/JASA
: APBD
: PT. WIJAYA KARYA SEMESTA
MATA
PEMBA YARAN
1
4.2 (2)
U RAIAN
SATUAN
KUANTITAS
KONTRAK
AWAL
4
m3
325.00
DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD
ZAINUDDIN, ST
NIP. 390 036 146
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
:
:
:
:
:
###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
SUMBER DANA
PENYEDIA BARANG/JASA
: APBD
: PT. WIJAYA KARYA SEMESTA
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
KONTRAK
AWAL
4
5.1 (1)
Ltr
780.00
5.1 (2)
Ltr
1,040.00
6.3 (6)a
Ton
DISETUJUI OLEH :
ZAINUDDIN, ST
NIP. 390 036 146
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
:
:
:
:
:
###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
: APBD
: PT. WIJAYA KARYA SEMESTA
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
KONTRAK
AWAL
4
6.1 (1)
Ltr
5,200.00
6.3 (6)
m3
260.00
DISETUJUI OLEH :
PEMBANTU PPTK WILAYAH IX ACEH TIMUR 1
DINAS BINA MARGA DAN CIPTA KARYA PROV. NAD
ZAINUDDIN, ST
NIP. 390 036 146
PEKERJAAN
PA K E T
NO. KONTRAK
TGL. KONTRAK
NILAI KONTRAK
NILAI ADD. II (K. INDUK)
PENYEDIA BARANG/JASA
:
:
:
:
:
:
:
###
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
APBD
PT. WIJAYA KARYA SEMESTA
DEVISI 7 STRUKTUR
MATA
PEMBA YARAN
1
U RAIAN
SATUAN
KUANTITAS
ADD. I
(K. INDUK)
4
7.1 (5)
Beton K250
M3
178.94
7.1 (6)
Beton K175
M3
2.26
7.1 (7)
M3
49.86
7.1 (8)
Beton K125
M3
7.20
7.3 (1)
Kg
23,566.00
M1
200.00
M1
200.00
7.7 (1) a
M1
8.00
7.7 (2) a
M1
8.00
7.9
7.10 (3)
Pasangan Batu
M3
168.00
Bronjong
M3
10.00
M1
32.00
DISETUJUI OLEH :
KORDINATAR LAPANGAN
WILAYAH II ACEH BESAR - 1
BUSTAMI
NIP. 110 046 009
Buah
M1
6.00
76.00
SERTIFIKAT BULANAN
ING)
NTITAS
ADD. I
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=5x6
33,002,000.00
33,002,000.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
33,002,000.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
SERTIFIKAT BULANAN
ING)
NTITAS
ADD. I
(K. INDUK)
5
-
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
38,213.00
5,731,950.00
569,199.00
113,839,800.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
119,571,750.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
SERTIFIKAT BULANAN
ING)
NTITAS
ADD. I
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
34,187.00
478,618.00
35,205.07
3,379,686.72
35,988.05
3,454,852.80
57,998,681.00
57,998,681.00
69,561.00
13,912,200.00
153,360.00
150,906,240.00
2,630.00
13,676,000.00
TOTAL HARGA
TOTAL PEMBAYARAN
243,806,278.52
-
PERSENTASE (%)
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
SERTIFIKAT BULANAN
ING)
NTITAS
ADD. I
(K. INDUK)
5
-
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
407,590.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
132,466,750.00
132,466,750.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
SERTIFIKAT BULANAN
ING)
NTITAS
ADD. I
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
438,820.00
342,279,600.00
416,900.00
433,576,000.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
775,855,600.00
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
SERTIFIKAT BULANAN
ING)
NTITAS
ADD. I
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
9,428.00
49,025,600.00
2,406,464.00
625,680,640.00
TOTAL HARGA
674,706,240.00
TOTAL PEMBAYARAN
PERSENTASE (%)
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
SERTIFIKAT BULANAN
ING)
NTITAS
ADD. II
(K. INDUK)
5
HARGA
SATUAN
(Rp)
6
JUMLAH HARGA
PELAKSANAAN
(Rp)
7=4x6
1,114,504.00
199,429,345.76
930,993.00
2,104,044.18
862,490.81
43,003,791.79
802,441.10
5,777,575.92
14,539.00
342,626,074.00
629,209.80
125,841,960.00
207,049.02
41,409,804.00
8,863,481.16
70,907,849.28
2,065,076.54
16,520,612.32
606,688.00
101,923,584.00
659,946.54
6,599,465.40
469,908.51
15,037,072.32
1,241,727.00
7,450,362.00
125,339.00
9,525,764.00
TOTAL HARGA
TOTAL PEMBAYARAN
PERSENTASE (%)
988,157,304.97
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. MAXITECH UTAMA INDONESIA
Ass. CV. DELTA KONS
M A R W A N, BE
CHIEF INSPECTOR
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 6 x 10
0.11
:
:
:
:
Rp
`01
SEPTEMBER
25 / SEPTEMBER / 2008
2 dari 8
33,002,000.00
3,630,220.00
0.11
3,630,220.00
11.00
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA
3,630,220.00
3,630,220.00
11.00%
SAFRIZAL, ST
General Superintendent
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
:
:
:
:
Rp
`01
SEPTEMBER
25 / SEPTEMBER / 2008
3 dari 8
119,571,750.00
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA
0.00%
SAFRIZAL, ST
General Superintendent
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
:
:
:
:
Rp
`01
SEPTEMBER
25 / SEPTEMBER / 2008
4 dari 8
243,806,278.52
5,200.00
13,676,000.00
13,676,000.00
5,200.00
13,676,000.00
13,676,000.00
5.61
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA
SAFRIZAL, ST
General Superintendent
5.61%
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
-
:
:
:
:
`01
SEPTEMBER
25 / SEPTEMBER / 2008
5 dari 8
132,466,750.00
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA
SAFRIZAL, ST
General Superintendent
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
:
:
:
:
Rp
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
`01
SEPTEMBER
25 / SEPTEMBER / 2008
6 dari 8
775,855,600.00
DIBUAT OLEH :
SAFRIZAL, ST
General Superintendent
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
:
:
:
:
Rp
`01
SEPTEMBER
25 / SEPTEMBER / 2008
7 dari 8
674,706,240.00
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA
SAFRIZAL, ST
General Superintendent
0.00%
SERTIFIKAT
BULAN
TANGGAL
HALAMAN
JUMLAH KONTRAK
BULAN INI
JUMLAH HARGA
KUANTITAS
(Rp)
10
11 = 10 x 6
:
:
:
:
Rp
`01
SEPTEMBER
25 / SEPTEMBER / 2008
8 dari 8
988,157,304.97
DIBUAT OLEH :
PENYEDIA BARANG / JASA
PT. WIJAYA KARYA SEMESTA
SAFRIZAL, ST
General Superintendent
0.00%
*
.
.
************
1
(6,329,686,000.00) ************ Model (1-3):
************ ************ ************ ************
Err:502
************ ******************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh
***
************
ribu juta milyar
***
************ 0-6329686000
***
************ ******************** ************ ************ ************ ************
************
Err:502
1
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502
***
************
***
************
***
************
Err:502
2
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502
***
************
***
************
***
************
Err:502
3
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502
***
************
***
************
***
************
Err:502
4
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
Err:502 Err:502
***
************
************
************
************
************ 000
************
************
************
************
************
************
************
************
Err:502
Err:502
Err:502
Err:502
Err:502
***
***
***
***
1
***
0
***
sepuluh
***
0
****
0
***
***
***
Err:502 00
0
***
Err:502 ************ ************ ************
Err:502 00
Err:502
************
Err:502 Err:502 *
Err:502
************
Err:502 Err:502 *
Err:502
1
Err:502
2
Err:502
3
Err:502
************ ******************** ************ ************ ************ ************
KALAU MAU MENGCOPY HARUS KE BAWAH
*
.
.
************
1
#REF! ************ Model (1-3):
************ ************ ************ ************
#REF!
************ ******************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh
***
************
ribu juta milyar
***
************
#REF!
***
************ ******************** ************ ************ ************ ************
************
#REF!
1
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***
************
***
************
***
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
1
2
3
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2
#REF!
#REF!
#REF!
#REF!
#REF!
***
***
***
***
***
***
***
***
***
3
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
***
4
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
1
***
#REF!
***
#REF!
***
#REF!
****
#REF!
***
#REF!
***
***
#REF!
#REF!
#REF!
***
#REF! ************ ************ ************
#REF!
#REF!
#REF!
#REF! *
#REF!
#REF! *
#REF!
*
.
.
************
1
#REF! ************ Model (1-3):
************ ************ ************ ************
#REF!
************ ******************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh
***
************
ribu juta milyar
***
************
#REF!
***
************ ******************** ************ ************ ************ ************
************
#REF!
1
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***
************
***
************
***
************
#REF!
2
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***
************
***
************
***
************
#REF!
3
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***
************
***
************
***
************
#REF!
4
***
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
***
***
***
***
***
***
***
1
***
#REF!
***
#REF!
***
#REF!
****
#REF!
***
#REF!
***
***
#REF!
#REF!
#REF!
***
#REF! ************ ************ ************
#REF!
#REF!
#REF!
#REF! *
#REF!
#REF! *
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
************
#REF!
************
#REF!
1
#REF!
2
#REF!
3
#REF!
************ ******************** ************ ************ ************ ************
KALAU MAU MENGCOPY HARUS KE BAWAH
*
.
.
************
1
#REF! ************ Model (1-3):
************ ************ ************ ************
#REF!
************ ******************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh
***
************
ribu juta milyar
***
************
#REF!
***
************ ******************** ************ ************ ************ ************
************
#REF!
1
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
1
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
***
***
2
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
***
3
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
***
4
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
1
***
#REF!
***
#REF!
***
#REF!
****
#REF!
***
#REF!
***
***
#REF!
#REF!
#REF!
***
#REF! ************ ************ ************
#REF!
#REF!
#REF!
#REF! *
#REF!
#REF! *
#REF!
2
#REF!
3
#REF!
************ ******************** ************ ************ ************ ************
KALAU MAU MENGCOPY HARUS KE BAWAH
*
.
.
************
1
#REF! ************ Model (1-3):
************ ************ ************ ************
#REF!
************ ******************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh
***
************
ribu juta milyar
***
************
#REF!
***
************ ******************** ************ ************ ************ ************
************
#REF!
1
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***
************
***
************
***
************
#REF!
2
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***
************
***
************
***
************
#REF!
3
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
***
************
***
************
***
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
4
#REF!
#REF!
#REF!
#REF!
#REF!
***
***
***
***
***
***
***
***
1
***
#REF!
***
#REF!
***
#REF!
****
#REF!
***
#REF!
***
***
#REF!
#REF!
#REF!
***
#REF! ************ ************ ************
#REF!
#REF!
#REF!
#REF! *
#REF!
#REF! *
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
************
#REF!
************
#REF!
1
#REF!
2
#REF!
3
#REF!
************ ******************** ************ ************ ************ ************
KALAU MAU MENGCOPY HARUS KE BAWAH
*
.
.
************
1
#REF! ************ Model (1-3):
************ ************ ************ ************
#REF!
************ ******************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh
***
************
ribu juta milyar
***
************
#REF!
***
************ ******************** ************ ************ ************ ************
************
#REF!
1
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
#REF!
#REF!
***
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
************
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
***
***
***
2
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
***
3
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
***
4
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
#REF!
***
***
***
1
***
#REF!
***
#REF!
***
#REF!
****
#REF!
***
#REF!
***
***
#REF!
#REF!
#REF!
***
#REF! ************ ************ ************
#REF!
#REF!
#REF!
#REF! *
#REF!
#REF! *
#REF!
1
#REF!
2
#REF!
3
#REF!
************ ******************** ************ ************ ************ ************
PEMERINTAH PRO
DINA
Jalan Jend. Su
KEGIATAN
PEKERJAAN
NO./PAKET
PENYEDIA BARANG/JASA
KONTRAK NOMOR
KONTRAK TANGGAL
TANGGAL ADDENDUM
TAHUN ANGGARAN
:
:
:
:
:
:
:
:
NO. BAB
URAIAN
DIVISI - I
UMUM
POTONGAN
Terbilang
: #REF!
PROSENTASE BOBOT YANG DICAPAI :
* PRESTASI S/D BULAN INI
* PRESTASI S/D BULAN LALU
* PRESTASI BULAN INI
=
=
=
#REF!
#REF!
#REF!
DISETUJUI OLEH :
PEJABAT PELAKSANA TEKNIS KEGIATAN
PEMB. JALAN DAN JEMBATAN WILAYAH II ACEH BESAR - I
Ir. M. HILAL, MT
NIP. 110 053 961
KEPALA BI
DI
P
REKAPITULASI
E ACEH DARUSSALAM
LANJUTAN) (MULTY YEARS)
KONTRAK AWAL
BOBOT
(%)
ADD. I
JUMLAH HARGA
( Rp.)
JUMLAH HARGA
( Rp.)
BOBOT
(%)
20.98
3,630,220.00
#DIV/0!
0.00
#DIV/0!
79.02
13,676,000.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
100.00
17,306,220.00
1,730,622.00
19,036,842.00
19,036,000.00
0.00
0.00
0.00
0.00
#DIV/0!
C)= (A)+(B)
(D1)
(D2)
(D3)
MC-05+MC-06+MC-07+MC-08+MC-09+MC-10
= ( 20 % x C )
=( 5%xC)
( E )
( F )
( F )
= ( D1 ) + ( D2 ) + ( D3 )
=(C) - (E)
%
%
%
DIPERIKSA OLEH :
KONSULTAN PENGAWAS
PT. TACITA PRIMA UTAMA
P
P
MENGETAHUI OLEH :
KEPALA BIDANG PEMBANGUNAN JALAN DAN JEMBATAN
DINAS BINA MARGA DAN CIPTA KARYA
Provinsi Nanggroe Aceh Darussalam
Ir. F A J R I, MT
NIP. 110 047 860
ARUSSALAM
ADDENDUM NO
TANGGAL
SERTIFIKAT NO.
TGL./BLN/THN
LEMBAR
:
:
:
:
:
BOBOT S/D
SEKARANG
(%)
02 (Dua)
15 JANURI 2008
11 (Sebelas)
25 J U N I 2008
1/8
TOTAL BIAYA
S/D SEKARANG
(%)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
DIBUAT OLEH :
PENYEDIA BARANG/JASA
PT. ALHAS JAYA GROUP
SOFYAN HASAN
DIREKTUR UTAMA
:
:
:
:
:
Err:509
PEMBANGUNAN CENTRE POINT OF INDONESIA (RAILING)
602.2/4157/DBM
16 September 2016
Rp. 2.954.986.136,50
APBD
2016
ITEM PEKERJAAN
SAT.
BULAN AG
VOLUME
VOLUME KONTRAK
KONTRAK
ADD-01
4
VOLUME M
SAAT INI
5
DIVISI - 1
1.2
UMUM
Mobilisasi dan Demobilisasi
Ls
1.00
0.11
DIVISI - 2
2.1
2.2
DRAINASE
Galian untuk selokan Drainase dan Saluran Air
Pasangan Batu dengan Mortar
m3
m3
150.00
200.00
###
###
DIVISI - 3
3.1(1)
3.1 (3)
3.1 (4)
3.1 (6)
3.2(1)
3.2(2)
3.3
PEKERJAAN TANAH
Galian Biasa
Galian Struktur dengan Kedalaman 0 - 2 meter
Galian Struktur dengan Kedalaman 2 - 4 meter
Cofferdam, Penyokong, Pengaku dan Pekerjaan yang Berk
Timbunan Biasa
Timbunan Pilihan
Penyiapan Badan Jalan
M3
M3
M3
LS
M3
M3
M2
14.00
96.00
96.00
1.00
200.00
984.00
5,200.00
###
###
DIVISI - 4
4.2(2)
PELEBARAN PERKERASAN
DAN BAHU JALAN
Lapisan Pondasi Agregat Kelas B
m3
325.00
###
DIVISI - 5
5.1(1)
5.2(2)
PERKERASAN BERBUTIR
Lapisan Pondasi Agregat Kelas A
Lapisan Pondasi Agregat Kelas B
m3
m3
780.00
1,040.00
###
###
DIVISI - 6
6.1(1)
6.3(6)
PERKERASAN ASPAL
Lapis Resap Pengikat
Laston - Lapis Pengikat Aspal Beton (AC-BC)
Ltr
m3
5,200.00
260.00
###
###
DIVISI - 7
7.1 (5)
7.1 (6)
7.1 (7)
7.1 (8)
7.3 (1)
7.6 (10) b
7.6 (12) b
7.7 (1) a
7.7 (2) a
7.9
7.10 (3)
7.11 (3)a
7.12 (2) a
7.13
STRUKTUR
Beton K250
Beton K175
Beton Siklop K175
Beton K125
Baja Tulangan U24 Polos
Pengadaan Tiang Pnc. Beton Bertulang Ukuran 40 Cm
Pemancangan Tiang Pancang Beton Bertulang Dia 40cm
Penyediaan Dinding Sumuran Silinder, Diameter 300cm
Penurunan Dinding Sumuran Silinder, Diameter 300cm
Pasangan Batu
Bronjong
Expansion Joint Tipe Baja Bersudut
Perletakan Elastomeric Bearing
Sandaran Jembatan Baja
M3
M3
M3
M3
Kg
M1
M1
M1
M1
M3
M3
M1
Buah
M1
178.94
2.26
49.86
7.20
23,566.00
200.00
200.00
8.00
8.00
168.00
10.00
32.00
6.00
76.00
###
###
###
###
###
###
###
###
###
###
###
###
###
###
5,200.00
DIVISI - 10
10.1 (1)
10.1 (2)
10.1 (5)
PEMELIHARAAN RUTIN
Pemeliharaan Rutin Perkerasan
Pemeliharaan Rutin Bahu Jalan
Pemeliharaan Rutin Jembatan (Jembatan Darurat)
Ls
Ls
Ls
###
###
###
:
:
:
:
:
:
:
:
:
:
BULAN AG
ITEM PEKERJAAN
SAT.
DIVISI - 1
1.2
UMUM
Mobilisasi dan Demobilisasi
DIVISI - 2
2.1
DRAINASE
Galian untuk Selokan Drainase
dan Saluran Air
Pasangan Batu dengan Mortar
VOLUME
VOLUME KONTRAK
KONTRAK
ADD-01
4
VOLUME M
SAAT INI
5
Ls
1.00
0.20
m3
57.20
m3
194.00
m3
m3
1,139.00
555.00
659.40
16.00
m3
m3
m2
205.00
14.00
19,050.00
48.00
14.00
###
4.2(2)
PELEBARAN PERKERASAN
DAN BAHU JALAN
Lapisan Pondasi Agregat Kelas B
m3
1,218.00
DIVISI - 5
5.1(1)
5.2(2)
PERKERASAN BERBUTIR
Lapisan Pondasi Agregat Kelas A
Lapisan Pondasi Agregat Kelas B
m3
m3
467.00
510.00
DIVISI - 6
6.1(1)
6.1(2)
6.3(5)
6.3(6)
6.3(6)a
PERKERASAN ASPAL
Lapis Resap Pengikat
Lapis Perekat
Laston - Lapis Aus Aspal Beton (AC-WC)
Laston - Lapis Pengikat Aspal Beton (AC-BC)
Laston - Lapis Pengikat Aspal Beton (AC-BC)L
Ltr
Ltr
m2
m3
Ton
2,880.00
6,809.00
19,050.00
1,395.00
287.00
654.26
738.48
789.60
83.60
153.75
DIVISI - 7
7.1(4)
7.1(5)
7.1(8)
7.3(1)
7.9
7.13
STRUKTUR
Beton K-250
Beton K-175
Beton K-125
Baja Tulangan U - 24 Polos
Pasangan Batu
Sandaran Jembatan Baja (Railing)
m3
m3
m3
Kg
m3
m'
428.60
40.30
26.90
37,512.30
80.00
78.00
289.52
31.92
28,525.60
57.60
DIVISI - 10
10.1 (1)
PEMELIHARAAN RUTIN
Pemeliharaan Rutin Perkerasan
Ls
1.00
0.20
2.2
DIVISI - 3
3.1(1)
3.1(8)
3.2(1)
3.2(2)
3.3
DIVISI - 4
PEKERJAAN TANAH
Galian Biasa
Galian Perkerasan Beraspal Tanpa
Cold Milling Machine
Timbunan Biasa
Timbunan Pilihan
Penyiapan Badan Jalan
10.1 (2)
10.1 (5)
Ls
Ls
1.00
1.00
0.20
0.20
:
:
:
:
:
:
:
:
:
:
DIVISI - 1
1.2
UMUM
Mobilisasi dan Demobilisasi
DIVISI - 2
2.1
DRAINASE
Galian untuk Selokan Drainase
dan Saluran Air
Pasangan Batu dengan Mortar
BULAN SEP
SAT.
3
VOLUME
VOLUME KONTRAK
KONTRAK
ADD-01
4
VOLUME M
SAAT INI
5
Ls
1.00
1.00
m3
57.20
197.20
m3
194.00
179.50
m3
m3
1,139.00
555.00
2,144.10
382.90
356.02
m3
m3
m2
205.00
14.00
19,050.00
129.20
2,649.60
2,536.70
1,281.40
2,147.80
4.2(2)
PELEBARAN PERKERASAN
DAN BAHU JALAN
Lapisan Pondasi Agregat Kelas B
m3
1,218.00
1,320.00
390.00
DIVISI - 5
5.1(1)
5.2(2)
PERKERASAN BERBUTIR
Lapisan Pondasi Agregat Kelas A
Lapisan Pondasi Agregat Kelas B
m3
m3
467.00
510.00
401.70
409.20
322.22
303.22
DIVISI - 6
6.1(1)
6.1(2)
6.3(5)
6.3(6)
6.3(6)a
PERKERASAN ASPAL
Lapis Resap Pengikat
Lapis Perekat
Laston - Lapis Aus Aspal Beton (AC-WC)
Laston - Lapis Pengikat Aspal Beton (AC-BC)
Laston - Lapis Pengikat Aspal Beton (AC-BC)L
Ltr
Ltr
m2
m3
Ton
2,880.00
6,809.00
19,050.00
1,395.00
287.00
7,233.50
14,006.60
28,531.80
452.10
736.30
5,930.86
8,116.49
14,939.91
327.98
573.90
DIVISI - 7
7.1(4)
7.1(5)
7.1(8)
7.3(1)
7.9
7.13
STRUKTUR
Beton K-250
Beton K-175
Beton K-125
Baja Tulangan U - 24 Polos
Pasangan Batu
Sandaran Jembatan Baja (Railing)
m3
m3
m3
Kg
m3
m'
428.60
40.30
26.90
37,512.30
80.00
78.00
416.80
63.20
29.70
42,966.00
147.50
80.00
80.50
9.43
5.33
8,140.50
22.40
DIVISI - 10
10.1 (1)
PEMELIHARAAN RUTIN
Pemeliharaan Rutin Perkerasan
Ls
1.00
1.00
0.45
2.2
DIVISI - 3
3.1(1)
3.1(8)
3.2(1)
3.2(2)
3.3
DIVISI - 4
PEKERJAAN TANAH
Galian Biasa
Galian Perkerasan Beraspal Tanpa
Cold Milling Machine
Timbunan Biasa
Timbunan Pilihan
Penyiapan Badan Jalan
0.05
10.1 (2)
10.1 (5)
Ls
Ls
1.00
1.00
1.00
1.00
0.45
0.10
NOMOR
PEMBAYARAN
1
:
:
:
:
:
:
:
:
:
:
BULAN OK
ITEM PEKERJAAN
SAT.
DIVISI - 1
1.2
UMUM
Mobilisasi dan Demobilisasi
DIVISI - 2
2.1
DRAINASE
Galian untuk Selokan Drainase
dan Saluran Air
Pasangan Batu dengan Mortar
VOLUME
VOLUME KONTRAK
KONTRAK
ADD-01
4
VOLUME M
SAAT INI
5
Ls
1.00
1.00
m3
57.20
197.20
m3
194.00
179.50
m3
m3
1,139.00
555.00
2,144.10
382.90
m3
m3
m2
205.00
14.00
19,050.00
129.20
2,649.60
2,536.70
4.2(2)
PELEBARAN PERKERASAN
DAN BAHU JALAN
Lapisan Pondasi Agregat Kelas B
m3
1,218.00
1,320.00
DIVISI - 5
5.1(1)
5.2(2)
PERKERASAN BERBUTIR
Lapisan Pondasi Agregat Kelas A
Lapisan Pondasi Agregat Kelas B
m3
m3
467.00
510.00
401.70
409.20
DIVISI - 6
6.1(1)
6.1(2)
6.3(5)
6.3(6)
6.3(6)a
PERKERASAN ASPAL
Lapis Resap Pengikat
Lapis Perekat
Laston - Lapis Aus Aspal Beton (AC-WC)
Laston - Lapis Pengikat Aspal Beton (AC-BC)
Laston - Lapis Pengikat Aspal Beton (AC-BC)L
Ltr
Ltr
m2
m3
Ton
2,880.00
6,809.00
19,050.00
1,395.00
287.00
7,233.50
14,006.60
28,531.80
452.10
736.30
DIVISI - 7
7.1(4)
7.1(5)
7.1(8)
7.3(1)
7.9
7.13
STRUKTUR
Beton K-250
Beton K-175
Beton K-125
Baja Tulangan U - 24 Polos
Pasangan Batu
Sandaran Jembatan Baja (Railing)
m3
m3
m3
Kg
m3
m'
428.60
40.30
26.90
37,512.30
80.00
78.00
416.80
63.20
29.70
42,966.00
147.50
80.00
DIVISI - 10
PEMELIHARAAN RUTIN
2.2
DIVISI - 3
3.1(1)
3.1(8)
3.2(1)
3.2(2)
3.3
DIVISI - 4
PEKERJAAN TANAH
Galian Biasa
Galian Perkerasan Beraspal Tanpa
Cold Milling Machine
Timbunan Biasa
Timbunan Pilihan
Penyiapan Badan Jalan
#VALUE!
73.03
10.1 (1)
10.1 (2)
10.1 (5)
Ls
Ls
Ls
1.00
1.00
1.00
1.00
1.00
1.00
SI PELAKSANAAN LAPANGAN
JUMLAH
7
PERSEN
TASE
%
8
0.11
5,200.00
11.00
100.00
Dibuat Oleh :
PT. JIA JAYA UTAMA
SAFRIZAL, ST
GENERAL SUPERINTENDENT
SI PELAKSANAAN LAPANGAN
JUMLAH
7
PERSEN
TASE
%
8
0.11
0.31
31.00
659.40
16.00
57.89
2.88
48.00
14.00
-
23.41
100.00
-
#REF!
654.26
22.72
#REF!
83.60
5.99
289.52
31.92
28,525.60
57.60
67.55
79.21
76.04
73.85
0.20
20.00
0.20
0.20
20.00
20.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
SI PELAKSANAAN LAPANGAN
JUMLAH
7
0.31
0.36
PERSEN
TASE
%
8
36.00
659.40
16.00
659.40
372.02
30.75
97.16
48.00
14.00
-
48.00
1,295.40
2,147.80
37.15
48.89
84.67
390.00
29.55
322.22
303.22
80.21
74.10
654.26
6,585.12
91.04
83.60
411.58
91.04
289.52
31.92
28,525.60
57.60
370.02
41.35
5.33
36,666.10
80.00
88.78
65.43
17.95
85.34
100.00
0.20
0.65
65.00
0.20
0.20
0.65
0.30
65.00
30.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
SI PELAKSANAAN LAPANGAN
VOLUME MC - 4
SEBELUM
6
JUMLAH
7
0.36
0.36
PERSEN
TASE
%
8
36.00
659.40
372.02
659.40
372.02
30.75
97.16
48.00
1,295.40
2,147.80
48.00
1,295.40
2,147.80
37.15
48.89
84.67
390.00
390.00
29.55
322.22
303.22
322.22
303.22
80.21
74.10
6,585.12
6,585.12
91.04
411.58
28,531.80
484.61
#VALUE!
