NOVIEMBRE 2016
OBRA
UBICACIN
PROPIETARIO
EJECUTOR
SUPERVISION
SUPERVISOR
RESIDENTE
PRESUPUESTO BASE
S/
INC IGV
PRESUPUESTO CONTRATADO
S/
INC IGV
PRESUPUESTO CONTRATADO
S/
ITEM
SIN IGV
FECHA
NOVIEMBRE 2016
FECHA PRESUPUESTO
DESCRIPCION
ACTUAL
1.00
VALORIZACIONES
660,069.66
1.10
660,069.66
2.00
REAJUSTES
2.10
PRESUPUESTO CONTRACTUAL
SUB TOTAL
660,069.66
3.00
TOTAL
660,069.66
4.00
AMORTIZACIONES DE ADELANTOS
198,020.90
4.10
ADELANTO DIRECTO
4.20
5.00
D.R.Q.N.C.
5.10
ADELANTO DIRECTO
5.20
ADELANTO DE MATERIALES
0.00
6.00
RETENCIONES
0.00
6.10
7.00
TOTAL GENERAL ( 3 - 4 + 5 + 6 )
IGV
66,006.97
66,006.97
132,013.93
132,013.93
0.00
0.00
462,048.76
18%
83,168.78
VALORIZACION N. 01
6.00
PENALIDADES
6.10
7.00
SALDO A CANCELAR
545,217.54
Multa por Aplicar S/.
0.00
VALORIZACION N. 01
N GENERAL VALORIZACIN N 01
NOVIEMBRE 2016
Saldo a Reintegrar
0.00
Montos S/.
S/.
462,048.76
S/.
83,168.78
S/.
545,217.54
EJECUTA
SUPERVISION
SUPERVISOR
RESIDENTE
MES VALORIZADO
MONTO DEL PRESUPUESTO BASE
FECHA PRESUPUESTO BASE
MONTO DEL PRESUP. CONTRATADO CON IGV:
FACTOR DE RELACION
ADELANTO DIRECTO EN EFECT. CON IGV 18%:
Valorizacion N
Fecha
01
02 JUNIO-15JUNIO 2016
Adelanto en
Efectivo sin IGV
Valorizacin de Obra
S/.
AMORTIZACION
MES (S/.)
0.00
660,069.66
66,006.97
0.00
660,069.66
66,006.97
02
03
04
05
06
07
08
TOTAL
66,006.97
0.00
66,006.97
10.00%
(incl. I.G.V.)
(incl. I.G.V.)
% AUTORIZADO
SALDO A
AMORTIZAR
(66,006.97)
(66,006.97)
VALORIZACION DE OBRA N 01
OBRA
ENTIDAD
UBICACIN
CONTRATISTA
SUPERVISION
SUPERVISOR
RESIDENTE
MODALIDAD
MONTO CONTRACT.
FIRMA DE CONTRATO
ENTREGA DE TERRENO
PLAZO DE EJECUCION
INICIO DE OBRA
FECHA DE TERMINO PREVISTA
Descripcin
OBRAS PROVISIONALES
ALMACEN, OFICINA DE OBRAS
Und.
Metrado
mes
6.00
Precio S/.
VALORIZACION
AVANCE ACTUAL
ANTERIOR ACUMULADO
Parcial S/.
METRADO
VALORIZADO
METRADO
SALDO
AVANCE ACUMULADO
VALORIZADO
METRADO
VALORIZADO
METRADO
VALORIZADO
300.00
1,800.00
0.00%
0.00
1.00
17.00%
300.00
1.00
17.00%
300.00
5.00
83.00%
1,500.00
3,068.06
48,960.00
0.00%
0.00%
0.00
0.00
2.00
0.30
100.00%
30.00%
3,068.06
14,688.00
2.00
0.30
100.00%
30.00%
3,068.06
14,688.00
0.70
0.00%
70.00%
0.00
34,272.00
01.02
und
2.00
1,534.03
01.03
glb
1.00
48,960.00
02
02.01
SEGURIDAD Y SALUD
EQUIPOS DE PROTECCION INDIVIDUAL
und
1.00
386.06
386.06
0.00%
0.00
1.00
100.00%
386.06
1.00
100.00%
386.06
02.02
und
1.00
2,500.00
0.00%
0.00
1.00
100.00%
2,500.00
1.00
100.00%
2,500.00
0.00%
0.00
1.00
1.00
1,962.21
666.07
2,500.00
1,962.21
und
und
0.00%
0.00%
0.00
0.00
0.20
1.00
20.00%
100.00%
392.44
666.07
0.20
1.00
20.00%
100.00%
392.44
666.07
0.80
-
80.00%
0.00%
1,569.77
0.00
m2
21.70
1.17
25.39
m2
21.70
2.84
61.63
0.00%
0.00%
0.00
0.00
21.70
0.00%
100.00%
0.00
61.63
21.70
0.00%
100.00%
0.00
61.63
21.70
-
100.00%
0.00%
25.39
0.00
24.93
486.88
02.03
02.04
03
03.01
03.01.01
03.01.01.01
03.01.01.02
03.01.02
666.07
0.00%
0.00
CAPATACION DE AGUA
TRABAJOS PRELIMINARES
LIMPIEZA MANUAL DE TERRENO NORMAL
TRAZO Y REPLANTEO INICAL
MOVIMIENTO DE TIERRAS
03.01.02.01
m3
19.53
486.88
0.00%
0.00
0.00%
0.00
0.00%
0.00
19.53
100.00%
03.01.02.02
m2
21.70
2.61
56.64
0.00%
0.00
0.00%
0.00
0.00%
0.00
21.70
100.00%
56.64
03.01.02.03
m3
24.41
15.32
373.96
0.00%
0.00
0.00%
0.00
0.00%
0.00
24.41
100.00%
373.96
03.01.03
03.01.03.01
m3
3.00
374.56
1,123.68
0.00%
0.00
0.00%
0.00
0.00%
0.00
3.00
100.00%
1,123.68
03.01.03.02
m2
20.70
36.22
749.75
03.01.03.03
m2
1.03
427.21
440.03
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
20.70
1.03
100.00%
100.00%
749.75
440.03
03.01.04
03.01.04.01
kg
117.51
5.23
614.58
0.00%
0.00
0.00%
0.00
0.00%
0.00
117.51
100.00%
614.58
03.01.04.02
m2
38.00
52.84
2,007.92
03.01.04.03
m3
3.89
435.50
1,694.10
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
38.00
3.89
100.00%
100.00%
2,007.92
1,694.10
m2
9.69
22.83
221.22
0.00%
0.00
0.00%
0.00
0.00%
0.00
9.69
100.00%
221.22
m2
11.80
19.76
233.17
0.00%
0.00
0.00%
0.00
0.00%
0.00
11.80
100.00%
233.17
m2
11.80
17.18
202.72
0.00%
0.00
0.00%
0.00
0.00%
0.00
11.80
100.00%
202.72
glb
1.12
25.64
28.72
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.12
100.00%
28.72
und
1.00
487.55
487.55
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
487.55
und
1.00
349.21
349.21
glb
1.00
155.55
155.55
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
1.00
1.00
100.00%
100.00%
349.21
155.55
03.01.05
03.01.05.01
03.01.05.02
03.01.06
PINTURA
03.01.06.01
03.01.07
03.01.07.01
03.01.08
03.01.08.01
03.01.08.02
03.01.08.03
03.01.09
03.01.09.01
03.01.10
03.01.10.01
03.02
03.02.01
03.02.01.01
CERCO PERIMTRICO
9.00
25.00
225.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
9.00
100.00%
225.00
24.00
29.24
701.76
0.00%
0.00
0.00%
0.00
0.00%
0.00
24.00
100.00%
701.76
0.00%
0.00%
0.00
0.00
5,594.96
945.27
100.00%
17.00%
9,791.18
1,881.09
5,594.96
945.27
100.00%
17.00%
9,791.18
1,881.09
4,649.69
0.00%
83.00%
0.00
9,252.88
0.00%
0.00
945.27
17.00%
1,077.61
945.27
17.00%
1,077.61
4,649.69
83.00%
5,300.65
und
5,594.96
1.75
9,791.18
03.02.01.02
5,594.96
1.99
03.02.01.03
5,594.96
1.14
11,133.97
6,378.25
03.02.02
MOVIMIENTO DE TIERRAS
03.02.02.01
5,594.96
1.14
6,378.25
0.00%
0.00
945.27
17.00%
1,077.61
945.27
17.00%
1,077.61
4,649.69
83.00%
5,300.65
03.02.02.02
5,594.96
7.93
0.00%
0.00
945.27
17.00%
7,495.99
945.27
17.00%
7,495.99
4,649.69
83.00%
36,872.04
m
m
5,594.96
5,594.96
1.63
7.41
44,368.03
9,119.78
03.02.02.03
03.02.02.04
0.00%
0.00
945.27
17.00%
1,540.79
945.27
17.00%
1,540.79
4,649.69
83.00%
7,578.99
41,458.65
0.00%
0.00
0.00%
0.00
0.00%
0.00
5,594.96
100.00%
41,458.65
03.02.02.05
5,594.96
6.90
38,605.22
m3
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
5,594.96
436.41
100.00%
100.00%
38,605.22
6,685.80
436.41
15.32
6,685.80
2,615.14
14.15
37,004.23
0.00%
0.00
0.00%
0.00
0.00%
0.00
2,615.14
100.00%
37,004.23
03.02.03.02
2,976.82
13.94
03.02.03.03
glb
1.00
992.98
41,496.87
992.98
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
2,976.82
1.00
100.00%
100.00%
41,496.87
992.98
5,594.96
0.54
3,021.28
0.00%
0.00
0.00%
0.00
0.00%
0.00
5,594.96
100.00%
3,021.28
03.02.02.06
03.02.03
03.02.03.01
03.02.03.04
03.03
03.03.01
TRABAJOS PRELIMINARES
03.03.01.01
m2
12.60
1.17
14.74
0.00%
0.00
12.60
100.00%
14.74
12.60
100.00%
14.74
0.00%
0.00
03.03.01.02
m2
12.60
2.84
35.78
0.00%
0.00
12.60
100.00%
35.78
12.60
100.00%
35.78
0.00%
0.00
VALORIZACION DE OBRA N 01
OBRA
ENTIDAD
UBICACIN
CONTRATISTA
SUPERVISION
SUPERVISOR
RESIDENTE
MODALIDAD
MONTO CONTRACT.
