[EXAMPLE]
1. Name the person accredited for perfecting interchangeable parts.
a. Eli Whitney
b. Taiichi Ohno
c. Henry Ford
d. Lillian Gilbreth
In this example, the correct answer is A) Eli Whitney and should be indicated as:
A
Question 1
Mark
If you wish to change your answer, the original answer must be clearly crossed out so that
the desired answer is absolutely clear. If there is any doubt as to your desired answer, that
response will receive no marks.
F-ACAD-22B
NAME: _______________________________________
STUDENTs NUMBER: ___________________________
A
SECTION: ___________
Mark
Question 1
Question 21
Question 2
Question 22
Question 3
Question 23
Question 4
Question 24
Question 5
Question 25
Question 6
Question 26
Question 7
Question 27
Question 8
Question 28
Question 9
Question 29
Question 10
Question 30
Question 11
Question 31
Question 12
Question 32
Question 13
Question 33
Question 14
Question 34
Question 15
Question 35
Question 16
Question 36
Question 17
Question 37
Question 18
Question 38
Question 19
Question 39
Question 20
Question 40
SCORE
SCORE
A
Question 41
Mark
Question 61
Mark
Mark
F-ACAD-22B
Question 42
Question 62
Question 43
Question 63
Question 44
Question 64
Question 45
Question 65
Question 46
Question 66
Question 47
Question 67
Question 48
Question 68
Question 49
Question 69
Question 50
Question 70
Question 51
Question 52
Question 53
Question 54
Question 55
Question 56
Question 57
Question 58
Question 59
Question 60
SCORE
SCORE
TOTAL SCORE:
1. He conducted research on income distribution and found out that 80% of wealth was
held by only 20% of the population. He then, developed his findings into a universal law:
80% of anything is attributed to 20% of its causes.
a. Vilfredo Pareto
b. Wilfredo Pareto
c. Kaoru Ishikawa
d. Shingeo Shingo
F-ACAD-22B
F-ACAD-22B
b. Quantity/Inventory
c. Part Description
d. Part Drawing
10. This refers to the identification and elimination of wastes inside the Value Stream
a. Kaizen
b. Quick Changeover
c. Lean Manufacturing
d. Agile Manufacturing
11. It
a.
b.
c.
d.
is the variation in the operation of a process not caused by the end customer.
Mura
Muri
Muda
Mudi
12. This refers to those activities that must be done for legal purposes. Company pays you
to do it, but its still waste
a. Required Waste
b. Values
c. Pure Waste
d. Value Added Work
13. Activities that take time or resources but do not satisfy customer requirements
a. Non-Value added Work
b. Value Added Work
c. Pure Waste
d. Downtime
14. Activities that the customer is willing to pay for
a. Value
b. Idle Time
c. Non-Value added Work
d. Value Added Work
15. Waste related to the inspection or repair of a product or service to fulfill customer
requirements
a. Inventory
b. Mura
c. Defects
d. Inspection Error
16. Which of the following andon does?
a. Detect defects
b. Prevent defects from being passed forward
c. Solve anomalies
d. Replace good verbal communication between workers or teams
17. Marking Standard which means object must always be in the area
a. Closed Box
b. Open Box
c. Marked Edges
F-ACAD-22B
d. Unmarked Edges
18. Within every operation is ________________ and ______________ Work
a. Value-Added Work, Non- Value Added Work
b. Identification, Elimination
c. Mura, Muri
d. Required Waste, Pure Waste
19. Which of the following will reduce or eliminate the waste of overproduction?
a. Build what the customer needs, when it is needed, in the quantity needed.
b. Shift from machine focus to people focus.
c. The focus must be on the operator and the machine, as opposed to the material.
d. Bring an open mind to work and always think about how to improve the process
20. Multiple bosses creating multiple jobs for people and sending emails/memos to
everyone are examples of which kind of wastes?
a. Inventory
b. Overproduction
c. Non-utilizing employees KSA
d. Waiting
21. Which of the following will reduce or eliminate the waste of waiting?
a. Build what the customer needs, when it is needed, in the quantity needed.
b. Shift from machine focus to people focus.
c. Bring an open mind to work and always think about how to improve the process
d. The focus must be on the operator and the machine, as opposed to the material.
22. Which of the following will reduce or eliminate the waste of motion?
a. Build what the customer needs, when it is needed, in the quantity needed.
b. Shift from machine focus to people focus.
c. Bring an open mind to work and always think about how to improve the process
d. The focus must be on the operator and the machine, as opposed to the material.