100.00
107.19
370.02
41.35
5.33
36,666.10
80.00
370.02
41.35
5.33
36,666.10
80.00
88.78
65.43
17.95
85.34
100.00
0.65
0.65
0.30
0.65
0.65
0.30
65.00
65.00
30.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
HAL 4
No
S TAT I O N E R
Agregat Kelas A
Agregat Kelas B
Aspal Lama
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
490 + 100
STA
400 + 000
'm 6
491
000
2.70
8.60
0.14
3.25
491
000
2.60
19.90
0.14
7.24
490
900
5.75
50.00
0.14
40.25
490
850
5.75
20.00
0.14
16.10
490
800
3.00
35.00
0.14
14.70
490
750
5.74
20.00
0.14
16.07
490
750
5.75
10.00
0.14
8.05
490
700
5.90
50.00
0.14
41.30
490
650
1.00
1.20
0.14
0.17
10
490
650
1.20
29.00
0.14
4.87
11
490
650
3.00
50.00
0.14
21.00
12
490
650
3.00
10.00
0.14
4.20
13
490
600
3.00
50.00
0.14
21.00
14
490
600
3.00
40.00
0.14
16.80
15
490
550
2.50
20.00
0.14
7.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 4-1
Jumlah Lalu MC-2
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
413.70 M1
68.00 M1
481.70 M1
MARWAN, BE
CHIEF INSPECTOR
222.00
95.20
317.20
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
HAL 4
No
S TAT I O N E R
Agregat Kelas A
Agregat Kelas B
Aspal Lama
STA
400 + 000
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
490 + 100
'm 6
16
490
550
3.00
50.00
0.14
21.00
17
490
550
2.50
20.00
0.14
7.00
18
490
500
1.20
29.00
0.14
4.87
19
490
500
1.00
1.50
0.14
0.21
20
490
450
2.70
6.00
0.14
2.27
21
490
450
1.20
1.00
0.14
0.17
22
490
400
3.00
25.00
0.14
10.50
23
490
150
0.70
5.60
0.14
0.55
24
490
150
0.80
1.45
0.14
0.16
25
490
150
0.85
5.00
0.14
0.60
26
490
150
0.58
3.00
0.14
0.24
27
490
150
1.56
5.40
0.14
1.18
28
490
150
0.50
5.60
0.14
0.39
29
490
150
0.50
0.90
0.14
0.06
30
490
150
0.60
0.50
0.14
0.04
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 4-2
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
159.95 M1
481.70 M1
641.65 M1
49.24
317.20
366.44
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
HAL 4
No
S TAT I O N E R
Agregat Kelas A
Agregat Kelas B
Aspal Lama
STA
400 + 000
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
490 + 100
'm 6
31
490
150
0.58
0.60
0.14
0.05
32
490
150
0.55
4.33
0.14
0.33
33
490
150
0.80
1.95
0.14
0.22
34
490
050
2.30
0.80
0.14
0.26
35
490
050
1.50
0.90
0.14
0.19
36
490
050
1.50
0.90
0.14
0.19
37
490
050
1.00
4.80
0.14
0.67
38
490
050
1.00
8.30
0.14
1.16
39
489
900
1.55
4.50
0.14
0.98
40
489
900
2.60
9.20
0.14
3.35
41
489
900
1.90
1.10
0.14
0.29
42
489
900
4.20
3.00
0.14
1.76
43
489
900
3.40
5.10
0.14
2.43
44
489
500
0.70
0.70
0.14
0.07
45
489
500
1.20
0.90
0.14
0.15
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 4-3
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
47.08 M1
641.65 M1
688.73 M1
12.10
366.44
378.54
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
HAL 4
No
S TAT I O N E R
LEBAR
JARAK
TEBAL
VOLUME
Agregat Kelas A
Agregat Kelas B
Aspal Lama
M1
M1
M1
s/d
490 + 100
STA
400 + 000
M3
'm 6
46
489
500
1.30
0.60
0.14
0.11
47
489
500
1.31
1.60
0.14
0.29
48
489
500
1.50
1.00
0.14
0.21
49
489
500
1.26
1.00
0.14
0.18
50
489
400
1.50
2.60
0.14
0.55
51
489
400
0.60
1.65
0.14
0.14
52
489
400
0.70
2.35
0.14
0.23
53
489
150
2.26
1.62
0.14
0.51
54
489
150
0.30
1.70
0.14
0.07
55
489
150
2.72
2.30
0.14
0.88
56
489
050
5.90
18.00
0.14
14.87
57
488
600
1.20
1.50
0.14
0.25
58
488
600
0.60
2.30
0.14
0.19
59
488
600
1.50
0.35
0.14
0.07
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 4-4
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
Aspal
Laston
Lama
AC-BC
'm 6
38.57 M1
688.73 M1
727.30 M1
18.55
378.54
397.09
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
HAL 4
No
S TAT I O N E R
Agregat Kelas A
Agregat Kelas B
Aspal Lama
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
490 + 100
STA
400 + 000
'm 6
60
488
600
1.23
1.45
0.14
0.25
61
488
600
0.83
0.80
0.14
0.09
Jumlah 4-5
2.25 M1
0.34
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
727.30 M1
729.55 M1
397.09
397.43
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Box Culvert Jalan Banda Aceh Medan
HAL 4
No
S TAT I O N E R
Agregat Kelas A
Agregat Kelas B
Aspal Lama
STA
400 + 000
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
490 + 100
'm 6
62
Alue Lhok
KM 409 + 100
10.00
12.10
0.14
16.94
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 4-6
Jumlah Lalu
Jumlah Total MC-3
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
12.10 M1
729.55 M1
741.65 M1
MARWAN, BE
CHIEF INSPECTOR
16.94
397.43
414.37
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Box Culvert Jalan Banda Aceh Medan
HAL 4
No
S TAT I O N E R
Agregat Kelas A
Agregat Kelas B
Aspal Lama
STA
400 + 000
'm 6
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
490 + 100
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 4-1
Jumlah Lalu MC-1
Jumlah Total MC-2
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
- M1
68.00 M1
68.00 M1
MARWAN, BE
CHIEF INSPECTOR
95.20
95.20
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 1
BULAN : JULI 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Box Culvert Jalan Banda Aceh Medan
HAL 4
No
S TAT I O N E R
Agregat Kelas A
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
Agregat Kelas A
Agregat Kelas B
Aspal Lama
STA
400 + 000
s/d
490 + 100
'm 6
Sarah Teube
KM 421 + 500
10.00
13.60
0.14
19.04
Alue Dua
KM 433 + 600
10.00
13.60
0.14
19.04
Nicah Awe
KM 343 + 500
10.00
13.60
0.14
19.04
Damar Tutong
KM 400 + 000
10.00
13.60
0.14
19.04
Lhok Bhani
KM 2 + 400
10.00
13.60
0.14
19.04
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 4-1
Jumlah Lalu
Jumlah Total MC-1
Diperiksa Oleh :
TIM SUPERVISI SEMENTARA
IR. A M R I
68.00 M1
- M1
68.00 M1
95.20
95.20
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 4 - 1
M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 4 - 2
KET
K
9
1
L
0
a
e
m
sl
m
a't'
o
s'
n
A
B
A
C
W
B
C
M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 4 - 3
KET
M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 4 - 4
KET
M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 4 - 5
KET
M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 4 - 6
KET
M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 4 - 1
KET
M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 4 - 1
KET
M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+850
Sta 490+900
Sta 490+950
Sta 491+000
Sta 491+050
Sta 491+100
Sta 491+150
Sta 491+200
Sta 491+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+100
Sta 490+150
Sta 490+200
Sta 490+250
Sta 490+300
Sta 490+350
Sta 490+400
Sta 490+450
Sta 490+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 489+350
Sta 489+400
Sta 489+450
Sta 489+500
Sta 489+550
Sta 489+600
Sta 489+650
Sta 489+700
Sta 489+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 400+000
Sta 400+050
Sta 400+100
Sta 400+150
Sta 400+200
Sta 400+250
Sta 400+300
Sta 400+350
Sta 400+400
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 343+000
Sta 343+050
KOTA LANGSA
Sta 343+100
Sta 343+150
Sta 343+200
Sta 343+250
Sta 343+300
Sta 343+350
Sta 343+400
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 2+000
Sta 2+050
Sta 2+100
Sta 2+150
Sta 2+200
Sta 2+250
Sta 2+300
Sta 2+350
Sta 2+400
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
MARWAN, BE
KORDINATOR LAPANGAN
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 409+000
Sta 409+050
Sta 409+100
Sta 409+150
Sta 409+200
Sta 409+250
Sta 409+300
Sta 409+350
Sta 409+400
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 3.1(8)
: Galian Perkerasan Beraspal Tanpa Colt Milling Machine
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 433+000
Sta 433+050
Sta 433+100
Sta 433+150
Sta 433+200
Sta 433+250
Sta 433+300
Sta 433+350
Sta 433+400
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 1
BULAN : JULI 2005
: 3.1(8)
Item Pekerjaan
Lokasi
SKET/GAMBAR
Sta 421+000
Sta 421+050
Sta 421+100
Sta 421+150
Sta 421+200
Sta 421+250
Sta 421+300
Sta 421+350
Sta 421+400
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ATA
R 2005
HAL. 4 - 1
BAR
PERBATASAN
SUMUT
Sta 491+300
Sta 491+350
Sta 491+400
Sta 491+450
Sta 491+500
Sta 491+550
Sta 491+600
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
ATA
ER 2005
HAL. 4 - 2
BAR
Sta 490+550
Sta 490+600
Sta 490+650
Sta 490+700
Sta 490+750
Sta 490+800
Sta 490+850
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
ER 2005
HAL. 4 - 3
BAR
Sta 489+800
Sta 489+850
Sta 489+900
Sta 489+950
Sta 490+000
Sta 490+050
Sta 490+100
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
ER 2005
BAR
HAL. 4 - 4
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
Sta 489+250
Sta 489+300
Sta 489+350
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
ER 2005
HAL. 4 - 5
BAR
Sta 400+450
Sta 400+500
Sta 400+550
Sta 400+600
Sta 400+650
Sta 400+700
Sta 400+800
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
ER 2005
HAL. 4 - 6
BAR
Sta 343+450
Sta 343+500
Sta 343+550
Sta 343+600
Sta 343+650
Sta 343+700
MEDAN
Sta 343+750
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
ER 2005
HAL. 4 - 7
BAR
h:
rvisi
RDANA
Sta 2+450
Sta 2+500
Sta 2+550
Sta 2+600
Sta 2+650
Sta 2+700
Sta 2+750
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
TOR
GENERAL SUPERINTENDENT
ATA
ER 2005
HAL. 4 - 8
BAR
Sta 409+450
Sta 409+500
Sta 409+550
Sta 409+600
Sta 409+650
Sta 409+700
Sta 409+750
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
S 2005
HAL. 4 - 1
BAR
Sta 433+450
Sta 433+500
Sta 433+550
Sta 433+600
Sta 433+650
Sta 433+700
Sta 433+750
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
005
HAL. 4 - 1
BAR
Sta 421+450
Sta 421+500
Sta 421+550
Sta 421+600
Sta 421+650
Sta 421+700
Sta 421+750
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+850
Sta 490+900
Sta 490+950
Sta 491+000
Sta 491+050
Sta 491+100
Sta 491+150
Sta 491+200
Sta 491+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+100
Sta 490+150
Sta 490+200
Sta 490+250
Sta 490+300
Sta 490+350
Sta 490+400
Sta 490+450
Sta 490+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 489+350
Sta 489+400
Sta 489+450
Sta 489+500
Sta 489+550
Sta 489+600
Sta 489+650
Sta 489+700
Sta 489+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ATA
2005
HAL. 7 - 1
BAR
PERBATASAN
SUMUT
Sta 491+300
Sta 491+350
Sta 491+400
Sta 491+450
Sta 491+500
Sta 491+550
Sta 491+600
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
ATA
ER 2005
HAL. 7 - 2
BAR
Sta 490+550
Sta 490+600
Sta 490+650
Sta 490+700
Sta 490+750
Sta 490+800
Sta 490+850
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
ER 2005
HAL. 7 - 3
BAR
Sta 489+800
Sta 489+850
Sta 489+900
Sta 489+950
Sta 490+000
Sta 490+050
Sta 490+100
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
ER 2005
BAR
HAL. 7 - 4
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
Sta 489+250
Sta 489+300
Sta 489+350
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
S TAT I O N E R
STA
Aspal Lama
491 + 000
LEBAR
JARAK
LUAS
M1
M1
M2
s/d
490 + 550
'm 6
491
000
2.70
8.60
491
000
2.60
19.90
490
900
5.75
50.00
490
850
5.75
20.00
490
800
3.00
35.00
490
750
5.75
20.00
490
750
5.75
10.00
490
700
5.90
50.00
490
650
1.00
1.20
10
490
650
1.20
29.00
11
490
650
3.00
50.00
12
490
650
3.00
10.00
13
490
600
3.00
50.00
14
490
600
3.00
40.00
15
490
550
2.50
20.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 7-1
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
413.70 M1
- M1
413.70 M1
Dibuat Oleh :
PT. BAHTERA KARAN
ARMAN SUROS
GENERAL SUPERINT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
S TAT I O N E R
STA
Aspal Lama
490 + 550
LEBAR
JARAK
LUAS
M1
M1
M2
s/d
490 + 150
'm 6
16
490
550
3.00
50.00
17
490
550
2.50
20.00
18
490
500
1.20
29.00
19
490
500
1.00
1.50
20
490
450
2.70
6.00
21
490
450
1.20
1.00
22
490
400
3.00
25.00
23
490
150
0.70
5.60
24
490
150
0.80
1.45
25
490
150
0.85
5.00
26
490
150
0.58
3.00
27
490
150
1.56
5.40
28
490
150
0.50
5.60
29
490
150
0.50
0.90
30
490
150
0.60
0.50
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 7-2
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
159.95 M1
413.70 M1
573.65 M1
Dibuat Oleh :
PT. BAHTERA KARAN
ARMAN SUROS
GENERAL SUPERINT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
S TAT I O N E R
STA
Aspal Lama
490 + 150
LEBAR
JARAK
LUAS
M1
M1
M2
s/d
489 + 500
'm 6
31
490
150
0.58
0.60
32
490
150
0.55
4.33
33
490
150
0.80
1.95
34
490
050
2.30
0.80
35
490
050
1.50
0.90
36
490
050
1.50
0.90
37
490
050
1.00
4.80
38
490
050
1.00
8.30
39
489
900
1.55
4.50
40
489
900
2.60
9.20
41
489
900
1.90
1.10
42
489
900
4.20
3.00
43
489
900
3.40
5.10
44
489
500
0.70
0.70
45
489
500
1.20
0.90
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 7-3
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
47.08 M1
573.65 M1
620.73 M1
Dibuat Oleh :
PT. BAHTERA KARAN
ARMAN SUROS
GENERAL SUPERINT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
S TAT I O N E R
LEBAR
JARAK
LUAS
M1
M1
M2
s/d
488 + 600
STA
Aspal Lama
489 + 500
'm 6
46
489
500
1.30
0.60
47
489
500
1.31
1.60
48
489
500
1.50
1.00
49
489
500
1.26
1.00
50
489
400
1.50
2.60
51
489
400
0.60
1.65
52
489
400
0.70
2.35
53
489
150
2.26
1.62
54
489
150
0.30
1.70
55
489
150
2.72
2.30
56
489
050
5.86
18.00
57
488
600
1.20
1.50
58
488
600
0.60
2.30
59
488
600
1.50
0.35
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 7-4
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
Aspal
Laston
Lama
AC-BC
'm 6
38.57 M1
620.73 M1
659.30 M1
Dibuat Oleh :
PT. BAHTERA KARAN
ARMAN SUROS
GENERAL SUPERINT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
S TAT I O N E R
STA
Aspal Lama
488 + 600
LEBAR
JARAK
LUAS
M1
M1
M2
s/d
488 + 600
'm 6
60
488
600
1.23
1.45
61
488
600
0.83
0.80
Jumlah 7-5
2.25 M1
Jumlah Lalu
Jumlah Total MC - 3
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
659.30 M1
661.55 M1
Dibuat Oleh :
PT. BAHTERA KARAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROS
GENERAL SUPERINT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
:3.3
: Penyiapan Badan Jalan
: Jalan Banda Aceh - Medan
S TAT I O N E R
Agregat Kelas A
Aspal Lama
STA
489 + 600
LEBAR
JARAK
LUAS
M1
M1
M2
s/d
490 + 200
'm 6
Damar Tutong
KM 400 + 000
10.00
13.60
Lhok Bhani
KM 2 + 400
10.00
13.60
Alue Lhok
KM 409 + 100
10.00
12.10
Alue Dua
KM 433 + 600
10.00
13.60
Nicah Awe
KM 343 + 500
10.00
13.60
Sarah Teube
KM 421 + 500
10.00
13.60
Agregat Kelas B
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 7-1
Jumlah Lalu MC-3
Jumlah Total MC-4
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
80.10 M1
661.55 M1
741.65 M1
Dibuat Oleh :
PT. BAHTERA KARAN
ARMAN SUROS
GENERAL SUPERINT
HAL 7 - 1
LUAS
KET
M2
23.22
51.74
287.50
115.00
105.00
115.00
57.50
295.00
1.20
34.80
150.00
30.00
150.00
120.00
50.00
1,585.96 M2
- M2
1,585.96 M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 7 - 2
LUAS
KET
M2
150.00
50.00
34.80
1.50
16.20
1.20
75.00
3.92
1.16
K
9
1
L
0
a
e
m
sl
m
a't
o
s'
n
A
B
A
C
W
B
C
4.25
1.74
8.42
2.80
0.45
0.30
351.74 M2
1,585.96 M2
1,937.70 M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 7 - 3
LUAS
KET
M2
0.35
2.38
1.56
1.84
1.35
1.35
4.80
8.30
6.98
23.92
2.09
12.60
17.34
0.49
1.08
86.43 M2
1,937.70 M2
2,024.13 M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 7 - 4
LUAS
KET
M2
0.78
2.10
1.50
1.26
3.90
0.99
1.65
3.66
0.51
6.26
105.48
1.80
1.38
0.53
131.80 M2
2,024.13 M2
2,155.93 M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 7 - 5
LUAS
KET
M2
1.78
0.66
2.44 M2
2,155.93 M2
2,158.37 M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 7 - 1
LUAS
KET
M2
Agregat Kelas B
136.00
136.00
121.00
136.00
136.00
136.00
801.00 M3
2,158.37 M3
2,959.37 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+850
Sta 490+900
Sta 490+950
Sta 491+000
Sta 491+050
Sta 491+100
Sta 491+150
Sta 491+200
Sta 491+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+100
Sta 490+150
Sta 490+200
Sta 490+250
Sta 490+300
Sta 490+350
Sta 490+400
Sta 490+450
Sta 490+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 489+350
Sta 489+400
Sta 489+450
Sta 489+500
Sta 489+550
Sta 489+600
Sta 489+650
Sta 489+700
Sta 489+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
SKET/GAMBAR
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 487+850
Sta 487+900
Sta 487+950
Sta 488+000
Sta 488+050
Sta 488+100
Sta 488+150
Sta 488+200
Sta 488+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 487+100
Sta 487+150
KOTA LANGSA
Sta 487+200
Sta 487+250
Sta 487+300
Sta 487+350
Sta 487+400
Sta 487+450
Sta 487+500
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ATA
2005
ATA
R 2005
HAL. 6 - 1
BAR
:
visi
RDANA
OR
PERBATASAN
SUMUT
Sta 491+300
Sta 491+350
Sta 491+400
Sta 491+450
Sta 491+500
Sta 491+550
Sta 491+600
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
R 2005
HAL. 6 - 2
BAR
Sta 490+550
Sta 490+600
Sta 490+650
Sta 490+700
Sta 490+750
Sta 490+800
Sta 490+850
MEDAN
:
visi
RDANA
OR
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
R 2005
ATA
R 2005
HAL. 6 - 3
BAR
Sta 489+800
Sta 489+850
Sta 489+900
Sta 489+950
Sta 490+000
Sta 490+050
Sta 490+100
MEDAN
:
visi
RDANA
OR
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
R 2005
BAR
HAL. 6 - 4
BAR
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
Sta 489+250
Sta 489+300
Sta 489+350
MEDAN
:
visi
RDANA
OR
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
2005
BAR
HAL. 6 - 1
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
Sta 489+250
Sta 489+300
Sta 489+350
MEDAN
:
visi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
OR
ATA
2005
HAL. 6 - 2
BAR
Sta 488+300
Sta 488+350
Sta 488+400
Sta 488+450
Sta 488+500
Sta 488+550
Sta 488+600
MEDAN
:
visi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
OR
ATA
2005
HAL. 6 - 3
BAR
Sta 487+550
Sta 487+600
Sta 487+650
Sta 487+700
Sta 487+750
Sta 487+800
MEDAN
Sta 487+850
:
visi
RDANA
OR
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 2
BULANPROVINSI
: AGUSTUSNANGGROE
2005
DINAS PRASARANA WILAYAH
ACEH DARUSSALAM
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
HAL 8
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
491 + 600
m 0,1
491
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
490 + 900
Timbunan Pilihan
m 0,1
'm 6
m 0,4 m 1,5
LEBAR
600
m 1,5 m 0,4
3.00
0.15
75.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
75.00
50.00
2
491
550
3.00
50.00
491
500
3.00
50.00
491
450
3.00
491
400
3.00
50.00
50.00
6
491
350
3.00
50.00
491
300
3.00
491
250
3.00
50.00
50.00
9
491
200
3.00
50.00
10
491
150
3.00
50.00
11
491
100
3.00
50.00
12
491
050
3.00
50.00
13
491
000
3.00
50.00
14
490
950
3.00
50.00
15
490
900
3.00
Jumlah 8 - 1
700.00 M1
2,025.00
1
Jumlah Lalu
- M
1
Jumlah Total
700.00 M
2,025.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
HAL 8
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
490 + 900
m 0,1
490
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
490 + 200
Timbunan Pilihan
m 0,1
'm 6
m 0,4 m 1,5
16
LEBAR
900
m 1,5 m 0,4
3.00
0.15
75.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
50.00
17
490
850
3.00
18
490
800
3.00
50.00
50.00
19
490
750
3.00
50.00
20
490
700
3.00
50.00
21
490
650
3.00
50.00
22
490
600
3.00
50.00
23
490
550
3.00
50.00
24
490
500
3.00
50.00
25
490
450
3.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
75.00
50.00
26
490
400
3.00
27
490
350
3.00
50.00
50.00
28
490
300
3.00
50.00
29
490
250
3.00
50.00
30
490
200
3.00
Jumlah 8 - 2
700.00 M1
2,100.00
Jumlah Lalu
700.00 M1
2,025.00
1
Jumlah Total
1,400.00 M
4,125.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
HAL 8
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
490 + 200
m 0,1
490
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
489 + 500
Timbunan Pilihan
m 0,1
'm 6
m 0,4 m 1,5
31
LEBAR
200
m 1,5 m 0,4
3.00
0.15
75.00
0.15
150.00
50.00
32
490
150
3.00
50.00
33
490
100
3.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
75.00
50.00
34
490
050
3.00
50.00
35
490
000
3.00
50.00
36
489
950
3.00
50.00
37
489
900
3.00
38
489
850
3.00
50.00
50.00
39
489
800
3.00
50.00
40
489
750
3.00
41
489
700
3.00
50.00
50.00
42
489
650
3.00
50.00
43
489
600
3.00
50.00
44
489
550
3.00
50.00
45
489
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
500
3.00
Jumlah 8 - 3
700.00 M1
2,100.00
1
Jumlah Lalu
1,400.00 M
4,125.00
Jumlah Total
2,100.00 M1
6,225.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
HAL 8
No
S TAT I O N E R
LEBAR
JARAK
TEBAL
LUAS
M1
M1
s/d
489 + 000
M1
M2
Laston AC-WC
STA
Aspal Lama
489 + 500
m 0,1
Timbunan Pilihan
m 0,1
'm 6
m 0,4 m 1,5
m 1,5 m 0,4
46
489
500
3.00
47
489
450
3.00
0.15
75.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
75.00
50.00
50.00
48
489
400
3.00
50.00
49
489
350
3.00
50
489
300
3.00
50.00
50.00
51
489
250
3.00
50.00
52
489
200
3.00
50.00
53
489
150
3.00
50.00
54
489
100
3.00
50.00
55
489
050
3.00
50.00
56
489
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
000
3.00
Jumlah 8 - 4
500.00 M1
1,500.00
1
Jumlah Lalu
2,100.00 M
6,225.00
1
Jumlah Total MC - 3
2,600.00 M
7,725.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
HAL 8
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
489 + 000
m 0,1
489
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
488 + 300
Timbunan Pilihan
m 0,1
'm 6
m 0,4 m 1,5
LEBAR
000
m 1,5 m 0,4
3.00
0.15
75.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
75.00
50.00
2
488
950
3.00
488
900
3.00
50.00
50.00
4
488
850
3.00
50.00
488
800
3.00
50.00
489
750
3.00
50.00
489
700
3.00
50.00
489
650
3.00
50.00
489
600
3.00
50.00
10
489
550
3.00
11
489
500
3.00
50.00
50.00
12
488
450
3.00
50.00
13
488
400
3.00
14
488
350
3.00
50.00
50.00
15
488
300
Jumlah 8 - 1
3.00
700.00 M1
2,100.00
Jumlah Lalu MC - 3
2,600.00 M1
7,725.00
1
Jumlah Total
3,300.00 M
9,825.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
HAL 8
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
488 + 300
m 0,1
488
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
487 + 600
Timbunan Pilihan
m 0,1
'm 6
m 0,4 m 1,5
LEBAR
300
m 1,5 m 0,4
3.00
0.15
75.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
50.00
2
488
250
3.00
50.00
488
200
3.00
50.00
488
150
3.00
50.00
488
100
3.00
50.00
488
050
3.00
488
000
3.00
50.00
50.00
8
487
950
3.00
50.00
487
900
3.00
10
487
850
3.00
50.00
50.00
11
487
800
3.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
75.00
50.00
12
487
750
3.00
13
487
700
3.00
50.00
50.00
14
487
650
3.00
50.00
15
487
600
3.00
Jumlah 8 - 2
700.00 M1
2,100.00
1
Jumlah Lalu
3,300.00 M
9,825.00
1
Jumlah Total
4,000.00 M
11,925.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 3.2(2)
: Timbunan Pilihan
: Jalan Banda Aceh - Medan
HAL 8
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
490 + 900
m 0,1
LEBAR
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
490 + 300
Timbunan Pilihan
m 0,1
'm 6
m 0,4 m 1,5
m 1,5 m 0,4
16
487
600
3.00
17
487
550
3.00
0.15
75.00
0.15
150.00
0.15
150.00
50.00
50.00
18
487
500
3.00
50.00
19
487
450
3.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
150.00
0.15
100.50
0.15
25.50
50.00
20
487
400
3.00
50.00
21
487
350
3.00
50.00
22
487
300
3.00
50.00
23
487
250
3.00
24
487
200
3.00
50.00
17.00
25
487
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Aspal
LastonLama
AC-WC
183
3.00
Jumlah 8 - 3
417.00 M1
1,251.00
Jumlah Lalu
4,000.00 M1
11,925.00
Jumlah Total MC - 4
4,417.00 M1
13,176.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
6
BACK'mUP
DATA
MC. No. 4
BULAN : OKTOBER 2005
ARMAN SUROSO
GENERAL SUPERINTENDENT
Timbunan Pilihan
HAL 8 - 1
VOL
M3
Timbunan Pilihan
11.25
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
11.25
315.00
315.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 8 - 2
VOL
M3
Timbunan Pilihan
11.25
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
K
9
1
L
0
a
e
msl
m
a't
os'
n
A
B
A
C
W
B
C
22.50
22.50
22.50
22.50
22.50
11.25
315.00
315.00
630.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 8 - 3
VOL
M3
Timbunan Pilihan
11.25
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
11.25
315.00
630.00
945.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 8 - 4
VOL
M3
Timbunan Pilihan
11.25
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
11.25
225.00
945.00
1,170.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 8 - 1
VOL
M3
Timbunan Pilihan
11.25
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
11.25
315.00
1,170.00
1,485.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 8 - 2
VOL
M3
Timbunan Pilihan
11.25
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
11.25
315.00
1,485.00
1,800.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 8 - 3
VOL
M3
Timbunan Pilihan
11.25
22.50
22.50
22.50
22.50
22.50
22.50
22.50
15.08
3.83
187.65
1,800.00
1,987.65
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
Timbunan Pilihan
BACK UP DATA
MC. No. 2
BULANPROVINSI
: AGUSTUSNANGGROE
2005
DINAS PRASARANA WILAYAH
ACEH DARUSSALAM
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
491 + 600
m 0,1
491
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
490 + 900
m 0,1
'm 6
m 0,4 m 1,5
LEBAR
600
m 1,5 m 0,4
3.00
0.10
75.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
75.00
50.00
2
491
550
3.00
50.00
491
500
3.00
50.00
491
450
3.00
491
400
3.00
50.00
50.00
6
491
350
3.00
50.00
491
300
3.00
491
250
3.00
50.00
50.00
9
491
200
3.00
50.00
10
491
150
3.00
50.00
11
491
100
3.00
50.00
12
491
050
3.00
50.00
13
491
000
3.00
50.00
14
490
950
3.00
50.00
15
490
900
3.00
Jumlah 8 - 1
650.00 M1
2,025.00
1
Jumlah Lalu
- M
1
Jumlah Total
650.00 M
2,025.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
490 + 900
m 0,1
490
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
490 + 300
m 0,1
'm 6
m 0,4 m 1,5
16
LEBAR
900
m 1,5 m 0,4
3.00
0.10
75.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
50.00
17
490
850
3.00
18
490
800
3.00
50.00
50.00
19
490
750
3.00
50.00
20
490
700
3.00
50.00
21
490
650
3.00
50.00
22
490
600
3.00
50.00
23
490
550
3.00
50.00
24
490
500
3.00
50.00
25
490
450
3.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
75.00
50.00
26
490
400
3.00
27
490
350
3.00
50.00
50.00
28
490
300
3.00
50.00
29
490
250
3.00
50.00
30
490
200
3.00
Jumlah 8 - 2
700.00 M1
2,100.00
Jumlah Lalu
650.00 M1
2,025.00
1
Jumlah Total MC - 3
1,350.00 M
4,125.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
490 + 900
m 0,1
490
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
490 + 300
m 0,1
'm 6
m 0,4 m 1,5
31
LEBAR
200
m 1,5 m 0,4
3.00
0.10
75.00
0.10
150.00
50.00
32
490
150
3.00
50.00
33
490
100
3.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
75.00
50.00
34
490
050
3.00
50.00
35
490
000
3.00
50.00
36
489
950
3.00
50.00
37
489
900
3.00
38
489
850
3.00
50.00
50.00
39
489
800
3.00
50.00
40
489
750
3.00
41
489
700
3.00
50.00
50.00
42
489
650
3.00
50.00
43
489
600
3.00
50.00
44
489
550
3.00
50.00
45
489
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
500
3.00
Jumlah 8 - 1
700.00 M1
2,100.00
1
Jumlah Lalu MC - 3
1,350.00 M
4,125.00
Jumlah Total
2,050.00 M1
6,225.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8
No
S TAT I O N E R
LEBAR
JARAK
TEBAL
LUAS
M1
M1
s/d
490 + 300
M1
M2
Laston AC-WC
STA
Aspal Lama
490 + 900
m 0,1
m 0,1
'm 6
m 0,4 m 1,5
m 1,5 m 0,4
46
489
500
3.00
47
489
450
3.00
0.10
75.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
75.00
50.00
50.00
48
489
400
3.00
50.00
49
489
350
3.00
50
489
300
3.00
50.00
50.00
51
489
250
3.00
50.00
52
489
200
3.00
50.00
53
489
150
3.00
50.00
54
489
100
3.00
50.00
55
489
50
3.00
50.00
56
489
000
3.00
50.00
57
488
950
3.00
58
488
900
3.00
50.00
50.00
59
488
850
3.00
50.00
60
488
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
800
3.00
Jumlah 8 - 2
700.00 M1
2,100.00
1
Jumlah Lalu
2,050.00 M
6,225.00
1
Jumlah Total
2,750.00 M
8,325.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
490 + 900
m 0,1
488
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
490 + 300
m 0,1
'm 6
m 0,4 m 1,5
61
LEBAR
800
m 1,5 m 0,4
3.00
0.10
75.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
75.00
50.00
62
488
750
3.00
63
488
700
3.00
50.00
50.00
64
488
650
3.00
50.00
65
488
600
3.00
50.00
66
488
550
3.00
50.00
67
488
500
3.00
50.00
68
488
450
3.00
50.00
69
488
400
3.00
50.00
70
488
350
3.00
71
488
300
3.00
50.00
50.00
72
488
250
3.00
50.00
73
488
200
3.00
74
488
150
3.00
50.00
50.00
75
488
100
Jumlah 8 - 3
3.00
700.00 M1
2,100.00
Jumlah Lalu
2,750.00 M1
8,325.00
1
Jumlah Total
3,450.00 M
10,425.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
490 + 900
m 0,1
488
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
490 + 300
m 0,1
'm 6
m 0,4 m 1,5
76
LEBAR
100
m 1,5 m 0,4
3.00
0.10
75.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
50.00
77
488
050
3.00
50.00
78
488
000
3.00
50.00
79
487
950
3.00
50.00
80
487
900
3.00
50.00
81
487
850
3.00
82
487
800
3.00
50.00
50.00
83
487
750
3.00
50.00
84
487
700
3.00
85
487
650
3.00
50.00
50.00
86
487
600
3.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
150.00
0.10
75.00
50.00
87
487
550
3.00
88
487
500
3.00
50.00
50.00
89
487
450
3.00
50.00
90
487
400
3.00
Jumlah 8 - 4
700.00 M1
2,100.00
1
Jumlah Lalu
3,450.00 M
10,425.00
1
Jumlah Total MC - 4
4,150.00 M
12,525.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
490 + 900
m 0,1
LEBAR
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
490 + 300
m 0,1
'm 6
m 0,4 m 1,5
m 1,5 m 0,4
91
487
400
3.00
92
487
350
3.00
0.10
75.00
0.10
150.00
0.10
150.00
50.00
50.00
93
487
300
3.00
50.00
94
487
250
3.00
0.10
150.00
0.10
100.50
0.10
25.50
50.00
95
487
200
3.00
17.00
96
487
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
183
3.00
Jumlah 8 - 5
217.00 M1
651.00
Jumlah Lalu
4,150.00 M1
12,525.00
Jumlah Total
4,367.00 M1
13,176.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
HAL 8
No
S TAT I O N E R
LEBAR
JARAK
TEBAL
LUAS
M1
M1
M1
M2
Laston AC-WC
Pondasi Agregat Kelas B
Laston AC-WC
Aspal Lama
STA
490 + 900
m 0,1
Damar Tutong
Lhok Bhani
490 + 300
m 0,1
'm 6
m 0,4 m 1,5
s/d
m 1,5 m 0,4
KM 400 + 000
10.00
13.60
0.10
136.00
KM 2 + 400
10.00
13.60
0.10
136.00
Alue Lhok
KM 409 + 100
10.00
12.10
0.10
121.00
Alue Dua
KM 433 + 600
10.00
13.60
0.10
136.00
Nicah Awe
KM 343 + 500
10.00
13.60
0.10
136.00
Sarah Teube
KM 421 + 500
10.00
13.60
0.10
136.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 8 - 5
80.10 M1
801.00
1
Jumlah Lalu
4,367.00 M
13,176.00
1
Jumlah Total MC - 4
4,447.10 M
13,977.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 8 - 1
VOL
M3
Pondasi Agregat Kelas B
7.50
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
7.50
210.00
210.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 8 - 2
VOL
M3
Pondasi Agregat Kelas B
7.50
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
K
9
1
L
0
a
e
msl
m
a't
os'
n
A
B
A
C
W
B
C
15.00
15.00
15.00
15.00
15.00
7.50
210.00
210.00
420.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 8 - 1
VOL
M3
Pondasi Agregat Kelas B
7.50
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
7.50
210.00
420.00
630.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 8 - 2
VOL
M3
Pondasi Agregat Kelas B
7.50
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
7.50
210.00
630.00
840.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 8 - 3
VOL
M3
Pondasi Agregat Kelas B
7.50
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
7.50
210.00
840.00
1,050.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 8 - 4
VOL
M3
Pondasi Agregat Kelas B
7.50
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
7.50