FIRMA DE CONTRATO
ENTREGA DE TERRENO
PLAZO DE EJECUCION
INICIO DE OBRA
FECHA DE TERMINO PREVISTA
Descripcin
TRAZO Y REPLANTEO DE NIVELES DURANTE EL PROCESO
Und.
Metrado
Precio S/.
VALORIZACION
AVANCE ACTUAL
ANTERIOR ACUMULADO
Parcial S/.
METRADO
VALORIZADO
METRADO
SALDO
AVANCE ACUMULADO
VALORIZADO
METRADO
VALORIZADO
METRADO
VALORIZADO
12.60
1.99
25.07
0.00%
0.00
12.60
100.00%
25.07
12.60
100.00%
25.07
0.00%
6.30
30.00
189.00
0.00%
0.00
6.30
100.00%
189.00
6.30
100.00%
189.00
0.00%
0.00
0.00
0.00%
0.00
100.00%
125.47
12.60
100.00%
20.54
MOVIMIENTO DE TIERRAS
03.03.02.01
m3
03.03.02.02
m3
8.19
15.32
125.47
0.00%
0.00
03.03.02.03
12.60
1.63
20.54
0.00%
0.00
12.60
36.22
456.37
0.00%
0.00
0.00%
0.00
03.03.03
03.03.03.01
03.03.04
m2
m3
0.00%
0.00
100.00%
20.54
0.00%
0.00
12.60
8.19
-
0.00%
0.00
12.60
100.00%
456.37
11.09
370.80
0.00%
0.00
0.00%
0.00
0.00%
0.00
11.09
100.00%
4,112.17
87.56
40.05
4,112.17
3,506.78
m2
0.00%
0.00
0.00%
0.00
0.00%
0.00
87.56
100.00%
3,506.78
03.03.04.03
03.03.05
kg
996.56
5.23
5,212.01
0.00%
0.00
0.00%
0.00
0.00%
0.00
996.56
100.00%
5,212.01
03.03.05.01
m2
45.26
30.73
0.00%
0.00
0.00%
0.00
0.00%
0.00
45.26
100.00%
1,390.84
m2
75.35
19.76
0.00%
0.00
0.00%
0.00
0.00%
0.00
75.35
100.00%
1,488.92
0.00%
0.00
0.00%
0.00
0.00%
0.00
59.51
100.00%
1,022.38
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
85.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
1.00
1.00
100.00%
100.00%
487.55
350.00
03.03.04.01
03.03.04.02
03.03.05.02
03.03.06
03.03.06.01
PINTURA
PINTURA LATEX EN MUROS EXTERIORES
03.03.07
03.03.07.01
03.03.08
03.03.08.01
03.03.08.02
59.51
17.18
1,022.38
und
1.00
85.00
85.00
und
1.00
487.55
487.55
und
JUNTAS
WATER STOP DE PVC DE 6" PROVISION Y COLOCADO DE JUNTA
03.03.10
CONTROL DE CALIDAD
03.03.10.02
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
m2
03.03.09
03.03.09.01
03.03.10.01
1,390.84
1,488.92
1.00
350.00
350.00
15.60
11.29
176.12
0.00%
0.00
0.00%
0.00
0.00%
0.00
15.60
100.00%
176.12
und
1.00
350.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
350.00
und
18.00
25.00
350.00
450.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
18.00
100.00%
450.00
m2
2.14
1.17
0.00%
0.00
2.14
100.00%
2.50
2.14
100.00%
2.50
0.00%
0.00
2.14
2.84
2.50
6.08
m2
0.00%
0.00
2.14
100.00%
6.08
2.14
100.00%
6.08
0.00%
0.00
24.93
11.72
0.00%
0.00%
0.00
0.00
0.47
2.14
100.00%
100.00%
11.72
3.49
0.47
2.14
100.00%
100.00%
11.72
3.49
0.00%
0.00%
0.00
0.00
TRABAJOS PRELIMINARES
LIMPIEZA MANUAL DE TERRENO NORMAL
TRAZO Y REPLANTEO INICAL
MOVIMIENTO DE TIERRAS
03.04.02.01
m3
0.47
03.04.02.02
2.14
1.63
3.49
03.04.02.03
m3
0.30
15.32
4.60
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.30
100.00%
4.60
m2
1.56
36.22
56.50
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.56
100.00%
56.50
03.04.03
03.04.03.01
03.04.04
03.04.04.01
03.04.04.02
m3
m2
1.07
14.14
374.56
52.84
400.78
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.07
100.00%
400.78
747.16
03.04.04.03
kg
112.73
5.23
589.58
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
14.14
112.73
100.00%
100.00%
747.16
589.58
m2
17.92
19.76
354.10
0.00%
0.00
0.00%
0.00
0.00%
0.00
17.92
100.00%
354.10
m2
12.91
17.18
221.79
0.00%
0.00
0.00%
0.00
0.00%
0.00
12.91
100.00%
221.79
und
und
1.00
1.00
487.55
350.00
487.55
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
487.55
350.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
350.00
03.04.05
03.04.05.01
03.04.06
03.04.06.01
03.04.07
03.04.07.01
03.04.07.02
03.05
03.05.01
03.05.01.01
m2
12.60
1.17
14.74
0.00%
0.00
03.05.01.02
m2
12.60
2.84
35.78
03.05.01.03
12.60
1.99
25.07
0.00%
0.00%
0.00
0.00
03.05.02
03.05.02.01
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA EN TERRENO SEMIROCOSO CON RETROEXCAVADORA
12.60
0.00%
0.00
100.00%
0.00%
35.78
0.00
12.60
-
0.00%
0.00
12.60
100.00%
14.74
100.00%
0.00%
35.78
0.00
12.60
0.00%
100.00%
0.00
25.07
6.30
30.00
189.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
6.30
100.00%
189.00
03.05.02.02
m3
8.19
15.32
125.47
03.05.02.03
12.60
1.63
20.54
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
8.19
12.60
100.00%
100.00%
125.47
20.54
03.05.03
03.05.03.01
03.05.04
03.05.04.01
03.05.04.02
03.05.04.03
03.05.05
m3
m2
12.60
36.22
456.37
0.00%
0.00
0.00%
0.00
0.00%
0.00
12.60
100.00%
456.37
m3
11.09
370.80
4,112.17
0.00%
0.00
0.00%
0.00
0.00%
0.00
11.09
100.00%
4,112.17
m2
kg
87.96
996.56
40.05
5.23
3,522.80
0.00%
0.00
0.00%
0.00
0.00%
0.00
87.96
100.00%
3,522.80
5,212.01
0.00%
0.00
0.00%
0.00
0.00%
0.00
996.56
100.00%
5,212.01
VALORIZACION DE OBRA N 01
OBRA
ENTIDAD
UBICACIN
CONTRATISTA
SUPERVISION
SUPERVISOR
RESIDENTE
MODALIDAD
MONTO CONTRACT.
FIRMA DE CONTRATO
ENTREGA DE TERRENO
PLAZO DE EJECUCION
INICIO DE OBRA
FECHA DE TERMINO PREVISTA
Descripcin
03.06.01.02
03.06.02
03.06.02.01
03.06.02.02
03.06.02.03
03.06.03
03.06.03.01
03.06.04
METRADO
VALORIZADO
METRADO
SALDO
AVANCE ACUMULADO
VALORIZADO
METRADO
VALORIZADO
METRADO
VALORIZADO
1,488.92
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
45.26
75.35
100.00%
100.00%
1,390.84
1,488.92
17.18
1,022.38
0.00%
0.00
0.00%
0.00
0.00%
0.00
59.51
100.00%
1,022.38
85.00
85.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
85.00
1.00
487.55
487.55
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
1.00
1.00
100.00%
100.00%
487.55
350.00
30.73
1,390.84
m2
75.35
19.76
m2
59.51
und
1.00
und
PINTURA
PINTURA LATEX EN MUROS EXTERIORES
HIPOCLORADOR DE FLUJO DIFUSO
SUMINISTRO E INSTALACION DE HIPOCLORADOR PVC DIFUSO
TAPAS METALICAS Y ACCESORIOS
MARCO Y TAPA METALICA PLANCHA LAC. 2MM C/MECAN 0.6M x 0.6M
ESCALERA METALICA TIPO GATO
WATER STOP DE PVC DE 6" PROVISION Y COLOCADO DE JUNTA
CONTROL DE CALIDAD
03.06.01.01
VALORIZACION
AVANCE ACTUAL
ANTERIOR ACUMULADO
Parcial S/.
