NO
URAIAN
KODE
A. PEKERJAAN PERSIAPAN
1
A-01
A-02
A-03
A-04
A-05
A-06
A-07
A-08
A-09
10
A-10
11
A-11
12
A-12
13
A-13
14
A-14
15
A-15
16
A -16
17
18
A-17
A-18
19
A-19
20
A-20
B. PEKERJAAN TANAH
1
B-01
B-02
B-03
B-04
B-05
B-06
Rekap - Hal 1
B-07
B-08
B-09
10
B-10
11
B-11
12
13
14
15
16
B-12
B-13
B-14
B-15
B-16
C. PEKERJAAN PONDASI
1
C-01
C-02
C-03
C-04
C-05
C-06
C-07
8
9
10
C-08
C-09
C-10
11
C-11
12
C-12
13
C-13
14
C-14
15
C-15
Rekap - Hal 2
16
C-16
17
C-17
D. PEKERJAAN BETON
Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K100), slump (122) cm,
1
w/c = 8,7
Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (122) cm,
2
w/c = 0,78
Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K150), slump (122) cm,
3
w/c = 0,72
Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump
4
(3-6)cm w/c = 0,87
Membuat 1 m3 lantai kerja beton mutu f'c = 14,5 Mpa (K175), slump
5
(122)cm w/c = 0,66
Membuat 1 m3 lantai kerja beton mutu f'c = 16,9 Mpa (K200), slump
6
(122)cm w/c = 0,61
Membuat 1 m3 lantai kerja beton mutu f'c = 19,3 Mpa (K225), slump
7
(122)cm w/c = 0,58
Membuat 1 m3 lantai kerja beton mutu f'c = 21,7 Mpa (K250), slump
8
(122)cm w/c = 0,56
Membuat 1 m3 lantai kerja beton mutu f'c = 24 Mpa (K275), slump
9
(122)cm w/c = 0,53
Membuat 1 m3 lantai kerja beton mutu f'c = 26,4 Mpa (K300), slump
10
(122)cm w/c = 0,52
Membuat 1 m3 lantai kerja beton mutu f'c = 28,8 Mpa (K325), slump
11
(122)cm w/c = 0,49
Membuat 1 m3 lantai kerja beton mutu f'c = 31,2 Mpa (K350), slump
12
(122)cm w/c = 0,48
D-01
D-02
D-03
D-04
D-05
D-06
D-07
D-08
D-09
D-10
D-11
D-12
13
D-13
14
15
D-14
D-15
16
D-16
17
D-17
18
D-18
19
D-19
20
D-20
21
D-21
22
D-22
23
D-23
24
D-24
25
D-25
Rekap - Hal 3
26
D-26
27
D-27
28
D-28
29
D-29
30
D-30
31
D- 31
32
D- 32
33
D- 33
34
D- 34
35
36
37
38
D- 35
D- 36
D-37
D-38
E-01
E-02
E-03
E-04
E-05
E-06
E-07
E-08
E-09
10
11
12
Rekap - Hal 4
E-10
E-11
E-12
13
14
15
16
E-13
E-14
E-15
E-16
17
E-17
18
E-18
19
E-19
20
21
22
23
24
25
E-20
E-21
E-22
E-23
E-24
E-25
32
E-32
33
E-33
34
E-34
26
27
28
29
30
31
E-26
E-27
E-28
E-29
E-30
E-31
F-01
F-02
F-03
F-04
F-05
F-06
F-07
F-08
F-09
Rekap - Hal 5
10
F-10
11
F-11
12
F-12
13
F-13
14
F-14
15
F-15
16
F-16
17
F-17
18
F-18
19
F-19
20
F-20
21
F-21
22
F-22
23
F-23
24
F-24
25
26
F-25
F-26
27
Membuat 1 m2 Acian
F-27
28
F-28
G. PEKERJAAN ATAP
1
G-01
G-02
G-03
G-04
G-05
G-06
G-07
Rekap - Hal 6
G-08
G-09
10
G-10
11
G-11
12
G-12
13
G-13
14
G-14
15
G-15
16
G-16
17
G-17
18
G-18
19
G-19
20
G-20
21
G-21
22
G-22
H. PEKERJAAN PLAFOND
1
H-01
H-02
H-03
H-04
H-05
H-06
H-07
H-08
H-09
10
H-10
11
H-11
12
H-12
13
H-13
14
H-14
15
H-15
I. PEKERJAAN LANTAI
Rekap - Hal 7
I-01
I-02
I-03
I-04
5
6
I-05
I-06
I-07
I-08
I-09
10
I-10
11
I-11
12
I-12
13
I-13
14
I-14
15
16
17
18
19
I-15
I-16
I-17
I-18
I-19
I-20
21
I-21
22
I-22
23
I-23
24
I-24
25
I-25
26
I-26
20
27
28
Memasang 1 m' plint vinyl karet ukuran (15 x 30) cm dengan perekat
Memasang 1 m2 floor hardener
I-27
I-28
Rekap - Hal 8
29
I-29
30
I-30
31
32
33
34
35
36
37
I-31
I-32
I-33
I-34
I-35
I-36
I-37
J. PEKERJAAN KAYU
1
2
J-01
J-02
J-03
J-04
5
6
7
8
J-05
J-06
J-07
J-08
10
11
J-11
12
13
J-09
J-10
J-12
J-13
14
J-14
15
J-15
16
J-16
17
J-17
Rekap - Hal 9
18
19
20
21
22
23
24
25
26
27
28
J-18
Memasang 1 m2 rangka plafond (60 x 60), kayu kelas II atau kelas III
J-20
Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas
II
Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas
II
Memasang 1 m2 rangka dinding pemisah ( 60 x 120) cm, kayu kelas
II atau III
Memasang 1 m2 dinding pemisah teakwood rangkap, rangka kayu
kelas II
Memasang 1 m2 dinding pemisah plywood rangkap, rangka kayu
kelas II
Memasang 1 m2 dinding lambrizing dari papan kayu kelas I
Memasang 1 m2 dinding lambrizing dari plywood ukuran (120 x 240)
cm
Memasang 1 m2 dinding bilik, rangka kayu kelas III atau IV
J-19
J-21
J-22
J-23
J-24
J-25
J-26
J-27
J-28
K-01
K-02
K-03
K-04
K-05
K-06
7
8
9
10
11
12
13
K-07
K-08
K-09
K-10
K-11
K-12
K-13
14
K-14
15
16
17
K-15
K-16
K-17
18
K-18
19
Memasang 1 m' talang 1/2 lingkaran D-15 cm, seng plat BJLS 30
lebar 45 cm
K-19
Rekap - Hal 10
20
K-20
L-01
L-02
L-03
L-04
L-05
L-06
L-07
L-08
L-09
L-10
L-11
L-12
13
L-13
14
15
16
17
L-14
L-15
L-16
L-17
M. PEKERJAAN SANITASI
1
Memasang 1 buah closet duduk
2
Memasang 1 buah closet jongkok
3
Memasang 1 buah Urinoir
4
Memasang 1 buah Wastafel
5
1 Buah bak Mandi Fibreglass Volume 0,30 m3
M-01
M-02
M-03
M-04
M-05
M-06
M-07
M-08
M-09
10
M-10
11
M-11
12
13
14
15
16
17
M-12
M-13
M-14
M-15
M-16
M-17
18
19
20
M-18
M-19
M-20
Rekap - Hal 11
21
22
23
24
25
26
M-21
M-22
M-23
M-24
M-25
M-26
27
M-27
N. PEKERJAAN PENGECATAN
1
N-01
2
3
N-02
N-03
10
N-10
11
12
N-11
N-14
N-13
14
N-14
15
N-15
4
5
6
7
8
9
13
16
N-04
N-05
N-06
N-07
N-08
N-09
N-16
O. PEKERJAAN PERTAMANAN
1
O-01
O-02
3
4
O-03
O-04
Rekap - Hal 12
KOEF
Analisa Harga Satuan
535,579.00
647,001.33
1,531,846.69
65,363.78
1,385,149.47
1,160,399.30
1,444,491.18
7,659.41
378,405.85
510,610.57
510,610.57
173,901.49
386,166.24
258,637.91
33,453.74
63,597.03
55,785.62
615,112.45
2,739,403.14
13,852,141.12
55,945.43
68,934.65
82,163.89
74,433.89
113,090.95
90,112.73
Rekap - Hal 13
4,129.73
24,495.98
18,648.48
41,297.26
335,902.37
190,132.89
237,227.80
152,078.18
337,277.03
765,202.29
1,023,074.24
960,685.69
917,441.08
887,034.99
845,366.74
697,148.35
892,989.04
862,517.45
675,713.22
3,219,621.42
1,004,990.55
1,082,948.21
803,675.36
1,121,888.15
129,280.32
Rekap - Hal 14
258,141.39
851,991.99
803,043.11
846,082.28
880,999.28
735,075.35
920,881.82
961,201.29
988,028.17
1,010,091.11
1,047,919.63
1,059,849.92
1,146,816.56
1,162,351.68
1,291,718.26
14,418.24
102,633.09
137,149.24
189,872.63
184,974.16
118,504.89
145,454.50
153,704.50
326,280.90
334,530.90
423,080.90
406,690.90
Rekap - Hal 15
308,810.83
87,502.91
4,699,862.47
5,810,862.85
9,601,085.22
7,286,343.63
6,580,015.66
6,322,274.39
6,829,447.05
82,156.50
103,316.98
507,089.15
132,817.83
291,098.80
280,008.48
274,209.85
140,146.98
140,838.93
132,824.43
391,921.73
388,674.53
309,432.77
114,732.44
203,817.53
194,784.18
Rekap - Hal 16
186,847.78
273,216.55
169,876.63
164,444.28
218,021.60
746,291.10
230,154.10
985,401.70
442,836.83
216,506.81
209,753.60
203,071.10
155,209.82
472,016.62
503,375.16
416,835.24
120,808.29
160,109.05
155,871.82
869,847.05
123,075.35
578,152.07
71,108.60
62,494.04
58,760.77
56,217.47
54,767.73
53,609.90
52,971.62
52,333.34
81,020.30
Rekap - Hal 17
51,206.46
46,622.52
47,147.31
83,641.29
67,700.41
75,196.65
73,339.54
71,719.88
65,811.42
35,135.65
141,752.16
141,752.16
117,002.16
43,149.95
25,471.87
12,218.87
53,666.18
32,194.41
30,987.71
63,019.49
112,433.56
75,686.95
50,562.14
52,718.14
47,384.47
50,276.48
Rekap - Hal 18
56,184.47
185,460.05
80,533.06
109,494.49
139,194.49
120,790.58
339,060.12
121,336.97
81,775.35
26,873.33
47,286.31
256,445.69
368,196.89
205,916.61
101,709.75
36,308.45
48,165.72
360,706.31
523,728.81
294,458.63
263,284.70
259,753.68
112,434.40
106,390.53
262,739.09
258,946.58
73,548.05
27,908.55
162,951.23
120,457.08
Rekap - Hal 19
910,552.65
1,300,966.33
64,810.09
73,417.32
214,406.56
337,642.43
204,899.34
165,885.33
188,495.88
190,984.45
282,665.33
548,281.82
199,129.94
154,848.98
656,272.78
164,201.22
896,567.65
653,980.63
266,012.26
270,601.28
27,537.62
99,981.56
126,919.08
136,954.48
47,579.60
34,617.50
123,900.97
188,604.98
Rekap - Hal 20
30,981.35
182,234.91
178,133.43
200,027.87
159,165.21
175,363.96
641,829.51
545,237.15
816,781.72
6,695,343.69
5,937,193.50
265,243.83
216,843.83
582,655.63
435,223.42
661,855.63
654,242.20
698,773.22
497,080.15
524,891.90
779,533.91
5,816,449.11
7,302,454.60
4,477,983.29
100,174.26
100,261.38
Rekap - Hal 21
480,728.57
142,128.57
143,678.03
68,599.00
68,327.74
144,076.31
326,122.12
414,066.43
283,016.71
115,857.06
131,869.48
30,837.27
28,516.88
86,163.86
1,601,036.77
124,670.69
556,634.75
874,983.31
555,145.83
667,884.50
687,260.68
55,058.58
575,658.01
3,079,566.11
656,442.03
770,234.86
141,229.24
819,885.99
136,821.41
97,043.56
Rekap - Hal 22
522,565.04
235,311.23
204,232.69
99,146.34
31,204.65
63,444.74
39,771.06
783,392.98
108,848.54
111,834.65
118,766.87
160,369.30
160,369.30
189,117.10
234,921.84
1,056,739.05
308,107.48
197,556.54
3,303,781.02
580,056.60
4,118,199.41
2,437,964.70
925,975.66
1,566,114.79
244,070.06
59,861.19
103,846.29
858,749.61
563,138.30
84,797.01
81,537.60
175,963.48
228,288.65
679,051.12
123,321.72
635,998.33
103,678.93
86,318.58
Rekap - Hal 23
102,961.86
150,883.51
382,620.55
680,522.25
13,042,987.22
7,475,548.17
16,623,947.43
13,159.79
12,483.11
41,612.85
46,696.84
63,446.26
42,571.31
21,360.29
49,415.84
37,643.06
24,954.41
114,951.08
57,244.77
27,555.11
57,244.77
45,679.28
63,997.52
110,995.99
74,936.92
34,999.03
12,941.20
Rekap - Hal 24
A-02
A-03
A-04
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
1.2500
5.5000
0.0050
0.0090
0.0720
0.0600
0.4000
0.4000
0.2000
0.0200
0.0200
47,804.68
1,804.00
318,180.50
237,988.67
5,432,350.00
24,057.55
38,802.50
70,593.60
105,890.40
112,949.76
120,009.12
1.2500
2.5000
1.2000
0.0050
0.0090
0.0720
0.0600
0.4500
0.4000
0.2000
0.0200
0.0200
47,804.68
1,804.00
100,110.45
318,180.50
237,988.67
5,432,350.00
24,057.55
27,161.75
70,593.60
105,890.40
112,949.76
120,009.12
1.2500
2.0000
25.0000
0.0050
0.0090
0.0600
0.3000
0.2000
0.0200
0.0200
47,804.68
1,804.00
56,651.65
318,180.50
237,988.67
24,057.55
70,593.60
105,890.40
112,949.76
120,009.12
Kayu 5/7
Paku Biasa 2"-5"
Kayu Papan 3/20
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
M3
Kg
M3
Oh
Oh
Oh
Oh
0.0120
0.0200
0.0070
0.1000
0.1000
0.0100
0.0050
2,444,557.50
24,057.55
2,310,000.00
70,593.60
105,890.40
112,949.76
120,009.12
1.2500
0.1800
0.8500
1.1000
35.0000
0.1500
0.1000
0.1500
30.0000
0.2500
0.2000
0.0800
0.1500
0.0600
2.0000
2.0000
1.0000
0.3000
0.0500
47,804.68
2,444,557.50
24,057.55
61,070.48
1,804.00
227,641.34
318,180.50
237,988.67
1,267.55
23,281.50
301,041.44
123,650.63
78,160.65
259,809.90
70,593.60
105,890.40
98,831.04
112,949.76
120,009.12
1.7000
0.2100
0.3000
10.5000
0.0300
0.0500
1.5000
1.0000
2.0000
0.2000
0.0500
47,804.68
2,444,557.50
24,057.55
1,804.00
318,180.50
237,988.67
138,136.90
70,593.60
105,890.40
112,949.76
120,009.12
1.2500
47,804.68
Jumlah
A-05
A-06
A-07
Btg
Persiapan - Hal 26
M3
Kg
kg
M3
M3
Lbr
Lbr
Oh
Oh
Oh
Oh
0.1860
0.3000
18.0000
0.0300
0.0500
1.5000
1.3500
1.0000
2.0000
0.2000
0.0500
2,444,557.50
24,057.55
1,804.00
318,180.50
237,988.67
138,136.90
259,809.90
70,593.60
105,890.40
112,949.76
120,009.12
0.1000
0.0050
70,593.60
120,009.12
M3
M3
M3
Oh
Oh
0.1500
0.0900
1.0100
1.0000
0.0500
292,312.17
311,635.81
227,641.34
70,593.60
120,009.12
Oh
Oh
6.6670
0.3330
70,593.60
120,009.12
6.6670
0.3330
70,593.60
120,009.12
0.0360
0.0800
0.0100
0.3000
2,444,557.50
24,057.55
5,432,350.00
98,831.04
0.4340
6.0660
0.0424
4.0000
2.5000
22,117.43
52,800.00
21,729.40
1,164.08
1,804.00
Jumlah
A-08
A-09
A-10
A-11
A-12
A-13
Pasir Beton
Koral Beton
Pekerja
Tukang Batu
Kepala Tukang
Mandor
M3
M3
Oh
Oh
Oh
Oh
0.0050
0.0090
0.3750
0.1250
0.0120
0.0190
318,180.50
237,988.67
70,593.60
98,831.04
112,949.76
120,009.12
Lbr
kg
Kg
M3
M3
Oh
Oh
Oh
Oh
0.4340
2.0000
2.2000
0.0050
0.0090
0.3750
0.1250
0.0120
0.0190
194,012.50
1,804.00
56,651.65
318,180.50
237,988.67
70,593.60
98,831.04
112,949.76
120,009.12
Btg
Kg
Oh
Oh
Oh
Oh
1.0000
0.2500
0.0170
0.0250
0.0020
0.0130
22,000.00
23,281.50
70,593.60
105,890.40
112,949.76
120,009.12
Btg
Oh
Oh
1.1500
0.5000
0.0250
22,000.00
70,593.60
120,009.12
0.434
0.042
0.042
0.004
0.002
110,548.32
70,593.60
98,831.04
112,949.76
120,009.12
0.9860
0.5240
201,773.00
447,004.80
Jumlah
A-14
A-15
A -16
A-17
A-18
Persiapan - Hal 28
Pasir Beton
Koral
Semen Portland
Pekerja
Tukang Batu
Kepala Tukang
Mandor
m3
m3
kg
Oh
Oh
Oh
Oh
0.0740
0.1460
45.0000
0.3750
0.1250
0.0120
0.0190
318,180.50
237,988.67
1,804.00
70,593.60
98,831.04
112,949.76
120,009.12
m'
m'
m'
kg
Oh
Oh
Oh
Oh
lot
1.5200
2.0000
1.0000
9.2230
0.9584
0.0639
0.0160
0.0032
0.1250
931,260.00
395,785.50
294,899.00
16,500.00
70,593.60
98,831.04
112,949.76
120,009.12
72,600.00
24.9375
11.3022
0.7006
23.7817
0.4840
1.0000
1.0500
76.8925
5.1262
1.2815
0.2563
0.1250
243,058.86
17,073.10
18,625.20
16,500.00
22,117.43
849,130.63
203,133.67
70,593.60
98,831.04
112,949.76
120,009.12
72,600.00
Jumlah
A-19
A-20
m'
kg
kg
kg
m2
buah
m'
Oh
Oh
Oh
Oh
lot
Jumlah
Persiapan - Hal 29
HARGA (Rp)
59,755.85
9,922.00
1,590.90
2,141.90
391,129.20
1,443.45
15,521.00
28,237.44
21,178.08
2,259.00
2,400.18
535,579.00
59,755.85
4,510.00
120,132.54
1,590.90
2,141.90