210.00
1,050.00
1,260.00
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 8 - 5
VOL
M3
Pondasi Agregat Kelas B
7.50
15.00
15.00
15.00
10.05
2.55
65.10
1,260.00
1,325.10
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 8 - 5
VOL
M3
Pondasi Agregat Kelas B
13.60
13.60
12.10
13.60
13.60
13.60
80.10
1,325.10
1,405.20
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+850
Sta 490+900
Sta 490+950
Sta 491+000
Sta 491+050
Sta 491+100
Sta 491+150
Sta 491+200
Sta 491+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 4.2(2)
: Lapis Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+100
Sta 490+150
Sta 490+200
Sta 490+250
Sta 490+300
Sta 490+350
Sta 490+400
Sta 490+450
Sta 490+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ATA
2005
ATA
R 2005
HAL. 8 - 1
BAR
PERBATASAN
SUMUT
Sta 491+300
Sta 491+350
Sta 491+400
Sta 491+450
Sta 491+500
Sta 491+550
Sta 491+600
MEDAN
:
visi
RDANA
OR
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
R 2005
HAL. 8 - 2
BAR
:
visi
RDANA
OR
Sta 490+550
Sta 490+600
Sta 490+650
Sta 490+700
Sta 490+750
Sta 490+800
Sta 490+850
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+850
Sta 490+900
Sta 490+950
Sta 491+000
Sta 491+050
Sta 491+100
Sta 491+150
Sta 491+200
Sta 491+250
Sta 491+300
Sta 491+350
Sta 491+400
Sta 491+450
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+100
Sta 490+150
KOTA LANGSA
Sta 490+200
Sta 490+250
Sta 490+300
Sta 490+350
Sta 490+400
Sta 490+450
Sta 490+500
Sta 490+550
Sta 490+600
Sta 490+650
Sta 490+700
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 489+350
Sta 489+400
Sta 489+450
Sta 489+500
Sta 489+550
Sta 489+600
Sta 489+650
Sta 489+700
Sta 489+750
Sta 489+800
Sta 489+850
Sta 489+900
Sta 489+950
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 2
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 487+850
Sta 487+900
Sta 487+950
Sta 488+000
Sta 488+050
Sta 488+100
Sta 488+150
Sta 488+200
Sta 488+250
Sta 488+300
Sta 488+350
Sta 488+400
Sta 488+450
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
HAL. 11 - 1
ET/GAMBAR
PERBATASAN
SUMUT
Sta 491+500
Sta 491+550
Sta 491+600
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 11 - 2
ET/GAMBAR
Sta 490+750
Sta 490+800
MEDAN
Sta 490+850
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 11 - 3
ET/GAMBAR
Sta 490+000
Sta 490+050
Sta 490+100
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
ET/GAMBAR
HAL. 11 - 4
Sta 489+250
Sta 489+300
Sta 489+350
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 11 - 1
ET/GAMBAR
Sta 489+250
Sta 489+300
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
Sta 489+350
HAL. 11 - 2
ET/GAMBAR
Sta 488+500
Sta 488+550
Sta 488+600
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Resap Pengikat
STA
Aspal Lama
490 + 950
LEBAR
JARAK
M1
M1
s/d
490 + 400
KOEF
LUAS
M2
'm 6
490
950
5.80
0.80
145.00
0.80
287.50
0.80
287.50
0.80
287.00
0.80
287.50
0.80
295.00
0.80
295.00
0.80
282.50
0.80
141.25
50.00
2
490
900
5.75
50.00
490
850
5.75
50.00
490
800
5.74
490
750
5.75
50.00
50.00
6
490
700
5.90
50.00
490
650
5.90
490
600
5.65
50.00
50.00
9
490
550
5.65
10
490
500
1.20
29.00
0.80
34.80
11
490
500
1.50
1.00
0.80
1.50
12
490
450
2.70
6.00
0.80
16.20
13
490
450
1.00
1.20
0.80
1.20
14
490
400
3.00
25.00
0.80
75.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 11-1
462.20 M1
2,436.95
1
Jumlah Lalu MC - 2
350.00 M
1,777.75
1
Jumlah Total
812.20 M
4,214.70
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Resap Pengikat
STA
Aspal Lama
490 + 300
LEBAR
JARAK
M1
M1
s/d
489 + 400
KOEF
LUAS
M2
'm 6
15
490
300
3.00
15.00
0.80
45.00
16
490
250
3.00
35.00
0.80
105.00
17
490
200
3.00
50.00
0.80
150.00
18
490
150
5.83
50.00
0.80
291.50
19
490
100
3.00
50.00
0.80
150.00
20
490
050
3.00
50.00
0.80
150.00
21
489
950
5.70
50.00
0.80
285.00
22
489
900
3.00
50.00
0.80
150.00
23
489
800
5.53
50.00
0.80
276.50
24
489
750
5.53
50.00
0.80
276.50
25
489
550
3.00
15.00
0.80
45.00
26
489
500
3.00
25.00
0.80
75.00
27
489
500
3.00
35.00
0.80
105.00
28
489
450
5.65
0.80
113.00
0.80
116.00
50.00
29
489
400
5.80
Jumlah 11-2
575.00 M1
2,333.50
Jumlah Lalu
812.20 M1
4,214.70
1
Jumlah Total
1,387.20 M
6,548.20
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Resap Pengikat
STA
Aspal Lama
489 + 350
LEBAR
JARAK
M1
M1
s/d
488 + 600
KOEF
LUAS
M2
'm 6
30
489
400
5.80
0.80
116.00
0.80
117.00
50.00
31
489
350
5.85
32
489
300
3.00
50.00
0.80
150.00
33
489
250
3.00
50.00
0.80
150.00
34
489
200
3.00
50.00
0.80
150.00
35
489
150
1.62
2.26
0.80
3.66
36
489
150
0.30
1.70
0.80
0.51
37
489
150
2.72
2.30
0.80
6.26
38
489
100
5.90
12.95
0.80
76.41
39
489
050
5.86
15.00
0.80
87.90
40
489
000
5.86
0.80
293.00
0.80
292.50
25.00
50.00
41
488
950
5.85
25.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 11-3
334.21 M1
1,443.24
1
Jumlah Lalu
1,387.20 M
6,548.20
Jumlah Total MC - 3
1,721.41 M1
7,991.44
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
Aspal
Laston
Lama
AC-BC
ARMAN SUROSO
GENERAL SUPERINTENDEN
'm 6
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
LEBAR
JARAK
KOEF
LUAS
M1
M1
s/d
488 + 600
M2
Resap Pengikat
STA
Aspal Lama
489 + 350
'm 6
488
900
5.80
15.00
0.80
87.00
488
600
3.00
40.00
0.80
120.00
487
950
5.85
0.80
117.00
0.80
116.00
50.00
4
487
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
900
5.80
Jumlah 11-3
105.00 M1
440.00
1
Jumlah Lalu
1,721.41 M
7,991.44
1
Jumlah Total MC - 3
1,826.41 M
8,431.44
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Resap Pengikat
STA
Aspal Lama
488 + 200
LEBAR
JARAK
M1
M1
s/d
488 + 850
KOEF
LUAS
M2
'm 6
488
900
5.80
0.80
145.00
0.80
145.00
50.00
2
488
850
5.80
488
800
3.00
50.00
0.80
150.00
488
750
3.00
50.00
0.80
150.00
488
600
5.96
0.80
149.00
0.80
297.50
0.80
150.00
0.80
147.50
0.80
295.00
0.80
148.75
50.00
6
488
550
5.95
50.00
488
500
6.00
488
300
5.90
50.00
488
250
5.90
10
488
200
5.95
50.00
Jumlah 11-1
350.00 M1
1,777.75
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah Lalu
- M1
1
Jumlah Total MC - 2
350.00 M
1,777.75
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Resap Pengikat
STA
Aspal Lama
489 + 350
LEBAR
JARAK
M1
M1
s/d
488 + 600
KOEF
LUAS
M2
'm 6
487
900
5.80
0.80
116.00
0.80
116.00
50.00
2
487
850
5.80
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 11-1
50.00 M1
232.00
1
Jumlah Lalu MC - 3
1,826.41 M
8,431.44
1
Jumlah Total
1,876.41 M
8,663.44
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 6.1(1)
: Lapis Resap Pengikat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Laston AC-BC
Aspal Lama
STA
489 + 600
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
490 + 200
'm 6
Nicah Awe
10.00
9.60
0.80
76.80
Damar Tutong
10.00
9.60
0.80
76.80
Alue Lhok
9.00
8.10
0.80
58.32
Sarah Teube
10.00
9.60
0.80
76.80
Alue Dua
10.00
9.60
0.80
76.80
Lhok Bhani
10.00
9.60
0.80
76.80
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 11-2
56.10 M1
442.32
Jumlah Lalu
1,876.41 M1
8,663.44
Jumlah Total MC - 4
1,932.51 M1
9,105.76
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
HAL 11 - 1
VOL
LITER
116.00
230.00
230.00
229.60
230.00
236.00
236.00
226.00
113.00
27.84
1.20
12.96
0.96
60.00
1,949.56
1,422.20
3,371.76
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 11 - 2
VOL
LITER
36.00
84.00
120.00
233.20
120.00
120.00
228.00
120.00
221.20
K
9
1
L
0
a
e
m
sl
m
a't
o
s'
n
A
B
A
C
W
B
C
221.20
36.00
60.00
84.00
90.40
92.80
1,866.80
3,371.76
5,238.56
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 11 - 3
VOL
LITER
92.80
93.60
120.00
120.00
120.00
2.93
0.41
5.01
61.13
70.32
234.40
234.00
1,154.59
5,238.56
6,393.15
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 11 - 3
VOL
LITER
69.60
96.00
93.60
92.80
352.00
6,393.15
6,745.15
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 11 - 1
VOL
LITER
116.00
116.00
120.00
120.00
119.20
238.00
120.00
118.00
236.00
119.00
1,422.20
1,422.20
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 11 - 1
VOL
LITER
92.80
92.80
185.60
6,745.15
6,930.75
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 11 - 2
VOL
LITER
61.44
61.44
46.66
61.44
61.44
61.44
353.86
6,930.75
7,284.61
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+850
Sta 490+900
Sta 490+950
Sta 491+000
Sta 491+050
Sta 491+100
Sta 491+150
Sta 491+200
Sta 491+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+100
Sta 490+150
Sta 490+200
Sta 490+250
Sta 490+300
Sta 490+350
Sta 490+400
Sta 490+450
Sta 490+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
Lokasi
SKET/GAMBAR
Sta 489+350
Sta 489+400
Sta 489+450
Sta 489+500
Sta 489+550
Sta 489+600
Sta 489+650
Sta 489+700
Sta 489+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 487+850
Sta 487+900
Sta 487+950
Sta 488+000
Sta 488+050
Sta 488+100
Sta 488+150
Sta 488+200
Sta 488+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 487+100
Sta 487+150
KOTA LANGSA
Sta 487+200
Sta 487+250
Sta 487+300
Sta 487+350
Sta 487+400
Sta 487+450
Sta 487+500
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 486+350
Sta 486+400
Sta 486+450
Sta 486+500
Sta 486+550
Sta 486+600
Sta 486+650
Sta 486+700
Sta 486+750
KOTA LANGSA
Diperiksa Oleh :
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 485+600
Sta 485+650
Sta 485+700
Sta 485+750
Sta 485+800
Sta 485+850
Sta 485+900
Sta 485+950
Sta 486+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 484+850
Sta 484+900
Sta 484+950
Sta 485+000
Sta 485+050
Sta 485+100
Sta 485+150
Sta 485+200
Sta 485+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 484+100
Sta 484+150
Sta 484+200
Sta 484+250
Sta 484+300
Sta 484+350
Sta 484+400
Sta 484+450
Sta 484+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 483+350
Sta 483+400
Sta 483+450
Sta 483+500
Sta 483+550
Sta 483+600
Sta 483+650
Sta 483+700
Sta 483+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 482+600
Sta 482+650
Sta 482+700
Sta 482+750
Sta 482+800
Sta 482+850
Sta 482+900
Sta 482+950
Sta 483+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 481+850
Sta 481+900
Sta 481+950
Sta 482+000
Sta 482+050
Sta 482+100
Sta 482+150
Sta 482+200
Sta 482+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 481+100
Sta 481+150
KOTA LANGSA
Sta 481+200
Sta 481+250
Sta 481+300
Sta 481+350
Sta 481+400
Sta 481+450
Sta 481+500
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 480+350
Sta 480+400
KOTA LANGSA
Sta 480+450
Sta 480+500
Sta 480+550
Sta 480+600
Sta 480+650
Sta 480+700
Sta 480+750
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 487+850
Sta 487+900
Sta 487+950
Sta 488+000
Sta 488+050
Sta 488+100
Sta 488+150
Sta 488+200
Sta 488+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 480+350
Sta 480+400
Sta 480+450
Sta 480+500
Sta 480+550
Sta 480+600
Sta 480+650
Sta 480+700
Sta 480+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 479+600
Sta 479+650
Sta 479+700
Sta 479+750
Sta 479+800
Sta 479+850
Sta 479+900
Sta 479+950
Sta 480+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 478+850
Sta 478+900
Sta 478+950
Sta 479+000
Sta 479+050
Sta 479+100
Sta 479+150
Sta 479+200
Sta 479+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 478+100
Sta 478+150
Sta 478+200
Sta 478+250
Sta 478+300
Sta 478+350
Sta 478+400
Sta 478+450
Sta 478+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 477+350
Sta 477+400
Sta 477+450
Sta 477+500
Sta 477+550
Sta 477+600
Sta 477+650
Sta 477+700
Sta 477+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 476+600
Sta 476+650
KOTA LANGSA
Sta 476+700
Sta 476+750
Sta 476+800
Sta 476+850
Sta 476+900
Sta 476+950
Sta 477+000
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 475+850
Sta 475+900
Sta 475+950
Sta 476+000
Sta 476+050
Sta 476+100
Sta 476+150
Sta 476+200
Sta 476+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 475+100
Sta 475+150
Sta 475+200
Sta 475+250
Sta 475+300
Sta 475+350
Sta 475+400
Sta 475+450
Sta 475+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 474+350
Sta 474+400
Sta 474+450
Sta 474+500
Sta 474+550
Sta 474+600
Sta 474+650
Sta 474+700
Sta 474+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
DATA
3
BER 2005
HAL. 12 - 15
MBAR
PERBATASAN
SUMUT
Sta 491+300
Sta 491+350
Sta 491+400
Sta 491+450
Sta 491+500
Sta 491+550
Sta 491+600
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 12 - 14
MBAR
Sta 490+550
Sta 490+600
Sta 490+650
Sta 490+700
Sta 490+750
Sta 490+800
Sta 490+850
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 12 - 13
MBAR
Sta 489+800
Sta 489+850
Sta 489+900
Sta 489+950
Sta 490+000
Sta 490+050
Sta 490+100
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
MBAR
HAL. 12 - 12
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
Sta 489+250
Sta 489+300
Sta 489+350
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 12 - 11
MBAR
Sta 488+300
Sta 488+350
Sta 488+400
Sta 488+450
Sta 488+500
Sta 488+550
Sta 488+600
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 12 - 10
MBAR
Sta 487+550
Sta 487+600
Sta 487+650
Sta 487+700
Sta 487+750
Sta 487+800
MEDAN
Sta 487+850
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 12 - 9
MBAR
eh :
Sta 486+800
Sta 486+850
Sta 486+900
Sta 486+950
Sta 487+000
Sta 487+050
MEDAN
Dibuat Oleh :
Sta 487+100
ervisi
ERDANA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 12 - 8
MBAR
Sta 486+050
Sta 486+100
Sta 486+150
Sta 486+200
Sta 486+250
Sta 486+300
Sta 486+350
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 12 - 7
MBAR
Sta 485+300
Sta 485+350
Sta 485+400
Sta 485+450
Sta 485+500
Sta 485+550
Sta 485+600
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 12 - 6
MBAR
Sta 484+550
Sta 484+600
Sta 484+650
Sta 484+700
Sta 484+750
Sta 484+800
Sta 484+850
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
DATA
3
BER 2005
HAL. 12 - 5
MBAR
Sta 483+800
Sta 483+850
Sta 483+900
Sta 483+950
Sta 484+000
Sta 484+050
Sta 484+100
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
MBAR
HAL. 12 - 4
Sta 483+050
Sta 483+100
Sta 483+150
Sta 483+200
Sta 483+250
Sta 483+300
Sta 483+350
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 12 - 3
MBAR
Sta 482+300
Sta 482+350
Sta 482+400
Sta 482+450
Sta 482+500
Sta 482+550
Sta 482+600
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 12 - 2
MBAR
Sta 481+550
Sta 481+600
Sta 481+650
Sta 481+700
Sta 481+750
Sta 481+800
Sta 481+850
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 12 - 1
MBAR
Sta 480+800
Sta 480+850
Sta 480+900
Sta 480+950
Sta 481+000
Sta 481+050
MEDAN
Sta 481+100
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
US 2005
HAL. 12 - 12
MBAR
eh :
ervisi
ERDANA
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
Sta 489+250
Sta 489+300
Sta 489+350
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
2
US 2005
HAL. 12 - 11
MBAR
Sta 488+300
Sta 488+350
Sta 488+400
Sta 488+450
Sta 488+500
Sta 488+550
Sta 488+600
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
2
US 2005
HAL. 12 - 10
MBAR
Sta 480+800
Sta 480+850
Sta 480+900
Sta 480+950
Sta 481+000
Sta 481+050
Sta 481+100
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 12 - 9
MBAR
Sta 480+050
Sta 480+100
Sta 480+150
Sta 480+200
Sta 480+250
Sta 480+300
Sta 480+350
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 12 - 8
MBAR
Sta 479+300
Sta 479+350
Sta 479+400
Sta 479+450
Sta 479+500
Sta 479+550
Sta 479+600
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
MBAR
HAL. 12 - 7
Sta 478+550
Sta 478+600
Sta 478+650
Sta 478+700
Sta 478+750
Sta 478+800
Sta 478+850
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 12 - 6
MBAR
Sta 477+800
Sta 477+850
Sta 477+900
Sta 477+950
Sta 478+000
Sta 478+050
MEDAN
Sta 478+100
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 12 - 5
MBAR
Sta 477+050
Sta 477+100
Sta 477+150
Sta 477+200
Sta 477+250
Sta 477+300
MEDAN
Sta 477+350
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 12 - 4
MBAR
eh :
ervisi
ERDANA
Sta 476+300
Sta 476+350
Sta 476+400
Sta 476+450
Sta 476+500
Sta 476+550
Sta 476+600
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 12 - 3
MBAR
Sta 475+550
Sta 475+600
Sta 475+650
Sta 475+700
Sta 475+750
Sta 475+800
Sta 475+850
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 12 - 2
MBAR
Sta 474+800
Sta 474+850
Sta 474+900
Sta 474+950
Sta 475+000
Sta 475+050
Sta 475+100
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 12 - 1
MBAR
KOTA KUALA
SIMPANG
Sta 474+000
Sta 474+050
Sta 474+150
Sta 474+200
Sta 474+250
Sta 474+300
Sta 474+350
KOTA LANGSA
MEDAN
eh :
ervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
476+ 500
LEBAR
JARAK
M1
M1
s/d
474 + 250
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
474
250
0.90
1.87
0.40
1.68
474
250
2.40
43.80
0.40
105.12
474
500
1.44
1.76
0.40
2.53
474
700
0.70
1.00
0.40
0.70
474
750
1.00
1.10
0.40
1.10
474
800
1.50
6.10
0.40
9.15
474
850
1.20
5.00
0.40
6.00
475
300
2.00
24.20
0.40
48.40
475
450
2.00
2.60
0.40
5.20
10
475
500
2.00
14.40
0.40
28.80
11
476
050
2.40
0.80
0.40
1.92
12
476
050
1.60
0.80
0.40
1.28
13
476
050
0.80
0.80
0.40
0.64
14
476
450
1.20
24.00
0.40
28.80
15
476
500
1.60
23.00
0.40
36.80
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 12 - 1
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
151.23 M1
- M1
151.23 M1
278.12
###
278.12
Dibuat Oleh :
PT. BAHTERA KARANG RAY
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
478 + 000
LEBAR
JARAK
M1
M1
s/d
476 + 550
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
16
476
550
1.60
40.00
0.40
64.00
17
476
600
1.80
11.50
0.40
20.70
18
477
050
2.00
27.82
0.40
55.64
19
477
050
1.00
0.56
0.40
0.56
20
477
050
1.00
1.64
0.40
1.64
21
477
100
2.70
20.76
0.40
56.05
22
477
450
2.10
9.44
0.40
19.82
23
477
550
2.33
8.73
0.40
20.34
24
477
550
2.23
6.03
0.40
13.45
25
477
550
2.63
12.10
0.40
31.82
26
477
600
2.60
12.80
0.40
33.28
27
477
600
2.33
10.00
0.40
23.30
28
477
700
3.94
37.65
0.40
148.34
29
477
950
2.78
42.00
0.40
116.76
30
478
000
2.70
25.15
0.40
67.91
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 12 - 2
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
266.18 M1
151.23 M1
417.41 M1
673.61
278.12
951.73
Dibuat Oleh :
PT. BAHTERA KARANG RAY
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
480+ 300
LEBAR
JARAK
M1
M1
s/d
478 + 200
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
31
478
200
2.70
27.70
0.40
74.79
32
478
300
2.70
5.26
0.40
14.20
33
478
350
2.70
11.80
0.40
31.86
34
478
650
2.85
3.10
0.40
8.84
35
478
650
2.50
0.83
0.40
2.08
36
478
250
2.90
2.72
0.40
7.89
37
479
300
2.90
6.85
0.40
19.87
38
479
300
1.30
3.10
0.40
4.03
39
479
750
2.90
22.86
0.40
66.29
40
479
950
1.02
7.99
0.40
8.15
41
479
950
0.63
2.40
0.40
1.51
42
479
950
3.53
1.23
0.40
4.34
43
479
950
3.82
0.94
0.40
3.59
44
480
100
3.30
11.85
0.40
39.11
45
480
350
3.52
31.80
0.40
111.94
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 12 - 3
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
140.43 M1
417.41 M1
557.84 M1
398.49
951.73
1,350.22
Dibuat Oleh :
PT. BAHTERA KARANG RAY
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
LEBAR
JARAK
KOEF
VOLUME
M1
M1
M2
s/d
488 + 200
Lapisan Perekat
STA
Aspal Lama
488+ 800
Agregat Kelas A
'm 6
46
488
200
0.96
2.20
0.40
2.11
47
488
300
1.93
2.85
0.40
5.50
48
488
300
1.46
0.97
0.40
1.42
49
488
300
1.57
5.30
0.40
8.32
50
488
350
0.95
1.00
0.40
0.95
51
488
350
1.85
15.58
0.40
28.82
52
488
400
1.30
2.90
0.40
3.77
53
488
550
1.82
9.58
0.40
17.44
54
488
750
1.99
11.71
0.40
23.30
55
488
750
1.90
11.15
0.40
21.19
56
488
750
1.71
9.70
0.40
16.59
57
488
750
3.33
9.72
0.40
32.37
58
488
750
1.63
3.35
0.40
5.46
59
488
750
3.16
1.16
0.40
3.67
60
488
800
0.90
1.20
0.40
1.08
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 12 - 4
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
88.37 M1
557.84 M1
646.21 M1
171.99
1,350.22
1,522.21
Dibuat Oleh :
PT. BAHTERA KARANG RAY
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
488+ 850
LEBAR
JARAK
M1
M1
s/d
488 + 800
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
61
488
800
1.50
15.20
0.40
22.80
62
488
800
4.53
9.42
0.40
42.67
63
488
850
4.53
5.30
0.40
24.01
64
488
850
2.95
0.85
0.40
2.51
65
488
850
2.80
9.95
0.40
27.86
66
488
850
1.97
10.00
0.40
19.70
67
488
850
1.65
11.80
0.40
19.47
68
488
850
3.37
4.27
0.40
14.39
Jumlah 12 - 5
66.79 M1
173.41
Jumlah Lalu
Jumlah MC - 2
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
646.21 M1
713.00 M1
MARWAN, BE
CHIEF INSPECTOR
1,522.21
1,695.62
Dibuat Oleh :
PT. BAHTERA KARANG RAY
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
480+ 450
LEBAR
JARAK
M1
M1
s/d
482 + 600
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
480
450
1.39
4.44
0.40
6.17
480
500
2.90
31.95
0.40
92.66
481
000
2.75
16.90
0.40
46.48
481
500
2.57
5.10
0.40
13.11
481
550
0.66
0.80
0.40
0.53
481
550
1.20
0.30
0.40
0.36
481
750
2.92
9.30
0.40
27.16
481
800
2.95
24.07
0.40
71.01
481
850
2.82
11.83
0.40
33.36
10
481
900
3.00
37.35
0.40
112.05
11
481
950
2.70
29.30
0.40
79.11
12
482
500
1.63
8.26
0.40
13.46
13
482
550
2.80
19.03
0.40
53.28
14
482
550
2.80
18.03
0.40
50.48
15
482
600
2.30
3.45
0.40
7.94
Jumlah 12 - 1
Jumlah Lalu MC - 2
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
220.11 M1
713.00 M1
933.11 M1
MARWAN, BE
CHIEF INSPECTOR
607.16
1,695.62
2,302.78
Dibuat Oleh :
PT. BAHTERA KARANG RAY
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
482+ 650
LEBAR
JARAK
M1
M1
s/d
483 + 150
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
16
482
650
2.90
21.50
0.40
62.35
17
482
700
3.20
45.60
0.40
145.92
18
482
750
1.50
1.80
0.40
2.70
19
482
750
0.30
2.10
0.40
0.63
20
482
750
1.45
1.72
0.40
2.49
21
482
750
0.82
2.14
0.40
1.75
22
482
800
0.82
4.43
0.40
3.63
23
482
850
2.70
18.83
0.40
50.84
24
482
900
2.97
2.40
0.40
7.13
25
482
900
0.44
3.70
0.40
1.63
26
482
900
2.88
16.30
0.40
46.94
27
482
950
2.85
6.97
0.40
19.86
28
482
950
2.79
8.10
0.40
22.60
29
483
050
2.65
36.60
0.40
96.99
30
483
150
1.35
6.20
0.40
8.37
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 12 - 2
178.39 M1
473.83
Jumlah Lalu
933.11 M1
2,302.78
Jumlah Total
1,111.50 M1
2,776.61
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
LEBAR
JARAK
M1
M1
KOEF
VOLUME
M2
Lapisan Perekat
STA
Aspal Lama
483+ 350
s/d
485 + 050
Agregat Kelas A
'm 6
31
483
350
2.10
4.00
0.40
8.40
32
483
350
1.89
6.79
0.40
12.83
33
483
400
1.73
2.73
0.40
4.72
34
483
500
3.15
22.80
0.40
71.82
35
483
500
1.69
1.45
0.40
2.45
36
483
550
1.93
7.30
0.40
14.09
37
483
600
1.90
6.30
0.40
11.97
38
483
600
1.67
3.37
0.40
5.63
39
483
650
1.40
6.10
0.40
8.54
40
483
700
1.40
32.00
0.40
44.80
41
483
850
1.30
6.30
0.40
8.19
42
484
050
1.60
4.95
0.40
7.92
43
484
150
1.05
2.00
0.40
2.10
44
484
450
1.00
3.58
0.40
3.58
45
485
050
1.85
17.25
0.40
31.91
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 12 - 3
126.92 M1
238.95
1
Jumlah Lalu
1,111.50 M
2,776.61
1
Jumlah Total
1,238.42 M
3,015.56
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
485+ 050
LEBAR
JARAK
M1
M1
s/d
485 + 550
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
46
485
050
3.70
2.60
0.40
9.62
47
485
100
3.47
9.10
0.40
31.58
48
485
200
1.20
26.40
0.40
31.68
49
485
250
1.10
5.06
0.40
5.57
50
485
450
0.60
8.90
0.40
5.34
51
485
450
1.30
7.34
0.40
9.54
52
485
450
1.20
9.85
0.40
11.82
53
485
450
1.60
6.05
0.40
9.68
54
485
450
1.00
7.08
0.40
7.08
55
485
500
1.60
5.00
0.40
8.00
56
485
500
1.30
3.95
0.40
5.14
57
485
500
2.10
5.60
0.40
11.76
58
485
500
0.50
0.60
0.40
0.30
59
485
550
0.65
0.80
0.40
0.52
60
485
550
1.15
15.40
0.40
17.71
Jumlah 12 - 4
Jumlah Lalu
Jumlah Total
113.73 M1
1,238.42 M1
1,352.15 M1
165.34
3,015.56
3,180.90
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAY
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
Aspal
Laston
Lama
AC-BC
'm 6
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
485+ 750
LEBAR
JARAK
M1
M1
s/d
486 + 050
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
61
485
750
0.70
5.50
0.40
3.85
62
485
750
1.00
8.20
0.40
8.20
63
485
750
0.80
1.66
0.40
1.33
64
485
800
3.10
3.89
0.40
12.06
65
485
800
0.70
1.40
0.40
0.98
66
485
800
1.00
12.20
0.40
12.20
67
485
800
0.80
12.00
0.40
9.60
68
485
800
3.50
4.85
0.40
16.98
69
486
050
2.20
3.10
0.40
6.82
70
486
050
4.33
0.62
0.40
2.68
71
486
050
0.87
3.30
0.40
2.87
72
486
050
0.90
0.60
0.40
0.54
73
486
050
1.20
4.30
0.40
5.16
74
486
050
0.73
7.16
0.40
5.23
75
486
050
3.64
0.48
0.40
1.75
Jumlah 12 - 5
69.26 M1
90.25
1
Jumlah Lalu
1,352.15 M
3,180.90
Jumlah Total
1,421.41 M1
3,271.15
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
Aspal
Laston
Lama
AC-BC
ARMAN SUROSO
GENERAL SUPERINTENDEN
'm 6
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
486+ 100
LEBAR
JARAK
M1
M1
s/d
486 + 400
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
76
486
100
0.73
7.71
0.40
5.63
77
486
150
0.80
8.90
0.40
7.12
78
486
150
0.55
3.10
0.40
1.71
79
486
150
1.50
0.70
0.40
1.05
80
486
150
0.71
6.40
0.40
4.54
81
486
200
0.70
0.70
0.40
0.49
82
486
200
2.30
0.55
0.40
1.27
83
486
200
0.90
2.65
0.40
2.39
84
486
250
1.40
6.08
0.40
8.51
85
486
250
0.36
6.08
0.40
2.19
86
486
300
0.70
11.00
0.40
7.70
87
486
300
0.40
8.50
0.40
3.40
88
486
400
0.99
11.88
0.40
11.76
89
486
400
0.99
17.10
0.40
16.93
90
486
400
0.80
6.22
0.40
4.98
Jumlah 12 - 6
97.57 M1
79.67
1
Jumlah Lalu
1,421.41 M
3,271.15
1
Jumlah Total
1,518.98 M
3,350.82
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
Aspal Lama
STA
486+ 450
LEBAR
JARAK
M1
M1
s/d
487 + 400
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
91
486
450
0.66
0.67
0.40
0.44
92
486
450
0.95
2.39
0.40
2.27
93
486
500
1.40
5.90
0.40
8.26
94
486
550
0.40
6.65
0.40
2.66
95
486
850
1.92
8.30
0.40
15.94
96
486
900
2.04
23.68
0.40
48.31
97
486
900
0.70
14.00
0.40
9.80
98
486
900
1.28
6.50
0.40
8.32
99
486
900
0.36
4.02
0.40
1.45
100
486
900
0.13
2.30
0.40
0.30
101
486
900
2.30
2.64
0.40
6.07
102
486
950
1.90
27.88
0.40
52.97
103
487
200
0.81
3.07
0.40
2.49
104
487
250
1.35
4.45
0.40
6.01
105
487
400
0.92
2.93
0.40
2.70
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 12 - 7
115.38 M1
167.99
1
Jumlah Lalu
1,518.98 M
3,350.82
Jumlah Total
1,634.36 M1
3,518.81
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
487+ 400
LEBAR
JARAK
M1
M1
s/d
487 + 850
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
106
487
400
0.90
1.40
0.40
1.26
107
487
450
1.83
9.60
0.40
17.57
108
487
450
2.20
1.70
0.40
3.74
109
487
450
2.20
10.60
0.40
23.32
110
487
450
4.40
8.45
0.40
37.18
111
487
500
1.33
3.30
0.40
4.39
112
487
500
1.90
16.29
0.40
30.95
113
487
500
3.57
7.01
0.40
25.03
114
487
500
1.94
10.40
0.40
20.18
115
487
550
2.54
3.67
0.40
9.32
116
487
550
2.10
5.37
0.40
11.28
117
487
600
1.85
16.70
0.40
30.90
118
487
750
2.13
9.24
0.40
19.68
119
487
850
2.10
7.80
0.40
16.38
120
487
850
3.93
10.60
0.40
41.66
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
Jumlah 12 - 8
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
122.13 M1
1,634.36 M1
1,756.49 M1
292.84
3,518.81
3,811.65
Dibuat Oleh :
PT. BAHTERA KARANG RAY
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
487+ 850
LEBAR
JARAK
M1
M1
s/d
488 + 150
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
121
487
850
1.20
2.10
0.40
2.52
122
487
850
1.90
7.06
0.40
13.41
123
487
850
4.60
6.63
0.40
30.50
124
487
850
4.60
16.66
0.40
76.64
125
487
850
0.80
30.00
0.40
24.00
126
487
900
0.80
19.00
0.40
15.20
127
487
900
1.93
20.50
0.40
39.57
128
487
900
1.00
7.74
0.40
7.74
129
487
900
0.77
6.90
0.40
5.31
130
487
950
2.49
0.88
0.40
2.19
131
487
950
1.30
9.00
0.40
11.70
132
488
150
2.88
7.31
0.40
21.05
133
488
150
1.30
1.20
0.40
1.56
134
488
150
1.66
9.94
0.40
16.50
135
488
150
2.88
8.67
0.40
24.97
Jumlah 12 - 9
153.59 M1
292.86
Jumlah Lalu
1,756.49 M1
3,811.65
Jumlah Total
1,910.08 M1
4,104.51
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 12
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
488+ 600
LEBAR
JARAK
M1
M1
s/d
489 + 100
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
136
488
600
1.20
1.50
0.40
1.80
137
488
600
0.60
2.30
0.40
1.38
138
488
600
1.50
0.35
0.40
0.53
139
488
600
1.23
1.45
0.40
1.78
140
488
600
0.83
0.80
0.40
0.66
141
489
050
3.37
27.45
0.40
92.51
142
489
100
2.50
34.00
0.40
85.00
Jumlah 12 - 10
67.85 M1
183.66
1
Jumlah Lalu
1,910.08 M
4,104.51
Jumlah Total
1,977.93 M1
4,288.17
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 12
No
S TAT I O N E R
Lapisan Perekat
Aspal Lama
STA
489+ 150
LEBAR
JARAK
M1
M1
s/d
489 + 400
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
143
489
150
2.00
15.80
0.40
31.60
144
489
200
2.30
2.60
0.40
5.98
145
489
250
1.60
3.90
0.40
6.24
146
489
250
1.60
2.40
0.40
3.84
147
489
300
1.80
8.40
0.40
15.12
148
489
300
1.90
3.80
0.40
7.22
149
489
300
1.50
2.80
0.40
4.20
150
489
300
1.60
1.10
0.40
1.76
151
489
350
1.60
2.10
0.40
3.36
152
489
350
2.80
4.00
0.40
11.20
153
489
350
2.70
5.20
0.40
14.04
154
489
350
2.58
14.80
0.40
38.18
155
489
350
1.50
1.80
0.40
2.70
156
489
400
1.50
2.60
0.40
3.90
157
489
400
0.60
1.65
0.40
0.99
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 12 - 11
72.95 M1
150.33
Jumlah Lalu
1,977.93 M1
4,288.17
Jumlah Total
2,050.88 M1
4,438.50
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 12
No
S TAT I O N E R
LEBAR
JARAK
M1
M1
s/d
489 + 650
KOEF
VOLUME
M2
Lapisan Perekat
STA
Aspal Lama
489+ 400
Agregat Kelas A
'm 6
158
489
400
0.70
2.35
0.40
1.65
159
489
400
2.90
43.00
0.40
124.70
160
489
450
2.90
6.45
0.40
18.71
161
489
500
0.70
0.70
0.40
0.49
162
489
500
0.90
1.20
0.40
1.08
163
489
500
0.60
1.30
0.40
0.78
164
489
500
1.60
1.31
0.40
2.10
165
489
500
1.00
1.50
0.40
1.50
166
489
500
1.00
1.26
0.40
1.26
167
489
550
0.90
1.65
0.40
1.49
168
489
550
2.30
6.20
0.40
14.26
169
489
550
1.00
1.30
0.40
1.30
170
489
600
2.28
16.20
0.40
36.94
171
489
650
0.50
10.00
0.40
5.00
172
489
650
1.50
5.50
0.40
8.25
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 12 - 12
99.92 M1
219.51
Jumlah Lalu
2,050.88 M1
4,438.50
Jumlah Total
2,150.80 M1
4,658.01
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 12
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
489+ 650
LEBAR
JARAK
M1
M1
s/d
489 + 800
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
173
489
650
3.40
11.00
0.40
37.40
174
489
650
1.60
1.90
0.40
3.04
175
489
700
1.50
6.57
0.40
9.86
176
489
700
0.40
5.60
0.40
2.24
177
489
750
2.10
3.10
0.40
6.51
178
489
750
3.40
4.10
0.40
13.94
179
489
750
1.65
4.00
0.40
6.60
180
489
750
2.10
5.85
0.40
12.29
181
489
750
2.80
10.80
0.40
30.24
182
489
750
1.30
5.56
0.40
7.23
183
489
800
1.35
0.70
0.40
0.95
184
489
800
2.60
5.25
0.40
13.65
185
489
800
1.00
5.00
0.40
5.00
186
489
800
0.90
1.30
0.40
1.17
187
489
800
0.80
0.80
0.40
0.64
Jumlah 12 - 13
71.53 M1
150.76
1
Jumlah Lalu
2,150.80 M
4,658.01
1
Jumlah Total
2,222.33 M
4,808.77
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 12
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
489+ 850
LEBAR
JARAK
M1
M1
s/d
489 + 950
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
188
489
850
1.70
3.70
0.40
6.29
189
489
850
11.04
2.80
0.40
30.91
190
489
900
1.55
4.50
0.40
6.98
191
489
900
2.60
9.20
0.40
23.92
192
489
900
1.90
1.10
0.40
2.09
193
489
900
4.20
3.00
0.40
12.60
194
489
900
3.40
5.10
0.40
17.34
195
489
950
2.60
4.00
0.40
10.40
196
489
950
2.60
3.20
0.40
8.32
197
489
950
3.80
2.70
0.40
10.26
198
489
950
2.20
1.30
0.40
2.86
199
489
950
2.27
27.70
0.40
62.88
200
489
950
0.40
3.60
0.40
1.44
201
489
950
3.10
10.50
0.40
32.55
202
489
950
1.80
8.55
0.40
15.39
Jumlah 12 - 14
90.95 M1
244.23
Jumlah Lalu