45.26
JUNTAS
03.06
03.06.01
Precio S/.
m2
03.05.09.01
03.05.10
03.05.10.02
Metrado
03.05.09
03.05.10.01
Und.
und
m
1.00
350.00
350.00
15.60
11.29
176.12
0.00%
0.00
0.00%
0.00
0.00%
0.00
15.60
100.00%
176.12
350.00
450.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
350.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
18.00
100.00%
450.00
100.00%
3.51
und
1.00
350.00
und
18.00
25.00
m2
3.00
1.17
0.00%
0.00
3.00
2.84
3.51
8.52
m2
0.00%
0.00
m3
0.66
24.93
16.45
m2
3.00
2.61
7.83
0.00%
0.00%
m3
0.30
15.32
4.60
m2
2.19
36.22
79.32
0.00%
0.00
100.00%
8.52
3.00
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00%
0.00%
0.00
0.00%
3.00
0.00%
0.00
3.00
100.00%
8.52
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00%
0.00
0.66
3.00
100.00%
100.00%
16.45
7.83
0.00
0.30
100.00%
4.60
0.00
2.19
100.00%
79.32
03.06.04.01
03.06.04.02
m3
m2
1.50
19.80
374.56
52.84
561.84
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.50
100.00%
561.84
1,046.23
0.00%
0.00
0.00%
0.00
0.00%
0.00
19.80
100.00%
1,046.23
03.06.04.03
kg
157.82
5.23
825.40
0.00%
0.00
0.00%
0.00
0.00%
0.00
157.82
100.00%
825.40
m2
25.09
19.76
495.78
0.00%
0.00
0.00%
0.00
0.00%
0.00
25.09
100.00%
495.78
m2
18.07
17.18
310.44
0.00%
0.00
0.00%
0.00
0.00%
0.00
18.07
100.00%
310.44
und
1.00
487.55
487.55
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
487.55
und
1.00
350.00
350.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
350.00
03.06.05
03.06.05.01
03.06.06
03.06.06.01
03.06.07
03.06.07.01
03.06.07.02
03.07
03.07.01
03.07.01.01
03.07.01.02
m
m
10,198.02
10,198.02
1.75
1.99
17,846.54
0.00%
0.00
100.00%
17,846.54
100.00%
17,846.54
0.00%
0.00
20,294.06
03.07.01.03
10,198.02
1.14
11,625.74
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
10,198.02
10,198.02
100.00%
100.00%
20,294.06
11,625.74
11,625.74
0.00%
0.00
0.00%
0.00
0.00%
0.00
10,198.02
100.00%
11,625.74
80,870.30
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
10,198.02
10,198.02
100.00%
100.00%
80,870.30
16,622.77
0.00%
0.00
0.00%
0.00
0.00%
0.00
10,198.02
100.00%
75,567.33
03.07.02
10,198.02
10,198.02
MOVIMIENTO DE TIERRAS
03.07.02.01
03.07.02.02
m
m
10,198.02
10,198.02
1.14
7.93
03.07.02.03
10,198.02
1.63
03.07.02.04
10,198.02
7.41
03.07.02.05
03.07.02.06
m
m3
10,198.02
795.45
6.90
15.32
70,366.34
0.00%
0.00
0.00%
0.00
0.00%
0.00
10,198.02
100.00%
70,366.34
12,186.29
0.00%
0.00
0.00%
0.00
0.00%
0.00
795.45
100.00%
12,186.29
m
m
2,700.53
7,497.49
13.94
17.94
37,645.39
0.00%
0.00
0.00%
0.00
0.00%
0.00
2,700.53
100.00%
37,645.39
134,504.97
0.00%
0.00
0.00%
0.00
0.00%
0.00
7,497.49
100.00%
134,504.97
585.24
0.54
316.03
0.00%
0.00
0.00%
0.00
0.00%
0.00
585.24
100.00%
316.03
0.00%
0.00%
0.00
0.00
0.00%
100.00%
0.00
1,757.88
0.00%
100.00%
0.00
1,757.88
1,004.50
-
100.00%
0.00%
1,145.13
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
1,004.50
100.00%
1,998.96
26,177.27
8,297.17
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
1,004.50
1,004.50
100.00%
100.00%
26,177.27
8,297.17
6,931.05
0.00%
0.00
0.00%
0.00
0.00%
0.00
1,004.50
100.00%
6,931.05
1,000.24
0.00%
0.00
0.00%
0.00
0.00%
0.00
65.29
100.00%
1,000.24
03.07.03
03.07.03.01
03.07.03.02
03.07.04
03.07.04.01
03.08
03.08.01
16,622.77
75,567.33
03.08.01.01
1,004.50
1.14
1,145.13
03.08.01.02
1,004.50
1.75
1,004.50
1.99
1,757.88
1,998.96
26.06
03.08.01.03
03.08.02
03.08.02.01
1,004.50
03.08.02.02
1,004.50
8.26
03.08.02.03
03.08.02.04
m
m3
1,004.50
65.29
6.90
15.32
03.08.03
CONEXIONES DOMICILIARIAS
1,004.50
1,004.50
VALORIZACION DE OBRA N 01
OBRA
ENTIDAD
UBICACIN
CONTRATISTA
SUPERVISION
SUPERVISOR
RESIDENTE
MODALIDAD
MONTO CONTRACT.
FIRMA DE CONTRATO
ENTREGA DE TERRENO
PLAZO DE EJECUCION
INICIO DE OBRA
FECHA DE TERMINO PREVISTA
Descripcin
Und.
Metrado
Precio S/.
VALORIZACION
AVANCE ACTUAL
ANTERIOR ACUMULADO
Parcial S/.
METRADO
VALORIZADO
METRADO
SALDO
AVANCE ACUMULADO
VALORIZADO
METRADO
VALORIZADO
METRADO
VALORIZADO
1,273.24
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
278.00
278.00
100.00%
100.00%
66,152.88
1,273.24
und
278.00
237.96
66,152.88
und
278.00
4.58
VARIOS
PRUEBA HIDRAULICA A ZANJA ABIERTA
1,004.50
1.14
1,145.13
0.00%
0.00
0.00%
0.00
0.00%
0.00
1,004.50
100.00%
1,145.13
1,004.50
0.54
542.43
0.00%
0.00
0.00%
0.00
0.00%
0.00
1,004.50
100.00%
542.43
m2
12.15
1.17
14.22
m2
12.15
2.84
34.51
0.00%
0.00%
0.00
0.00
0.00%
100.00%
0.00
34.51
0.00%
100.00%
0.00
34.51
12.15
-
100.00%
0.00%
14.22
0.00
12.15
12.15
MOVIMIENTO DE TIERRAS
03.09.02.01
03.09.02.02
m3
m3
14.58
17.58
30.00
15.32
437.40
0.00%
0.00
0.00%
0.00
0.00%
0.00
14.58
100.00%
437.40
269.33
03.09.02.03
m2
12.15
2.61
31.71
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
17.58
12.15
100.00%
100.00%
269.33
31.71
03.09.03
03.09.03.01
03.09.04
03.09.04.01
03.09.04.02
03.09.04.03
03.09.05
03.09.05.01
m2
7.89
36.22
285.78
0.00%
0.00
0.00%
0.00
0.00%
0.00
7.89
100.00%
285.78
m3
7.93
374.56
0.00%
0.00
0.00%
0.00
0.00%
0.00
7.93
100.00%
2,970.26
m2
kg
73.92
296.46
52.84
5.23
2,970.26
3,905.93
0.00%
0.00
0.00%
0.00
0.00%
0.00
73.92
100.00%
3,905.93
1,550.49
0.00%
0.00
0.00%
0.00
0.00%
0.00
296.46
100.00%
1,550.49
m2
36.00
30.73
1,106.28
0.00%
0.00
0.00%
0.00
0.00%
0.00
36.00
100.00%
1,106.28
m2
9.00
17.18
154.62
0.00%
0.00
0.00%
0.00
0.00%
0.00
9.00
100.00%
154.62
und
32.00
681.58
0.00%
0.00
0.00%
0.00
0.00%
0.00
32.00
100.00%
21,810.56
und
32.00
250.00
21,810.56
8,000.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
32.00
100.00%
8,000.00
und
10.00
120.00
1,200.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
10.00
100.00%
1,200.00
m2
2.56
1.17
3.00
0.00%
0.00
100.00%
3.00
m2
2.56
2.84
7.27
0.00%
0.00
03.09.06
03.09.06.01
PINTURA
PINTURA LATEX EN MUROS EXTERIORES
03.09.07
03.09.07.01
03.09.07.02
03.10
03.10.01
03.11
03.11.01
03.11.01.01
03.11.01.02
03.11.02
03.11.02.01
03.11.02.02
03.11.02.03
0.00%
0.00
2.69
100.00%
67.06
m3
19.90
15.32
304.87
0.00%
0.00
0.00%
0.00
0.00%
0.00
19.90
100.00%
304.87
m2
2.56
2.61
6.68
0.00%
0.00
0.00%
0.00
0.00%
0.00
2.56
100.00%
6.68
m2
1.96
36.22
70.99
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.96
100.00%
70.99
m3
0.96
374.56
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.96
100.00%
359.58
m2
21.12
52.84
359.58
1,115.98
0.00%
0.00
0.00%
0.00
0.00%
0.00
21.12
100.00%
1,115.98
kg
71.32
5.23
373.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
71.32
100.00%
373.00
m2
11.28
30.73
346.63
0.00%
0.00
0.00%
0.00
0.00%
0.00
11.28
100.00%
346.63
m2
5.64
17.18
96.90
0.00%
0.00
0.00%
0.00
0.00%
0.00
5.64
100.00%
96.90
und
6.00
681.58
0.00%
0.00
0.00%
0.00
0.00%
0.00
6.00
100.00%
4,089.48
und
6.00
120.00
4,089.48
720.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
6.00
100.00%
720.00
m2
36.00
1.17
42.12
0.00%
0.00
36.00
100.00%
42.12
m2
5.76
2.84
16.36
0.00%
0.00
m3
9.22
24.93
229.85
m3
8.39
15.32
128.53
0.00%
0.00%
m2
2.88
36.22
104.31
m3
7.41
370.80
2,747.63
m2
kg
8.00
8.00
52.84
5.23
422.72
41.84
PINTURA
PINTURA LATEX EN MUROS EXTERIORES
TAPAS METALICAS Y ACCESORIOS
MARCO Y TAPA METALICA PLANCHA LAC. 2MM C/MECAN 0.3M x 0.3M
SUMINISTRO E INSTALACION DE ACCESORIOS EN VALVULAS DE AIRE
PASE AEREO PARA LINEA DE CONDUCCION
TRABAJOS PRELIMINARES
LIMPIEZA MANUAL DE TERRENO NORMAL
TRAZO Y REPLANTEO INICAL
MOVIMIENTO DE TIERRAS
03.12.03
03.12.03.01
03.12.04
03.12.04.02
03.12.04.03
03.12.05
0.00
0.00
03.11.06.01
03.11.07
03.12.04.01
0.00%
0.00%
03.11.06
03.12.02.02
0.00
03.12.02.01
2.56
7.27
0.00%
03.11.05.01
03.12.01.02
03.12.02
0.00
03.12.01.01
0.00%
100.00%
67.06
03.11.04.03
03.11.05
03.12.01
2.56
24.93
03.11.07.02
03.12
7.27
2.69
03.11.03.01
03.11.04
03.11.07.01
0.00
m3
03.11.04.02
0.00%
100.00%
03.11.03
03.11.04.01
2.56
0.00
0.00%
0.00
100.00%
16.36
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00
0.00%
0.00%
0.00
0.00%
0.00%
0.00
0.00%
0.00
5.76
0.00%
0.00
100.00%
16.36
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00
0.00%
0.00%
0.00
0.00%
0.00
5.76
0.00%
0.00
9.22
8.39
100.00%
100.00%
229.85
128.53
0.00
2.88
100.00%
104.31
0.00
7.41
100.00%
2,747.63
0.00%
0.00
8.00
100.00%
422.72
0.00%
0.00
8.00
100.00%
41.84
VALORIZACION DE OBRA N 01
OBRA
ENTIDAD
UBICACIN
CONTRATISTA
SUPERVISION
SUPERVISOR
RESIDENTE
MODALIDAD
MONTO CONTRACT.