391,129.20
1,443.45
12,222.79
28,237.44
21,178.08
2,259.00
2,400.18
647,001.33
59,755.85
3,608.00
1,416,291.25
1,590.90
2,141.90
1,443.45
21,178.08
21,178.08
2,259.00
2,400.18
1,531,846.69
Persiapan - Hal 30
29,334.69
481.15
16,170.00
7,059.36
10,589.04
1,129.50
600.05
65,363.78
59,755.85
440,020.35
20,448.92
67,177.53
63,140.00
34,146.20
31,818.05
35,698.30
38,026.45
5,820.38
60,208.29
9,892.05
11,724.10
15,588.59
141,187.20
211,780.80
98,831.04
33,884.93
6,000.46
1,385,149.47
81,267.96
513,357.08
7,217.27
18,942.00
9,545.42
11,899.43
207,205.35
70,593.60
211,780.80
22,589.95
6,000.46
1,160,399.30
59,755.85
Persiapan - Hal 31
454,687.70
7,217.27
32,472.00
9,545.42
11,899.43
207,205.35
350,743.36
70,593.60
211,780.80
22,589.95
6,000.46
1,444,491.18
7,059.36
600.05
7,659.41
43,846.83
28,047.22
229,917.75
70,593.60
6,000.46
378,405.85
470,647.53
39,963.04
510,610.57
470,647.53
39,963.04
510,610.57
88,004.07
1,924.60
54,323.50
29,649.31
173,901.49
9,598.96
320,284.80
921.33
4,656.30
4,510.00
Persiapan - Hal 32
1,590.90
2,141.90
26,472.60
12,353.88
1,355.40
2,280.17
386,166.24
84,201.43
3,608.00
124,633.63
1,590.90
2,141.90
26,472.60
12,353.88
1,355.40
2,280.17
258,637.91
22,000.00
5,820.38
1,200.09
2,647.26
225.90
1,560.12
33,453.74
25,300.00
35,296.80
3,000.23
63,597.03
47,977.97
2,964.93
4,150.90
451.80
240.02
55,785.62
198,948.18
234,230.52
Persiapan - Hal 33
23,545.36
34,746.35
81,180.00
26,472.60
12,353.88
1,355.40
2,280.17
615,112.45
1,415,515.20
791,571.00
294,899.00
152,179.50
67,656.91
6,315.30
1,807.20
384.03
9,075.00
2,739,403.14
6,061,280.32
192,963.59
13,048.82
392,398.05
10,704.83
849,130.63
213,290.36
5,428,118.39
506,627.68
144,745.12
30,758.34
9,075.00
13,852,141.12
Persiapan - Hal 34
B-02
B-03
B-04
B-05
B-06
B-07
B-08
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
0.7500
0.0250
70,593.60
120,009.12
0.9000
0.0450
70,593.60
120,009.12
1.0500
0.0670
70,593.60
120,009.12
1.0000
0.0320
70,593.60
120,009.12
1.5000
0.0600
70,593.60
120,009.12
1.2000
0.0450
70,593.60
120,009.12
0.0500
0.0050
70,593.60
120,009.12
0.3300
0.0100
70,593.60
120,009.12
Oh
Oh
Jumlah
B-09
B-10
Oh
Oh
Pek Tanah - Hal 35
0.5000
0.0500
70,593.60
120,009.12
Jumlah
B-11
m3
Oh
Oh
1.2000
0.3000
0.0100
261,270.17
70,593.60
120,009.12
Jumlah
B-12
B-13
90,530.00
84,395.44
70,593.60
98,831.04
112,949.76
120,009.12
23,281.50
70,593.60
120,009.12
1.2000
0.2500
0.0250
263,857.00
70,593.60
120,009.12
1.2000
6.5000
1.5000
0.2000
0.0200
0.0200
339,909.90
34,922.25
70,593.60
98,831.04
112,949.76
120,009.12
B-14
B-15
B-16
m3
kg
Oh
Oh
Oh
Oh
Jumlah
HARGA (Rp)
52,945.20
3,000.23
55,945.43
63,534.24
5,400.41
68,934.65
74,123.28
8,040.61
82,163.89
70,593.60
3,840.29
74,433.89
105,890.40
7,200.55
113,090.95
84,712.32
5,400.41
90,112.73
3,529.68
600.05
4,129.73
23,295.89
1,200.09
24,495.98
18,648.48
35,296.80
6,000.46
Pek Tanah - Hal 37
41,297.26
313,524.20
21,178.08
1,200.09
335,902.37
12,221.55
91,056.53
80,006.87
56,474.88
39,532.42
4,517.99
9,600.73
190,132.89
22,451.44
104,650.34
56,474.88
39,532.42
4,517.99
9,600.73
237,227.80
139,689.00
10,589.04
1,800.14
152,078.18
316,628.40
17,648.40
3,000.23
337,277.03
407,891.88
226,994.63
105,890.40
19,766.21
2,259.00
2,400.18
765,202.29
URAIAN
SATUAN
VOLUME
m3
1.2000
Semen Portland
kg
202.0000
Pasir pasang
m3
0.4850
Pekerja
Oh
1.5000
Tukang Batu
Oh
0.7500
Kepala Tukang
Oh
0.0750
Mandor
Oh
0.0750
Jumlah
C-02
C-03
C-04
Pondasi - Hal 39
Mandor
Oh
0.0750
Jumlah
C-05
C-06
C-07
C-08
Pondasi - Hal 40
C-09
1.2000
0.4320
0.7800
0.3900
0.0390
0.0390
C-10
Memasang 1 m3 Beton Siklop, 60% beton campuran 1 Pc : 2Pb : 3kr + 40% Batu Belah
Batu belah 15/20 cm
m3
0.4800
Semen Portland
kg
194.0000
Pasir Beton
m3
0.3120
Koral Beton
m3
0.4680
Besi beton
kg
126.0000
Kawat Beton
Kg
1.8000
Pekerja
Oh
3.4000
Tukang Batu
Oh
0.8500
Kepala Tukang
Oh
0.0850
Mandor
Oh
0.1700
Jumlah
C-11
C-12
0.4500
194.0000
0.3120
0.4680
2.4000
0.8000
0.0800
0.1190
Pondasi - Hal 41
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
0.6700
0.0670
0.0500
Jumlah
C-13
C-14
0.0149
0.0738
0.1178
49.4925
43.0000
0.9000
0.0320
0.1200
0.0900
0.2400
1.0000
0.6700
0.0670
0.0500
0.1170
0.0400
0.0020
C-15
C-16
Pekerja
Kepala Tukang
Mandor
Alat Bantu
Oh
Oh
Oh
Lot
2.7500
0.0700
0.2750
0.3500
15.3700
6.0660
2.2000
1.0000
2.0000
0.2000
2.0000
Jumlah
C-17
Pondasi - Hal 43
ndasi
HARGA SATUAN
(Rp)
HARGA (Rp)
292,312.17
350,774.60
1,804.00
364,408.00
227,641.34
110,406.05
70,593.60
105,890.40
98,831.04
74,123.28
112,949.76
8,471.23
120,009.12
9,000.68
1,023,074.24
292,312.17
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
350,774.60
294,052.00
118,373.50
105,890.40
74,123.28
8,471.23
9,000.68
960,685.69
292,312.17
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
350,774.60
245,344.00
123,836.89
105,890.40
74,123.28
8,471.23
9,000.68
917,441.08
292,312.17
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
350,774.60
211,068.00
127,706.79
105,890.40
74,123.28
8,471.23
Pondasi - Hal 44
120,009.12
9,000.68
887,034.99
292,312.17
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
350,774.60
164,164.00
132,942.54
105,890.40
74,123.28
8,471.23
9,000.68
845,366.74
292,312.17
90,530.00
330,000.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
350,774.60
15,390.10
56,100.00
77,398.05
105,890.40
74,123.28
8,471.23
9,000.68
697,148.35
383,460.00
1,804.00
90,530.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
460,152.00
110,044.00
13,307.91
111,999.54
105,890.40
74,123.28
8,471.23
9,000.68
892,989.04
383,460.00
1,804.00
90,530.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
460,152.00
73,964.00
11,859.43
119,056.42
105,890.40
74,123.28
8,471.23
9,000.68
862,517.45
Pondasi - Hal 45
383,460.00
261,270.17
70,593.60
98,831.04
112,949.76
120,009.12
460,152.00
112,868.71
55,063.01
38,544.11
4,405.04
4,680.36
675,713.22
184,060.80
349,976.00
99,272.32
111,378.70
2,079,000.00
41,906.70
240,018.24
84,006.38
9,600.73
20,401.55
3,219,621.42
383,460.00
1,804.00
318,180.50
237,988.67
70,593.60
98,831.04
112,949.76
120,009.12
172,557.00
349,976.00
99,272.32
111,378.70
169,424.64
79,064.83
9,035.98
14,281.09
1,004,990.55
261,270.17
318,180.50
237,988.67
1,804.00
16,500.00
23,281.50
2,444,557.50
24,057.55
19,401.25
56,263.63
70,593.60
4,964.13
29,908.97
35,698.30
2,182.84
742,500.00
20,953.35
78,225.84
2,886.91
1,746.11
13,503.27
70,593.60
Pondasi - Hal 46
98,831.04
112,949.76
120,009.12
66,216.80
7,567.63
6,000.46
1,082,948.21
261,270.17
318,180.50
237,988.67
1,804.00
16,500.00
23,281.50
2,444,557.50
24,057.55
19,401.25
56,263.63
70,593.60
98,831.04
112,949.76
120,009.12
4,180.32
25,454.44
29,748.58
1,767.92
528,000.00
16,297.05
66,003.05
2,886.91
1,746.11
11,252.73
56,474.88
49,415.52
5,647.49
4,800.36
803,675.36
261,270.17
318,180.50
237,988.67
1,804.00
16,500.00
23,281.50
2,444,557.50
24,057.55
19,401.25
56,263.63
70,593.60
98,831.04
112,949.76
120,009.12
3,892.93
23,481.72
28,035.06
89,284.47
709,500.00
20,953.35
78,225.84
2,886.91
1,746.11
13,503.27
70,593.60
66,216.80
7,567.63
6,000.46
1,121,888.15
1,078,774.00
70,593.60
120,009.12
126,216.56
2,823.74
240.02
129,280.32
Pondasi - Hal 47
70,593.60
112,949.76
120,009.12
66,000.00
194,132.40
7,906.48
33,002.51
23,100.00
258,141.39
21,729.40
16,500.00
42,682.75
98,831.04
70,593.60
120,009.12
30,000.00
333,980.88
100,089.00
93,902.05
98,831.04
141,187.20
24,001.82
60,000.00
851,991.99
Pondasi - Hal 48
D-02
D-03
HARGA SATUAN
(Rp)
Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K100), slump (122) cm, w/c = 8,7
Semen Portland
kg
247.0000
1,804.00
Pasir Beton
m3
0.6207
318,180.50
kerikil
kg
0.7400
4,290.00
Pekerja
Oh
1.6500
70,593.60
Tukang Batu
Oh
0.2750
98,831.04
Kepala Tukang
Oh
0.0280
112,949.76
Mandor
Oh
0.0830
120,009.12
Jumlah
URAIAN
SATUAN
VOLUME
Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K125), slump (122) cm, w/c = 0,78
Semen Portland
kg
276.0000
Pasir Beton
m3
0.5914
kerikil
kg
0.7496
Pekerja
Oh
1.6500
Tukang Batu
Oh
0.2750
Kepala Tukang
Oh
0.0280
Mandor
Oh
0.0830
Jumlah
1,804.00
318,180.50
4,290.00
70,593.60
98,831.04
112,949.76
120,009.12
Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K150), slump (122) cm, w/c = 0,72
Semen Portland
kg
299.0000
Pasir Beton
m3
0.5707
kerikil
kg
0.7533
Pekerja
Oh
1.6500
Tukang Batu
Oh
0.2750
Kepala Tukang
Oh
0.0280
Mandor
Oh
0.0830
Jumlah
1,804.00
318,180.50
4,290.00
70,593.60
98,831.04
112,949.76
120,009.12
D-04
Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6)cm w/c = 0,87
Semen Portland
kg
230.0000
1,804.00
Pasir Beton
m3
0.6379
318,180.50
kerikil
kg
0.7607
4,290.00
Pekerja
Oh
1.2000
70,593.60
Tukang Batu
Oh
0.2000
98,831.04
Kepala Tukang
Oh
0.0200
112,949.76
Mandor
Oh
0.0600
120,009.12
Jumlah
D-05
Membuat 1 m3 lantai kerja beton mutu f'c = 14,5 Mpa (K175), slump (122)cm w/c = 0,66
Semen Portland
kg
326.0000
1,804.00
Pasir Beton
m3
0.5429
318,180.50
kerikil
kg
0.7622
4,290.00
Pekerja
Oh
1.6500
70,593.60
Tukang Batu
Oh
0.2750
98,831.04
Kepala Tukang
Mandor
Oh
Oh
0.0280
0.0830
112,949.76
120,009.12
Jumlah
D-06
Membuat 1 m3 lantai kerja beton mutu f'c = 16,9 Mpa (K200), slump (122)cm w/c = 0,61
Semen Portland
kg
352.0000
1,804.00
Pasir Beton
m3
0.5221
318,180.50
kerikil
kg
0.7637
4,290.00
Pekerja
Oh
1.6500
70,593.60
Tukang Batu
Oh
0.2750
98,831.04
Kepala Tukang
Oh
0.0280
112,949.76
Mandor
Oh
0.0830
120,009.12
Jumlah
D-07
Membuat 1 m3 lantai kerja beton mutu f'c = 19,3 Mpa (K225), slump (122)cm w/c = 0,58
Semen Portland
kg
371.0000
1,804.00
Pasir Beton
m3
0.4986
318,180.50
kerikil
kg
0.7756
4,290.00
Pekerja
Oh
1.6500
70,593.60
Tukang Batu
Oh
0.2750
98,831.04
Kepala Tukang
Oh
0.0280
112,949.76
Mandor
Oh
0.0830
120,009.12
Jumlah
D-08
Membuat 1 m3 lantai kerja beton mutu f'c = 21,7 Mpa (K250), slump (122)cm w/c = 0,56
Semen Portland
kg
384.0000
1,804.00
Pasir Beton
m3
0.4943
318,180.50
kerikil
kg
0.7696
4,290.00
Pekerja
Oh
1.6500
70,593.60
Tukang Batu
Oh
0.2750
98,831.04
Kepala Tukang
Oh
0.0280
112,949.76
Mandor
Oh
0.0830
120,009.12
Jumlah
D-09
Membuat 1 m3 lantai kerja beton mutu f'c = 24 Mpa (K275), slump (122)cm w/c = 0,53
Semen Portland
kg
406.0000
1,804.00
Pasir Beton
m3
0.4886
318,180.50
kerikil
kg
0.7600
4,290.00
Pekerja
Oh
1.6500
70,593.60
Tukang Batu
Oh
0.2750
98,831.04
Kepala Tukang
Oh
0.0280
112,949.76
Mandor
Oh
0.0830
120,009.12
Jumlah
D-10
Membuat 1 m3 lantai kerja beton mutu f'c = 26,4 Mpa (K300), slump (122)cm w/c = 0,52
Semen Portland
kg
413.0000
1,804.00
Pasir Beton
m3
0.4864
318,180.50
kerikil
kg
0.7563
4,290.00
Pekerja
Oh
1.6500
70,593.60
Tukang Batu
Oh
0.2750
98,831.04
Kepala Tukang
Oh
0.0280
112,949.76
Mandor
Oh
0.0830
120,009.12
Jumlah
D-11
Membuat 1 m3 lantai kerja beton mutu f'c = 28,8 Mpa (K325), slump (122)cm w/c = 0,49
Semen Portland
kg
439.0000
1,804.00
Pasir Beton
m3
0.4786
318,180.50
kerikil
kg
0.7452
4,290.00
Pekerja
Oh
2.1000
70,593.60
Tukang Batu
Oh
0.3500
98,831.04
Kepala Tukang
Oh
0.0350
112,949.76
Mandor
Oh
0.1050
120,009.12
Jumlah
D-12
Membuat 1 m3 lantai kerja beton mutu f'c = 31,2 Mpa (K350), slump (122)cm w/c = 0,48
Semen Portland
kg
448.0000
1,804.00
Pasir Beton
m3
0.4764
318,180.50
kerikil
kg
0.7407
4,290.00
Pekerja
Oh
2.1000
70,593.60
Tukang Batu
Oh
0.3500
98,831.04
Kepala Tukang
Oh
0.0350
112,949.76
Mandor
Oh
0.1050
120,009.12
Jumlah
D-13
400.0000
0.4800
0.8000
1.2000
2.1000
0.3500
0.0350
0.1050
1,804.00
318,180.50
220,000.00
35,000.00
70,593.60
98,831.04
112,949.76
120,009.12
1.0500
0.0600
0.0300
0.0030
0.0030
6,208.40
70,593.60
98,831.04
112,949.76
120,009.12
1.0500
0.0700
0.0350
0.0040
0.0040
88,857.73
70,593.60
98,831.04
112,949.76
120,009.12
1.0500
0.0800
120,587.31
70,593.60
D-14
D-15
D-16
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
0.0400
0.0040
0.0040
98,831.04
112,949.76
120,009.12
10.5000
0.1500
0.0700
0.0700
0.0070
0.0040
16,500.00
23,281.50
70,593.60
98,831.04
112,949.76
120,009.12
10.5000
0.1000
0.0500
0.0500
0.0050
0.0030
16,500.00
23,281.50
70,593.60
98,831.04
112,949.76
120,009.12
1.0200
0.0500
0.0250
0.0250
0.0020
0.0010
110,548.32
23,281.50
70,593.60
98,831.04
112,949.76
120,009.12
m3
kg
ltr
Oh
Oh
Oh
Oh
0.0400
0.3000
0.1000
0.5200
0.2600
0.0260
0.0260
1,650,000.00
24,057.55
19,401.25
70,593.60
105,890.40
112,949.76
120,009.12
m3
kg
ltr
Oh
Oh
Oh
Oh
0.0450
0.3000
0.1000
0.5200
0.2600
0.0260
0.0260
1,650,000.00
24,057.55
19,401.25
70,593.60
105,890.40
112,949.76
120,009.12
Jumlah
D-17
D-18
D-19
D-20
D-21
D-22
m3
kg
ltr
m3
lbr
btg
Oh
Oh
Oh
Oh
0.0400
0.4000
0.2000
0.0150
0.3500
2.0000
0.6600
0.3300
0.0330
0.0330
1,650,000.00
24,057.55