2,222.33 M1
4,808.77
Jumlah Total
2,313.28 M1
5,053.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 12
No
S TAT I O N E R
Lapisan Perekat
Aspal Lama
STA
489+ 950
'm 6
LEBAR
JARAK
M1
M1
s/d
490 + 100
KOEF
VOLUME
M2
Agregat Kelas A
203
489
950
4.40
3.40
0.40
14.96
204
489
950
2.00
4.70
0.40
9.40
205
489
950
0.40
13.00
0.40
5.20
206
490
000
1.96
13.35
0.40
26.17
207
490
000
2.70
11.75
0.40
31.73
208
490
000
2.70
21.00
0.40
56.70
209
490
050
0.80
2.30
0.40
1.84
210
490
050
0.90
1.50
0.40
1.35
211
490
050
0.90
1.50
0.40
1.35
212
490
050
1.00
4.80
0.40
4.80
213
490
050
1.00
8.30
0.40
8.30
214
490
100
1.60
13.80
0.40
22.08
215
490
100
1.30
6.70
0.40
8.71
216
490
100
1.50
3.80
0.40
5.70
217
490
100
0.60
50.00
0.40
30.00
Jumlah 12 - 15
159.90 M1
228.29
1
Jumlah Lalu
2,313.28 M
5,053.00
Jumlah Total
2,473.18 M1
5,281.29
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
Lokasi
HAL 12
No
S TAT I O N E R
LEBAR
JARAK
M1
M1
s/d
490 + 250
KOEF
VOLUME
M2
Lapisan Perekat
STA
Aspal Lama
490+ 150
Agregat Kelas A
'm 6
218
490
150
0.70
5.60
0.40
3.92
219
490
150
0.80
1.45
0.40
1.16
220
490
150
0.85
5.00
0.40
4.25
221
490
150
0.58
3.00
0.40
1.74
222
490
150
1.56
5.40
0.40
8.42
223
490
150
0.50
5.60
0.40
2.80
224
490
150
0.50
0.90
0.40
0.45
225
490
150
0.60
0.50
0.40
0.30
226
490
150
0.58
0.60
0.40
0.35
227
490
150
0.55
4.33
0.40
2.38
228
490
150
0.80
1.95
0.40
1.56
229
490
200
0.95
18.50
0.40
17.58
230
490
200
0.98
3.00
0.40
2.94
231
490
200
2.10
6.10
0.40
12.81
232
490
250
1.50
8.10
0.40
12.15
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 12 - 16
70.03 M1
72.81
1
Jumlah Lalu
2,473.18 M
5,281.29
1
Jumlah Total
2,543.21 M
5,354.10
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 12
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
490 + 250
LEBAR
JARAK
M1
M1
s/d
490 + 750
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
233
490
250
0.80
2.00
0.40
1.60
234
490
300
1.40
1.55
0.40
2.17
235
490
300
1.80
11.70
0.40
21.06
236
490
400
1.50
6.10
0.40
9.15
237
490
400
0.50
8.50
0.40
4.25
238
490
400
2.00
4.20
0.40
8.40
239
490
450
1.60
10.50
0.40
16.80
240
490
500
1.70
13.60
0.40
23.12
241
490
550
2.50
20.00
0.40
50.00
242
490
550
2.50
20.00
0.40
50.00
243
490
600
2.70
6.00
0.40
16.20
244
490
650
1.00
1.20
0.40
1.20
245
490
650
1.20
29.00
0.40
34.80
246
490
650
1.50
1.00
0.40
1.50
247
490
2.10
750
6.00
0.40
12.60
Jumlah 12 - 17
141.35 M1
252.85
1
Jumlah Lalu
2,543.21 M
5,354.10
Jumlah Total
2,684.56 M1
5,606.95
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 12
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
490+ 750
LEBAR
JARAK
M1
M1
s/d
491 + 350
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
248
490
750
1.50
3.60
0.40
5.40
249
490
800
2.40
4.00
0.40
9.60
250
490
800
3.00
44.00
0.40
132.00
251
490
850
3.00
10.00
0.40
30.00
252
490
850
2.30
15.00
0.40
34.50
253
491
000
2.70
8.60
0.40
23.22
254
491
000
2.60
19.90
0.40
51.74
255
491
100
2.00
7.50
0.40
15.00
256
491
150
1.30
7.80
0.40
10.14
257
491
200
1.40
6.90
0.40
9.66
258
491
200
0.80
12.80
0.40
10.24
259
491
200
3.00
30.00
0.40
90.00
260
491
200
2.50
24.00
0.40
60.00
261
491
200
3.00
32.00
0.40
96.00
262
491
350
2.00
19.60
0.40
39.20
Jumlah 12 - 18
245.70 M1
616.70
1
Jumlah Lalu
2,684.56 M
5,606.95
1
Jumlah Total
2,930.26 M
6,223.65
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 12
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
491+ 350
LEBAR
JARAK
M1
M1
s/d
491 + 550
KOEF
VOLUME
M2
Agregat Kelas A
'm 6
263
491
350
2.90
5.30
0.40
15.37
264
491
400
2.80
37.80
0.40
105.84
265
491
450
2.00
7.00
0.40
14.00
266
491
450
2.70
13.70
0.40
36.99
267
491
450
1.60
9.20
0.40
14.72
268
491
500
2.00
24.00
0.40
48.00
269
491
500
3.40
12.00
0.40
40.80
270
491
500
5.40
9.00
0.40
48.60
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 12 - 19
118.00 M1
324.32
Jumlah Lalu
2,930.26 M1
6,223.65
Jumlah MC - 3
3,048.26 M1
6,547.97
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
HAL 12 - 1
VOL
LITER
0.67
42.05
1.01
0.28
0.44
3.66
2.40
19.36
2.08
11.52
0.77
0.51
0.26
11.52
14.72
111.25
111.25
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 2
VOL
LITER
25.60
8.28
22.26
0.22
0.66
22.42
7.93
8.14
5.38
K
9
1
L
0
a
e
msl
m
a't
os'
n
A
B
A
C
W
B
C
12.73
13.31
9.32
59.34
46.70
27.16
269.45
111.25
380.70
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 3
VOL
LITER
29.92
5.68
12.74
3.54
0.83
3.16
7.95
1.61
26.52
3.26
0.60
1.74
1.44
15.64
44.78
159.41
380.70
540.11
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 4
VOL
LITER
0.84
2.20
0.57
3.33
0.38
11.53
1.51
6.98
9.32
8.48
6.64
12.95
2.18
1.47
0.43
68.81
540.11
608.92
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 5
VOL
LITER
9.12
17.07
9.60
1.00
11.14
7.88
7.79
5.76
69.36
608.92
678.28
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 1
VOL
LITER
2.47
37.06
18.59
5.24
0.21
0.14
10.86
28.40
13.34
44.82
31.64
5.38
21.31
20.19
3.18
242.83
678.28
921.11
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 2
VOL
LITER
24.94
58.37
1.08
0.25
1.00
0.70
1.45
20.34
2.85
0.65
18.78
7.94
9.04
38.80
3.35
189.54
921.11
1,110.65
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 3
VOL
LITER
3.36
5.13
1.89
28.73
0.98
5.64
4.79
2.25
3.42
17.92
3.28
3.17
0.84
1.43
12.76
95.59
1,110.65
1,206.24
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 4
VOL
LITER
3.85
12.63
12.67
2.23
2.14
3.82
4.73
3.87
2.83
3.20
2.06
4.70
0.12
0.21
7.08
66.14
1,206.24
1,272.38
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 5
VOL
LITER
1.54
3.28
0.53
4.82
0.39
4.88
3.84
6.79
2.73
1.07
1.15
0.22
2.06
2.09
0.70
36.09
1,272.38
1,308.47
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 6
VOL
LITER
2.25
2.85
0.68
0.42
1.82
0.20
0.51
0.96
3.40
0.88
3.08
1.36
4.70
6.77
1.99
31.87
1,308.47
1,340.34
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 7
VOL
LITER
0.18
0.91
3.30
1.06
6.38
19.32
3.92
3.33
0.58
0.12
2.43
21.19
1.00
2.40
1.08
67.20
1,340.34
1,407.54
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 8
VOL
LITER
0.50
7.03
1.50
9.33
14.87
1.76
12.38
10.01
8.07
3.73
4.51
12.36
7.87
6.55
16.66
117.13
1,407.54
1,524.67
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 9
VOL
LITER
1.01
5.36
12.20
30.66
9.60
6.08
15.83
3.10
2.12
0.88
4.68
8.42
0.62
6.60
9.99
117.15
1,524.67
1,641.82
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 10
VOL
LITER
0.72
0.55
0.21
0.71
0.26
37.00
34.00
73.45
1,641.82
1,715.27
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 11
VOL
LITER
12.64
2.39
2.50
1.54
6.05
2.89
1.68
0.70
1.34
4.48
5.62
15.27
1.08
1.56
0.40
60.14
1,715.27
1,775.41
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 12
VOL
LITER
0.66
49.88
7.48
0.20
0.43
0.31
0.84
0.60
0.50
0.60
5.70
0.52
14.78
2.00
3.30
87.80
1,775.41
1,863.21
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 13
VOL
LITER
14.96
1.22
3.94
0.90
2.60
5.58
2.64
4.92
12.10
2.89
0.38
5.46
2.00
0.47
0.26
60.32
1,863.21
1,923.53
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 14
VOL
LITER
2.52
12.36
2.79
9.57
0.84
5.04
6.94
4.16
3.33
4.10
1.14
25.15
0.58
13.02
6.16
97.70
1,923.53
2,021.23
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 15
VOL
LITER
5.98
3.76
2.08
10.47
12.69
22.68
0.74
0.54
0.54
1.92
3.32
8.83
3.48
2.28
12.00
91.31
2,021.23
2,112.54
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 16
VOL
LITER
1.57
0.46
1.70
0.70
3.37
1.12
0.18
0.12
0.14
0.95
0.62
7.03
1.18
5.12
4.86
29.12
2,112.54
2,141.66
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 17
VOL
LITER
0.64
0.87
8.42
3.66
1.70
3.36
6.72
9.25
20.00
20.00
6.48
0.48
13.92
0.60
5.04
101.14
2,141.66
2,242.80
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 18
VOL
LITER
2.16
3.84
52.80
12.00
13.80
9.29
20.70
6.00
4.06
3.86
4.10
36.00
24.00
38.40
15.68
246.69
2,242.80
2,489.49
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 19
VOL
LITER
6.15
42.34
5.60
14.80
5.89
19.20
16.32
19.44
129.74
2,489.49
2,619.23
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+850
Sta 490+900
Sta 490+950
Sta 491+000
Sta 491+050
Sta 491+100
Sta 491+150
Sta 491+200
Sta 491+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+850
Sta 490+900
Sta 490+950
Sta 491+000
Sta 491+050
Sta 491+100
Sta 491+150
Sta 491+200
Sta 491+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
Lokasi
SKET/GAMBAR
Sta 490+100
Sta 490+150
Sta 490+200
Sta 490+250
Sta 490+300
Sta 490+350
Sta 490+400
Sta 490+450
Sta 490+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 489+350
Sta 489+400
Sta 489+450
Sta 489+500
Sta 489+550
Sta 489+600
Sta 489+650
Sta 489+700
Sta 489+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
KOTA LANGSA
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 487+850
Sta 487+900
Sta 487+950
Sta 488+000
Sta 488+050
Sta 488+100
Sta 488+150
Sta 488+200
Sta 488+250
KOTA LANGSA
Diperiksa Oleh :
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 487+100
Sta 487+150
Sta 487+200
Sta 487+250
Sta 487+300
Sta 487+350
Sta 487+400
Sta 487+450
Sta 487+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 486+350
Sta 486+400
Sta 486+450
Sta 486+500
Sta 486+550
Sta 486+600
Sta 486+650
Sta 486+700
Sta 486+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 485+600
Sta 485+650
Sta 485+700
Sta 485+750
Sta 485+800
Sta 485+850
Sta 485+900
Sta 485+950
Sta 486+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 484+850
Sta 484+900
Sta 484+950
Sta 485+000
Sta 485+050
Sta 485+100
Sta 485+150
Sta 485+200
Sta 485+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 484+100
Sta 484+150
Sta 484+200
Sta 484+250
Sta 484+300
Sta 484+350
Sta 484+400
Sta 484+450
Sta 484+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 483+350
Sta 483+400
Sta 483+450
Sta 483+500
Sta 483+550
Sta 483+600
Sta 483+650
Sta 483+700
Sta 483+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 482+600
Sta 482+650
KOTA LANGSA
Sta 482+700
Sta 482+750
Sta 482+800
Sta 482+850
Sta 482+900
Sta 482+950
Sta 483+000
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 481+850
Sta 481+900
KOTA LANGSA
Sta 481+950
Sta 482+000
Sta 482+050
Sta 482+100
Sta 482+150
Sta 482+200
Sta 482+250
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 481+100
Sta 481+150
Sta 481+200
Sta 481+250
Sta 481+300
Sta 481+350
Sta 481+400
Sta 481+450
Sta 481+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 480+350
Sta 480+400
Sta 480+450
Sta 480+500
Sta 480+550
Sta 480+600
Sta 480+650
Sta 480+700
Sta 480+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 479+600
Sta 479+650
Sta 479+700
Sta 479+750
Sta 479+800
Sta 479+850
Sta 479+900
Sta 479+950
Sta 480+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 478+850
Sta 478+900
Sta 478+950
Sta 479+000
Sta 479+050
Sta 479+100
Sta 479+150
Sta 479+200
Sta 479+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 478+100
Sta 478+150
Sta 478+200
Sta 478+250
Sta 478+300
Sta 478+350
Sta 478+400
Sta 478+450
Sta 478+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 477+350
Sta 477+400
Sta 477+450
Sta 477+500
Sta 477+550
Sta 477+600
Sta 477+650
Sta 477+700
Sta 477+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 476+600
Sta 476+650
KOTA LANGSA
Sta 476+700
Sta 476+750
Sta 476+800
Sta 476+850
Sta 476+900
Sta 476+950
Sta 477+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 475+850
Sta 475+900
KOTA LANGSA
Sta 475+950
Sta 476+000
Sta 476+050
Sta 476+100
Sta 476+150
Sta 476+200
Sta 476+250
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 475+100
Sta 475+150
Sta 475+200
Sta 475+250
Sta 475+300
Sta 475+350
Sta 475+400
Sta 475+450
Sta 475+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 474+350
Sta 474+400
Sta 474+450
Sta 474+500
Sta 474+550
Sta 474+600
Sta 474+650
Sta 474+700
Sta 474+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
DATA
2
US 2005
HAL. 12 - 17
MBAR
PERBATASAN
SUMUT
Sta 491+300
Sta 491+350
Sta 491+400
Sta 491+450
Sta 491+500
Sta 491+550
Sta 491+600
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 12 - 16
MBAR
PERBATASAN
SUMUT
Sta 491+300
Sta 491+350
Sta 491+400
Sta 491+450
Sta 491+500
Sta 491+550
Sta 491+600
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 12 - 17
MBAR
Sta 490+550
Sta 490+600
Sta 490+650
Sta 490+700
Sta 490+750
Sta 490+800
Sta 490+850
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
MBAR
HAL. 12 - 18
Sta 489+800
Sta 489+850
Sta 489+900
Sta 489+950
Sta 490+000
Sta 490+050
Sta 490+100
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 12 - 19
MBAR
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
Sta 489+250
Sta 489+300
Sta 489+350
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
4
ER 2005
HAL. 12 - 19
MBAR
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
Sta 489+250
Sta 489+300
MEDAN
Sta 489+350
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
4
ER 2005
HAL. 12 - 1
MBAR
eh :
Sta 488+300
Sta 488+350
Sta 488+400
Sta 488+450
Sta 488+500
Sta 488+550
MEDAN
Dibuat Oleh :
Sta 488+600
pervisi
ERDANA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
4
ER 2005
HAL. 1 - 1
MBAR
Sta 487+550
Sta 487+600
Sta 487+650
Sta 487+700
Sta 487+750
Sta 487+800
Sta 487+850
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 1 - 1
MBAR
Sta 486+800
Sta 486+850
Sta 486+900
Sta 486+950
Sta 487+000
Sta 487+050
Sta 487+100
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 1 - 1
MBAR
Sta 486+050
Sta 486+100
Sta 486+150
Sta 486+200
Sta 486+250
Sta 486+300
Sta 486+350
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 485+300
Sta 485+350
Sta 485+400
Sta 485+450
Sta 485+500
Sta 485+550
Sta 485+600
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
MBAR
HAL. 1 - 1
Sta 484+550
Sta 484+600
Sta 484+650
Sta 484+700
Sta 484+750
Sta 484+800
Sta 484+850
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 12 - 16
MBAR
Sta 483+800
Sta 483+850
Sta 483+900
Sta 483+950
Sta 484+000
Sta 484+050
Sta 484+100
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 483+050
Sta 483+100
Sta 483+150
Sta 483+200
Sta 483+250
Sta 483+300
MEDAN
Sta 483+350
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 482+300
Sta 482+350
Sta 482+400
Sta 482+450
Sta 482+500
Sta 482+550
MEDAN
Sta 482+600
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
eh :
pervisi
ERDANA
Sta 481+550
Sta 481+600
Sta 481+650
Sta 481+700
Sta 481+750
Sta 481+800
Sta 481+850
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 480+800
Sta 480+850
Sta 480+900
Sta 480+950
Sta 481+000
Sta 481+050
Sta 481+100
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 12 - 15
MBAR
Sta 480+050
Sta 480+100
Sta 480+150
Sta 480+200
Sta 480+250
Sta 480+300
Sta 480+350
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 479+300
Sta 479+350
Sta 479+400
Sta 479+450
Sta 479+500
Sta 479+550
Sta 479+600
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 12 - 14
MBAR
Sta 478+550
Sta 478+600
Sta 478+650
Sta 478+700
Sta 478+750
Sta 478+800
Sta 478+850
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
MBAR
HAL. 12 - 13
Sta 477+800
Sta 477+850
Sta 477+900
Sta 477+950
Sta 478+000
Sta 478+050
Sta 478+100
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 477+050
Sta 477+100
Sta 477+150
Sta 477+200
Sta 477+250
Sta 477+300
MEDAN
Sta 477+350
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 476+300
Sta 476+350
Sta 476+400
Sta 476+450
Sta 476+500
Sta 476+550
MEDAN
Sta 476+600
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
eh :
pervisi
ERDANA
Sta 475+550
Sta 475+600
Sta 475+650
Sta 475+700
Sta 475+750
Sta 475+800
Sta 475+850
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 474+800
Sta 474+850
Sta 474+900
Sta 474+950
Sta 475+000
Sta 475+050
Sta 475+100
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
KOTA KUALA
SIMPANG
Sta 474+000
Sta 474+050
KOTA LANGSA
Sta 474+150
Sta 474+200
Sta 474+250
Sta 474+300
Sta 474+350
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
477 + 794
LEBAR
JARAK
M1
M1
s/d
483 + 514
KOEF
LUAS
M2
'm 6
477
794
5.96
477
800
6.50
6.00
0.40
35.76
0.40
162.50
0.40
286.00
0.40
42.70
50.00
3
477
850
6.50
19.00
478
610
6.10
14.00
478
624
6.10
0.40
42.70
480
300
5.57
0.40
38.99
480
314
5.57
0.40
38.99
483
500
5.82
0.40
40.74
10
483
514
5.82
0.40
40.74
14.00
14.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 12 - 1
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
117.00 M1
- M1
117.00 M1
729.12
729.12
Dibuat Oleh :
PT. BAHTERA KARANG RAY
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
491 + 600
LEBAR
JARAK
M1
M1
s/d
491 + 550
KOEF
LUAS
M2
'm 6
11
491
600
5.70
0.40
142.50
0.40
144.00
50.00
12
491
550
5.76
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 12 - 2
Jumlah Lalu
Jumlah Total MC - 2
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
50.00 M1
117.00 M1
167.00 M1
MARWAN, BE
CHIEF INSPECTOR
286.50
729.12
1,015.62
Dibuat Oleh :
PT. BAHTERA KARANG RAY
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
491 + 550
LEBAR
JARAK
M1
M1
s/d
490 + 900
KOEF
LUAS
M2
'm 6
491
550
5.76
0.40
144.00
0.40
291.00
50.00
2
491
500
5.82
50.00
491
450
5.82
0.40
291.00
0.40
293.50
0.40
295.00
0.40
295.00
0.40
299.00
0.40
299.00
0.40
302.50
0.40
305.00
0.40
292.50
0.40
305.00
0.40
290.00
0.40
143.75
50.00
4
491
400
5.87
50.00
491
350
5.90
50.00
491
300
5.90
50.00
491
250
5.98
491
200
5.98
50.00
50.00
9
491
150
6.05
50.00
10
491
100
6.10
11
491
050
5.85
50.00
50.00
12
491
000
6.10
50.00
13
490
950
5.80
50.00
14
490
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
900
5.75
Jumlah 12 - 1
Jumlah Lalu MC - 2
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
650.00 M1
167.00 M1
817.00 M1
MARWAN, BE
CHIEF INSPECTOR
3,846.25
1,015.62
4,861.87
Dibuat Oleh :
PT. BAHTERA KARANG RAY
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
LEBAR
JARAK
KOEF
LUAS
M1
M1
s/d
490 + 200
M2
Lapisan Perekat
STA
Aspal Lama
490 + 900
'm 6
15
490
900
5.75
16
490
850
5.75
0.40
143.75
0.40
287.50
0.40
287.00
0.40
287.50
0.40
295.00
0.40
295.00
0.40
282.50
0.40
282.50
0.40
286.50
0.40
283.50
0.40
290.00
0.40
290.00
0.40
290.00
0.40
290.00
0.40
145.75
50.00
50.00
17
490
800
5.74
50.00
18
490
750
5.75
19
490
700
5.90
50.00
50.00
20
490
650
5.90
50.00
21
490
600
5.65
50.00
22
490
550
5.65
50.00
23
490
500
5.73
50.00
24
490
450
5.67
50.00
25
490
400
5.80
50.00
26
490
350
5.80
27
490
300
5.80
50.00
50.00
28
490
250
5.80
50.00
29
490
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
200
5.83
Jumlah 12 - 2
700.00 M1
4,036.50
1
Jumlah Lalu
817.00 M
4,861.87
1
Jumlah Total
1,517.00 M
8,898.37
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
490 + 200
LEBAR
JARAK
M1
M1
s/d
489 + 500
KOEF
LUAS
M2
'm 6
30
490
200
5.83
0.40
145.75
0.40
291.50
0.40
295.00
0.40
295.00
0.40
285.00
0.40
285.00
0.40
290.00
0.40
285.00
0.40
276.50
0.40
276.50
0.40
287.50
0.40
287.50
0.40
282.50
0.40
282.50
0.40
143.75
50.00
31
490
150
5.83
32
490
100
5.90
50.00
50.00
33
490
050
5.90
50.00
34
490
000
5.70
50.00
35
489
950
5.70
50.00
36
489
900
5.80
50.00
37
489
850
5.70
50.00
38
489
800
5.53
50.00
39
489
750
5.53
40
489
700
5.75
50.00
50.00
41
489
650
5.75
50.00
42
489
600
5.65
43
489
550
5.65
50.00
50.00
44
489
500
Jumlah 12 - 3
5.75
700.00 M1
4,009.00
Jumlah Lalu
1,517.00 M1
8,898.37
1
Jumlah Total
2,217.00 M
12,907.37
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
489 + 500
LEBAR
JARAK
M1
M1
s/d
489 + 000
KOEF
LUAS
M2
'm 6
45
489
500
5.75
0.40
143.75
0.40
282.50
0.40
290.00
0.40
292.50
0.40
292.50
0.40
292.50
0.40
292.50
0.40
295.00
0.40
295.00
0.40
293.00
50.00
46
489
450
5.65
50.00
47
489
400
5.80
50.00
48
489
350
5.85
50.00
49
489
300
5.85
50.00
50
489
250
5.85
51
489
200
5.85
50.00
50.00
52
489
150
5.90
50.00
53
489
100
5.90
54
489
050
5.86
50.00
50.00
55
489
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
000
5.86
0.40
146.50
Jumlah 12 - 4
500.00 M1
2,915.75
1
Jumlah Lalu
2,217.00 M
12,907.37
1
Jumlah Total MC - 3
2,717.00 M
15,823.12
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
489 + 000
LEBAR
JARAK
M1
M1
s/d
488 + 400
KOEF
LUAS
M2
'm 6
489
000
5.86
488
950
5.85
0.40
146.50
0.40
292.50
0.40
290.00
50.00
50.00
3
488
900
5.80
50.00
488
850
5.80
0.40
290.00
0.40
295.00
0.40
294.00
0.40
292.50
0.40
292.50
0.40
298.00
0.40
297.50
0.40
290.00
0.40
294.00
0.40
142.50
50.00
5
488
800
5.90
50.00
488
750
5.88
50.00
488
700
5.85
50.00
488
650
5.85
488
600
5.96
50.00
50.00
10
488
550
5.95
50.00
11
488
500
5.80
12
488
450
5.88
50.00
50.00
13
488
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
400
5.70
Jumlah 12 - 1
600.00 M1
3,515.00
Jumlah Lalu MC - 3
2,717.00 M1
15,823.12
Jumlah Total
3,317.00 M1
19,338.12
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
LEBAR
JARAK
M1
M1
KOEF
LUAS
M2
Lapisan Perekat
STA
Aspal Lama
488 + 400
s/d
487 + 700
'm 6
14
488
400
5.70
15
488
350
5.70
0.40
142.50
0.40
285.00
0.40
295.00
0.40
295.00
0.40
297.50
0.40
295.00
0.40
297.50
0.40
297.50
0.40
296.50
0.40
296.50
0.40
290.00
0.40
290.00
0.40
295.00
0.40
295.00
0.40
148.75
50.00
50.00
16
488
300
5.90
50.00
17
488
250
5.90
18
488
200
5.95
50.00
50.00
19
488
150
5.90
50.00
20
488
100
5.95
50.00
21
488
050
5.95
50.00
22
488
000
5.93
50.00
23
487
950
5.93
50.00
24
487
900
5.80
50.00
25
487
850
5.80
26
487
800
5.90
50.00
50.00
27
487
750
5.90
50.00
28
487
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
700
5.95
Jumlah 12 - 2
700.00 M1
4,116.75
1
Jumlah Lalu
3,317.00 M
19,338.12
1
Jumlah Total
4,017.00 M
23,454.87
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
487 + 700
LEBAR
JARAK
M1
M1
s/d
487 + 150
KOEF
LUAS
M2
'm 6
29
487
700
5.95
0.40
148.75
0.40
297.50
0.40
296.50
0.40
296.50
0.40
295.00
0.40
295.00
0.40
294.50
0.40
295.00
0.40
296.00
0.40
296.00
0.40
197.65
0.40
49.30
50.00
30
488
650
5.95
50.00
31
488
600
5.93
50.00
32
488
550
5.93
50.00
33
488
500
5.90
50.00
34
488
450
5.90
35
488
400
5.89
50.00
50.00
36
488
350
5.90
50.00
37
488
300
5.92
38
487
250
5.92
50.00
50.00
39
487
200
5.90
17.00
40
487
183
Jumlah 12 - 3
Jumlah Lalu
Jumlah Total
5.80
517.00 M1
4,017.00 M1
4,534.00 M1
3,057.70
23,454.87
26,512.57
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAY
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
STA
Aspal Lama
487 + 000
LEBAR
JARAK
M1
M1
s/d
481 + 050
KOEF
LUAS
M2
'm 6
487
000
2.93
0.40
73.25
0.40
146.50
0.40
143.00
0.40
105.00
0.40
30.00
0.40
29.70
0.40
105.00
0.40
141.10
50.00
2
486
950
2.93
50.00
486
900
2.86
50.00
486
850
3.00
486
830
3.00
486
870
2.97
20.00
20.00
7
486
850
3.00
50.00
486
800
3.40
33.00
486
767
3.40
0.40
56.10
10
485
500
6.20
0.40
155.00
50.00
11
485
450
6.20
0.40
310.00
0.40
315.00
0.40
155.00
0.40
314.00
50.00
12
485
400
6.30
13
485
350
6.20
14
481
050
6.28
50.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
50.00
Jumlah 12 - 4
473.00 M1
2,078.65
1
Jumlah Lalu
4,534.00 M
26,512.57
Jumlah Total MC - 4
5,007.00 M1
28,591.22
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 5
BULAN : NOPEMBER 2005
: 6.1(2)
: Lapis Perekat
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
Lapisan Perekat
Aspal Lama
STA
487 + 000
LEBAR
JARAK
M1
M1
s/d
481 + 500
KOEF
LUAS
M2
'm 6
Nicah Awe
10.00
9.60
0.40
96.00
Damar Tutong
10.00
9.60
0.40
96.00
Alue Lhok
9.00
8.10
0.40
72.90
Sarah Teube
10.00
9.60
0.40
96.00
Alue Dua
10.00
9.60
0.40
96.00
Lhok Bhani
10.00
9.60
0.40
96.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 12 - 1
56.10 M1
552.90
1
Jumlah Lalu MC - 4
5,007.00 M
28,591.22
1
Jumlah Total MC - 5
5,063.10 M
29,144.12
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
HAL 12 - 6
VOL
LITER
14.30
65.00
114.40
17.08
17.08
15.60
15.60
16.30
16.30
291.66
291.66
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 7
VOL
LITER
57.00
57.60
114.60
291.66
406.26
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 1
VOL
LITER
57.60
116.40
116.40
117.40
118.00
118.00
119.60
119.60
121.00
122.00
117.00
122.00
116.00
57.50
1,538.50
406.26
1,944.76
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 2
VOL
K
9
1
L
0
a
e
msl
m
a't'
o
s'
n
A
B
A
C
W
B
C
LITER
57.50
115.00
114.80
115.00
118.00
118.00
113.00
113.00
114.60
113.40
116.00
116.00
116.00
116.00
58.30
1,614.60
1,944.76
3,559.36
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 3
VOL
LITER
58.30
116.60
118.00
118.00
114.00
114.00
116.00
114.00
110.60
110.60
115.00
115.00
113.00
113.00
57.50
1,603.60
3,559.36
5,162.96
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 4
VOL
LITER
57.50
113.00
116.00
117.00
117.00
117.00
117.00
118.00
118.00
117.20
58.60
1,166.30
5,162.96
6,329.26
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 1
VOL
LITER
58.60
117.00
116.00
116.00
118.00
117.60
117.00
117.00
119.20
119.00
116.00
117.60
57.00
1,406.00
6,329.26
7,735.26
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 2
VOL
LITER
57.00
114.00
118.00
118.00
119.00
118.00
119.00
119.00
118.60
118.60
116.00
116.00
118.00
118.00
59.50
1,646.70
7,735.26
9,381.96
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 3
VOL
LITER
59.50
119.00
118.60
118.60
118.00
118.00
117.80
118.00
118.40
118.40
79.06
19.72
1,223.08
9,381.96
10,605.04
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 4
VOL
LITER
29.30
58.60
57.20
42.00
12.00
11.88
42.00
56.44
22.44
62.00
124.00
126.00
62.00
125.60
831.46
10,605.04
11,436.50
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 12 - 1
VOL
LITER
38.40
38.40
29.16
38.40
38.40
38.40
221.16
11,436.50
11,657.66
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
6.00
25.00
25.00
19.00
14.00
Aspal Lama
5.96 m'
Sta 477+ 800 - Sta 477+ 825
AC-WC 4 Cm
Aspal Lama
6.50 m'
Sta 477+ 825 - Sta 477+ 850
AC-WC 4 Cm
Aspal Lama
6.50 m'
Sta 477+ 850 - Sta 477+ 869
AC-WC 4 Cm
Aspal Lama
6.50 m'
Sta 478+610 - Sta 478+624
AC-WC 4 Cm
Aspal Lama
6.10 m'
14.00
Aspal Lama
5.57 m'
JUMLAH 13 - 1
JUMLAH LALU
JUMLAH TOTAL
103.00
103.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
14.00
25.00
Aspal Lama
5.82 m'
Sta 491+575 - Sta 491+600
AC-WC 4 Cm
Aspal Lama
5.70 m'
25.00
Aspal Lama
5.76 m'
JUMLAH 13 - 2
JUMLAH LALU
JUMLAH TOTAL MC - 2
64.00
103.00
167.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
AC-WC 4 Cm
AC-WC 4 Cm
25.00
50.00
50.00
50.00
25.00
Aspal Lama
5.76 m'
Sta 491+475 - Sta 491+525
AC-WC 4 Cm
Aspal Lama
5.82 m'
Sta 491+425 - Sta 491+475
AC-WC 4 Cm
Aspal Lama
5.82 m'
Sta 491+375 - Sta 491+425
AC-WC 4 Cm
Aspal Lama
5.87 m'
Sta 491+350 - Sta 491+375
AC-WC 4 Cm
Aspal Lama
5.96 m'
JUMLAH 13 - 1
JUMLAH LALU MC - 2
JUMLAH TOTAL
200.00
167.00
367.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
25.00
50.00
50.00
Aspal Lama
5.96 m'
Sta 491+275 - Sta 491+325
AC-WC 4 Cm
Aspal Lama
5.80 m'
Sta 491+225 - Sta 491+275
AC-WC 4 Cm
Aspal Lama
5.80 m'
50.00
50.00
25.00
Aspal Lama
5.82 m'
Sta 491+125 - Sta 491+175
AC-WC 4 Cm
Aspal Lama
5.80 m'
Sta 491+100 - Sta 491+125
AC-WC 4 Cm
Aspal Lama
5.80 m'
JUMLAH 13 - 2
JUMLAH LALU
JUMLAH TOTAL
250.00
367.00
617.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
25.00
50.00
50.00
50.00
50.00
25.00
Aspal Lama
5.80 m'
Sta 491+025 - Sta 491+075
AC-WC 4 Cm
Aspal Lama
5.83 m'
Sta 490+975 - Sta 491+025
AC-WC 4 Cm
Aspal Lama
5.83 m'
Sta 490+925 - Sta 490+975
AC-WC 4 Cm
Aspal Lama
6.00 m'
Sta 490+875 - Sta 490+925
AC-WC 4 Cm
Aspal Lama
6.00 m'
Sta 490+850 - Sta 490+875
AC-WC 4 Cm
Aspal Lama
5.90 m'
JUMLAH 13 - 3
JUMLAH LALU
JUMLAH TOTAL
Diperiksa Oleh :
250.00
617.00
867.00
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
25.00
50.00
50.00
50.00
Aspal Lama
5.90 m'
Sta 490+775 - Sta 490+825
AC-WC 4 Cm
Aspal Lama
5.70 m'
Sta 490+725 - Sta 490+775
AC-WC 4 Cm
Aspal Lama
5.80 m'
Sta 490+675 - Sta 490+725
AC-WC 4 Cm
Aspal Lama
5.80 m'
Sta 490+625 - Sta 490+675
AC-WC 4 Cm
50.00
25.00
Aspal Lama
5.90 m'
Sta 490+600 - Sta 490+625
AC-WC 4 Cm
Aspal Lama
5.85 m'
JUMLAH 13 - 4
JUMLAH LALU
JUMLAH TOTAL
250.00
867.00
1,117.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Aspal Lama
5.85 m'
25.00
50.00
50.00
50.00
50.00
25.00
Aspal Lama
5.80 m'
Sta 490+475 - Sta 490+525
AC-WC 4 Cm
Aspal Lama
5.76 m'
Sta 490+425 - Sta 490+475
AC-WC 4 Cm
Aspal Lama
5.77 m'
Sta 490+375 - Sta 490+425
AC-WC 4 Cm
Aspal Lama
5.80 m'
Sta 490+350 - Sta 490+375
AC-WC 4 Cm
Aspal Lama
5.90 m'
JUMLAH 13 - 5
JUMLAH LALU
JUMLAH TOTAL
250.00
1,117.00
1,367.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
MARWAN, BE
KORDINATOR LAPANGAN
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
25.00
50.00
50.00
50.00
50.00
Aspal Lama
5.90 m'
Sta 490+275 - Sta 490+325
AC-WC 4 Cm
Aspal Lama
5.90 m'
Sta 490+225 - Sta 490+275
AC-WC 4 Cm
Aspal Lama
5.80 m'
Sta 490+175 - Sta 490+225
AC-WC 4 Cm
Aspal Lama
5.90 m'
Sta 490+125 - Sta 490+175
AC-WC 4 Cm
Aspal Lama
5.90 m'
Sta 490+100 - Sta 490+125
Sta 490+100 - Sta 490+125
AC-WC 4 Cm
25.00
Aspal Lama
5.90 m'
JUMLAH 13 - 6
JUMLAH LALU
JUMLAH TOTAL
250.00
1,367.00
1,617.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
25.00
50.00
Aspal Lama
5.90 m'
Sta 490+025 - Sta 490+075
AC-WC 4 Cm
Aspal Lama
5.90 m'
Sta 489+975 - Sta 490+025
AC-WC 4 Cm
50.00
50.00
50.00
25.00
Aspal Lama
5.87 m'
Sta 489+925 - Sta 489+975
AC-WC 4 Cm
Aspal Lama
5.70 m'
Sta 489+875 - Sta 489+925
AC-WC 4 Cm
Aspal Lama
5.70 m'
Sta 489+850 - Sta 489+875
AC-WC 4 Cm
Aspal Lama
5.70 m'
JUMLAH 13 - 7
JUMLAH LALU
JUMLAH TOTAL
250.00
1,617.00
1,867.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
25.00
50.00
50.00
50.00
50.00
25.00
Aspal Lama
5.70 m'
Sta 489+775 - Sta 489+825
AC-WC 4 Cm
Aspal Lama
5.80 m'
Sta 489+725 - Sta 489+775
AC-WC 4 Cm
Aspal Lama
5.80 m'
Sta 489+675 - Sta 489+725
AC-WC 4 Cm
Aspal Lama
5.75 m'
Sta 489+625 - Sta 489+675
AC-WC 4 Cm
Aspal Lama
5.75 m'
Sta 489+600 - Sta 489+625
AC-WC 4 Cm
Aspal Lama
5.70 m'
JUMLAH 13 - 8
JUMLAH LALU
JUMLAH TOTAL
250.00
1,867.00
2,117.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
25.00
50.00
50.00
Aspal Lama
5.70 m'
Sta 489+525 - Sta 489+575
AC-WC 4 Cm
Aspal Lama
5.75 m'
Sta 489+475 - Sta 489+525
AC-WC 4 Cm
Aspal Lama
5.75 m'
Sta 489+425 - Sta 489+475
AC-WC 4 Cm
50.00
50.00
25.00
Aspal Lama
5.70 m'
Sta 489+375 - Sta 489+425
AC-WC 4 Cm
Aspal Lama
5.75 m'
Sta 489+350 - Sta 489+375
AC-WC 4 Cm
Aspal Lama
5.70 m'
JUMLAH 13 - 9
JUMLAH LALU
JUMLAH TOTAL
250.00
2,117.00
2,367.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
25.00
50.00
50.00
50.00
50.00
25.00
Aspal Lama
5.70 m'
Sta 489+275 - Sta 489+325
AC-WC 4 Cm
Aspal Lama
5.70 m'
Sta 489+225 - Sta 489+275
AC-WC 4 Cm
Aspal Lama
5.80 m'
Sta 489+175 - Sta 489+225
AC-WC 4 Cm
Aspal Lama
5.80 m'
Sta 489+125 - Sta 489+175
AC-WC 4 Cm
Aspal Lama
5.90 m'
Sta 489+100 - Sta 489+125
AC-WC 4 Cm
Aspal Lama
5.90 m'
JUMLAH 13 - 10
JUMLAH LALU
JUMLAH TOTAL MC - 3
250.00
2,367.00
2,617.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(5)
Item Pekerjaan
: Laston Lapis Aus Aspal Beton (AC-WC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
25.00
50.00
25.00
Aspal Lama
5.90 m'
Sta 489+025 - Sta 489+075
AC-WC 4 Cm
Aspal Lama
5.86 m'
Sta 489+000 - Sta 489+025
AC-WC 4 Cm
Aspal Lama
5.86 m'
JUMLAH 13 - 11
JUMLAH LALU
JUMLAH TOTAL MC - 3
100.00
2,617.00
2,717.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
TEBAL
M'
HAL 13 - 1
LUAS
M2
5.96
0.04
35.76
6.50
0.04
162.50
6.50
0.04
162.50
6.50
0.04
123.50
6.10
0.04
85.40
LEBAR
M'
5.57
0.04
77.98
647.64
647.64
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
LEBAR
M'
5.82
5.70
TEBAL
M'
HAL 13 - 2
LUAS
M2
0.04
81.48
0.04
142.50
5.76
0.04
144.00
367.98
647.64
1,015.62
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 13 - 1
LUAS
M2
0.04
144.00
5.82
0.04
291.00