FIRMA DE CONTRATO
ENTREGA DE TERRENO
PLAZO DE EJECUCION
INICIO DE OBRA
FECHA DE TERMINO PREVISTA
Descripcin
TARRAJEO DE TORRES DE ANCLAJE
Und.
m2
Metrado
Precio S/.
Parcial S/.
VALORIZACION
AVANCE ACTUAL
ANTERIOR ACUMULADO
METRADO
VALORIZADO
METRADO
SALDO
AVANCE ACUMULADO
VALORIZADO
METRADO
VALORIZADO
METRADO
VALORIZADO
8.00
30.62
244.96
0.00%
0.00
0.00%
0.00
0.00%
0.00
8.00
100.00%
244.96
16.12
8,201.53
0.00%
0.00
0.00%
0.00
0.00%
0.00
508.78
100.00%
8,201.53
508.78
17.40
16.17
281.36
0.00%
0.00
0.00%
0.00
0.00%
0.00
17.40
100.00%
281.36
glb
1.00
444.67
444.67
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
444.67
glb
1.00
139.87
139.87
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
139.87
ACCESORIOS
ACCESORIOS PARA FIJACION PRINCIPAL
ACCESORIOS PARA FIJACION DE PENDOLA
SISTEMA DE ALCANTARILLADO
RED COLECTORA Y EMISORA
TRABAJOS PRELIMINARES
04.01.01.01
04.01.01.02
m
m
9,822.39
9,822.39
1.14
1.75
11,197.52
0.00%
0.00
1,732.80
18.00%
1,975.39
1,732.80
18.00%
1,975.39
8,089.59
82.00%
9,222.13
17,189.18
04.01.01.03
9,822.39
1.99
19,546.56
0.00%
0.00%
0.00
0.00
9,822.39
1,732.80
100.00%
18.00%
17,189.18
3,448.27
9,822.39
1,732.80
100.00%
18.00%
17,189.18
3,448.27
8,089.59
0.00%
82.00%
0.00
16,098.28
4,124.08
0.00%
0.00
188.40
100.00%
4,124.08
188.40
100.00%
4,124.08
0.00%
0.00
186,298.95
0.00%
0.00
1,544.40
23.00%
43,474.86
1,544.40
23.00%
43,474.86
5,073.68
77.00%
142,824.09
88,574.26
10,727.44
0.00%
0.00
0.00%
0.00
0.00%
0.00
2,471.38
100.00%
88,574.26
0.00
10,727.44
04.01.02
MOVIMIENTO DE TIERRAS
-
04.01.02.01
04.01.02.02
m
m
188.40
6,618.08
21.89
28.15
04.01.02.03
2,471.38
35.84
04.01.02.04
04.01.02.05
m
m3
544.54
39.20
19.70
43.39
0.00%
0.00
544.54
100.00%
1,700.89
0.00%
0.00
30.15
77.00%
1,308.21
30.15
77.00%
1,308.21
9.05
23.00%
392.68
04.01.02.06
m3
367.65
52.08
19,147.21
m3
109.45
65.09
7,124.10
0.00%
0.00%
0.00
0.00
345.81
04.01.02.07
94.00%
0.00%
18,009.78
0.00
345.81
-
94.00%
0.00%
18,009.78
0.00
21.84
109.45
6.00%
100.00%
1,137.43
7,124.10
04.01.02.08
04.01.02.09
m3
m3
72.88
39.68
72.32
32.55
5,270.68
0.00%
0.00
1,291.58
0.00%
0.00
0.00%
0.00
04.01.02.10
9,277.85
4.89
45,368.69
04.01.02.11
9,277.85
7.41
0.00%
0.00%
0.00
0.00
1,732.80
1,732.80
19.00%
19.00%
8,473.39
12,840.05
04.01.02.12
04.01.02.13
m
m
544.54
9,277.85
6.74
7.79
68,748.87
3,670.20
0.00%
0.00
0.00%
0.00
0.00%
72,274.45
0.00%
0.00
1,732.80
19.00%
13,498.51
1,732.80
19.00%
04.01.02.14
PRIMER RELLENO DE ZANJA TSR DN=160MM H=0.30M S/ CLAVE TUBERIA MAT. PRESTAMO
544.54
7.26
3,953.36
04.01.02.15
SEGUNDO RELLENO 100% MAT. PROPIO Y COMP. DE ZANJA TN P/TUB HASTA 1.5m
188.40
18.31
0.00%
0.00%
0.00
0.00
188.40
0.00%
100.00%
0.00
3,449.60
188.40
0.00%
100.00%
0.00
3,449.60
04.01.02.16
04.01.02.17
SEGUNDO RELLENO 100% MAT. PROPIO Y COMP. DE ZANJA TN P/TUB 160m HASTA 1.20m
SEGUNDO RELLENO 100% MAT. PROPIO Y COMP. DE ZANJA TN P/TUB HASTA 2.00m
m
m
544.40
6,618.08
17.39
11.50
3,449.60
9,467.12
0.00%
0.00
0.00%
0.00
0.00%
76,107.92
0.00%
0.00
23.00%
17,760.60
04.01.02.18
SEGUNDO RELLENO 100% MAT. PROPIO Y COMP. DE ZANJA TN P/TUB HASTA 2.50m
2,471.38
12.48
30,842.82
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
04.01.02.19
04.01.03
04.01.03.01
04.01.03.02
04.02
1,544.40
0.00
1,732.80
1,732.80
-
1,544.40
-
0.00%
72.88
100.00%
0.00%
0.00
39.68
100.00%
1,291.58
19.00%
19.00%
0.00%
8,473.39
12,840.05
0.00
7,545.05
7,545.05
81.00%
81.00%
36,895.29
55,908.82
5,270.68
0.00
544.54
100.00%
3,670.20
13,498.51
7,545.05
81.00%
58,775.94
544.54
-
100.00%
0.00%
3,953.36
0.00
0.00
544.40
100.00%
9,467.12
23.00%
17,760.60
5,073.68
77.00%
58,347.32
0.00%
0.00%
0.00
0.00
2,471.38
995.90
100.00%
100.00%
30,842.82
15,257.19
m3
995.90
15.32
15,257.19
544.54
24.37
13,270.44
0.00%
0.00
0.00%
0.00
0.00%
0.00
544.54
100.00%
13,270.44
9,277.85
35.14
326,023.65
0.00%
0.00
1,732.80
19.00%
60,890.59
1,732.80
19.00%
60,890.59
7,545.05
81.00%
265,133.06
30,950.70
0.00%
0.00
10.00
67.00%
20,633.80
10.00
67.00%
20,633.80
5.00
33.00%
10,316.90
246,480.74
0.00%
0.00%
0.00
0.00
95.00
90.00%
0.00%
220,902.55
0.00
95.00
-
90.00%
0.00%
220,902.55
0.00
11.00
37.00
10.00%
100.00%
25,578.19
112,361.60
0.00%
0.00
0.00%
0.00
0.00%
0.00
64.00
100.00%
131,200.00
CONSTRUCCION DE BUZONES
CONSTRUCCION DE BUZON TIPO I EN TERRENO SEMIROCOSO HASTA 1.50m
CONSTRUCCION DE BUZON TIPO I EN TERRENO SEMIROCOSO DE 1.51m - 2m
und
und
15.00
106.00
2,063.38
2,325.29
04.02.03
und
37.00
3,036.80
und
64.00
2,050.00
04.03
04.03.01
0.00%
0.00
04.02.01
04.02.02
04.02.04
0.00%
112,361.60
131,200.00
CONEXIONES DOMICILIARIAS
TRABAJOS PRELIMINARES
04.03.01.01
834.00
1.14
0.00%
0.00
0.00%
0.00
0.00%
0.00
834.00
100.00%
950.76
834.00
1.75
950.76
1,459.50
04.03.01.02
0.00%
0.00
0.00%
0.00
0.00%
0.00
834.00
100.00%
1,459.50
834.00
1.99
1,659.66
0.00%
0.00
0.00%
0.00
0.00%
0.00
834.00
100.00%
1,659.66
21,734.04
6,179.94
0.00%
0.00
0.00%
0.00
0.00%
0.00
834.00
100.00%
21,734.04
0.00%
0.00
0.00%
0.00
0.00%
0.00
834.00
100.00%
6,179.94
10,641.84
0.00%
0.00
0.00%
0.00
0.00%
0.00
834.00
100.00%
10,641.84
04.03.01.03
04.03.02
04.03.02.01
834.00
26.06
04.03.02.02
04.03.02.03
m
m
834.00
834.00
7.41
12.76
04.03.02.04
m3
104.34
15.32
1,598.49
0.00%
0.00
0.00%
0.00
0.00%
0.00
104.34
100.00%
1,598.49
und
278.00
465.76
129,481.28
0.00%
0.00
0.00%
0.00
0.00%
0.00
278.00
100.00%
129,481.28
04.03.03
04.03.03.01
04.04
04.04.01
04.04.02
05
05.01
05.01.01
05.01.01.01
05.01.01.01.01
05.01.01.01.02
05.01.01.02
CONEXIONES DOMICILIARIAS
CONEXION DE DESAGUE
VARIOS
PRUEBA HIDRAULICA A ZANJA ABIERTA
9,822.39
1.14
11,197.52
9,822.39
1.74
17,090.96
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
9,822.39
9,822.39
100.00%
100.00%
11,197.52
17,090.96
429.70
43.21
1.17
2.84
502.75
0.00%
0.00
0.00%
0.00
0.00%
0.00
429.70
100.00%
502.75
122.72
0.00%
0.00
0.00%
0.00
0.00%
0.00
43.21
100.00%
122.72
m2
m2
VALORIZACION DE OBRA N 01
OBRA
ENTIDAD
UBICACIN
CONTRATISTA
SUPERVISION
SUPERVISOR
RESIDENTE
MODALIDAD
MONTO CONTRACT.