19,401.25
2,750,000.00
194,012.50
24,200.00
70,593.60
105,890.40
112,949.76
120,009.12
m3
kg
ltr
m3
lbr
btg
Oh
Oh
Oh
Oh
0.0400
0.4000
0.2000
0.0180
0.3500
2.0000
0.6600
0.3300
0.0330
0.0330
1,650,000.00
24,057.55
19,401.25
2,750,000.00
194,012.50
24,200.00
70,593.60
105,890.40
112,949.76
120,009.12
0.0400
0.4000
0.2000
0.0150
0.3500
6.0000
0.6600
0.3300
0.0330
0.0330
1,650,000.00
24,057.55
19,401.25
2,750,000.00
194,012.50
24,200.00
70,593.60
105,890.40
112,949.76
120,009.12
0.0300
0.4000
0.2000
0.0200
0.3500
3.0000
4.0000
0.6600
0.3300
0.0330
1,650,000.00
24,057.55
19,401.25
2,750,000.00
194,012.50
24,200.00
14,740.00
70,593.60
105,890.40
112,949.76
Jumlah
D-23
D-24
D-25
m3
kg
ltr
m3
lbr
btg
buah
Oh
Oh
Oh
Mandor
Oh
0.0330
120,009.12
m3
kg
ltr
m3
lbr
btg
Oh
Oh
Oh
Oh
0.0300
0.4000
0.1500
0.0150
0.3500
2.0000
0.6600
0.3300
0.0330
0.0330
1,650,000.00
24,057.55
19,401.25
2,750,000.00
194,012.50
24,200.00
70,593.60
105,890.40
112,949.76
120,009.12
0.0264
0.6000
0.5000
0.1500
0.0500
0.0050
0.0080
1,650,000.00
24,057.55
24,200.00
70,593.60
105,890.40
112,949.76
120,009.12
Jumlah
D-26
D-27
D-28
D-29
0.2700
2.0000
0.6000
210.0000
3.0000
336.0000
0.5400
0.8100
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
Oh
Oh
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
Jumlah
D-30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
Kayu kelas III
m3
0.4000
Paku 5 -12 cm
kg
4.0000
Minyak bekisting
ltr
2.0000
Besi beton
kg
315.0000
Kawat beton
kg
4.5000
Semen Portland
kg
336.0000
Pasir beton
m3
0.5400
Koral beton
m3
0.8100
Kayu kelas II (balok)
m3
0.1500
Plywood 9 mm
lbr
3.5000
Dolken kayu galam, (8-10), panjang 4 m
btg
20.0000
Pekerja
Oh
7.0500
Tukang Batu
Oh
0.2750
Tukang Kayu
Oh
1.6500
Tukang Besi
Oh
2.1000
Kepala Tukang
Oh
0.4030
Mandor
Oh
0.3530
Jumlah
D- 31
D- 32
0.3200
3.2000
1.6000
157.5000
2.2500
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
2,500,000.00
194,012.50
24,200.00
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
2,500,000.00
194,012.50
24,200.00
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
Semen Portland
Pasir beton
Koral beton
Kayu kelas II (balok)
Plywood 9 mm
Dolken kayu galam, (8-10), panjang 4 m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
kg
m3
m3
m3
lbr
btg
Oh
Oh
Oh
Oh
Oh
Oh
336.0000
0.5400
0.8100
0.1200
2.8000
32.0000
5.3000
0.2750
1.3000
1.0500
0.2650
0.2650
1,804.00
318,180.50
237,988.67
2,500,000.00
194,012.50
24,200.00
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
D- 33
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
2,500,000.00
194,012.50
24,200.00
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
D- 34
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
2,500,000.00
194,012.50
24,200.00
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
Jumlah
D- 35
0.0020
0.0100
3.0000
0.0450
4.0000
0.0060
0.0090
0.1800
0.0200
0.0200
0.0200
0.0060
0.0090
1,650,000.00
24,057.55
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
D- 36
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150
0.2970
0.0330
0.0330
0.0330
0.0100
0.0150
1,650,000.00
24,057.55
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
D-37
kg
1.0000
495,000.00
Oh
Oh
Oh
Oh
0.0500
0.0750
0.0075
0.0025
70,593.60
98,831.04
112,949.76
120,009.12
m2
Oh
Oh
Oh
Oh
1.0000
0.0200
0.0630
0.0063
0.0025
124,168.00
70,593.60
98,831.04
112,949.76
120,009.12
Jumlah
D-38
D-39
Jumlah
Memasang 1 m2 bekisting untuk plat lantai
Kayu kelas III
m3
Paku 5 -12 cm
kg
Minyak bekisting
ltr
Balok kayu kelas II
m3
0.0400
0.4000
0.2000
0.0150
1,650,000.00
24,057.55
19,401.25
2,750,000.00
lbr
ls
Oh
Oh
Oh
Oh
0.3500
1.0000
0.6600
0.3300
0.0330
0.0330
Jumlah
Memasang
1
m2
bekisting
untuk
plat
lantai,
pakai bambu
D-39
Kayu kelas III
m3
0.0400
Paku 5 -12 cm
kg
0.4000
Minyak bekisting
ltr
0.2000
Balok kayu kelas II
m3
0.0150
Bahan Plywood tebal 9 mm lebar 0,350
lbr
0.3500
bambu
btg
6.0000
Pekerja
Oh
0.6600
Tukang Kayu
Oh
0.3300
Kepala Tukang
Oh
0.0330
Mandor
Oh
0.0330
Jumlah
D-39 Membuat 1 m3 kolom beton bertulang 15x20 (175 kg besi + bekisting)
kayu kelas III
m3
0.4000
Paku 5 -12 cm
kg
4.0000
Minyak bekisting
ltr
2.0000
Besi beton
kg
179.0000
kawat beton
kg
4.5000
Semen portland
kg
336.0000
Pasir beton
m3
0.5400
koral beton
m3
0.8100
Kayu kelas II (balok)
m3
0.1500
Plywood 9 mm
lbr
3.5000
Dolken kayu galam, (8-10), panjang 4 m
btg
20.0000
Pekerja
Oh
7.0500
Tukang batu
Oh
0.2750
Tukang kayu
btg
1.6500
Tukang besi
Oh
2.1000
Kepala tukang
Oh
0.4030
Mandor
Oh
0.3530
Mandor
D-40 Membuat 1 m3 kolom beton bertulang 20x20 (200 kg besi + bekisting)
kayu kelas III
m3
0.4000
Paku 5 -12 cm
kg
4.0000
Minyak bekisting
ltr
2.0000
Besi beton
kg
210.0000
kawat beton
kg
4.5000
Semen portland
kg
336.0000
Pasir beton
m3
0.5400
koral beton
m3
0.8100
Kayu kelas II (balok)
m3
0.1500
Plywood 9 mm
lbr
3.5000
Dolken kayu galam, (8-10), panjang 4 m
btg
20.0000
194,012.50
200,000.00
70,593.60
105,890.40
112,949.76
120,009.12
1,650,000.00
24,057.55
19,401.25
2,750,000.00
194,012.50
16,500.00
70,593.60
105,890.40
112,949.76
120,009.12
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
2,750,000.00
194,012.50
24,200.00
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
2,750,000.00
194,012.50
24,200.00
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
Oh
Oh
btg
Oh
Oh
Oh
7.0500
0.2750
1.6500
2.1000
0.4030
0.3530
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
Mandor
D-41 Membuat 1 m3 kolom beton bertulang 18x18 (172 kg besi + bekisting)
Besi beton
m3
0.4000
Kawat beton
kg
4.0000
Semen Portland
ltr
2.0000
Pasir beton
kg
172.0000
Koral beton
kg
4.5000
Kayu kelas II (balok)
kg
336.0000
Plywood 9 mm
m3
0.5400
Dolken kayu galam, (8-10), panjang 4 m
m3
0.8100
Kayu kelas II (balok)
m3
0.1500
Plywood 9 mm
lbr
3.5000
Tukang Kayu
btg
20.0000
Tukang Besi
Oh
7.0500
Kepala Tukang
Oh
0.2750
Tukang kayu
btg
1.6500
Jumlah
Oh
2.1000
Kepala tukang
Oh
0.4030
Mandor
Oh
0.3530
Mandor
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
2,750,000.00
194,012.50
24,200.00
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
2,750,000.00
194,012.50
24,200.00
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
D-43 Membuat 1 m3 kolom beton bertulang 12x12 kolom praktis (250kg besi + bekisting)
Kayu kelas III
m3
0.4000
1,650,000.00
Paku 5-12cm
kg
4.0000
24,057.55
Minyak bekisting
ltr
2.0000
19,401.25
Pek Beton - Hal 59
Besi beton
Kawat beton
Semen portland
Pasir beton
Koral beton
Kayu kelas II (balok)
Plywood 9 mm
Dolken kayu galam
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
kg
kg
kg
m3
m3
m3
lbr
btg
Oh
Oh
btg
Oh
Oh
Oh
258.0000
4.5000
336.0000
0.5400
0.8100
0.1500
3.5000
20.0000
7.0500
0.2750
1.6500
2.1000
0.4030
0.3530
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
2,750,000.00
194,012.50
24,200.00
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
Mandor
D-44 Membuat 1 m3 kolom beton bertulang 30x30 kolom praktis (175kg besi + bekisting)
Kayu kelas III
m3
0.4000
1,650,000.00
Paku 5-12cm
kg
4.0000
24,057.55
Minyak bekisting
ltr
2.0000
19,401.25
Besi beton
kg
175.0000
16,500.00
Kawat beton
kg
4.5000
23,281.50
Semen portland
kg
336.0000
1,804.00
Pasir beton
m3
0.5400
318,180.50
Koral beton
m3
0.8100
237,988.67
Kayu kelas II (balok)
m3
0.1500
2,750,000.00
Plywood 9 mm
lbr
3.5000
194,012.50
Dolken kayu galam
btg
20.0000
24,200.00
Pekerja
Oh
7.0500
70,593.60
Tukang batu
Oh
0.2750
98,831.04
Tukang kayu
btg
1.6500
105,890.40
Tukang besi
Oh
2.1000
98,831.04
Kepala tukang
Oh
0.4030
112,949.76
Mandor
Oh
0.3530
120,009.12
Mandor
D- 45
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
2,750,000.00
194,012.50
24,200.00
70,593.60
98,831.04
105,890.40
98,831.04
Kepala tukang
Mandor
Oh
Oh
0.3330
0.3180
112,949.76
120,009.12
D- 46
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
2,750,000.00
194,012.50
24,200.00
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
D- 46
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
2,750,000.00
194,012.50
24,200.00
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
D- 46
Jumlah
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
2,750,000.00
Plywood 9 mm
Dolken kayu galam
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
lbr
btg
Oh
Oh
btg
Oh
Oh
Oh
2.8000
16.0000
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
194,012.50
24,200.00
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
Jumlah
D-40 Membuat 1 m3 kolom beton bertulang 11x11 (300 kg besi + bekisting)
Kayu kelas III
m3
0.4000
Paku 5-12cm
kg
4.0000
Minyak bekisting
ltr
2.0000
Besi beton
kg
299.0000
Kawat beton
kg
4.5000
Semen portland
kg
336.0000
Pasir beton
m3
0.5400
Koral beton
m3
0.8100
Kayu kelas II (balok)
m3
0.1500
Plywood 9 mm
lbr
3.5000
Dolken kayu galam
btg
20.0000
Pekerja
Oh
7.0500
Tukang batu
Oh
0.2750
Tukang kayu
btg
1.6500
Tukang besi
Oh
2.1000
Kepala tukang
Oh
0.4030
Mandor
Oh
0.3530
Jumlah
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
2,750,000.00
194,012.50
24,200.00
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
1,650,000.00
24,057.55
19,401.25
16,500.00
23,281.50
1,804.00
318,180.50
237,988.67
2,750,000.00
194,012.50
24,200.00
70,593.60
98,831.04
105,890.40
98,831.04
112,949.76
120,009.12
HARGA (Rp)
445,588.00
197,499.18
3,174.60
116,479.44
27,178.54
3,162.59
9,960.76
803,043.11
497,904.00
188,181.04
3,215.91
116,479.44
27,178.54
3,162.59
9,960.76
846,082.28
539,396.00
181,590.16
3,231.80
116,479.44
27,178.54
3,162.59
9,960.76
880,999.28
414,920.00
202,953.70
3,263.58
84,712.32
19,766.21
2,259.00
7,200.55
735,075.35
588,104.00
172,726.56
3,269.93
116,479.44
27,178.54
3,162.59
9,960.76
920,881.82
635,008.00
166,135.68
3,276.29
116,479.44
27,178.54
3,162.59
9,960.76
961,201.29
669,284.00
158,635.71
3,327.13
116,479.44
27,178.54
3,162.59
9,960.76
988,028.17
692,736.00
157,272.08
3,301.71
116,479.44
27,178.54
3,162.59
9,960.76
1,010,091.11
732,424.00
155,453.90
3,260.40
116,479.44
27,178.54
3,162.59
9,960.76
1,047,919.63
745,052.00
154,772.09
3,244.51
116,479.44
27,178.54
3,162.59
9,960.76
1,059,849.92
791,956.00
152,272.10
3,196.84
148,246.56
34,590.86
3,953.24
12,600.96
1,146,816.56
808,192.00
151,590.28
3,177.78
148,246.56
34,590.86
3,953.24
12,600.96
1,162,351.68
721,600.00
152,726.64
176,000.00
42,000.00
148,246.56
34,590.86
3,953.24
12,600.96
1,291,718.26
6,518.82
4,235.62
2,964.93
338.85
360.03
14,418.24
93,300.61
4,941.55
3,459.09
451.80
480.04
102,633.09
126,616.67
5,647.49
Pek Beton - Hal 65
3,953.24
451.80
480.04
137,149.24
173,250.00
3,492.23
4,941.55
6,918.17
790.65
480.04
189,872.63
173,250.00
2,328.15
3,529.68
4,941.55
564.75
360.03
184,974.16
112,759.29
1,164.08
1,764.84
2,470.78
225.90
120.01
118,504.89
66,000.00
7,217.27
1,940.13
36,708.67
27,531.50
2,936.69
3,120.24
145,454.50
74,250.00
7,217.27
1,940.13
36,708.67
27,531.50
2,936.69
3,120.24
153,704.50
66,000.00
9,623.02
3,880.25
41,250.00
67,904.38
48,400.00
46,591.78
34,943.83
3,727.34
3,960.30
326,280.90
66,000.00
9,623.02
3,880.25
49,500.00
67,904.38
48,400.00
46,591.78
34,943.83
3,727.34
3,960.30
334,530.90
66,000.00
9,623.02
3,880.25
41,250.00
67,904.38
145,200.00
46,591.78
34,943.83
3,727.34
3,960.30
423,080.90
49,500.00
9,623.02
3,880.25
55,000.00
67,904.38
72,600.00
58,960.00
46,591.78
34,943.83
3,727.34
3,960.30
406,690.90
49,500.00
9,623.02
2,910.19
41,250.00
67,904.38
48,400.00
46,591.78
34,943.83
3,727.34
3,960.30
308,810.83
43,560.00
14,434.53
12,100.00
10,589.04
5,294.52
564.75
960.07
87,502.91
330,000.00
36,086.33
7,760.50
2,598,750.00
52,383.38
606,144.00
171,817.47
192,770.82
374,146.08
27,178.54
137,657.52
103,772.59
29,592.84
31,802.42
4,699,862.47
445,500.00
48,115.10
11,640.75
3,465,000.00
69,844.50
606,144.00
171,817.47
192,770.82
398,853.84
27,178.54
165,189.02
138,363.46
36,482.77
33,962.58
5,810,862.85
660,000.00
96,230.20
38,802.50
5,197,500.00
104,766.75
606,144.00
171,817.47
192,770.82
375,000.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
9,601,085.22
528,000.00
76,984.16
31,042.00
3,465,000.00
69,844.50
606,144.00
171,817.47
192,770.82
350,000.00
543,235.00
387,200.00
448,269.36
27,178.54
174,719.16
138,363.46
37,612.27
38,162.90
7,286,343.63
528,000.00
76,984.16
31,042.00
2,598,750.00
52,383.38
606,144.00
171,817.47
192,770.82
300,000.00
543,235.00
774,400.00
374,146.08
27,178.54
137,657.52
103,772.59
29,931.69
31,802.42
6,580,015.66
396,000.00
76,984.16
31,042.00
2,598,750.00
52,383.38
606,144.00
171,817.47
192,770.82
400,000.00
543,235.00
580,800.00
374,146.08
27,178.54
137,657.52
103,772.59
29,592.84
31,802.42
6,322,274.39
412,500.00
72,172.65