5.82
0.04
291.00
5.87
0.04
293.50
5.96
0.04
149.00
LEBAR
M'
5.76
1,168.50
1,015.62
2,184.12
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 13 - 2
LUAS
M2
5.96
0.04
149.00
5.80
0.04
290.00
5.80
0.04
290.00
LEBAR
M'
5.82
0.04
291.00
5.80
0.04
290.00
5.80
0.04
145.00
1,455.00
2,184.12
3,639.12
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
LEBAR
M'
TEBAL
M'
HAL 13 - 3
LUAS
M2
5.80
0.04
145.00
5.83
0.04
291.50
5.83
0.04
291.50
6.00
0.04
300.00
6.00
0.04
300.00
5.90
0.04
147.50
1,475.50
3,639.12
5,114.62
Dibuat Oleh :
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 13 - 4
LUAS
M2
5.90
0.04
147.50
5.70
0.04
285.00
5.80
0.04
290.00
5.80
0.04
290.00
LEBAR
M'
5.90
0.04
295.00
5.85
0.04
146.25
1,453.75
5,114.62
6,568.37
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
LEBAR
M'
5.85
TEBAL
M'
HAL 13 - 5
LUAS
M2
0.04
146.25
5.80
0.04
290.00
5.76
0.04
288.00
5.77
0.04
288.50
5.80
0.04
290.00
5.90
0.04
147.50
1,450.25
6,568.37
8,018.62
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 13 - 6
LUAS
M2
5.90
0.04
147.50
5.90
0.04
295.00
5.80
0.04
290.00
5.90
0.04
295.00
5.90
0.04
295.00
LEBAR
M'
5.90
0.04
147.50
1,470.00
8,018.62
9,488.62
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 13 - 7
LUAS
M2
5.90
0.04
147.50
5.90
0.04
295.00
LEBAR
M'
5.87
0.04
293.50
5.70
0.04
285.00
5.70
0.04
285.00
5.70
0.04
142.50
1,448.50
9,488.62
10,937.12
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 13 - 8
LUAS
M2
5.70
0.04
142.50
5.80
0.04
290.00
5.80
0.04
290.00
5.75
0.04
287.50
5.75
0.04
287.50
5.70
0.04
142.50
LEBAR
M'
1,440.00
10,937.12
12,377.12
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 13 - 9
LUAS
M2
5.70
0.04
142.50
5.75
0.04
287.50
5.75
0.04
287.50
LEBAR
M'
5.70
0.04
285.00
5.75
0.04
287.50
5.70
0.04
142.50
1,432.50
12,377.12
13,809.62
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 13 - 10
LEBAR
M'
TEBAL
M'
LUAS
M2
5.70
0.04
142.50
5.70
0.04
285.00
5.80
0.04
290.00
5.80
0.04
290.00
5.90
0.04
295.00
5.90
0.04
147.50
1,450.00
13,809.62
15,259.62
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 13 - 11
LUAS
M2
5.90
0.04
147.50
5.86
0.04
293.00
5.86
0.04
146.50
LEBAR
M'
587.00
15,259.62
15,846.62
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
477 + 794
LEBAR
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
483 + 514
'm 6
477
794
5.96
477
800
6.50
6.00
0.04
35.76
0.04
162.50
0.04
286.00
0.04
42.70
50.00
3
477
850
6.50
19.00
478
610
6.10
14.00
478
624
6.10
0.04
42.70
480
300
5.57
0.04
38.99
480
314
5.57
0.04
38.99
483
500
5.82
0.04
40.74
10
483
514
5.82
0.04
40.74
14.00
14.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 13 - 1
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
117.00 M1
- M1
117.00 M1
729.12
729.12
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
491 + 600
LEBAR
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
491 + 550
'm 6
11
491
600
5.70
0.04
142.50
0.04
144.00
50.00
12
491
550
5.76
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 13 - 2
Jumlah Lalu
Jumlah Total MC - 2
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
50.00 M1
117.00 M1
167.00 M1
MARWAN, BE
CHIEF INSPECTOR
286.50
729.12
1,015.62
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
491 + 550
LEBAR
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
490 + 900
'm 6
491
550
5.76
0.04
144.00
0.04
291.00
50.00
2
491
500
5.82
50.00
491
450
5.82
0.04
291.00
0.04
293.50
0.04
295.00
0.04
295.00
0.04
299.00
0.04
299.00
0.04
302.50
0.04
305.00
0.04
292.50
0.04
305.00
0.04
290.00
0.04
143.75
50.00
4
491
400
5.87
50.00
491
350
5.90
50.00
491
300
5.90
50.00
491
250
5.98
491
200
5.98
50.00
50.00
9
491
150
6.05
50.00
10
491
100
6.10
11
491
050
5.85
50.00
50.00
12
491
000
6.10
50.00
13
490
950
5.80
50.00
14
490
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
900
5.75
Jumlah 13 - 1
Jumlah Lalu MC - 2
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
650.00 M1
167.00 M1
817.00 M1
MARWAN, BE
CHIEF INSPECTOR
3,846.25
1,015.62
4,861.87
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13
No
S TAT I O N E R
LEBAR
JARAK
TEBAL
LUAS
M1
M1
s/d
490 + 200
M1
M2
Laston AC-WC
STA
Aspal Lama
490 + 900
'm 6
15
490
900
5.75
16
490
850
5.75
0.04
143.75
0.04
287.50
0.04
287.00
0.04
287.50
0.04
295.00
0.04
295.00
0.04
282.50
0.04
282.50
0.04
286.50
0.04
283.50
0.04
290.00
0.04
290.00
0.04
290.00
0.04
290.00
0.04
145.75
50.00
50.00
17
490
800
5.74
50.00
18
490
750
5.75
19
490
700
5.90
50.00
50.00
20
490
650
5.90
50.00
21
490
600
5.65
50.00
22
490
550
5.65
50.00
23
490
500
5.73
50.00
24
490
450
5.67
50.00
25
490
400
5.80
50.00
26
490
350
5.80
27
490
300
5.80
50.00
50.00
28
490
250
5.80
50.00
29
490
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
200
5.83
Jumlah 13-2
700.00 M1
4,036.50
1
Jumlah Lalu
817.00 M
4,861.87
1
Jumlah Total
1,517.00 M
8,898.37
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
490 + 200
LEBAR
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
489 + 500
'm 6
30
490
200
5.83
0.04
145.75
0.04
291.50
0.04
295.00
0.04
295.00
0.04
285.00
0.04
285.00
0.04
290.00
0.04
285.00
0.04
276.50
0.04
276.50
0.04
287.50
0.04
287.50
0.04
282.50
0.04
282.50
0.04
143.75
50.00
31
490
150
5.83
32
490
100
5.90
50.00
50.00
33
490
050
5.90
50.00
34
490
000
5.70
50.00
35
489
950
5.70
50.00
36
489
900
5.80
50.00
37
489
850
5.70
50.00
38
489
800
5.53
50.00
39
489
750
5.53
40
489
700
5.75
50.00
50.00
41
489
650
5.75
50.00
42
489
600
5.65
43
489
550
5.65
50.00
50.00
44
489
500
Jumlah 13-3
5.75
700.00 M1
4,009.00
Jumlah Lalu
1,517.00 M1
8,898.37
1
Jumlah Total
2,217.00 M
12,907.37
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
489 + 500
LEBAR
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
489 + 000
'm 6
45
489
500
5.75
0.04
143.75
0.04
282.50
0.04
290.00
0.04
292.50
0.04
292.50
0.04
292.50
0.04
292.50
0.04
295.00
0.04
295.00
0.04
293.00
50.00
46
489
450
5.65
50.00
47
489
400
5.80
50.00
48
489
350
5.85
50.00
49
489
300
5.85
50.00
50
489
250
5.85
51
489
200
5.85
50.00
50.00
52
489
150
5.90
50.00
53
489
100
5.90
54
489
050
5.86
50.00
50.00
55
489
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
000
5.86
0.04
146.50
Jumlah 13-4
500.00 M1
2,915.75
1
Jumlah Lalu
2,217.00 M
12,907.37
1
Jumlah Total MC - 3
2,717.00 M
15,823.12
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
489 + 000
LEBAR
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
488 + 400
'm 6
489
000
5.86
488
950
5.85
0.04
146.50
0.04
292.50
0.04
290.00
50.00
50.00
3
488
900
5.80
50.00
488
850
5.80
0.04
290.00
0.04
295.00
0.04
294.00
0.04
292.50
0.04
292.50
0.04
298.00
0.04
297.50
0.04
290.00
0.04
294.00
0.04
142.50
50.00
5
488
800
5.90
50.00
488
750
5.88
50.00
488
700
5.85
50.00
488
650
5.85
488
600
5.96
50.00
50.00
10
488
550
5.95
50.00
11
488
500
5.80
12
488
450
5.88
50.00
50.00
13
488
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
400
5.70
Jumlah 13-1
600.00 M1
3,515.00
Jumlah Lalu MC - 3
2,717.00 M1
15,823.12
Jumlah Total
3,317.00 M1
19,338.12
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13
No
S TAT I O N E R
Laston AC-WC
LEBAR
JARAK
TEBAL
LUAS
M1
M1
M1
M2
Laston AC-WC
STA
Aspal Lama
488 + 400
s/d
487 + 700
'm 6
14
488
400
5.70
15
488
350
5.70
0.04
142.50
0.04
285.00
0.04
295.00
0.04
295.00
0.04
297.50
0.04
295.00
0.04
297.50
0.04
297.50
0.04
296.50
0.04
296.50
0.04
290.00
0.04
290.00
0.04
295.00
0.04
295.00
0.04
148.75
50.00
50.00
16
488
300
5.90
50.00
17
488
250
5.90
18
488
200
5.95
50.00
50.00
19
488
150
5.90
50.00
20
488
100
5.95
50.00
21
488
050
5.95
50.00
22
488
000
5.93
50.00
23
487
950
5.93
50.00
24
487
900
5.80
50.00
25
487
850
5.80
26
487
800
5.90
50.00
50.00
27
487
750
5.90
50.00
28
487
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
700
5.95
Jumlah 13-2
700.00 M1
4,116.75
1
Jumlah Lalu
3,317.00 M
19,338.12
1
Jumlah Total
4,017.00 M
23,454.87
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
487 + 700
LEBAR
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
487 + 183
'm 6
29
487
700
5.95
0.04
148.75
0.04
297.50
0.04
296.50
0.04
296.50
0.04
295.00
0.04
295.00
0.04
294.50
0.04
295.00
0.04
296.00
0.04
296.00
0.04
197.65
0.04
49.30
50.00
30
488
650
5.95
50.00
31
488
600
5.93
50.00
32
488
550
5.93
50.00
33
488
500
5.90
50.00
34
488
450
5.90
35
488
400
5.89
50.00
50.00
36
488
350
5.90
50.00
37
488
300
5.92
38
487
250
5.92
50.00
50.00
39
487
200
5.90
17.00
40
487
183
Jumlah 13-3
Jumlah Lalu
Jumlah Total
5.80
517.00 M1
4,017.00 M1
4,534.00 M1
3,057.70
23,454.87
26,512.57
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13
No
S TAT I O N E R
Laston AC-WC
STA
Aspal Lama
487 + 700
LEBAR
JARAK
TEBAL
LUAS
M1
M1
M1
M2
s/d
487 + 150
'm 6
41
487
000
2.93
0.04
73.25
0.04
146.50
0.04
143.00
0.04
105.00
0.04
30.00
0.04
29.70
0.04
105.00
0.04
141.10
50.00
42
486
950
2.93
50.00
43
486
900
2.86
50.00
44
486
850
3.00
45
486
830
3.00
46
486
870
2.97
20.00
20.00
47
486
850
3.00
50.00
48
486
800
3.40
33.00
49
486
767
3.40
0.04
56.10
50
485
500
6.20
0.04
155.00
50.00
51
485
450
6.20
0.04
310.00
0.04
315.00
0.04
155.00
0.04
314.00
50.00
52
485
400
6.30
53
485
350
6.20
54
481
050
6.28
50.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
50.00
Jumlah 13-4
473.00 M1
2,078.65
1
Jumlah Lalu
4,534.00 M
26,512.57
Jumlah Total MC - 4
5,007.00 M1
28,591.22
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 5
BULAN : NOPEMBER 2005
6.3(5)
Laston Lapis Aus Aspal Beton (AC-WC)
Jalan Banda Aceh - Medan
HAL 13
No
S TAT I O N E R
LEBAR
JARAK
TEBAL
LUAS
M1
M1
M1
M2
Laston AC-WC
Laston AC-BC
'm 10
Nicah Awe
10.00
9.60
0.04
96.00
Damar Tutong
10.00
9.60
0.04
96.00
Alue Lhok
9.00
8.10
0.04
72.90
Sarah Teube
10.00
9.60
0.04
96.00
Alue Dua
10.00
9.60
0.04
96.00
Lhok Bhani
10.00
9.60
0.04
96.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 13-1
56.10 M1
552.90
1
Jumlah Lalu MC - 4
5,007.00 M
28,591.22
1
Jumlah Total MC - 5
5,063.10 M
29,144.12
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 13 - 1
KET
M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 13 - 2
KET
M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 13 - 1
KET
M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 13 - 2
KET
K
9
1
L
0
a
e
msl
m
a't'
os'
n
A
B
A
C
W
B
C
M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 13 - 3
KET
M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 13 - 4
KET
M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 13 - 1
KET
M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 13 - 2
KET
M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 13 - 3
KET
M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 13 - 4
KET
M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 13 - 1
KET
M2
M2
M2
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+850
Sta 490+900
Sta 490+950
Sta 491+000
Sta 491+050
Sta 491+100
Sta 491+150
Sta 491+200
Sta 491+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+850
Sta 490+900
Sta 490+950
Sta 491+000
Sta 491+050
Sta 491+100
Sta 491+150
Sta 491+200
Sta 491+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
Lokasi
SKET/GAMBAR
Sta 490+100
Sta 490+150
Sta 490+200
Sta 490+250
Sta 490+300
Sta 490+350
Sta 490+400
Sta 490+450
Sta 490+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 489+350
Sta 489+400
Sta 489+450
Sta 489+500
Sta 489+550
Sta 489+600
Sta 489+650
Sta 489+700
Sta 489+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
KOTA LANGSA
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 487+850
Sta 487+900
Sta 487+950
Sta 488+000
Sta 488+050
Sta 488+100
Sta 488+150
Sta 488+200
Sta 488+250
KOTA LANGSA
Diperiksa Oleh :
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 487+100
Sta 487+150
Sta 487+200
Sta 487+250
Sta 487+300
Sta 487+350
Sta 487+400
Sta 487+450
Sta 487+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 486+350
Sta 486+400
Sta 486+450
Sta 486+500
Sta 486+550
Sta 486+600
Sta 486+650
Sta 486+700
Sta 486+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 485+600
Sta 485+650
Sta 485+700
Sta 485+750
Sta 485+800
Sta 485+850
Sta 485+900
Sta 485+950
Sta 486+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 484+850
Sta 484+900
Sta 484+950
Sta 485+000
Sta 485+050
Sta 485+100
Sta 485+150
Sta 485+200
Sta 485+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 484+100
Sta 484+150
Sta 484+200
Sta 484+250
Sta 484+300
Sta 484+350
Sta 484+400
Sta 484+450
Sta 484+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 483+350
Sta 483+400
Sta 483+450
Sta 483+500
Sta 483+550
Sta 483+600
Sta 483+650
Sta 483+700
Sta 483+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 482+600
Sta 482+650
KOTA LANGSA
Sta 482+700
Sta 482+750
Sta 482+800
Sta 482+850
Sta 482+900
Sta 482+950
Sta 483+000
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 481+850
Sta 481+900
KOTA LANGSA
Sta 481+950
Sta 482+000
Sta 482+050
Sta 482+100
Sta 482+150
Sta 482+200
Sta 482+250
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 481+100
Sta 481+150
Sta 481+200
Sta 481+250
Sta 481+300
Sta 481+350
Sta 481+400
Sta 481+450
Sta 481+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 480+350
Sta 480+400
Sta 480+450
Sta 480+500
Sta 480+550
Sta 480+600
Sta 480+650
Sta 480+700
Sta 480+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 479+600
Sta 479+650
Sta 479+700
Sta 479+750
Sta 479+800
Sta 479+850
Sta 479+900
Sta 479+950
Sta 480+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 478+850
Sta 478+900
Sta 478+950
Sta 479+000
Sta 479+050
Sta 479+100
Sta 479+150
Sta 479+200
Sta 479+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 478+100
Sta 478+150
Sta 478+200
Sta 478+250
Sta 478+300
Sta 478+350
Sta 478+400
Sta 478+450
Sta 478+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 477+350
Sta 477+400
Sta 477+450
Sta 477+500
Sta 477+550
Sta 477+600
Sta 477+650
Sta 477+700
Sta 477+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 476+600
Sta 476+650
KOTA LANGSA
Sta 476+700
Sta 476+750
Sta 476+800
Sta 476+850
Sta 476+900
Sta 476+950
Sta 477+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 475+850
Sta 475+900
KOTA LANGSA
Sta 475+950
Sta 476+000
Sta 476+050
Sta 476+100
Sta 476+150
Sta 476+200
Sta 476+250
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 475+100
Sta 475+150
Sta 475+200
Sta 475+250
Sta 475+300
Sta 475+350
Sta 475+400
Sta 475+450
Sta 475+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 474+350
Sta 474+400
Sta 474+450
Sta 474+500
Sta 474+550
Sta 474+600
Sta 474+650
Sta 474+700
Sta 474+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(5)
: Laston - Lapis Aus Aspal Beton (AC-WC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
DATA
2
US 2005
HAL. 13 - 5
MBAR
PERBATASAN
SUMUT
Sta 491+300
Sta 491+350
Sta 491+400
Sta 491+450
Sta 491+500
Sta 491+550
Sta 491+600
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 13 - 1
MBAR
PERBATASAN
SUMUT
Sta 491+300
Sta 491+350
Sta 491+400
Sta 491+450
Sta 491+500
Sta 491+550
Sta 491+600
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 13 - 2
MBAR
Sta 490+550
Sta 490+600
Sta 490+650
Sta 490+700
Sta 490+750
Sta 490+800
Sta 490+850
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
MBAR
HAL. 13 - 3
Sta 489+800
Sta 489+850
Sta 489+900
Sta 489+950
Sta 490+000
Sta 490+050
Sta 490+100
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 13 - 4
MBAR
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
Sta 489+250
Sta 489+300
Sta 489+350
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
4
ER 2005
HAL. 13 - 1
MBAR
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
Sta 489+250
Sta 489+300
MEDAN
Sta 489+350
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
4
ER 2005
HAL. 13 - 2
MBAR
eh :
Sta 488+300
Sta 488+350
Sta 488+400
Sta 488+450
Sta 488+500
Sta 488+550
MEDAN
Dibuat Oleh :
Sta 488+600
pervisi
ERDANA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
4
ER 2005
HAL. 13 - 3
MBAR
Sta 487+550
Sta 487+600
Sta 487+650
Sta 487+700
Sta 487+750
Sta 487+800
Sta 487+850
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 1 - 1
MBAR
Sta 486+800
Sta 486+850
Sta 486+900
Sta 486+950
Sta 487+000
Sta 487+050
Sta 487+100
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
DATA
3
BER 2005
HAL. 1 - 1
MBAR
Sta 486+050
Sta 486+100
Sta 486+150
Sta 486+200
Sta 486+250
Sta 486+300
Sta 486+350
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 485+300
Sta 485+350
Sta 485+400
Sta 485+450
Sta 485+500
Sta 485+550
Sta 485+600
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
MBAR
HAL. 1 - 1
Sta 484+550
Sta 484+600
Sta 484+650
Sta 484+700
Sta 484+750
Sta 484+800
Sta 484+850
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 13 - 4
MBAR
Sta 483+800
Sta 483+850
Sta 483+900
Sta 483+950
Sta 484+000
Sta 484+050
Sta 484+100
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 483+050
Sta 483+100
Sta 483+150
Sta 483+200
Sta 483+250
Sta 483+300
MEDAN
Sta 483+350
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 482+300
Sta 482+350
Sta 482+400
Sta 482+450
Sta 482+500
Sta 482+550
MEDAN
Sta 482+600
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
eh :
pervisi
ERDANA
Sta 481+550
Sta 481+600
Sta 481+650
Sta 481+700
Sta 481+750
Sta 481+800
Sta 481+850
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 480+800
Sta 480+850
Sta 480+900
Sta 480+950
Sta 481+000
Sta 481+050
Sta 481+100
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 13 - 3
MBAR
Sta 480+050
Sta 480+100
Sta 480+150
Sta 480+200
Sta 480+250
Sta 480+300
Sta 480+350
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 479+300
Sta 479+350
Sta 479+400
Sta 479+450
Sta 479+500
Sta 479+550
Sta 479+600
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 13 - 2
MBAR
Sta 478+550
Sta 478+600
Sta 478+650
Sta 478+700
Sta 478+750
Sta 478+800
Sta 478+850
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
MBAR
HAL. 13 - 1
Sta 477+800
Sta 477+850
Sta 477+900
Sta 477+950
Sta 478+000
Sta 478+050
Sta 478+100
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 477+050
Sta 477+100
Sta 477+150
Sta 477+200
Sta 477+250
Sta 477+300
MEDAN
Sta 477+350
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 476+300
Sta 476+350
Sta 476+400
Sta 476+450
Sta 476+500
Sta 476+550
MEDAN
Sta 476+600
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
eh :
pervisi
ERDANA
Sta 475+550
Sta 475+600
Sta 475+650
Sta 475+700
Sta 475+750
Sta 475+800
Sta 475+850
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
Sta 474+800
Sta 474+850
Sta 474+900
Sta 474+950
Sta 475+000
Sta 475+050
Sta 475+100
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 1 - 1
MBAR
KOTA KUALA
SIMPANG
Sta 474+000
Sta 474+050
KOTA LANGSA
Sta 474+150
Sta 474+200
Sta 474+250
Sta 474+300
Sta 474+350
MEDAN
eh :
pervisi
ERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
BE
CTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
477 + 750
477 + 800
477 + 850
6.00
50.00
19.00
###
6.50
6.37
0.05
0.05
0.05
36.00
325.00
121.03
1.80 AC-WC
16.25 AC-WC
6.05 AC-WC
478 + 600
14.00
6.10
0.05
85.40
4.27 AC-WC
567.43
-
28.37
###
JUMLAH TOTAL
567.43
28.37
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
INDIKASI
STA
STA
AWAL
AKHIR
480 + 300
:
:
:
:
PANJANG
m
14.20
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
5.57
0.05
VOL
m3
KET
79.09
3.95 AC-WC
79.09
3.95
JUMLAH LALU
JUMLAH TOTAL
567.43
646.52
28.37
32.32
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
84 483 + 500
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
:
:
:
:
PANJANG
m
14.66
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
5.82
0.05
85.32
VOL
m3
KET
4.27 ACWC
85.32
646.52
731.84
4.27
32.32
36.59
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
731.84
731.84
36.59
36.59
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
731.84
731.84
36.59
36.59
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
231
232
233
234
235
JUMLAH SAAT INI
JUMLAH LALU
JUMLAH TOTAL
731.84
731.84
36.59
36.59
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
272
273
274
275
276
JUMLAH SAAT INI
JUMLAH LALU
JUMLAH TOTAL
731.84
731.84
36.59
36.59
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
312
313
314
315
316
731.84
731.84
36.59
36.59
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
317
318
319
320
321
322
323
324
325
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
731.84
731.84
36.59
36.59
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
INDIKASI
STA
STA
AWAL
AKHIR
474 + 250
474 + 250
474 + 500
474 + 700
474 + 750
474 + 800
474 + 850
475 + 300
475 + 450
475 + 500
476 + 050
476 + 450
476 + 500
476 + 550
476 + 600
477 + 050
477 + 100
477 + 450
477 + 550
477 + 600
477 + 700
477 + 950
478 + 000
478 + 200
478 + 300
478 + 350
478 + 650
479 + 250
479 + 300
479 + 750
479 + 950
:
:
:
:
LEBAR
m
0.90
2.40
1.44
0.70
1.00
1.50
1.20
2.00
2.00
2.00
2.40
1.60
0.80
1.20
1.60
1.60
1.80
2.00
1.00
1.00
2.70
2.10
2.33
2.23
2.63
2.60
2.33
3.94
2.78
2.70
2.70
2.70
2.70
2.85
2.50
2.90
2.90
1.30
2.90
1.02
0.63
3.53
3.82
PENANGANAN
TEBAL
LUAS
m
m2
0.05
1.68
0.05
105.12
0.05
2.53
0.05
0.70
0.05
1.10
0.05
9.15
0.05
6.00
0.05
48.40
0.05
5.20
0.05
28.80
0.05
1.92
0.05
1.28
0.05
0.64
0.05
28.80
0.05
36.80
0.05
64.00
0.05
20.70
0.05
55.64
0.05
0.56
0.05
1.64
0.05
56.05
0.05
19.82
0.05
20.34
0.05
13.45
0.05
31.82
0.05
33.28
0.05
23.30
0.05
148.34
0.05
116.76
0.05
67.91
0.05
74.79
0.05
14.20
0.05
31.86
0.05
8.84
0.05
2.08
0.05
7.89
0.05
19.87
0.05
4.03
0.05
66.29
0.05
8.15
0.05
1.51
0.05
4.34
0.05
3.59
1,199.17
-
HAL - 1
VOL
m3
0.08
5.26
0.13
0.04
0.06
0.46
0.30
2.42
0.26
1.44
0.10
0.06
0.03
1.44
1.84
3.20
1.04
2.78
0.03
0.08
2.80
0.99
1.02
0.67
1.59
1.66
1.17
7.42
5.84
3.40
3.74
0.71
1.59
0.44
0.10
0.39
0.99
0.20
3.31
0.41
0.08
0.22
0.18
k=2,25
Ton
0.18
11.84
0.29
0.09
0.14
1.04
0.68
5.45
0.59
3.24
0.23
0.14
0.07
3.24
4.14
7.20
2.34
6.26
0.07
0.18
6.30
2.23
2.30
1.51
3.58
3.74
2.63
16.70
13.14
7.65
8.42
1.60
3.58
0.99
0.23
0.88
2.23
0.45
7.45
0.92
0.18
0.50
0.41
59.97
-
135.03
###
JUMLAH TOTAL
1,199.17
59.97
135.03
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
44
45
46
47
48
INDIKASI
STA
STA
AWAL
AKHIR
480 + 100
480 + 350
480 + 450
480 + 500
481 + 000
JUMLAH SAAT INI
JUMLAH LALU
JUMLAH TOTAL
:
:
:
:
PANJANG
m
11.85
31.80
4.44
31.95
16.90
LEBAR
m
3.30
3.52
1.39
2.90
2.75
PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
39.11
111.94
6.17
92.66
46.48
296.36
1,199.17
1,495.53
HAL - 2
VOL
m3
1.96
5.60
0.31
4.63
2.32
14.82
59.97
74.79
k=2,25
Ton
4.41
12.60
0.70
10.42
5.22
33.35
135.03
168.38
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
INDIKASI
STA
STA
AWAL
AKHIR
481 + 500
481 + 550
481 + 750
481 + 800
481 + 850
481 + 900
481 + 950
482 + 500
482 + 550
482 + 600
482 + 650
482 + 700
482 + 750
482 + 800
482 + 850
482 + 900
482 + 950
483 + 050
483 + 150
483 + 350
483 + 400
483 + 500
483 + 550
483 + 600
483 + 650
483 + 700
483 + 850
484 + 050
484 + 150
484 + 450
:
:
:
:
PANJANG
m
5.10
0.80
0.30
9.30
24.07
11.83
37.35
29.30
8.26
19.03
18.03
3.45
21.50
45.60
1.80
2.10
1.72
2.14
4.43
18.83
2.40
3.70
16.30
6.97
8.10
36.60
6.20
4.00
6.79
2.73
22.80
1.45
7.30
6.30
3.37
6.10
32.00
6.30
4.95
2.00
3.58
LEBAR
m
2.57
0.66
1.20
2.92
2.95
2.82
3.00
2.70
1.63
2.80
2.80
2.30
2.90
3.20
1.50
0.30
1.45
0.82
0.82
2.70
2.97
0.44
2.88
2.85
2.79
2.65
1.35
2.10
1.89
1.73
3.15
1.69
1.93
1.90
1.67
1.40
1.40
1.30
1.60
1.05
1.00
PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
13.11
0.53
0.36
27.16
71.01
33.36
112.05
79.11
13.46
53.28
50.48
7.94
62.35
145.92
2.70
0.63
2.49
1.75
3.63
50.84
7.13
1.63
46.94
19.86
22.60
96.99
8.37
8.40
12.83
4.72
71.82
2.45
14.09
11.97
5.63
8.54
44.80
8.19
7.92
2.10
3.58
HAL - 2
VOL
m3
k=2,25
Ton
0.66
0.03
0.02
1.36
3.55
1.67
5.60
3.96
0.67
2.66
2.52
0.40
3.12
7.30
0.14
0.03
0.12
0.09
0.18
2.54
0.36
0.08
2.35
0.99
1.13
4.85
0.42
0.42
0.64
0.24
3.59
0.12
0.70
0.60
0.28
0.43
2.24
0.41
0.40
0.11
0.18
1.49
0.07
0.05
3.06
7.99
3.76
12.60
8.91
1.51
5.99
5.67
0.90
7.02
16.43
0.32
0.07
0.27
0.20
0.41
5.72
0.81
0.18
5.29
2.23
2.54
10.91
0.95
0.95
1.44
0.54
8.08
0.27
1.58
1.35
0.63
0.97
5.04
0.92
0.90
0.25
0.41
1,142.72
1,495.53
2,638.25
57.16
74.79
131.95
128.68
168.38
297.06
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
INDIKASI
STA
STA
AWAL
AKHIR
485 + 050
485 + 100
485 + 200
485 + 250
485 + 450
485 + 500
485 + 550
485 + 750
485 + 800
486 + 050
486 + 100
486 + 150
486 + 200
486 + 250
:
:
:
:
PANJANG
m
17.25
2.60
9.10
26.40
5.06
8.90
7.34
9.85
6.05
7.08
5.00
3.95
5.60
0.60
0.80
15.40
5.50
8.20
1.66
3.89
1.40
12.20
12.00
4.85
3.10
0.62
3.30
0.60
4.30
7.16
0.48
7.71
8.90
3.10
0.70
6.40
0.70
0.55
2.65
6.08
LEBAR
m
1.85
3.70
3.47
1.20
1.10
0.60
1.30
1.20
1.60
1.00
1.60
1.30
2.10
0.50
0.65
1.15
0.70
1.00
0.80
3.10
0.70
1.00
0.80
3.50
2.20
4.33
0.87
0.90
1.20
0.73
3.64
0.73
0.80
0.55
1.50
0.71
0.70
2.30
0.90
1.40
PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
1.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
31.91
9.62
31.58
31.68
5.57
5.34
9.54
11.82
9.68
7.08
8.00
5.14
11.76
0.30
0.52
17.71
3.85
8.20
1.33
12.06
0.98
12.20
9.60
16.98
6.82
2.68
2.87
0.54
5.16
5.23
1.75
5.63
7.12
1.71
1.05
4.54
0.49
1.27
2.39
8.51
HAL - 3
VOL
m3
k=2,25
Ton
1.60
0.48
1.58
1.58
0.28
0.27
0.48
0.59
0.48
7.43
0.40
0.26
0.59
0.02
0.03
0.89
0.19
0.41
0.07
0.60
0.05
0.61
0.48
0.85
0.34
0.13
0.14
0.03
0.26
0.26
0.09
0.28
0.36
0.09
0.05
0.23
0.02
0.06
0.12
0.43
3.60
1.08
3.56
3.56
0.63
0.61
1.08
1.33
1.08
16.72
0.90
0.59
1.33
0.05
0.07
2.00
0.43
0.92
0.16
1.35
0.11
1.37
1.08
1.91
0.77
0.29
0.32
0.07
0.59
0.59
0.20
0.63
0.81
0.20
0.11
0.52
0.05
0.14
0.27
0.97
130
6.08
0.36
0.05
2.19
0.11
0.25
322.40
2,638.25
2,960.65
23.22
131.95
155.17
52.30
297.06
349.36
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
INDIKASI
STA
STA
AWAL
AKHIR
486 + 300
486 + 400
486 + 450
486 + 500
486 + 550
486 + 850
486 + 900
486 + 950
487 + 200
487 + 250
487 + 400
487 + 450
487 + 500
487 + 550
487 + 600
487 + 750
487 + 850
:
:
:
:
PANJANG
m
11.00
8.50
11.88
17.10
6.22
0.67
2.39
5.90
6.65
8.30
23.68
14.00
6.50
4.02
2.30
2.64
27.88
3.07
4.45
2.93
1.40
9.60
1.70
10.60
8.45
3.30
16.29
7.01
10.40
3.67
5.37
16.70
9.24
7.80
10.60
2.10
7.06
6.63
16.66
LEBAR
m
0.70
0.40
0.99
0.99
0.80
0.66
0.95
1.40
0.40
1.92
2.04
0.70
1.28
0.36
0.13
2.30
1.90
0.81
1.35
0.92
0.90
1.83
2.20
2.20
4.40
1.33
1.90
3.57
1.94
2.54
2.10
1.85
2.13
2.10
3.93
1.20
1.90
4.60
4.60
PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
7.70
3.40
11.76
16.93
4.98
0.44
2.27
8.26
2.66
15.94
48.31
9.80
8.32
1.45
0.30
6.07
52.97
2.49
6.01
2.70
1.26
17.57
3.74
23.32
37.18
4.39
30.95
25.03
20.18
9.32
11.28
30.90
19.68
16.38
41.66
2.52
13.41
30.50
76.64
HAL - 4
VOL
m3
k=2,25
Ton
0.39
0.17
0.59
0.85
0.25
0.02
0.11
0.41
0.13
0.80
2.42
0.49
0.42
0.07
0.02
0.30
2.65
0.12
0.30
0.14
0.06
0.88
0.19
1.17
1.86
0.22
1.55
1.25
1.01
0.47
0.56
1.55
0.98
0.82
2.08
0.13
0.67
1.53
3.83
0.88
0.38
1.33
1.91
0.56
0.05
0.25
0.92
0.29
1.80
5.45
1.10
0.95
0.16
0.05
0.68
5.96
0.27
0.68
0.32
0.14
1.98
0.43
2.63
4.19
0.50
3.49
2.81
2.27
1.06
1.26
3.49
2.21
1.85
4.68
0.29
1.51
3.44
8.62
30.00
0.80
0.05
24.00
1.20
2.70
652.67
2,960.65
3,613.32
32.66
155.17
187.83
73.54
349.36
422.90
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
INDIKASI
STA
STA
AWAL
AKHIR
487 + 900
487 + 950
488 + 150
488 + 200
488 + 300
488 + 350
488 + 400
488 + 550
488 + 600
488 + 750
488 + 800
488 + 850
:
:
:
:
PANJANG
m
19.00
20.50
7.74
6.90
0.88
9.00
7.31
1.20
9.94
8.67
2.20
2.85
0.97
5.30
1.00
15.58
2.90
9.58
1.50
2.30
0.35
1.45
0.80
11.71
11.15
9.70
9.72
3.35
1.16
1.20
15.20
9.42
5.30
0.85
9.95
10.00
11.80
LEBAR
m
0.80
1.93
1.00
0.77
2.49
1.30
2.88
1.30
1.66
2.88
0.96
1.93
1.46
1.57
0.95
1.85
1.30
1.82
1.20
0.60
1.50
1.23
0.83
1.99
1.90
1.71
3.33
1.63
3.16
0.90
1.50
4.53
4.53
2.95
2.80
1.97
1.65
PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
15.20
39.57
7.74
5.31
2.19
11.70
21.05
1.56
16.50
24.97
2.11
5.50
1.42
8.32
0.95
28.82
3.77
17.44
1.80
1.38
0.53
1.78
0.66
23.30
21.19
16.59
32.37
5.46
3.67
1.08
22.80
42.67
24.01
2.51
27.86
19.70
19.47
HAL - 5
VOL
m3
k=2,25
Ton
0.76
1.98
0.39
0.27
0.11
0.59
1.05
0.08
0.83
1.25
0.11
0.28
0.07
0.42
0.05
1.44
0.19
0.87
0.09
0.07
0.03
0.09
0.03
1.17
1.06
0.83
1.62
0.27
0.18
0.05
1.14
2.13
1.20
0.13
1.39
0.99
0.97
1.71
4.46
0.88
0.61
0.25
1.33
2.36
0.18
1.87
2.81
0.25
0.63
0.16
0.95
0.11
3.24
0.43
1.96
0.20
0.16
0.07
0.20
0.07
2.63
2.39
1.87
3.65
0.61
0.41
0.11
2.57
4.79
2.70
0.29
3.13
2.23
2.18
207
208
209
4.27
27.45
34.00
489 + 050
489 + 100
3.37
3.37
2.50
0.05
0.05
0.05
14.39
92.51
85.00
0.72
4.63
4.25
1.62
10.42
9.56
674.85
3,613.32
4,288.17
33.78
187.83
221.61
76.05
422.90
498.95
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
LEBAR
m
PENANGANAN
TEBAL
LUAS
m
m2
HAL - 6
VOL
m3
k=2,25
Ton
489 + 150
15.80
2.00
0.05
31.60
1.58
3.56
489 + 200
489 + 250
2.60
3.90
2.40
8.40
3.80
2.80
1.10
2.10
4.00
5.20
14.80
1.80
2.60
1.65
2.35
43.00
6.45
0.70
1.20
1.30
1.31
1.50
1.26
1.65
6.20
1.30
16.20
10.00
5.50
11.00
1.90
6.57
5.60
2.30
1.60
1.60
1.80
1.90
1.50
1.60
1.60
2.80
2.70
2.58
1.50
1.50
0.60
0.70
2.90
2.90
0.70
0.90
0.60
1.60
1.00
1.00
0.90
2.30
1.00
2.28
0.50
1.50
3.40
1.60
1.50
0.40
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
5.98
6.24
3.84
15.12
7.22
4.20
1.76
3.36
11.20
14.04
38.18
2.70
3.90
0.99
1.65
124.70
18.71
0.49
1.08
0.78
2.10
1.50
1.26
1.49
14.26
1.30
36.94
5.00
8.25
37.40
3.04
9.86
2.24
0.30
0.31
0.19
0.76
0.36
0.21
0.09
0.17
0.56
0.70
1.91
0.14
0.20
0.05
0.08
6.24
0.94
0.02
0.05
0.04
0.11
0.08
0.06
0.07
0.71
0.07
1.85
0.25
0.41
1.87
0.15
0.49
0.11
0.68
0.70
0.43
1.71
0.81
0.47
0.20
0.38
1.26
1.58
4.30
0.32
0.45
0.11
0.18
14.04
2.12
0.05
0.11
0.09
0.25
0.18
0.14
0.16
1.60
0.16
4.16
0.56
0.92
4.21
0.34
1.10
0.25
489 + 300
489 + 350
489 + 400
489 + 450
489 + 500
489 + 550
489 + 600
489 + 650
489 + 700
247
248
249
250
251
252
489 + 750
3.10
4.10
4.00
5.85
10.80
5.56
2.10
3.40
1.65
2.10
2.80
1.30
0.05
0.05
0.05
0.05
0.05
0.05
6.51
13.94
6.60
12.29
30.24
7.23
0.33
0.70
0.33
0.61
1.51
0.36
0.74
1.58
0.74
1.37
3.40
0.81
499.19
4,288.17
4,787.36
24.97
221.61
246.58
56.22
498.95
555.17
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
INDIKASI
STA
STA
AWAL
AKHIR
489 + 800
489 + 850
489 + 900
489 + 950
490 + 000
490 + 050
490 + 100
:
:
:
:
PANJANG
m
0.70
5.25
5.00
1.30
0.80
3.70
2.80
4.50
9.20
1.10
3.00
5.10
4.00
3.20
2.70
1.30
27.70
3.60
10.50
8.55
3.40
4.70
13.00
13.35
11.75
21.00
2.30
1.50
1.50
4.80
8.30
13.80
6.70
3.80
LEBAR
m
1.35
2.60
1.00
0.90
0.80
1.70
11.04
1.55
2.60
1.90
4.20
3.40
2.60
2.60
3.80
2.20
2.27
0.40
3.10
1.80
4.40
2.00
0.40
1.96
2.70
2.70
0.80
0.90
0.90
1.00
1.00
1.60
1.30
1.50
PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.95
13.65
5.00
1.17
0.64
6.29
30.91
6.98
23.92
2.09
12.60
17.34
10.40
8.32
10.26
2.86
62.88
1.44
32.55
15.39
14.96
9.40
5.20
26.17
31.73
56.70
1.84
1.35
1.35
4.80
8.30
22.08
8.71
5.70
HAL - 7
VOL
m3
k=2,25
Ton
0.05
0.68
0.25
0.06
0.03
0.31
1.55
0.35
1.20
0.10
0.63
0.87
0.52
0.42
0.51
0.14
3.14
0.07
1.63
0.77
0.75
0.47
0.26
1.31
1.59
2.84
0.09
0.07
0.07
0.24
0.42
1.10
0.44
0.29
0.11
1.53
0.56
0.14
0.07
0.70
3.49
0.79
2.70
0.23
1.42
1.96
1.17
0.95
1.15
0.32
7.07
0.16
3.67
1.73
1.69
1.06
0.59
2.95
3.58
6.39
0.20
0.16
0.16
0.54
0.95
2.48
0.99
0.65
287
50.00
0.60
0.05
30.00
1.50
3.38
493.93
4,787.36
5,281.29
24.72
246.58
271.30
55.69
555.17
610.86
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
INDIKASI
STA
STA
AWAL
AKHIR
490 + 150
490 + 200
490 + 250
490 + 300