FIRMA DE CONTRATO
ENTREGA DE TERRENO
PLAZO DE EJECUCION
INICIO DE OBRA
FECHA DE TERMINO PREVISTA
Descripcin
Und.
Metrado
Precio S/.
VALORIZADO
METRADO
SALDO
AVANCE ACUMULADO
VALORIZADO
METRADO
VALORIZADO
METRADO
VALORIZADO
112.78
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
42.26
43.21
100.00%
100.00%
1,267.80
112.78
1,083.97
0.00%
0.00
0.00%
0.00
0.00%
0.00
42.26
100.00%
1,083.97
15.32
459.60
0.00%
0.00
0.00%
0.00
0.00%
0.00
30.00
100.00%
459.60
m3
42.26
05.01.01.02.02
m2
43.21
2.61
05.01.01.02.03
m3
42.26
25.65
m3
30.00
05.01.01.03
METRADO
05.01.01.02.01
05.01.01.02.04
VALORIZACION
AVANCE ACTUAL
ANTERIOR ACUMULADO
Parcial S/.
30.00
1,267.80
CONCRETO SIMPLE
05.01.01.03.01
m2
7.06
36.22
255.71
0.00%
0.00
0.00%
0.00
0.00%
0.00
7.06
100.00%
255.71
05.01.01.04
05.01.01.04.01
CONCRETO ARMADO
CONCRETO EN CAMARA DE REJAS f'c=210kg/cm2
m3
5.73
435.50
2,495.42
kg
237.95
5.23
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
5.73
237.95
100.00%
100.00%
2,495.42
1,244.48
m2
56.62
44.72
1,244.48
2,532.05
0.00%
0.00
0.00%
0.00
0.00%
0.00
56.62
100.00%
2,532.05
m2
35.41
35.81
1,268.03
0.00%
0.00
0.00%
0.00
0.00%
0.00
35.41
100.00%
1,268.03
und
1.00
275.77
275.77
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
275.77
m2
23.76
2.84
67.48
0.00%
0.00
0.00%
0.00
0.00%
0.00
23.76
100.00%
67.48
m3
81.41
30.00
2,442.30
0.00%
0.00
0.00%
0.00
0.00%
0.00
81.41
100.00%
2,442.30
65.15
05.01.01.04.02
05.01.01.04.03
05.01.01.05
05.01.01.05.01
05.01.01.06
COMPUERTAS Y ACCESORIOS
05.01.01.06.01
05.01.02
05.01.02.01
05.01.02.01.01
05.01.02.02
05.01.02.02.01
COMPUERTAS Y ACCESORIOS
TANQUE IMHOFF
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO INICAL
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA EN TERRENO SEMIROCOSO CON RETROEXCAVADORA
05.01.02.02.02
m2
24.96
2.61
05.01.02.02.03
m3
25.00
25.65
641.25
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
24.96
25.00
100.00%
100.00%
65.15
641.25
m3
170.70
15.32
2,615.12
0.00%
0.00
0.00%
0.00
0.00%
0.00
170.70
100.00%
2,615.12
05.01.02.02.04
05.01.02.03
05.01.02.03.01
05.01.02.04
05.01.02.04.01
05.01.02.04.02
05.01.02.04.03
m2
24.96
36.22
904.05
0.00%
0.00
0.00%
0.00
0.00%
0.00
24.96
100.00%
904.05
m3
kg
32.08
3,362.27
435.50
5.23
13,970.84
0.00%
0.00
0.00%
0.00
0.00%
0.00
32.08
100.00%
13,970.84
17,584.67
0.00%
0.00
0.00%
0.00
0.00%
0.00
3,362.27
100.00%
17,584.67
m2
224.87
40.05
9,006.04
0.00%
0.00
0.00%
0.00
0.00%
0.00
224.87
100.00%
9,006.04
m2
238.96
35.81
8,557.16
0.00%
0.00
0.00%
0.00
0.00%
0.00
238.96
100.00%
8,557.16
glb
1.00
7,800.00
7,800.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
7,800.00
und
4.00
2,646.80
10,587.20
0.00%
0.00
0.00%
0.00
0.00%
0.00
4.00
100.00%
10,587.20
und
2.00
3,146.71
6,293.42
0.00%
0.00
0.00%
0.00
0.00%
0.00
2.00
100.00%
6,293.42
05.01.02.05
05.01.02.05.01
05.01.02.06
05.01.02.06.01
05.01.02.07
05.01.02.07.01
05.01.02.07.02
05.01.03
LECHO DE SECADO
05.01.03.01
OBRAS PRELIMINARES
05.01.03.01.01
05.01.03.02
m2
75.53
2.84
214.51
0.00%
0.00
0.00%
0.00
0.00%
0.00
75.53
100.00%
214.51
05.01.03.02.01
m3
501.06
30.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
501.06
100.00%
15,031.80
05.01.03.02.02
m2
79.21
2.61
15,031.80
206.74
0.00%
0.00
0.00%
0.00
0.00%
0.00
79.21
100.00%
206.74
05.01.03.02.03
05.01.03.02.04
m3
m3
39.30
577.19
25.65
15.32
1,008.05
0.00%
0.00
0.00%
0.00
0.00%
0.00
39.30
100.00%
1,008.05
8,842.55
0.00%
0.00
0.00%
0.00
0.00%
0.00
577.19
100.00%
8,842.55
05.01.03.03
CONCRETO SIMPLE
05.01.03.03.01
m2
42.25
36.22
1,530.30
0.00%
0.00
0.00%
0.00
0.00%
0.00
42.25
100.00%
1,530.30
05.01.03.04
05.01.03.04.01
CONCRETO ARMADO
CONCRETO EN LOSAS CIMENTACION f'c=210 kg/cm2
m3
67.42
435.50
29,361.41
0.00%
0.00
0.00%
0.00
0.00%
0.00
67.42
100.00%
29,361.41
kg
1,684.14
5.23
0.00%
0.00
0.00%
0.00
0.00%
0.00
1,684.14
100.00%
8,808.05
153.76
40.05
8,808.05
6,158.09
m2
0.00%
0.00
0.00%
0.00
0.00%
0.00
153.76
100.00%
6,158.09
m2
21.60
35.81
773.50
0.00%
0.00
0.00%
0.00
0.00%
0.00
21.60
100.00%
773.50
glb
1.00
950.00
950.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
950.00
140.00
29.24
4,093.60
0.00%
0.00
0.00%
0.00
0.00%
0.00
140.00
100.00%
4,093.60
m2
429.70
1.17
m2
43.21
2.84
502.75
122.72
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
429.70
43.21
100.00%
100.00%
502.75
122.72
05.01.03.04.02
05.01.03.04.03
05.01.03.05
05.01.03.05.01
05.01.03.06
VARIOS
05.01.03.06.01
05.01.03.07
05.01.03.07.01
05.02
05.02.01
05.02.01.01
05.02.01.01.01
05.02.01.01.02
05.02.01.02
05.02.01.02.01
05.02.01.02.02
CERCO PERIMTRICO
PTAR 1
CAMARA DE REJAS
OBRAS PRELIMINARES
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA EN TERRENO SEMIROCOSO CON RETROEXCAVADORA
REFINE Y NIVELACION INTERIOR Y APISIONADO MANUAL EN TSR
0.00
m3
42.26
30.00
1,267.80
0.00%
0.00
0.00%
0.00
0.00%
0.00
42.26
100.00%
1,267.80
m2
43.21
2.61
112.78
0.00%
0.00
0.00%
0.00
0.00%
0.00
43.21
100.00%
112.78
VALORIZACION DE OBRA N 01
OBRA
ENTIDAD
UBICACIN
CONTRATISTA
SUPERVISION
SUPERVISOR
RESIDENTE
MODALIDAD
MONTO CONTRACT.