23,281.50
3,465,000.00
69,844.50
606,144.00
171,817.47
192,770.82
262,500.00
485,031.25
338,800.00
398,853.84
27,178.54
165,189.02
138,363.46
36,482.77
33,962.58
6,829,447.05
3,300.00
240.58
49,500.00
1,047.67
7,216.00
1,909.08
2,141.90
12,706.85
1,976.62
2,117.81
1,976.62
677.70
1,080.08
82,156.50
4,950.00
481.15
59,400.00
1,164.08
9,922.00
2,863.62
3,569.83
20,966.30
3,261.42
3,494.38
3,261.42
1,129.50
1,800.14
103,316.98
495,000.00
3,529.68
7,412.33
847.12
300.02
507,089.15
124,168.00
1,411.87
6,226.36
711.58
300.02
132,817.83
66,000.00
9,623.02
3,880.25
41,250.00
67,904.38
200,000.00
46,591.78
34,943.83
3,727.34
3,960.30
477,880.90
66,000.00
9,623.02
3,880.25
41,250.00
67,904.38
99,000.00
46,591.78
34,943.83
3,727.34
3,960.30
376,880.90
660,000.00
96,230.20
38,802.50
2,953,500.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
7,394,585.22
660,000.00
96,230.20
38,802.50
3,465,000.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
7,906,085.22
660,000.00
96,230.20
38,802.50
2,838,000.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
7,279,085.22
660,000.00
96,230.20
38,802.50
3,316,500.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
7,757,585.22
660,000.00
96,230.20
38,802.50
Pek Beton - Hal 73
4,257,000.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
8,698,085.22
660,000.00
96,230.20
38,802.50
2,887,500.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
7,328,585.22
528,000.00
76,984.16
31,042.00
2,656,500.00
69,844.50
606,144.00
171,817.47
192,770.82
385,000.00
543,235.00
387,200.00
448,269.36
27,178.54
174,719.16
138,363.46
37,612.27
38,162.90
6,512,843.63
528,000.00
76,984.16
31,042.00
2,656,500.00
69,844.50
606,144.00
171,817.47
192,770.82
385,000.00
543,235.00
387,200.00
448,269.36
27,178.54
174,719.16
138,363.46
37,612.27
38,162.90
6,512,843.63
528,000.00
76,984.16
31,042.00
2,656,500.00
69,844.50
606,144.00
171,817.47
192,770.82
385,000.00
543,235.00
387,200.00
448,269.36
27,178.54
174,719.16
138,363.46
37,612.27
38,162.90
6,512,843.63
528,000.00
76,984.16
31,042.00
2,953,500.00
69,844.50
606,144.00
171,817.47
192,770.82
385,000.00
Pek Beton - Hal 75
543,235.00
387,200.00
448,269.36
27,178.54
174,719.16
138,363.46
37,612.27
38,162.90
6,809,843.63
660,000.00
96,230.20
38,802.50
4,933,500.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
9,374,585.22
660,000.00
96,230.20
38,802.50
3,547,500.00
104,766.75
606,144.00
171,817.47
192,770.82
412,500.00
679,043.75
484,000.00
497,684.88
27,178.54
174,719.16
207,545.18
45,518.75
42,363.22
7,988,585.22
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
140.0000
32.9500
0.0910
0.6500
0.2000
0.0200
0.0300
995.93
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
140.0000
26.5500
0.0930
0.6500
0.2000
0.0200
0.0300
995.93
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
140.0000
22.2000
0.1020
0.6500
0.2000
0.0200
0.0300
995.93
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
70.0000
14.3700
0.0400
0.3200
0.1000
0.0100
0.0150
995.93
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
70.0000
14.3750
0.0430
0.3200
0.1000
995.93
1,804.00
227,641.34
70,593.60
98,831.04
Kepala Tukang
Mandor
Oh
Oh
0.0100
0.0150
112,949.76
120,009.12
70.0000
9.6800
0.0450
0.3200
0.1000
0.0100
0.0150
995.93
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
9,079.79
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
9,079.79
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
8,254.35
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
Jumlah
E-08
E-09
E-10 Memasang 1 M2 Dinding Batako Besar Pres uk. 8x20x30 adk 1pc :4ps
Batako
Buah
13.0000
Semen Portland
kg
12.0000
Pasir pasang
M3
0.0380
Pekerja
Oh
0.3000
Tukang Batu
Oh
0.1000
Kepala Tukang
Oh
0.0100
Mandor
Oh
0.0150
3,880.25
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
Jumlah
E-11
E-12
E-13
E-14
10.0000
13.5000
0.0480
1.9500
0.3500
0.1500
0.0150
0.0170
6,091.99
1,804.00
227,641.34
33,000.00
70,593.60
98,831.04
112,949.76
120,009.12
10.0000
8.0000
0.0380
1.9000
0.3200
0.1200
0.0120
0.0150
7,139.66
1,804.00
227,641.34
33,000.00
70,593.60
98,831.04
112,949.76
120,009.12
10.0000
8.0000
0.0270
1.9000
0.3200
0.1200
0.0120
0.0150
6,596.43
1,804.00
227,641.34
33,000.00
70,593.60
98,831.04
112,949.76
120,009.12
10.0000
14.0500
0.0040
0.0420
3.8700
0.0060
0.0010
0.0300
0.0050
0.3700
0.1570
0.0070
0.0164
0.0185
6,091.99
1,804.00
318,180.50
227,641.34
33,000.00
1,804.00
8,254.35
23,281.50
237,988.67
70,593.60
98,831.04
112,949.76
112,949.76
120,009.12
E-15
E-16
E-17
E-18
10.0000
10.4600
0.0030
0.0320
0.8700
0.0040
0.0010
0.0200
0.0040
0.3400
0.1300
0.0070
0.0137
0.0170
7,139.66
1,804.00
318,180.50
227,641.34
33,000.00
1,804.00
8,254.35
23,281.50
237,988.67
70,593.60
98,831.04
112,949.76
112,949.76
120,009.12
10.0000
10.4600
0.0030
0.0320
0.8700
0.0040
0.0010
0.0200
0.0040
0.3400
0.1300
0.0070
0.0137
0.0170
6,596.43
1,804.00
318,180.50
227,641.34
33,000.00
1,804.00
8,254.35
23,281.50
237,988.67
70,593.60
98,831.04
112,949.76
112,949.76
120,009.12
53.0000
9.3000
0.0180
2.7500
0.9000
0.4500
0.0450
0.0450
1,056.00
1,804.00
227,641.34
8,250.00
70,593.60
98,831.04
112,949.76
120,009.12
106.0000
9.3000
0.0180
2.9000
0.9000
5,500.00
1,804.00
227,641.34
8,250.00
70,593.60
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
0.4500
0.0450
0.0450
98,831.04
112,949.76
120,009.12
26.5000
9.3000
0.0180
1.9400
0.9000
0.4500
0.0450
0.0450
2,822.00
1,804.00
227,641.34
8,250.00
70,593.60
98,831.04
112,949.76
120,009.12
1.0600
3.0030
14.4400
0.0250
0.6500
1.3000
0.6500
0.0650
0.0650
726,072.38
2,500.00
1,804.00
227,641.34
8,250.00
70,593.60
98,831.04
112,949.76
120,009.12
1.1000
11.7500
0.0350
0.7000
0.3500
0.0350
0.0300
292,829.53
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
86.0000
9.3000
0.0180
1.5000
1.0000
0.5000
0.0500
0.0500
600.00
1,804.00
227,641.34
8,250.00
70,593.60
98,831.04
112,949.76
120,009.12
Jumlah
E-19
E-20
E-21
E-22
E-23
m2
kg
m3
Oh
Oh
Oh
Oh
Porselen
Semen Portland
Pasir pasang
semen warna
Pekerja
Tukang batu
Kepala Tukang
Mandor
E-24
E-25
buah
kg
m3
kg
Oh
Oh
Oh
Oh
Jumlah
M2
kg
Oh
Oh
Oh
Oh
53.0000
9.3000
0.0180
2.7500
0.9000
0.4500
0.0450
0.0450
900.00
1,804.00
227,641.34
8,250.00
70,593.60
98,831.04
112,949.76
120,009.12
26.5000
9.3000
0.0180
1.9400
0.9000
0.4500
0.0450
0.0450
1,800.00
1,804.00
227,641.34
8,250.00
70,593.60
98,831.04
112,949.76
120,009.12
2.2000
0.2500
0.3500
0.1750
0.0170
0.0020
38,802.50
97,782.30
70,593.60
105,890.40
112,949.76
120,009.12
Jumlah
E-26
E-27
E-28
E-29
35,000.00
31,000.00
79,933.15
12,416.80
15,521.00
14,300.00
19,800.00
70,593.60
105,890.40
112,949.76
120,009.12
35,000.00
31,000.00
194,012.50
24,057.55
15,521.00
70,593.60
105,890.40
112,949.76
120,009.12
35,000.00
31,000.00
182,371.75
24,057.55
15,521.00
70,593.60
105,890.40
112,949.76
120,009.12
E-30
E-31
E-32
E-33
E-34
35.0000
0.2000
0.0350
0.3000
0.1000
0.0100
0.0150
23,643.66
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
1.2000
0.0140
0.0112
0.0030
0.1000
0.0500
0.0050
0.0020
27,937.80
5,432,350.00
24,057.55
23,000.00
70,593.60
105,890.40
112,949.76
120,009.12
8.3300
3.1500
0.0112
0.0030
2.0000
3.0000
0.1500
0.1000
10,144.75
1,850.00
1,025.00
1,850.00
70,593.60
105,890.40
112,949.76
120,009.12
HARGA (Rp)
139,430.32
59,441.80
20,715.36
45,885.84
19,766.21
2,259.00
3,600.27
291,098.80
139,430.32
47,896.20
21,170.64
45,885.84
19,766.21
2,259.00
3,600.27
280,008.48
139,430.32
40,048.80
23,219.42
45,885.84
19,766.21
2,259.00
3,600.27
274,209.85
69,715.16
25,923.48
9,105.65
22,589.95
9,883.10
1,129.50
1,800.14
140,146.98
69,715.16
25,932.50
9,788.58
22,589.95
9,883.10
Pek Dinding - Hal 85
1,129.50
1,800.14
140,838.93
69,715.16
17,462.72
10,243.86
22,589.95
9,883.10
1,129.50
1,800.14
132,824.43
326,872.26
23,091.20
7,967.45
21,178.08
9,883.10
1,129.50
1,800.14
391,921.73
326,872.26
19,844.00
7,967.45
21,178.08
9,883.10
1,129.50
1,800.14
388,674.53
247,630.5000
19,844.0000
7,967.4468
21,178.0800
9,883.1040
1,129.4976
1,800.1368
309,432.77
50,443.25
21,648.00
8,650.37
21,178.08
9,883.10
1,129.50
1,800.14
114,732.44
60,919.93
24,354.00
10,926.78
64,350.00
24,707.76
14,824.66
1,694.25
2,040.16
203,817.53
71,396.60
14,432.00
8,650.37
62,700.00
22,589.95
11,859.72
1,355.40
1,800.14
194,784.18
65,964.25
14,432.00
6,146.32
62,700.00
22,589.95
11,859.72
1,355.40
1,800.14
186,847.78
60,919.93
25,346.20
1,272.72
9,560.94
127,710.00
10.82
8.25
698.45
1,189.94
26,119.63
15,516.47
790.65
1,852.38
2,220.17
273,216.55
71,396.60
18,869.84
954.54
7,284.52
28,710.00
7.22
8.25
465.63
951.95
24,001.82
12,848.04
790.65
1,547.41
2,040.16
169,876.63
65,964.25
18,869.84
954.54
7,284.52
28,710.00
7.22
8.25
465.63
951.95
24,001.82
12,848.04
790.65
1,547.41
2,040.16
164,444.28
55,968.00
16,777.20
4,097.54
22,687.50
63,534.24
44,473.97
5,082.74
5,400.41
218,021.60
583,000.00
16,777.20
4,097.54
23,925.00
63,534.24
44,473.97
5,082.74
5,400.41
746,291.10
74,783.00
16,777.20
4,097.54
16,005.00
63,534.24
44,473.97
5,082.74
5,400.41
230,154.10
769,636.72
7,507.50
26,049.76
5,691.03
5,362.50
91,771.68
64,240.18
7,341.73
7,800.59
985,401.70
322,112.49
21,197.00
7,967.45
49,415.52
34,590.86
3,953.24
3,600.27
442,836.83
51,600.00
16,777.20
4,097.54
12,375.00
70,593.60
49,415.52
5,647.49
6,000.46
216,506.81
47,700.00
16,777.20
4,097.54
22,687.50
63,534.24
44,473.97
5,082.74
5,400.41
209,753.60
47,700.00
16,777.20
4,097.54
16,005.00
63,534.24
44,473.97
5,082.74
5,400.41
203,071.10
85,365.50
24,445.58
24,707.76
18,530.82
1,920.15
240.02
155,209.82
222,079.64
3,608.63
25,206.10
156,839.71
10,589.04
47,650.68
5,082.74
960.07
472,016.62
222,079.64
3,608.63
25,206.10
166,850.75
14,118.72
63,534.24
6,776.99
1,200.09
503,375.16
222,079.64
3,608.63
25,206.10
80,310.83
14,118.72
63,534.24
6,776.99
1,200.09
416,835.24
14,350.00
4,650.00
29,095.67
1,365.85
54,323.50
1,029.60
2,475.00
7,059.36
5,294.52
564.75
600.05
120,808.29
14,350.00
4,650.00
70,620.55
2,646.33
54,323.50
7,059.36
5,294.52
564.75
600.05
160,109.05
14,350.00
4,650.00
66,383.32
2,646.33
54,323.50
7,059.36
5,294.52
564.75
600.05
155,871.82
827,527.98
360.80
7,967.45
21,178.08
9,883.10
1,129.50
1,800.14
869,847.05
33,525.36
76,052.90
269.44
69.00
7,059.36
5,294.52
564.75
240.02
123,075.35
84,505.77
5,827.50
11.48
5.55
141,187.20
317,671.20
16,942.46
12,000.91
578,152.07
F-02
F-03
F-04
F-05
URAIAN
SATUAN
VOLUME
15.5040
0.0160
0.3000
0.1500
0.0150
0.0150
10.2240
0.0200
0.3000
0.1500
0.0150
0.0150
7.7760
0.0230
0.3000
0.1500
0.0150
0.0150
6.2400
0.0240
0.3000
0.1500
0.0150
0.0150
Plesteran - Hal 93
5.1840
0.0260
0.3000
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
0.1500
0.0150
0.0150
4.4160
0.0270
0.3000
0.1500
0.0150
0.0150
3.9360
0.0280
0.3000
0.1500
0.0150
0.0150
3.4560
0.0290
0.3000
0.1500
0.0150
0.0150
F-09
5.7600
0.0030
0.1300
0.3600
0.1200
0.0120
0.0180
F-10
Jumlah
F-06
F-07
F-08
Plesteran - Hal 94
3.0000
0.0050
0.0200
0.3600
Tukang Batu
Kepala Tukang
Mandor
F-11
F-12
F-13
F-14
F-15
Oh
Oh
Oh
Jumlah
Membuat 1 m2 Plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm
Semen merah
m3
Kapur Padam
m3
Pasir Pasang
m3
Pekerja
Oh
Tukang Batu
Oh
Kepala Tukang
Oh
Mandor
Oh
Jumlah
0.1200
0.0120
0.0180
0.0090
0.0090
0.0090
0.3600
0.1200
0.0120
0.0180
0.0070
0.0070
0.0150
0.3600
0.1200
0.0120
0.0180
13.6320
0.0270
0.4000
0.2000
0.0200
0.0220
10.3680
0.0310
0.2600
0.2000
0.0200
0.0130
Plesteran - Hal 95
8.3200
0.0320
0.4000
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
0.2000
0.0200
0.0220
6.9120
0.0350
0.4000
0.2000
0.0200
0.0220
5.8880
0.0360
0.4000
0.2000
0.0200
0.0220
0.0090
0.0090
0.0180
0.4400
0.2200
0.0220
0.0220
5.1840
0.0260
0.1500
0.0750
0.0080
0.0080
Jumlah
F-16
F-17
F-18
F-19
F-20
Plesteran - Hal 96
0.5000
0.0130
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
0.0800
0.4000
0.0400
0.0040
Jumlah
F-21
F-22
F-23
4.3200
0.0060
0.3000
0.1000
0.0100
0.0150
F-24
F-25
Plesteran - Hal 97
Mandor
Oh
0.0040
Jumlah
F-26
F-27
F-28
kg
Oh
Oh
Oh
Oh
Jumlah
Plesteran - Hal 98
2.0000
0.2000
0.1000
0.0100
0.0100
teran
HARGA SATUAN
(Rp)
HARGA (Rp)
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
27,969.22
3,642.26
21,178.08
14,824.66
1,694.25
1,800.14
71,108.60
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
18,444.10
4,552.83
21,178.08
14,824.66
1,694.25
1,800.14
62,494.04
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
14,027.90
5,235.75
21,178.08
14,824.66
1,694.25
1,800.14
58,760.77
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
11,256.96
5,463.39
21,178.08
14,824.66
1,694.25
1,800.14
56,217.47