490 + 400
490 + 450
490 + 500
490 + 550
490 + 600
490 + 650
490 + 750
490 + 800
490 + 850
:
:
:
:
PANJANG
m
5.60
1.45
5.00
3.00
5.40
5.60
0.90
0.50
0.60
4.33
1.95
18.50
3.00
6.10
8.10
2.00
1.55
11.70
6.10
8.50
4.20
10.50
13.60
20.00
20.00
6.00
1.20
29.00
1.00
6.00
3.60
4.00
44.00
10.00
15.00
LEBAR
m
0.70
0.80
0.85
0.58
1.56
0.50
0.50
0.60
0.58
0.55
0.80
0.95
0.98
2.10
1.50
0.80
1.40
1.80
1.50
0.50
2.00
1.60
1.70
2.50
2.50
2.70
1.00
1.20
1.50
2.10
1.50
2.40
3.00
3.00
2.30
PENANGANAN
TEBAL
LUAS
m
m2
0.05
3.92
0.05
1.16
0.05
4.25
0.05
1.74
0.05
8.42
0.05
2.80
0.05
0.45
0.05
0.30
0.05
0.35
0.05
2.38
0.05
1.56
0.05
17.58
0.05
2.94
0.05
12.81
0.05
12.15
0.05
1.60
0.05
2.17
0.05
21.06
0.05
9.15
0.05
4.25
0.05
8.40
0.05
16.80
0.05
23.12
0.05
50.00
0.05
50.00
0.05
16.20
0.05
1.20
0.05
34.80
0.05
1.50
0.05
12.60
0.05
5.40
0.05
9.60
0.05
132.00
0.05
30.00
0.05
34.50
HAL - 8
VOL
m3
0.20
0.06
0.21
0.09
0.42
0.14
0.02
0.02
0.02
0.12
0.08
0.88
0.15
0.64
0.61
0.08
0.11
1.05
0.46
0.21
0.42
0.84
1.16
2.50
2.50
0.81
0.06
1.74
0.08
0.63
0.27
0.48
6.60
1.50
1.73
k=2,25
Ton
0.45
0.14
0.47
0.20
0.95
0.32
0.05
0.05
0.05
0.27
0.18
1.98
0.34
1.44
1.37
0.18
0.25
2.36
1.04
0.47
0.95
1.89
2.61
5.63
5.63
1.82
0.14
3.92
0.18
1.42
0.61
1.08
14.85
3.38
3.89
323
324
325
326
327
328
329
330
331
491 + 000
8.60
19.90
7.50
7.80
6.90
12.80
30.00
24.00
32.00
491 + 100
491 + 150
491 + 200
491 + 200
2.70
2.60
2.00
1.30
1.40
0.80
3.00
2.50
3.00
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
23.22
51.74
15.00
10.14
9.66
10.24
90.00
60.00
96.00
903.16
5,281.29
6,184.45
1.16
2.59
0.75
0.51
0.48
0.51
4.50
3.00
4.80
45.19
271.30
316.49
2.61
5.83
1.69
1.15
1.08
1.15
10.13
6.75
10.80
101.75
610.86
712.61
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
332
333
334
335
336
337
338
339
340
INDIKASI
STA
STA
AWAL
AKHIR
491 + 350
491 + 400
491 + 450
491 + 500
:
:
:
:
PANJANG
m
19.60
5.30
37.80
7.00
13.70
9.20
24.00
12.00
9.00
LEBAR
m
2.00
2.90
2.80
2.00
2.70
1.60
2.00
3.40
5.40
PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
39.20
15.37
105.84
14.00
36.99
14.72
48.00
40.80
48.60
HAL - 9
VOL
m3
k=2,25
Ton
1.96
0.77
5.29
0.70
1.85
0.74
2.40
2.04
2.43
4.41
1.73
11.90
1.58
4.16
1.67
5.40
4.59
5.47
363.52
6,184.45
6,547.97
18.18
316.49
334.67
40.91
712.61
753.52
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
INDIKASI
STA
STA
AWAL
AKHIR
474 + 250
474 + 250
474 + 500
474 + 700
474 + 750
474 + 800
474 + 850
475 + 300
475 + 450
475 + 500
476 + 050
476 + 450
476 + 500
476 + 550
476 + 600
477 + 050
477 + 100
477 + 450
477 + 550
477 + 600
477 + 700
477 + 950
478 + 000
478 + 200
478 + 300
478 + 350
478 + 650
479 + 250
479 + 300
479 + 750
479 + 950
:
:
:
:
PANJANG
m
1.87
43.80
1.76
1.00
1.10
6.10
5.00
24.20
2.60
14.40
0.80
0.80
0.80
24.00
23.00
40.00
11.50
27.82
0.56
1.64
20.76
9.44
8.73
6.03
12.10
12.80
10.00
37.65
42.00
25.15
27.70
5.26
11.80
3.10
0.83
2.72
6.85
3.10
22.86
7.99
2.40
1.23
0.94
PENANGANAN
TEBAL
LUAS
m
m2
0.05
1.68
0.05
105.12
0.05
2.53
0.05
0.70
0.05
1.10
0.05
9.15
0.05
6.00
0.05
48.40
0.05
5.20
0.05
28.80
0.05
1.92
0.05
1.28
0.05
0.64
0.05
28.80
0.05
36.80
0.05
64.00
0.05
20.70
0.05
55.64
0.05
0.56
0.05
1.64
0.05
56.05
0.05
19.82
0.05
20.34
0.05
13.45
0.05
31.82
0.05
33.28
0.05
23.30
0.05
148.34
0.05
116.76
0.05
67.91
0.05
74.79
0.05
14.20
0.05
31.86
0.05
8.84
0.05
2.08
0.05
7.89
0.05
19.87
0.05
4.03
0.05
66.29
0.05
8.15
0.05
1.51
0.05
4.34
0.05
3.59
1,199.17
-
HAL - 1
VOL
m3
0.08
5.26
0.13
0.04
0.06
0.46
0.30
2.42
0.26
1.44
0.10
0.06
0.03
1.44
1.84
3.20
1.04
2.78
0.03
0.08
2.80
0.99
1.02
0.67
1.59
1.66
1.17
7.42
5.84
3.40
3.74
0.71
1.59
0.44
0.10
0.39
0.99
0.20
3.31
0.41
0.08
0.22
0.18
k=2,25
Ton
0.18
11.84
0.29
0.09
0.14
1.04
0.68
5.45
0.59
3.24
0.23
0.14
0.07
3.24
4.14
7.20
2.34
6.26
0.07
0.18
6.30
2.23
2.30
1.51
3.58
3.74
2.63
16.70
13.14
7.65
8.42
1.60
3.58
0.99
0.23
0.88
2.23
0.45
7.45
0.92
0.18
0.50
0.41
59.97
-
135.03
###
JUMLAH TOTAL
1,199.17
59.97
135.03
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
44
45
46
47
48
INDIKASI
STA
STA
AWAL
AKHIR
480 + 100
480 + 350
480 + 450
480 + 500
481 + 000
JUMLAH SAAT INI
JUMLAH LALU
JUMLAH TOTAL
:
:
:
:
LEBAR
m
3.30
3.52
1.39
2.90
2.75
PANJANG
m
11.85
31.80
4.44
31.95
16.90
PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
39.11
111.94
6.17
92.66
46.48
296.36
1,199.17
1,495.53
HAL - 2
VOL
m3
1.96
5.60
0.31
4.63
2.32
14.82
59.97
74.79
k=2,25
Ton
4.41
12.60
0.70
10.42
5.22
33.35
135.03
168.38
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
INDIKASI
STA
STA
AWAL
AKHIR
481 + 500
481 + 550
481 + 750
481 + 800
481 + 850
481 + 900
481 + 950
482 + 500
482 + 550
482 + 600
482 + 650
482 + 700
482 + 750
482 + 800
482 + 850
482 + 900
482 + 950
483 + 050
483 + 150
483 + 350
483 + 400
483 + 500
483 + 550
483 + 600
483 + 650
483 + 700
483 + 850
484 + 050
484 + 150
484 + 450
:
:
:
:
LEBAR
m
2.57
0.66
1.20
2.92
2.95
2.82
3.00
2.70
1.63
2.80
2.80
2.30
2.90
3.20
1.50
0.30
1.45
0.82
0.82
2.70
2.97
0.44
2.88
2.85
2.79
2.65
1.35
2.10
1.89
1.73
3.15
1.69
1.93
1.90
1.67
1.40
1.40
1.30
1.60
1.05
1.00
PANJANG
m
5.10
0.80
0.30
9.30
24.07
11.83
37.35
29.30
8.26
19.03
18.03
3.45
21.50
45.60
1.80
2.10
1.72
2.14
4.43
18.83
2.40
3.70
16.30
6.97
8.10
36.60
6.20
4.00
6.79
2.73
22.80
1.45
7.30
6.30
3.37
6.10
32.00
6.30
4.95
2.00
3.58
PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
13.11
0.53
0.36
27.16
71.01
33.36
112.05
79.11
13.46
53.28
50.48
7.94
62.35
145.92
2.70
0.63
2.49
1.75
3.63
50.84
7.13
1.63
46.94
19.86
22.60
96.99
8.37
8.40
12.83
4.72
71.82
2.45
14.09
11.97
5.63
8.54
44.80
8.19
7.92
2.10
3.58
HAL - 2
VOL
m3
k=2,25
Ton
0.66
0.03
0.02
1.36
3.55
1.67
5.60
3.96
0.67
2.66
2.52
0.40
3.12
7.30
0.14
0.03
0.12
0.09
0.18
2.54
0.36
0.08
2.35
0.99
1.13
4.85
0.42
0.42
0.64
0.24
3.59
0.12
0.70
0.60
0.28
0.43
2.24
0.41
0.40
0.11
0.18
1.49
0.07
0.05
3.06
7.99
3.76
12.60
8.91
1.51
5.99
5.67
0.90
7.02
16.43
0.32
0.07
0.27
0.20
0.41
5.72
0.81
0.18
5.29
2.23
2.54
10.91
0.95
0.95
1.44
0.54
8.08
0.27
1.58
1.35
0.63
0.97
5.04
0.92
0.90
0.25
0.41
1,142.72
1,495.53
2,638.25
57.16
74.79
131.95
128.68
168.38
297.06
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
INDIKASI
STA
STA
AWAL
AKHIR
485 + 050
485 + 100
485 + 200
485 + 250
485 + 450
485 + 500
485 + 550
485 + 750
485 + 800
486 + 050
486 + 100
486 + 150
486 + 200
486 + 250
:
:
:
:
LEBAR
m
1.85
3.70
3.47
1.20
1.10
0.60
1.30
1.20
1.60
1.00
1.60
1.30
2.10
0.50
0.65
1.15
0.70
1.00
0.80
3.10
0.70
1.00
0.80
3.50
2.20
4.33
0.87
0.90
1.20
0.73
3.64
0.73
0.80
0.55
1.50
0.71
0.70
2.30
0.90
1.40
PANJANG
m
17.25
2.60
9.10
26.40
5.06
8.90
7.34
9.85
6.05
7.08
5.00
3.95
5.60
0.60
0.80
15.40
5.50
8.20
1.66
3.89
1.40
12.20
12.00
4.85
3.10
0.62
3.30
0.60
4.30
7.16
0.48
7.71
8.90
3.10
0.70
6.40
0.70
0.55
2.65
6.08
PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
31.91
9.62
31.58
31.68
5.57
5.34
9.54
11.82
9.68
7.08
8.00
5.14
11.76
0.30
0.52
17.71
3.85
8.20
1.33
12.06
0.98
12.20
9.60
16.98
6.82
2.68
2.87
0.54
5.16
5.23
1.75
5.63
7.12
1.71
1.05
4.54
0.49
1.27
2.39
8.51
HAL - 3
VOL
m3
k=2,25
Ton
1.60
0.48
1.58
1.58
0.28
0.27
0.48
0.59
0.48
0.35
0.40
0.26
0.59
0.02
0.03
0.89
0.19
0.41
0.07
0.60
0.05
0.61
0.48
0.85
0.34
0.13
0.14
0.03
0.26
0.26
0.09
0.28
0.36
0.09
0.05
0.23
0.02
0.06
0.12
0.43
3.60
1.08
3.56
3.56
0.63
0.61
1.08
1.33
1.08
0.79
0.90
0.59
1.33
0.05
0.07
2.00
0.43
0.92
0.16
1.35
0.11
1.37
1.08
1.91
0.77
0.29
0.32
0.07
0.59
0.59
0.20
0.63
0.81
0.20
0.11
0.52
0.05
0.14
0.27
0.97
130
0.36
6.08
0.05
2.19
0.11
0.25
322.40
2,638.25
2,960.65
16.14
131.95
148.09
36.37
297.06
333.43
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
INDIKASI
STA
STA
AWAL
AKHIR
486 + 300
486 + 400
486 + 450
486 + 500
486 + 550
486 + 850
486 + 900
486 + 950
487 + 200
487 + 250
487 + 400
487 + 450
487 + 500
487 + 550
487 + 600
487 + 750
487 + 850
:
:
:
:
LEBAR
m
0.70
0.40
0.99
0.99
0.80
0.66
0.95
1.40
0.40
1.92
2.04
0.70
1.28
0.36
0.13
2.30
1.90
0.81
1.35
0.92
0.90
1.83
2.20
2.20
4.40
1.33
1.90
3.57
1.94
2.54
2.10
1.85
2.13
2.10
3.93
1.20
1.90
4.60
4.60
PANJANG
m
11.00
8.50
11.88
17.10
6.22
0.67
2.39
5.90
6.65
8.30
23.68
14.00
6.50
4.02
2.30
2.64
27.88
3.07
4.45
2.93
1.40
9.60
1.70
10.60
8.45
3.30
16.29
7.01
10.40
3.67
5.37
16.70
9.24
7.80
10.60
2.10
7.06
6.63
16.66
PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
7.70
3.40
11.76
16.93
4.98
0.44
2.27
8.26
2.66
15.94
48.31
9.80
8.32
1.45
0.30
6.07
52.97
2.49
6.01
2.70
1.26
17.57
3.74
23.32
37.18
4.39
30.95
25.03
20.18
9.32
11.28
30.90
19.68
16.38
41.66
2.52
13.41
30.50
76.64
HAL - 4
VOL
m3
k=2,25
Ton
0.39
0.17
0.59
0.85
0.25
0.02
0.11
0.41
0.13
0.80
2.42
0.49
0.42
0.07
0.02
0.30
2.65
0.12
0.30
0.14
0.06
0.88
0.19
1.17
1.86
0.22
1.55
1.25
1.01
0.47
0.56
1.55
0.98
0.82
2.08
0.13
0.67
1.53
3.83
0.88
0.38
1.33
1.91
0.56
0.05
0.25
0.92
0.29
1.80
5.45
1.10
0.95
0.16
0.05
0.68
5.96
0.27
0.68
0.32
0.14
1.98
0.43
2.63
4.19
0.50
3.49
2.81
2.27
1.06
1.26
3.49
2.21
1.85
4.68
0.29
1.51
3.44
8.62
0.80
30.00
0.05
24.00
1.20
2.70
652.67
2,960.65
3,613.32
32.66
148.09
180.75
73.54
333.43
406.97
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
INDIKASI
STA
STA
AWAL
AKHIR
487 + 900
487 + 950
488 + 150
488 + 200
488 + 300
488 + 350
488 + 400
488 + 550
488 + 600
488 + 750
488 + 800
488 + 850
:
:
:
:
LEBAR
m
0.80
1.93
1.00
0.77
2.49
1.30
2.88
1.30
1.66
2.88
0.96
1.93
1.46
1.57
0.95
1.85
1.30
1.82
1.20
0.60
1.50
1.23
0.83
1.99
1.90
1.71
3.33
1.63
3.16
0.90
1.50
4.53
4.53
2.95
2.80
1.97
1.65
PANJANG
m
19.00
20.50
7.74
6.90
0.88
9.00
7.31
1.20
9.94
8.67
2.20
2.85
0.97
5.30
1.00
15.58
2.90
9.58
1.50
2.30
0.35
1.45
0.80
11.71
11.15
9.70
9.72
3.35
1.16
1.20
15.20
9.42
5.30
0.85
9.95
10.00
11.80
PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
15.20
39.57
7.74
5.31
2.19
11.70
21.05
1.56
16.50
24.97
2.11
5.50
1.42
8.32
0.95
28.82
3.77
17.44
1.80
1.38
0.53
1.78
0.66
23.30
21.19
16.59
32.37
5.46
3.67
1.08
22.80
42.67
24.01
2.51
27.86
19.70
19.47
HAL - 5
VOL
m3
k=2,25
Ton
0.76
1.98
0.39
0.27
0.11
0.59
1.05
0.08
0.83
1.25
0.11
0.28
0.07
0.42
0.05
1.44
0.19
0.87
0.09
0.07
0.03
0.09
0.03
1.17
1.06
0.83
1.62
0.27
0.18
0.05
1.14
2.13
1.20
0.13
1.39
0.99
0.97
1.71
4.46
0.88
0.61
0.25
1.33
2.36
0.18
1.87
2.81
0.25
0.63
0.16
0.95
0.11
3.24
0.43
1.96
0.20
0.16
0.07
0.20
0.07
2.63
2.39
1.87
3.65
0.61
0.41
0.11
2.57
4.79
2.70
0.29
3.13
2.23
2.18
207
208
209
3.37
3.37
2.50
489 + 050
489 + 100
4.27
27.45
34.00
0.05
0.05
0.05
14.39
92.51
85.00
0.72
4.63
4.25
1.62
10.42
9.56
674.85
3,613.32
4,288.17
33.78
180.75
214.53
76.05
406.97
483.02
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
LEBAR
m
PANJANG
m
PENANGANAN
TEBAL
LUAS
m
m2
HAL - 6
VOL
m3
k=2,25
Ton
489 + 150
2.00
15.80
0.05
31.60
1.58
3.56
489 + 200
489 + 250
2.30
1.60
1.60
1.80
1.90
1.50
1.60
1.60
2.80
2.70
2.58
1.50
1.50
0.60
0.70
2.90
2.90
0.70
0.90
0.60
1.60
1.00
1.00
0.90
2.30
1.00
2.28
0.50
1.50
3.40
1.60
1.50
0.40
2.60
3.90
2.40
8.40
3.80
2.80
1.10
2.10
4.00
5.20
14.80
1.80
2.60
1.65
2.35
43.00
6.45
0.70
1.20
1.30
1.31
1.50
1.26
1.65
6.20
1.30
16.20
10.00
5.50
11.00
1.90
6.57
5.60
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
5.98
6.24
3.84
15.12
7.22
4.20
1.76
3.36
11.20
14.04
38.18
2.70
3.90
0.99
1.65
124.70
18.71
0.49
1.08
0.78
2.10
1.50
1.26
1.49
14.26
1.30
36.94
5.00
8.25
37.40
3.04
9.86
2.24
0.30
0.31
0.19
0.76
0.36
0.21
0.09
0.17
0.56
0.70
1.91
0.14
0.20
0.05
0.08
6.24
0.94
0.02
0.05
0.04
0.11
0.08
0.06
0.07
0.71
0.07
1.85
0.25
0.41
1.87
0.15
0.49
0.11
0.68
0.70
0.43
1.71
0.81
0.47
0.20
0.38
1.26
1.58
4.30
0.32
0.45
0.11
0.18
14.04
2.12
0.05
0.11
0.09
0.25
0.18
0.14
0.16
1.60
0.16
4.16
0.56
0.92
4.21
0.34
1.10
0.25
489 + 300
489 + 350
489 + 400
489 + 450
489 + 500
489 + 550
489 + 600
489 + 650
489 + 700
247
248
249
250
251
252
489 + 750
2.10
3.40
1.65
2.10
2.80
1.30
3.10
4.10
4.00
5.85
10.80
5.56
0.05
0.05
0.05
0.05
0.05
0.05
6.51
13.94
6.60
12.29
30.24
7.23
0.33
0.70
0.33
0.61
1.51
0.36
0.74
1.58
0.74
1.37
3.40
0.81
499.19
4,288.17
4,787.36
24.97
214.53
239.50
56.22
483.02
539.24
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
INDIKASI
STA
STA
AWAL
AKHIR
489 + 800
489 + 850
489 + 900
489 + 950
490 + 000
490 + 050
490 + 100
:
:
:
:
LEBAR
m
1.35
2.60
1.00
0.90
0.80
1.70
11.04
1.55
2.60
1.90
4.20
3.40
2.60
2.60
3.80
2.20
2.27
0.40
3.10
1.80
4.40
2.00
0.40
1.96
2.70
2.70
0.80
0.90
0.90
1.00
1.00
1.60
1.30
1.50
PANJANG
m
0.70
5.25
5.00
1.30
0.80
3.70
2.80
4.50
9.20
1.10
3.00
5.10
4.00
3.20
2.70
1.30
27.70
3.60
10.50
8.55
3.40
4.70
13.00
13.35
11.75
21.00
2.30
1.50
1.50
4.80
8.30
13.80
6.70
3.80
PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.95
13.65
5.00
1.17
0.64
6.29
30.91
6.98
23.92
2.09
12.60
17.34
10.40
8.32
10.26
2.86
62.88
1.44
32.55
15.39
14.96
9.40
5.20
26.17
31.73
56.70
1.84
1.35
1.35
4.80
8.30
22.08
8.71
5.70
HAL - 7
VOL
m3
k=2,25
Ton
0.05
0.68
0.25
0.06
0.03
0.31
1.55
0.35
1.20
0.10
0.63
0.87
0.52
0.42
0.51
0.14
3.14
0.07
1.63
0.77
0.75
0.47
0.26
1.31
1.59
2.84
0.09
0.07
0.07
0.24
0.42
1.10
0.44
0.29
0.11
1.53
0.56
0.14
0.07
0.70
3.49
0.79
2.70
0.23
1.42
1.96
1.17
0.95
1.15
0.32
7.07
0.16
3.67
1.73
1.69
1.06
0.59
2.95
3.58
6.39
0.20
0.16
0.16
0.54
0.95
2.48
0.99
0.65
287
0.60
50.00
0.05
30.00
1.50
3.38
493.93
4,787.36
5,281.29
24.72
239.50
264.22
55.69
539.24
594.93
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
INDIKASI
STA
STA
AWAL
AKHIR
490 + 150
490 + 200
490 + 250
490 + 300
490 + 400
490 + 450
490 + 500
490 + 550
490 + 600
490 + 650
490 + 750
490 + 800
490 + 850
:
:
:
:
LEBAR
m
0.70
0.80
0.85
0.58
1.56
0.50
0.50
0.60
0.58
0.55
0.80
0.95
0.98
2.10
1.50
0.80
1.40
1.80
1.50
0.50
2.00
1.60
1.70
2.50
2.50
2.70
1.00
1.20
1.50
2.10
1.50
2.40
3.00
3.00
2.30
PANJANG
m
5.60
1.45
5.00
3.00
5.40
5.60
0.90
0.50
0.60
4.33
1.95
18.50
3.00
6.10
8.10
2.00
1.55
11.70
6.10
8.50
4.20
10.50
13.60
20.00
20.00
6.00
1.20
29.00
1.00
6.00
3.60
4.00
44.00
10.00
15.00
PENANGANAN
TEBAL
LUAS
m
m2
0.05
3.92
0.05
1.16
0.05
4.25
0.05
1.74
0.05
8.42
0.05
2.80
0.05
0.45
0.05
0.30
0.05
0.35
0.05
2.38
0.05
1.56
0.05
17.58
0.05
2.94
0.05
12.81
0.05
12.15
0.05
1.60
0.05
2.17
0.05
21.06
0.05
9.15
0.05
4.25
0.05
8.40
0.05
16.80
0.05
23.12
0.05
50.00
0.05
50.00
0.05
16.20
0.05
1.20
0.05
34.80
0.05
1.50
0.05
12.60
0.05
5.40
0.05
9.60
0.05
132.00
0.05
30.00
0.05
34.50
HAL - 8
VOL
m3
0.20
0.06
0.21
0.09
0.42
0.14
0.02
0.02
0.02
0.12
0.08
0.88
0.15
0.64
0.61
0.08
0.11
1.05
0.46
0.21
0.42
0.84
1.16
2.50
2.50
0.81
0.06
1.74
0.08
0.63
0.27
0.48
6.60
1.50
1.73
k=2,25
Ton
0.45
0.14
0.47
0.20
0.95
0.32
0.05
0.05
0.05
0.27
0.18
1.98
0.34
1.44
1.37
0.18
0.25
2.36
1.04
0.47
0.95
1.89
2.61
5.63
5.63
1.82
0.14
3.92
0.18
1.42
0.61
1.08
14.85
3.38
3.89
323
324
325
326
327
328
329
330
331
491 + 000
2.70
2.60
2.00
1.30
1.40
0.80
3.00
2.50
3.00
491 + 100
491 + 150
491 + 200
491 + 200
8.60
19.90
7.50
7.80
6.90
12.80
30.00
24.00
32.00
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
23.22
51.74
15.00
10.14
9.66
10.24
90.00
60.00
96.00
903.16
5,281.29
6,184.45
1.16
2.59
0.75
0.51
0.48
0.51
4.50
3.00
4.80
45.19
264.22
309.41
2.61
5.83
1.69
1.15
1.08
1.15
10.13
6.75
10.80
101.75
594.93
696.68
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
332
333
334
335
336
337
338
339
340
INDIKASI
STA
STA
AWAL
AKHIR
491 + 350
491 + 400
491 + 450
491 + 500
:
:
:
:
LEBAR
m
2.00
2.90
2.80
2.00
2.70
1.60
2.00
3.40
5.40
PANJANG
m
19.60
5.30
37.80
7.00
13.70
9.20
24.00
12.00
9.00
PENANGANAN
TEBAL
LUAS
m
m2
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
39.20
15.37
105.84
14.00
36.99
14.72
48.00
40.80
48.60
HAL - 9
VOL
m3
k=2,25
Ton
1.96
0.77
5.29
0.70
1.85
0.74
2.40
2.04
2.43
4.41
1.73
11.90
1.58
4.16
1.67
5.40
4.59
5.47
363.52
6,184.45
6,547.97
18.18
309.41
327.59
40.91
696.68
737.59
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+850
Sta 490+900
Sta 490+950
Sta 491+000
Sta 491+050
Sta 491+100
Sta 491+150
Sta 491+200
Sta 491+250
Sta 491+300
Sta 491+350
Sta 491+400
Sta 491+450
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+100
Sta 490+150
KOTA LANGSA
Sta 490+200
Sta 490+250
Sta 490+300
Sta 490+350
Sta 490+400
Sta 490+450
Sta 490+500
Sta 490+550
Sta 490+600
Sta 490+650
Sta 490+700
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 489+350
Sta 489+400
Sta 489+450
Sta 489+500
Sta 489+550
Sta 489+600
Sta 489+650
Sta 489+700
Sta 489+750
Sta 489+800
Sta 489+850
Sta 489+900
Sta 489+950
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 487+850
Sta 487+900
Sta 487+950
Sta 488+000
Sta 488+050
Sta 488+100
Sta 488+150
Sta 488+200
Sta 488+250
Sta 488+300
Sta 488+350
Sta 488+400
Sta 488+450
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 487+100
Sta 487+150
Sta 487+200
Sta 487+250
Sta 487+300
Sta 487+350
Sta 487+400
Sta 487+450
Sta 487+500
Sta 487+550
Sta 487+600
Sta 487+650
Sta 487+700
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 486+350
Sta 486+400
Sta 486+450
Sta 486+500
Sta 486+550
Sta 486+600
Sta 486+650
Sta 486+700
Sta 486+750
Sta 486+800
Sta 486+850
Sta 486+900
Sta 486+950
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 485+600
Sta 485+650
KOTA LANGSA
Sta 485+700
Sta 485+750
Sta 485+800
Sta 485+850
Sta 485+900
Sta 485+950
Sta 486+000
Sta 486+050
Sta 486+100
Sta 486+150
Sta 486+200
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 484+850
Sta 484+900
KOTA LANGSA
Sta 484+950
Sta 485+000
Sta 485+050
Sta 485+100
Sta 485+150
Sta 485+200
Sta 485+250
Sta 485+300
Sta 485+350
Sta 485+400
Sta 485+450
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 484+100
Sta 484+150
Sta 484+200
Sta 484+250
Sta 484+300
Sta 484+350
Sta 484+400
Sta 484+450
Sta 484+500
Sta 484+550
Sta 484+600
Sta 484+650
Sta 484+700
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
SKET/GAMBAR
Sta 483+350
Sta 483+400
Sta 483+450
Sta 483+500
Sta 483+550
Sta 483+600
Sta 483+650
Sta 483+700
Sta 483+750
Sta 483+800
Sta 483+850
Sta 483+900
Sta 483+950
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 482+600
Sta 482+650
Sta 482+700
Sta 482+750
Sta 482+800
Sta 482+850
Sta 482+900
Sta 482+950
Sta 483+000
Sta 483+050
Sta 483+100
Sta 483+150
Sta 483+200
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 481+850
Sta 481+900
Sta 481+950
Sta 482+000
Sta 482+050
Sta 482+100
Sta 482+150
Sta 482+200
Sta 482+250
Sta 482+300
Sta 482+350
Sta 482+400
Sta 482+450
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 481+100
Sta 481+150
KOTA LANGSA
Sta 481+200
Sta 481+250
Sta 481+300
Sta 481+350
Sta 481+400
Sta 481+450
Sta 481+500
Sta 481+550
Sta 481+600
Sta 481+650
Sta 481+700
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 480+350
Sta 480+400
KOTA LANGSA
Sta 480+450
Sta 480+500
Sta 480+550
Sta 480+600
Sta 480+650
Sta 480+700
Sta 480+750
Sta 480+800
Sta 480+850
Sta 480+900
Sta 480+950
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 487+850
Sta 487+900
Sta 487+950
Sta 488+000
Sta 488+050
Sta 488+100
Sta 488+150
Sta 488+200
Sta 488+250
Sta 488+300
Sta 488+350
Sta 488+400
Sta 488+450
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 480+350
Sta 480+400
Sta 480+450
Sta 480+500
Sta 480+550
Sta 480+600
Sta 480+650
Sta 480+700
Sta 480+750
Sta 480+800
Sta 480+850
Sta 480+900
Sta 480+950
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 479+600
Sta 479+650
Sta 479+700
Sta 479+750
Sta 479+800
Sta 479+850
Sta 479+900
Sta 479+950
Sta 480+000
Sta 480+050
Sta 480+100
Sta 480+150
Sta 480+200
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 478+850
Sta 478+900
KOTA LANGSA
Sta 478+950
Sta 479+000
Sta 479+050
Sta 479+100
Sta 479+150
Sta 479+200
Sta 479+250
Sta 479+300
Sta 479+350
Sta 479+400
Sta 479+450
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 478+100
Sta 478+150
Sta 478+200
Sta 478+250
Sta 478+300
Sta 478+350
Sta 478+400
Sta 478+450
Sta 478+500
Sta 478+550
Sta 478+600
Sta 478+650
Sta 478+700
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 477+350
Sta 477+400
Sta 477+450
Sta 477+500
Sta 477+550
Sta 477+600
Sta 477+650
Sta 477+700
Sta 477+750
Sta 477+800
Sta 477+850
Sta 477+900
Sta 477+950
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 476+600
Sta 476+650
Sta 476+700
Sta 476+750
Sta 476+800
Sta 476+850
Sta 476+900
Sta 476+950
Sta 477+000
Sta 477+050
Sta 477+100
Sta 477+150
Sta 477+200
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 475+850
Sta 475+900
Sta 475+950
Sta 476+000
Sta 476+050
Sta 476+100
Sta 476+150
Sta 476+200
Sta 476+250
Sta 476+300
Sta 476+350
Sta 476+400
Sta 476+450
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMUT
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 475+100
Sta 475+150
Sta 475+200
Sta 475+250
Sta 475+300
Sta 475+350
Sta 475+400
Sta 475+450
Sta 475+500
Sta 475+550
Sta 475+600
Sta 475+650
Sta 475+700
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 474+350
Sta 474+400
KOTA LANGSA
Sta 474+450
Sta 474+500
Sta 474+550
Sta 474+600
Sta 474+650
Sta 474+700
Sta 474+750
Sta 474+800
Sta 474+850
Sta 474+900
Sta 474+950
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
SKET/GAMBAR
KOTA KUALA
SIMPANG
Sta 474+000
Sta 474+050
KOTA LANGSA
Sta 474+150
Sta 474+200
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
HAL. 15 - 15
ET/GAMBAR
PERBATASAN
SUMUT
Sta 491+500
Sta 491+550
Sta 491+600
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 14
ET/GAMBAR
Sta 490+750
Sta 490+800
MEDAN
Sta 490+850
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 13
ET/GAMBAR
Sta 490+000
Sta 490+050
Sta 490+100
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
ET/GAMBAR
HAL. 15 - 12
Sta 489+250
Sta 489+300
Sta 489+350
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 11
ET/GAMBAR
Sta 488+500
Sta 488+600
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
Sta 488+550
HAL. 15 - 10
ET/GAMBAR
Sta 487+750
Sta 487+800
Sta 487+850
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 9
ET/GAMBAR
Sta 487+000
Sta 487+050
Sta 487+100
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 8
ET/GAMBAR
Sta 486+250
Sta 486+300
MEDAN
Sta 486+350
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 7
ET/GAMBAR
Sta 485+500
Sta 485+550
Sta 485+600
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
ET/GAMBAR
HAL. 15 - 6
Sta 484+750
Sta 484+800
Sta 484+850
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
ET/GAMBAR
HAL. 15 - 5
ET/GAMBAR
Sta 484+000
Sta 484+050
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
Sta 484+100
HAL. 15 - 4
ET/GAMBAR
Sta 483+250
Sta 483+300
Sta 483+350
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 3
ET/GAMBAR
Sta 482+500
Sta 482+550
Sta 482+600
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 2
ET/GAMBAR
Sta 481+750
Sta 481+800
MEDAN
Sta 481+850
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 1
ET/GAMBAR
Sta 481+000
Sta 481+050
MEDAN
Sta 481+100
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 12
ET/GAMBAR
Sta 489+250
Sta 489+300
Sta 489+350
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
ET/GAMBAR
HAL. 15 - 11
Sta 488+500
Sta 488+600
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
Sta 488+550
HAL. 15 - 10
ET/GAMBAR
Sta 481+000
Sta 481+050
Sta 481+100
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 9
ET/GAMBAR
Sta 480+250
Sta 480+300
Sta 480+350
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 8
ET/GAMBAR
Sta 479+500
Sta 479+550
MEDAN
Sta 479+600
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 7
ET/GAMBAR
Sta 478+750
Sta 478+800
MEDAN
Sta 478+850
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 6
ET/GAMBAR
Sta 478+000
Sta 478+050
Sta 478+100
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
ET/GAMBAR
HAL. 15 - 5
Sta 477+250
Sta 477+300
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
Sta 477+350
HAL. 15 - 4
ET/GAMBAR
Sta 476+500
Sta 476+550
Sta 476+600
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 3
ET/GAMBAR
Sta 475+750
Sta 475+800
Sta 475+850
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 2
ET/GAMBAR
Sta 475+000
Sta 475+050
MEDAN
Sta 475+100
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 15 - 1
ET/GAMBAR
Sta 474+250
Sta 474+300
Sta 474+350
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
STA
Aspal Lama
476+ 500
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
474 + 250
Agregat Kelas A
'm 6
474
250
0.90
1.87
0.05
0.08
474
250
2.40
43.80
0.05
5.26
474
500
1.44
1.76
0.05
0.13
474
700
0.70
1.00
0.05
0.04
474
750
1.00
1.10
0.05
0.06
474
800
1.50
6.10
0.05
0.46
474
850
1.20
5.00
0.05
0.30
475
300
2.00
24.20
0.05
2.42
475
450
2.00
2.60
0.05
0.26
10
475
500
2.00
14.40
0.05
1.44
11
476
050
2.40
0.80
0.05
0.10
12
476
050
1.60
0.80
0.05
0.06
13
476
050
0.80
0.80
0.05
0.03
14
476
450
1.20
24.00
0.05
1.44
15
476
500
1.60
23.00
0.05
1.84
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 15 - 1
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
151.23 M1
- M1
151.23 M1
13.92
###
13.92
Dibuat Oleh :
PT. BAHTERA KARANG RAY
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
STA
Aspal Lama
478 + 000
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
476 + 550
Agregat Kelas A
'm 6
16
476
550
1.60
40.00
0.05
3.20
17
476
600
1.80
11.50
0.05
1.04
18
477
050
2.00
27.82
0.05
2.78
19
477
050
1.00
0.56
0.05
0.03
20
477
050
1.00
1.64
0.05
0.08
21
477
100
2.70
20.76
0.05
2.80
22
477
450
2.10
9.44
0.05
0.99
23
477
550
2.33
8.73
0.05
1.02
24
477
550
2.23
6.03
0.05
0.67
25
477
550
2.63
12.10
0.05
1.59
26
477
600
2.60
12.80
0.05
1.66
27
477
600
2.33
10.00
0.05
1.17
28
477
700
3.94
37.65
0.05
7.42
29
477
950
2.78
42.00
0.05
5.84
30
478
000
2.70
25.15
0.05
3.40
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 15 - 2
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
266.18 M1
151.23 M1
417.41 M1
33.69
13.92
47.61
Dibuat Oleh :
PT. BAHTERA KARANG RAY
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
STA
Aspal Lama
480+ 350
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
478 + 200
Agregat Kelas A
'm 6
31
478
200
2.70
27.70
0.05
3.74
32
478
300
2.70
5.26
0.05
0.71
33
478
350
2.70
11.80
0.05
1.59
34
478
650
2.85
3.10
0.05
0.44
35
478
650
2.50
0.83
0.05
0.10
36
478
250
2.90
2.72
0.05
0.39
37
479
300
2.90
6.85
0.05
0.99
38
479
300
1.30
3.10
0.05
0.20
39
479
750
2.90
22.86
0.05
3.31
40
479
950
1.02
7.99
0.05
0.41
41
479
950
0.63
2.40
0.05
0.08
42
479
950
3.53
1.23
0.05
0.22
43
479
950
3.82
0.94
0.05
0.18
44
480
100
3.30
11.85
0.05
1.96
45
480
350
3.52
31.80
0.05
5.60
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 15 - 3
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
140.43 M1
417.41 M1
557.84 M1
19.92
47.61
67.53
Dibuat Oleh :
PT. BAHTERA KARANG RAY
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
s/d
488 + 200
M3
STA
Aspal Lama
488+ 800
Agregat Kelas A
'm 6
46
488
200
0.96
2.20
0.05
0.11
47
488
300
1.93
2.85
0.05
0.28
48
488
300
1.46
0.97
0.05
0.07
49
488
300
1.57
5.30
0.05
0.42
50
488
350
0.95
1.00
0.05
0.05
51
488
350
1.85
15.58
0.05
1.44
52
488
400
1.30
2.90
0.05
0.19
53
488
550
1.82
9.58
0.05
0.87
54
488
750
1.99
11.71
0.05
1.17
55
488
750
1.90
11.15
0.05
1.06
56
488
750
1.71
9.70
0.05
0.83
57
488
750
3.33
9.72
0.05
1.62
58
488
750
1.63
3.35
0.05
0.27
59
488
750
3.16
1.16
0.05
0.18
60
488
800
0.90
1.20
0.05
0.05
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 15 - 4
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
88.37 M1
557.84 M1
646.21 M1
8.61
67.53
76.14
Dibuat Oleh :
PT. BAHTERA KARANG RAY
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
STA
Aspal Lama
488+ 850
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
488 + 800
Agregat Kelas A
'm 6
61
488
800
1.50
15.20
0.05
1.14
62
488
800
4.53
9.42
0.05
2.13
63
488
850
4.53
5.30
0.05
1.20
64
488
850
2.95
0.85
0.05
0.13
65
488
850
2.80
9.95
0.05
1.39
66
488
850
1.97
10.00
0.05
0.99
67
488
850
1.65
11.80
0.05
0.97
68
488
850
3.37
4.27
0.05
0.72
Jumlah 15 - 5
66.79 M1
8.67
Jumlah Lalu
Jumlah Total MC-2
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
646.21 M1
713.00 M1
MARWAN, BE
CHIEF INSPECTOR
76.14
84.81
Dibuat Oleh :
PT. BAHTERA KARANG RAY
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
STA
Aspal Lama
482 + 600
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
480+ 450
Agregat Kelas A
'm 6
480
450
1.39
4.44
0.05
0.31
480
500
2.90
31.95
0.05
4.63
481
000
2.75
16.90
0.05
2.32
481
500
2.57
5.10
0.05
0.66
481
550
0.66
0.80
0.05
0.03
481
550
1.20
0.30
0.05
0.02
481
750
2.92
9.30
0.05
1.36
481
800
2.95
24.07
0.05
3.55
481
850
2.82
11.83
0.05
1.67
10
481
900
3.00
37.35
0.05
5.60
11
481
950
2.70
29.30
0.05
3.96
12
482
500
1.63
8.26
0.05
0.67
13
482
550
2.80
19.03
0.05
2.66
14
482
550
2.80
18.03
0.05
2.52
15
482
600
2.30
3.45
0.05
0.40
Jumlah 15 - 1
Jumlah Lalu MC - 2
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
220.11 M1
713.00 M1
933.11 M1
MARWAN, BE
CHIEF INSPECTOR
30.36
84.81
115.17
Dibuat Oleh :
PT. BAHTERA KARANG RAY
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
STA
Aspal Lama
483 + 150
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
482+ 650
Agregat Kelas A
'm 6
16
482
650
2.90
21.50
0.05
3.12
17
482
700
3.20
45.60
0.05
7.30
18
482
750
1.50
1.80
0.05
0.14
19
482
750
0.30
2.10
0.05
0.03
20
482
750
1.45
1.72
0.05
0.12
21
482
750
0.82
2.14
0.05
0.09
22
482
800
0.82
4.43
0.05
0.18
23
482
850
2.70
18.83
0.05
2.54
24
482
900
2.97
2.40
0.05
0.36
25
482
900
0.44
3.70
0.05
0.08
26
482
900
2.88
16.30
0.05
2.35
27
482
950
2.85
6.97
0.05
0.99
28
482
950
2.79
8.10
0.05
1.13
29
483
050
2.65
36.60
0.05
4.85
30
483
150
1.35
6.20
0.05
0.42
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 15 - 2
178.39 M1
23.70
Jumlah Lalu
933.11 M1
115.17
Jumlah Total
1,111.50 M1
138.87
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
STA
Aspal Lama
485 + 050
s/d
483+ 350
Agregat Kelas A
'm 6
31
483
350
2.10
4.00
0.05
0.42
32
483
350
1.89
6.79
0.05
0.64
33
483
400
1.73
2.73
0.05
0.24
34
483
500
3.15
22.80
0.05
3.59
35
483
500
1.69
1.45
0.05
0.12
36
483
550
1.93
7.30
0.05
0.70
37
483
600
1.90
6.30
0.05
0.60
38
483
600
1.67
3.37
0.05
0.28
39
483
650
1.40
6.10
0.05
0.43
40
483
700
1.40
32.00
0.05
2.24
41
483
850
1.30
6.30
0.05
0.41
42
484
050
1.60
4.95
0.05
0.40
43
484
150
1.05
2.00
0.05
0.11
44
484
450
1.00
3.58
0.05
0.18
45
485
050
1.85
17.25
0.05
1.60
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 15 - 3
126.92 M1
11.96
1
Jumlah Lalu
1,111.50 M
138.87
1
Jumlah Total
1,238.42 M
150.83
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
STA
Aspal Lama
485 + 550
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
485+ 050
Agregat Kelas A
'm 6
46
485
050
3.70
2.60
0.05
0.48
47
485
100
3.47
9.10
0.05
1.58
48
485
200
1.20
26.40
0.05
1.58
49
485
250
1.10
5.06
0.05
0.28
50
485
450
0.60
8.90
0.05
0.27
51
485
450
1.30
7.34
0.05
0.48
52
485
450
1.20
9.85
0.05
0.59
53
485
450
1.60
6.05
0.05
0.48
54
485
450
1.00
7.08
0.05
0.35
55
485
500
1.60
5.00
0.05
0.40
56
485
500
1.30
3.95
0.05
0.26
57
485
500
2.10
5.60
0.05
0.59
58
485
500
0.50
0.60
0.05
0.02
59
485
550
0.65
0.80
0.05
0.03
60
485
550
1.15
15.40
0.05
0.89
Jumlah 15 - 4
Jumlah Lalu
Jumlah Total
113.73 M1
1,238.42 M1
1,352.15 M1
8.28
150.83
159.11
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAY
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
Aspal
Laston
Lama
AC-BC
'm 6
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
STA
Aspal Lama
485+ 750
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
486 + 050
Agregat Kelas A
'm 6
61
485
750
0.70
5.50
0.05
0.19
62
485
750
1.00
8.20
0.05
0.41
63
485
750
0.80
1.66
0.05
0.07