FIRMA DE CONTRATO
ENTREGA DE TERRENO
PLAZO DE EJECUCION
INICIO DE OBRA
FECHA DE TERMINO PREVISTA
Descripcin
Und.
Metrado
Precio S/.
VALORIZACION
AVANCE ACTUAL
ANTERIOR ACUMULADO
Parcial S/.
METRADO
VALORIZADO
METRADO
SALDO
AVANCE ACUMULADO
VALORIZADO
METRADO
VALORIZADO
METRADO
459.60
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
42.26
30.00
100.00%
100.00%
m3
42.26
25.65
1,083.97
m3
30.00
15.32
VALORIZADO
1,083.97
459.60
CONCRETO SIMPLE
m2
7.06
36.22
255.71
0.00%
0.00
0.00%
0.00
0.00%
0.00
7.06
100.00%
255.71
m3
5.73
435.50
2,495.42
0.00%
0.00
0.00%
0.00
0.00%
0.00
5.73
100.00%
2,495.42
kg
m2
237.95
56.62
5.23
44.72
1,244.48
0.00%
0.00
0.00%
0.00
0.00%
0.00
237.95
100.00%
1,244.48
2,532.05
0.00%
0.00
0.00%
0.00
0.00%
0.00
56.62
100.00%
2,532.05
m2
35.41
35.81
1,268.03
0.00%
0.00
0.00%
0.00
0.00%
0.00
35.41
100.00%
1,268.03
und
1.00
275.77
275.77
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
275.77
05.02.02.01
TRABAJOS PRELIMINARES
05.02.02.01.01
05.02.02.02
m2
58.58
2.84
166.37
0.00%
0.00
0.00%
0.00
0.00%
0.00
58.58
100.00%
166.37
05.02.02.02.01
m3
476.87
30.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
476.87
100.00%
14,306.10
05.02.02.02.02
05.02.02.02.03
m2
m3
58.58
243.32
2.61
25.65
14,306.10
152.89
0.00%
0.00
0.00%
0.00
0.00%
0.00
58.58
100.00%
152.89
6,241.16
0.00%
0.00
0.00%
0.00
0.00%
0.00
243.32
100.00%
6,241.16
05.02.02.02.04
m3
243.32
15.32
3,727.66
0.00%
0.00
0.00%
0.00
0.00%
0.00
243.32
100.00%
3,727.66
05.02.02.03
05.02.02.03.01
05.02.02.04
05.02.02.04.01
05.02.02.04.02
05.02.02.04.03
05.02.02.05
05.02.02.05.01
m2
58.72
36.22
2,126.84
0.00%
0.00
0.00%
0.00
0.00%
0.00
58.72
100.00%
2,126.84
m3
71.13
435.50
30,977.12
kg
2,351.23
5.23
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
71.13
2,351.23
100.00%
100.00%
30,977.12
12,296.93
m2
605.91
40.05
12,296.93
24,266.70
0.00%
0.00
0.00%
0.00
0.00%
0.00
605.91
100.00%
24,266.70
m2
403.28
35.81
14,441.46
0.00%
0.00
0.00%
0.00
0.00%
0.00
403.28
100.00%
14,441.46
glb
1.00
7,800.00
7,800.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
7,800.00
und
4.00
2,646.80
10,587.20
und
2.00
3,146.71
6,293.42
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
4.00
2.00
100.00%
100.00%
10,587.20
6,293.42
05.02.02.06
INSTALACIONES HIDRAULICAS
05.02.02.06.01
05.02.02.07
05.02.02.07.01
05.02.02.07.02
05.02.03
05.02.03.01
LECHO DE SECADO
OBRAS PRELIMINARES
m2
75.53
2.84
214.51
0.00%
0.00
0.00%
0.00
0.00%
0.00
75.53
100.00%
214.51
05.02.03.02.01
05.02.03.02.02
m3
m2
501.06
79.21
30.00
2.61
15,031.80
0.00%
0.00
0.00%
0.00
0.00%
0.00
501.06
100.00%
15,031.80
206.74
05.02.03.02.03
m3
39.30
25.65
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
79.21
39.30
100.00%
100.00%
206.74
1,008.05
m3
577.19
15.32
1,008.05
8,842.55
05.02.03.02.04
0.00%
0.00
0.00%
0.00
0.00%
0.00
577.19
100.00%
8,842.55
m2
42.25
36.22
1,530.30
0.00%
0.00
0.00%
0.00
0.00%
0.00
42.25
100.00%
1,530.30
m3
67.42
435.50
29,361.41
0.00%
0.00
0.00%
0.00
0.00%
0.00
67.42
100.00%
29,361.41
kg
m2
1,684.14
153.76
5.23
40.05
8,808.05
0.00%
0.00
0.00%
0.00
0.00%
0.00
1,684.14
100.00%
8,808.05
6,158.09
0.00%
0.00
0.00%
0.00
0.00%
0.00
153.76
100.00%
6,158.09
m2
21.60
35.81
773.50
0.00%
0.00
0.00%
0.00
0.00%
0.00
21.60
100.00%
773.50
glb
1.00
950.00
950.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
950.00
140.00
29.24
4,093.60
0.00%
0.00
0.00%
0.00
0.00%
0.00
140.00
100.00%
4,093.60
m2
m2
5.53
3.15
1.17
2.84
6.47
0.00%
0.00
5.53
100.00%
6.47
5.53
100.00%
6.47
0.00%
0.00
8.95
0.00%
0.00
3.15
100.00%
8.95
3.15
100.00%
8.95
0.00%
0.00
293.70
9.79
100.00%
293.70
0.00%
0.00
05.02.03.01.01
05.02.03.02
05.02.03.03
05.02.03.03.01
CONCRETO SIMPLE
SOLADO DE CONCRETO E=4" DE CONCRETO 1:10
05.02.03.04
CONCRETO ARMADO
05.02.03.04.01
05.02.03.04.02
05.02.03.04.03
05.02.03.05
05.02.03.05.01
05.02.03.06
05.02.03.06.01
05.02.03.07
05.02.03.07.01
05.03
05.03.01
05.03.01.01
05.03.01.01.01
05.03.01.01.02
05.03.01.02
CAMARA DE REJAS
OBRAS PRELIMINARES
LIMPIEZA MANUAL DE TERRENO NORMAL
TRAZO Y REPLANTEO INICAL
MOVIMIENTO DE TIERRAS
05.03.01.02.01
m3
9.79
30.00
293.70
0.00%
0.00
9.79
100.00%
05.03.01.02.02
05.03.01.02.03
m2
m3
5.53
5.95
2.61
25.65
14.43
0.00%
0.00
5.53
100.00%
14.43
5.53
100.00%
14.43
0.00%
0.00
152.62
0.00%
0.00
5.95
100.00%
152.62
5.95
100.00%
152.62
0.00%
0.00
05.03.01.02.04
m3
4.80
15.32
73.54
0.00%
0.00
4.80
100.00%
73.54
4.80
100.00%
73.54
0.00%
0.00
VALORIZACION DE OBRA N 01
OBRA
ENTIDAD
UBICACIN
CONTRATISTA
SUPERVISION
SUPERVISOR
RESIDENTE
MODALIDAD
MONTO CONTRACT.
FIRMA DE CONTRATO
ENTREGA DE TERRENO
PLAZO DE EJECUCION
INICIO DE OBRA
FECHA DE TERMINO PREVISTA
Descripcin
Und.
Metrado
Precio S/.
VALORIZACION
AVANCE ACTUAL
ANTERIOR ACUMULADO
Parcial S/.