1,804.00
227,641.34
70,593.60
9,351.94
5,918.67
21,178.08
Plesteran - Hal 99
98,831.04
112,949.76
120,009.12
14,824.66
1,694.25
1,800.14
54,767.73
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
7,966.46
6,146.32
21,178.08
14,824.66
1,694.25
1,800.14
53,609.90
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
7,100.54
6,373.96
21,178.08
14,824.66
1,694.25
1,800.14
52,971.62
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
6,234.62
6,601.60
21,178.08
14,824.66
1,694.25
1,800.14
52,333.34
1,804.00
82,300.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
10,391.04
246.90
29,593.37
25,413.70
11,859.72
1,355.40
2,160.16
81,020.30
1,804.00
90,530.00
227,641.34
70,593.60
5,412.00
452.65
4,552.83
25,413.70
98,831.04
112,949.76
120,009.12
11,859.72
1,355.40
2,160.16
51,206.46
330,000.00
90,530.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
2,970.00
814.77
2,048.77
25,413.70
11,859.72
1,355.40
2,160.16
46,622.52
330,000.00
90,530.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
2,310.00
633.71
3,414.62
25,413.70
11,859.72
1,355.40
2,160.16
47,147.31
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
24,592.13
6,146.32
28,237.44
19,766.21
2,259.00
2,640.20
83,641.29
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
18,703.87
7,056.88
18,354.34
19,766.21
2,259.00
1,560.12
67,700.41
1,804.00
227,641.34
70,593.60
15,009.28
7,284.52
28,237.44
98,831.04
112,949.76
120,009.12
19,766.21
2,259.00
2,640.20
75,196.65
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
12,469.25
7,967.45
28,237.44
19,766.21
2,259.00
2,640.20
73,339.54
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
10,621.95
8,195.09
28,237.44
19,766.21
2,259.00
2,640.20
71,719.88
330,000.00
90,530.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
2,970.00
814.77
4,097.54
31,061.18
21,742.83
2,484.89
2,640.20
65,811.42
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
9,351.94
5,918.67
10,589.04
7,412.33
903.60
960.07
35,135.65
1,804.00
227,641.34
902.00
2,959.34
70,593.60
98,831.04
112,949.76
120,009.12
5,647.49
39,532.42
4,517.99
480.04
54,039.27
1,804.00
4,290.00
70,593.60
98,831.04
112,949.76
120,009.12
18,040.00
64,350.00
31,767.12
22,236.98
2,597.84
2,760.21
141,752.16
1,804.00
2,640.00
70,593.60
98,831.04
112,949.76
120,009.12
18,040.00
39,600.00
31,767.12
22,236.98
2,597.84
2,760.21
117,002.16
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
7,793.28
1,365.85
21,178.08
9,883.10
1,129.50
1,800.14
43,149.95
1,804.00
70,593.60
98,831.04
112,949.76
120,009.12
5,606.83
10,589.04
7,412.33
903.60
960.07
25,471.87
1,804.00
70,593.60
98,831.04
112,949.76
2,886.40
4,941.55
3,459.09
451.80
8 m')
120,009.12
480.04
12,218.87
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
11,437.36
2,731.70
21,178.08
14,824.66
1,694.25
1,800.14
53,666.18
1,804.00
70,593.60
98,831.04
112,949.76
120,009.12
5,863.00
14,118.72
9,883.10
1,129.50
1,200.09
32,194.41
2,328.15
70,593.60
98,831.04
112,949.76
120,009.12
4,656.30
14,118.72
9,883.10
1,129.50
1,200.09
30,987.71
PC : 2 PP
G-02
G-03
G-04
G-05
URAIAN
SATUAN
VOLUME
buah
Oh
Oh
Oh
Oh
Jumlah
25.0000
0.1500
0.0750
0.0080
0.0080
buah
kg
m3
Oh
Oh
Oh
Oh
Jumlah
5.0000
8.0000
0.0320
0.4000
0.2000
0.0200
0.0020
0.6000
0.0500
0.1400
0.0670
0.0070
0.0070
0.3500
0.1200
0.1400
0.0700
0.0070
0.0070
Asbes Gelombang
Paku seng
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Lbr
M3
Oh
Oh
Oh
Oh
0.4200
0.1200
0.1400
0.0700
0.0070
0.0070
Jumlah
G-06
G-07
G-08
G-09
G-10
0.4000
0.1200
0.1400
0.0670
0.0070
0.0070
0.5100
0.1200
0.1400
0.0670
0.0070
0.0080
0.8000
0.1200
0.1400
0.0670
0.0070
0.0070
Lbr
buah
Oh
Oh
Oh
Oh
Jumlah
2.1000
6.0000
0.0840
0.1250
0.0130
0.0040
buah
11.0000
kg
Oh
Oh
Oh
Oh
0.0300
0.2000
0.1000
0.0010
0.0010
Jumlah
G-11
G-12
G-13
18.0000
0.1500
0.0750
0.0080
0.0080
18.0000
0.1500
0.0750
0.0080
0.0080
M2
Kg
Oh
Oh
Oh
Oh
1.0000
0.2000
0.2000
0.1000
0.0100
0.0010
Jumlah
G-14
G-15
buah
Kg
zak
M3
Kg
Oh
Oh
Oh
Oh
Jumlah
Lbr
3.0000
0.0500
0.2160
0.0320
1.0000
0.4000
0.2000
0.0200
0.0200
1.0000
Kg
Oh
Oh
Oh
Oh
0.0500
0.2500
0.1500
0.0150
0.0130
Lbr
kg
Oh
Oh
Oh
Oh
0.6500
0.0200
0.1200
0.0600
0.0060
0.0060
Lbr
Kg
Oh
Oh
Oh
Oh
0.2700
0.0400
0.1500
0.0700
0.0080
0.0060
M2
Oh
Oh
Oh
Oh
1.0000
0.1500
0.0500
0.0050
0.0080
Lbr
Kg
Oh
Oh
Oh
Oh
1.0000
0.0200
0.1500
0.7500
0.0080
0.0060
Lbr
Kg
Oh
Oh
1.0000
0.0200
0.1500
0.7500
Jumlah
G-16
G-17
G-18
G-19
G-20
Kepala Tukang
Mandor
Oh
Oh
0.0080
0.0060
M2
Kg
Oh
Oh
Oh
Oh
1.1000
0.0400
0.1000
1.0000
0.0100
0.0100
Jumlah
G-21
G-22
lbr
kg
Oh
Oh
Oh
Oh
0.7000
0.0200
0.1200
0.0600
0.0060
0.0060
m2
Kg
Oh
Oh
Oh
Oh
1.0000
0.2000
0.2000
0.1000
0.0100
0.0010
m2
Kg
Oh
Oh
Oh
Oh
5.0000
0.2000
0.2000
0.1000
0.0100
0.0010
Jumlah
G-12
G-11
up Atap
HARGA SATUAN
(Rp)
HARGA (Rp)
1,705.00
70,593.60
105,890.40
112,949.76
120,009.12
42,625.00
10,589.04
7,941.78
903.60
960.07
63,019.49
7,760.50
1,804.00
227,641.34
70,593.60
105,890.40
112,949.76
120,009.12
38,802.50
14,432.00
7,284.52
28,237.44
21,178.08
2,259.00
240.02
112,433.56
93,126.00
24,057.55
70,593.60
105,890.40
112,949.76
120,009.12
55,875.60
1,202.88
9,883.10
7,094.66
790.65
840.06
75,686.95
83,600.00
19,800.00
70,593.60
105,890.40
112,949.76
120,009.12
29,260.00
2,376.00
9,883.10
7,412.33
790.65
840.06
50,562.14
74,800.00
19,800.00
70,593.60
105,890.40
112,949.76
120,009.12
31,416.00
2,376.00
9,883.10
7,412.33
790.65
840.06
52,718.14
66,000.00
19,800.00
70,593.60
105,890.40
112,949.76
120,009.12
26,400.00
2,376.00
9,883.10
7,094.66
790.65
840.06
47,384.47
57,200.00
19,800.00
70,593.60
105,890.40
112,949.76
120,009.12
29,172.00
2,376.00
9,883.10
7,094.66
790.65
960.07
50,276.48
44,000.00
19,800.00
70,593.60
105,890.40
112,949.76
120,009.12
35,200.00
2,376.00
9,883.10
7,094.66
790.65
840.06
56,184.47
74,933.84
1,164.08
70,593.60
105,890.40
112,949.76
120,009.12
157,361.06
6,984.45
5,929.86
13,236.30
1,468.35
480.04
185,460.05
5,044.33
55,487.58
3,492.23
70,593.60
105,890.40
112,949.76
120,009.12
104.77
14,118.72
10,589.04
112.95
120.01
80,533.06
4,950.00
70,593.60
105,890.40
112,949.76
120,009.12
89,100.00
10,589.04
7,941.78
903.60
960.07
109,494.49
6,600.00
70,593.60
105,890.40
112,949.76
120,009.12
118,800.00
10,589.04
7,941.78
903.60
960.07
139,194.49
90,021.80
24,057.55
70,593.60
105,890.40
112,949.76
120,009.12
90,021.80
4,811.51
14,118.72
10,589.04
1,129.50
120.01
120,790.58
80,670.40
24,057.55
90,200.00
227,641.34
15,003.63
70,593.60
105,890.40
112,949.76
120,009.12
242,011.19
1,202.88
19,483.20
7,284.52
15,003.63
28,237.44
21,178.08
2,259.00
2,400.18
339,060.12
83,347.77
83,347.77
24,057.55
70,593.60
105,890.40
112,949.76
120,009.12
1,202.88
17,648.40
15,883.56
1,694.25
1,560.12
121,336.97
100,110.45
24,057.55
70,593.60
105,890.40
112,949.76
120,009.12
65,071.79
481.15
8,471.23
6,353.42
677.70
720.05
81,775.35
23,281.50
24,057.55
70,593.60
105,890.40
112,949.76
120,009.12
6,286.01
962.30
10,589.04
7,412.33
903.60
720.05
26,873.33
29,877.93
70,593.60
105,890.40
112,949.76
120,009.12
29,877.93
10,589.04
5,294.52
564.75
960.07
47,286.31
164,522.60
14,630.00
70,593.60
105,890.40
112,949.76
120,009.12
164,522.60
292.60
10,589.04
79,417.80
903.60
720.05
256,445.69
276,273.80
14,630.00
70,593.60
105,890.40
276,273.80
292.60
10,589.04
79,417.80
112,949.76
120,009.12
903.60
720.05
368,196.89
81,865.51
14,630.00
70,593.60
105,890.40
112,949.76
120,009.12
90,052.07
585.20
7,059.36
105,890.40
1,129.50
1,200.09
205,916.61
121,770.00
12,416.80
70,593.60
105,890.40
112,949.76
120,009.12
85,239.00
248.34
8,471.23
6,353.42
677.70
720.05
101,709.75
143,550.00
24,057.55
70,593.60
105,890.40
112,949.76
120,009.12
143,550.00
4,811.51
14,118.72
10,589.04
1,129.50
120.01
174,318.78
174,319.00
27,161.75
24,057.55
70,593.60
105,890.40
112,949.76
120,009.12
135,808.75
4,811.51
14,118.72
10,589.04
1,129.50
120.01
166,577.53
166,578.00
H-02
H-03
H-04
H-05
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
1.1000
0.0100
0.0300
0.0700
0.0070
0.0015
23,281.50
19,800.00
70,593.60
105,890.40
112,949.76
120,009.12
1.1000
0.0100
0.0300
0.0700
0.0070
0.0015
34,060.83
19,800.00
70,593.60
105,890.40
112,949.76
120,009.12
1.5000
0.0500
0.0600
0.1000
0.0100
0.0030
228,934.75
19,800.00
70,593.60
105,890.40
112,949.76
120,009.12
3.6000
0.1500
1.0500
1.5000
0.1500
0.5000
0.0500
0.0075
28,085.25
28,325.83
4,656.30
228,934.75
70,593.60
105,890.40
112,949.76
120,009.12
Lbr
Kg
Oh
Oh
Oh
Oh
Jumlah
6,710,245.67
24,057.55
182,371.75
70,593.60
105,890.40
112,949.76
120,009.12
Jumlah
H-06
H-07
H-08
H-09
H-10
0.0230
0.0600
0.3900
0.2700
0.4000
0.0400
0.0135
6,710,245.67
24,057.55
102,438.60
70,593.60
105,890.40
112,949.76
120,009.12
0.0230
0.0600
0.3900
0.2700
0.4000
0.0400
0.0135
6,710,245.67
24,057.55
93,384.68
70,593.60
105,890.40
112,949.76
120,009.12
40,354.60
40,354.60
97,006.25
38,802.50
4,656.30
74,415.00
100,430.00
70,593.60
105,890.40
112,949.76
120,009.12
40,354.60
40,354.60
79,933.15
40,354.60
4,656.30
74,415.00
100,430.00
70,593.60
105,890.40
112,949.76
120,009.12
0.4150
0.1500
0.3640
0.1100
4.0000
0.0720
0.1250
0.1000
0.0500
0.0050
0.0050
H-11
H-12
H-13
H-14
H-15
m3
Kg
Lbr
Kg
Oh
Oh
Oh
Oh
Jumlah
0.0230
0.0600
0.3900
0.1100
0.2700
0.4000
0.0400
0.0135
6,710,245.67
24,057.55
97,006.25
14,300.00
70,593.60
105,890.40
112,949.76
120,009.12
6,710,245.67
24,057.55
79,933.15
40,354.60
70,593.60
105,890.40
112,949.76
120,009.12
m'
Kg
Oh
Oh
Oh
Oh
Jumlah
1.0500
0.0100
0.0500
0.0500
0.0050
0.0030
60,531.90
24,057.55
70,593.60
105,890.40
112,949.76
120,009.12
m'
Kg
Oh
Oh
Oh
Oh
Jumlah
1.0500
0.1500
0.0500
0.0500
0.0050
0.0030
6,208.40
77,605.00
70,593.60
105,890.40
112,949.76
120,009.12
m2
buah
Oh
Oh
Oh
Oh
Jumlah
1.0000
18.0000
0.1500
0.2500
0.0250
0.0750
108,900.00
385.00
70,593.60
98,831.04
112,949.76
120,009.12
H-06
M
Kg
Oh
Oh
Oh
Oh
1.0000
18.0000
0.1000
0.0500
0.0050
0.0050
108,900.00
385.00
385.00
70,593.60
98,831.04
112,949.76
0.3400
0.0030
0.3000
0.1100
0.2200
0.0220
0.0050
66,003.05
5,432,350.00
24,057.55
70,593.60
105,890.40
112,949.76
120,009.12
1.0500
0.0100
0.0500
0.0210
0.0020
0.0010
13,037.64
24,057.55
70,593.60
105,890.40
112,949.76
120,009.12
HARGA (Rp)
25,609.65
198.00
2,117.81
7,412.33
790.65
180.01
36,308.45
37,466.92
198.00
2,117.81
7,412.33
790.65
180.01
48,165.72
343,402.13
990.00
4,235.62
10,589.04
1,129.50
360.03
360,706.31
101,106.90
4,248.87
4,889.12
343,402.13
10,589.04
52,945.20
5,647.49
900.07
523,728.81
154,335.65
1,443.45
71,124.98
19,060.27
42,356.16
4,517.99
1,620.12
Plafond - Hal 119
294,458.63
154,335.65
1,443.45
39,951.05
19,060.27
42,356.16
4,517.99
1,620.12
263,284.70
154,335.65
1,443.45
36,420.03
19,060.27
42,356.16
4,517.99
1,620.12
259,753.68
16,747.16
6,053.19
35,310.28
4,268.28
18,625.20
5,357.88
12,553.75
7,059.36
5,294.52
564.75
600.05
112,434.40
16,747.16
6,053.19
29,095.67
4,439.01
18,625.20
5,357.88
12,553.75
7,059.36
5,294.52
564.75
600.05
106,390.53
154,335.65
1,443.45
37,832.44
1,573.00
19,060.27
42,356.16
4,517.99
1,620.12
262,739.09
154,335.65
1,443.45
31,173.93
4,439.01
19,060.27
42,356.16
4,517.99
1,620.12
258,946.58
63,558.50
240.58
3,529.68
5,294.52
564.75
360.03
73,548.05
6,518.82
11,640.75
3,529.68
5,294.52
564.75
360.03
27,908.55
108,900.00
6,930.00
10,589.04
24,707.76
2,823.74
9,000.68
162,951.23
108,900.00
6,930.00
38.50
3,529.68
494.16
564.75
120,457.08
22,441.04
16,297.05
7,217.27
7,765.30
23,295.89
2,484.89
600.05
80,101.48
80,100.00
13,689.52
240.58
3,529.68
2,223.70
225.90
120.01
20,029.38
20,029.00
I-02
I-03
I-04
I-05
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
6.6300
9.8000
0.0450
1.3000
0.2500
0.1250
0.0130
0.0130
125,202.73
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
11.8700
10.0000
0.0450
1.5000
0.2600
0.1300
0.0130
0.0130
102,438.60
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
2.6500
1.1400
0.0030
0.1000
0.0900
0.0900
0.0090
0.0050
16,492.61
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
3.5300
1.1400
0.0030
0.1000
0.0900
0.0900
0.0090
0.0050
14,819.45
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
Keramik artistik
Semen Portland
Pasir Pasang
semen Warna
Pekerja
Tukang Batu
Kepala Tukang
Mandor
I-06
I-07
I-08
I-09
buah
Kg
M3
Kg
Oh
Oh
Oh
Oh
Jumlah
53.0000
8.1900
0.0450
2.7500
0.7000
0.3500
0.0350
0.0350
1,056.00
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
1,860.00
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
4,252.75
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
6,420.05
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
8,324.90
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