64
485
800
3.10
3.89
0.05
0.60
65
485
800
0.70
1.40
0.05
0.05
66
485
800
1.00
12.20
0.05
0.61
67
485
800
0.80
12.00
0.05
0.48
68
485
800
3.50
4.85
0.05
0.85
69
486
050
2.20
3.10
0.05
0.34
70
486
050
4.33
0.62
0.05
0.13
71
486
050
0.87
3.30
0.05
0.14
72
486
050
0.90
0.60
0.05
0.03
73
486
050
1.20
4.30
0.05
0.26
74
486
050
0.73
7.16
0.05
0.26
75
486
050
3.64
0.48
0.05
0.09
Jumlah 15 - 5
69.26 M1
4.51
1
Jumlah Lalu
1,352.15 M
159.11
Jumlah Total
1,421.41 M1
163.62
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
Aspal
Laston
Lama
AC-BC
ARMAN SUROSO
GENERAL SUPERINTENDEN
'm 6
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
STA
Aspal Lama
486+ 100
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
486 + 400
Agregat Kelas A
'm 6
76
486
100
0.73
7.71
0.05
0.28
77
486
150
0.80
8.90
0.05
0.36
78
486
150
0.55
3.10
0.05
0.09
79
486
150
1.50
0.70
0.05
0.05
80
486
150
0.71
6.40
0.05
0.23
81
486
200
0.70
0.70
0.05
0.02
82
486
200
2.30
0.55
0.05
0.06
83
486
200
0.90
2.65
0.05
0.12
84
486
250
1.40
6.08
0.05
0.43
85
486
250
0.36
6.08
0.05
0.11
86
486
300
0.70
11.00
0.05
0.39
87
486
300
0.40
8.50
0.05
0.17
88
486
400
0.99
11.88
0.05
0.59
89
486
400
0.99
17.10
0.05
0.85
90
486
400
0.80
6.22
0.05
0.25
Jumlah 15 - 6
97.57 M1
4.00
1
Jumlah Lalu
1,421.41 M
163.62
1
Jumlah Total
1,518.98 M
167.62
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
STA
486+ 450
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
487 + 400
Agregat Kelas A
'm 6
91
486
450
0.66
0.67
0.05
0.02
92
486
450
0.95
2.39
0.05
0.11
93
486
500
1.40
5.90
0.05
0.41
94
486
550
0.40
6.65
0.05
0.13
95
486
850
1.92
8.30
0.05
0.80
96
486
900
2.04
23.68
0.05
2.42
97
486
900
0.70
14.00
0.05
0.49
98
486
900
1.28
6.50
0.05
0.42
99
486
900
0.36
4.02
0.05
0.07
100
486
900
0.13
2.30
0.05
0.01
101
486
900
2.30
2.64
0.05
0.30
102
486
950
1.90
27.88
0.05
2.65
103
487
200
0.81
3.07
0.05
0.12
104
487
250
1.35
4.45
0.05
0.30
105
487
400
0.92
2.93
0.05
0.13
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 15 - 7
115.38 M1
8.38
1
Jumlah Lalu
1,518.98 M
167.62
Jumlah Total
1,634.36 M1
176.00
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
STA
Aspal Lama
487+ 400
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
487 + 850
Agregat Kelas A
'm 6
106
487
400
0.90
1.40
0.05
0.06
107
487
450
1.83
9.60
0.05
0.88
108
487
450
2.20
1.70
0.05
0.19
109
487
450
2.20
10.60
0.05
1.17
110
487
450
4.40
8.45
0.05
1.86
111
487
500
1.33
3.30
0.05
0.22
112
487
500
1.90
16.29
0.05
1.55
113
487
500
3.57
7.01
0.05
1.25
114
487
500
1.94
10.40
0.05
1.01
115
487
550
2.54
3.67
0.05
0.47
116
487
550
2.10
5.37
0.05
0.56
117
487
600
1.85
16.70
0.05
1.54
118
487
750
2.13
9.24
0.05
0.98
119
487
850
2.10
7.80
0.05
0.82
120
487
850
3.93
10.60
0.05
2.08
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
Jumlah 15 - 8
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
122.13 M1
1,634.36 M1
1,756.49 M1
14.64
176.00
190.64
Dibuat Oleh :
PT. BAHTERA KARANG RAY
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 1
No
S TAT I O N E R
STA
Aspal Lama
487+ 850
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
488 + 150
Agregat Kelas A
'm 6
121
487
850
1.20
2.10
0.05
0.13
122
487
850
1.90
7.06
0.05
0.67
123
487
850
4.60
6.63
0.05
1.52
124
487
850
4.60
16.66
0.05
3.83
125
487
850
0.80
30.00
0.05
1.20
126
487
900
0.80
19.00
0.05
0.76
127
487
900
1.93
20.50
0.05
1.98
128
487
900
1.00
7.74
0.05
0.39
129
487
900
0.77
6.90
0.05
0.27
130
487
950
2.49
0.88
0.05
0.11
131
487
950
1.30
9.00
0.05
0.59
132
488
150
2.88
7.31
0.05
1.05
133
488
150
1.30
1.20
0.05
0.08
134
488
150
1.66
9.94
0.05
0.83
135
488
150
2.88
8.67
0.05
1.25
Jumlah 15 - 9
153.59 M1
14.66
Jumlah Lalu
1,756.49 M1
190.64
Jumlah Total
1,910.08 M1
205.30
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 15
No
S TAT I O N E R
STA
Aspal Lama
488+ 600
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
489 + 100
Agregat Kelas A
'm 6
136
488
600
1.20
1.50
0.05
0.09
137
488
600
0.60
2.30
0.05
0.07
138
488
600
1.50
0.35
0.05
0.03
139
488
600
1.23
1.45
0.05
0.09
140
488
600
0.83
0.80
0.05
0.03
141
489
050
3.37
27.45
0.05
4.63
142
489
100
2.50
34.00
0.05
4.25
Jumlah 15 - 10
67.85 M1
9.19
1
Jumlah Lalu
1,910.08 M
205.30
Jumlah Total
1,977.93 M1
214.49
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 15
No
S TAT I O N E R
STA
489+ 150
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
489 + 400
Agregat Kelas A
'm 6
143
489
150
2.00
15.80
0.05
1.58
144
489
200
2.30
2.60
0.05
0.30
145
489
250
1.60
3.90
0.05
0.31
146
489
250
1.60
2.40
0.05
0.19
147
489
300
1.80
8.40
0.05
0.76
148
489
300
1.90
3.80
0.05
0.36
149
489
300
1.50
2.80
0.05
0.21
150
489
300
1.60
1.10
0.05
0.09
151
489
350
1.60
2.10
0.05
0.17
152
489
350
2.80
4.00
0.05
0.56
153
489
350
2.70
5.20
0.05
0.70
154
489
350
2.58
14.80
0.05
1.91
155
489
350
1.50
1.80
0.05
0.14
156
489
400
1.50
2.60
0.05
0.20
157
489
400
0.60
1.65
0.05
0.05
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 15 - 11
72.95 M1
7.53
Jumlah Lalu
1,977.93 M1
214.49
Jumlah Total
2,050.88 M1
222.02
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 15
No
S TAT I O N E R
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
489 + 650
STA
Aspal Lama
489+ 400
Agregat Kelas A
'm 6
158
489
400
0.70
2.35
0.05
0.08
159
489
400
2.90
43.00
0.05
6.24
160
489
450
2.90
6.45
0.05
0.94
161
489
500
0.70
0.70
0.05
0.02
162
489
500
0.90
1.20
0.05
0.05
163
489
500
0.60
1.30
0.05
0.04
164
489
500
1.60
1.31
0.05
0.10
165
489
500
1.00
1.50
0.05
0.08
166
489
500
1.00
1.26
0.05
0.06
167
489
550
0.90
1.65
0.05
0.07
168
489
550
2.30
6.20
0.05
0.71
169
489
550
1.00
1.30
0.05
0.07
170
489
600
2.28
16.20
0.05
1.85
171
489
650
0.50
10.00
0.05
0.25
172
489
650
1.50
5.50
0.05
0.41
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 15 - 12
99.92 M1
10.97
Jumlah Lalu
2,050.88 M1
222.02
Jumlah Total
2,150.80 M1
232.99
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 15
No
S TAT I O N E R
STA
Aspal Lama
489+ 650
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
489 + 800
Agregat Kelas A
'm 6
173
489
650
3.40
11.00
0.05
1.87
174
489
650
1.60
1.90
0.05
0.15
175
489
700
1.50
6.57
0.05
0.49
176
489
700
0.40
5.60
0.05
0.11
177
489
750
2.10
3.10
0.05
0.33
178
489
750
3.40
4.10
0.05
0.70
179
489
750
1.65
4.00
0.05
0.33
180
489
750
2.10
5.85
0.05
0.61
181
489
750
2.80
10.80
0.05
1.51
182
489
750
1.30
5.56
0.05
0.36
183
489
800
1.35
0.70
0.05
0.05
184
489
800
2.60
5.25
0.05
0.68
185
489
800
1.00
5.00
0.05
0.25
186
489
800
0.90
1.30
0.05
0.06
187
489
800
0.80
0.80
0.05
0.03
Jumlah 15 - 13
71.53 M1
7.53
1
Jumlah Lalu
2,150.80 M
232.99
1
Jumlah Total
2,222.33 M
240.52
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 15
No
S TAT I O N E R
STA
Aspal Lama
489+ 850
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
489 + 950
Agregat Kelas A
'm 6
188
489
850
1.70
3.70
0.05
0.31
189
489
850
2.80
11.04
0.05
1.55
190
489
900
1.55
4.50
0.05
0.35
191
489
900
2.60
9.20
0.05
1.20
192
489
900
1.90
1.10
0.05
0.10
193
489
900
4.20
3.00
0.05
0.63
194
489
900
3.40
5.10
0.05
0.87
195
489
950
2.60
4.00
0.05
0.52
196
489
950
2.60
3.20
0.05
0.42
197
489
950
3.80
2.70
0.05
0.51
198
489
950
2.20
1.30
0.05
0.14
199
489
950
2.27
27.70
0.05
3.14
200
489
950
0.40
3.60
0.05
0.07
201
489
950
3.10
10.50
0.05
1.63
202
489
950
1.80
8.55
0.05
0.77
Jumlah 15 - 14
99.19 M1
12.21
Jumlah Lalu
2,222.33 M1
240.52
Jumlah Total
2,321.52 M1
252.73
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 15
No
S TAT I O N E R
STA
489+ 950
'm 6
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
490 + 100
Agregat Kelas A
203
489
950
4.40
3.40
0.05
0.75
204
489
950
2.00
4.70
0.05
0.47
205
489
950
0.40
13.00
0.05
0.26
206
490
000
1.96
13.35
0.05
1.31
207
490
000
2.70
11.75
0.05
1.59
208
490
000
2.70
21.00
0.05
2.84
209
490
050
0.80
2.30
0.05
0.09
210
490
050
0.90
1.50
0.05
0.07
211
490
050
0.90
1.50
0.05
0.07
212
490
050
1.00
4.80
0.05
0.24
213
490
050
1.00
8.30
0.05
0.42
214
490
100
1.60
13.80
0.05
1.10
215
490
100
1.30
6.70
0.05
0.44
216
490
100
1.50
3.80
0.05
0.29
217
490
100
0.60
50.00
0.05
1.50
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 15 - 15
159.90 M1
11.44
1
Jumlah Lalu
2,321.52 M
252.73
Jumlah Total
2,481.42 M1
264.17
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
Lokasi
HAL 15
No
S TAT I O N E R
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
490 + 250
STA
Aspal Lama
490+ 150
Agregat Kelas A
'm 6
218
490
150
0.70
5.60
0.05
0.20
219
490
150
0.80
1.45
0.05
0.06
220
490
150
0.85
5.00
0.05
0.21
221
490
150
0.58
3.00
0.05
0.09
222
490
150
1.56
5.40
0.05
0.42
223
490
150
0.50
5.60
0.05
0.14
224
490
150
0.50
0.90
0.05
0.02
225
490
150
0.60
0.50
0.05
0.02
226
490
150
0.58
0.60
0.05
0.02
227
490
150
0.55
4.33
0.05
0.12
228
490
150
0.80
1.95
0.05
0.08
229
490
200
0.95
18.50
0.05
0.88
230
490
200
0.98
3.00
0.05
0.15
231
490
200
2.10
6.10
0.05
0.64
232
490
250
1.50
8.10
0.05
0.61
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 15 - 16
70.03 M1
3.66
1
Jumlah Lalu
2,481.42 M
264.17
1
Jumlah Total
2,551.45 M
267.83
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 15
No
S TAT I O N E R
STA
Aspal Lama
490 + 250
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
490 + 750
Agregat Kelas A
'm 6
233
490
250
0.80
2.00
0.05
0.08
234
490
300
1.40
1.55
0.05
0.11
235
490
300
1.80
11.70
0.05
1.05
236
490
400
1.50
6.10
0.05
0.46
237
490
400
0.50
8.50
0.05
0.21
238
490
400
2.00
4.20
0.05
0.42
239
490
450
1.60
10.50
0.05
0.84
240
490
500
1.70
13.60
0.05
1.16
241
490
550
2.50
20.00
0.05
2.50
242
490
550
2.50
20.00
0.05
2.50
243
490
600
2.70
6.00
0.05
0.81
244
490
650
1.00
1.20
0.05
0.06
245
490
650
1.20
29.00
0.05
1.74
246
490
650
1.50
1.00
0.05
0.08
247
490
2.10
750
6.00
0.05
0.63
Jumlah 15 - 17
141.35 M1
12.65
1
Jumlah Lalu
2,551.45 M
267.83
Jumlah Total
2,692.80 M1
280.48
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 15
No
S TAT I O N E R
STA
Aspal Lama
490+ 750
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
491 + 350
Agregat Kelas A
'm 6
248
490
750
1.50
3.60
0.05
0.27
249
490
800
2.40
4.00
0.05
0.48
250
490
800
3.00
44.00
0.05
6.60
251
490
850
3.00
10.00
0.05
1.50
252
490
850
2.30
15.00
0.05
1.73
253
491
000
2.70
8.60
0.05
1.16
254
491
000
2.60
19.90
0.05
2.59
255
491
100
2.00
7.50
0.05
0.75
256
491
150
1.30
7.80
0.05
0.51
257
491
200
1.40
6.90
0.05
0.48
258
491
200
0.80
12.80
0.05
0.51
259
491
200
3.00
30.00
0.05
4.50
260
491
200
2.50
24.00
0.05
3.00
261
491
200
3.00
32.00
0.05
4.80
262
491
350
2.00
19.60
0.05
1.96
Jumlah 15 - 18
245.70 M1
30.84
1
Jumlah Lalu
2,692.80 M
280.48
1
Jumlah Total
2,938.50 M
311.32
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)a
: Laston - Lapis Pengikat Aspal Beton (AC-BC) Leveling
: Jalan Banda Aceh - Medan
HAL 15
No
S TAT I O N E R
STA
Aspal Lama
491+ 350
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
491 + 550
Agregat Kelas A
'm 6
263
491
350
2.90
5.30
0.05
0.77
264
491
400
2.80
37.80
0.05
5.29
265
491
450
2.00
7.00
0.05
0.70
266
491
450
2.70
13.70
0.05
1.85
267
491
450
1.60
9.20
0.05
0.74
268
491
500
2.00
24.00
0.05
2.40
269
491
500
3.40
12.00
0.05
2.04
270
491
500
5.40
9.00
0.05
2.43
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 15 - 19
118.00 M1
16.22
Jumlah Lalu
2,938.50 M1
311.32
Jumlah Total MC - 3
3,056.50 M1
327.54
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAY
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDEN
HAL 15 - 1
VOLUME
2.25
TON
0.18
11.84
0.29
0.09
0.14
1.04
0.68
5.45
0.59
3.24
0.23
0.14
0.07
3.24
4.14
31.36
31.36
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 2
VOLUME
2.25
TON
7.20
2.34
6.26
0.07
0.18
6.30
2.23
2.30
1.51
K
9
1
L
0
a
e
msl
m
a't
os'
n
A
B
A
C
W
B
C
3.58
3.74
2.63
16.70
13.14
7.65
75.83
31.36
107.19
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 3
VOLUME
2.25
TON
8.42
1.60
3.58
0.99
0.23
0.88
2.23
0.45
7.45
0.92
0.18
0.50
0.41
4.41
12.60
44.85
107.19
152.04
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 4
VOLUME
2.25
TON
0.25
0.63
0.16
0.95
0.11
3.24
0.43
1.96
2.63
2.39
1.87
3.65
0.61
0.41
0.11
19.40
152.04
171.44
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 5
VOLUME
2.25
TON
2.57
4.79
2.70
0.29
3.13
2.23
2.18
1.62
19.51
171.44
190.95
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 1
VOLUME
2.25
TON
0.70
10.42
5.22
1.49
0.07
0.05
3.06
7.99
3.76
12.60
8.91
1.51
5.99
5.67
0.90
68.34
190.95
259.29
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 2
VOLUME
2.25
TON
7.02
16.43
0.32
0.07
0.27
0.20
0.41
5.72
0.81
0.18
5.29
2.23
2.54
10.91
0.95
53.35
259.29
312.64
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 3
VOLUME
2.25
TON
0.95
1.44
0.54
8.08
0.27
1.58
1.35
0.63
0.97
5.04
0.92
0.90
0.25
0.41
3.60
26.93
312.64
339.57
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 4
VOLUME
2.25
TON
1.08
3.56
3.56
0.63
0.61
1.08
1.33
1.08
0.79
0.90
0.59
1.33
0.05
0.07
2.00
18.66
339.57
358.23
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 5
VOLUME
2.25
TON
0.43
0.92
0.16
1.35
0.11
1.37
1.08
1.91
0.77
0.29
0.32
0.07
0.59
0.59
0.20
10.16
358.23
368.39
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 6
VOLUME
2.25
TON
0.63
0.81
0.20
0.11
0.52
0.05
0.14
0.27
0.97
0.25
0.88
0.38
1.33
1.91
0.56
9.01
368.39
377.40
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 7
VOLUME
2.25
TON
0.05
0.25
0.92
0.29
1.80
5.45
1.10
0.95
0.16
0.02
0.68
5.96
0.27
0.68
0.29
18.87
377.40
396.27
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 8
VOLUME
2.25
TON
0.14
1.98
0.43
2.63
4.19
0.50
3.49
2.81
2.27
1.06
1.26
3.47
2.21
1.85
4.68
32.97
396.27
429.24
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 9
VOLUME
2.25
TON
0.29
1.51
3.42
8.62
2.70
1.71
4.46
0.88
0.61
0.25
1.33
2.36
0.18
1.87
2.81
33.00
429.24
462.24
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 10
VOLUME
2.25
TON
0.20
0.16
0.07
0.20
0.07
10.42
9.56
20.68
462.24
482.92
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 11
VOLUME
2.25
TON
3.56
0.68
0.70
0.43
1.71
0.81
0.47
0.20
0.38
1.26
1.58
4.30
0.32
0.45
0.11
16.96
482.92
499.88
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 12
VOLUME
2.25
TON
0.18
14.04
2.12
0.05
0.11
0.09
0.23
0.18
0.14
0.16
1.60
0.16
4.16
0.56
0.92
24.70
499.88
524.58
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 13
VOLUME
2.25
TON
4.21
0.34
1.10
0.25
0.74
1.58
0.74
1.37
3.40
0.81
0.11
1.53
0.56
0.14
0.07
16.95
524.58
541.53
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 14
VOLUME
2.25
TON
0.70
3.49
0.79
2.70
0.23
1.42
1.96
1.17
0.95
1.15
0.32
7.07
0.16
3.67
1.73
27.51
541.53
569.04
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 15
VOLUME
2.25
TON
1.69
1.06
0.59
2.95
3.58
6.39
0.20
0.16
0.16
0.54
0.95
2.48
0.99
0.65
3.38
25.77
569.04
594.81
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 16
VOLUME
2.25
TON
0.45
0.14
0.47
0.20
0.95
0.32
0.05
0.05
0.05
0.27
0.18
1.98
0.34
1.44
1.37
8.26
594.81
603.07
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 17
VOLUME
2.25
TON
0.18
0.25
2.36
1.04
0.47
0.95
1.89
2.61
5.63
5.63
1.82
0.14
3.92
0.18
1.42
28.49
603.07
631.56
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 18
VOLUME
2.25
TON
0.61
1.08
14.85
3.38
3.89
2.61
5.83
1.69
1.15
1.08
1.15
10.13
6.75
10.80
4.41
69.41
631.56
700.97
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 15 - 19
VOLUME
2.25
TON
1.73
11.90
1.58
4.16
1.67
5.40
4.59
5.47
36.50
700.97
737.47
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
25.00
50.00
50.00
50.00
50.00
Aspal Lama
6.00 m'
Sta 490+875 - Sta 490+925
AC-BC 5 Cm
Aspal Lama
6.00 m'
Sta 490+825 - Sta 490+875
AC-BC 5 Cm
Aspal Lama
5.90 m'
Sta 490+775 - Sta 490+825
AC-BC 5 Cm
Aspal Lama
5.70 m'
Sta 490+725 - Sta 490+775
AC-BC 5 Cm
Aspal Lama
5.80 m'
25.00
Aspal Lama
5.80 m'
JUMLAH 1-1
JUMLAH LALU MC - 2
JUMLAH TOTAL
250.00
350.00
600.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
25.00
25.00
Aspal Lama
5.80 m'
Sta 490+650 - Sta 490+675
AC-BC 5 Cm
Aspal Lama
5.90 m'
JUMLAH 1-1
JUMLAH LALU
JUMLAH TOTAL MC - 2
50.00
600.00
650.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
25.00
50.00
25.00
Sta 490+500
29.00
Sta 490+500
1.00
Sta 490+450
6.00
Aspal Lama
5.90 m'
AC-BC 5 Cm
AC-BC 5 Cm
Aspal Lama
5.85 m'
Sta 490+550 - Sta 490+575
AC-BC 5 Cm
Aspal Lama
5.80 m'
Sta 490+500
AC-BC 5 Cm
Aspal Lama
0.20 1.20
4.60
Sta 490+500
AC-BC 5 Cm
Aspal Lama
0.40 1.50
4.10
Sta 490+450
AC-BC 5 Cm
Aspal Lama
2.70
3.30
JUMLAH 1-1
JUMLAH LALU MC - 2
JUMLAH TOTAL
136.00
650.00
786.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Sta 490+450
AC-BC 5 Cm
Sta 490+450
1.20
25.00
15.00
Aspal Lama
0.20 1.00
4.80
Aspal Lama
3.00
3.00
Aspal Lama
3.00
3.00
35.00
50.00
50.00
Aspal Lama
3.00
3.00
Aspal Lama
3.00
3.00
Aspal Lama
5.90 m'
JUMLAH 1-1
JUMLAH LALU
JUMLAH TOTAL
176.20
786.00
962.20
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
50.00
50.00
50.00
50.00
50.00
50.00
Aspal Lama
3.00
3.00
Aspal Lama
3.00
3.00
Aspal Lama
5.70 m'
Sta 489+900 - Sta 489+950
AC-BC 5 Cm
Aspal Lama
3.00
3.00
Aspal Lama
5.80 m'
Sta 489+750 - Sta 489+800
AC-BC 5 Cm
Aspal Lama
5.80 m'
JUMLAH 1-1
JUMLAH LALU
JUMLAH TOTAL
Diperiksa Oleh :
300.00
962.20
1,262.20
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
15.00
35.00
25.00
25.00
Aspal Lama
3.00
3.00
Aspal Lama
3.00
3.00
Aspal Lama
3.00
3.00
Aspal Lama
3.00
3.00
25.00
50.00
Aspal Lama
3.00
3.00
Aspal Lama
3.00
3.00
JUMLAH 1-2
JUMLAH LALU
JUMLAH TOTAL
175.00
1,262.20
1,437.20
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Aspal Lama
3.00
3.00
50.00
50.00
50.00
Aspal Lama
3.00
3.00
Aspal Lama
3.00
3.00
Sta 489+150
AC-BC 5 Cm
Sta 489+150
2.26
Sta 489+150
1.70
Sta 489+150
2.30
Aspal Lama
2.40
1.62
1.98
Sta 489+150
AC-BC 5 Cm
Aspal Lama
2.85
0.30
2.85
Sta 489+150
AC-BC 5 Cm
Aspal Lama
3.00
2.72
0.28
JUMLAH 1-3
JUMLAH LALU
JUMLAH TOTAL
156.26
1,437.20
1,593.46
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
MARWAN, BE
KORDINATOR LAPANGAN
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Sta 489+100
AC-BC 5 Cm
Sta 489+100
18.00
15.00
50.00
50.00
15.00
Aspal Lama
5.90 m'
Sta 489+025 - Sta 489+040
AC-BC 5 Cm
Aspal Lama
5.86 m'
Sta 488+975 - Sta 489+025
AC-BC 5 Cm
Aspal Lama
5.86 m'
Sta 488+925 - Sta 488+975
AC-BC 5 Cm
Aspal Lama
5.85 m'
Sta 488+910 - Sta 488+925
AC-BC 5 Cm
Aspal Lama
5.78 m'
Sta 488+600
Sta 488+600
AC-BC 5 Cm
40.00
Aspal Lama
3.00 m'
JUMLAH 1-3
JUMLAH LALU
JUMLAH TOTAL
188.00
1,593.46
1,781.46
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
25.00
25.00
Aspal Lama
6.00 m'
Sta 487+900 - Sta 487+850
AC-BC 5 Cm
Aspal Lama
6.00 m'
Sta 487+850 - Sta 487+800
AC-BC 5 Cm
25.00
25.00
Aspal Lama
6.00 m'
Sta 487+800 - Sta 487+750
AC-BC 5 Cm
Aspal Lama
6.00 m'
JUMLAH 14-9
JUMLAH LALU
JUMLAH TOTAL MC - 3
100.00
1,781.46
1,881.46
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
50.00
50.00
50.00
25.00
50.00
25.00
Aspal Lama
5.90
0.10
Aspal Lama
3.00
3.00
Aspal Lama
3.00
3.00
Aspal Lama
5.96 m'
Sta 488+525 - Sta 488+575
AC-BC 5 Cm
Aspal Lama
5.95 m'
Sta 488+500 - Sta 488+525
AC-BC 5 Cm
Aspal Lama
6.00 m'
JUMLAH 1-2
JUMLAH LALU
JUMLAH TOTAL MC - 2
250.00
100.00
350.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
No. Mata Pembayaran : 6.3(6)
Item Pekerjaan
: Laston Lapis Pengikat Aspal Beton (AC-BC)
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
25.00
50.00
25.00
Aspal Lama
5.90 m'
Sta 488+225 - Sta 488+275
AC-BC 5 Cm
Aspal Lama
5.90 m'
Sta 488+200 - Sta 488+225
AC-BC 5 Cm
Aspal Lama
5.95 m'
JUMLAH 1-1
JUMLAH LALU
JUMLAH TOTAL
100.00
100.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
TEBAL
M'
HAL 14 - 1
V0LUME
M3
6.00
0.05
7.50
6.00
0.05
15.00
5.90
0.05
14.75
5.70
0.05
14.25
5.80
0.05
14.50
LEBAR
M'
5.80
0.05
7.25
73.25
89.15
162.40
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 14 - 2
V0LUME
M3
5.80
0.05
7.25
5.90
0.05
7.38
LEBAR
M'
14.63
162.40
177.03
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 14 - 3
V0LUME
M3
5.90
0.05
7.38
5.85
0.05
14.63
5.80
0.05
7.25
1.20
0.05
1.74
1.50
0.05
0.08
0.05
0.81
LEBAR
M'
2.70
31.89
177.03
208.92
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 14 - 4
V0LUME
M3
1.00
0.05
0.06
3.00
0.05
3.75
3.00
0.05
2.25
LEBAR
M'
3.00
0.05
5.25
3.00
0.05
7.50
0.05
14.75
5.90
33.56
208.92
242.48
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
LEBAR
M'
TEBAL
M'
HAL 14 - 5
V0LUME
M3
3.00
0.05
7.50
3.00
0.05
7.50
0.05
14.25
0.05
7.50
5.80
0.05
14.50
5.80
0.05
14.50
5.70
3.00
65.75
242.48
308.23
Dibuat Oleh :
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 14 - 6
V0LUME
M3
3.00
0.05
2.25
3.00
0.05
5.25
3.00
0.05
3.75
3.00
0.05
3.75
LEBAR
M'
3.00
0.05
3.75
3.00
0.05
7.50
26.25
308.23
334.48
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
LEBAR
M'
3.00
TEBAL
M'
HAL 14 - 7
V0LUME
M3
0.05
7.50
3.00
0.05
7.50
3.00
0.05
7.50
1.62
0.05
0.18
0.30
0.05
0.03
2.72
0.05
0.31
23.02
334.48
357.50
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 14 - 8
V0LUME
M3
5.90
0.05
5.31
5.86
0.05
4.40
5.86
0.05
14.65
5.85
0.05
14.63
5.78
0.05
4.34
LEBAR
M'
3.00
0.05
6.00
49.33
357.50
406.83
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 14 - 9
V0LUME
M3
6.00
0.05
7.50
6.00
0.05
7.50
LEBAR
M'
6.00
0.05
7.50
6.00
0.05
7.50
30.00
406.83
436.83
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 14 - 2
V0LUME
M3
0.05
14.75
3.00
0.05
7.50
3.00
0.05
7.50
5.96
0.05
7.45
5.95
0.05
14.88
0.05
7.50
LEBAR
M'
5.90
6.00
59.58
29.57
89.15
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 14 - 1
V0LUME
M3
5.90
0.05
7.38
5.90
0.05
14.75
5.95
0.05
7.44
LEBAR
M'
29.57
29.57
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)
: Laston Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
HAL 14
No
S TAT I O N E R
Laston AC-BC
STA
Aspal Lama
490 + 950
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
490 + 400
'm 6
490
950
5.80
0.05
7.25
0.05
14.38
0.05
14.38
0.05
14.35
0.05
14.38
0.05
14.75
0.05
14.75
0.05
14.13
0.05
7.06
50.00
2
490
900
5.75
50.00
490
850
5.75
50.00
490
800
5.74
490
750
5.75
50.00
50.00
6
490
700
5.90
50.00
490
650
5.90
490
600
5.65
50.00
50.00
9
490
550
5.65
10
490
500
1.20
29.00
0.05
1.74
11
490
500
1.50
1.00
0.05
0.08
12
490
450
2.70
6.00
0.05
0.81
13
490
450
1.00
1.20
0.05
0.06
14
490
400
3.00
25.00
0.05
3.75
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 14-1
Jumlah Lalu MC - 2
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
462.20 M1
350.00 M1
812.20 M1
MARWAN, BE
CHIEF INSPECTOR
121.87
88.65
210.52
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)
: Laston Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
HAL 14
No
S TAT I O N E R
Laston AC-BC
STA
Aspal Lama
490 + 300
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
489 + 400
'm 6
15
490
300
3.00
15.00
0.05
2.25
16
490
250
3.00
35.00
0.05
5.25
17
490
200
3.00
50.00
0.05
7.50
18
490
150
5.83
50.00
0.05
14.58
19
490
100
3.00
50.00
0.05
7.50
20
490
050
3.00
50.00
0.05
7.50
21
489
950
5.70
50.00
0.05
14.25
22
489
900
3.00
50.00
0.05
7.50
23
489
800
5.53
50.00
0.05
13.83
24
489
750
5.53
50.00
0.05
13.83
25
489
550
3.00
15.00
0.05
2.25
26
489
500
3.00
25.00
0.05
3.75
27
489
500
3.00
35.00
0.05
5.25
28
489
450
5.65
0.05
7.06
0.05
7.25
50.00
29
489
400
5.80
Jumlah 14-2
575.00 M1
119.55
Jumlah Lalu
812.20 M1
210.52
Jumlah Total
1,387.20 M1
330.07
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)
: Laston Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
HAL 14
No
S TAT I O N E R
Laston AC-BC
STA
Aspal Lama
489 + 400
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
488 + 950
'm 6
30
489
400
5.80
0.05
7.25
0.05
7.31
50.00
31
489
350
5.85
32
489
300
3.00
50.00
0.05
7.50
33
489
250
3.00
50.00
0.05
7.50
34
489
200
3.00
50.00
0.05
7.50
35
489
150
1.62
2.26
0.05
0.18
36
489
150
0.30
1.70
0.05
0.03
37
489
150
2.72
2.30
0.05
0.31
38
489
100
5.90
12.95
0.05
3.82
39
489
050
5.86
15.00
0.05
4.40
40
489
000
5.86
0.05
14.65
0.05
14.63
25.00
50.00
41
488
950
5.85
25.00
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 14-3
334.21 M1
75.08
1
Jumlah Lalu
1,387.20 M
330.07
Jumlah Total
1,721.41 M1
405.15
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)
: Laston Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
HAL 14
No
S TAT I O N E R
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
s/d
487 + 900
M1
M3
Laston AC-BC
STA
Aspal Lama
488 + 900
'm 6
42
488
900
5.80
15.00
0.05
4.35
43
488
600
3.00
40.00
0.05
6.00
44
487
950
5.85
0.05
7.31
0.05
7.25
50.00
45
487
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Aspal
Laston
Lama
AC-BC
900
5.80
Jumlah 14-4
105.00 M1
24.91
1
Jumlah Lalu
1,721.41 M
405.15
1
Jumlah Total MC - 3
1,826.41 M
430.06
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
'm 6
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)
: Laston Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
HAL 14
No
S TAT I O N E R
Laston AC-BC
STA
Aspal Lama
488 + 900
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
488 + 200
'm 6
488
900
5.80
0.05
7.25
0.05
7.25
50.00
2
488
850
5.80
488
800
3.00
50.00
0.05
7.50
488
750
3.00
50.00
0.05
7.50
488
600
5.96
0.05
7.45
0.05
14.88
0.05
7.25
0.05
7.38
0.05
14.75
0.05
7.44
50.00
6
488
550
5.95
50.00
488
500
5.80
488
300
5.90
50.00
488
250
5.90
10
488
200
5.95
50.00
Jumlah 14-1
350.00 M1
88.65
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah Lalu
Jumlah Total MC - 2
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
- M1
350.00 M1
MARWAN, BE
CHIEF INSPECTOR
88.65
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 6.3(6)
: Laston Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
HAL 14
No
S TAT I O N E R
Laston AC-BC
STA
Aspal Lama
487 + 900
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
487 + 850
'm 6
487
900
5.80
0.05
7.25
0.05
7.25
50.00
2
487
850
5.80
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 14-1
50.00 M1
14.50
1
Jumlah Lalu MC - 3
1,826.41 M
430.06
1
Jumlah Total
1,876.41 M
444.56
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 6.3(6)
: Laston Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
HAL 14
No
S TAT I O N E R
Laston AC-BC
Aspal Lama
STA
343 + 500
LEBAR
JARAK
TEBAL
VOLUME
M1
M1
M1
M3
s/d
2 + 400
'm 6
Nicah Awe
KM 343 + 500
10.00
13.60
0.05
6.80
Damar Tutong
KM 400 + 000
10.00
13.60
0.05
6.80
Alue Lhok
KM 409 + 100
10.00
12.10
0.05
6.05
Sarah Teube
KM 421 + 500
10.00
13.60
0.05
6.80
Alue Dua
KM 433 + 600
10.00
13.60
0.05
6.80
Lhok Bhani
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
KM 2 + 400
10.00
13.60
0.05
6.80
Jumlah 14-2
80.10 M1
40.05
1
Jumlah Lalu
1,876.41 M
444.56
Jumlah Total MC - 4
1,956.51 M1
484.61
Diperiksa Oleh :
Dibuat Oleh :
Konsultan Supervisi
PT. BAHTERA KARANG RAYA
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 14 - 1
KET
M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 14 - 2
KET
K
9
1
L
0
a
e
msl
m
a't'
os'
n
A
B
A
C
W
B
C
M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 14 - 3
KET
M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 14 - 4
KET
M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 14 - 1
KET
M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 14 - 1
KET
M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 14 - 2
KET
M3
M3
M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)
: Laston - Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+850
Sta 490+900
Sta 490+950
Sta 491+000
Sta 491+050
Sta 491+100
Sta 491+150
Sta 491+200
Sta 491+250
Sta 491+300
Sta 491+350
Sta 491+400
Sta 491+450
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)
: Laston - Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+100
Sta 490+150
KOTA LANGSA
Sta 490+200
Sta 490+250
Sta 490+300
Sta 490+350
Sta 490+400
Sta 490+450
Sta 490+500
Sta 490+550
Sta 490+600
Sta 490+650
Sta 490+700
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)
: Laston - Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 489+350
Sta 489+400
Sta 489+450
Sta 489+500
Sta 489+550
Sta 489+600
Sta 489+650
Sta 489+700
Sta 489+750
Sta 489+800
Sta 489+850
Sta 489+900
Sta 489+950
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 6.3(6)
: Laston - Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)
: Laston - Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 2
BACK UP DATA
MC. No. 2
BULAN : AGUSTUS 2005
: 6.3(6)
: Laston - Lapis Pengikat Aspal Beton (AC-BC)
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 487+850
Sta 487+900
Sta 487+950
Sta 488+000
Sta 488+050
Sta 488+100
Sta 488+150
Sta 488+200
Sta 488+250
Sta 488+300
Sta 488+350
Sta 488+400
Sta 488+450
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
HAL. 14 - 1
ET/GAMBAR
PERBATASAN
SUMUT
Sta 491+500
Sta 491+550
Sta 491+600
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 14 - 2
ET/GAMBAR
Sta 490+750
Sta 490+800
MEDAN
Sta 490+850
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 14 - 3
ET/GAMBAR
Sta 490+000
Sta 490+050
Sta 490+100
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
ET/GAMBAR
HAL. 14 - 4
Sta 489+250
Sta 489+300
Sta 489+350
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 14 - 1
ET/GAMBAR
Sta 489+250
Sta 489+300
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
Sta 489+350
HAL. 14 - 2
ET/GAMBAR
Sta 488+500
Sta 488+550
Sta 488+600
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
488 + 200
50.00
6.00
0.05
300.00
15.00 ACBC
488 + 250
50.00
6.00
0.05
300.00
15.00 ACBC
488 + 500
50.00
6.00
0.05
300.00
15.00 ACBC
488 + 550
50.00
6.00
0.05
300.00
15.00 ACBC
488 + 600
40.00
3.00
0.05
120.00
6.00
488 + 750
50.00
3.00
0.05
150.00
7.50
488 + 800
50.00
3.00
0.05
150.00
7.50
488 + 850
50.00
6.00
0.05
300.00
15.00
488 + 900
40.00
6.00
0.05
240.00
12.00 ACBC
488 + 950
50.00
6.00
0.05
300.00
15.00 ACBC
489 + 000
40.00
6.00
0.05
240.00
12.00 ACBC
489 + 050
12.95
6.00
0.05
77.70
3.89 ACBC
489 + 150
1.62
1.70
2.72
2.26
0.30
2.30
0.05
0.05
0.05
3.66
0.51
6.26
0.18
0.03
0.31
489 + 200
50.00
3.00
0.05
150.00
7.50
489 + 250
50.00
3.00
0.05
150.00
7.50
489 + 300
50.00
3.00
0.05
150.00
7.50
489 + 350
50.00
3.00
0.05
150.00
7.50
489 + 400
25.00
3.00
0.05
75.00
3.75
489 + 450
25.00
3.00
0.05
75.00
3.75
489 + 500
35.00
25.00
3.00
3.00
0.05
0.05
105.00
75.00
5.25
3.75
489 + 550
15.00
3.00
0.05
45.00
2.25
489 + 750
50.00
6.00
0.05
300.00
15.00 ACBC
4,063.13
4,063.13
203.16
203.16
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
489 + 800
50.00
6.00
0.05
300.00
15.00 ACBC
489 + 900
50.00
3.00
0.05
150.00
7.50 ACBC
489 + 950
50.00
6.00
0.05
300.00
15.00 ACBC
490 + 050
50.00
3.00
0.05
150.00
7.50 ACBC
490 + 100
50.00
3.00
0.05
150.00
7.50 ACBC
490 + 150
50.00
6.00
0.05
300.00
15.00 ACBC
490 + 200
50.00
3.00
0.05
150.00
7.50 ACBC
490 + 250
35.00
3.00
0.05
105.00
5.25 ACBC
490 + 300
15.00
3.00
0.05
45.00
2.25 ACBC
490 + 400
25.00
3.00
0.05
75.00
3.75 ACBC
490 + 450
6.00
1.20
2.70
1.00
0.05
0.05
16.20
1.20
0.81 ACBC
0.06 ACBC
490 + 500
29.00
1.00
1.20
1.50
0.05
0.05
34.80
1.50
1.74 ACBC
0.08 ACBC
490 + 550
50.00
6.00
0.05
300.00
15.00 ACBC
490 + 600
50.00
6.00
0.05
300.00
15.00 ACBC
490 + 650
50.00
6.00
0.05
300.00
15.00 ACBC
490 + 700
50.00
6.00
0.05
300.00
15.00 ACBC
490 + 750
50.00
6.00
0.05
300.00
15.00 ACBC
490 + 800
50.00
6.00
0.05
300.00
15.00 ACBC
490 + 850
50.00
6.00
0.05
300.00
15.00 ACBC
490 + 900
50.00
6.00
0.05
300.00
15.00 ACBC
4,178.70
4,063.13
8,241.83
208.94
203.16
412.10
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
12.60
10.00
0.05
126.00
6.30 ACBC
13.60
10.00
0.05