METRADO
VALORIZADO
METRADO
SALDO
AVANCE ACUMULADO
VALORIZADO
METRADO
VALORIZADO
METRADO
VALORIZADO
CONCRETO SIMPLE
m2
3.14
36.22
113.73
0.00%
0.00
3.14
100.00%
113.73
3.14
100.00%
113.73
0.00%
0.00
m3
3.28
435.50
1,428.44
0.00%
0.00
3.28
100.00%
1,428.44
3.28
100.00%
1,428.44
0.00%
0.00
05.03.01.04.02
m2
19.59
44.72
0.00%
0.00
19.59
100.00%
876.06
19.59
100.00%
876.06
0.00%
0.00
kg
396.62
5.23
876.06
2,074.32
05.03.01.04.03
0.00%
0.00
396.62
100.00%
2,074.32
396.62
100.00%
2,074.32
0.00%
0.00
m2
7.48
35.81
267.86
0.00%
0.00
0.00%
0.00
0.00%
0.00
7.48
100.00%
267.86
und
1.00
65.41
65.41
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
65.41
m2
22.94
1.17
0.00%
0.00
22.94
100.00%
26.84
22.94
100.00%
26.84
0.00%
0.00
m2
22.94
2.84
26.84
65.15
0.00%
0.00
22.94
100.00%
65.15
22.94
100.00%
65.15
0.00%
0.00
m3
85.90
30.00
2,577.00
0.00%
0.00
85.90
100.00%
2,577.00
85.90
100.00%
2,577.00
0.00%
0.00
59.87
588.41
0.00%
0.00
22.94
100.00%
59.87
22.94
100.00%
59.87
0.00%
0.00%
0.00
22.94
100.00%
588.41
22.94
100.00%
588.41
0.00%
0.00
1,076.54
0.00%
0.00
0.00%
0.00
0.00%
0.00
100.00%
1,076.54
05.03.01.03.01
05.03.01.04
05.03.01.04.01
05.03.01.05
05.03.01.05.01
05.03.01.06
05.03.01.06.01
05.03.02
05.03.02.01
05.03.02.01.01
05.03.02.01.02
05.03.02.02
05.03.02.02.01
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA EN TERRENO SEMIROCOSO CON RETROEXCAVADORA
0.00
05.03.02.02.02
m2
22.94
2.61
05.03.02.02.03
05.03.02.02.04
m3
m3
22.94
70.27
25.65
15.32
m2
14.52
36.22
525.91
0.00%
0.00
14.52
100.00%
525.91
14.52
100.00%
525.91
0.00%
0.00
m3
9.69
435.50
4,220.00
0.00%
0.00
9.69
100.00%
4,220.00
9.69
100.00%
4,220.00
0.00%
0.00
93.20
794.31
100.00%
100.00%
4,167.90
4,154.24
93.20
794.31
100.00%
100.00%
4,167.90
4,154.24
0.00%
0.00%
0.00
0.00
05.03.02.03
05.03.02.03.01
05.03.02.04
05.03.02.04.01
70.27
CONCRETO SIMPLE
SOLADO DE CONCRETO E=4" DE CONCRETO 1:10
CONCRETO ARMADO
CONCRETO F'C=210KG/CM2
05.03.02.04.02
m2
93.20
44.72
4,167.90
05.03.02.04.03
kg
794.31
5.23
4,154.24
0.00%
0.00%
0.00
0.00
m2
85.95
35.81
3,077.87
0.00%
0.00
0.00%
0.00
0.00%
0.00
85.95
100.00%
3,077.87
und
1.00
56.97
56.97
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.00
100.00%
56.97
m2
60.00
1.17
70.20
m2
14.40
2.84
40.90
0.00%
0.00%
0.00
0.00
60.00
14.40
100.00%
100.00%
70.20
40.90
60.00
14.40
100.00%
100.00%
70.20
40.90
0.00%
0.00%
0.00
0.00
m3
33.93
30.00
1,017.90
0.00%
0.00
33.93
100.00%
1,017.90
33.93
100.00%
1,017.90
m3
42.41
15.32
649.72
0.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
m2
m2
14.14
19.60
36.22
52.84
512.15
0.00%
0.00
14.14
100.00%
512.15
14.14
100.00%
512.15
1,035.66
0.00%
0.00
19.60
100.00%
1,035.66
19.60
100.00%
1,035.66
2.49
100.00%
947.15
2.49
100.00%
05.03.02.05
05.03.02.05.01
05.03.02.06
SISTEMAS DE ADITAMENTO
05.03.02.06.01
05.03.03
05.03.03.01
05.03.03.01.01
05.03.03.01.02
05.03.03.02
05.03.03.02.01
05.03.03.02.02
05.03.03.03
05.03.03.03.01
05.03.03.03.02
05.03.03.04
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
SOLADO DE CONCRETO E=4" MEZACLA 1:10
ENCOFRADO Y DESENCOFRADO DE CIMIENTO CORRIDO
0.00%
0.00
100.00%
649.72
0.00%
0.00
0.00%
0.00
947.15
0.00%
0.00
0.00
42.41
CONCRETO ARMADO
05.03.03.04.01
m3
2.49
380.38
947.15
0.00%
0.00
05.03.03.04.02
05.03.03.04.03
m2
kg
19.21
2,499.52
44.72
5.23
859.07
0.00%
0.00
19.21
100.00%
859.07
19.21
100.00%
859.07
0.00%
13,072.49
0.00%
0.00
2,499.52
100.00%
13,072.49
2,499.52
100.00%
13,072.49
0.00%
0.00
4,167.89
0.00%
0.00
0.00%
0.00
0.00%
0.00
37.33
100.00%
4,167.89
05.03.03.05
MUROS Y TABIQUES
05.03.03.05.01
m2
37.33
111.65
05.03.03.06
05.03.03.06.01
und
2.00
19.30
38.60
0.00%
0.00
0.00%
0.00
0.00%
0.00
2.00
100.00%
38.60
05.03.03.07
FILTROS
m3
m3
5.89
27.35
59.30
51.05
349.28
0.00%
0.00
0.00%
0.00
0.00%
0.00
5.89
100.00%
349.28
1,396.22
0.00%
0.00
0.00%
0.00
0.00%
0.00
27.35
100.00%
1,396.22
0.00%
0.00
05.03.03.07.01
05.03.03.07.02
05.03.04
05.03.04.01
OBRAS PRELIMINARES
05.03.04.01.01
05.03.04.02
m2
4.49
1.17
5.25
0.00%
0.00
4.49
100.00%
5.25
4.49
100.00%
5.25
05.03.04.02.01
m3
6.51
24.93
162.29
m2
2.34
2.61
0.00
0.00
100.00%
0.00%
162.29
0.00
6.51
-
100.00%
0.00%
162.29
0.00
2.34
0.00%
100.00%
0.00
6.11
05.03.04.02.03
05.03.04.02.04
m3
m3
1.81
5.87
19.73
15.32
6.11
35.71
0.00%
0.00%
6.51
05.03.04.02.02
0.00%
0.00
0.00%
0.00
0.00%
0.00
1.81
100.00%
35.71
89.93
0.00%
0.00
0.00%
0.00
0.00%
0.00
5.87
100.00%
89.93
m3
0.95
435.50
413.73
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.95
100.00%
413.73
m2
kg
13.04
39.59
44.72
5.23
583.15
0.00%
0.00
0.00%
0.00
0.00%
0.00
13.04
100.00%
583.15
207.06
0.00%
0.00
0.00%
0.00
0.00%
0.00
39.59
100.00%
207.06
05.03.04.03
05.03.04.03.01
05.03.04.03.02
05.03.04.03.03
05.03.04.04
CONCRETO ARMADO
VALORIZACION DE OBRA N 01
OBRA
ENTIDAD
UBICACIN
CONTRATISTA
SUPERVISION
SUPERVISOR
RESIDENTE
MODALIDAD
MONTO CONTRACT.
FIRMA DE CONTRATO
ENTREGA DE TERRENO
PLAZO DE EJECUCION
INICIO DE OBRA
FECHA DE TERMINO PREVISTA
Descripcin
TARRAJEO CON IMPERMEABILIZANTES
Und.
Metrado
m2
6.94
Precio S/.
35.81
VALORIZACION
AVANCE ACTUAL
ANTERIOR ACUMULADO
Parcial S/.