Mandor
Oh
0.0310
120,009.12
10.0000
8.1900
0.0450
1.6200
0.7000
0.3500
0.0350
0.0350
4,950.00
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
1,540.00
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
Jumlah
I-10
I-11
I-12
Memasang 1 M2 Lantai mosaik ukuran (30 x 30) cm, campuran spesi 1pc : 3ps
Mosaik
buah
11.8700
33,000.00
Semen Portland
Kg
14.1500
1,804.00
Pasir Pasang
M3
0.0390
227,641.34
semen Warna
Kg
2.0000
15,003.63
Pekerja
Oh
0.7000
70,593.60
Tukang Batu
Oh
0.3500
98,831.04
Kepala Tukang
Oh
0.0350
112,949.76
Mandor
Oh
0.0350
120,009.12
Jumlah
I-13
I-14
11.8700
10.0000
0.0450
3,585.35
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
5,882.80
1,804.00
227,641.34
semen Warna
Pekerja
Tukang batu
Kepala Tukang
Mandor
Kg
Oh
Oh
Oh
Oh
1.5000
0.2600
0.1300
0.0130
0.0130
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
m2
Kg
Oh
Oh
Oh
Oh
1.0500
0.3500
0.1700
0.1700
0.0170
0.0090
562,139.58
97,782.30
70,593.60
98,831.04
112,949.76
120,009.12
1.0500
0.3500
0.1700
0.1700
0.0170
0.0090
93,500.00
97,782.30
70,593.60
98,831.04
112,949.76
120,009.12
m2
kg
m3
kg
OH
OH
OH
OH
1.0600
8.1900
0.0450
0.6500
0.7000
0.3500
0.0350
0.0350
726,072.38
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
M2
zak
Oh
Oh
Oh
Oh
1.0500
0.6000
0.7000
0.3500
0.0350
0.0350
514,975.92
31,042.00
70,593.60
105,890.40
112,949.76
120,009.12
m2
kg
Oh
Oh
Oh
1.0500
0.6000
0.7000
0.3500
0.0350
137,500.00
45,010.90
70,593.60
105,890.40
112,949.76
Jumlah
I-15
I-16
I-17
I-18
I-19
Mandor
Oh
0.0350
120,009.12
buah
kg
Oh
Oh
Oh
Oh
Jumlah
11.8700
0.3500
0.1500
0.1500
0.0150
0.0800
18,700.00
31,042.00
70,593.60
105,890.40
112,949.76
120,009.12
buah
zak
M3
Kg
Oh
Oh
Oh
Oh
Jumlah
2.6500
0.0200
0.0030
0.1000
0.0600
0.0300
0.0030
0.0030
6,573.14
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
buah
zak
M3
Kg
Oh
Oh
Oh
Oh
Jumlah
4.3000
0.0500
0.0032
0.3000
0.0600
0.0300
0.0030
0.0030
20,177.30
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
buah
kg
m3
Kg
Oh
Oh
Oh
Oh
Jumlah
5.3000
1.1400
0.0030
0.0250
0.0900
0.0900
0.0090
0.0050
20,177.30
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
10.6000
1.1400
0.0030
0.0500
0.0900
11,000.00
1,804.00
227,641.34
15,003.63
70,593.60
Jumlah
I-20
I-21
I-22
I-23
I-24
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
0.0900
0.0090
0.0050
98,831.04
112,949.76
120,009.12
5.3000
0.5700
0.0015
0.0130
0.0900
0.0900
0.0090
0.0050
5,500.00
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
3.5300
1.1400
0.0030
0.1000
0.0900
0.0900
0.0090
0.0050
3,828.00
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
Jumlah
I-25
I-26
I-27
I-28
Memasang 1 m' plint vinyl karet ukuran (15 x 30) cm dengan perekat
Vinyl karet
buah
1.760
Lem vinyl
kg
0.080
pekerja
Oh
0.080
Tukang
Oh
0.080
Kepala tukang
Oh
0.008
Mandor
Oh
0.004
Jumlah
60,500.00
31,042.00
70,593.60
98,831.04
112,949.76
120,009.12
kg
Oh
Oh
Oh
Oh
5.0000
0.1200
0.1200
0.1200
0.0060
30,800.00
70,593.60
98,831.04
112,949.76
120,009.12
0.0030
0.0500
0.1200
0.1200
0.0120
2,860,000.00
14,300.00
70,593.60
98,831.04
112,949.76
Jumlah
I-29
Mandor
Oh
0.0060
120,009.12
7,150.00
1,804.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
Jumlah
I-30
Jumlah
I-31
M2
Kg
Oh
Oh
Oh
Oh
1.0100
0.1000
0.2500
0.5000
0.0250
0.0025
126,133.99
227,641.34
70,593.60
15,003.63
112,949.76
120,009.12
1.0100
0.1000
0.2500
0.5000
0.0250
0.0025
147,811.66
227,641.34
70,593.60
15,003.63
112,949.76
120,009.12
1.0100
0.1000
0.2500
0.5000
0.0250
0.0025
107,353.58
227,641.34
70,593.60
15,003.63
112,949.76
120,009.12
1.0100
0.1000
0.2500
0.5000
0.0250
0.0025
123,391.95
227,641.34
70,593.60
15,003.63
112,949.76
120,009.12
Jumlah
I-32
I-33
I-34
I-35
I-36
I-37
I-01
buah
Kg
Oh
Oh
Oh
Oh
Jumlah
25.0000
0.1000
0.2500
0.5000
0.0250
0.0025
23,643.66
227,641.34
70,593.60
15,003.63
112,949.76
120,009.12
buah
Kg
Oh
Oh
Oh
Oh
Jumlah
18.0000
0.1000
0.2500
0.5000
0.0250
0.0025
27,472.17
227,641.34
70,593.60
15,003.63
112,949.76
120,009.12
m2
1.0300
m3
0.0400
kg
0.1000
liter
0.0500
Lbr
0.0900
btg
1.5000
Oh
0.1700
Oh
0.0800
Oh
0.0100
Oh
0.0100
Jumlah
Memasang 1 M2 Lantai keramik setara mulia ukuran 40 x 40 cm
keramik 40 x 40 cm
buah
7.0000
Semen Portland
kg
11.3800
Pasir Pasang
M3
0.0420
Semen Warna
Kg
1.5000
Pekerja
Oh
0.3500
Tukang Batu
Oh
0.0350
Kepala Tukang
Oh
0.0620
Mandor
Oh
0.0310
Jumlah
385.00
2,860,000.00
18,625.20
19,401.25
194,012.50
439,259.82
70,593.60
105,890.40
112,949.76
120,009.12
12,675.49
1,980.00
227,641.34
15,003.63
70,593.60
98,831.04
112,949.76
120,009.12
HARGA (Rp)
830,094.12
17,679.20
10,243.86
19,504.72
17,648.40
12,353.88
1,468.35
1,560.12
910,552.65
1,215,946.18
18,040.00
10,243.86
22,505.45
18,354.34
12,848.04
1,468.35
1,560.12
1,300,966.33
43,705.43
2,056.56
682.92
1,500.36
6,353.42
8,894.79
1,016.55
600.05
64,810.09
52,312.66
2,056.56
682.92
1,500.36
6,353.42
8,894.79
1,016.55
600.05
73,417.32
55,968.00
14,774.76
10,243.86
41,259.99
49,415.52
34,590.86
3,953.24
4,200.32
214,406.56
197,160.00
14,774.76
10,243.86
48,011.63
24,707.76
34,590.86
3,953.24
4,200.32
337,642.43
112,697.98
18,761.60
10,243.86
24,305.89
24,707.76
3,459.09
7,002.89
3,720.28
204,899.34
76,206.01 70620.561
18,040.00
10,243.86
22,505.45
24,707.76
3,459.09
7,002.89
3,720.28
165,885.33
98,816.55
18,040.00
10,243.86
22,505.45
24,707.76
3,459.09
7,002.89
Lantai - Hal 132
3,720.28
188,495.88
49,500.00
14,774.76
10,243.86
24,305.89
49,415.52
34,590.86
3,953.24
4,200.32
190,984.45
50,820.00
17,679.20
10,243.86
65,565.88
74,123.28
51,886.30
5,986.34
6,360.48
282,665.33
391,710.00
25,526.60
8,878.01
30,007.27
49,415.52
34,590.86
3,953.24
4,200.32
548,281.82
42,558.12
25,526.60
8,878.01
30,007.27
49,415.52
34,590.86
3,953.24
4,200.32
199,129.94
69,828.84
18,040.00
10,243.86
22,505.45
18,354.34
12,848.04
1,468.35
1,560.12
154,848.98
590,246.56
34,223.81
12,000.91
16,801.28
1,920.15
1,080.08
656,272.78
98,175.00
34,223.81
12,000.91
16,801.28
1,920.15
1,080.08
164,201.22
769,636.72
14,774.76
10,243.86
9,752.36
49,415.52
34,590.86
3,953.24
4,200.32
896,567.65
540,724.71
18,625.20
49,415.52
37,061.64
3,953.24
4,200.32
653,980.63
144,375.00
27,006.54
49,415.52
37,061.64
3,953.24
Lantai - Hal 134
4,200.32
266,012.26
221,969.00
10,864.70
10,589.04
15,883.56
1,694.25
9,600.73
270,601.28
17,418.83
36.08
682.92
1,500.36
4,235.62
2,964.93
338.85
360.03
27,537.62
86,762.39
90.20
728.45
4,501.09
4,235.62
2,964.93
338.85
360.03
99,981.56
106,939.69
2,056.56
682.92
375.09
6,353.42
8,894.79
1,016.55
600.05
126,919.08
116,600.00
2,056.56
682.92
750.18
6,353.42
Lantai - Hal 135
8,894.79
1,016.55
600.05
136,954.48
29,150.00
1,028.28
341.46
195.05
6,353.42
8,894.79
1,016.55
600.05
47,579.60
13,512.84
2,056.56
682.92
1,500.36
6,353.42
8,894.79
1,016.55
600.05
34,617.50
106,480.00
2,483.36
5,647.49
7,906.48
903.60
480.04
123,900.97
154,000.00
8,471.23
11,859.72
13,553.97
720.05
188,604.98
8,580.00
715.00
8,471.23
11,859.72
1,355.40
Lantai - Hal 136
720.05
30,981.35
37,895.00
2,056.56
682.92
1,500.36
52,945.20
74,123.28
8,471.23
4,560.35
182,234.91
127,395.33
22,764.13
17,648.40
7,501.82
2,823.74
300.02
178,133.43
149,289.77
22,764.13
17,648.40
7,501.82
2,823.74
300.02
200,027.87
108,427.12
22,764.13
17,648.40
7,501.82
2,823.74
300.02
159,165.21
124,625.87
22,764.13
17,648.40
7,501.82
2,823.74
300.02
175,363.96
Lantai - Hal 137
591,091.42
22,764.13
17,648.40
7,501.82
2,823.74
300.02
641,829.51
494,499.06
22,764.13
17,648.40
7,501.82
2,823.74
300.02
545,237.15
396.55
114,400.00
1,862.52
970.06
17,461.13
658,889.73
12,000.91
8,471.23
1,129.50
1,200.09
816,781.72
88,728.41
22,532.40
9,560.94
22,505.45
24,707.76
3,459.09
7,002.89
3,720.28
182,217.21
URAIAN
SATUAN
VOLUME
J-01
J-02
Membuat dan memasang 1 m3 Kusen Pintu & Jendela Kayu kelas II atau kelas III
Balok kayu
m3
1.2000
Paku 10 cm
kg
1.2500
Lem kayu
kg
1.0000
Pekerja
Oh
6.0000
Tukang Kayu
Oh
18.0000
Kepala Tukang
Oh
1.8000
Mandor
Oh
0.3000
Jumlah
J-03
J-04
Membuat dan memasang 1 m2 pintu klamp sederhana, kayu kelas III untuk gudang sementara
Papan kayu
m3
0.0400
Paku 5 - 7 cm
Kg
0.0500
Pekerja
Oh
0.3500
Tukang Kayu
Oh
1.0500
Kepala Tukang
Oh
0.1050
Mandor
Oh
0.0180
Jumlah
J-05
Lem kayu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Kg
Oh
Oh
Oh
Oh
Jumlah
0.5000
1.0000
3.0000
0.3000
0.0500
J-06
Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Papan kayu
m3
0.0240
Lem kayu
kg
0.3000
Pekerja
Oh
0.8000
Tukang Kayu
Oh
2.4000
Kepala Tukang
Oh
0.2400
Mandor
Oh
0.0400
Jumlah
J-07
Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas I atau II
Papan kayu
m3
0.0640
Lem kayu
kg
0.5000
Pekerja
Oh
1.0000
Tukang Kayu
Oh
3.0000
Kepala Tukang
Oh
0.3000
Mandor
Oh
0.0500
Jumlah
J-08
Membuat dan memasang daun pintu kayu lapis (Plywood) rangkap, rangka tertutup kayu kelas
cm)
Papan kayu
m3
0.0250
paku 1 -2,5 cm
kg
0.0300
Lem kayu
kg
0.5000
Plywood tebal 4 mm uk (90 x 220) cm
lbr
1.0000
Pekerja
Oh
0.7000
Tukang Kayu
Oh
2.1000
Kepala Tukang
Oh
0.2100
Mandor
Oh
0.0350
Jumlah
J-09
Jumlah
J-10
0.0600
0.1500
0.6700
2.0000
0.2000
0.3350
J-11
J-12
J-13
Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
Balok kayu
m3
1.1000
Besi strip tebal 5 mm
kg
15.0000
Paku 12 cm
kg
5.6000
Pekerja
Oh
4.0000
Tukang Kayu
Oh
12.0000
Kepala Tukang
Oh
1.2000
Mandor
Oh
0.2000
Jumlah
J-14
paku 12 cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
J-15
J-16
J-17
J-18
J-19
kg
Oh
Oh
Oh
Oh
Jumlah
Memasang 1 m3 konstruksi, gording kayu kelas II
Balok kayu
m3
Besi strip tebal 5 mm
kg
Paku 12 cm
kg
Pekerja
Oh
Tukang Kayu
Oh
Kepala Tukang
Oh
Mandor
Oh
Jumlah
5.6000
6.7000
20.1000
2.0100
0.3350
1.1000
15.0000
3.0000
2.4000
7.2000
0.7200
0.1200
0.0140
0.0036
0.2500
0.1000
0.1000
0.0100
0.0050
0.0140
0.0072
0.2500
0.1000
0.1000
0.0100
0.0050
0.1650
0.2000
0.1200
0.1200
0.0120
0.0060
Memasang 1 m2 rangka plafond (50 x 100) cm, kayu kelas II atau kelas III
Kaso-kaso (5 x 7) cm
Paku 7 - 10 cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
m3
kg
Oh
Oh
Oh
Oh
Jumlah
0.0154
0.2000
0.1500
0.3000
0.0300
0.0750
J-20
Memasang 1 m2 rangka plafond (60 x 60), kayu kelas II atau kelas III
Kaso-kaso (5 x 7) cm
m3
0.0163
Paku 7 - 10 cm
kg
0.2500
Pekerja
Oh
0.2000
Tukang Kayu
Oh
0.3000
Kepala Tukang
Oh
0.0300
Mandor
Oh
0.0100
Jumlah
J-21
Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Papan kayu
m3
0.0108
paku 5 cm dan 7 cm
kg
0.1000
Pekerja
Oh
0.1000
Tukang Kayu
Oh
0.2000
Kepala Tukang
Oh
0.0200
Mandor
Oh
0.0050
Jumlah
J-22
Memasang 1 m' lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Papan kayu
m3
0.0110
paku 5 cm dan 7 cm
kg
0.0500
Pekerja
Oh
0.1000
Tukang Kayu
Oh
0.2000
Kepala Tukang
Oh
0.0200
Mandor
Oh
0.0050
Jumlah
J-23
Memasang 1 m2 rangka dinding pemisah ( 60 x 120) cm, kayu kelas II atau III
Balok kayu
M3
0.0280
paku 5 cm dan 7 cm
Lbr
0.1500
Pekerja
Oh
0.1500
Tukang Kayu
Oh
0.4500
Kepala Tukang
Oh
0.0450
Mandor
Oh
0.0080
Jumlah
J-24
paku 5 cm dan 10 cm
Teakwood tebal 4 mm uk (120 x 240) cm
Lem kayu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
kg
lbr
kg
Oh
Oh
Oh
Oh
Jumlah
0.1500
0.8600
0.5600
0.1500
0.4500
0.0450
0.0080
J-25
J-26
0.0070
0.1000
0.1500
0.6000
1.8000
0.1800
0.0300
J-27
J-28
1.5000
0.0140
0.0120
0.0030
0.1000
Tukang Kayu
Kepala Tukang
Mandor
Oh
Oh
Oh
Jumlah
0.0500
0.0050
0.0050
Kayu
HARGA SATUAN
(Rp)
3,300,000.00
18,625.20
45,010.90
70,593.60
105,890.40
112,949.76
120,009.12
2,860,000.00
18,625.20
70,593.60
105,890.40
112,949.76
120,009.12
3,300,000.00
HARGA (Rp)
3,630,000.00
23,281.50
45,010.90
494,155.20
2,223,698.40
237,194.50
42,003.19
6,695,343.69
3,300,000.00
23,281.50
45,010.90
423,561.60
1,906,027.20
203,309.57
36,002.74
5,937,193.50
114,400.00
931.26
24,707.76
111,184.92
11,859.72
2,160.16
265,243.83
66,000.00
931.26
24,707.76
111,184.92
11,859.72
2,160.16
216,843.83
132,000.00
45,010.90
70,593.60
105,890.40
112,949.76
120,009.12
22,505.45
70,593.60
317,671.20
33,884.93
6,000.46
582,655.63
3,300,000.00
45,010.90
70,593.60
105,890.40
112,949.76
120,009.12
79,200.00
13,503.27
56,474.88
254,136.96
27,107.94
4,800.36
435,223.42
3,300,000.00
45,010.90
70,593.60
105,890.40
112,949.76
120,009.12
211,200.00
22,505.45
70,593.60
317,671.20
33,884.93
6,000.46
661,855.63
atau II
atau II
71,500.00
721.73
22,505.45
259,809.90
49,415.52
222,369.84
23,719.45
4,200.32
654,242.20
2,860,000.00
24,057.55
45,010.90
259,809.90
70,593.60
105,890.40
112,949.76
120,009.12
73,216.00
721.73
22,505.45
259,809.90
56,474.88
254,136.96
27,107.94
4,800.36
atau II
698,773.22
2,860,000.00
24,057.55
70,593.60
105,890.40
112,949.76
120,009.12
171,600.00
3,608.63
47,297.71
211,780.80