23. This refers to those costs without benefits
a. Idle Times
b. Wastes
c. Values
d. Profits
24. What is this waste that refers to the effort of adding no value to the product or service
from the customers viewpoint?
a. Inventory
b. Non-value added work
c. Excess Processing
d. Waiting
25. It
a.
b.
c.
is a measure of how spread out numbers are. Its symbol is (the Greek letter sigma)
Standard Deviation
Mean
Variance
F-ACAD-22B
d. Cumulative Variance
26. It is an agreed-upon set of work procedures that establish the best and most reliable
methods and sequences for each process and each worker.
a. Standard
b. Mean
c. Variance
d. Cumulative Variance
27. He was an Industrial Engineer credited with developing a quick changeover
methodology
a. Henry Ford
b. Sinichi Toyoda
c. Shingeo Shingo
d. Shingeo Toyoda
28. A picture composed of lines and words designed to represent a meaningful relationship
between an effect and its causes. It groups causes according to selected categories
a. Ishikawa Diagram
b. Pareto Diagram
c. Check Sheet
d. A3
29. Positive correlation:
a. as x increases, y increases
b. as x increases, y decreases
c. No evidence that y is directly affected by a changes in x
d. as x increases, x increases
30. The use of controls that will enable an individual to immediately recognize the
standard and any deviation from it
a. Pokayoke
b. Control Charts
c. Visual Business
d. Pareto Diagram
F-ACAD-22B
36. A
a.
b.
c.
d.
F-ACAD-22B
41. It
a.
b.
c.
d.
42. Products were produced one at a time and were generally unique
a. Lean production
b. Craft production
c. Agile production
d. Mass production
43. Which of the following is a major issue of mass production?
a. Increased product handling
b. Additional transportation and storage
c. Rework of Products
d. All of the above
44. To monitor effect of implementation of project plan & find Countermeasures to further
improve the solution.
a. Plan
b. Do
c. Check
d. Act
45. To Enlighten the Team as to the Real Problem by analyzing the Data and defining and
implementing a solution plan
a. Plan
b. Do
c. Check
d. Act
46. To investigate the current situation & understand fully the nature of the problem being
solved.
a. Plan
b. Do
c. Check
d. Act
47. To
a.
b.
c.
d.
F-ACAD-22B
b. A3
c. Gemba
d. Heijunka
49. It
a.
b.
c.
d.
is the Waste, work that does not add any value to the product
Mura
Muri
Muda
Mudi
50. Customers orders vary from month to month, creating uneven production scheduling.
Build-to-order companies will be building huge quantities, paying overtime, and stressing
their people and equipment one week, but then sending them home the next due to light
orders. How do we call this kind of build-to-order approach?
a. hurry up, then slow down
b. Mass production
c. Customized production
d. Overtime
51. What are the benefits of leveling production schedule?
a. Reduced risk of unsold goods
b. Balanced use of labor and machines
c. Smoothed demand on the upstream processes and suppliers
d. All of the above
52. What are the three components of leveling?
a. Volume, Variety and Time
b. Volume, Customer Demand and Time
c. Variety, Customer Demand and Time
d. Customer Demand, Time, Labor
53. It
a.
b.
c.
d.
F-ACAD-22B
60. The purpose of the ____ is to tell the story of an opportunity and how it was addressed,
using one sheet of paper.
a. A3
b. A4
c. A5
d. A6
61. The reason we call A3 as _____________ is because you are trying to tell a story through
the document. When you interact with team members and stakeholders, you are sharing
and testing your ideas. Like a story, it will evolve.
a. Dialogue
b. Storyboard
c. Conversation
d. Lean tool
63. Its fundamental objective is to create value in the most effective and efficient way
a. Lean Manufacturing
b. Lean Production
c. Lean Thinking
F-ACAD-22B
d. System Thinking
64. The set of shared attitudes, values, goals and practices that characterizes an
institution, organization, or group
a. A3 Culture
b. Culture
c. Lean Culture
d. System Thinking
65. In
a.
b.
c.
d.
business, _______ is the place where value is created; where the work is done
Lemba
Gemba
Memba
Kambe
66. Agreement by the group on countermeasures that address the reasonable concerns of
all stakeholders
a. Stakeholders
b. Consensus
c. Gemba
d. Countermeasure
67. __________ are temporary responses to specific problems that will serve until a better
approach is found or until conditions change
a. Fix
b. Solution
c. Countermeasures
d. Action Plan
68. The purpose of this tab is to provide a place to document the improvement to relevant
metrics that occurred during the identified project.
a. Boxplot
b. Box score
c. Box Tab
d. Box chart
69. Complete the quote: A problem well stated is a _______________
a. Solution to be solved
b. Problem completely solved
c. Problem Half solved
d. DMAIC
70. Which of the following is most correct way to state a problem in a A3?
a. The printer closest to Department ABC is down two flights of stairs from employee A
b. Last month there was a 25% decline in throughput on Product Line
c. Airplanes are hard to control. The airplanes are assumed to show low performance,
therefore, root cause must be known to solve the issue. Airplanes may not be safe
to be used in the airline; therefore, it must be improved.
d. In the last 3 months, 7% of vendors complained that we paid our bills 10 or more
days late
F-ACAD-22B