METRADO
VALORIZADO
METRADO
SALDO
AVANCE ACUMULADO
VALORIZADO
METRADO
VALORIZADO
METRADO
248.52
0.00%
0.00
0.00%
0.00
0.00%
0.00
6.94
100.00%
VALORIZADO
248.52
INSTALACIONES SANITARIAS
OBRAS PRELIMINARES
m2
32.00
1.17
37.44
0.00%
0.00
0.00%
0.00
0.00%
0.00
32.00
100.00%
37.44
m3
9.60
24.93
239.33
0.00%
0.00
0.00%
0.00
0.00%
0.00
9.60
100.00%
239.33
CAMA DE APOYO
RELLENO CON MATERIAL PROPIO
m
m3
32.00
4.80
32.08
19.73
1,026.56
0.00%
0.00
0.00%
0.00
0.00%
0.00
32.00
100.00%
1,026.56
94.70
0.00%
0.00
0.00%
0.00
0.00%
0.00
4.80
100.00%
94.70
TUBERIAS
05.03.05.03.01
4.00
11.73
46.92
0.00%
0.00
0.00%
0.00
0.00%
0.00
4.00
100.00%
46.92
05.03.05.03.02
05.03.05.04
28.00
8.85
247.80
0.00%
0.00
0.00%
0.00
0.00%
0.00
28.00
100.00%
247.80
m3
0.38
380.38
0.00%
0.00
0.00%
0.00
0.00%
0.00
0.38
100.00%
144.54
m2
2.88
44.72
144.54
128.79
0.00%
0.00
0.00%
0.00
0.00%
0.00
2.88
100.00%
128.79
m2
20.00
3.28
0.00%
0.00
0.00%
0.00
0.00%
0.00
20.00
100.00%
65.60
20.00
2.84
65.60
56.80
m2
0.00%
0.00
0.00%
0.00
0.00%
0.00
20.00
100.00%
56.80
m3
36.00
30.00
1,080.00
20.00
1.63
32.60
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
36.00
20.00
100.00%
100.00%
1,080.00
32.60
m3
93.60
15.32
1,433.95
0.00%
0.00
0.00%
0.00
0.00%
0.00
93.60
100.00%
1,433.95
m2
20.00
36.22
724.40
0.00%
0.00
0.00%
0.00
0.00%
0.00
20.00
100.00%
724.40
m3
m2
14.39
172.00
370.80
40.05
5,335.81
0.00%
0.00
0.00%
0.00
0.00%
0.00
14.39
100.00%
5,335.81
6,888.60
0.00%
0.00
0.00%
0.00
0.00%
0.00
172.00
100.00%
6,888.60
kg
289.88
5.23
1,516.07
0.00%
0.00
0.00%
0.00
0.00%
0.00
289.88
100.00%
1,516.07
m2
172.00
30.73
5,285.56
0.00%
0.00
0.00%
0.00
0.00%
0.00
172.00
100.00%
5,285.56
und
2.00
1,583.78
3,167.56
0.00%
0.00
0.00%
0.00
0.00%
0.00
2.00
100.00%
3,167.56
120.00
29.24
3,508.80
0.00%
0.00
0.00%
0.00
0.00%
0.00
120.00
100.00%
3,508.80
m2
92.96
3.28
304.91
0.00%
0.00
0.00%
0.00
0.00%
0.00
92.96
100.00%
304.91
m2
95.96
2.84
272.53
0.00%
0.00
0.00%
0.00
0.00%
0.00
95.96
100.00%
272.53
213.81
30.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
213.81
100.00%
6,414.30
05.03.05.04.01
05.03.05.04.02
05.03.06
05.03.06.01
05.03.06.01.01
05.03.06.01.02
05.03.06.02
05.03.06.02.01
05.03.06.02.02
05.03.06.02.03
05.03.06.03
05.03.06.03.01
05.03.06.04
05.03.06.04.01
05.03.06.04.02
05.03.06.04.03
05.03.06.05
05.03.06.05.01
05.03.06.06
05.03.06.06.01
05.03.06.07
05.03.06.07.01
05.03.07
05.03.07.01
05.03.07.01.01
05.03.07.01.02
05.03.07.02
0.00
05.03.07.02.01
m3
05.03.07.02.02
92.96
1.63
6,414.30
151.52
0.00%
0.00
0.00%
0.00
0.00%
0.00
92.96
100.00%
05.03.07.02.03
05.03.07.02.04
m3
m3
18.59
253.78
19.73
15.32
366.78
0.00%
0.00
0.00%
0.00
0.00%
0.00
18.59
100.00%
366.78
3,887.91
0.00%
0.00
0.00%
0.00
0.00%
0.00
253.78
100.00%
3,887.91
151.52
05.03.07.03
05.03.07.04
m2
92.96
36.22
3,367.01
0.00%
0.00
0.00%
0.00
0.00%
0.00
92.96
100.00%
3,367.01
05.03.07.05
05.03.07.05.01
m3
53.61
370.80
19,878.59
0.00%
0.00
0.00%
0.00
0.00%
0.00
53.61
100.00%
19,878.59
22,622.64
m2
564.86
40.05
0.00%
0.00
0.00%
0.00
0.00%
0.00
564.86
100.00%
kg
1,516.50
5.23
22,622.64
7,931.30
05.03.07.05.03
05.03.07.06
0.00%
0.00
0.00%
0.00
0.00%
0.00
1,516.50
100.00%
7,931.30
05.03.07.06.01
m2
462.50
30.73
14,212.63
TARRAJEO EN EXTERIORES
m2
195.64
19.76
3,865.85
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
462.50
195.64
100.00%
100.00%
14,212.63
3,865.85
4.00
71.32
285.28
0.00%
0.00
0.00%
0.00
0.00%
0.00
4.00
100.00%
285.28
m3
176.64
51.05
9,017.47
0.00%
0.00
0.00%
0.00
0.00%
0.00
176.64
100.00%
9,017.47
52.00
20.80
1,081.60
0.00%
0.00
glb
1.00
36,502.99
36,502.99
0.00%
0.00
mes
6.00
500.00
3,000.00
0.00%
0.00
05.03.07.05.02
05.03.07.06.02
05.03.07.07
05.03.07.07.01
05.03.07.07.02
05.03.08
05.03.08.01
06
06.01
07
INSTALACIONES SANITARIAS
TUBERIA PVC UF DN 10" SERIE 25
MATERIAL FILTRANTE 02
CARPINTERIA METALICA
VERTEDEROS DE REPARTICIION
FLETE
FLETE TERRESTRE
0.60
0.00%
0.00
60.00%
21,901.79
0.00%
0.00
0.60
0.00%
0.00
52.00
100.00%
1,081.60
60.00%
21,901.79
0.40
40.00%
14,601.20
0.00%
0.00
6.00
100.00%
3,000.00
IMPACTO AMBIENTAL
07.01
07.01.01
OBRAS PROVISIONALES
PROVISION E INSTALACION DE SERVICIOS HIGIENICOS
07.02
REFORESTACION
VALORIZACION DE OBRA N 01
OBRA
ENTIDAD
UBICACIN
CONTRATISTA
SUPERVISION
SUPERVISOR
RESIDENTE
MODALIDAD
MONTO CONTRACT.
FIRMA DE CONTRATO
ENTREGA DE TERRENO
PLAZO DE EJECUCION
INICIO DE OBRA
FECHA DE TERMINO PREVISTA
Descripcin
SEMBRADO DE ARBUSTOS DE LA ZONA
Und.
Metrado
Precio S/.
Parcial S/.
VALORIZACION
AVANCE ACTUAL
ANTERIOR ACUMULADO
METRADO
VALORIZADO
METRADO
SALDO
AVANCE ACUMULADO
VALORIZADO
METRADO
VALORIZADO
METRADO
VALORIZADO
m2
530.00
37.73
19,996.90
0.00%
0.00
0.00%
0.00
0.00%
0.00
530.00
100.00%
19,996.90
CAPACITACION Y SENSIBILIZACION
07.03.01
glb
2.00
3,550.00
7,100.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
2.00
100.00%
7,100.00
07.03.02
glb
2.00
3,550.00
7,100.00
0.00%
0.00
0.00%
0.00
0.00%
0.00
2.00
100.00%
7,100.00
COSTO DIRECTO
GASTOS GENERALES 8%
UTILIDADES 7%
SUBTOTAL
IGV 18%
TOTAL PRESUPUESTO
PROCENTAJES
3,445,769.26
275,661.54
241,203.85
3,962,634.65
713,274.24
4,675,908.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
573,973.62
45,917.89
40,178.15
660,069.66
118,812.54
778,882.20
16.66%
573,973.62
45,917.89
40,178.15
660,069.66
118,812.54
778,882.20
16.66%
2,871,795.66
229,743.65
201,025.70
3,302,565.01
594,461.70
3,897,026.71
83.34%
OBRA
ENTIDAD
CONTRATISTA
SUPERVISION
SUPERVISOR
RESIDENTE
MONTO CONTRACTUAL :
VALORIZACION N :
AVA N C E P O RC EN TUA L
MES :
1.2
CURVA
"S"
92.11%
0.8
67.57%
0.6
42.76%
1 6 .6 6 %
0.4
0 .0 0 %
0.00%
0 .0 0 %
11.71%
0 .0 0 %
25.34%
0 .0 0 %
0 .0 0 %
0.2
REAL
ACUMULADO S/..
AVANCE PORCENTUAL
PARCIAL %
ACUMULADO %
MESES
INICIO
26 OCTUBRE - 30 NOVIEMBRE
463,853.94
463,853.94
11.71%
11.71%
26 OCTUBRE - 30 NOVIEMBRE
01 DICIEMBRE - 31 DICIEMBRE
540,254.65
1,004,108.59
13.63%
25.34%
01 DICIEMBRE - 31 DICIEMBRE
01 ENERO - 31 ENERO
690,464.12
1,694,572.71
17.42%
42.76%
01 ENERO - 31 ENERO
01 FEBRERO - 28 FEBRERO
983,038.27
2,677,610.98
24.81%
67.57%
01 FEBRERO - 28 FEBRERO
01 MARZO - 31 MARZO
972,382.92
3,649,993.90
24.54%
92.11%
01 MARZO - 31 MARZO
01 ABRIL - 24 ABRIL
312,640.75
3,962,634.65
7.89%
100.00%
01 ABRIL - 24 ABRIL
TOTAL
3,962,634.65
100.00%
TOTAL
660,069.66
660,069.66
CURVA
"S"
100.00%
92.11%
67.57%
42.76%
0 .0 0 %
0 .0 0 %
0 .0 0 %
0 .0 0 %
34%
AVANCE PORCENTUAL
ACUMULADO S/.
PARCIAL %
ACUMULADO %
0.00%
0.00%
660,069.66
16.66%
16.66%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
16.66%
92.11%
AVANCE MENSUAL
100.00%
67.57%
90.00%
80.00%
42.76%
70.00%
60.00%
25.34%
50.00%
11.71%
30.00%
20.00%
16.66%
40.00%
01 ENERO - 31
ENERO
01 FEBRERO - 28
FEBRERO
0.00%
01 DICIEMBRE - 31
DICIEMBRE
0.00%
26 OCTUBRE - 30
NOVIEMBRE
0.00%
INICIO
0.00%
0.00%
0.00%
0.00%
10.00%
01 MARZO - 31
MARZO
01 ABRIL
PERIODO DE EJECUCION
0.00
INICIO
1.00
2.00
3.00
4.00
5.00
26 OCTUBRE - 30 NOVIE
6.00
01 DICIEMBRE - 31 DICIE
01 ENERO - 31 ENERO
01 FEBRERO - 28 FEBRER
01 MARZO - 31 MARZO
01 ABRIL - 24 ABRIL
0.00%
11.71%
25.34%
42.76%
67.57%
92.11%
100.00%
01 MARZO - 31
MARZO
0.00%
01 FEBRERO - 28
FEBRERO
0.00%
01 ENERO - 31
ENERO
0.00%
EMBRE - 31
BRE
0.00%
0.00%
25.34%
42.76%
67.57%
92.11%
100.00%
PROGRAMADO vs EJECUTADO
01 ABRIL - 24 ABRIL
0.00%
16.66%
0.00%
0.00%
0.00%
0.00%
0.00%