22,589.95
40,203.06
497,080.15
3,300,000.00
24,057.55
45,010.90
182,371.75
70,593.60
105,890.40
112,949.76
120,009.12
82,500.00
721.73
13,503.27
182,371.75
56,474.88
254,136.96
27,107.94
4,800.36
524,891.90
2,860,000.00
24,057.55
45,010.90
182,371.75
249,888.10
70,593.60
105,890.40
112,949.76
120,009.12
71,500.00
721.73
36,008.72
182,371.75
124,944.05
60,004.56
270,020.52
28,802.19
5,160.39
779,533.91
yu kelas II
3,300,000.00
24,636.48
3,630,000.00
369,547.25
104,301.12
282,374.40
1,270,684.80
135,539.71
24,001.82
5,816,449.11
3,960,000.00
369,547.25
18,625.20
70,593.60
105,890.40
112,949.76
120,009.12
104,301.12
472,977.12
2,128,397.04
227,029.02
40,203.06
7,302,454.60
2,750,000.00
24,636.48
18,625.20
70,593.60
105,890.40
112,949.76
120,009.12
3,025,000.00
369,547.25
55,875.60
169,424.64
762,410.88
81,323.83
14,401.09
4,477,983.29
5,432,350.00
24,200.00
18,625.20
70,593.60
105,890.40
112,949.76
120,009.12
76,052.90
87.12
4,656.30
7,059.36
10,589.04
1,129.50
600.05
100,174.26
5,432,350.00
24,200.00
18,625.20
70,593.60
105,890.40
112,949.76
120,009.12
76,052.90
174.24
4,656.30
7,059.36
10,589.04
1,129.50
600.05
100,261.38
2,750,000.00
18,625.20
70,593.60
105,890.40
112,949.76
120,009.12
453,750.00
3,725.04
8,471.23
12,706.85
1,355.40
720.05
480,728.57
as III
5,432,350.00
18,625.20
70,593.60
105,890.40
112,949.76
120,009.12
83,658.19
3,725.04
10,589.04
31,767.12
3,388.49
9,000.68
142,128.57
5,432,350.00
18,625.20
70,593.60
105,890.40
112,949.76
120,009.12
88,547.31
4,656.30
14,118.72
31,767.12
3,388.49
1,200.09
143,678.03
3,300,000.00
18,625.20
70,593.60
105,890.40
112,949.76
120,009.12
35,640.00
1,862.52
7,059.36
21,178.08
2,259.00
600.05
68,599.00
3,300,000.00
18,625.20
70,593.60
105,890.40
112,949.76
120,009.12
36,300.00
931.26
7,059.36
21,178.08
2,259.00
600.05
68,327.74
2,750,000.00
18,625.20
70,593.60
105,890.40
112,949.76
120,009.12
77,000.00
2,793.78
10,589.04
47,650.68
5,082.74
960.07
144,076.31
2,750,000.00
77,000.00
II
II
II atau III
elas II
18,625.20
182,371.75
45,010.90
70,593.60
105,890.40
112,949.76
120,009.12
2,793.78
156,839.71
25,206.10
10,589.04
47,650.68
5,082.74
960.07
326,122.12
2,750,000.00
18,625.20
259,809.90
45,010.90
70,593.60
105,890.40
112,949.76
120,009.12
77,000.00
2,793.78
223,436.51
25,206.10
14,118.72
63,534.24
6,776.99
1,200.09
414,066.43
3,300,000.00
18,625.20
7,760.50
70,593.60
105,890.40
112,949.76
120,009.12
23,100.00
1,862.52
1,164.08
42,356.16
190,602.72
20,330.96
3,600.27
283,016.71
259,809.90
24,057.55
70,593.60
105,890.40
112,949.76
120,009.12
103,923.96
1,202.88
1,764.84
7,941.78
903.60
120.01
115,857.06
27,937.80
5,432,350.00
18,625.20
55,900.00
70,593.60
41,906.70
76,052.90
223.50
167.70
7,059.36
las II
) cm
105,890.40
112,949.76
120,009.12
5,294.52
564.75
600.05
131,869.48
K-02
K-03
K-04
K-05
URAIAN
SATUAN
Kg
Oh
Oh
Oh
Oh
Jumlah
Ltr
Ltr
Jam
Oh
Oh
Oh
Oh
Jumlah
VOLUME
1.1500
0.0600
0.0600
0.0060
0.0030
17,073.10
70,593.60
98,831.04
112,949.76
120,009.12
1.1500
0.0600
0.0600
0.0060
0.0030
15,055.37
70,593.60
98,831.04
112,949.76
120,009.12
1.0000
0.1000
0.8000
0.1000
0.1000
0.0010
0.0050
9,500.00
62,084.00
66,000.00
70,593.60
98,831.04
112,949.76
120,009.12
52,800.00
18,625.20
42,682.75
70,593.60
98,831.04
112,949.76
120,009.12
Kawat las
Solar
Minyak pelumas
Sewa alat
Pekerja
Tukang Besi
Kepala Tukang
Mandor
K-06
K-07
K-08
K-09
kg
ltr
ltr
jam
Oh
Oh
Oh
Oh
Jumlah
0.0400
0.0300
0.0040
0.0170
0.6500
0.6500
0.0650
0.0320
42,682.75
9,500.00
62,084.00
66,000.00
70,593.60
98,831.04
112,949.76
120,009.12
26,510.00
55,094.89
3,000.00
70,593.60
98,831.04
112,949.76
120,009.12
m2
Oh
Oh
Oh
Oh
Jumlah
m2
Oh
Oh
Oh
Oh
Jumlah
1.0000
1.2000
1.2000
0.1200
0.0060
657,399.72
70,593.60
98,831.04
112,949.76
120,009.12
1.0000
0.4400
0.4400
0.0440
0.0220
472,989.00
70,593.60
98,831.04
112,949.76
120,009.12
1.0000
0.0800
0.8000
0.0800
0.0040
573,656.16
70,593.60
98,831.04
112,949.76
120,009.12
K-10
K-11
K-12
K-13
K-14
m2
Oh
Oh
Oh
Oh
Jumlah
1.0000
1.0000
1.0000
0.1000
0.0500
500,540.61
70,593.60
98,831.04
112,949.76
120,009.12
m
buah
tube
Oh
Oh
Oh
Oh
Jumlah
1.1000
2.0000
0.0600
0.0430
0.0430
0.0043
0.0021
28,085.25
1,552.10
217,294.00
70,593.60
98,831.04
112,949.76
120,009.12
4.4000
14.6000
0.0850
0.0850
0.0085
0.0042
28,085.25
29,877.93
70,593.60
98,831.04
112,949.76
120,009.12
4.4000
4.5000
0.2700
0.0850
0.0850
0.0080
0.0040
232,980.00
440,000.00
217,294.00
70,593.60
98,831.04
112,949.76
120,009.12
591,030.00
70,593.60
98,831.04
Kepala Tukang
Mandor
K-15
K-16
K-17
K-18
Oh
Oh
Jumlah
0.0350
0.0180
112,949.76
120,009.12
6.1770
27.0800
1.6700
1.6700
0.1670
0.0830
61,070.48
3,000.00
70,593.60
98,831.04
112,949.76
120,009.12
m2
cm
kg
Oh
Oh
Oh
Oh
Jumlah
1.1000
11.1100
1.7160
0.1000
0.1000
0.0100
0.0050
42,682.75
3,000.00
24,636.48
70,593.60
98,831.04
112,949.76
120,009.12
m2
buah
kg
Oh
Oh
Oh
Oh
Jumlah
1.1000
10.0000
7.0000
0.2000
0.2000
0.0200
0.0010
227,413.69
14,300.00
55,781.00
70,593.60
98,831.04
112,949.76
120,009.12
23,281.50
24,057.55
2,860,000.00
70,593.60
98,831.04
112,949.76
120,009.12
K-19
Memasang 1 m' talang 1/2 lingkaran D-15 cm, seng plat BJLS 30 lebar 45 cm
Seng plat
m'
1.0500
23,281.50
paku 1 - 2,5 cm
kg
0.0100
24,057.55
Besi strip
kg
0.5000
55,781.00
Pekerja
Oh
0.1500
70,593.60
Tukang Besi
Oh
0.3000
98,831.04
Kepala Tukang
Oh
0.0300
112,949.76
Mandor
Oh
0.0070
120,009.12
Jumlah
K-20
1.0000
495,000.00
20.0000
0.1500
0.0750
0.0080
0.0080
385.00
70,593.60
98,831.04
112,949.76
120,009.12
1 UNIT Pasang partisi Alumunium, Daun partisi Multiplek rangka kayu Kamper
Bahan
Tenaga
7.6200
m'
1.3500
lbr
Multiplek 9 mm
0.0300
m3
11.7000
m'
0.1000
kg
0.2500
kg
4.0000
bh
2.0000
bh
Handle partisi
1.5400
m2
Cat kayu
4.8600
m2
Cat tembok
0.3000
Oh
Pekerja Terampil
1.3000
Oh
0.1300
Oh
0.0130
Oh
Mandor
HARGA (Rp)
19,634.07
4,235.62
5,929.86
677.70
360.03
30,837.27
17,313.68
4,235.62
5,929.86
677.70
360.03
28,516.88
9,500.00
6,208.40
52,800.00
7,059.36
9,883.10
112.95
600.05
86,163.86
792,000.00
610,906.56
2,134.14
74,123.28
103,772.59
11,859.72
6,240.47
1,601,036.77
1,707.31
285.00
248.34
1,122.00
45,885.84
64,240.18
7,341.73
3,840.29
124,670.69
126,187.60
249,139.11
60,000.00
45,885.84
64,240.18
7,341.73
3,840.29
556,634.75
657,399.72
84,712.32
118,597.25
13,553.97
720.05
874,983.31
472,989.00
31,061.18
43,485.66
4,969.79
2,640.20
555,145.83
573,656.16
5,647.49
79,064.83
9,035.98
480.04
667,884.50
500,540.61
70,593.60
98,831.04
11,294.98
6,000.46
687,260.68
K-11
30,893.77
3,104.20
13,037.64
3,035.52
4,249.73
485.68
252.02
55,058.58
123,575.10
436,217.71
6,000.46
8,400.64
960.07
504.04
575,658.01
1,025,112.00
1,980,000.00
58,669.38
6,000.46
8,400.64
903.60
480.04
3,079,566.11
591,030.00
24,707.76
34,590.86
3,953.24
2,160.16
656,442.03
377,232.35
81,240.00
117,891.31
165,047.84
18,862.61
9,960.76
770,234.86
46,951.03
33,330.00
42,276.21
7,059.36
9,883.10
1,129.50
600.05
141,229.24
250,155.06
143,000.00
390,467.00
14,118.72
19,766.21
2,259.00
120.01
819,885.99
24,445.58
360.86
54,340.00
14,118.72
39,532.42
2,823.74
1,200.09
136,821.41
24,445.58
240.58
27,890.50
10,589.04
29,649.31
3,388.49
840.06
97,043.56
495,000.00
7,700.00
10,589.04
7,412.33
903.60
960.07
522,565.04
99,000.00
754,380.00
214,189.80
289,156.23
9,623,020.00
288,690.60
13,037.64
152,540.39
24,057.55
2,405.76
45,010.90
11,252.73
14,382.79
57,531.17
15,676.21
31,352.42
75,664.88
116,523.91
36,939.98
Jumlah I
179,528.30
1,883,361.50
73,000.00
21,900.00
105,890.40
137,657.52
112,949.76
14,683.47
120,009.12
1,560.12
Jumlah II
Jumlah I + II
175,801.11
2,059,162.61
L-02
L-03
L-04
L-05
URAIAN
SATUAN
buah
Oh
Oh
Jumlah
1.0000
0.6000
0.0600
buah
Oh
Oh
Jumlah
1.0000
0.5000
0.0500
VOLUME
buah
Oh
Oh
Jumlah
1.0000
0.2500
0.0250
1.0000
0.1250
0.0130
ps
Oh
Oh
Oh
Oh
1.0000
0.2500
0.2500
0.0250
0.0130
ps
Oh
Oh
1.0000
0.1250
0.0130
unit
1.0000
Jumlah
L-06
L-07
Engsel
Tukang Kayu
Kepala Tukang
ps
Oh
Oh
1.0000
0.2000
0.0200
unit
Oh
Oh
Jumlah
1.0000
0.1000
0.0100
unit
Oh
Oh
Jumlah
1.0000
0.1250
0.0130
unit
Oh
Oh
Jumlah
1.1000
0.1000
0.0100
m2
Oh
Oh
Oh
Oh
1.1000
0.1600
0.1600
0.0160
0.0080
m2
Oh
Oh
Oh
Oh
1.1000
0.1600
0.1600
0.0160
0.0080
Jumlah
L-08
L-09
L-10
L-11
L-12
L-13
1.2000
0.2500
0.2500
0.0250
0.0080
L-14
m2
Oh
Oh
Oh
Oh
1.1000
0.1600
0.1600
0.0160
0.0080
m2
Oh
Oh
Oh
Oh
1.1000
0.2500
0.1250
0.0130
0.0130
m2
Oh
Oh
Oh
Oh
1.1000
0.1600
0.1600
0.0160
0.0080
m2
Oh
Oh
Oh
Oh
1.1000
0.1600
0.1600
0.0160
0.0080
Jumlah
L-15
L-16
L-17
dan Kaca
HARGA SATUAN
(Rp)
HARGA (Rp)
165,000.00
105,890.40
112,949.76
165,000.00
63,534.24
6,776.99
235,311.23
145,640.00
105,890.40
112,949.76
145,640.00
52,945.20
5,647.49
204,232.69
69,850.00
105,890.40
112,949.76
69,850.00
26,472.60
2,823.74
99,146.34
16,500.00
105,890.40
112,949.76
16,500.00
13,236.30
1,468.35
31,204.65
16,500.00
70,593.60
105,890.40
112,949.76
120,009.12
16,500.00
17,648.40
26,472.60
2,823.74
1,560.12
63,444.74
25,066.42
105,890.40
112,949.76
25,066.42
13,236.30
1,468.35
39,771.06
743,455.90
743,455.90
16,500.00
105,890.40
112,949.76
16,500.00
21,178.08
2,259.00
783,392.98
97,130.00
105,890.40
112,949.76
97,130.00
10,589.04
1,129.50
108,848.54
97,130.00
105,890.40
112,949.76
97,130.00
13,236.30
1,468.35
111,834.65
97,316.67
105,890.40
112,949.76
107,048.34
10,589.04
1,129.50
118,766.87
118,476.97
70,593.60
105,890.40
112,949.76
120,009.12
130,324.66
11,294.98
16,942.46
1,807.20
960.07
160,369.30
118,476.97
70,593.60
105,890.40
112,949.76
120,009.12
130,324.66
11,294.98
16,942.46
1,807.20
960.07
160,369.30
118,476.97
70,593.60
105,890.40
112,949.76
120,009.12
142,172.36
17,648.40
26,472.60
2,823.74
960.07
189,117.10
186,252.00
70,593.60
105,890.40
112,949.76
120,009.12
204,877.20
11,294.98
16,942.46
1,807.20
960.07
234,921.84
931,260.00
70,593.60
105,890.40
112,949.76
120,009.12
1,024,386.00
17,648.40
13,236.30
1,468.35
1,560.12
1,056,739.05
252,784.40
70,593.60
105,890.40
112,949.76
120,009.12
278,062.84
11,294.98
16,942.46
1,807.20
960.07
308,107.48
152,283.55
70,593.60
105,890.40
112,949.76
120,009.12
167,511.90
11,294.98
16,942.46
1,807.20
960.07
197,556.54
M-02
M-03
M-04
M-05
URAIAN
Memasang 1 buah closet duduk
Closet duduk standar TOTO
Perlengkapan (6%)
Pekerja
Tukang batu
Kepala Tukang
Mandor
SATUAN
VOLUME
HARGA SATUAN
(Rp)
buah
lot
Oh
Oh
Oh
Oh
Jumlah
1.0000
0.0600
3.3000
1.1000
0.0110
0.1600
2,775,154.80
2,775,154.80
70,593.60
98,831.04
112,949.76
120,009.12
buah
kg
m3
Oh
Oh
Oh
Oh
Jumlah
1.0000
6.0000
0.0100
1.0000
1.5000
0.1500
0.1600
311,972.10
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
buah
lot
kg
m3
Oh
Oh
Oh
Oh
Jumlah
1.0000
0.3000
6.0000
0.0100
1.0000
1.0000
0.1000
0.1000
3,009,521.90
3,009,521.90
1,804.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
buah
lot
kg
m3
Oh
Oh
Oh
Oh
Jumlah
1.0000
0.1200
6.0000
0.0100
1.2000
1.4500
0.1500
0.1000
1,462,078.20
1,462,078.20
90,200.00
227,641.34
70,593.60
98,831.04
112,949.76
120,009.12
1.0000
1.8000
2.7000
388,025.00
70,593.60
98,831.04
Kepala Tukang
Mandor
Perlengkapan 18% harga bak
M-06
M-07
M-08
M-09
M-10
Oh
Oh
lot
Jumlah
0.5400
0.1100
0.1800
112,949.76
120,009.12
388,025.00
0.4000
120.0000
0.3000
6.0000
6.0000
3.0000
0.3000
0.3000
1,080,000.00
1,804.00
227,641.34
9,900.00
70,593.60
98,831.04
112,949.76
120,009.12
1.1000
25.0000
10.0000
0.0610
0.0690
0.3800
0.1900
0.0190
0.0190
102,179.92
1,267.55
1,804.00
227,641.34
261,270.17
70,593.60
98,831.04
112,949.76
120,009.12
1.6000
0.6800
0.0130
0.1100
0.0600
0.0300
0.0030
0.0025
11,935.00
1,804.00
227,641.34
261,270.17
70,593.60
98,831.04
112,949.76
120,009.12
1.1000
0.0270
3.9200
0.0560
0.0240
0.1400
0.0700
0.0070
0.0070
53,900.00
1,267.55
1,804.00
227,641.34
261,270.17
70,593.60
98,831.04
112,949.76
120,009.12
186.00
1,267.55
buah
buah
kg
m3
m3
Oh
Oh
Oh
Oh
Jumlah
semen
Pasir pasang
Batu pecah 2/3
Besi beton
Pasir beton
Pekerja
Tukang las
Kepala Tukang
Mandor
Tukang Gali
M-11
M-12
M-13
M-14
kg
m3
m3
m3
m3
Oh
Oh
Oh
Oh
Oh
Jumlah
110.00
0.1840
0.0330
4.8500
0.1200
2.1600
0.7200
0.0720
0.1080
0.1000
1,804.00
227,641.34
383,627.38
16,500.00
318,180.50
70,593.60
98,831.04
112,949.76
120,009.12
70,593.60
53.0000
44.0000
0.0700
0.0700
1.6000
0.0600
3.2000
1.0150
0.0015
0.0160
1,267.55
1,804.00
227,641.34
383,627.38
16,500.00
318,180.50
70,593.60
98,831.04
112,949.76
120,009.12
m'
Oh
Oh
Oh
Oh
lot
Jumlah
1.2000
0.0360
0.0600
0.0060
0.0018
0.3500
46,563.00
70,593.60
98,831.04
112,949.76
120,009.12
55,875.60
m'
Oh
Oh
Oh
Oh
lot
Jumlah
1.2000
0.0360
0.0600
0.0060
0.0018
0.3500
46,563.00
70,593.60
98,831.04
112,949.76
120,009.12
46,563.00
m'
Oh
Oh
Oh
oh
lot
Jumlah