136.00
6.80 ACBC
13.60
10.00
0.05
136.00
6.80 ACBC
13.60
10.00
0.05
136.00
6.80 ACBC
13.60
10.00
0.05
136.00
6.80 ACBC
13.60
10.00
0.05
136.00
6.80 ACBC
806.00
8,241.83
9,047.83
40.30
412.10
452.40
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan
STA
SKET/GAMBAR
PANJANG
M'
19.90
8.60
50.00
20.00
35.00
Agregat Kelas A
Agregat Kelas B
Aspal Lama
3.40
2.60
Aspal Lama
3.30
2.70
6.00 m'
Sta 490+880 - Sta 490+900
Agregat Kelas A
Agregat Kelas B
5.90 m'
Sta 490+815 - Sta 490+850
Aspal Lama
0.30
Agregat Kelas A
Agregat Kelas B
0.30
20.00
Agregat Kelas A
Agregat Kelas B
5.80 m'
JUMLAH SAAT INI
JUMLAH LALU
JUMLAH TOTAL
153.50
153.50
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
10.00
50.00
Agregat Kelas A
Agregat Kelas B
5.80 m'
Sta 490+700 - Sta 490+750
Agregat Kelas A
Agregat Kelas B
5.80 m'
50.00
1.20
29.00
10.00
Agregat Kelas A
Agregat Kelas B
Aspal Lama
3.00
3.00
Agregat Kelas B
0.20 1.00
4.80
Agregat Kelas B
1.20
4.80
Agregat Kelas B
3.00
3.00
150.20
153.50
303.70
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
50.00
40.00
50.00
20.00
20.00
Sta 490+500
1.50
Agregat Kelas A
Agregat Kelas B
Aspal Lama
3.00
3.00
Agregat Kelas B
3.00
3.00
Aspal Lama
3.00
3.00
Agregat Kelas B
2.50
3.50
Agregat Kelas B
2.50
3.50
Sta 490+500
Agregat Kelas B
Agregat Kelas A
Aspal Lama
0.20 1.00
4.80
181.50
303.70
485.20
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Sta 490+500
Sta 490+500
29.00
Sta 490+450
1.00
Sta 490+450
6.00
Agregat Kelas A
Aspal Lama
Agregat Kelas B
0.20 1.20
4.60
Sta 490+450
Agregat Kelas A
Agregat Kelas B
Aspal Lama
0.10 1.20
4.70
Sta 490+450
Agregat Kelas B
2.70
Agregat Kelas A
Aspal Lama
3.30
Sta 490+400
Sta 490+400
25.00
Sta 490+150
1.45
Sta 490+150
5.00
Agregat Kelas A
Aspal Lama
Agregat Kelas B
3.00
3.00
Sta 490+150
Agregat Kelas A
Agregat Kelas B
Aspal Lama
3.00
0.80
2.20
Sta 490+150
Agregat Kelas B
Agregat Kelas A
Aspal Lama
1.20 0.85
3.95
67.45
485.20
552.65
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Sta 490+150
Sta 490+150
3.00
Sta 490+150
5.40
Sta 490+150
5.60
Sta 490+150
0.90
Sta 490+150
0.50
Sta 490+150
0.60
Agregat Kelas A
Agregat Kelas B
Aspal Lama
3.00
0.58
2.42
Sta 490+150
Agregat Kelas A
Aspal Lama
Agregat Kelas B
1.20 1.56
3.24
Sta 490+150
Agregat Kelas A
Aspal Lama
Agregat Kelas B
1.20 0.50
4.30
Sta 490+150
Agregat Kelas A
Aspal Lama
Agregat Kelas B
0.20 0.50
5.30
Sta 490+150
Agregat Kelas A
Aspal Lama
Agregat Kelas B
0.20 0.60
5.20
Sta 490+150
Agregat Kelas A
Agregat Kelas B
Aspal Lama
3.00
0.58
2.42
16.00
552.65
568.65
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan
STA
SKET/GAMBAR
PANJANG
M'
Sta 490+150
Sta 490+150
5.60
Sta 490+150
4.33
Sta 490+150
0.80
Sta 490+050
2.30
Agregat Kelas A
Agregat Kelas B
Aspal Lama
5.30
0.70
Sta 490+150
Agregat Kelas A
Agregat Kelas B
Aspal Lama
5.45
0.55
Sta 490+150
Agregat Kelas A
Agregat Kelas B
Aspal Lama
3.00
1.95
1.05
Sta 490+050
Aspal Lama
Agregat Kelas A
Agregat Kelas B
3.00
0.80
2.20
Sta 490+050
Aspal Lama
3.00
Sta 490+050
1.50
Sta 490+050
1.50
Agregat Kelas A
Agregat Kelas B
0.90
2.10
Sta 490+050
Agregat Kelas A
Aspal Lama
Agregat Kelas B
2.10
0.90
3.00
16.03
568.65
584.68
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Sta 490+050
Sta 490+050
Agregat Kelas B
1.00
Agregat Kelas A
Aspal Lama
5.00
4.80
Sta 490+050
Sta 490+050
8.30
Sta 489+900
4.50
Sta 489+900
9.20
Sta 489+900
1.10
Sta 489+900
3.00
Agregat Kelas A
Aspal Lama
Agregat Kelas B
1.00
5.00
Sta 489+900
Agregat Kelas A
Aspal Lama
Agregat Kelas B
0.25 1.55
4.20
Sta 489+900
Agregat Kelas A
Aspal Lama
Agregat Kelas B
2.60
3.40
Sta 489+900
Agregat Kelas A
Aspal Lama
Agregat Kelas B
0.10 1.90
4.00
Sta 489+900
Agregat Kelas A
Aspal Lama
Agregat Kelas B
4.20
1.80
30.90
584.68
615.58
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
MARWAN, BE
KORDINATOR LAPANGAN
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Sta 489+900
Sta 489+900
5.10
Sta 489+500
0.70
Sta 489+500
0.90
Sta 489+500
0.60
Sta 489+500
1.60
Agregat Kelas A
Aspal Lama
Agregat Kelas B
3.40
2.60
Sta 489+500
Agregat Kelas A
Agregat Kelas B
Aspal Lama
2.60
0.70
2.70
Sta 489+500
Agregat Kelas A
Aspal Lama
Agregat Kelas B
0.60 1.20
4.20
Sta 489+500
Agregat Kelas A
Aspal Lama
Agregat Kelas B
0.50 1.30
4.20
Sta 489+500
Agregat Kelas B
Agregat Kelas A
Aspal Lama
0.99 1.31
3.70
Sta 489+500
Sta 489+500
1.00
Agregat Kelas A
Aspal Lama
Agregat Kelas B
1.50
4.50
9.90
615.58
625.48
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Sta 489+500
Sta 489+500
1.00
Sta 489+400
2.60
Agregat Kelas A
Aspal Lama
Agregat Kelas B
0.54 1.26
4.20
Sta 489+400
Agregat Kelas B
Agregat Kelas A
Aspal Lama
0.50 1.50
4.00
Sta 489+400
Sta 489+400
2.35
Sta 489+400
1.65
Sta 489+150
1.62
Sta 489+150
1.70
Agregat Kelas A
Aspal Lama
Agregat Kelas B
0.30 0.70
5.00
Sta 489+400
Agregat Kelas A
Aspal Lama
Agregat Kelas B
1.90 0.60
3.50
Sta 489+150
Agregat Kelas A
Agregat Kelas B
Aspal Lama
1.04
2.26
2.70
Sta 489+150
Agregat Kelas A
Agregat Kelas B
Aspal Lama
0.30
5.70
10.92
625.48
636.40
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Sta 489+150
Sta 489+150
2.30
Sta 489+050
18.00
Sta 488+600
1.50
Sta 488+600
2.30
Sta 488+600
0.35
Sta 488+600
1.45
Agregat Kelas A
Aspal Lama
Agregat Kelas B
3.00
2.72
0.28
Sta 489+050
Agregat Kelas A
Agregat Kelas B
5.86 m'
Sta 488+600
Agregat Kelas A
Aspal Lama
Agregat Kelas B
0.80 1.20
4.00
Sta 488+600
Agregat Kelas A
Agregat Kelas B
Aspal Lama
5.00
0.60
0.40
Sta 488+600
Agregat Kelas A
Agregat Kelas B
1.50
Aspal Lama
1.50
3.00
Sta 488+600
Aspal Lama
Agregat Kelas A
Agregat Kelas B
3.00
1.23
1.77
25.90
636.40
662.30
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.1 (1)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas A
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Sta 488+600
Sta 488+600
Agregat Kelas A
Agregat Kelas B
Aspal Lama
3.17
0.83
2.00
0.80
0.80
662.30
663.10
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
TEBAL
M'
HAL 9 - 1
V0LUME
M3
2.60
0.15
7.76
2.70
0.15
3.48
6.00
0.15
45.00
5.90
0.15
17.70
3.00
0.15
15.75
LEBAR
M'
5.80
0.15
17.40
107.09
###
107.09
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 9 - 2
V0LUME
M3
5.80
0.15
8.70
5.80
0.15
43.50
LEBAR
M'
3.00
0.15
22.50
1.00
0.15
0.18
1.20
0.15
5.22
3.00
0.15
4.50
84.60
107.09
191.69
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 9 - 3
V0LUME
M3
3.00
0.15
22.50
3.00
0.15
18.00
3.00
0.15
22.50
2.50
0.15
7.50
2.50
0.15
7.50
1.00
0.15
0.23
LEBAR
M'
78.23
191.69
269.92
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 9 - 4
V0LUME
M3
1.20
0.15
5.22
1.20
0.15
0.18
2.70
0.15
2.43
LEBAR
M'
3.00
0.15
11.25
0.80
0.15
0.17
0.85
0.15
0.64
19.89
269.92
289.81
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
LEBAR
M'
TEBAL
M'
HAL 9 - 5
V0LUME
M3
0.58
0.15
0.26
1.56
0.15
1.26
0.50
0.15
0.42
0.50
0.15
0.07
0.60
0.15
0.05
0.58
0.15
0.05
2.11
289.81
291.92
Dibuat Oleh :
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 9 - 6
V0LUME
M3
0.70
0.15
0.59
0.55
0.15
0.36
1.95
0.15
0.23
0.80
0.15
0.28
LEBAR
M'
0.90
0.15
0.20
0.90
0.15
0.20
1.86
291.92
293.78
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
LEBAR
M'
1.00
TEBAL
M'
HAL 9 - 7
V0LUME
M3
0.15
0.72
1.00
0.15
1.25
1.55
0.15
1.05
2.60
0.15
3.59
1.90
0.15
0.31
4.20
0.15
1.89
8.81
293.78
302.59
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 9 - 8
V0LUME
M3
3.40
0.15
2.60
0.70
0.15
0.07
1.20
0.15
0.16
1.30
0.15
0.12
1.31
0.15
0.31
LEBAR
M'
1.50
0.15
0.23
3.49
302.59
306.08
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 9 - 9
V0LUME
M3
1.26
0.15
0.19
1.50
0.15
0.59
LEBAR
M'
0.70
0.15
0.25
0.60
0.15
0.15
2.26
0.15
0.55
0.3
0.15
0.08
1.81
306.08
307.89
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 9 - 10
V0LUME
M3
2.72
0.15
0.94
5.86
0.15
15.82
1.20
0.15
0.27
0.60
0.15
0.21
1.50
0.15
0.08
1.23
0.15
0.27
LEBAR
M'
17.59
307.89
325.48
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
LEBAR
M'
0.83
TEBAL
M'
HAL 9 - 11
V0LUME
M3
0.15
0.10
0.10
325.48
325.58
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
S TAT I O N E R
Agregat Kelas A
STA
Aspal Lama
491 + 000
LEBAR
JARAK
TEBAL
M1
M1
M1
s/d
490 + 550
Agregat Kelas B
'm 6
491
000
2.70
8.60
0.15
491
000
2.60
19.90
0.15
490
900
5.75
50.00
0.15
490
850
5.75
20.00
0.15
490
800
3.00
35.00
0.15
490
750
5.75
20.00
0.15
490
750
5.75
10.00
0.15
490
700
5.90
50.00
0.15
490
650
1.00
1.20
0.15
10
490
650
1.20
29.00
0.15
11
490
650
3.00
50.00
0.15
12
490
650
3.00
10.00
0.15
13
490
600
3.00
50.00
0.15
14
490
600
3.00
40.00
0.15
15
490
550
2.50
20.00
0.15
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 9-1
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
413.70 M1
- M1
413.70 M1
Dibuat Oleh :
PT. BAHTERA KARAN
ARMAN SUROS
GENERAL SUPERINT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
S TAT I O N E R
Agregat Kelas A
STA
Aspal Lama
490 + 550
LEBAR
JARAK
TEBAL
M1
M1
M1
s/d
490 + 150
Agregat Kelas B
'm 6
16
490
550
3.00
50.00
0.15
17
490
550
2.50
20.00
0.15
18
490
500
1.20
29.00
0.15
19
490
500
1.00
1.50
0.15
20
490
450
2.70
6.00
0.15
21
490
450
1.20
1.00
0.15
22
490
400
3.00
25.00
0.15
23
490
150
0.70
5.60
0.15
24
490
150
0.80
1.45
0.15
25
490
150
0.85
5.00
0.15
26
490
150
0.58
3.00
0.15
27
490
150
1.56
5.40
0.15
28
490
150
0.50
5.60
0.15
29
490
150
0.50
0.90
0.15
30
490
150
0.60
0.50
0.15
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 9-2
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
159.95 M1
413.70 M1
573.65 M1
Dibuat Oleh :
PT. BAHTERA KARAN
ARMAN SUROS
GENERAL SUPERINT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
S TAT I O N E R
Agregat Kelas A
STA
Aspal Lama
489 + 150
LEBAR
JARAK
TEBAL
M1
M1
M1
s/d
489 + 500
Agregat Kelas B
'm 6
31
490
150
0.58
0.60
0.15
32
490
150
0.55
4.33
0.15
33
490
150
0.80
1.95
0.15
34
490
050
2.30
0.80
0.15
35
490
050
1.50
0.90
0.15
36
490
050
1.50
0.90
0.15
37
490
050
1.00
4.80
0.15
38
490
050
1.00
8.30
0.15
39
489
900
1.55
4.50
0.15
40
489
900
2.60
9.20
0.15
41
489
900
1.90
1.10
0.15
42
489
900
4.20
3.00
0.15
43
489
900
3.40
5.10
0.15
44
489
500
0.70
0.70
0.15
45
489
500
1.20
0.90
0.15
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 9-3
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
47.08 M1
573.65 M1
620.73 M1
Dibuat Oleh :
PT. BAHTERA KARAN
ARMAN SUROS
GENERAL SUPERINT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
S TAT I O N E R
LEBAR
JARAK
TEBAL
M1
M1
M1
s/d
488 + 600
Agregat Kelas A
STA
Aspal Lama
489 + 500
Agregat Kelas B
'm 6
46
489
500
1.30
0.60
0.15
47
489
500
1.31
1.60
0.15
48
489
500
1.50
1.00
0.15
49
489
500
1.26
1.00
0.15
50
489
400
1.50
2.60
0.15
51
489
400
0.60
1.65
0.15
52
489
400
0.70
2.35
0.15
53
489
150
2.26
1.62
0.15
54
489
150
0.30
1.70
0.15
55
489
150
2.72
2.30
0.15
56
489
050
5.86
18.00
0.15
57
488
600
1.20
1.50
0.15
58
488
600
0.60
2.30
0.15
59
488
600
1.50
0.35
0.15
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 9-4
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
Aspal
Laston
Lama
AC-BC
'm 6
38.57 M1
620.73 M1
659.30 M1
Dibuat Oleh :
PT. BAHTERA KARAN
ARMAN SUROS
GENERAL SUPERINT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
S TAT I O N E R
Agregat Kelas A
STA
Aspal Lama
488 + 600
LEBAR
JARAK
TEBAL
M1
M1
M1
s/d
488 + 600
Agregat Kelas B
'm 6
60
488
600
1.23
1.45
0.15
61
488
600
0.83
0.80
0.15
Jumlah 9-5
2.25 M1
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah Lalu
Jumlah Total MC-3
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
659.30 M1
661.55 M1
Dibuat Oleh :
PT. BAHTERA KARAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SUROS
GENERAL SUPERINT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
S TAT I O N E R
Agregat Kelas A
Aspal Lama
STA
433 + 500
LEBAR
JARAK
TEBAL
M1
M1
M1
s/d
2 + 400
Agregat Kelas B
'm 6
Nicah Awe
KM 343 + 500
10.00
13.60
0.15
Damar Tutong
KM 400 + 000
10.00
13.60
0.15
Alue Lhok
KM 409 + 100
10.00
12.10
0.15
Sarah Teube
KM 421 + 500
10.00
13.60
0.15
Alue Dua
KM 433 + 600
10.00
13.60
0.15
Lhok Bhani
KM 2 + 400
10.00
13.60
0.15
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 1-3
Jumlah Lalu MC-3
Jumlah Total MC-4
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
80.10 M1
661.55 M1
741.65 M1
Dibuat Oleh :
PT. BAHTERA KARAN
ARMAN SUROS
GENERAL SUPERINT
HAL 9 - 1
VOLUME
M3
Agregat Kelas B
3.48
7.76
43.13
17.25
15.75
17.25
8.63
44.25
0.18
5.22
22.50
4.50
22.50
18.00
7.50
KET
237.90 M3
- M3
237.90 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 9 - 2
VOLUME
M3
Agregat Kelas B
22.50
7.50
5.22
0.23
2.43
0.18
11.25
0.59
0.17
KET
K
9
1
L
0
a
e
m
sl
m
a't
o
s'
n
A
B
A
C
W
B
C
0.64
0.26
1.26
0.42
0.07
0.05
52.77 M3
237.90 M3
290.67 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 9 - 3
VOLUME
M3
Agregat Kelas B
0.05
0.36
KET
0.23
0.28
0.20
0.20
0.72
1.25
1.05
3.59
0.31
1.89
2.60
0.07
0.16
12.96 M3
290.67 M3
303.63 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 9 - 4
VOLUME
KET
M3
Agregat Kelas B
0.12
0.31
0.23
0.19
0.59
0.15
0.25
0.55
0.08
0.94
15.82
0.27
0.21
0.08
19.79 M3
303.63 M3
323.42 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 9 - 5
VOLUME
M3
Agregat Kelas B
0.27
0.10
0.37 M3
KET
323.42 M3
323.79 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 9 - 5
VOLUME
M3
Agregat Kelas B
20.40
20.40
18.15
20.40
20.40
20.40
KET
120.15 M3
323.79 M3
443.94 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+850
Sta 490+900
Sta 490+950
Sta 491+000
Sta 491+050
Sta 491+100
Sta 491+150
Sta 491+200
Sta 491+250
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+100
Sta 490+150
Sta 490+200
Sta 490+250
Sta 490+300
Sta 490+350
Sta 490+400
Sta 490+450
Sta 490+500
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 489+350
Sta 489+400
Sta 489+450
Sta 489+500
Sta 489+550
Sta 489+600
Sta 489+650
Sta 489+700
Sta 489+750
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.1 (1)
: Lapisan Pondasi Agregat Kelas A
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ATA
R 2005
HAL. 9 - 1
BAR
PERBATASAN
SUMUT
Sta 491+300
Sta 491+350
Sta 491+400
Sta 491+450
Sta 491+500
Sta 491+550
Sta 491+600
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
ATA
ER 2005
HAL. 9 - 2
BAR
Sta 490+550
Sta 490+600
Sta 490+650
Sta 490+700
Sta 490+750
Sta 490+800
Sta 490+850
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
ER 2005
HAL. 9 - 3
BAR
Sta 489+800
Sta 489+850
Sta 489+900
Sta 489+950
Sta 490+000
Sta 490+050
Sta 490+100
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
ATA
ER 2005
BAR
HAL. 9 - 4
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
Sta 489+250
Sta 489+300
Sta 489+350
MEDAN
h:
rvisi
RDANA
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
E
TOR
ARMAN SUROSO
GENERAL SUPERINTENDENT
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
AC-WC
AC-WC
AC-WC
AC-WC
JUMLAH TOTAL
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
JUMLAH LALU
JUMLAH TOTAL
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
488 + 600
:
:
:
:
PANJANG
m
1.50
2.30
0.35
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
1.20
0.60
1.50
0.15
0.15
0.15
1.80
1.38
0.53
VOL
m3
KET
0.27
0.21
0.08 oke
1.45
0.80
1.23
0.83
0.15
0.15
1.78
0.66
0.27
0.10
6.15
6.15
0.93
0.93
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
489 + 050
12.95
6.00
0.15
77.70
11.66 oke
489 + 150
1.62
1.70
2.72
2.26
0.30
2.30
0.15
0.15
0.15
3.66
0.51
6.26
0.55
0.08 oke
0.94
489 + 400
2.60
1.65
2.35
1.50
0.60
0.70
0.15
0.15
0.15
3.90
0.99
1.65
0.59
0.15 oke
0.25
489 + 500
0.70
1.20
1.30
1.31
1.50
1.26
###
0.90
0.60
1.60
1.00
1.00
0.15
0.15
0.15
0.15
0.15
0.15
0.49
1.08
0.78
2.10
1.50
1.26
101.88
0.07
0.16
0.12
0.32 oke
0.23
0.19
15.31
JUMLAH LALU
JUMLAH TOTAL
6.15
108.03
0.93
16.24
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
489 + 900
:
:
:
:
PANJANG
m
4.50
9.20
1.10
3.00
5.10
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
1.55
2.60
1.90
4.20
3.40
0.15
0.15
0.15
0.15
0.15
6.98
23.92
2.09
12.60
17.34
VOL
m3
KET
1.05
3.59
0.31 oke
1.89
2.60
62.93
108.03
170.96
9.44
16.24
25.68
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
490 + 150
5.60
1.45
5.00
3.00
5.40
5.60
0.90
0.50
0.60
4.33
1.95
0.70
0.80
0.85
0.58
1.56
0.50
0.50
0.60
0.58
0.55
0.80
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
3.92
1.16
4.25
1.74
8.42
2.80
0.45
0.30
0.35
2.38
1.56
0.59
0.17
0.64
0.26
1.26
0.42 oke
0.07
0.05
0.05
0.36
0.23
490 + 600
490 + 650
6.00
1.20
29.00
1.00
2.70
1.00
1.20
1.50
0.15
0.15
0.15
0.15
16.20
1.20
34.80
1.50
2.43
0.18 oke
5.22
0.23
8.60
19.90
2.70
2.60
0.15
0.15
23.22
51.74
3.48
7.76 oke
490 + 700
491 + 000
155.99
170.96
326.95
23.40
25.68
49.08
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
490 + 050
:
:
:
:
PANJANG
m
2.30
1.50
1.50
4.80
8.30
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
0.80
0.90
0.90
1.00
1.00
0.15
0.15
0.15
0.15
0.15
1.84
1.35
1.35
4.80
8.30
VOL
m3
KET
0.28
0.20 oke
0.20
0.72
1.25
17.64
326.95
344.59
2.65
49.08
51.73
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan
STA
SKET/GAMBAR
PANJANG
M'
19.90
50.00
20.00
35.00
20.00
Agregat Kelas B
3.40
2.60
Agregat Kelas B
6.00 m'
Sta 490+880 - Sta 490+900
Lap. Base Lama
Agregat Kelas B
5.90 m'
Sta 490+815 - Sta 490+850
Aspal Lama
Agregat Kelas B
5.70
5.70
Agregat Kelas B
5.80 m'
50.00
Agregat Kelas B
5.80 m'
JUMLAH SAAT INI
JUMLAH LALU
JUMLAH TOTAL
194.90
194.90
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
50.00
1.20
Agregat Kelas B
3.00
3.00
0.20 1.00
Aspal Lama
4.80
29.00
10.00
50.00
40.00
Aspal Lama
1.20
4.80
Aspal Lama
3.00
3.00
Agregat Kelas B
3.00
3.00
Aspal Lama
3.00
3.00
180.20
194.90
375.10
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
50.00
Sta 490+500
1.50
Sta 490+450
1.00
Sta 490+450
6.00
Sta 490+150
1.45
Sta 490+150
5.00
Agregat Kelas B
3.00
3.00
Sta 490+500
Agregat Kelas B
Aspal Lama
0.20 1.00
4.80
Sta 490+450
Agregat Kelas B
Aspal Lama
0.10 1.20
4.70
Sta 490+450
Agregat Kelas B
Aspal Lama
2.70
3.30
Sta 490+150
Aspal Lama
3.00
Agregat Kelas B
0.80
2.20
Sta 490+150
Agregat Kelas B
Aspal Lama
1.20 0.85
3.95
64.95
375.10
440.05
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan
STA
SKET/GAMBAR
PANJANG
M'
Sta 490+150
Aspal Lama
Sta 490+150
3.00
Sta 490+150
5.40
Sta 490+150
5.60
Agregat Kelas B
3.00
0.58
2.42
Sta 490+150
Agregat Kelas B
Aspal Lama
1.20 1.56
3.24
Sta 490+150
Agregat Kelas B
1.20 0.50
Aspal Lama
4.30
Sta 490+150
Agregat Kelas B
Sta 490+150
0.90
Sta 490+150
0.50
Sta 490+150
0.60
Aspal Lama
0.20 0.50
5.30
Sta 490+150
Agregat Kelas B
Aspal Lama
0.20 0.60
5.20
Sta 490+150
Aspal Lama
3.00
Agregat Kelas B
0.58
2.42
16.00
440.05
456.05
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Sta 490+150
Aspal Lama
Sta 490+150
5.60
Sta 490+150
4.33
Sta 490+150
0.80
Sta 490+050
2.30
Sta 490+050
1.50
Sta 490+050
1.50
Agregat Kelas B
5.30
0.70
Sta 490+150
Aspal Lama
Agregat Kelas B
5.45
0.55
Sta 490+150
Aspal Lama
Agregat Kelas B
3.00
1.95
1.05
Sta 490+050
Aspal Lama
Agregat Kelas B
3.00
0.80
2.20
Sta 490+050
Aspal Lama
3.00
Agregat Kelas B
0.90
2.10
Sta 490+050
Agregat Kelas B
2.10
Aspal Lama
0.90
3.00
16.03
456.05
472.08
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Sta 490+050
Agregat Kelas B
Sta 490+050
4.80
Sta 490+050
8.30
Sta 489+900
4.50
Sta 489+900
9.20
Aspal Lama
1.00
5.00
Sta 490+050
Agregat Kelas B
Aspal Lama
1.00
5.00
Sta 489+900
Agregat Kelas B
Aspal Lama
0.25 1.55
4.20
Sta 489+900
Agregat Kelas B
Aspal Lama
2.60
3.40
Sta 489+900
Agregat Kelas B
Sta 489+900
1.10
Sta 489+900
3.00
Aspal Lama
0.10 1.90
4.00
Sta 489+900
Agregat Kelas B
Aspal Lama
4.20
1.80
30.90
472.08
502.98
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Sta 489+900
Sta 489+900
Agregat Kelas B
Aspal Lama
3.40
2.60
5.10
Sta 489+500
Aspal Lama
Sta 489+500
0.70
Sta 489+500
0.90
Sta 489+500
0.60
Sta 489+500
1.60
Sta 489+500
1.00
Agregat Kelas B
2.60
0.70
2.70
Sta 489+500
Agregat Kelas B
Aspal Lama
0.60 1.20
4.20
Sta 489+500
Agregat Kelas B
Aspal Lama
0.50 1.30
4.20
Sta 489+500
Agregat Kelas B
Aspal Lama
0.99 1.31
3.70
Sta 489+500
Agregat Kelas B
1.50
Aspal Lama
4.50
9.90
502.98
512.88
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
MARWAN, BE
KORDINATOR LAPANGAN
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Sta 489+500
Agregat Kelas B
Sta 489+500
1.00
Sta 489+400
2.60
Sta 489+400
2.35
Sta 489+400
1.65
Sta 489+150
1.62
Aspal Lama
0.54 1.26
4.20
Sta 489+400
Agregat Kelas B
Aspal Lama
0.50 1.50
4.00
Sta 489+400
Agregat Kelas B
Aspal Lama
0.30 0.70
5.00
Sta 489+400
Agregat Kelas B
Aspal Lama
1.90 0.60
3.50
Sta 489+150
Aspal Lama
Agregat Kelas B
1.04
2.26
2.70
Sta 489+150
Sta 489+150
Agregat Kelas B
1.70
Aspal Lama
0.30
5.70
10.92
512.88
523.80
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
No. Mata Pembayaran : 5.2(2)
Item Pekerjaan
: Lapisan Pondasi Agregat Kelas B
Lokasi
: Jalan Banda Aceh - Medan
SKET/GAMBAR
STA
PANJANG
M'
Sta 489+150
Aspal Lama
3.00
Sta 489+150
2.30
Sta 488+600
1.50
Agregat Kelas B
2.72
0.28
Sta 488+600
Agregat Kelas B
Aspal Lama
0.80 1.20
4.00
Sta 488+600
Aspal Lama
5.00
Sta 488+600
2.30
Sta 488+600
0.35
Sta 488+600
1.45
Sta 488+600
0.80
Agregat Kelas B
0.60
0.40
Sta 488+600
Agregat Kelas B
1.50
Aspal Lama
1.50
3.00
Sta 488+600
Aspal Lama
3.00
Agregat Kelas B
1.23
1.77
Sta 488+600
Aspal Lama
3.17
Agregat Kelas B
0.83
2.00
8.70
523.80
532.50
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
TEBAL
M'
HAL 10 - 1
V0LUME
M3
2.60
0.20
10.35
6.00
0.20
60.00
5.90
0.20
23.60
5.70
0.20
39.90
5.80
0.20
23.20
LEBAR
M'
5.80
0.20
58.00
215.05
215.05
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 10 - 2
V0LUME
M3
3.00
0.20
30.00
1.00
0.20
0.24
LEBAR
M'
1.20
0.20
6.96
3.00
0.20
6.00
3.00
0.20
30.00
3.00
0.20
24.00
97.20
215.05
312.25
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 10 - 3
V0LUME
M3
3.00
0.20
30.00
1.00
0.20
0.30
1.20
0.20
0.24
2.70
0.20
3.24
0.80
0.20
0.23
0.85
0.20
0.85
LEBAR
M'
34.86
312.25
347.11
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 10 - 4
V0LUME
M3
0.58
0.20
0.35
1.56
0.20
1.68
0.50
0.20
0.56
LEBAR
M'
0.50
0.20
0.09
0.60
0.20
0.06
0.58
0.20
0.07
2.81
347.11
349.92
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
LEBAR
M'
TEBAL
M'
HAL 10 - 5
V0LUME
M3
0.70
0.20
0.78
0.55
0.20
0.48
1.95
0.20
0.31
0.80
0.20
0.37
0.90
0.20
0.27
0.90
0.20
0.27
2.48
349.92
352.40
Dibuat Oleh :
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 10 - 6
V0LUME
M3
1.00
0.20
0.96
1.00
0.20
1.66
1.55
0.20
1.40
2.60
0.20
4.78
LEBAR
M'
1.90
0.20
0.42
4.20
0.20
2.52
11.74
352.40
364.14
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
LEBAR
M'
3.40
TEBAL
M'
HAL 10 - 7
V0LUME
M3
0.20
3.47
0.70
0.20
0.10
1.20
0.20
0.22
1.30
0.20
0.16
1.31
0.20
0.42
1.50
0.20
0.30
4.67
364.14
368.81
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 10 - 8
V0LUME
M3
1.26
0.20
0.25
1.50
0.20
0.78
0.70
0.20
0.33
0.60
0.20
0.20
2.26
0.20
0.73
LEBAR
M'
0.3
0.20
0.10
2.39
368.81
371.20
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
TEBAL
M'
HAL 10 - 9
V0LUME
M3
2.72
0.20
1.25
1.20
0.20
0.36
LEBAR
M'
0.60
0.20
0.28
1.50
0.20
0.11
1.23
0.20
0.36
0.83
0.20
0.13
2.49
371.20
373.69
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
S TAT I O N E R
Agregat Kelas B
KM
491 + 000
LEBAR
JARAK
TEBAL
M1
M1
M1
s/d
490 + 450
'm 6
491
000
2.60
19.90
0.20
490
900
5.75
50.00
0.20
490
850
5.75
20.00
0.20
490
800
3.00
35.00
0.20
490
750
5.75
20.00
0.20
490
700
5.90
50.00
0.20
490
650
1.00
1.20
0.20
490
650
1.20
29.00
0.20
490
650
3.00
50.00
0.20
10
490
650
3.00
10.00
0.20
11
490
600
3.00
50.00
0.20
12
490
600
3.00
40.00
0.20
13
490
550
3.00
50.00
0.20
14
490
500
1.00
1.50
0.20
15
490
450
2.70
6.00
0.20
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 10-1
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
432.60 M1
- M1
432.60 M1
Dibuat Oleh :
PT. BAHTERA KARAN
ARMAN SUROS
GENERAL SUPERINT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
S TAT I O N E R
Agregat Kelas B
KM
490 + 450
LEBAR
JARAK
TEBAL
M1
M1
M1
s/d
490 + 050
'm 6
16
490
450
1.20
1.00
0.20
17
490
150
0.70
5.60
0.20
18
490
150
0.80
1.45
0.20
19
490
150
0.85
5.00
0.20
20
490
150
0.58
3.00
0.20
21
490
150
1.56
5.40
0.20
22
490
150
0.50
5.60
0.20
23
490
150
0.50
0.90
0.20
24
490
150
0.60
0.50
0.20
25
490
150
0.58
0.60
0.20
26
490
150
0.55
4.33
0.20
27
490
150
0.80
1.95
0.20
28
490
050
2.30
0.80
0.20
29
490
050
1.50
0.90
0.20
30
490
050
1.50
0.90
0.20
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 10-2
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
37.93 M1
432.60 M1
470.53 M1
Dibuat Oleh :
PT. BAHTERA KARAN
ARMAN SUROS
GENERAL SUPERINT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
S TAT I O N E R
Agregat Kelas B
KM
490 + 050
LEBAR
JARAK
TEBAL
M1
M1
M1
s/d
489 + 400
'm 6
31
490
050
1.00
4.80
0.20
32
490
050
1.00
8.30
0.20
33
489
900
1.55
4.50
0.20
34
489
900
2.60
9.20
0.20
35
489
900
1.90
1.10
0.20
36
489
900
4.20
3.00
0.20
37
489
900
3.40
5.10
0.20
38
489
500
0.70
0.70
0.20
39
489
500
1.20
0.90
0.20
40
489
500
1.30
0.60
0.20
41
489
500
1.31
1.60
0.20
42
489
500
1.50
1.00
0.20
43
489
500
1.26
1.00
0.20
44
489
400
1.50
2.60
0.20
45
489
400
0.70
2.35
0.20
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Jumlah 10-3
Jumlah Lalu
Jumlah Total
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
46.75 M1
470.53 M1
517.28 M1
Dibuat Oleh :
PT. BAHTERA KARAN
ARMAN SUROS
GENERAL SUPERINT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
S TAT I O N E R
LEBAR
JARAK
TEBAL
M1
M1
M1
s/d
488 + 600
Agregat Kelas B
KM
489 + 400
'm 6
46
489
400
0.60
1.65
0.20
47
489
150
2.26
1.62
0.20
48
489
150
0.30
1.70
0.20
49
489
150
2.72
2.30
0.20
50
488
600
1.20
1.50
0.20
51
488
600
0.60
2.30
0.20
52
488
600
1.50
0.35
0.20
53
488
600
1.23
1.45
0.20
54
488
600
0.83
0.80
0.20
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah 10-4
Jumlah Lalu
Jumlah Total MC - 3
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
13.67 M1
517.28 M1
530.95 M1
Dibuat Oleh :
PT. BAHTERA KARAN
ARMAN SUROS
GENERAL SUPERINT
BAGIAN PELAKSANA KEGIATAN SKS PEMBANGUNAN JALAN LINTAS TIMUR SIMPANG-LANGSA-BATAS SUMU
PEKERJAAN PEMBANGUNAN JALAN BATAS KOTA LANGSA - BATAS SUMUT
BACK UP DATA
MC. No. 4
BULAN : OKTOBER 2005
: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Box Culvert Jalan Banda Aceh - Medan
S TAT I O N E R
Agregat Kelas B
Lapisan Base Lama
KM
433 + 500
LEBAR
JARAK
TEBAL
M1
M1
M1
s/d
2 + 400
'm 6
Nicah Awe
KM 343 + 500
10.00
13.60
0.20
Damar Tutong
KM 400 + 000
10.00
13.60
0.20
Alue Lhok
KM 409 + 100
10.00
12.10
0.20
Sarah Teube
KM 421 + 500
10.00
13.60
0.20
Alue Dua
KM 433 + 600
10.00
13.60
0.20
Lhok Bhani
KM 2 + 400
10.00
13.60
0.20
Jumlah 10-1
80.10 M1
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
BOB ISMED, ST
KORDINATOR LAPANGAN
Jumlah Lalu MC - 3
Jumlah Total MC - 4
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
MARWAN, BE
CHIEF INSPECTOR
530.95 M1
611.05 M1
Dibuat Oleh :
PT. BAHTERA KARAN
ARMAN SUROS
GENERAL SUPERINT
HAL 10 - 1
VOLUME
M3
10.35
57.50
23.00
21.00
23.00
59.00
0.24
6.96
30.00
6.00
30.00
24.00
30.00
0.30
3.24
KET
324.59 M3
- M3
324.59 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 10 - 2
VOLUME
M3
0.24
0.78
0.23
0.85
0.35
1.68
0.56
0.09
0.06
KET
K
9
1
L
0
a
e
m
sl
m
a't
o
s'
n
A
B
A
C
W
B
C
0.07
0.48
0.31
0.37
0.27
0.27
6.61 M3
324.59 M3
331.20 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 10 - 3
VOLUME
M3
0.96
1.66
KET
1.40
4.78
0.42
2.52
3.47
0.10
0.22
0.16
0.42
0.30
0.25
0.78
0.33
17.77 M3
331.20 M3
348.97 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 10 - 4
VOLUME
KET
M3
0.20
0.73
0.10
1.25
0.36
0.28
0.11
0.36
0.13
3.52 M3
348.97 M3
352.49 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL 10 - 1
VOLUME
M3
27.20
27.20
24.20
27.20
27.20
27.20
160.20 M3
KET
352.49 M3
512.69 M3
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+850
Sta 490+900
Sta 490+950
Sta 491+000
Sta 491+050
Sta 491+100
Sta 491+150
Sta 491+200
Sta 491+250
Sta 491+300
Sta 491+350
Sta 491+400
Sta 491+450
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 490+100
Sta 490+150
KOTA LANGSA
Sta 490+200
Sta 490+250
Sta 490+300
Sta 490+350
Sta 490+400
Sta 490+450
Sta 490+500
Sta 490+550
Sta 490+600
Sta 490+650
Sta 490+700
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 489+350
Sta 489+400
Sta 489+450
Sta 489+500
Sta 489+550
Sta 489+600
Sta 489+650
Sta 489+700
Sta 489+750
Sta 489+800
Sta 489+850
Sta 489+900
Sta 489+950
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
BACK UP DATA
MC. No. 3
BULAN : SEPTEMBER 2005
: 5.2(2)
: Lapisan Pondasi Agregat Kelas B
: Jalan Banda Aceh - Medan
SKET/GAMBAR
Sta 488+600
Sta 488+650
Sta 488+700
Sta 488+750
Sta 488+800
Sta 488+850
Sta 488+900
Sta 488+950
Sta 489+000
Sta 489+050
Sta 489+100
Sta 489+150
Sta 489+200
KOTA LANGSA
Diperiksa Oleh :
BAG. PELAKSANA KEG. SKS
LINTAS TIMUR III
Diperiksa Oleh :
Konsultan Supervisi
PT. BINA CIPTA PERDANA
Dibuat O
PT. BAHTERA K
BOB ISMED, ST
KORDINATOR LAPANGAN
MARWAN, BE
CHIEF INSPECTOR
ARMAN SU
GENERAL SUPE
HAL. 10 - 1
ET/GAMBAR
PERBATASAN
SUMUT
Sta 491+500
Sta 491+550
Sta 491+600
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 10 - 2
ET/GAMBAR
Sta 490+750
Sta 490+800
MEDAN
Sta 490+850
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
HAL. 10 - 3
ET/GAMBAR
Sta 490+000
Sta 490+050
Sta 490+100
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
ET/GAMBAR
HAL. 10 - 4
Sta 489+250
Sta 489+300
Sta 489+350
MEDAN
Dibuat Oleh :
PT. BAHTERA KARANG RAYA
ARMAN SUROSO
GENERAL SUPERINTENDENT
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
AC-WC
AC-WC
AC-WC
AC-WC
JUMLAH TOTAL
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
JUMLAH LALU
JUMLAH TOTAL
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
488 + 600
:
:
:
:
PANJANG
m
1.50
2.30
0.35
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
1.20
0.60
1.50
0.20
0.20
0.20
1.80
1.38
0.53
VOL
m3
0.36
0.28
0.11
KET
1.45
0.80
1.23
0.83
0.20
0.20
1.78
0.66
0.36
0.13
6.15
6.15
1.24
1.24
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
489 + 000
12.95
6.07
0.20
78.61
15.72 b
489 + 100
3.00
1.34
2.40
3.00
1.30
2.50
1.50
2.00
2.50
2.30
0.20
0.20
0.20
0.20
0.20
7.50
2.01
4.80
7.50
2.99
1.50
0.40
0.96
1.50
0.60
489 + 150
1.62
1.70
2.72
2.26
0.30
2.30
0.20
0.20
0.20
3.66
0.51
6.26
0.73
0.10
1.25
489 + 400
2.60
1.65
2.35
1.50
0.60
0.70
0.20
0.20
0.20
3.90
0.99
1.65
0.78
0.20
0.33
489 + 500
0.70
###
0.20
0.49
0.10
KET
1.20
1.30
1.31
1.50
1.26
0.90
0.60
1.60
1.00
1.00
0.20
0.20
0.20
0.20
0.20
1.08
0.78
2.10
1.50
1.26
127.59
6.15
133.74
0.22
0.16
0.42
0.30
0.25
25.52
1.24
26.76
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
KET
133.74
133.74
26.76
26.76
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
490 + 650
490 + 700
:
:
:
:
PANJANG
m
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
VOL
m3
6.00
1.20
29.00
1.00
2.70
1.00
1.20
1.50
0.20
0.20
0.20
0.20
16.20
1.20
34.80
1.50
3.24
0.24
6.96
0.30
490 + 700
1.20
29.00
1.00
1.20
0.20
0.20
1.20
34.80
0.24
6.96
491 + 000
8.60
2.70
0.20
23.22
4.64 b
490 + 750
KET
19.90
2.60
0.20
51.74
164.66
133.74
298.40
10.35 b
32.93
26.76
59.69
PERHITUNGAN VOLUME
PEKERJAAN
PAKET
PELAKSANA
JENIS PEKERJAAN
No
INDIKASI
STA
STA
AWAL
AKHIR
490 + 050
:
:
:
:
PANJANG
m
2.30
1.50
1.50
4.80
8.30
PENANGANAN
LEBAR
TEBAL
LUAS
m
m
m2
0.80
0.90
0.90
1.00
1.00
0.20
0.20
0.20
0.20
0.20
1.84
1.35
1.35
4.80
8.30
VOL
m3
0.37
0.27
0.27
0.96
1.66
KET
17.64
298.40
316.04
3.53
59.69
63.22