1.2000
0.0360
0.0600
0.0060
0.0018
0.3500
107,482.93
70,593.60
98,831.04
112,949.76
120,009.12
107,482.93
M-15
M-16
M-17
M-18
M-20
1.2000
0.0360
0.0600
0.0060
0.0018
0.3500
141,241.10
70,593.60
98,831.04
112,949.76
120,009.12
141,241.10
M'
Oh
Oh
Oh
Oh
lot
Jumlah
1.2000
0.0810
0.1350
0.0135
0.0041
0.3500
424,499.35
70,593.60
98,831.04
112,949.76
120,009.12
424,499.35
M'
Oh
Oh
Oh
Oh
lot
Jumlah
1.2000
0.0810
0.1350
0.0135
0.0041
0.3500
65,964.25
70,593.60
98,831.04
112,949.76
120,009.12
65,964.25
1.0000
600,662.70
Oh
Oh
Oh
Oh
Jumlah
0.0300
0.3000
0.0300
0.0015
70,593.60
98,831.04
112,949.76
120,009.12
buah
buah
Oh
Oh
Oh
Oh
Jumlah
1.0000
0.0250
0.0100
0.1000
0.0100
0.0050
90,797.85
22,500.00
70,593.60
98,831.04
112,949.76
120,009.12
buah
Oh
Oh
Oh
Oh
1.0000
0.0100
0.1000
0.0100
0.0050
74,000.00
70,593.60
98,831.04
112,949.76
120,009.12
M-19
M'
Oh
Oh
Oh
Oh
lot
Jumlah
buah
Jumlah
M-21
M-22
1.1000
12.0000
0.1030
0.0305
0.0345
0.0100
0.1000
0.0100
0.0050
53,900.00
1,267.55
1,804.00
227,641.34
261,270.17
70,593.60
98,831.04
112,949.76
120,009.12
1.0500
0.3500
0.1500
0.4000
0.0250
0.0013
69,844.50
69,844.50
70,593.60
98,831.04
112,949.76
120,009.12
M-23
1.1000
25.0000
0.2060
0.0610
0.0690
0.3800
0.1900
0.0190
0.0190
244,197.07
1,267.55
1,804.00
227,641.34
261,270.17
70,593.60
98,831.04
112,949.76
120,009.12
M-24
1.0000
2.0000
1.1000
0.0010
0.1600
0.0600
388,025.00
70,593.60
98,831.04
112,949.76
120,009.12
388,025.00
4.5000
0.2140
2.2500
15.0000
0.3000
15.0000
5.4000
5.0000
68,934.65
261,270.17
890,123.98
291,098.80
1,259,787.83
62,494.04
172,671.13
337,581.75
M-25
buah
buah
zak
M3
M3
Oh
Oh
Oh
Oh
Jumlah
M3
M3
M3
M2
M3
M2
M'
M'
M-26
M-27
M3
kg
M3
M'
M3
Jumlah
3.3750
5.4000
1.0500
9.0000
1.1250
28,157.22
335,902.37
257,900.00
15,521.00
46,703.44
2.2500
0.1070
1.1250
7.5000
0.1500
7.5000
9.0000
2.5000
1.6880
2.7000
0.5250
9.0000
0.5630
55,945.43
261,270.17
735,075.35
291,098.80
1,259,787.83
62,494.04
172,671.13
337,581.75
28,157.22
335,902.37
257,900.00
15,521.00
46,703.44
3.7000
2.5000
55,945.43
24,495.98
22.4900
140,838.93
0.2500
22.0700
2.1600
0.5000
2.0000
8.0000
1.0000
1,458,042.74
16,500.00
1,650,000.00
228,288.65
679,051.12
135,808.75
973,911.71
HARGA (Rp)
2,775,154.80
166,509.29
232,958.88
108,714.14
1,242.45
19,201.46
3,303,781.02
311,972.10
10,824.00
2,276.41
70,593.60
148,246.56
16,942.46
19,201.46
580,056.60
3,009,521.90
902,856.57
10,824.00
2,276.41
70,593.60
98,831.04
11,294.98
12,000.91
4,118,199.41
1,462,078.20
175,449.38
541,200.00
2,276.41
84,712.32
143,305.01
16,942.46
12,000.91
2,437,964.70
388,025.00
127,068.48
266,843.81
60,992.87
13,201.00
69,844.50
925,975.66
432,000.00
216,480.00
68,292.40
59,400.00
423,561.60
296,493.12
33,884.93
36,002.74
1,566,114.79
112,397.91
31,688.71
18,040.00
13,886.12
18,027.64
26,825.57
18,777.90
2,146.05
2,280.17
244,070.06
10
19,096.00
1,226.72
2,959.34
28,739.72
4,235.62
2,964.93
338.85
300.02
59,861.19
59,290.00
34.22
7,071.68
12,747.91
6,270.48
9,883.10
6,918.17
790.65
840.06
103,846.29
235,763.99
Sanitasi - Hal 176
198,440.00
41,886.01
12,659.70
80,025.00
38,181.66
152,482.18
71,158.35
8,132.38
12,960.98
7,059.36
858,749.61
67,180.06
79,376.00
15,934.89
26,853.92
26,400.00
19,090.83
225,899.52
100,313.51
169.42
1,920.15
563,138.30
55,875.60
2,541.37
5,929.86
677.70
216.02
19,556.46
84,797.01
55,875.60
2,541.37
5,929.86
677.70
216.02
16,297.05
81,537.60
128,979.51
2,541.37
5,929.86
677.70
216.02
37,619.02
175,963.48
169,489.32
2,541.37
5,929.86
677.70
216.02
49,434.39
228,288.65
509,399.22
5,718.08
13,342.19
1,524.82
492.04
148,574.77
679,051.12
79,157.10
5,718.08
13,342.19
1,524.82
492.04
23,087.49
123,321.72
600,662.70
2,117.81
29,649.31
3,388.49
180.01
635,998.33
90,797.85
562.50
705.94
9,883.10
1,129.50
600.05
103,678.93
74,000.00
705.94
9,883.10
1,129.50
600.05
86,318.58
59,290.00
15,210.58
185.81
6,943.06
9,013.82
705.94
9,883.10
1,129.50
600.05
102,961.86
73,336.73
24,445.58
10,589.04
39,532.42
2,823.74
156.01
150,883.51
268,616.77
31,688.71
371.62
13,886.12
18,027.64
26,825.57
18,777.90
2,146.05
2,280.17
382,620.55
388,025.00
141,187.20
108,714.14
112.95
19,201.46
23,281.50
680,522.25
310,205.93
55,911.82
2,002,778.96
4,366,481.93
377,936.35
937,410.63
932,424.08
1,687,908.75
Sanitasi - Hal 179
95,030.62
1,813,872.80
270,795.00
139,689.00
52,541.37
13,042,987.22
125,877.21
27,955.91
826,959.77
2,183,240.96
188,968.18
468,705.31
1,554,040.13
843,954.38
47,529.39
906,936.40
135,397.50
139,689.00
26,294.04
7,475,548.17
206,998.08
61,239.95
3,167,467.45
364,510.69
364,155.00
3,564,000.00
114,144.33
1,358,102.25
1,086,470.00
973,911.71
16,623,947.43
N-02
N-03
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
0.0500
0.1500
0.0025
45,414.45
70,593.60
120,009.12
kg
kg
kg
Oh
Oh
Oh
Oh
Jumlah
0.0800
0.0200
0.0100
0.0400
0.0400
0.0040
0.0025
48,115.10
38,802.50
32,904.52
70,593.60
98,831.04
112,949.76
120,009.12
kg
kg
kg
Oh
Oh
Oh
Oh
Jumlah
0.1500
0.1700
0.1700
0.0700
0.0750
0.0075
0.0025
56,263.63
36,939.98
75,664.88
70,593.60
105,890.40
112,949.76
120,009.12
N-04
Mengecat 1 m2 bidang kayu baru ( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup)
Cat Meni
kg
0.2000
27,161.75
Plamir
kg
0.1500
56,263.63
Cat dasar
kg
0.1700
36,939.98
Cat Penutup 3x setara Sieve
kg
0.2600
75,664.88
Pekerja
Oh
0.0700
70,593.60
Tukang Kayu
Oh
0.0090
105,890.40
Kepala Tukang
Oh
0.0060
112,949.76
Mandor
Oh
0.0025
120,009.12
Jumlah
N-05
Mengecat 1 m2 bidang kayu baru ( 1 lps plamir, 1 lps cat dasar, 3 lps cat penutup)
Cat Meni
kg
0.2000
27,161.75
Plamir
kg
0.1500
56,263.63
Cat dasar
kg
0.1700
36,939.98
Cat Penutup 3x setara Sieve
kg
0.3500
75,664.88
Pekerja
Oh
0.0700
70,593.60
Tukang Kayu
Oh
0.1050
105,890.40
Kepala Tukang
Oh
0.0040
112,949.76
Mandor
Oh
0.0025
120,009.12
Pengecatan - Hal 181
Jumlah
N-06
N-07
N-09
N-10
N-11
ltr
ltr
lbr
Oh
Oh
Oh
Jumlah
ltr
kg
lbr
buah
Oh
Oh
Oh
Oh
Jumlah
0.2000
0.1500
2.0000
0.0600
0.0160
0.0025
71,396.60
72,948.70
4,656.30
98,831.04
112,949.76
120,009.12
0.3500
0.1000
0.0060
38,802.50
70,593.60
120,009.12
0.1500
0.0500
0.1000
0.0100
0.1600
0.1600
0.0160
0.0025
114,730.00
45,010.90
4,656.30
27,500.00
70,593.60
98,831.04
112,949.76
120,009.12
Mengecat 1 m2 Tembok Baru (1 lps plamir, 1 lps cat dasar, 2 lps cat penutup)
Plamir tembok
kg
0.1000
Cat dasar
kg
0.1000
Cat Penutup 2x setara ICI
kg
0.2600
Pekerja
Oh
0.0200
Tukang cat
Oh
0.0630
Kepala Tukang
Oh
0.0063
Mandor
Oh
0.0025
Jumlah
56,263.63
36,939.98
75,664.88
70,593.60
98,831.04
112,949.76
120,009.12
36,939.98
75,664.88
70,593.60
98,831.04
112,949.76
120,009.12
kg
kg
buah
ls
0.1500
0.1600
0.0100
1.0000
143,569.25
56,263.63
27,500.00
33,453.74
Ampelas
Pekerja
Tukang cat
Kepala tukang
Mandor
N-12
N-13
N-14
N-15
N-16
lbr
Oh
Oh
Oh
Oh
Jumlah
0.5000
0.2000
0.3000
0.0300
0.0100
4,656.30
70,593.60
98,831.04
112,949.76
120,009.12
m2
kg
Oh
Oh
Oh
Oh
Jumlah
1.1000
0.2500
0.3500
0.1750
0.0170
0.0017
38,802.50
31,042.00
70,593.60
105,890.40
112,949.76
120,009.12
0.1000
0.0100
0.0200
0.2000
0.0200
0.0100
27,161.75
20,177.30
70,593.60
98,831.04
112,949.76
120,009.12
27,161.75
20,177.30
5,500,000.00
70,593.60
98,831.04
112,949.76
120,009.12
124,168.00
70,593.60
98,831.04
112,949.76
120,009.12
Memasang 1 m2 Wallpaper
Wallpaper
Lem vinil
Pekerja
Tukang Kayu
Kepala tukang
Mandor
0.2500
0.0250
0.0100
0.2500
0.1500
0.0150
0.0250
100,886.50
56,263.63
20,177.30
70,593.60
98,831.04
112,949.76
120,009.12
Jumlah
Mengecat 1 m2 Tembok Baru (1 lps plamir, 1 lps cat dasar, 2 lps cat penutup)
Plamir tembok
kg
0.1000
Cat dasar
kg
0.1000
Cat Penutup 2x setara Vinilex
kg
0.2600
Pekerja
Oh
0.0200
Tukang cat
Oh
0.0630
Kepala Tukang
Oh
0.0063
Mandor
Oh
0.0025
Jumlah
Mengecatan 1 m2 Plafond (3x) luar 2 lantai/lebih
Cat Tembok setara vinilex
kg
0.1500
Rol Cat
buah
0.0100
Steger werk
ls
1.0000
Ampelas
lbr
0.5000
Pekerja
Oh
0.2000
Tukang cat
Oh
0.3000
Kepala tukang
Oh
0.0300
Mandor
Oh
0.0100
Jumlah
Mengecatan 1 m2 Plafond (3x)
Cat Tembok setara vinilex
kg
0.1500
Rol Cat
buah
0.0100
alat bantu
ls
1.0000
Ampelas
lbr
0.5000
Pekerja
Oh
0.2000
Tukang cat
Oh
0.3000
Kepala tukang
Oh
0.0300
Mandor
Oh
0.0100
Jumlah
Mengecat 1 m2 Tembok Baru (1 lps plamir, 1 lps cat dasar,3 lps cat penutup)
Plamir tembok
kg
0.1000
Cat dasar
kg
0.1000
Cat Penutup 3x setara Vinilex
kg
0.3900
Pekerja
Oh
0.0300
Tukang cat
Oh
0.0945
Kepala Tukang
Oh
0.0095
Mandor
Oh
0.0038
Jumlah
56,263.63
36,939.98
6,798.00
70,593.60
98,831.04
112,949.76
120,009.12
33,990.00
27,500.00
33,453.74
4,656.30
70,593.60
98,831.04
112,949.76
120,009.12
33,990.00
27,500.00
2,000.00
4,656.30
70,593.60
98,831.04
112,949.76
120,009.12
56,263.63
36,939.98
33,990.00
70,593.60
98,831.04
112,949.76
120,009.12
HARGA (Rp)
2,270.72
10,589.04
300.02
13,159.79
3,849.21
776.05
329.05
2,823.74
3,953.24
451.80
300.02
12,483.11
8,439.54
6,279.80
12,863.03
4,941.55
7,941.78
847.12
300.02
41,612.85
5,432.35
8,439.54
6,279.80
19,672.87
4,941.55
953.01
677.70
300.02
46,696.84
5,432.35
8,439.54
6,279.80
26,482.71
4,941.55
11,118.49
451.80
300.02
Pengecatan - Hal 185
63,446.26
14,279.32
10,942.31
9,312.60
5,929.86
1,807.20
300.02
42,571.31
13,580.88
7,059.36
720.05
21,360.29
17,209.50
2,250.55
465.63
275.00
11,294.98
15,812.97
1,807.20
300.02
49,415.84
5,626.36
3,694.00
19,672.87
1,411.87
6,226.36
711.58
300.02
37,643.06
4,432.80
13,619.68
1,976.62
4,150.90
474.39
300.02
24,954.41
21,535.39
9,002.18
275.00
33,453.74
2,328.15
14,118.72
29,649.31
3,388.49
1,200.09
114,951.08
42,682.75
7,760.50
24,707.76
18,530.82
1,920.15
204.02
95,805.99
2,716.18
201.77
1,411.87
19,766.21
2,259.00
1,200.09
27,555.11
2,716.18
201.77
11,000.00
17,648.40
22,236.98
2,541.37
900.07
57,244.77
37,250.40
423.56
5,929.86
1,355.40
720.05
45,679.28
25,221.63
1,406.59
201.77
17,648.40
14,824.66
1,694.25
3,000.23
63,997.52
5,626.36
3,694.00
1,767.48
1,411.87
6,226.36
711.58
300.02
19,737.67
5,098.50
275.00
33,453.74
2,328.15
14,118.72
29,649.31
3,388.49
1,200.09
89,512.01
5,098.50
275.00
2,000.00
2,328.15
14,118.72
29,649.31
3,388.49
1,200.09
58,058.27
5,626.36
3,694.00
13,256.10
2,117.81
9,339.53
1,073.02
456.03
35,562.86
URAIAN
SATUAN
VOLUME
O-01
O-02
0.0800
0.0010
1.0000
0.0250
0.0025
0.0400
0.0010
1.0000
0.0200
0.0020
0.0400
0.4500
0.0400
0.0040
O-03
O-04
krg
M2
Oh
Oh
aman Pohon
HARGA SATUAN
(Rp)
HARGA (Rp)
31,192.55
70,306.34
106,365.41
70,593.60
120,009.12
2,495.40
70.31
106,365.41
1,764.84
300.02
110,995.99
31,192.55
70,306.34
70,306.34
70,593.60
120,009.12
2,495.40
70.31
70,306.34
1,764.84
300.02
74,936.92
31,192.55
70,306.34
32,029.14
70,593.60
120,009.12
1,247.70
70.31
32,029.14
1,411.87
240.02
34,999.03
31,192.55
18,643.83
70,593.60
120,009.12
1,247.70
8,389.72
2,823.74
480.04
12,941.20
1
2
KODE
Tk
Fk
V
Fa
v1
v2
Ts2
T1
T2
T3
Ts2
Q2
- ALAT BANTU
Diperlukan alat bantu kecil-kecil : sekop, keranjang, cangkul
dll
- TENAGA
Produksi menentukan : manual
Produksi per hari = Tk x Q1
Q1
Qt
M
P
Koefisien tenaga / m3
'- Mandor = (Tk x M) /Qt
'- Pekerja = (Tk x P) /Qt
B. PEKERJAAN GALIAN TANAH KERAS (TANAH MENYESUAIKAN LAPANGAN)
1
2
3
4
5
I. ASUMSI
Pekerjaan galian dilakukan secara mekanis
Lokasi pekerjaan sepanjang jalan komplek perumahan
Kondisi existing jalan sedang/baik
Jam kerja efektif per hari
Faktor Pengembangan bahan
Tk
Fk
Lh
b
Fa
V
c
n
Ts
Q1
V
Fb
Fa
Cut and Fill - Hal 192
Waktu siklus
'- Mengisi / memuat
'- Lain-lain
Ts1
T1
T2
Ts1
Q1
- DUMP TRUCK
Kapasitas bak
Faktor Efisiensi Alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
'- waktu tempuh isi = (L/v1) x 60
'- waktu tempuh kosong = (L?v2) x 60
'- Lain-lain (bongkar muat)
V
Fa
v1
v2
Ts2
T1
T2
T3
Ts2
Q2
- ALAT BANTU
Diperlukan alat bantu kecil-kecil : sekop, keranjang, cangkul
dll
- TENAGA
Produksi menentukan : manual
Produksi per hari = Tk x Q1
Kebutuhan Tenaga kerja
'- Mandor
'- Pekerja
Q1
Qt
M
P
Koefisien tenaga / m3
'- Mandor = (Tk x M) /Qt
'- Pekerja = (Tk x P) /Qt
AN
KOEF
SATUAN
7.0000
1.1000
jam
5.0000
km
4.0000
0.8300
30.0000
40.0000
m3
km/jam
km/jam
10.0000
7.5000
35.0000
52.5000
menit
menit
menit
menit
4.3117
0.2319
m3/jam
jam
1.0000
lumpsum
4.3117
30.1818
m3/jam
m3
0.5000
2.0000
Orang
Orang
0.1160
0.4639
jam
jam
7.0000
1.2000
jam
0.2000
km
25.0000
2.0000
0.8300
0.1500
3.0000
4.0000
0.0333
38.9063
0.0257
m
m
PANGAN)
0.8000
0.9500
0.8300
m
km/jam
pp
jam
m3/jam
jam
m3
1.5000
0.5000
2.0000
menit
menit
menit
15.7700
0.0634
m3/jam
jam
4.0000
0.8300
10.0000
20.0000
m3
km/jam
km/jam
1.2000
0.6000
5.0000
6.8000
menit
menit
menit
menit
24.4118
0.0410
m3/jam
jam
1.0000
lumpsum
38.9063
272.3438
m3/jam
m3
0.2500
1.0000
Orang
Orang
0.0064
0.0257
jam
jam